Pampa Energy nine-month profit rises to ARS 738B

San Matías Pipeline is planned as an approximately 470-km, 36-inch line, with capacity up to 28 million m³/day and commissioning expected in the second quarter of 2028.

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

PAM reported revenue of ARS 3,062,922,000,000 and period profit of ARS 737,692,000,000 for the nine months ended September 30, 2026, versus ARS 1,805,519,000,000 and ARS 260,444,000,000, respectively, in 2025. Gross profit was ARS 1,011,925,000,000, and basic and diluted earnings per share were ARS 542.54, versus ARS 191.75. The interim statements are unaudited; an independent review concluded that nothing came to its attention indicating they were not prepared, in all material respects, under IAS 34.

Net cash generated by operating activities fell to ARS 208,184,000,000 from ARS 594,389,000,000. Pampa paid ARS 1,519,436,000,000 for property, plant and equipment acquisitions, and net cash used in investing was ARS 1,540,240,000,000. The net financial result was a loss of ARS 153,101,000,000, compared with a gain of ARS 30,599,000,000.

SMP, in which Pampa holds 20%, entered into a syndicated international loan of up to US$900 million for the San Matías pipeline project; lenders had disbursed US$118 million as of September 30, 2026. The seven-year loan bears interest at Term SOFR plus a 4.25% annual margin.

2 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 1 point

How the balance works

Positive

  • Moderate pointRevenue rose to ARS 3,062,922,000,000 year over year.
  • Moderate pointPeriod profit rose to ARS 737,692,000,000 year over year.

Negative

  • Moderate pointOperating cash generated fell to ARS 208,184,000,000 year over year.
Revenue ARS 3,062,922,000,000 Nine months ended September 30, 2026; ARS 1,805,519,000,000 in the comparable 2025 period
Profit of the period ARS 737,692,000,000 Nine months ended September 30, 2026; ARS 260,444,000,000 in the comparable 2025 period
Basic and diluted earnings per share ARS 542.54 per share Nine months ended September 30, 2026; ARS 191.75 per share in the comparable 2025 period
Net cash generated by operating activities ARS 208,184,000,000 Nine months ended September 30, 2026; ARS 594,389,000,000 in the comparable 2025 period
Property, plant and equipment acquisition payments ARS 1,519,436,000,000 Nine months ended September 30, 2026
Net financial result Loss of ARS 153,101,000,000 Nine months ended September 30, 2026; gain of ARS 30,599,000,000 in the comparable 2025 period
SMP syndicated international loan Up to US$900 million Seven-year loan entered into by SMP for the San Matías pipeline project
SMP loan disbursements US$118 million Disbursed by lenders as of September 30, 2026
IAS 34 technical
"in accordance with IAS 34"
IAS 34 is an international accounting standard that requires companies to prepare interim financial reports—shorter updates like quarterly or half‑year statements—showing condensed but reliable information on profit, assets and cash flow between annual reports. It matters to investors because these regular snapshots make it easier to spot trends, risks or improvements sooner than waiting for a full-year report, much like checking a progress report between school terms to track performance and momentum.
Term SOFR financial
"interest at a rate of Term SOFR plus a 4.25% annual margin"
Term SOFR is a benchmark interest rate that reflects the cost of borrowing money over a specific period, based on actual transactions in the financial markets. It is used by lenders and borrowers to set the interest rates on loans and financial contracts, helping to ensure rates are fair and transparent. For investors, understanding term SOFR helps gauge borrowing costs and the overall direction of interest rates in the economy.
limited-recourse financial
"issued limited-recourse Class 1 CB"
A limited-recourse arrangement means a lender or creditor can only seek repayment from a specific asset, project, or pool of cash flows pledged as security, and cannot go after the borrower’s other assets if that collateral falls short. For investors this signals where the risk lives: it can protect a company’s broader balance sheet but also make returns and recovery dependent on the performance of the tied asset—like lending for a single car and being able to repossess only that car if payments stop.
functional currency financial
"US dollars, which is the Company’s functional currency"
The functional currency is the single currency a company uses as its primary money for recording business transactions and preparing financial statements — think of it as the company's "home" currency or the money it budgets and measures performance in. It matters to investors because currency choices determine how foreign sales, costs and exchange-rate swings translate into reported revenue, profit and debt, affecting comparisons, risk assessments and valuation.
firm transportation agreements technical
"execution of firm natural gas transportation agreements"
Firm transportation agreements are contracts that guarantee a customer reserved capacity to move commodities (commonly natural gas, oil, or refined products) through a pipeline or transport network for a set period in exchange for fixed payments. They matter to investors because they create predictable, often long-term revenue for the transporter while reducing delivery risk for the shipper — like renting a locked parking space that provides steady income to the owner and reliable access to the renter, which influences cash flow, risk and valuation.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What were PAM’s revenue and profit for the first nine months of 2026?

PAM reported revenue of ARS 3,062,922,000,000 and period profit of ARS 737,692,000,000 for the nine months ended September 30, 2026. The comparable 2025 figures were ARS 1,805,519,000,000 and ARS 260,444,000,000, respectively.

What are the size and cost of PAM’s San Matías Pipeline project?

The pipeline is approximately 470 km long, has a 36-inch diameter and capacity of up to 28 million m³ per day. Its estimated investment is US$1.3 billion, and it is expected to be commissioned in the second quarter of 2028.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549


 

FORM 6-K

 

REPORT OF FOREIGN ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 UNDER

SECURITIES EXCHANGE ACT OF 1934

 

For the month of November, 2026

(Commission File No. 001-34429),


 

PAMPA ENERGIA S.A.
(PAMPA ENERGY INC.)

 

Argentina

(Jurisdiction of incorporation or organization)


 

Maipú 1
C1084ABA
City of Buenos Aires
Argentina

(Address of principal executive offices)


 

(Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.)

Form 20-F ___X___ Form 40-F ______

(Indicate by check mark whether the registrant by furnishing the
information contained in this form is also thereby furnishing the
information to the Commission pursuant to Rule 12g3-2(b) under
the Securities Exchange Act of 1934.)

Yes ______ No ___X___

(If "Yes" is marked, indicate below the file number assigned to the
registrant in connection with Rule 12g3-2(b): 82- .)

 

  

 
 

 

This Form 6-K for Pampa Energía S.A. (“Pampa” or the “Company”) contains:

Exhibit 1: Unaudited consolidated condensed interim financial statements (ARS)

 
 


SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

Date: November 4, 2026

 

Pampa Energía S.A.
     
     
By:

/s/ Gustavo Mariani


 
 

Name: Gustavo Mariani

Title:   Chief Executive Officer

 

 

 

FORWARD-LOOKING STATEMENTS

 

This press release may contain forward-looking statements. These statements are statements that are not historical facts, and are based on management's current view and estimates offuture economic circumstances, industry conditions, company performance and financial results. The words "anticipates", "believes", "estimates", "expects", "plans" and similar expressions, as they relate to the company, are intended to identify forward-looking statements. Statements regarding the declaration or payment of dividends, the implementation of principal operating and financing strategies and capital expenditure plans, the direction of future operations and the factors or trends affecting financial condition, liquidity or results of operations are examples of forward-looking statements. Such statements reflect the current views of management and are subject to a number of risks and uncertainties. There is no guarantee that the expected events, trends or results will a ctually occur. The statements are based on many assumptions and factors, including general economic and market conditions, industry conditions, and operating factors. Any changes in such assumptions or factors could cause actual results to differ materially from current expectations.

 

 

 

 

Free translation from the original prepared in Spanish for publication in Argentina

 

 

 

 

 

 

UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL STATEMENTS

 

AS OF SEPTEMBER 30, 2026

AND FOR THE NINE AND THREE-MONTH PERIODS THEN ENDED

PRESENTED ON COMPARATIVE BASIS

 

(In millions of Argentine Pesos (“$”))

 

 

 
 

www.pwc.com.ar Price Waterhouse & Co. S.R.L. Bouchard 557, 8th floor, C1106ABG Autonomous City of Buenos Aires, Argentina, T: +(54.11) 4850.0000 Report on review of interim financial information To the Shareholders, President and Directors of Pampa Energía S.A. Introduction We have reviewed the accompanying condensed consolidated interim statement of financial position of Pampa Energía S.A. and its subsidiaries (the ‘Group’) as at September 30, 2026 and the related condensed consolidated interim and statements of comprehensive income for the nine-month and three-month periods then ended, and condensed consolidated statements of changes in equity and cash flows for the nine-month period then ended and selected explanatory notes. Responsibilities of the Board of Directors The board of Directors of Pampa Energía S.A. is responsible for the preparation and presentation of this condensed consolidated interim financial information in accordance with IFRS Accounting Standards and is therefore responsible for the preparation and presentation of the condensed interim financial statements mentioned in the first paragraph, in accordance with International Accounting Standard 34 (IAS 34). Scope of review We conducted our review in accordance with International Standard on Review Engagements 2410, 'Review of interim financial information performed by the independent auditor of the entity'. A review of interim financial information consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion. Conclusion Based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed consolidated interim financial information is not prepared, in all material respects, in accordance with IAS 34. Autonomous City of Buenos Aires, November 2, 2026. PRICE WATERHOUSE & CO. S.R.L. (Partner) C.P.C.E.C.A.B.A. Tº 1 Fº 17 Juan Manuel Gallego Tinto Contador Público (U.N.C.) C.P.C.E.C.A.B.A. Tº 413 Fº 001

 

 

 

 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

GLOSSARY OF TERMS

The following are not technical definitions, but they are helpful for the reader’s understanding of some terms used in the notes to the Unaudited Consolidated Condensed Interim Financial Statements of the Company.

Terms Definitions
ADR American Depositary Receipt
BCBA Buenos Aires Stock Exchange 
BCRA Argentina´s Central Bank 
BNA Banco de la Nación Argentina
BBL Barrel
BO Official Gazette
CAMMESA Compañía Administradora del Mercado Eléctrico Mayorista S.A.
CB Corporate Bonds 
CC Combined Cycle
CIESA Compañía de Inversiones de Energía S.A.
CITELEC Compañía Inversora en Transmisión Eléctrica Citelec S.A.
CNV National Securities Commission of Argentina 
CPB Piedra Buena thermal power plant    
CPI Consumer price index
CSJN Argentina’s Supreme Court of Justice
CTB CT Barragán S.A.
CTEB Ensenada Barragán thermal power plant
CTG Güemes thermal power plant
CTGEBA Genelba thermal power plant
CTIW Ingeniero White thermal power plant
CTLL Loma la Lata thermal power plant
CTPP Parque Pilar thermal power plant
EISA Energía e Inversiones S.A.
ENARGAS  National Regulatory Authority of Gas 
ENARSA  Energía Argentina S.A.
ENRE  National Regulatory Authority of Electricity 
ENReGE  National Regulatory Authority of Gas and Electricity (formerly ENARGAS and ENRE)
FEPASAU Fértil Pampa S.A.U.
FRA Adjusted Rent Factor
FTR Five-Year Tariff Review
GASA Generación Argentina S.A.
GBA Greater Buenos Aires

   
 1 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

GLOSSARY OF TERMS: (Continuation)

 

Terms Definitions
GUDI Distributors’ large users
HIDISA Hidroeléctrica Diamante S.A.
HINISA Hidroeléctrica Los Nihuiles S.A.
HPPL Hidroeléctrica Pichi Picún Leufú
IAS International Accounting Standards 
IASB International Accounting Standards Board
IFRS International Financial Reporting Standards
INDEC National Institute of Statistics and Censuses
IPIM Wholesale Domestic Price Index
LNG Liquefied Natural Gas
Loma Negra Loma Negra Compañía Industrial Argentina S.A.
m3 Cubic meters
MAT  WEM’s Forward Market
MECON  Ministry of Economy of Argentina
MEyM  Ministry of Energy and Mining
MLC  Foreign Exchange Market 
MW Megawatt
MWh Megawatt/hour
NYSE New York Stock Exchange
OCP Oleoductos de Crudos Pesados Ltd
Oldelval Oleoductos del Valle S.A.
OPGSA Operaciones de Petróleo y Gas S.A. (formerly Autotrol Renovables S.A.)
PB18 Pampa Bloque 18 S.A.S. 
PEB Pampa Energía Bolivia S.A. 
PECSA Pampa Energía Chile S.p.A.
PEN Federal Executive Branch 
PEPE II Pampa Energía II Wind Farm
PEPE III Pampa Energía III Wind Farm
PEPE IV Pampa Energía IV Wind Farm
PEPE VI Pampa Energía VI Wind Farm
PESOSA Pampa Energía Soluciones S.A.
PGSM Complejo Puerto General San Martín
PISA Pampa Inversiones S.A.
POSA Petrobras Operaciones S.A.

   
 2 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

GLOSSARY OF TERMS: (Continuation)

 

Terms Definitions
RDA Rincón de Aranda
RIGI Incentive Regime for Large Investments
SACDE Sociedad Argentina de Construcción y Desarrollo Estratégico S.A. 
SE Secretary of Energy
SESA Southern Energy S.A.
SMP San Matías Pipeline S.A.
SPV Special Purpose Vehicle
TGS Transportadora de Gas del Sur S.A.
TJSM Termoeléctrica José de San Martín S.A.
TMB Termoeléctrica Manuel Belgrano S.A.
The Company / Pampa Pampa Energía S.A.
The Group Pampa Energía S.A. and its subsidiaries
Tn/d Tons per day
Tn/y Tons per year
Transba Empresa de Transporte de Energía Eléctrica por Distribución Troncal de la Provincia de Buenos Aires Transba S.A.
Transener Compañía de Transporte de Energía Eléctrica en Alta Tensión Transener S.A.
US$ U.S. dollar
VAR Vientos de Arauco Renovables S.A.U.
VMOS VMOS S.A.
WEM Wholesale Electricity Market
$ Argentine Pesos

 

   
 3 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

 

UNAUDITED CONSOLIDATED CONDENSED INTERIM STATEMENT OF
COMPREHENSIVE INCOME

For the nine and three-month periods ended September 30, 2026, presented on comparative basis.

(In millions of Argentine Pesos (“$”))

 

      Nine-month   Three-month
  Note   09.30.2026   09.30.2025   09.30.2026   09.30.2025
                   
Revenue 8   3,062,922   1,805,519   1,189,011   796,635
Cost of sales 9   (2,050,997)   (1,214,020)   (808,794)   (513,313)
Gross profit     1,011,925   591,499   380,217   283,322
                   
Selling expenses 10.1   (127,049)   (83,758)   (48,123)   (35,913)
Administrative expenses 10.2   (206,472)   (157,003)   (77,580)   (63,302)
Exploration expenses 10.3   (493)   (362)   (133)   (137)
Other operating income 10.4   70,433   103,420   30,546   43,239
Other operating expenses 10.4   (119,484)   (73,410)   (68,390)   (28,651)
Impairment of property, plant and equipment, intangible assets and inventories     (1,181)   (10,298)   631   (9,522)
Recovery of impairment (Impairment) of financial assets     4,300   (6,067)   1,086   (3,559)
Share of profit from associates and joint ventures 5.1.2   287,123   133,104   70,386   41,757
Operating income      919,102   497,125   288,640   227,234
                   
Financial income 10.5   19,136   47,525   8,433   8,781
Financial costs 10.5   (203,110)   (180,417)   (80,240)   (68,958)
Other financial results 10.5   30,873   163,491   484   25,381
Financial results, net     (153,101)   30,599   (71,323)   (34,796)
Profit before income tax     766,001   527,724   217,317   192,438
Income tax 10.6   (28,309)   (267,280)   (30,011)   (152,155)
Profit of the period     737,692   260,444   187,306   40,283
                   
Other comprehensive income                  
Items that will not be reclassified to profit or loss                  
Exchange differences on translation     395,400   1,141,248   177,767   564,751
Items that may be reclassified to profit or loss                  
Derivatives (1)     (300,522)   23,857   (159,524)   (2,786)
Income tax     105,183   (8,350)   55,834   975
Exchange differences on translation     83,650   (44,746)   17,766   (40,952)
Other comprehensive income of the period     283,711   1,112,009   91,843   521,988
Total comprehensive income of the period     1,021,403   1,372,453   279,149   562,271

 

(1)See Note 12.7.

 

   
 4 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

 

UNAUDITED CONSOLIDATED CONDENSED INTERIM

STATEMENT OF COMPREHENSIVE INCOME (Continuation)

For the nine and three-month periods ended September 30, 2026, presented on comparative basis.

(In millions of Argentine Pesos (“$”))

 

      Nine-month   Three-month
  Note   09.30.2026   09.30.2025   09.30.2026   09.30.2025
Total profit (loss) of the period attributable to:                  
                   
Owners of the company     731,349   260,777   186,605   40,207
Non-controlling interest     6,343   (333)   701   76
      737,692   260,444   187,306   40,283
                   
                   
Total comprehensive income of the period attributable to:                  
                   
Owners of the Company     1,014,064   1,369,724   278,011   560,719
Non-controlling interest     7,339   2,729   1,138   1,552
      1,021,403   1,372,453   279,149   562,271
                   
Earnings per share attributable to equity holders of the Company:                  
                   
Total basic and diluted earning per share  13.2   542.54   191.75   139.26   29.56

 

 

The accompanying notes are an integral part of these Unaudited Consolidated Condensed Interim Financial Statements.

   
 5 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

 UNAUDITED CONSOLIDATED CONDENSED INTERIM STATEMENT
OF FINANCIAL POSITION

As of September 30, 2026, presented on comparative basis.

(In millions of Argentine Pesos (“$”))

 

  Note   09.30.2026   12.31.2025
ASSETS          
NON-CURRENT ASSETS          
Property, plant and equipment 11.1   5,860,280   4,805,587
Intangible assets 11.2   133,923   130,376
Right-of-use assets     26,543   51,992
Deferred tax asset 11.3   355,636   62,442
Investments in associates and joint ventures 5.1.2   2,136,424   1,541,388
Financial assets at fair value through profit and loss 12.1   51,360   48,275
Other assets     393   467
Trade and other receivables 12.2   128,127   63,031
Total non-current assets     8,692,686   6,703,558
           
CURRENT ASSETS          
Inventories 11.4   407,639   335,514
Financial assets at fair value through profit and loss 12.1   762,777   533,116
Derivatives     -   75,562
Trade and other receivables 12.2   1,653,221   893,726
Cash and cash equivalents 12.3   807,435   1,054,459
Total current assets     3,631,072   2,892,377
Total assets     12,323,758   9,595,935

 

 

   
 6 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

 

UNAUDITED CONSOLIDATED CONDENSED INTERIM STATEMENT

OF FINANCIAL POSITION (Continuation)

As of September 30, 2026, presented on comparative basis.

(In millions of Argentine Pesos (“$”))

 

  Note   09.30.2026   12.31.2025
SHAREHOLDERS´ EQUITY          
Share capital 13.1   1,340   1,360
Share capital adjustment     7,024   7,126
Share premium     21,732   19,950
Treasury shares 13.1   4   4
Treasury shares adjustment     19   21
Treasury shares cost     (191)   (67,788)
Legal reserve     68,523   65,723
Voluntary reserve     4,104,941   3,489,126
Other reserves     2,111   3,497
Other comprehensive income     1,121,914   1,201,897
Retained earnings      919,510   511,531
Equity attributable to owners of the company     6,246,927   5,232,447
Non-controlling interest     19,675   12,336
Total equity     6,266,602   5,244,783
           
LIABILITIES          
NON-CURRENT LIABILITIES          
Provisions 11.5   114,644   145,551
Income tax and minimum notional income tax provision 11.6   42,412   38,534
Deferred tax liability 11.3   70,579   81,493
Tax liabilities 11.7   293,912   309,156
Defined benefit plans     44,189   38,417
Borrowings 12.4   4,083,939   2,683,747
Trade and other payables 12.5   102,910   124,931
Total non-current liabilities      4,752,585   3,421,829
           
CURRENT LIABILITIES          
Provisions 11.5   16,338   18,552
Income tax liability 11.6   236,859   120,939
Tax liabilities 11.7   151,723   81,473
Defined benefit plans     8,226   9,279
Salaries and social security payable      66,885   52,327
Derivatives     252,764   -
Borrowings 12.4   112,730   69,942
Trade and other payables 12.5   459,046   576,811
Total current liabilities      1,304,571   929,323
Total liabilities      6,057,156   4,351,152
Total liabilities and equity     12,323,758   9,595,935

 

The accompanying notes are an integral part of these Unaudited Consolidated Condensed Interim Financial Statements.

   
 7 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

 

UNAUDITED CONSOLIDATED CONDENSED INTERIM STATEMENT OF CHANGES IN EQUITY

For the nine -month period ended September 30, 2026, presented on comparative basis.

(In millions of Argentine Pesos (“$”))

 

  Equity holders of the company   Retained earnings            
  Share capital   Share capital adjustment   Share premium   Treasury shares   Treasury shares adjustment   Treasury shares cost   Legal reserve   Voluntary reserve   Other reserves   Other comprehensive income (loss)   Unappropriated retained earnings   Equity attributable to owners   Non-controlling interest   Total equity
Balance as of December 31, 2024 1,360   7,126   19,950   4   21   (211)   46,616   1,708,688   2,475   839,025   766,073   3,391,127   9,167   3,400,294
Voluntary reserve constitution -   -   -   -   -   -   -   766,073   -   -   (766,073)   -   -   -
Treasury shares acquisition -   -   -   -   -   (23,302)   -   -   -   -   -   (23,302)   -   (23,302)
Stock compensation plans -   -   -   -   -   -   -   -   (646)   -   -   (646)   -   (646)
Profit (Loss) for the nine-month period -   -   -   -   -   -   -   -   -   -   260,777   260,777   (333)   260,444
Other comprehensive income for the nine-month period -   -   -   -   -   -   15,719   834,513   -   268,866   (10,151)   1,108,947   3,062   1,112,009
Balance as of September 30, 2025 1,360   7,126   19,950   4   21   (23,513)   62,335   3,309,274   1,829   1,107,891   250,626   4,736,903   11,896   4,748,799
Treasury shares acquisition -   -   -   -   -   (44,275)   -   -   -   -   -   (44,275)   -   (44,275)
Stock compensation plans -   -   -   -   -   -   -   -   1,668   -   -   1,668   -   1,668
Dividends distribution -   -   -   -   -   -   -   -   -   -   -   -   (1,884)   (1,884)
Profit for the complementary three-month period -   -   -   -   -   -   -   -   -   -   235,012   235,012   1,736   236,748
Other comprehensive income for the complementary three-month period -   -   -   -   -   -   3,388   179,852   -   94,006   25,893   303,139   588   303,727
Balance as of December 31, 2025 1,360   7,126   19,950   4   21   (67,788)   65,723   3,489,126   3,497   1,201,897   511,531   5,232,447   12,336   5,244,783
Voluntary reserve constitution -   -   -   -   -   -   -   511,531   -   -   (511,531)   -   -   -
Treasury shares acquisition (20)   (104)   -   20   104   -   -   -   -   -   -   -   -   -
Capital reduction -   -   -   (20)   (104)   67,577   -   (67,453)   -   -   -   -   -   -
Stock compensation plans -   2   1,782   -   (2)   20   -   -   (1,386)   -   -   416   -   416
Profit for the nine-month period -   -   -   -   -   -   -   -   -   -   731,349   731,349   6,343   737,692
Other comprehensive income for the nine-month period -   -   -   -   -   -   2,800   171,737   -   (79,983)   188,161   282,715   996   283,711
Balance as of September 30, 2026 1,340   7,024   21,732   4   19   (191)   68,523   4,104,941   2,111   1,121,914   919,510   6,246,927   19,675   6,266,602

  

The accompanying notes are an integral part of these Unaudited Consolidated Condensed Interim Financial Statements.

   
 8 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

 

UNAUDITED CONSOLIDATED CONDENSED INTERIM STATEMENT OF CASH FLOWS

For the nine-month period ended September 30, 2026, presented on comparative basis.

(In millions of Argentine Pesos (“$”))

 

  Note   09.30.2026   09.30.2025
Cash flows from operating activities:          
Profit of the period     737,692   260,444
Adjustments to reconcile net profit to cash flows from operating activities 14.1   542,772   490,809
Changes in operating assets and liabilities 14.2   (1,072,280)   (156,864)
Net cash generated by operating activities     208,184   594,389
           
Cash flows from investing activities:          
Payment for property, plant and equipment acquisitions     (1,519,436)   (858,567)
Collection for sales of public securities and shares, net     128,140   416,990
(Subscription) Recovery of mutual funds, net     (152,371)   16,691
Capital integration in companies     (79,797)   (44,726)
Collection for equity interests in companies sales     -   630
Collection for intangible assets sales     -   10,571
Dividends collection     70,196   35,265
Collection for equity interests in areas sales     13,028   2,410
Payment of loans      -   (13)
Net cash used in investing activities     (1,540,240)   (420,749)
           
Cash flows from financing activities:          
Proceeds from borrowings 12.4   1,224,838   665,797
Payment of  borrowings     (44,190)   (142,971)
Payment of  borrowings interests 12.4   (129,358)   (141,214)
Repurchase and redemption of corporate bonds 12.4   (2,832)   (806,076)
Payment for treasury shares acquisition     -   (23,302)
Payments of leases     (24,443)   (14,222)
Net cash generated by (used in) financing activities     1,024,015   (461,988)
           
Decrease in cash and cash equivalents     (308,041)   (288,348)
           
Cash and cash equivalents at the beginning of the year 12.3   1,054,459   761,231
Exchange and conversion difference generated by cash and cash equivalents     61,017   94,843
Decrease in cash and cash equivalents     (308,041)   (288,348)
Cash and cash equivalents at the end of the period 12.3   807,435   567,726

 

 

The accompanying notes are an integral part of these Unaudited Consolidated Condensed Interim Financial Statements.

 

   
 9 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 1: GENERAL INFORMATION

1.1 General information of the Company

The Company is an Argentine company, which participates in the energy sector, mainly in the production of oil and gas and power generation.

In the oil and gas segment, the Company develops an important activity in gas and oil exploration and production, reaching a production level in the nine-month period ended September 30, 2026 of 13.7 million m3/day of natural gas and 21.7 thousand bbl/day of oil in 9 productive areas and 2 exploratory areas in Argentina. Its main production blocks are located in the Province of Neuquén. Additionally, the Company participates in SESA, an entity dedicated to natural gas liquefaction.

In the generation segment, the Company, directly and through its subsidiaries and joint ventures, has a 5,207 MW installed capacity as of September 30, 2026, which represents approximately 12% of Argentina’s installed capacity, and being one of the largest independent generators in the country.

In the petrochemicals segment, as of September 30, 2026, the Company operates 2 high-complexity plants in Argentina producing styrene and polystyrene, with a share ranging between 90% and 99%, in the domestic market (see synthetic rubber production closure in Note 21).

Through the holding, transportation and others segment, the Company participates in the electricity transmission and gas transportation businesses. In the transmission business, the Company jointly controls Citelec, which has a controlling interest in Transener, a company engaged in the operation and maintenance of a 22,454 km high-voltage electricity transmission network in Argentina with an 86% market share of Argentina’s high-voltage transmission lines. In the gas transportation business, the Company jointly controls CIESA, which has a controlling interest in TGS, a company holding a concession for the transportation of natural gas with 9,248 km of gas pipelines in the center, west and south of Argentina, and which is also engaged in the processing and sale of natural gas liquids through the Cerri Complex, located in Bahía Blanca, in the Province of Buenos Aires, in addition to shale gas transportation and conditioning at Vaca Muerta. Additionally, the Company participates in VMOS, an entity that will operate an oil pipeline connecting Vaca Muerta with an offshore export port, and in SMP, a company that will be responsible for the construction and operation of the dedicated gas pipeline that will connect the Neuquina Basin with the San Matías Gulf to supply SESA. Finally, the segment includes advisory services provided to related companies.

Finally, the Company will develop the project for the construction and operation of a granulated urea production complex in Bahía Blanca, representing its entry into the fertilizer business (see Note 18).

1.2 Economic context in which the Company operates

The Company operates in an economic context which main variables are experiencing volatility as a result of political and economic events both in the domestic and international spheres.

During 2026, the Argentine economy continued undergoing a stabilization process and recorded a 23.6% cumulative inflation as of September 2026, considering the CPI published by INDEC.

   
 10 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 1: (Continuation)

In the international sphere, during 2026 geopolitical tensions persisted in the Middle East as a result of the military conflict in the region, affecting the international energy market. Attacks on energy infrastructure and crude oil transportation routes, together with restrictions on maritime transit, particularly in the strait of Hormuz, led to constraints on crude oil production, supply and exports, as well as to higher logistics costs, which drove the Brent crude price volatility in the international market.

In this context, the Brent crude price experienced significant volatility in 2026, rising from around US$ 60/bbl at the beginning of the year to over US$ 100/bbl in late March, easing to approximately US$ 70/bbl by late June and again exceeding US$ 100/bbl by late September.

The outlook for the Argentine and international economy remains subject to a high degree of uncertainty as to the evolution of economic activity, the course of the geopolitical conflict and its potential effect on the energy market.

The context of volatility and uncertainty persists as of the date of issuance of these Consolidated Condensed Interim Financial Statements, and it is not possible to foresee the evolution of the macroeconomic and financial situation in Argentina or the international context, or what new measures might be announced.

The Company’s Management permanently monitors the evolution of the variables affecting its business to define its course of action and identify potential impacts on its assets and financial position.

The Company’s Consolidated Condensed Interim Financial Statements should be read in light of these circumstances.

NOTE 2: REGULATORY FRAMEWORK

The main regulations applicable to the Company’s activities, identified during 2026, are detailed below. It is worth highlighting that this is not an exhaustive list of all regulations the Company is subject to.

   
 11 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

2.1Oil and Gas
2.1.1Export of liquid hydrocarbons and their derivatives

On July 20, 2026, SE Resolution No. 166/26 created the Export Operations Registry, in which all export notifications, objections and free export certificates for hydrocarbons and their derivatives must be recorded, and approved the Export Procedure for Liquid Hydrocarbons and their Derivatives, repealing the regime established by MEyM Resolution No. 241/17.

2.1.2Natural Gas Export

For the Neuquina Basin, the SE assigned an export quota of 5.7 million m³/day and 7.9 million m³/day for the 2027 and 2028 summer periods (January–April and October–December), respectively, and a quota of 5 million m³/day and 5.8 million m³/day for the 2027 and 2028 winter periods (May–September), respectively. In both periods, the minimum price is equal to the average awarded price under all GasAr Plan rounds for the basin multiplied by the applicable seasonal adjustment factor.

The Company was assigned the following volumes:

-565,307 m³/day for the January–April 2027 and October–December 2027 periods.
-495,883 m³/day for the May–September 2027 period.
-783,495 m³/day for the January–April 2028 and October–December 2028 periods.
-575,224 m³/day for the May–September 2028 period.
2.1.3Assignment of gas contracts with ENARSA

SE Resolution No. 224/26 extended, through December 31, 2026, the deadline set forth in SE Resolution No. 54/26 for producers opting to accept the assignment of their contracts with ENARSA to distributors and CAMMESA to submit the relevant notice to the SE. Distributors are required to opt in within the same term. In turn, ENARGAS will oversee the assignment and volume allocation process through a procedure to be determined jointly with ENARSA.

2.1.4Compensation for natural gas consumption subsidies

ENARGAS Resolution No. 101/26 repealed ENARGAS Resolution No. 125/25 and approved a new reporting procedure related to the Focused Energy Subsidies (SEF) regime created by Executive Order No. 943/25 under the unification of national energy subsidies and the elimination of income-level segmentation, to be replaced by a user allocation scheme distinguishing between subsidized and non-subsidized users.

However, ENARGAS Resolution No. 101/26 preserves the criterion whereby subsidy compensations are received by natural gas producers and applied as a deduction in billings to distributors.

Within the framework of the new SEF regime, PEN Executive Order No. 26/26 provides that the price awarded to each producer participating in the GasAr Plan may be above, below or in line with the Uniform Annual Price (“PAU”), depending on the time of year and taking into account the applicable seasonal adjustment factor.

   
 12 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

In the months in which the PAU is higher than the GasAr Plan price, the difference will be recorded as a credit balance, which will be applied to offset the months in which the opposite situation occurs. This mechanism will under no circumstances affect the price receivable by producers under the GasAr Plan. Along the same line, SE Resolution No. 23/26 establishes the PAU to be passed on to end users under the natural gas supply agreements entered into under the GasAr Plan.

   
 13 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

2.2Generation
2.2.1Emergency in the National Energy Sector

PEN Executive Order No. 585/26, dated July 11, 2026, extended until December 31, 2027 the National Energy Sector emergency declared by Executive Order No. 55/23 with respect to the electricity generation, transmission and distribution segments under federal jurisdiction, maintaining its original scope.

2.2.2SE Resolution No. 293/26

On October 21, 2026, SE Resolution No. 293/26 amended SE Resolution No. 400/25 with respect to the percentages, relative to the reference value, within which generators managing their own fuel supply may declare their variable production cost (“CVP”), as well as the limits on energy sales by existing generators.

Regarding the CVP declaration, in 2026, generators maintain a percentage to be declared ranging from a minimum of 75% of the CVP to a maximum of 25% above the CVP; in 2027, these percentages will be reduced to 50% and 17.5%, respectively, and in 2028, to 25% and 10%, respectively. When the fuel used is GN Acuerdo (natural gas under the Gas Agreement modality), the maximum additional percentage above the CVP will be 0%.

As for sales in the MAT Energy, thermal and hydroelectric existing generators may freely contract with any demand segment starting in 2029, one year earlier than originally provided. In addition, the resolution raises the 20% cap on sales to large users to 60% for the April 2027–March 2028 period and to 80% for the April 2028–December 2028 period; finally, it provides that sales to distributors for GUDI will be subject to the above-mentioned limits only for thermal generators.

Furthermore, a simplified regime for monthly entry into the WEM and recategorization of large users, was established.

2.2.3Energy Plus Contracts

As from March 2026, the Company no longer markets capacity and energy under Energy Plus contracts.

2.2.4Remuneration for assigned generation

SE Resolutions No. 34/26 and No. 281/26 updated the remuneration values for assigned generation, providing for 2% and 11% increases applicable as from the January and October 2026 economic transactions, respectively. The spot price to value royalties and short-term reserve services in the WEM was set at $ 14,669/MWh and $ 16,283/MWh, respectively.

2.2.5LNG purchase auctions

During the second quarter of 2026, the Electronic Gas Market (“MEGSA”) organized auctions in which ENARSA offered LNG volumes on a firm basis to distributors, industrial users, generators and traders.

   
 14 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

For the June 1-August 5, 2026 and August 6-August 31, 2026 periods, Pampa was awarded a 74.5 million m³ and a 39.5 million m³ volume, respectively, for CTGEBA’s consumption. In turn, CTB was awarded for the same periods a 51.6 million m³ and a 34.4 million m³ volume, respectively, for CTEB’s consumption.

2.2.6Extra-Trend Demand Regime

On September 25, 2026, SE Resolution No. 264/26 amended Section 13 of SE Resolution No. 400/25 and regulated the regime applicable to Extra-Trend Demands (“XDEM”). This regime applies to new demands or expansions representing a capacity increase equal to or greater than 0.5% of the WEM’s average demand over the last 12 rolling months as of the application filing date. Two categories of Extra-Trend Demands are defined: i) XDEM Production, for any type of consumption, and ii) XDEM Data, which expressly covers data centers and artificial intelligence infrastructure.

XDEM must submit a special supply plan, in the form of a sworn statement, with a five-year rolling horizon, detailing the expected demand applicable to contracting and the backup mechanisms. In addition, they must evidence, on a monthly basis, contractual coverage through new eligible XDEM supply equivalent to at least 80% of the energy actually demanded during the month, and have firm capacity backup equivalent to 100% of their maximum demand for XDEM Production and 115% for XDEM Data.

It is worth highlighting that, as a result of the Company’s participation in the firm transportation capacity expansion, the Company’s generating units operating exclusively on gas and increasing their availability to supply the WEM may qualify as new eligible XDEM supply and, therefore, serve such demands. CTGEBA would fall into this situation.

2.2.7Sale of ENARSA’s equity interests in TMB, TJSM and CTGB

PEN Executive Order No. 1,107/26 was published on September 28, 2026, authorizing the sale, through a national and international open call for tenders, of all of ENARSA’s equity interests in TMB and TJSM, representing 65.01% and 68.83% of their respective capital stock. The Company holds an equity interest in both companies and has a right of first refusal to acquire the shares subject to the sale process, as provided for in their respective bylaws, which must be observed in the tender process.

The sale of ENARSA’s shares in Central Termoeléctrica Guillermo Brown (“CTGB”) was also authorized, once the trust is liquidated and ENARSA is admitted as a shareholder.

2.2.8Law No. 27,828

Among other amendments, Law No. 27,828 extended until December 31, 2045 the exemption period for specific taxes, fees or royalties provided for under Law No. 27,191 in connection with the access to and use of renewable energy sources. 

   
 15 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

2.3Gas Transportation
2.3.1TGS’s Tariff situation

As part of the monthly updates to natural gas transportation tariffs, in 2026 TGS received monthly increases of 2.37%, 2.90%, 2.52%, 2.17%, 4.21%, 4.19%, 2.61%, 1.73%, 1.71% and 2.29%, effective January through October 2026, respectively.

2.3.2Contractual reorganization

Under PEN Executive Order No. 49/26, the National Energy Sector emergency for the natural gas transportation and distribution segments was extended until December 31, 2027.

Within this framework, SE Resolution No. 66/26 provided for the reconfiguration of the Argentine natural gas transportation system and established measures aimed at optimizing the system’s use, improving its operating efficiency and ensuring natural gas supply. It also instructed ENARGAS to adjust the tariff schemes, service regulations and capacity allocation mechanisms, on the condition that the revenues determined in the FTR remain unchanged.

Accordingly, on April 14, 2026, through ENARGAS Resolution No. 409/26, the process was concluded and the licensees were instructed to execute new firm transportation contracts pursuant to the established guidelines, effective as from May 1, 2026. In addition, the firm nature of certain exchange and displacement contracts was recognized and, finally, on April 29, 2026, the new applicable tariff schemes were published through ENARGAS Resolution No. 448/26.

As of the date of issuance of these Consolidated Condensed Interim Financial Statements, TGS is implementing the contracts and operating conditions resulting from this regulatory process.

2.4Transmission

Transener and Transba tariff situation

Within the framework of the FTR carried out in 2025, ENReGE continued applying the monthly tariff adjustment mechanism based on the CPI and IPIM indexes and established 1.88%, 2.55%, 2.07%, 1.61%, 2.35%, 4.31%, 2.39%, 1.35%, 1.24% and 1.98% tariff increases from January through October 2026, respectively.

   
 16 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

2.5Hydrocarbons and natural gas transportation

 

2.5.1 Technical regulations for the transportation of liquid hydrocarbons

On May 20, 2026, through SE Resolution No. 119/26, technical regulations for the transportation of liquid hydrocarbons were approved. These regulations apply to transportation systems passing through two or more provinces and/or intended for the total or partial export or import of crude oil, oil derivative products and natural gas liquids. Their main purpose is to unify and establish the technical guidelines for pipeline safety and integrity, thus replacing MEyM Resolution No. 120/17.

2.5.2 Natural gas transportation capacity

TGS tendered transportation capacity under the expansion of the GPM and its final sections (see Note 5.1.4) for the execution of firm natural gas transportation agreements for up to 35 years, effective as from May 2027. Pampa and certain subsidiaries were awarded a total of 3.9 million m³/day on the section to Greater Buenos Aires and 1.4 million m³/day on the section to Bahía Blanca.

Furthermore, on September 4, 2026, Transportadora de Gas del Norte (“TGN”) launched an open call for tenders to contract natural gas transportation capacity. Pampa and certain subsidiaries submitted bids for a 35-year term to contract transportation capacity on the route, with receipt in GBA and delivery in Salta, for a total volume of 0.96 million m³/day. As of the date of issuance of these Consolidated Condensed Interim Financial Statements, the award is still pending.

It is worth highlighting that, in addition to securing a greater supply of its own gas, the awarded transportation capacity provides significant benefits to the generation segment under the guidelines of SE Resolution No. 400/25, since electricity produced using gas transported through new infrastructure captures the full dispatch margin when traded in the spot market (FRA = 1), boosting the competitiveness and profitability of the generation segment’s assets, particularly the CC.

2.6Hydrocarbons exploration and exploitation on the Argentine Continental Shelf

PEN Executive Order No. 868/26 introduces changes aimed at strengthening the enforcement of Law No. 26,659, related to hydrocarbon activities on the Argentine Continental Shelf and, particularly, to activities not authorized by Argentina in the Malvinas area.

Among the amendments, a key change is the introduction of affidavits as a requirement to evidence compliance with Law No. 26,659, both in the RIGI admission procedure and in the processing of applications for exploration permits, exploitation concessions, transportation and storage authorizations, and hydrocarbon processing licenses.

 

   
 17 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

2.7Regulations on access to the MLC

 

During 2026, the BCRA introduced measures to facilitate financing and foreign exchange transactions of projects under the RIGI.

In April 2026, SPV were allowed to count as inflows certain direct investment contributions, financial borrowings and financing for the import of capital goods entered and settled by companies that are shareholders or partners of the SPV, among other authorized parties. It was also established that such funds could be taken into account for purposes of the SPV’s access to the MLC to pay for imports of goods and services, with the simultaneity requirement deemed fulfilled when such access occurred within the time limits established by the applicable regulations.

In August 2026, foreign exchange easing measures were extended to certain payments related to reinsurance agreements associated with projects under the RIGI.

For more information on Argentina’s exchange rate policies, please visit the Central Bank’s website: www.bcra.gov.ar.

2.8Tax regulations

2.8.1 Income tax

Tax inflation adjustment

Law No. 27,802, published in the BO on March 6, 2026, establishes the adjustment of tax losses carryforwards generated in fiscal years beginning on or after January 1, 2025, inclusive, considering the variation in the CPI between the closing month of the fiscal year in which they arise and the closing month of the fiscal year being assessed.

2.8.2 Other Regimes

2.8.2.1 Hydrocarbon Export Duties Regime

Pursuant to PEN Executive Order No. 488/20, oil, natural gas and liquefied gas exports are exempt from export duties provided that the Brent crude oil price published by the SE at the end of each month is equal to or lower than US$ 45/bbl. Under this regime, the export duty rate is subject to a gradual increase of up to 8% as the reference price increases, reaching 8% when the price is equal to or higher than US$ 60/bbl.

   
 18 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 2: (Continuation)

PEN Executive Order No. 59/26 updated the export duties regime applicable to crude oil and introduced a distinction between conventional and unconventional crude oil production. Under the updated regime, conventional crude oil exports are exempt from export duties when the international Brent crude oil price is equal to or lower than US$ 65/bbl, and are subject to a rate increasing gradually up to 8% according to a formula based on the increase in the reference price, reaching 8% when the price is equal to or higher than US$ 80/bbl. The Executive Order entered into effect on February 20, 2026, pursuant to SE Resolution No. 42/26.

As of September 30, 2026, crude oil and natural gas exports are subject to an 8% export duty rate.

2.8.2.2 Export duties regime for industrial products

PEN Executive Order No. 566/26, effective as from July 1, 2026, provided for the reduction and/or elimination of export duties applicable to various tariff codes of industrial products, a measure covering certain petrochemical products (xylene, hexane, toluene, styrene, polystyrene and rubber).

The regulation contemplates a progressive duty reduction scheme for the products sold by the Company, providing for the full elimination of the corresponding export duties by June 2027.

2.8.2.3 RIGI amendment

Pursuant to Executive Order No. 105/26, dated February 19, 2026, the deadline to apply for the RIGI was extended until July 8, 2027. In addition, the decree expanded the list of eligible projects to include, among others: (i) the construction of infrastructure for the collection, treatment, processing, fractionation, and liquefaction of natural gas, as well as the transportation of natural gas intended for the export of liquefied natural gas; (ii) the exploration and production of new onshore liquid and gaseous hydrocarbon developments located in areas that, at the time of submitting the application for adhesion, do not have existing investments in exploration or production activities; and (iii) the exploration and production of new offshore liquid and gaseous hydrocarbon developments. Additionally, it set a minimum investment threshold of US$ 600 million for onshore developments and US$ 200 million for offshore developments.

Where activities not covered by the RIGI coexist within the same hydrocarbon area, segregation and traceability must be ensured through independent measurement systems and the SPV must be the exclusive owner of the assets, rights, and operations associated with the RIGI-eligible project.

   
 19 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 3: BASIS OF PREPARATION

These Consolidated Condensed Interim Financial Statements for the nine-month period ended September 30, 2026 have been prepared pursuant to the provisions of IAS 34, “Interim Financial Information”, are expressed in millions of pesos and were approved for their issuance by the Company’s Board of Directors on November 2, 2026.

The information included in the Consolidated Condensed Interim Financial Statements is recorded in US dollars, which is the Company’s functional currency and, in accordance with CNV requirements, is presented in pesos, the legal currency in Argentina.

This consolidated condensed interim financial information has been prepared under the historical cost convention, modified by the measurement of financial assets at fair value through profit or loss and they should be read together with the Consolidated Financial Statements as of December 31, 2025, which have been prepared under IFRS Accounting Standards.

These Consolidated Condensed Interim Financial Statements for the nine-month period ended September 30, 2026 have not been audited. The Company’s Management estimates they include all the necessary adjustments to state fairly the results of operations for the period. The results for the nine-month period ended September 30, 2026, do not necessarily reflect in proportion the Company’s results for the complete year.

The accounting policies have been consistently applied to all entities within the Group.

Comparative information

The information as of December 31, 2025, and for the nine and three month periods ended September 30, 2025, disclosed for comparative purposes, arises from the Consolidated Financial Statements as of those dates.

Additionally, certain non-significant reclassifications have been made to the Consolidated Financial Statements´ figures disclosed for comparative purposes to keep the consistency in the presentation with the current period figures.

   
 20 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 4: ACCOUNTING POLICIES

The accounting policies applied in these Consolidated Condensed Interim Financial Statements are consistent with those used in the Consolidated Financial Statements for the last fiscal year, which ended on December 31, 2025.

4.1 New accounting standards, amendments and interpretations issued by the IASB effective as of December 31, 2026 and adopted by the Company

The Company has applied the following standards and / or amendments for the first time as of January 1, 2026:

-IFRS 9 and IFRS 7 - “Financial Instruments and Disclosures” (amended in May 2024 and December 2024).
-IMPROVEMENTS TO IFRS – Volume 11 (July 2024).

 

The application of the detailed standards and amendments did not have any impact on the results of the operations or the financial position of the Company.

4.2 New accounting standards, amendments and interpretations issued by the IASB not yet effective and not early adopted by the Company

Pursuant to CNV General Resolution No. 972/23, early application of IFRS accounting standards and/or amendments thereto is not permitted unless specifically permitted at the time of adoption.

As of September 30, 2026, the Company has not early applied the following standards and/or amendments:

-IFRS 18 - “Presentation and Disclosure in Financial Statements”: issued in April 2024. It establishes new presentation and disclosure requirements aiming to ensure that financial statements provide relevant information faithfully representing an entity’s situation. The standard does not affect the recognition or measurement of financial statement items; however, it introduces new requirements for improved comparability among entities. Specifically, the following are worth mentioning: (i) the classification of income and expenses into operating, investing and financing categories; (ii) the incorporation of required subtotals; and (iii) the disclosure of performance measures defined by management. The standard is applicable retrospectively to fiscal years and interim periods beginning on or after January 1, 2027, allowing for early adoption. The Company is currently analyzing the disclosure impact on the financial statements in relation to the application of the standard.
   
 21 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 4: (Continuation)

 

-IFRS 19 - “Subsidiaries without Public Accountability: Disclosures”: issued in May 2024. It allows for reduced disclosures for entities without public accountability that are subsidiaries of an entity preparing consolidated financial statements available for public use and in compliance with IFRS accounting standards. Subsequently, in August 2025, amendments were introduced reducing disclosure requirements related to supplier financing arrangements, lack of exchangeability of currency and international tax reform, and replacing disclosure requirements regarding management-defined performance measures with a cross-reference to IFRS 18 for entities using such measures. The standard and its amendments are effective for fiscal periods beginning on or after January 1, 2027, with early adoption permitted. The application of this standard will not impact the Company’s operating results or financial position.

 

-IAS 21 - “Effects of Changes in Foreign Exchange Rates”: In November 2025, IAS 21 was amended regarding the translation of financial statements for presentation in a currency different from the functional currency, and certain disclosure requirements were introduced. In particular, for the translation from a non-hyperinflationary functional currency to a hyperinflationary presentation currency, it establishes that all amounts (assets, liabilities, equity items, income and expenses, including comparative information) are translated at the closing exchange rate. The amendments are retrospectively applicable for annual periods beginning on or after January 1, 2027, with early adoption permitted. The Company is assessing the impact of applying the translation methodology on profit or loss, other comprehensive income arising from exchange differences on translation and comparative information.

 

-IFRS 20 - “Regulatory Assets and Regulatory Liabilities”: issued in May 2026. It replaces IFRS 14 and sets out the accounting treatment for regulatory assets, liabilities, income and expenses arising when part or all of a regulated rate for goods or services supplied in one period is charged to customers in a different period. The standard is applicable retrospectively to annual and interim reporting periods beginning on or after January 1, 2029, with early adoption permitted. The Company is assessing the impact of its application on the Company’s operating results or financial position.

 

-IAS 28 - “Investments in Associates and Joint Ventures”: in June 2026, the section on exemptions from applying the equity method was amended, extending the option to measure an investment in an associate or joint venture at fair value through profit or loss to those entities whose main activity consists of investing in specific types of assets under IFRS 18. The amendment is applicable upon adoption of IFRS 18, which is mandatory for reporting periods beginning on or after January 1, 2027. The application of the amendment will not impact on the Company’s operating results or financial position.

 

   
 22 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: GROUP STRUCTURE

5.1Interest in subsidiaries, associates and joint ventures
5.1.1Subsidiaries information

Unless otherwise indicated, the country is also the principal place where the subsidiary carries out its activities.

            09.30.2026   12.31.2025
Company   Country   Main activity   Direct and indirect participation %   Direct and indirect participation %
Ecuador Pipeline Holdings Limited (1)   Grand Cayman   Investment   -   100.00%
EISA   Uruguay   Investment   100.00%   100.00%
Enecor S.A.   Argentina   Electricity transportation   70.00%   70.00%
FEPASAU   Argentina   Fertilizers   100.00%   100.00%
Fideicomiso CIESA    Argentina   Investment   100.00%   100.00%
GASA   Argentina   Investment   100.00%   100.00%
HIDISA   Argentina   Generation   61.00%   61.00%
HINISA   Argentina   Generation   52.04%   52.04%
OCP    Grand Cayman   Investment   100.00%   100.00%
OPGSA    Argentina   Oil   100.00%   100.00%
Pampa Ecuador Inc (1)   Nevis Island    Investment   -   100.00%
PAMPA E&P S.A.U.   Argentina   Oil   100.00%   100.00%
PB18   Ecuador   Oil   100.00%   100.00%
PEB   Bolivia   Investment   100.00%   100.00%
PECSA   Chile   Trader   100.00%   100.00%
PESOSA   Argentina   Trader   100.00%   100.00%
Petrolera San Carlos S.A.   Venezuela   Oil   100.00%   100.00%
PISA   Uruguay   Investment   100.00%   100.00%
Recursos Energéticos S.A.   Argentina   Generation and Investment   100.00%   100.00%
VAR   Argentina   Generation   100.00%   100.00%
Vientos Solutions Argentina S.A.U.   Argentina   Advisory services   100.00%   100.00%

(1)Dissolved entity.

 

   
 23 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: (Continuation)

5.1.2Associates and joint ventures information

The following table presents the main activity and the financial information used for valuation and percentages of participation in associates and joint ventures; unless otherwise indicated, the share capital consists of millions of common shares with one vote per share:
 

        Information about the issuer    
    Main activity   Date   Share capital   Profit (Loss) of the period   Equity   Direct and indirect participation %
Associates                        
SESA    Gas treatment   09.30.2026   1,203   241   286,935   20.00%
VMOS   Hydrocarbon transportation   09.30.2026   215,889   25,335   1,013,549   9.09%
SMP   Gas transportation   09.30.2026   101   (3,407)   71,961   20.00%
Joint ventures                    
CIESA (1)   Investment   09.30.2026   639   232,215   2,322,658   50.00%
Citelec (2)   Investment   09.30.2026   556   121,761   546,938   50.00%
CTB   Generation   09.30.2026   8,558   199,598   941,254   50.00%

(1)The Company holds a 50% interest in CIESA, a company that holds a 53.83% interest in TGS’s capital stock; therefore, the Company has a 26.91% interest in TGS.
As of September 30, 2026, TGS’s common shares and ADR traded on the BCBA and NYSE were listed at $ 8,375.00 and US$ 25.95, respectively, conferring Pampa’s holding an approximate market value of $ 1,696,744 million.
(2)The Company has a 50% interest in Citelec, a company that holds a 52.65% interest in Transener’s capital stock; therefore, the Company has a 26.33% indirect interest in Transener. As of September 30, 2026, Transener’s common share price listed at the BCBA was $ 3,100, conferring Pampa’s indirect holding an approximate market value of $ 362,887 million.

The detail of the balances of investments in associates and joint ventures is as follows:

    09.30.2026   12.31.2025
Disclosed in non-current assets        
Associates        
SESA   57,387   17,315
VMOS   92,141   44,672
SMP   14,393   -
Total associates   163,921   61,987
Joint ventures        
CIESA   1,228,407   899,846
Citelec   273,469   227,627
CTB   470,627   351,928
Total joint ventures   1,972,503   1,479,401
Total associates and joint ventures   2,136,424   1,541,388

 

   
 24 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: (Continuation)

 

The following table shows the breakdown of the result from investments in associates and joint ventures:

 

    09.30.2026   09.30.2025
Associates        
SESA   11,483   2,221
VMOS   3,396   (4,529)
SMP   (607)   -
Total associates   14,272   (2,308)
         
Joint ventures        
CIESA   113,037   96,515
Citelec    60,015   33,511
CTB   99,799   5,386
Total joint ventures   272,851   135,412
Total associates and joint ventures   287,123   133,104

 

The evolution of investments in associates and joint ventures is as follows:

 

    09.30.2026   09.30.2025
At the beginning of the year   1,541,388   1,024,769
Dividends   (66,631)   (88,197)
Capital integration   79,797   44,726
Share of profit    287,123   133,104
Exchange differences on translation   294,747   265,483
At the end of the period   2,136,424   1,379,885

 

5.1.3CTB

Reversal of impairment losses on non-financial assets

During the quarter ended June 30, 2026, CTB identified significant changes in the environment where it operates and, consequently, determined CTEB’s recoverable amount as of June 30, 2026.

The recoverability assessment resulted in the reversal of impairment losses recognized in previous fiscal years, with a $ 45,902 million (US$ 31 million) impact on the Company’s share of profit from associates and joint ventures for the period.

 

   
 25 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: (Continuation)

5.1.4CIESA – TGS

Perito Moreno Gas Pipeline (GPM) Expansion

MECON Resolution No. 676/26 approved the application to opt into the RIGI for the GPM expansion project, effective as of April 30, 2026.

TGS conducted a public call for tenders to award a portion of the incremental transportation capacity associated with the expansion of the GPM and on April 15, 2026, 5.4 million m³/day were awarded. The remaining capacity was awarded on August 26, 2026.

Integral NGL Project

On June 10, 2026, TGS’s Board of Directors approved the development of the Integral NGL Project, which is structured into two independent, but operationally linked, single projects representing successive stages of the processing, fractionating, obtaining and storing of natural gas liquids, and the subsequent product dispatch and export.

The Integral NGL Project will be executed through the following companies controlled by TGS and established as SPV within RIGI’s framework:

(i) Procesadora de Gas del Sur S.A. (“PGS”): in charge of the so-called separation project, consisting of the construction, operation and maintenance of a natural gas processing plant located in Tratayén, Province of Neuquén, and a natural gas stream segregation pipeline, which will enable the provision of natural gas gathering and processing services to gas producers; and

(ii) Midstream de Gas del Sur S.A. (“MGS”): in charge of the transportation, fractionation, storage and commercialization project, comprising the construction, operation and maintenance of a multiproduct pipeline connecting the Tratayén Plant with a fractionation plant in the Bahía Blanca area, Province of Buenos Aires, together with storage and dispatch facilities. Under the project, MGS will acquire the natural gas liquids mix resulting from PGS’s processing for its transportation, fractionation into commercial products (such as propane, butane and natural gasoline), storage and subsequent sale to export customers.

The project is structured through long-term agreements, including execution, transportation and processing, liquid hydrocarbon purchase and sale, and commercial cooperation agreements.

TGS has granted corporate guarantees and surety bonds to secure certain obligations arising from the agreements entered into with the producers participating in the project and from the financing agreements obtained by MGS and PGS for the project’s development.

   
 26 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: (Continuation)

Weather event

During the period ended September 30, 2026, TGS recorded $ 9,586 million losses arising from expenses related to the weather event of March 7, 2025, which resulted in the flooding of the Cerri Complex, and received $ 13,716 million from insurance companies as an advance payment on account of the final settlement of the claim.

5.1.5SMP

San Matías Pipeline Project

In addition to the gas liquefaction project to be developed by SESA, which includes the installation of two liquefaction vessels in the Gulf of San Matías, SMP will be responsible for the construction and operation of a dedicated pipeline connecting gas production from Vaca Muerta, in Neuquén, to the Gulf of San Matías, in Río Negro, to supply the liquefaction vessels intended for LNG exports. The project involves the construction of an approximately 470-km-long, 36-inch-diameter pipeline with a transportation capacity of up to 28 million m³/day. The estimated investment amounts to US$ 1.3 billion, and the pipeline is expected to be commissioned in the second quarter of 2028.

MECON Resolution No. 873/26 approved the application to opt into the RIGI for the project undertaken by SMP, effective as from June 1, 2026.

Syndicated international loan

In August 2026, SMP entered into a syndicated international loan with a consortium of financial institutions for a total amount of up to US$ 900 million to finance the construction and development of the project. The financing has a 7-year term and accrues interest at a rate of Term SOFR plus a 4.25% annual margin.

SMP may request disbursements on a monthly basis until completion of the project or the first amortization date, scheduled for December 31, 2029, whichever occurs first. As of September 30, 2026, the banks have made disbursements totaling US$ 118 million.

To secure its obligations, SMP granted certain collateral under the financing, including the following: (i) it assigned its collection rights under the transportation agreement entered into with SESA, and (ii) SMP’s shareholders (including the Company) have executed a fiduciary assignment of their shares as collateral for the financing, which will remain in effect until the loan is repaid.

As of September 30, 2026, SMP has complied with all covenants undertaken under the syndicated loan agreement.

   
 27 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: (Continuation)

5.1.6VMOS

Issuance of Class 1 CB

On September 22, 2026, VMOS issued limited-recourse Class 1 CB with a face value of US$ 233.7 million, at a 6.25% fixed annual interest rate and maturing on September 22, 2030.

Net proceeds will be used to finance the development, construction and operation of the VMOS Project, including working capital and investments related to the construction work.

VMOS has undertaken certain commitments regarding the creation of collateral and/or restrictions on certain rights. In particular, it has committed to perfecting an assignment as collateral of all present and future collection rights corresponding to the dollar-linked tariff under the initial transportation agreements and the designated transportation agreement, to secure the payment of principal and interest on the Class 1 CB. As of the date of issuance of these Consolidated Condensed Interim Financial Statements, VMOS has not yet perfected such assignment as collateral.

5.2Oil and gas participations

Assets and liabilities as of September 30, 2026 and December 31, 2025 and the production cost of the Joint Operations and Consortiums in which the Company participates corresponding to the nine-month periods ended September 30, 2026 and 2025 are detailed below:

    09.30.2026   12.31.2025
         
         
Non-current assets                  203,135                  176,789
Current assets                    15,230                    12,935
         
Total assets                  218,365                  189,724
         
Non-current liabilities                    60,400                    57,631
Current liabilities                    33,055                    30,414
         
Total liabilities                     93,455                    88,045
         
         
    09.30.2026   09.30.2025
Production cost                    43,194                    88,386

It is worth highlighting that the information presented does not include charges recorded by the Company as a member of the Joint Operations and Consortiums.

   
 28 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 5: (Continuation)

Relinquishment process for the Veta Escondida block

Provincial Executive Order No. 605/26 approved the Settlement Agreement entered into between the Province of Neuquén and Pampa on March 4, 2026, which set aside the executive order declaring the termination of the Veta Escondida block´s concession. In addition, the parties agreed to conclude the process for relinquishing the block to the Province. Within this framework, the Company and Total Austral (co-concessionaire) are jointly carrying out such process in an orderly manner, with the Company being responsible for the abandonment of wells and facilities and the required environmental remediation works.

NOTE 6: RISKS

6.1 Critical accounting estimates and judgments

The preparation of these Consolidated Condensed Interim Financial Statements requires the Company’s Management to make future estimates and assessments, to apply critical judgment and to establish assumptions affecting the application of accounting policies and the amounts of disclosed assets and liabilities, and income and expenses.

Those estimates and judgments are evaluated on a continuous basis and are based on past experiences and other reasonable factors under the existing circumstances. Actual future results might differ from the estimates and evaluations made at the date of preparation of these Consolidated Condensed Interim Financial Statements.

In the preparation of these Consolidated Condensed Interim Financial Statements, management judgments on applying the Company’s accounting policies and sources of information used for the respective estimates are the same as those applied in the Consolidated Financial Statements for the fiscal year ended December 31, 2025.

6.2 Financial risk management

The Company’s activities are subject to several financial risks: market risk (including the exchange rate risk, the interest rate risk and price risk), credit risk and liquidity risk.

No significant changes have arisen in risk management policies since last fiscal year.

   
 29 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM
FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 7: SEGMENT INFORMATION

The Company is a fully integrated power company in Argentina, which participates mainly in the production of oil and gas and power generation.

Through its own activities, subsidiaries and shareholdings in joint ventures and associates, and based on the business nature, customer portfolio and risks involved, the following business segments have been identified:

Oil and Gas, principally consisting of the Company’s interests in oil and gas areas, the activities of Pampa Energía S.A. - Sucursal Dedicada Proyecto RDA and direct and indirect interest in SESA and PECSA.

Generation, principally consisting of the Company’s direct and indirect interests in HINISA, HIDISA, VAR, CTB, TMB, TJSM and through its own electricity generation activities through thermal plants CTG, CPB, Piquirenda, CTLL, CTGEBA, Ecoenergía, CTPP, CTIW, the HPPL hydroelectric complex and PEPE II, PEPE III, PEPE IV and PEPE VI wind farms.

Petrochemicals, principally comprising of the Company’s own styrenics operations and the catalytic reformer plant operations conducted in local plants.

Holding, Transportation and Others, principally consisting of our stake in joint businesses CITELEC, CIESA and their respective subsidiaries holding the concession over high-voltage electricity transmission and gas transportation, respectively, the direct and indirect interests in VMOS, SMP, Oldelval and OCP, holding activities, and other investment activities.

The Company manages its operating segment based on its individual net result in U.S. dollars.

   
 30 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 7: (Continuation)

 

    in millions of US$   in millions of $
Consolidated profit and loss information for the nine-month period ended September 30, 2026   Oil and gas   Generation   Petrochemicals   Holding, Transportation and others   Eliminations   Consolidated   Consolidated
Revenue - local market   446   1,007   205   23   -   1,681   2,444,101
Revenue - foreign market   256   -   172   -   -   428   618,821
Intersegment revenue   221   1   -   -   (222)   -   -
Cost of sales   (628)   (661)   (324)   -   221   (1,392)   (2,050,997)
Gross profit   295   347   53   23   (1)   717   1,011,925
                             
Selling expenses   (75)   (4)   (9)   -   -   (88)   (127,049)
Administrative expenses   (65)   (34)   (4)   (40)   1   (142)   (206,472)
Exploration expenses   -   -   -   -   -   -   (493)
Other operating income   31   10   1   5   -   47   70,433
Other operating expenses   (11)   (11)   (37)   (24)   -   (83)   (119,484)
Impairment of intangible assets and inventories   (1)   -   -   -   -   (1)   (1,181)
Recovery of impairment of financial assets   3   -   -   -   -   3   4,300
Share of profit from associates and joint ventures   8   68   -   116   -   192   287,123
Operating income   185   376   4   80   -   645   919,102
                             
Financial income   1   13   -   -   (1)   13   19,136
Financial costs   (96)   (25)   -   (20)   1   (140)   (203,110)
Other financial results   (23)   36   (8)   17   -   22   30,873
Financial results, net   (118)   24   (8)   (3)   -   (105)   (153,101)
Profit before income tax   67   400   (4)   77   -   540   766,001
                             
Income tax   49   (88)   2   16   -   (21)   (28,309)
Profit (loss) of the period   116   312   (2)   93   -   519   737,692
                             
Depreciation and amortization   297   108   -   -   -   405   585,060

 

   
 31 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 7: (Continuation)

 

    in millions of US$   in millions of $
Consolidated profit and loss information for the nine-month period ended September 30, 2026   Oil and gas   Generation   Petrochemicals   Holding, Transportation and others   Eliminations   Consolidated   Consolidated
Total profit of the period attributable to:                            
Owners of the company   116   308   (2)   93   -   515   731,349
Non-controlling interest   -   4   -   -   -   4   6,343
                             
Consolidated financial position information as of September 30, 2026                            
Assets   3,570   2,881   176   1,584   (89)   8,122   12,323,758
Liabilities   2,951   674   80   376   (89)   3,992   6,057,156
                             
Net book values of property, plant and equipment (1)   2,252   1,280   -   331   -   3,863   5,860,280
                             
Additional consolidated information as of September 30, 2026                            
Increases in property, plant and equipment and intangible assets   633   15   -   300   -   948   1,386,193

 

 

(1)Assets located in Argentina.

 

 

   
 32 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 7: (Continuation)

 

    in millions of US$   in millions of $
Consolidated profit and loss information for the nine-month period ended September 30, 2025   Oil and gas   Generation   Petrochemicals   Holding, Transportation and others   Eliminations   Consolidated   Consolidated
Revenue - local market   416   583   190   18   -   1,207   1,457,923
Revenue - foreign market   143   2   139   -   -   284   347,596
Intersegment revenue   99   -   -   -   (99)   -   -
Cost of sales   (461)   (319)   (319)   -   99   (1,000)   (1,214,020)
Gross profit   197   266   10   18   -   491   591,499
                             
Selling expenses   (56)   (3)   (9)   (1)   -   (69)   (83,758)
Administrative expenses   (60)   (31)   (5)   (35)   -   (131)   (157,003)
Exploration expenses   -   -   -   -   -   -   (362)
Other operating income   41   17   19   8   -   85   103,420
Other operating expenses   (16)   (9)   (8)   (29)   -   (62)   (73,410)
Impairment of intangible assets and inventories   (8)   -   -   -   -   (8)   (10,298)
Impairment of financial assets   (5)   -   -   -   -   (5)   (6,067)
Share of profit from associates and joint ventures   2   5   -   94   -   101   133,104
Operating income   95   245   7   55   -   402   497,125
                             
Financial income   -   15   27   -   -   42   47,525
Financial costs   (77)   (36)   -   (38)   -   (151)   (180,417)
Other financial results   (25)   81   4   77   -   137   163,491
Financial results, net   (102)   60   31   39   -   28   30,599
Profit (Loss) before income tax   (7)   305   38   94   -   430   527,724
                             
Income tax   (31)   (180)   (11)   8   -   (214)   (267,280)
Profit (Loss) of the period   (38)   125   27   102   -   216   260,444
                             
                             
Depreciation and amortization   214   87   4   -   -   305   365,949

  

   
 33 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 7: (Continuation)

 

    in millions of US$   in millions of $
Consolidated profit and loss information for the nine-month period ended September 30, 2025   Oil and gas   Generation   Petrochemicals   Holding, Transportation and others   Eliminations   Consolidated   Consolidated
Total profit (loss) of the period attributable to:                            
Owners of the company   (38)   125   27   102   -   216   260,777
Non-controlling interest   -   -   -   -   -   -   (333)
                             
Consolidated financial position information as of December 31, 2025                            
Assets   2,513   3,046   147   931   (43)   6,594   9,595,935
Liabilities   1,737   668   73   554   (43)   2,989   4,351,152
                           
Net book values of property, plant and equipment (1)   1,896   1,370   -   37   -   3,303   4,805,587
                             
Additional consolidated information as of September 30, 2025                            
Increases in property, plant and equipment, intangible assets and right-of-use assets   720   46   14   9   -   789   938,938

 

 

(1)Assets located in Argentina.

 

   
 34 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 8: REVENUE

    09.30.2026   09.30.2025
         
Gas sales   510,432   464,711
Oil sales   491,488   217,732
Other sales   17,140   9,854
Oil and gas sales subtotal (1)   1,019,060   692,297
         
Energy sales in spot market   840,041   219,729
Energy sales by supply contracts   470,926   348,941
Fuel supply   141,352   121,855
Other sales   11,881   8,955
Generation sales subtotal   1,464,200   699,480
         
Products from catalytic reforming sales   315,272   220,689
Styrene sales   64,752   53,265
Synthetic rubber sales   76,530   62,399
Polystyrene sales   88,611   55,198
Other sales   1,305   649
Petrochemicals sales subtotal   546,470   392,200
         
Technical assistance and administration services sales   33,071   21,183
Other sales   121   359
Holding, Transportation and others subtotal   33,192   21,542
Total revenue (2)(3)   3,062,922   1,805,519

 

(1)See Note 12.7.

 

(2)Revenues from CAMMESA represent 40% and 33% of total revenues from sales for the nine-month periods ended September 30, 2026 and 2025, respectively, and correspond mainly to the Oil and gas and Generation segments.

 

(3)Including $ 39,106 million and $ 14,160 million in the Oil and gas segment and $ 12,857 million and $ 9,696 million in the Petrochemical segment corresponding to export duties for the nine-month periods ended September 30, 2026 and 2025, respectively.

 

   
 35 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 9: COST OF SALES

 

    09.30.2026   09.30.2025
Inventories at the beginning of the year   335,514   230,095
         
Plus: Charges of the period        
Purchases of inventories, energy and gas    748,348   382,972
Salaries and social security charges   96,467   78,005
Employees benefits   13,509   12,625
Defined benefit plans   2,471   3,137
Works contracts, fees and compensation for services   184,948   132,437
Property, plant and equipment depreciation   545,754   339,486
Intangible assets amortization   3,790   3,564
Right-of-use assets amortization   26,296   15,179
Energy transportation   7,693   14,330
Transportation and freights   53,748   40,782
Consumption of materials   26,692   21,572
Penalties   10,169   1,605
Maintenance   71,748   54,153
Canons and royalties   201,896   105,575
Rental and insurance   58,491   20,209
Surveillance and security   8,543   7,598
Taxes, rates and contributions   8,735   2,906
Other   9,736   7,070
Total charges of the period   2,079,034   1,243,205
         
Exchange differences on translation   44,088   93,739
         
Less: Inventories at the end of the period   (407,639)   (353,019)
Total cost of sales   2,050,997   1,214,020

   
 36 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 10: OTHER ITEMS OF THE STATEMENT OF COMPREHENSIVE INCOME

10.1 Selling expenses

 

    09.30.2026   09.30.2025
Salaries and social security charges   5,629   4,646
Employees benefits   280   218
Fees and compensation for services   3,475   1,841
Property, plant and equipment depreciation   -   8
Taxes, rates and contributions   27,385   17,807
Transportation and freights   87,982   58,048
Other   2,298   1,190
Total selling expenses   127,049   83,758

10.2 Administrative expenses

    09.30.2026   09.30.2025
Salaries and social security charges   75,979   57,098
Employees benefits   7,271   6,689
Defined benefit plans   5,709   7,121
Fees and compensation for services   66,850   48,353
Compensation agreements   6,632   1,039
Directors' and Syndics' fees    6,292   5,672
Property, plant and equipment depreciation   9,220   7,712
Maintenance   2,575   2,813
Transport and per diem   3,127   1,496
Taxes, rates and contributions   17,572   10,389
Other   5,245   8,621
Total administrative expenses   206,472   157,003

 

10.3 Exploration expenses

    09.30.2026   09.30.2025
Geological and geophysical expenses   493   362
Total exploration expenses   493   362

   
 37 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 10: (Continuation)

10.4 Other operating income and expenses

 

    09.30.2026   09.30.2025
Other operating income        
Insurance recovery   8,120   17,442
Results for property, plant and equipment sale   729   118
Results for other assets sale and derecognition   5,488   1,247
Result from intangible assets sale   -   4,973
Recovery of provision for contingencies   1,552   18,692
Dividends received   3,565   4
Commercial interests   13,630   14,055
GasAR Plan   24,668   40,750
Contractual income   7,278   -
Other   5,403   6,139
Total other operating income   70,433   103,420
         
Other operating expenses        
Provision for contingencies   (19,760)   (20,487)
Provision for environmental remediation   (244)   (6,981)
Results for property, plant and equipment derecognition   (3,513)   (66)
Results for other assets sale and derecognition   (3,602)   (34)
Tax on bank transactions    (25,319)   (21,817)
Donations and contributions   (4,251)   (1,921)
Institutional promotion   (1,650)   (1,038)
Costs of concessions agreements completion   (2,079)   (930)
Royalties GasAR Plan   (3,325)   (5,565)
Incident costs   (1,044)   (5,436)
Restructuring costs   (34,805)   -
Project expenses   (8,733)   -
Other   (11,159)   (9,135)
Total other operating expenses   (119,484)   (73,410)

   
 38 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 10: (Continuation)

10.5 Financial results

  09.30.2026   09.30.2025
Financial income      
Financial interests   17,671   46,904
Other interests   1,465   621
Total financial income   19,136   47,525
       
Financial costs        
Financial interests (1)   (168,319)   (125,203)
Commercial and other interests    (44)   (331)
Fiscal interests   (29,511)   (49,012)
Bank and other financial expenses   (5,236)   (5,871)
Total financial costs   (203,110)   (180,417)
       
Other financial results        
Foreign currency exchange difference, net   21,409   34,757
Changes in the fair value of financial instruments   35,634   128,438
Result from present value measurement   (27,532)   (1,953)
Result from repurchase of CB   354   2,370
Other financial results   1,008   (121)
Total other financial results   30,873   163,491
Total financial results, net   (153,101)   30,599

 

(1)Net of $ 17,392 million and $ 4,104 million of borrowing costs capitalized in property, plant and equipment corresponding to the nine-month periods ended September 30, 2026 and 2025 respectively.

   
 39 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 10: (Continuation)

10.6 Income tax

 

The breakdown of income tax charge is:

 

    09.30.2026   09.30.2025
Current tax    236,051   70,767
Deferred tax    (180,191)   195,766
Difference between previous fiscal year income tax provision and the income tax statement   (27,551)   747
Total income tax - Loss   28,309   267,280

 

Below is a reconciliation between income tax expense and the amount resulting from application of the tax rate on the profit before taxes:

 

    09.30.2026   09.30.2025
Profit before income tax   766,001   527,724
Current income tax rate   35%   35%
Income tax at the statutory tax rate   268,100   184,703
Share of profit from companies   (100,493)   (46,587)
Effects of exchange differences and other results associated with the valuation of the currency, net   65,210   289,395
Effects of valuation of property, plant and equipment, intangible assets and financial assets   (429,556)   (280,048)
Difference between previous fiscal year income tax provision and deferred tax and the income tax statement    26,501   709
Effect for tax inflation adjustment   196,852   105,531
Other   1,695   13,577
Total income tax - Loss   28,309   267,280

 

   
 40 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: NON-FINANCIAL ASSETS AND LIABILITIES

11.1Property, plant and equipment

      Original values
Type of good     At the beginning    Increases (1)   Transfers   Decreases   Impairment   Traslation effect   At the end 
               
               
Lands     15,313   -   -   -   -   652   15,965
Buildings     258,531   -   373   -   -   11,065   269,969
Vehicles     12,488   1,262   89   (71)   -   722   14,490
Furniture and fixtures, tools and software and communication equipment     79,915   1,634   2,526   (325)   -   3,946   87,696
Thermal generation plants     1,874,712   325   7,832   (3,617)   -   80,010   1,959,262
Renewable generation plants     1,032,611   49   (576)   -   -   45,854   1,077,938
Mining property, wells and drilling equipment     3,715,256   -   939,572   -   -   197,168   4,851,996
Drilling and work in progress     913,848   1,380,921   (949,816)   (2)   -   52,004   1,396,955
Other goods     756   -   -   -   -   32   788
Total at 09.30.2026     7,903,430   1,384,191   -   (4,015)   -   391,453   9,675,059
Total at 09.30.2025     4,525,269   887,228   -   (1,080)   (12,454)   1,663,970   7,062,933

  

(1) Includes $ 17,392 million and $ 4,104 million of borrowing costs capitalized for the nine-month periods ended September 30, 2026 and 2025. respectively

 

   
 41 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: (Continuation)

 

      Depreciation   Net book values
Type of good     At the beginning    Decreases    For the period   Impairment   Traslation effect   At the end   At the end   At 12.31.2025
                 
                 
Lands     -   -   -   -   -   -   15,965   15,313
Buildings     (113,562)   -   (7,825)   -   (5,263)   (126,650)   143,319   144,969
Vehicles   (9,214)   71   (1,184)   -   (536)   (10,863)   3,627   3,274
Furniture and fixtures, tools and software and communication equipment     (57,755)   318   (6,638)   -   (3,125)   (67,200)   20,496   22,160
Thermal generation plants     (924,355)   113   (103,251)   -   (44,636)   (1,072,129)   887,133   950,357
Renewable generation plants     (162,656)   -   (37,388)   -   (10,765)   (210,809)   867,129   869,955
Mining property, wells and drilling equipment     (1,829,565)   -   (398,679)   -   (98,108)   (2,326,352)   2,525,644   1,885,691
Drilling and work in progress     -   -   -   -   -   -   1,396,955   913,848
Other goods     (736)   -   (9)   -   (31)   (776)   12   20
Total at 09.30.2026     (3,097,843)   502   (554,974)   -   (162,464)   (3,814,779)   5,860,280    
Total at 09.30.2025     (1,834,736)   1,014   (347,206)   3,079   (670,838)   (2,848,687)   4,214,246    
Total at 12.31.2025                                 4,805,587

 

   
 42 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: (Continuation)

11.2 Intangible assets

    Original values
Type of good   At the beginning   Increases    Decreases    Impairment   Traslation effect    
            At the end
             
Concession agreements   2,692   -   -   -   1,117   3,809
Goodwill    50,354   -   -   -   2,146   52,500
Intangible identified in acquisitions of companies   100,795   -   -   -   4,295   105,090
Digital assets    1,623   2,002   -   (114)   159   3,670
Total at 09.30.2026   155,464   2,002   -   (114)   7,717   165,069
Total at 09.30.2025   113,512   2,309   (5,457)   (339)   36,628   146,653
                         
                         
    Amortization        
Type of good   At the beginning   For the period   Traslation effect            
        At the end        
                 
Concession agreements   (2,692)   -   (1,117)   (3,809)        
Intangible identified in acquisitions of companies   (22,396)   (3,790)   (1,151)   (27,337)        
Total at 09.30.2026   (25,088)   (3,790)   (2,268)   (31,146)        
Total at 09.30.2025   (14,342)   (3,564)   (4,677)   (22,583)        
                         
                         
    Net book values                
Type of good   At the end   At 12.31.2025                
                     
                         
Goodwill    52,500   50,354                
Intangible identified in acquisitions of companies   77,753   78,399                
Digital assets    3,670   1,623                
Total at 09.30.2026   133,923                    
Total at 09.30.2025   124,070                    
Total at 12.31.2025       130,376                

 

   
 43 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: (Continuation)

11.3 Deferred tax assets and liabilities

 

The composition of the deferred tax assets and liabilities is as follows:

 

    09.30.2026   12.31.2025
Tax loss carryforwards   12,661   1,958
Property, plant and equipment, right-of-use assets, intangible assets and inventories   263,341   42,449
Derivatives   84,250   -
Trade and other receivables   7,301   296
Other assets   1,401   5,494
Provisions and other non-deductible liabilities   51,600   72,709
Deferred tax asset   420,554   122,906
Property, plant and equipment, intangible assets and inventories   (69,599)   (71,845)
Investments in companies   (16,883)   (14,832)
Financial assets at fair value through profit and loss   (20,524)   (28,945)
Derivatives   -   (23,593)
Trade and other receivables   (28,467)   (2,719)
Provisions and other non-deductible liabilities   (24)   (23)
Deferred tax liability   (135,497)   (141,957)

 

Deferred tax assets and liabilities are offset only when there is a legally enforceable right to offset tax assets and liabilities; and when deferred income tax charges are associated with the same fiscal authority. Therefore, they are disclosed in the Consolidated Condensed Interim Statement of Financial Position:

 

    09.30.2026   12.31.2025
Deferred tax asset, net   355,636   62,442
Deferred tax liability, net   (70,579)   (81,493)

 

 

   
 44 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: (Continuation)

11.4 Inventories

  09.30.2026   12.31.2025
Current        
Materials and spare parts   262,741   229,357
Advances to suppliers   18,291   13,326
In process and finished products   126,607   92,831
Total (1)   407,639   335,514

 

(1)It includes impairment loss as a result of the performed recoverability assessment for $ 1,069 million (US$ 0.74 million), $ 584 million (US$ 0.55 million) and $ 367 million (US$ 0.36 million) for the nine-month periods ended September 30, 2026 and 2025 and for the year ended December 31, 2025, respectively.

11.5 Provisions

    09.30.2026   12.31.2025
Non-current        
Contingencies   43,111   77,937
Asset retirement obligation and wind turbines decommisioning   46,229   41,624
Environmental remediation   25,303   25,990
Other provisions   1   -
Total non-current   114,644   145,551
         
Current        
Contingencies   167   -
Asset retirement obligation and wind turbines decommisioning   6,657   6,877
Environmental remediation   5,335   5,319
Other provisions   4,179   6,356
Total current   16,338   18,552

 

   
 45 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: (Continuation)

 

The evolution of provisions is shown below:

    09.30.2026
    Contingencies   Asset retirement obligation and wind turbines decommisioning   Environmental remediation
             
At the beginning of the year   77,937   48,501   31,309
Increase   15,818   2,691   244
Utilization   (47,425)   (501)   (201)
Exchange differences on translation   (1,526)   2,195   1,377
Decrease   (1,526)   -   (2,091)
At the end of the period   43,278   52,886   30,638

 

    09.30.2025
    Contingencies   Asset retirement obligation and wind turbines decommisioning   Environmental remediation
             
At the beginning of the year   98,546   30,350   18,465
Increase   19,644   2,533   6,150
Utilization   (1,950)   (1,126)   (64)
Exchange differences on translation   14,638   9,973   6,550
Decrease   (49,194)   (1,560)   (941)
At the end of the period   81,684   40,170   30,160

 

Provision for lawsuits and contingencies

In the lawsuit filed by POSA for alleged breaches of the Assignment Agreement executed in 2016, on March 31, 2026, the National Chamber of Appeals in Commercial Matters disallowed the appeal for nullity filed by the Company against the Final Award. As of the issuance date of these Consolidated Condensed Interim Financial Statements, the Company has settled all obligations due.

   
 46 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 11: (Continuation)

11.6 Income tax and minimum notional income tax provision

    09.30.2026   12.31.2025
Non-current        
Income tax   39,919   32,508
Minimum notional income tax   2,493   6,026
Total non-current   42,412   38,534
         
         
Current        
Income tax   236,859   120,939
Total current   236,859   120,939

 

11.7 Tax liabilities

 

    09.30.2026   12.31.2025
Non-current        
Payment plans   293,912   309,156
Total non-current   293,912   309,156
         
Current        
Value added tax   60,717   3,460
Personal assets tax provision    15,544   15,770
Tax withholdings to be deposited   18,253   16,002
Payment plans   21,448   19,907
Royalties   30,476   17,186
Other   5,285   9,148
Total current   151,723   81,473

 

 

   
 47 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: FINANCIAL ASSETS AND LIABILITIES

12.1Financial assets at fair value through profit and loss

 

    09.30.2026   12.31.2025
Non-current        
Shares   51,360   48,275
Total non-current   51,360   48,275
         
Current        
Government securities    590,373   448,832
Corporate bonds   7,588   68,219
Shares   -   4,042
Mutual funds   164,816   12,023
Total current   762,777   533,116

 

12.2Trade and other receivables

 

    09.30.2026   12.31.2025
Non-current        
Receivables under judicial collection   34,986   -
Trade receivables   34,986   -
         
Non-current        
Advances to suppliers   87,385   60,604
Tax credits   4,810   50
Prepaid expenses   145   1,723
Contractual indemnity receivable   -   592
Guarantee deposits   13   4
Other   788   58
Other receivables   93,141   63,031
Total non-current   128,127   63,031

 

   
 48 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

 

  Note   09.30.2026   12.31.2025
Current          
Receivables     507,995   361,965
CAMMESA     272,963   171,648
Related parties 16   10,811   11,577
Impairment of financial assets     (1,481)   (29,085)
Trade receivables, net     790,288   516,105
           
Current          
Related parties 16   214,464   6,659
Tax credits     141,206   84,377
Prepaid expenses     31,501   26,730
Guarantee deposits (1)     418,982   207,186
Expenses to be recovered     5,710   4,681
Receivables for sale of assets     -   13,095
GasAr Plan     40,037   22,904
Contractual indemnity receivable     1,459   2,783
Receivable for maintenance contract     1,379   878
Impairment of other receivables     (56)   (1,008)
Other     8,251   9,336
Other receivables, net     862,933   377,621
           
Total current     1,653,221   893,726

 

(1)Includes guarantee deposits on derivatives amounting for $ 416,781 million and $ 205,627 million as of September 30, 2026, and December 31, 2025, respectively.

 

Due to the short-term nature of trade and other receivables, their book value is not considered to differ from their fair value. For non-current trade and other receivables, fair values do not significantly differ from book values.

   
 49 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

 

The movements in the impairment of financial assets are as follows:

 

    09.30.2026   09.30.2025
At the beginning of the year   29,085   833
Increase   6,312   6,398
Decrease   (10,340)   (425)
Reclasification   (23,549)   -
Exchange differences on translation   (27)   13
At the end of the period   1,481   6,819

 

The movements in the impairment of other receivables are as follows:

 

    09.30.2026   09.30.2025
At the beginning of the year   1,008   14
Increase   746   17
Decrease   (1,702)   (11)
Exchange differences on translation   4   1
At the end of the period   56   21

12.3Cash and cash equivalents
    09.30.2026   12.31.2025
Cash   304   291
Banks   260,812   487,206
Term deposit   16   16
Mutual funds   546,303   566,946
Total   807,435   1,054,459

   
 50 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

12.4Borrowings

 

    09.30.2026   12.31.2025
Non-current        
Financial borrowings   85,710   65,475
Corporate bonds   3,998,229   2,618,272
Total non-current   4,083,939   2,683,747
         
Current        
Bank overdrafts   103   -
Financial borrowings   36,292   47,738
Corporate bonds   76,335   22,204
Total current   112,730   69,942
Total   4,196,669   2,753,689

 

As of September 30, 2026, and December 31, 2025 the fair value of the Company’s CB amounts approximately to $ 3,944,381 million and $ 2,666,318 million, respectively. Such values were calculated on the basis of the determined market price of the Company’s CB at the end of each period or year (fair value Level 1).

The carrying amounts of short-term borrowings approximate their fair value due to their short-term maturity.

The long-term borrowings were measured at amortized cost, which does not differ significantly from their fair value.

As of the issuance of these Consolidated Condensed Interim Financial Statements, the Company is in compliance with the covenants provided for in its indebtedness´ contracts.

   
 51 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

12.4.1 Borrowings´ evolution:

The evolution of the consolidated borrowings for the nine-month periods ended September 30, 2026 and 2025 is disclosed below:
 

    09.30.2026   09.30.2025
Borrowings at the beginning of the year   2,753,689   2,145,013
Proceeds from borrowings   1,224,838   665,797
Payment of borrowings   (44,190)   (153,301)
Accrued interest   168,319   125,203
Payment of interests   (129,358)   (141,214)
Repurchase and redemption of CB   (2,832)   (806,076)
Result from repurchase of CB   (354)   (2,370)
Borrowing costs capitalized in property, plant and equipment   17,392   4,104
Exchange differences on translation   209,165   584,743
Borrowings at the end of the period   4,196,669   2,421,899

 

 

12.4.2 CB Issuance Program and frequent issuer prospectus

The latest update of the CB global program and the frequent issuer prospectus, including information as of December 31, 2025, was approved by CNV Resolutions No. RE-2026-27928092-APN-GE#CNV and No. RE-2026-27853437-APN-GE#CNV dated March 18, 2026.

On April 7, 2026, the Company’s Ordinary and Extraordinary General Shareholders’ Meeting resolved to approve the CB Issuance Program’s term extension for an additional five-year period as from December 9, 2026, the Program’s expiration date.

 

   
 52 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

 

12.4.3 CB

On April 1, 2026, the Company issued the local Class 27 CB for a face value of US$ 200 million, at a fixed 5.49% annual interest rate and maturing on April 1, 2029.

Additionally, on May 21, 2026, the Company reopened the international Class 26 CB for a face value of US$ 500 million, at a fixed 7.75% annual interest rate and with a 7.60% yield, maturing in November 2037. As a result, the total outstanding face value of Class 26 CB amounts to US$ 950 million.

On August 21, 2026, the Company issued local Class 28 CB for a face value of US$ 138 million, at a 5.50% fixed annual interest rate and maturing on August 21, 2030.

Post-closing, the Company issued local Class 29 CB for a face value of US$ 220 million, at a 6.50% fixed annual interest rate and maturing on November 2, 2030.

 

12.4.4 Partial Application of Proceeds

In compliance with the provisions of CNV General Resolution No. 1,095/25, the Company hereby reports, as a sworn statement, that, as of September 30, 2026, it has partially applied a total of US$ 799 million of the issued amount of Class 26 CB, with US$ 151 million remaining pending application, corresponding to the May 2026 reopening. Additionally, the Company has fully applied the issued amount of Class 27 CB, totaling US$ 200 million.

In accordance with the use of proceeds disclosed in the CB issuance documents, the Company reports that such proceeds have been applied as follows: (a) regarding Class 26 CB: (i) placement agents’ fees and other issuance expenses; (ii) working capital contributions in Argentina; (iii) investments in property, plant and equipment in Argentina; and (iv) capital contributions to controlled or related companies, acquisition of equity interests and/or financing of their business operations; and (b) regarding Class 27 CB: (i) investments in property, plant and equipment in Argentina; and (ii) refinancing of existing liabilities.

In addition, as of September 30, 2026, US$ 138 million, corresponding to the issued amount of Class 28 CB, remains pending application.

 

12.4.5 Bank borrowings

During the nine-month period ended September 30, 2026, the Company took out net bank debt of US$ 2.4 million (totaling US$ 34.1 million, net of repayments of US$ 31.7 million). Post-closing, the Company took out bank debt of US$ 28 million.

   
 53 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

12.5Trade and other payables

 

  Note   09.30.2026   12.31.2025
Non-current          
Customer guarantees     36   35
Trade payables     36   35
           
Compensation agreements      87,056   102,166
Leases liability     15,122   21,442
Contractual penalty debt     -   592
Other     696   696
Other payables     102,874   124,896
Total non-current     102,910   124,931
           
Current          
Suppliers     356,195   455,296
Customer advances     3,473   19,512
Related parties 16   47,397   42,241
Trade payables     407,065   517,049
           
Compensation agreements      26,057   19,851
Leases liability     18,734   31,264
Contractual penalty debt     1,234   2,367
Various creditors     5,956   6,280
Other payables     51,981   59,762
           
Total current     459,046   576,811

 

Due to the short-term nature of trade and other payables, its book value is not considered to differ from their fair value. For other non-current liabilities, fair values do not significantly differ from book values.

   
 54 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

12.6Fair value of financial instruments

The following table shows the Company’s financial assets and liabilities measured at fair value as of September 30, 2026 and December 31, 2025:

 

As of September 30, 2026   Level 1   Level 2   Level 3   Total
Assets                
Financial assets at fair value through
profit and loss
               
Government securities   590,373   -   -   590,373
Corporate bonds   7,588   -   -   7,588
Mutual funds   164,816   -   -   164,816
Shares   3,152   -   48,208   51,360
Cash and cash equivalents                
Mutual funds   546,303   -   -   546,303
Other receivables                
Guarantee deposits    58,562   -   -   58,562
Total assets   1,370,794   -   48,208   1,419,002
                 
Derivatives   -   252,764   -   252,764
Total liabilities   -   252,764   -   252,764

  

As of December 31, 2025   Level 1   Level 2   Level 3   Total
Assets                
Financial assets at fair value through
profit and loss
               
Government securities   448,832   -   -   448,832
Corporate bonds   68,219   -   -   68,219
Mutual funds   12,023   -   -   12,023
Shares   7,066   -   45,251   52,317
Cash and cash equivalents                
Mutual funds   566,946   -   -   566,946
Derivatives   -   75,562   -   75,562
Other receivables                
Guarantee deposits    205,161   -   -   205,161
Total assets   1,308,247   75,562   45,251   1,429,060

 

 

   
 55 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 12: (Continuation)

The techniques used for the measurement of assets and liabilities at fair value through profit and loss, classified as Level 2 and 3, are detailed below:

-Derivatives: calculated from variations between market prices at the closing date of the period, and the amount at the time of the contract.
-Shares: it was determined using the income-based approach through the “Indirect Cash Flow” method, that is, the net present value of expected future cash flows, mainly through the collection of dividends taking into consideration the equity interest in TJSM and TMB thermal plants and discount rate of 16.9%. The projections used were prepared based on estimates regarding the future behavior of certain sensitive variables, including: (i) the dividend distribution policy; (ii) prices for energy traded on the spot market; (iii) projections of plants availability and dispatch; (iv) evolution of structural costs and expenses and; (v) macroeconomic variables such as inflation rates and exchange rates, among others. The Company recognized results arising from changes in the fair value of financial instruments classified as Level 3 under the “Other financial results” line item in the Statement of Comprehensive Income. Actual values obtained may vary significantly from those projected, mainly due to: i) the timing and magnitude of dividend distributions; ii) the timing and magnitude of energy prices increases; and/or iii) costs evolution. The Company estimates that any sensitivity analysis that considers changes in any of the estimates taken individually may lead to distorting conclusions, generating an adverse effect on the Company’s results.
12.7Hedge accounting

During 2025 and 2026, the Company entered into forward crude oil sale contracts, without physical delivery, and designated a portion of these derivatives as cash flow hedges.

The Company applies cash flow hedge accounting to certain transactions to manage the international reference price risk associated with a specific volume of forecasted crude oil sales for the May 2025-May 2027 period, thereby ensuring stable cash flows.

As of September 30, 2026, the fair value of forward crude oil sale contracts designated as hedges amounts to a $ 241,218 million (US$ 169 million) loss, recognized in other comprehensive income or loss as the hedge is considered to be effective; this amount is expected to be fully reclassified to profit or loss during the October 2026-May 2027 period, as the hedged crude oil sales are recognized in earnings.

The amount reclassified from other comprehensive income or loss to sales revenue, from designated hedges, resulted in a $ 207,278 million (US$ 143 million) loss during the nine-month period ended September 30, 2026. In addition, a $ 4,679 million (US$ 3.1 million) loss corresponding to the ineffective portion of the hedge was recognized within financial results.

The contracts are entered into in markets or with financial institutions with high credit ratings; therefore, the Company considers that there are no significant credit risks to its operations as a result of its derivative activities.

   
 56 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 13: EQUITY COMPONENTS

13.1Share Capital

As of September 30, 2026, the capital stock amounts to $ 1,344 million, including $ 4 million of treasury shares.

To comply with the provisions established by the CNV, the breakdown of the translation differences originated in the share capital and capital adjustment accounts is detailed below:

    09.30.2026
    Share capital   Share capital adjustment
At the beginning of the year 51,216   267,965
Variation of the period   1,475   7,703
At the end of the period 52,691   275,668
         
    09.30.2025
    Share capital   Share capital adjustment
At the beginning of the year 35,932   187,995
Variation of the period 12,575   65,797
At the end of the period 48,507   253,792

 

13.2Earnings per share

Basic earnings per share are calculated by dividing the result attributable to the Company’s equity holders by the weighted average of outstanding common shares during the year. Diluted earnings per share are calculated by adjusting the weighted average of outstanding common shares to reflect the conversion of all dilutive potential common shares.

Potential common shares will be deemed dilutive only when their conversion into common shares may reduce the earnings per share or increase losses per share of the continuing operations. Potential common shares will be deemed anti-dilutive when their conversion into common shares may result in an increase in the earnings per share or a decrease in the losses per share of the continuing operations.

   
 57 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 13: (Continuation)

The calculation of diluted earnings per share does not entail a conversion, the exercise or another issuance of shares which may have an anti-dilutive effect on the losses per share, and where the option exercise price is higher than the average price of ordinary shares during the period, no dilutive effect is recorded, being the diluted earning per share equal to the basic. As of September 30, 2026 and 2025, the Company does not hold any significant potential dilutive shares, therefore there are no differences with the basic earnings per share.
 

    09.30.2026   09.30.2025
Earning attributable to equity holders of the Company    731,349   260,777
Weighted average amount of outstanding shares   1,348   1,360
Basic and diluted earnings per share   542.54   191.75

 

13.3Distribution of profits

 

Dividends distributed to individuals, undivided estates or beneficiaries residing abroad derived from profits generated during fiscal years beginning on or after January 1, 2018 are subject to a 7% withholding tax. The distribution of dividends is made based on the Company’s Stand-Alone Financial Statements.

 

The Company may pay and distribute dividends and any other type of profits to its shareholders, except if: (i) there is an event of breach; or (ii) the Company is not in a position to incur debt under the indentures governing the Class 21, Class 23, Additional Class 23, Class 26 and Additional Class 26 CB. As of the date of issuance of these Consolidated Condensed Interim Financial Statements, the Company has complied with all commitments set forth in the indentures governing the above-mentioned CB.

13.4Capital reduction

 

On April 7, 2026, the Company’s Ordinary and Extraordinary General Shareholders’ Meeting resolved to reduce the share capital by the sum of $ 19,920,279 and, consequently, to cancel the treasury shares held by the Company and its subsidiaries as of the business day immediately preceding the Meeting, which amounted to 19,920,279 shares. This reduction was registered with the Public Registry on May 29, 2026.

 

   
 58 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 14: STATEMENT OF CASH FLOWS’ COMPLEMENTARY INFORMATION

14.1Adjustments to reconcile net profit to cash flows from operating activities

 

  Note   09.30.2026   09.30.2025
Income tax 10.6   28,309   267,280
Accrued interest     178,367   120,964
Depreciations and amortizations 9, 10.1 and 10.2   585,060   365,949
Share of profit from associates and joint ventures  5.1.2   (287,123)   (133,104)
Results for property, plant and equipment sale and derecognition 10.4   2,784   (52)
Results for other assets sale and derecognition 10.4   (1,886)   (1,213)
Results for intangible assets sales 10.4   -   (4,973)
Impairment of property, plant and equipment, intangible assets and inventories     1,181   10,298
(Recovery of impairment) Impairment of financial assets     (4,300)   6,067
Result from present value measurement 10.5   27,532   1,953
Changes in the fair value of financial instruments     (11,967)   (107,737)
Exchange differences, net     (21,854)   (53,297)
Result from repurchase of CB 10.5   (354)   (2,370)
Costs of concessions agreements completion 10.4   2,079   930
Restructuring costs     14,235   -
Provision for contingecies, net 10.4   18,208   1,795
Provision for environmental remediation 10.4   244   6,981
Accrual of defined benefit plans 9 and 10.2   8,180   10,258
Compensation agreements  10.2   6,632   1,039
Earned dividends 10.4   (3,565)   (4)
Other     1,010   45
Adjustments to reconcile net profit to cash flows from operating activities     542,772   490,809

 

 

   
 59 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 14: (Continuation)

14.2Changes in operating assets and liabilities

 

    09.30.2026   09.30.2025
Increase in trade receivables and other receivables   (789,575)   (242,578)
Increase in inventories   (29,097)   (29,721)
Increase in trade and other payables   20,596   94,480
Decrease in salaries and social security payables   343   2,628
Defined benefit plans payments   (3,484)   (2,210)
Increase in tax liabilities   79,839   19,346
Decrease in provisions   (57,121)   (9,059)
Income tax payment   (84,774)   -
(Payments) Collections for derivatives, net   (209,007)   10,250
Changes in operating assets and liabilities   (1,072,280)   (156,864)

 

14.3Significant non-cash transactions

 

    09.30.2026   09.30.2025
         
Acquisition of property, plant and equipment through an increase in trade payables   (91,721)   (124,692)
Borrowing costs capitalized in property, plant and equipment   (17,392)   (4,104)
Decrease in other receivables through an increase in financial assets at fair value through profit or loss   146,600   -
Collection of dividends from joint ventures through financial assets   -   53,026
Payment of borrowings through financial assets at amortized cost transfer   -   (10,330)
Compensation of income tax throught a decrease in tax credits    (60,050)   -
Increase in other receivables through a decrease in financial assets at fair value through profit or loss   -   (217,046)
Increase in right-of-use assets through an increase in other liabilities   -   (48,311)
Decrease in financial assets at fair value through profit or loss through a decrease in income tax liability   -   (4,030)

 

   
 60 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 15: CONTINGENT LIABILITIES AND ASSETS

During the nine-month period ended September 30, 2026, the following changes were identified in relation to the contingent liabilities and assets reported in the Consolidated Financial Statements as of December 31, 2025:

15.1 Labor claim – “Compensating Fund” defined benefit plan

In one of the lawsuits filed against the Company concerning the application of an index (the CPI) to update the plan benefits, the National Chamber of Appeals in Labor Matters (“CNAT”) upheld the first-instance judgment dismissing the claim; this decision was appealed by the plaintiff before the Superior Court of Justice of the City of Buenos Aires (“TSJCABA”) and before the CSJN.

Moreover, in connection with the claims for alleged plan underfunding, the CSJN settled the jurisdictional dispute and ruled that the unconstitutionality appeal filed by the Company against the judgment of the Chamber of Appeals in Commercial Matters must be heard and decided by the TSJCABA.
 

15.2 Environmental claims

The CSJN dismissed the complaint in the lawsuit brought by the Association of Land Owners of Patagonia (“ASSUPA”), which mainly sought an order compelling the defendants to remediate the alleged environmental damage caused by hydrocarbon activities in the Neuquina Basin.

Furthermore, in the proceeding brought by ASSUPA for alleged environmental damage arising from hydrocarbon activities in the Austral Basin, the preliminary objection of defective pleading was upheld and the plaintiff was ordered to amend and restate its complaint. ASSUPA filed an appeal against such decision, which is pending resolution by the competent Court of Appeals.

15.3 Administrative claims

In the lawsuits brought by CTLL (currently Pampa) against the Argentine Government for non-compliance regarding the renewal of, and the recognition of costs associated with, the gas supply contracts, on March 10, 2026 and March 17, 2026, the Federal Court of Appeals in Administrative Litigation Matters resolved to grant the extraordinary appeals as to the existence of a federal question and to deny them as to the alleged arbitrariness. The Company filed direct appeals against such denial before the CSJN.

In the declaratory action initiated by the Company before the CSJN, following the declaration of termination of the concession over the Veta Escondida block by the Province of Neuquén, the Province of Neuquén and the Company executed a settlement agreement on March 4, 2026, approved by Provincial Executive Order No. 605/26, putting an end to the dispute. Upon the parties’ request, on June 10, 2026 the CSJN declared the judicial proceeding terminated.

   
 61 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 15: (Continuation)

15.4 Civil and Commercial Claims

In the arbitration proceeding initiated by EcuadorTLC S.A. (currently PB18), in its capacity as assignee of the Ecuadorian company Petromanabí S.A., against the Republic of Ecuador, the Arbitration Court’s award is still pending.

During 2025 and 2026, the Company filed claims against ENARSA for breach of the agreements entered into under the GasAr Plan framework, seeking payment of certain overdue invoices for gas supply and Take-or-Pay (“TOP”) obligations totaling $ 57,612 million, plus interest. One of the claims is at the evidentiary stage, while the other two are at their initial stage.

NOTE 16: RELATED PARTIES´ BALANCES AND TRANSACTIONS

16.1 Balances with related parties

As of September 30, 2026   Trade receivables   Other receivables   Trade  payables
  Current   Current   Current
Associates and joint ventures            
CTB   5,996   17   3,610
TGS   3,710   214,001   26,467
Transener   113   249   261
VMOS   -   -   227
Other related parties            
Loma Negra   838   -   -
SACDE   154   197   16,832
    10,811   214,464   47,397

 

As of December 31, 2025   Trade receivables   Other receivables   Trade  payables
  Current   Current   Current
Associates and joint ventures            
CTB   235   15   -
TGS   11,207   6,326   23,305
Transener   43   157   439
Other related parties            
SACDE   92   161   18,497
    11,577   6,659   42,241

 

 

   
 62 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 16: (Continuation)

16.2 Operations with related parties

 

Operations for the nine-month period   Sales of goods and services (1)
  Purchases of goods and services (2)   Fees and compensation for services (3)   Other operating income (expenses), net (4)
  2026   2025   2026   2025   2026   2025   2026   2025
Associates and joint ventures                                
CTB   7,498   1,420   (2,808)   -   -   -   -   -
TGS    47,611   48,927   (128,158)   (86,706)   -   -   -   -
Transener   -   -   (634)   (458)   -   -   589   493
                                 
Other related parties                                
Fundación Pampa   -   -   -   -   -   -   (3,727)   (1,682)
Loma Negra   3,177   -   -   -   -   -   406   -
SACDE    -   -   (189,932)   (224,411)   (2,380)   (3,311)   459   421
Salaverri, Dellatorre, Burgio & Wetzler    -   -   -   -   (243)   (290)   -   -
Other   -   -   (1,434)   (38)   -   -   -   -
    58,286   50,347   (322,966)   (311,613)   (2,623)   (3,601)   (2,273)   (768)

 

(1)Correspond mainly to advisory services provided in relation with technical assistance and sales of gas and energy.
(2)Correspond mainly to natural gas transportation services, fuel purchases and other services imputed to cost of sales and selling expenses for $ 131,600 million and $ 87,191 million and infrastructure works contracted to SACDE charged in property, plant and equipment for $ 189,932 million and $ 224,384 million, of which $ 36, 949 million and $ 57,553 million, correspond to fees and general expenses calculated on the costs incurred by SACDE and/or Pampa to carry the works out for the nine-month periods ended September 30, 2026 and 2025, respectively.
(3)Disclosed within administrative expenses.
(4)Corresponds mainly to donations expenses and operating leases income.

 

Operations for the nine-month period   Loans granted, net   Financial income (1)   Dividends collection
  2026   2025   2026   2025   2026   2025
Associates and joint ventures                        
CIESA   -   -   -   -   -   53,026
Citelec   -   -   -   -   66,631   35,261
CTB   -   (13)   -   -   -   -
TGS    -   -   168   621   -   -
                         
Other related parties                        
Oldelval   -   -   -   -   3,424   -
Other   -   -   -   -   141   4
    -   (13)   168   621   70,196   88,291

 

 

(1)Correspond mainly to accrued interest on loans granted.

 

   
 63 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 17: ASSETS AND LIABILITIES IN CURRENCIES OTHER THAN PESOS (1)

 

  Type   Amount in currencies other than pesos   Exchange rate (2)   Total
09.30.2026
  Total
12.31.2025
       
ASSETS                  
                 
NON-CURRENT ASSETS                  
Other receivables US$    57.61    1,517.00     87,400     61,210
  EUR   0.01    1,721.80   12   -
Total non-current assets               87,412     61,210
                 
CURRENT ASSETS                  
                   
Financial assets at fair value through profit and loss US$     372.49    1,517.00   565,067   525,329
Derivatives US$   -     -    -     75,555
Trade and other receivables US$     604.42    1,517.00   916,906   470,777
  CLP     9,300.05     1.56     14,505     11,073
  U$   0.03   37.70     1   43
  BOB   0.27    126.21   35   -
Cash and cash equivalents US$     433.24    1,517.00   657,219   981,029
  CLP     150.23     1.56    234   31
  EUR   0.01    1,721.80   12   12
  BOB    0.004    126.21     1   -
Total current assets             2,153,980   2,063,849
Total assets             2,241,392   2,125,059
                   
LIABILITIES                  
                   
NON-CURRENT LIABILITIES                  
Provisions US$    47.26    1,517.00     71,699   111,634
Borrowings US$     2,692.12    1,517.00   4,083,939   2,683,747
Trade and other payables US$    67.38    1,517.00   102,214   124,234
Total non-current liabilities              4,257,852   2,919,615
                   
CURRENT LIABILITIES                  
Provisions US$   7.87    1,517.00     11,936     12,140
Tax liabilities US$   0.25    1,517.00    381    249
  CLP     755.63     1.56    1,179    381
  U$   6.50   37.70    245    1,472
Salaries and social security payable CLP   2.50     1.56     4     4
Derivatives US$     166.62    1,517.00   252,764   -
Borrowings US$    74.24    1,517.00   112,627     69,942
Trade and other payables US$     203.42    1,517.00   308,589   426,963
  EUR   7.19    1,721.80     12,388    6,454
  CLP   1.27     1.56     2   12
  BOB   0.04    126.21     5     5
  GBP   0.00    2,012.30     1   -
  U$   0.18   37.70     7     7
Total current liabilities              700,128   517,629
Total liabilities              4,957,980   3,437,244
Net Position Liability               (2,716,588)     (1,312,185)

 

(1)Information presented to comply with CNV Rules.
(2)Exchange rate in force on September 30, 2026 according to the BNA for pounds sterling (GBP), U.S. dollars (US$), euros (EUR), chilean pesos (CLP), bolivian pesos (BOB) and uruguayan pesos (U$).
   
 64 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 18: INVESTMENT COMMITMENTS

 

Development projects in Vaca Muerta

Rincón de Aranda Development – RDA Project

Within the framework of the expansion of projects eligible for the RIGI established by PEN Executive Order No. 105/26 (see Note 2.8.2.3), on March 9, 2026, the Company, through its SPV Pampa Energía S.A. – Sucursal Dedicada Proyecto RDA, submitted an application to opt into the RIGI as a long-term strategic export project, associated with the development of new shale oil wells and the construction of related infrastructure in the Rincón de Aranda block (the “RDA Project”). MECON Resolution No. 1,025/26 approved this application, effective as from June 25, 2026.

The RDA Project consists of the exploitation of the Vaca Muerta formation in the Rincón de Aranda block, which covers a surface area of 237 km². The development contemplates the drilling and completion of a total of 259 horizontal wells with laterals of up to 3,000 meters, distributed across three productive levels. In parallel, a treatment and conditioning plant will be built with a capacity of 45,000 bbl/day of crude oil and 800,000 m³/day of gas, together with the oil and gas pipelines required for the evacuation of production and the final disposal of frac water.

It is worth highlighting that, in line with PEN Executive Order No. 105/26, existing wells are excluded from the scope of the approved RIGI, which only covers the new wells to be drilled by the SPV after the opt-in application submission.

The total estimated investment for the RDA Project amounts to approximately US$ 4,500 million, to be executed through 2041 in accordance with the approved investment plan.

UREA Project

On April 21, 2026, the Company, through its subsidiary FEPASAU, submitted an application to opt into the RIGI for the construction, operation and management of a 6,000-tn/d granulated urea production complex in Bahía Blanca, which will additionally produce ammonia and other fertilizers (the “UREA Project”). MECON Resolution No. 1,468/26 approved the UREA Project’s application for admission to the RIGI, effective August 3, 2026.

The UREA Project will be supplied with gas from Vaca Muerta, aims to produce 2.1 million tn/y of urea as from 2030, and further includes the construction of a desalination plant to supply water to the complex, storage silos and logistics infrastructure at the port of Bahía Blanca, including facilities for loading trucks and vessels for the export market, with a total estimated investment of US$ 2,700 million. The Project will take approximately 41 months to complete and will be undertaken by SACDE and Tecnimont, which will be in charge of the construction, and the engineering and procurement management, respectively, pursuant to the EPC Contract (an acronym for “Engineering, Procurement and Construction”) executed on July 17, 2026.

   
 65 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 18: (Continuation)

In addition, on June 10, 2026, the Company, through its subsidiary FEPASAU, submitted an application for admission of the UREA Project to the Province of Buenos Aires Strategic Investment Regime; the application is currently being processed and pending approval by the relevant authority.

It is worth highlighting that on July 17, 2026, the Company’s Board of Directors approved the final investment decision for the Project, marking the Company’s entry into the fertilizer business, fertilizers being a commodity essential to agricultural production and global food security. Likewise, on that same date, the Company’s Board of Directors approved the granting of a guarantee in favor of FEPASAU to secure all of FEPASAU’s payment obligations under the EPC Contract.

The Project’s strategic location enables direct connection with the gas pipelines coming from Vaca Muerta, with one of the country’s main export ports, and with the Company’s thermal power plants and wind farms. Natural gas and electricity, inputs accounting for approximately 70% of the cost structure of urea production, will be supplied mainly by the Company. This reinforces the competitive advantages of the Company’s vertical integration and contributes to the Project’s operating efficiency and profitability.

On October 1, 2026, FEPASAU entered into a loan agreement with Itaú Unibanco S.A., Nassau Branch, for up to US$ 300 million to finance costs associated with the development and construction of the UREA Project. The loan is expected to be prepaid with the proceeds from the UREA Project’s structured financing. The financing has a 4-year term, with principal repayable at maturity, accrues interest at a variable rate of Term SOFR plus a stepped applicable margin, payable quarterly, and is backed by certain guarantees granted by the Company. On October 5, 2026, the first US$ 20 million disbursement was made.

NOTE 19: INCIDENT AT HINISA

During the period ended September 30, 2026, HINISA recorded $ 1,044 million losses for expenses related to the incident arising from the weather event that occurred on January 11, 2025, which forced the Nihuil II and III plants out of service, and received advance payments of $ 4,685 million, recognized under the insurance recovery line item, as reimbursement of cleaning and remediation costs.

On September 3, 2026, HINISA, together with the Province of Mendoza, Hidroelectricidad Mendocina S.A., Nación Seguros S.A. and La Meridional Compañía Argentina de Seguros S.A., entered into a payment and claim settlement agreement, which provides for a total payment of US$ 22.1 million to HINISA for property damage and loss of profit. HINISA has already received US$ 10.5 million as advance payments. Once the Agreement is ratified by the Governor of the Province of Mendoza, HINISA would collect the remaining balance of the agreed amount, equivalent to US$ 11.6 million. On October 23, 2026, subsequent to the closing, the executive order ratifying the agreement was published.

   
 66 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 20: TERMINATION OF HYDROELECTRIC CONCESSIONS

In July 2026, HINISA submitted to the Province of Mendoza various technical, operating, labor and economic information and documentation associated with the end of the concession’s transition period and, together with the Ministry of Energy and Environment of the Province of Mendoza, it implemented all the necessary measures to ensure the orderly reversion of the assets and the subsequent safe operation of the power plant. On July 31, 2026, the Asset Handover Certificate was executed, thus completing the reversion process.

On July 28, 2026, PEN Executive Order No. 667/26 approved the National and International Open Call for Tenders, to be conducted jointly with the Province of Mendoza, for the granting of the new hydroelectric generation concession of the Los Nihuiles Complex. In turn, Executive Order No. 1,436/26 of the Province of Mendoza authorized the joint call for tenders and approved the corresponding bidding terms and conditions, which were submitted to the PEN for review. The tender provides for the sale of 100% of the share package of Hidroelectricidad Mendocina S.A. (“HEMSA”), which will take over the operation of the assets until December 31, 2026, or until the new concessionaire takes over, whichever occurs first. Furthermore, provision was made for the creation of an ad hoc evaluation committee for this procedure, made up of an equal number of representatives of the Federal Government and the Province of Mendoza.

On the other hand, the transition period for HIDISA’s concession expired on June 30, 2026. As of the date of issuance of these Consolidated Condensed Interim Financial Statements, HIDISA continues operating the hydroelectric complex ensuring the safety of the assets and the supply of energy.

 

NOTE 21: SYNTHETIC RUBBER PRODUCTION CLOSURE

On July 22, 2026, the Company announced the start of the process to close synthetic rubber production at PGSM. This decision was driven by the sharp decline in the domestic synthetic rubber market over the last few years, resulting from lower activity in the tire industry, which rendered the business no longer viable. The decision was also part of a capital allocation strategy aimed at focusing investments on those businesses where the Company identifies greater opportunities for growth, value creation and positive impact for the country.

Synthetic rubber production fully ceased as of September 2026 and resulted in the termination of 128 employees, out of the Company’s total headcount of 1,972.

As of September 30, 2026, estimated restructuring costs of $ 34,805 million (US$ 24 million) were recorded, which are disclosed within “Other operating expenses” in the statement of profit or loss.

 

   
 67 

Free translation from the original prepared in Spanish for publication in Argentina

 
 
 

NOTES TO THE UNAUDITED CONSOLIDATED CONDENSED INTERIM FINANCIAL
STATEMENTS (Continuation)

For the nine-month period ended September 30, 2026, presented on comparative basis.
(In millions of Argentine Pesos (“$”))
 

NOTE 22: DOCUMENTATION SAFEKEEPING

In compliance with CNV General Resolution No. 629/14, the Company informs having sent non-sensitive work papers and information corresponding to the periods not covered by the statute of limitations for their keeping in the Administración de Archivos S.A. (AdeA)’s data warehouse located at Ruta 36, km 34.5, Florencio Varela, Province of Buenos Aires.

A list of the documentation delivered for storage, as well as the documentation provided for in Article 5.a.3) Section I, Chapter V, Title II of the PROVISIONS (2013 regulatory provisions and amending rules), is available at the Company headquarters.

NOTE 23: SUBSEQUENT EVENTS

Subsequent to September 30, 2026 and until the issuance of these Consolidated Condensed Interim Financial Statements, no other relevant events have occurred which may significantly affect them.

   
 68 

 

Filing Exhibits & Attachments

1 document

Keep reading