Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

PowerBank Corporation (PBK) reported September-quarter revenue of CA$4.197 million, down 78.1% from CA$19.150 million a year earlier, and a net loss of CA$6.150 million versus net income of CA$1.011 million. Lower EPC services and development-fee revenue accounted for most of the revenue decline. Operating cash outflow was CA$3.497 million, compared with an inflow of CA$2.310 million.

At September 30, 2026, cash was CA$12.569 million and working capital was CA$5.753 million. PBK said forecast liquidity and internally generated cash flows are insufficient to fund operations and obligations for at least the next 12 months, and it had no binding commitments sufficient to meet all forecast needs; management is pursuing equity, debt refinancing, project financing and asset monetization. A material uncertainty raises substantial doubt about going concern. The Ontario Land Tribunal approved the 903 project’s OPA/ZBA on July 21, 2026, and the IESO extended its milestone commercial operation date to July 29, 2027; construction remains contingent on outstanding approvals. For OZ-1, PowerBank terminated supplier agreements, paid a CA$0.5 million termination fee and CA$0.1 million in retrofit reimbursements, and had approximately CA$4.1 million in payables released.

0 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

2 major · 3 points

Hollow bars mark forward-looking points. How the balance works

Positive

  • None.

Negative

  • Major pointNet results shifted from CA$1.011 million income to a CA$6.150 million loss.
  • Major point. Forward-looking: it has not happened yet and may not happen.Substantial doubt about going concern; forecast funding falls short for at least 12 months.
  • Moderate pointRevenue fell 78.1% to CA$4.197 million year over year.

Filing Explained

PowerBank’s ATM ended September 30, 2026, after issuing 2,207,961 shares for approximately US$1.024 million gross.

Form 6-K is a foreign private issuer’s interim report for material information published in its home market; this filing reports PowerBank’s quarter ended September 30, 2026. At that date, common shares outstanding were 64,175,710, versus 47,697,277 on June 30, 2026; the increased share base reduces existing holders’ percentage ownership absent offsetting changes.

The quarter’s capital table records 9,045,268 shares issued net of costs, 5,764,546 RSUs settled, and 1,668,619 shares issued to settle liabilities.

The 2026 at-the-market program had issued 2,207,961 shares for approximately US$1.024 million in gross proceeds by September 30, 2026, when PowerBank terminated it. An at-the-market program permits gradual share sales at prevailing market prices; the company says a new program would require new prospectus and registration documentation.

Revenue CA$4.197 million Three months ended September 30, 2026; down 78.1% from CA$19.150 million a year earlier
Net loss CA$6.150 million Three months ended September 30, 2026; compared with net income of CA$1.011 million a year earlier
Basic and diluted loss per share CA$0.10 Three months ended September 30, 2026
Cash CA$12.569 million As of September 30, 2026
Working capital CA$5.753 million As of September 30, 2026
Net cash used in operating activities CA$3.497 million Three months ended September 30, 2026; compared with CA$2.310 million provided a year earlier
903 project milestone commercial operation date July 29, 2027 Date following the IESO-approved Force Majeure claim extension
OZ-1 termination fee CA$0.5 million Paid to the supplier under the OZ-1 termination arrangement
going concern financial
"substantial doubt about the Company’s ability to continue as a going concern"
Going concern is the accounting assumption that a company will keep operating and meeting its obligations for the foreseeable future. The phrase matters most when a company or its auditors disclose substantial doubt about it, a formal warning that the business may not have enough resources to continue without raising money, restructuring, or selling assets. That language in a filing or press release signals elevated financial risk.
working capital financial
"Working capital is calculated by deducting current liabilities from current assets"
Working capital is the money a business has available to cover its daily expenses, like paying bills and buying supplies. It’s like the cash in your wallet that helps you handle everyday costs; having enough ensures the business can operate smoothly without running into money shortages.
independent power producer (IPP) technical
"ownership of renewable projects as an Independent Power Producer (IPP)"
An independent power producer (IPP) is a privately owned company that builds and runs power plants to sell electricity to utilities, businesses, or on wholesale markets instead of being part of a government utility. For investors, an IPP is like a landlord of energy-generating assets: its income comes from selling kilowatts, so profitability and risk depend on contract terms, fuel or technology costs, and market electricity prices.
engineering, procurement and construction (EPC) technical
"engineering, procurement and construction (EPC)"
Engineering, procurement and construction (EPC) is a project delivery method where a single contractor designs the project, buys the major equipment and materials, and builds the facility from start to finish, like hiring one contractor to design and build a house and buy the appliances. Investors care because EPC contracts bundle technical and schedule risk with a single counterparty and often include fixed prices and deadlines, which can affect project costs, profit visibility and cash flow.
battery energy storage system (BESS) technical
"solar power plants and battery energy storage system (BESS)"
A battery energy storage system (BESS) is a large-scale setup that stores electricity in rechargeable batteries and releases it when needed, like a giant rechargeable battery for the power grid. It matters to investors because it helps smooth out supply and demand, capture surplus renewable power, provide backup and short-term grid services that can earn recurring revenue, and can boost the value of generation and transmission assets as demand for flexible energy grows.
at-the-market equity program financial
"to establish a new at-the-market equity program"
An at-the-market equity program lets a company sell newly issued shares directly into the open market at the current trading price through a broker, rather than in a single, prearranged block. It provides flexible, on-demand access to cash—like drawing small amounts from a credit line—but increases the number of shares outstanding, which can reduce existing shareholders’ ownership percentage and put downward pressure on the stock price, so investors monitor program size and pacing.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

Why did PBK report a loss in the September 2026 quarter?

PBK reported a CA$6.150 million net loss, as lower EPC activity and no development-fee revenue contributed to the quarter’s results. EPC services revenue fell as construction activity and project progress were lower; the company also recorded an EPC gross loss tied primarily to changes in estimated project completion percentages.

What is PBK’s cash position and going-concern status?

PBK reported CA$12.569 million in cash and CA$5.753 million in working capital at September 30, 2026. It said forecast liquidity and internally generated cash flows are insufficient for at least the next 12 months and that it had no binding commitments sufficient to fund all forecast liquidity requirements.

What is the latest status of PBK’s 903 BESS project?

The Ontario Land Tribunal approved the project’s OPA/ZBA on July 21, 2026, and the IESO extended its milestone commercial operation date to July 29, 2027. Site Plan Approval and a Planning Act consent application remain in process, and construction is contingent on outstanding approvals.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

Form 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE

SECURITIES EXCHANGE ACT OF 1934

 

For the month of November 2026.

 

Commission File Number 001-41976

 

PowerBank Corporation

(Translation of registrant’s name into English)

 

505 Consumers Rd., Suite 803

Toronto, Ontario, M2J 4Z2 Canada

(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

 

Form 20-F ☒ Form 40-F ☐

 

 

 

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

Date November 16, 2026 PowerBank Corporation
   
  By: /s/ “Dr. Richard Lu”
    Dr. Richard Lu
    Chief Executive Officer

 

2

 

 

Exhibit Index

 

Exhibit   Description of Exhibit
99.1   Management’s Discussion and Analysis for the three months ended September 30, 2026
99.2   Condensed Consolidated Interim Unaudited Financial Statements for the three months ended September 30, 2026
99.3   Form 52-109F2 - Certification of Interim Filings of Chief Executive Officer dated November 16, 2026
99.4   Form 52-109F2 - Certification of Interim Filings of Chief Financial Officer dated November 16, 2026

 

3

 

 

Exhibit 99.1

 

POWERBANK CORPORATION

 

Management’s Discussion and Analysis

 

For the Three Months Ended September 30, 2026

 

  Contact Information :
  PowerBank Corporation
  505 Consumers Road, Suite 803
  Toronto, ON M2J 4V8
  Contact Person: Ms. Nicole Rusaw, CFO
  Email: info@powerbankcorp.com

 

 
Management’s Discussion and Analysis

 

MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATIONS

 

This Management’s Discussion and Analysis (“MD&A”) comments on the financial performance and financial condition of PowerBank Corporation (“PowerBank” or the “Company”) for the three months ended September 30, 2026. This MD&A is presented as of November 16, 2026 and was reviewed and approved by our Board of Directors (the “Board”).

 

Unless otherwise stated or the context otherwise indicates, all references to “PowerBank”, the “Company”, “we”, “us” or “our” refer to PowerBank Corporation together with our subsidiaries, on a consolidated basis. This MD&A also refers to our fiscal years. Our fiscal year commences on July 1st of each year and ends on June 30th of the following year. Our current fiscal year, which will end on June 30, 2027, is referred to as “Fiscal 2027”, “FY2027” or similar words. Our previous fiscal year, which ended on June 30, 2026, is referred to as “Fiscal 2026”, “FY2026” or similar words. Other fiscal years are referenced by the applicable calendar year during which the fiscal year ends.

 

The information in this MD&A should be read in conjunction with: (i) the Company’s unaudited condensed consolidated interim financial statements for the three months ended September 30, 2026 and 2025, which have been prepared in accordance IAS 34, Interim Financial Reporting, as issued by the International Accounting Standards Board (“IASB”); (ii) the Company’s audited annual consolidated financial statements for the years ended June 30, 2026, 2025 and 2024, along with the related notes thereto, which have been prepared in accordance with IFRS® Accounting Standards (“IFRS”) as issued by the IASB; and (iii) the Company’s MD&A for the years ended June 30, 2026, 2025 and 2024 (the “Annual MD&A”).

 

Additional information relating to PowerBank, including our most recently filed Annual Report on Form 20-F, can be found on SEDAR+ at www.sedarplus.ca and EDGAR. All amounts are in thousands of Canadian dollars except where otherwise indicated and per share amounts.

 

Overview

 

Business Profile

 

PowerBank Corporation is incorporated in Ontario, Canada with its registered office located at 199 Bay Street, Suite 4000, Toronto, Ontario M5L 1A9 and head office located at 505 Consumers Road, Suite 803, Toronto, Ontario, M2J 4V8. The Company was originally founded in Canada in 2013 as Abundant Solar Energy Inc., and in 2017 established a 100% owned U.S. subsidiary, Abundant Solar Power Inc., to meet the demand for renewable energy in both countries. The Company changed its name from Abundant Solar Energy Inc. to SolarBank Corporation on October 17, 2022 and had another name change to PowerBank Corporation on July 23, 2025.

 

The Company commenced trading its common shares on the Canadian Securities Exchange (the “CSE”) under the symbol “SUNN” on March 2, 2023. On February 14, 2024, the Company migrated its listing to Cboe Canada Exchange Inc. where it has the current trading symbol “PBK”. On April 8, 2024, the Company’s common shares commenced trading on the Nasdaq where it has the current trading symbol “PBK”.

 

The Company operates in the growing renewable energy sector that specializes in delivering solar and other renewable energy power plants in Canada and the United States of America. Throughout its years in business, the Company has worked to provide safe, reliable and low-cost solar and battery energy storage power plants that would generate solar renewable electricity to: (a) address the growing requirements for jurisdictions to reduce carbon emissions in the form of Solar Renewable Energy Credits (“SREC”) and other environmental attributes; (b) provide a cost competitive alternative to conventional electricity generation to further decarbonize the electricity grid; and (c) enhance grid reliability via its distributed generation projects.

 

As an established independent renewable and clean energy project developer and asset operator, the Company is engaged in the site origination, development, engineering, procurement and construction (“EPC”), operation and maintenance (“O&M”), and asset management of solar power plants and battery energy storage system (“BESS”), whether electricity grid interconnected or behind-the-meter (“BTM”) projects on roofs of commercial and/or industrial buildings, or ground-mount projects, community-scale or utility-scale in size.

 

The Company continues to shift its business model from a “develop to sell” strategy to the ownership of renewable projects as an Independent Power Producer (“IPP”). The Company focuses on organic growth and also pursues M&A opportunities.

 

2
Management’s Discussion and Analysis

 

Development of the Business

 

USA

 

The Company is focused on key distributed generation markets in New York, Pennsylvania, New Jersey, Maryland and Illinois. In New York, the Company’s 3.7 megawatts of direct current (“MW DC”) project has reached Permission to Operate (“PTO”) in July 2025. Three projects for Honeywell totaling 21 MW DC reached commercial operation in fiscal 2026. Two projects for Qcells and one project for Solar Advocate Development LLC (“Solar Advocate”), totaling 15.5 MW DC are expected to reach PTO in the next 12 months. Approximately 40 projects are under utility interconnection studies and/or permitting in the US, with approximately 20 distributed generation projects having secured positive interconnection studies in New York State alone. In addition, the Company is working on site origination for further potential renewable and alternative energy projects.

 

Community solar projects rely on state-level policies, legislation, regulations, and economics along with federal tax incentives to meet hurdle requirements. The federal investment tax credits (“ITCs”) that solar projects relied upon are being wound down under the One Big Beautiful Bill Act of 2025 (“OBBBA”). Following IRS guidance released under the Bill, the Company worked to preserve via safe harbor the ITCs associated with 23 projects, worth an estimated $240 million in construction value before legislated deadlines. The Company is monitoring market and policy developments in markets where distributed solar projects may continue to meet hurdle rates without reliance on federal ITCs.

 

The OBBBA preserved ITCs for BESS projects on an extended timeline. The Company is continuing origination and development of distributed BESS projects in the markets noted above to capitalize on the continued availability of ITCs, with a variety of sites in various stages of development. The Company expects to commence construction on its first BESS projects in the United States in the fiscal year 2027.

 

In fiscal 2025, PowerBank announced the sale of its Gainesville, Highway 28, Hardie and Rice Road solar power projects (the “Qcells Projects”) to an affiliate of Qcells North America (“Owner”), which included PowerBank’s continued engagement to construct the Qcells Projects through to commercial operation under EPC agreements. The development and construction of the Qcells Projects was subject to the receipt of required permits. During fiscal 2026, as the Gainesville and Highway 28 projects have not at this time received the required permits, the Owner has provided notice to PowerBank to resell the Gainesville and Highway 28 projects back to PowerBank (the “Sell-Back Notice”). As a result of the Sell-Back Notice, the transactions for those two projects have been terminated and any funds advanced to PowerBank will be returned to the Owner, for an aggregate amount of US$2.35 million. Accordingly, the Company recorded adjustments to development fee revenue of $2.5 million and the related cost of goods sold of $1.8 million for the year ended June 30, 2026 to reflect the contractual repurchase of the projects. In connection with the repurchase accounting, as of June 30, 2026, returned inventory in-transit increased by $2.3 million, prepaid expenses and deposits increased by $0.3 million, and trade and other payables increased by $3.3 million. PowerBank remains confident in the underlying value of both assets. PowerBank will evaluate its strategic options for the Gainesville and Highway 28 projects, which may include developing them as owned independent power producer (IPP) assets or pursuing a sale to another third-party buyer. Both projects are safe harbored for ITC purposes. Highway 28 reached NTP in Q4 FY2026. The Hardie and Rice Road projects are already under construction and are not affected by the Sell-Back Notice — with racking installation complete at Rice Road and both projects are on track with commercial operations expected in FY2027. As of the original transaction date, the Hardie project and Rice Rd project had a combined total project value of US$22.9 million.

 

In April 2026, the Company secured a US$2.95M federal contract with the United States Army to provide engineering, procurement and construction services on a solar generation and EV charger project at the Farmingdale Armed Forces Reserve Center in Farmingdale, New York. The facility is used by units of the US Army, Navy, Marine Corps and the New York National Guard.

 

In the next 6-12 months, the Company expects to commence full construction mobilization on a further 12 projects in New York State with an estimated construction value of US$110M, pending receipt of financing and final permits.

 

Canada

 

The Company finished the construction on a 1.4MW DC rooftop solar project in Alberta in Q2 FY2026 and the project reached Commercial Operation Date (“COD”) on December 10, 2025. In addition, the Company is advancing more than ten solar projects in Nova Scotia going through development activities to participate in Nova Scotia’s Community Solar Program. These projects are owned by a third-party fund with Nova Scotia partners, and the Company provides development services on a fee-for-service basis. The Company is actively developing potential projects in Ontario, Alberta, and Nova Scotia.

 

3
Management’s Discussion and Analysis

 

In addition to providing operation and maintenance services of solar projects, the Company is developing solutions to assist the real estate sector to achieve net zero greenhouse gas emissions by acquiring small Feed-in-Tariff (“FIT”) rooftop and ground mount solar projects.

 

With the acquisition of Solar Flow-Through Funds Ltd. (“SFF”), including its pipeline of BESS projects, on July 8, 2024, through this acquisition and another smaller acquisition, the Company also acquired approximately 80 operating small-scale rooftop and ground-mounted solar projects under Ontario’s Feed-in Tariff (“FIT”) Program, with a combined capacity of approximately 30 MW. The FIT contracts were awarded by Ontario’s Independent Electricity System Operator (“IESO”) and have remaining terms of approximately 10 to 15 years, depending on each project’s commercial operation date (“COD”). During the remaining contract terms, the electricity generated by these projects is sold under the applicable FIT contracts, generating recurring annual revenue of approximately $8.5 million.

 

Through this acquisition, the Company became the owner of the three BESS projects in Ontario, each of which was awarded with the Ontario IESO long term procurement Capacity Contract, known as “E-LT1”. The SFF 06 project commenced construction during February 2025 and achieved COD on April 20, 2026, while the remaining two projects (903 and OZ-1) are in the final stage of permitting. After Commercial Operation, each BESS project is expected to operate under a long-term contract with guaranteed capacity payments from the IESO, provided all contract obligations are met. The BESS projects will also earn revenue from the energy and ancillary markets in Ontario. Each has a 4.74 MW discharge capacity with a four-hour duration using lithium-iron-phosphate technology.

 

With the acquisition of SFF, the Company is now responsible for securing the permits and financing required to complete the construction of the BESS projects. In November 2024, the Company secured financial closing of a combined project loan in an initial principal amount of $25.8 million for two of the three BESS projects. In December 2025, the credit agreement was amended to increase the total credit commitment to $28.1 million. The Company remains in discussion with a project finance lender for the financing for the third BESS project.

 

The 903 project remains in the permitting process and commencement of construction remains subject to the receipt of final permits. In particular, in order to proceed with construction of the 903 project, an Official Plan Amendment and Zoning By-law Amendment (“OPA/ZBA”) were required from the Town of Armour, Ontario. On November 8, 2022, the 763 ProjectCo received a Municipal Support Resolution, which was unanimously approved by the Council for the Town of Armour. However, the OPA/ZBA were delayed as a result of certain public opposition and the Council’s evaluation of how to respond to such opposition. At a Council meeting for the Town of Armour held on January 13, 2026, the Council voted against the approval of the OPA/ZBA due to public opposition. The Company appealed this decision to the Ontario Land Tribunal (“OLT”), and a hearing was held on July 9, 2026. Subsequent to year ended June 30, 2026, on July 21, 2026, the OLT issued its decision approving the OPA/ZBA. The IESO approved the Force Majeure claim on September 15, 2026, resulting in an extension of the Milestone Commercial Operation Date (MCOD) to July 29, 2027. The Company submitted its Site Plan Approval application to the municipality on August 27, 2026, and is currently working toward submitting the Planning Act consent application. The building permit application will follow upon receipt of Site Plan Approval. Construction of the project remains contingent upon obtaining these outstanding approvals. Accordingly, the timing of the remaining permitting approvals and their potential impact on the overall project schedule remain uncertain.

 

The OZ-1 Project does not have a project loan and remains in the permitting process. Commencement of construction remains subject to the receipt of financing and final permits. The Company submitted an application to the Municipality of Arran-Elderslie for Site Plan Approval on February 26, 2025, related to the proposed BESS and made an application for consent to establish a long-term lease on the lands where the OZ-1 Project is located (the “OZ-1 Consent”). The application for the OZ-1 Consent was made in the context of Section 50(3) of the Planning Act (Ontario) to permit a lease on the lands where the OZ-1 Project is located for a period longer than 21 years. On July 29, 2025, the County of Bruce provisionally approved Consent Application B-2024-075, subject to seven (7) conditions. Certain conditions were overly broad in scope and application, lacked certainty, and were not reasonable. As a result, the Company appealed the decision on the OZ-1 Consent to the Ontario Land Tribunal (“OLT”). Following an OLT hearing held on January 30, 2026, the OZ-1 Consent was approved with revised conditions acceptable to the Company. The remaining permitting process is being completed with the Municipality of Arran-Elderslie. On June 8, 2026, Council considered the Company’s Site Plan Approval application but elected not to vote on the application. Instead, Council directed the Company to continue working with municipal staff to address requested changes to the proposed road design and site access. The requested changes were introduced late in the permitting process and related to matters that had previously been approved through the entrance permit process. As the Company was unable to accommodate these requested changes at that stage of the permitting process, it filed an appeal with the OLT on July 7, 2026 on the basis of the Municipality’s failure to make a decision on the Site Plan Approval application. The OLT hearing has been scheduled for December 10, 2026 and the Company and the Municipality of Arran-Elderslie have reached an agreement to proceed with an uncontested hearing and enter into Minutes of Settlement in advance of the OLT hearing. The building permit application will follow upon receipt of Site Plan Approval. A delay in obtaining the remaining permits has delayed commencement of construction and commercial operation beyond the originally planned timeline. In order to extend the deadline for commercial operation under the E-LT1 contract for the project, the Company has provided the IESO with notice of a potential force majeure event arising from the permitting delays. The timing of the remaining permitting approvals and the impact on the project schedule remain uncertain.

 

4
Management’s Discussion and Analysis

 

As a result of permitting delays, the Company and its battery storage systems supplier (the “Supplier”) agreed to terminate the contracts for OZ-1 on mutually agreeable terms. Once permitting certainty is achieved for OZ-1, the Company will either re-enter into agreements with the Supplier or pursue an alternative supplier. A termination arrangement has now been concluded pursuant to which the parties agreed to terminate the OZ-1 equipment supply and long-term service agreements, with PowerBank relinquishing all rights and obligations. The Supplier will retain possession and property of the systems originally allocated to OZ-1, and PowerBank paid the Supplier a termination fee of $0.5 million along with a reimbursement of certain retrofit costs in the amount of $0.1 million, in addition to any amounts due for services performed to date. As part of the settlement, the outstanding OZ-1 accounts payable of approximately $4.1 million were released, in addition, $3.1 million of the amount previously paid to the Supplier was applied to project 903 and SFF 06, reducing the related project payables. Final completion deadlines for the remaining projects are also being adjusted. PowerBank paid $0.5 million for an extended warranty for the SFF 06 and 903 projects.

 

Recent Developments

 

During and up to the date of this MD&A, the Company achieved the following business objectives in Fiscal 2027:

 

●On October 29, 2026, shareholders approved a share consolidation at a ratio between 10:1 and 30:1 at the Company’s Annual General and Special Meeting. The Board of Directors approved a 20:1 consolidation ratio on November 11, 2026. The effective date remains subject to approval by Cboe Canada Inc. and Nasdaq.

 

●On October 26, 2026, PowerBank announced the completion of a $25.4 million project-level refinancing across 53 operating solar projects, which reduced outstanding project loan principal by approximately $4.2 million, or 14%. The refinancing consolidated 50 credit agreements into a single facility with a Canadian bank and is expected to release approximately $5.0 million in net cash to PowerBank. PowerBank also announced that it will bring operations and maintenance of 49 of the projects in-house.

 

●On October 13, 2026, the Company achieved commercial operation on a 3.25 MW DC community solar project it developed and built for Solar Advocate Development in Camillus, NY.

 

●On October 1, 2026 the Company announced that it has received written notification from the Nasdaq granting the Company an additional 180-day period, or until March 28, 2027, to regain compliance with Nasdaq’s minimum bid price requirement under Nasdaq Listing Rule 5550(a)(2). The Company satisfies the continued listing requirement for market value of publicly held shares and all other applicable listing requirements for initial listing on the Nasdaq Capital Market, except for the minimum bid price requirement. The notification has no immediate effect on the listing or trading of the Company’s Common Shares, which will continue to trade on the Nasdaq Capital Market under the symbol “PBK”. If, at any time during the additional compliance period, the closing bid price of the Company’s Common Shares is at least US$1.00 per share for a minimum of 10 consecutive business days, Nasdaq will provide written confirmation that the Company has regained compliance, and the matter will be closed. The Company received an initial notification from Nasdaq indicating that it was not in compliance with the minimum bid price requirement and was provided an initial 180-day compliance period through September 29, 2026. In connection with its request for an additional compliance period, the Company applied to transfer the listing of its Common Shares from the Nasdaq Global Market to the Nasdaq Capital Market. The transfer was approved by Nasdaq on September 30, 2026 and became effective on October 1, 2026. The Company intends to continue monitoring the closing bid price of its Common Shares between now and March 28, 2027, and will evaluate all available options during the second compliance period to rectify the deficiency and regain compliance with the minimum bid price requirement. The Company’s Common Shares will continue to be listed and traded on the Nasdaq Capital Market during this period. PowerBank also announced that certain of its directors, officers and consultants would establish an automatic securities disposition plan effective October 2, 2026.

 

●On September 30, 2026, PowerBank announced the termination of its at-the-market equity offering program, which had been established in February 2026.

 

●On September 3, 2026, PowerBank announced that it had been awarded a contract, through a competitive solicitation administered by the New York Power Authority, to develop and construct a 1.628 MW DC ground-mount solar project at SUNY Oneonta. The project has an estimated construction value of approximately US$3.58 million and is expected to qualify for approximately US$1.4 million in ITCs.

 

5
Management’s Discussion and Analysis

 

●On August 31, 2026, PowerBank announced that it had entered into a fee-for-service development agreement with 1001634281 Ontario Inc. to provide early development services for a BESS project to be submitted into the IESO LT2(c-2) capacity procurement. If a contract is awarded, PowerBank would hold a right of first refusal to act as EPC provider. PowerBank also agreed to settle $817,332 of outstanding legal fees through the issuance of approximately 1,297,352 common shares at a deemed price of $0.63 per share, subject to regulatory approvals.

 

●On August 24, 2026, PowerBank announced the appointment of Nicole Rusaw, CPA, CA, as Chief Financial Officer, succeeding Sam Sun.

 

●On August 20, 2026, PowerBank announced that its 6.86 MW Brooklyn ground-mounted community solar project in Nova Scotia had received its final environmental permit, with construction expected to begin in fall 2026. The project has an expected development and construction cost of $14 million and is supported by up to $2.639 million in federal Clean Technology Investment Tax Credits and $1.92 million in grants. The project is owned and funded by AI Renewable Flow-through Fund, with PowerBank acting as lead developer.

 

●On August 18, 2026, PowerBank announced that it had executed repurchase agreements, through its U.S. subsidiary Abundant Solar Power Inc., to reacquire the Gainesville and Highway 28 community solar projects in New York State, which it had previously sold to a third party. The projects total 13.9 MW, are expected to be construction-ready in 2026 and 2027, and have a combined construction value of approximately US$32.5 million and expected ITC value of approximately US$13 million.

 

●On August 11, 2026, PowerBank announced that it had executed a lease agreement for the ON-765 West Solar Project, a 4 MW ground-mount solar project in North Bruce Peninsula, Ontario, which is expected to qualify for the federal Clean Technology Investment Tax Credit. PowerBank intends to complete preliminary assessments and advance permitting.

 

●On August 4, 2026, PowerBank announced that its 903 BESS project in Ontario had received Official Plan Amendment and Zoning By-law Amendment approvals on July 21, 2026, completing the project’s most complex permitting phase. The project, which holds a 22-year Independent Electricity System Operator (“IESO”) capacity contract, is now in site plan approval, with all construction permits expected by the fourth quarter of 2026. The project’s ownership is split equally between PowerBank (50%) and a partnership of First Nations communities (50%).

 

●On July 30, 2026, PowerBank announced that it will support TriMac Engineering of Sydney, Nova Scotia, under a fee-for-service agreement, in providing solar feasibility and related assessments to the Municipality of the County of Victoria, Nova Scotia. TriMac’s contract with the Municipality was executed on July 8, 2026.

 

●On July 20, 2026, PowerBank announced that it had executed a lease agreement for the Scofield project, a 3.2 MW DC ground-mount community solar project in Broome County, New York, which is a relocation and redesign of its previously announced Boyle Rd. project. The project is expected to be eligible for incentives under the New York State Energy Research and Development Authority NY-Sun Program, and an interconnection application is underway. PowerBank stated that physical work began on the project before the July 4, 2026 deadline for U.S. federal Investment Tax Credit (“ITC”) eligibility under the One Big Beautiful Bill Act and is expected to satisfy the IRS Physical Work Test. The project has an estimated construction value of approximately US$8 million and an expected ITC value of approximately US$3.2 million.

 

●On July 20, 2026 PowerBank also disclosed that it had entered into amending agreements, each dated July 1, 2026 and each with a term of five years, to the consulting agreements under which certain of its executive officers provide services, as follows:

 

○Executive Chair: an amendment to the consulting agreement between PowerBank and Art Vancouver Productions Inc., under which Matthew Wayrynen will continue to provide services as Executive Chair. The monthly fee for Mr. Wayrynen’s services was increased to C$50,000 (plus applicable taxes), subject to further increase to up to C$100,000 per month upon PowerBank completing equity or debt financings in an aggregate amount equal to or greater than US$25,000,000.

 

○Chief Executive Officer: an amendment to the consulting agreement between PowerBank and Light Voltaic Corporation, under which Dr. Richard Lu will continue to provide services as Chief Executive Officer. The monthly fee for Dr. Lu’s services was increased to C$66,875 (plus applicable taxes), subject to further increase to up to C$100,000 per month upon PowerBank completing equity or debt financings in an aggregate amount equal to or greater than US$25,000,000.

 

6
Management’s Discussion and Analysis

 

○Senior Vice President, Corporate Development: an amendment to the consulting agreement between PowerBank and The Phoenix Trendz Inc., under which Tracy Zheng will continue to provide services as Senior Vice President, Corporate Development. The monthly fee for Ms. Zheng’s services was increased to C$33,334 (plus applicable taxes), subject to further increase to up to C$50,000 per month upon PowerBank completing equity or debt financings in an aggregate amount equal to or greater than US$25,000,000.

 

○PowerBank also entered into amending agreements, each with a five-year term, with three members of its advisory board and with a corporate advisor. Under the amended terms, each of the three individual advisors will receive a monthly fee of C$50,000, payable in a combination of cash and PowerBank common shares, and the corporate advisor will continue to receive a monthly fee of US$50,000. PowerBank further entered into an amending agreement with its General Counsel, under which the General Counsel will receive a monthly fee of C$50,000, payable in a combination of cash and PowerBank common shares. The fees payable to the advisors and the General Counsel may be increased upon PowerBank completing equity or debt financings above specified thresholds, which were not disclosed in the news release.

 

○PowerBank disclosed that the compensation described above, together with the fees payable to its independent directors (C$112,500 in aggregate for all independent directors for each calendar quarter), is payable, at PowerBank’s election and subject to stock exchange approval, in PowerBank common shares on a quarterly basis, based on the closing market price of the shares on the last trading day of each quarter. PowerBank also announced that it had granted restricted share units, within the limits of its restricted share unit plan, to certain of its directors, officers, employees and consultants. The number of restricted share units granted and the identity of the recipients were not disclosed.

 

●On July 17, 2026, PowerBank issued a total of 298,804 common shares to certain former and current directors and officers of Solar Flow-Through Funds Ltd. (“SFF”) in settlement of outstanding directors’ fees owed to those individuals, which PowerBank assumed as part of its acquisition of SFF.

 

●On July 8, 2026, PowerBank announced that it had received a certificate of final completion for a 1.45 MW DC rooftop solar project in Calgary, Alberta, built under an EPC agreement with Fiera Real Estate. The project achieved commercial operation in December 2025 and sells power under Alberta’s Small Scale Generation program.

 

●On July 2, 2026, PowerBank announced that SB-14, a 7.01 MW DC / 5 MW AC ground-mount community solar project in upstate New York, had achieved commercial operation. PowerBank developed and constructed the project for Honeywell International Inc. under a US$41 million engineering, procurement and construction EPC agreement covering a three-project portfolio. SB-14 is the second project in that portfolio to reach commercial operation, bringing operating capacity across the portfolio to 14.02 MW.

 

●On July 1, 2026, the Company closed a registered direct offering of 7,000,000 common shares to two new long-term institutional investors (the “2026 Offering”). U.S.$4.2 million was funded upon the closing of the 2026 Offering, before deducting placement agent fees and other estimated 2026 Offering expenses. The Company intends to use the net proceeds from the 2026 Offering for delivery of its independent power producer project portfolio, working capital and general corporate purposes. A.G.P./Alliance Global Partners acted as sole placement agent for the Offering.

 

7
Management’s Discussion and Analysis

 

Results of Operations

 

The following table outlines our consolidated statements of comprehensive income (loss) for the periods indicated:

 

   Three months ended September 30 
(in thousands of Canadian dollars)  2026   2025 
         
Revenue  $4,197   $19,150 
Cost of goods sold   2,679    10,606 
Gross profit  $1,518   $8,544 
Operating expenses:          
Advertising and promotion   4    9 
Professional fees   1,590    2,641 
Consulting fees   3,645    1,405 
Depreciation and amortization   41    27 
Salary and wages   535    419 
Share-based compensation   405    721 
Insurance   291    308 
Listing fees   7    55 
Travel and events   49    72 
Repairs and maintenance   45    28 
Other operating expense   786    252 
Total operating expenses  $7,398   $5,937 
Other income (expense)          
Interest income   140    90 
Interest expense   (1,166)   (813)
Fair value change of derivatives   1,307    66 
Fair value change of warrant liabilities   257    102 
Fair value change of CVR liabilities   (142)   (542)
Fair value change of other liabilities due to non-controlling interest holders   (10)   (10)
Other income (expense)   (174)   (90)
Net income (loss) before income taxes  $(5,668)  $1,410 
Current tax recovery (expense)   (227)   (302)
Deferred tax recovery (expense)   (255)   (97)
Net income (loss) for the period  $(6,150)  $1,011 
Other comprehensive income (loss)   (60)   190 
Comprehensive Income (loss)  $(6,210)  $1,201 
Income (loss) attributable to:          
Shareholders of the Company   (6,184)   1,000 
Non-controlling interest   34    11 
Income (loss) for the period  $(6,150)  $1,011 
Total comprehensive loss attributable to:          
Shareholders of the company   (6,244)   1,190 
Non-controlling interest   34    11 
Total comprehensive income (loss)  $(6,210)  $1,201 
           
Earnings (loss) per share - basic   (0.10)   0.03 
Earnings (loss) per share - diluted   (0.10)   0.02 

 

8
Management’s Discussion and Analysis

 

Review of Operations

 

Trend

 

In Fiscal 2027, the Company continues to focus on scaling its business model by growing its pipeline, monetizing its close-to-notice to proceed projects and advancing its EPC projects in the US and continued development activities for projects in both US and Canada. It is expected that the Company’s revenue will resume growing in Fiscal 2027.

 

Key business highlights and projects updates in Fiscal 2027

 

Existing projects

 

The Company classifies its existing projects as those that are currently in the construction phase.

 

      Size         
Name  Location  (MWdc solar MW AC/MWh BESS)  Timeline  Milestone  Current Status
Camillus  New York, USA  3.25  Q2 FY2027  Permission to Operate  EPC project. Construction started in Q4 FY2025. Owned by Solar Advocate Development. PTO has been reached in Q2 FY2027.
Hardie Rd  New York, USA  6.9  Q2 FY2027  Under Construction  EPC project. Construction started in Q4 FY2025. Owned by Qcells.
Rice Road  New York, USA  6.4  Q2 FY2027  Under Construction  EPC project. Construction started in Q4 FY2025. Owned by Qcells.

 

9
Management’s Discussion and Analysis

 

Projects under development

 

Name  Location  Size (MWDC)  Timeline  Milestone Reached  Expected Cost (in thousands of Canadian dollar)   Cost Incurred (in thousands of Canadian dollar)   Sources of Funding  Current Status
261 Township (Phase2)  Alberta, Canada  4.2  Q4 FY2027  Under development   200    44   Equity financing, working capital  Phase 1 construction started in Q1 FY2025 and reached PTO in Q2 FY2026. Preliminary interconnection was completed and executed for Phase 2. Detailed Interconnection & Transmission Study was submitted in May 2026. Expected to reach NTP in Q4 FY2027.
Gainesville  New York, USA  7   FY2028  Under development   2,700    1,087   Equity financing, working capital  Expected to reach NTP in FY2028, subject to the resolution of permitting issues. See “Legal Matters and Contingencies.”
Hwy 28  New York, USA  7  Q4 FY2026  NTP   2,100    2,083   Equity financing, working capital, New York Green Bank facility  The project has received all major discretionary permits. Site prep work has been initiated and full construction mobilization will commence on receipt of financing. NTP was reached in Q4 FY2026.
Jordan 1  New York, USA  7  Q4 FY2026  NTP   2,000    1,935   Equity financing, working capital, New York Green Bank facility  The project has received all major discretionary permits. Site prep work has been initiated and full construction mobilization will commence on receipt of financing. NTP was reached in Q4 FY2026.
Jordan 2  New York, USA  7  Q4 FY2026  NTP   2,000    696   Equity financing, working capital, New York Green Bank facility  The project has received all major discretionary permits. Site prep work has been initiated and full construction mobilization will commence on receipt of financing. NTP was reached in Q4 FY2026.
NS Projects  Nova Scotia, Canada  31  Q4 FY2027  Under development   900    88   Service fee  Two of the three projects reached NTP in August 2026. The remaining project is expected to reach NTP in April 2027.
Silver Springs  New York, USA  2.9  Q4 FY2027  Under development   1,300    460   Equity financing, working capital  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q4 FY2027.
Grandview  Pennsylvania, USA  4.2  Q4 FY2027   Under development   2,100    390   Equity financing, working capital  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q4 FY2027.

 

10
Management’s Discussion and Analysis

 

Schwanger  Pennsylvania, USA  4.2  Q3 FY2027  Under development   2,100    180   Equity financing, working capital  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q3 FY2027.
North Main  New York, USA  7.2  Q4 FY2027  Under development   1,250    558   Equity financing, working capital  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q4 FY2027.
Viridi Solar and BESS  New York, USA  2.2 MW (Solar) 1.2 MWH (BESS)  Q4 FY2026  NTP   2,000    1,961   Equity financing, working capital, New York Green Bank facility  The project has received all major discretionary permits in Q4 FY2026. Full construction mobilization will commence on receipt of financing.
Hoadley Hill Rd  New York, USA  7.2  Q3 FY2027  Under development   1,900    961   Equity financing, working capital, New York Green Bank facility  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q3 FY2027.
Day Hollow  New York, USA  2.8  Q3 FY2027  Under development   800    159   Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in Q3 FY2027.
903 (BESS)  Ontario, Canada 

Discharge: 4.74

Storage: 18.96

  Q4 FY2027  Under development   12,001    10,490   Equity financing, working capital  EPC project. EPC agreement entered Oct. 3, 2023. Debt financing has been secured through RBC. Commencement of construction remains subject to receipt of final permits. There is no certainty that final permits will be received.
OZ-1 (BESS)  Ontario, Canada 

Discharge: 4.74

Storage: 18.96

  Q4 FY2027  Under development   12,001    3,228   Equity financing, working capital  EPC project. EPC agreement entered Oct. 3, 2023. Commencement of construction remains subject to receipt of financing and final permits. There is no certainty that financing or final permits will be received. See “Legal Matters and Contingencies”.
DMNA  New York, USA  17.5/2.2 MWH BESS  Q3 FY2027  NTP   3,934    417   Equity financing, working capital, New York Green Bank facility  The Company has executed lease and power purchase agreements with the New York State Division of Military and Naval Affairs for the development of the project. Site prep work has commenced in Q4 FY2026 and full construction mobilization will occur on receipt of financing.

 

11
Management’s Discussion and Analysis

 

Elmira  New York, USA  2.6  Q3 FY2027  NTP   2,500    2,376   Equity financing, working capital, New York Green Bank facility  The project has received all major discretionary permits. Site prep work has been initiated in Q4 FY2026 and full construction mobilization will commence on receipt of financing.
Phillips Rd  New York, USA  2.1  Q4 FY2027  Under development   500    222    Equity financing, working capital, New York Green Bank facility  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q4 FY2027.
Donovan Hill  New York, USA  6.7  Q4 FY2027  Under development   500    183   Equity financing, working capital  The project has completed its interconnection approval and is now in the permitting stage. Expected to reach NTP in Q4 FY2027.
Holland Glnwd (BESS)  New York, USA  20 MWh   FY2028  Under development   1,500    38    Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in FY2028.
NY-Sapbush (BESS)  New York, USA  20 MWh   FY2028  Under development   1,500    -    Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in FY2028.
NY-Conklin Hill Rd (BESS)  New York, USA  20 MWh   FY2028  Under development   1,500    -    Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in FY2028.
Round Hill Rd (BESS)  New York, USA  20 MWh  FY2028  Under development   1,500    50   Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in FY2028.
Montana Rd (BESS)  New York, USA  20 MWh   FY2028  Under development   1,500    -   Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in FY2028.
Genesee Rd (BESS)  New York, USA  20 MWh   FY2028  Under development   1,500    1   Equity financing, working capital  The project is under interconnection study. Expected to reach NTP in FY2028.
118 Scofield  New York, USA  3.2  Q4 FY2027  Under development   1,500    75   Equity financing, working capital  The project is under interconnection study and in permitting. Expected to reach NTP in Q4 FY2027
ON-765 West  Ontario, Canada  4  Q4 FY2027  Under development   1,500    -   Equity financing, working capital  The project is under interconnection study and in permitting. Expected to reach NTP in Q4 FY2027

 

Projects under development comprise (i) projects owned by the Company that have not yet achieved a Notice to Proceed (“NTP”), and (ii) projects that have been divested, but for which the Company has retained the engineering, procurement and construction (“EPC”) agreement and continues to perform development activities on behalf of the purchaser.

 

During fiscal 2027, certain projects were cancelled due to their utility-scale nature, significant cash requirements, and management’s determination, based on further studies and analyses, that they were no longer economically viable. As a result, inventory totalling $134 was written off.

 

12
Management’s Discussion and Analysis

 

Revenue

 

The Company’s revenue is mainly from Development fees, EPC services, IPP production and O&M services and other services.

 

   Three Months Ended September 30 
(in thousands of Canadian dollars)  2026   2025   Change 
Development fees  $-   $3,373   $(3,373)
EPC services   213    11,932    (11,719)
IPP production   3,759    3,845    (86)
O&M and other services   225    -    225 
Total revenue  $4,197   $19,150   $(14,953)

 

Total revenue

 

For the three months ended September 30, 2026, total revenue decreased by $14,953, or 78.1%, to $4,197, compared with $19,150 for the same period in the prior year. The decrease primarily reflects lower EPC services revenue of $11,719 and development fee revenue of $3,373, together with a decrease of $86 in IPP production revenue, partially offset by an increase of $225 in O&M and other services revenue.

 

Development Fees

 

For the three months ended September 30, 2026, development fee revenue was nil, compared with $3,373 for the same period in the prior year.

 

EPC Services

 

For the three months ended September 30, 2026, EPC services revenue decreased by $11,719, or 98.2%, to $213, compared with $11,932 for the same period in the prior year. The decrease primarily reflects lower construction activity levels and project progress achieved during the quarter.

 

IPP Production

 

For the three months ended September 30, 2026, IPP production revenue decreased by $86, or 2.2%, to $3,759, compared with $3,845 for the same period in the prior year. The variance reflects the variations in energy generation output and production timing across certain facilities which impacted overall revenue during the quarter.

 

O&M and Other Services

 

For the three months ended September 30, 2026, O&M and other services revenue increased by $225 to $225, compared with nil for the same period in the prior year. The increase reflects revenue from a new O&M agreement and other services provided during the quarter.

 

13
Management’s Discussion and Analysis

 

Cost of goods sold

 

   Three Months Ended September 30 
(in thousands of Canadian dollars)  2026   2025   Change 
Cost of development fees  $-   $-   $- 
Cost of EPC services   631    8,726    (8,095)
Cost of IPP production   1,980    1,880    100 
Cost of O&M and other services   68    -    68 
Total cost of goods sold  $2,679   $10,606   $(7,927)

 

Cost of development fees

 

For the three months ended September 30, 2026, development fee costs were nil, consistent with the same period in the prior year. As no development fee revenue was recognized during the quarter, there was no gross profit on development fees, compared to $3,373 in the same period in the prior year.

 

Cost of EPC services

 

For the three months ended September 30, 2026, EPC services costs were $631, compared to $8,726 in the same period in the prior year, a decrease of $8,095. EPC services generated a gross loss of $418, compared to gross profit of $3,206, representing a gross margin of 27%, in the same period in the prior year. The gross loss primarily reflects changes in estimated project completion percentages and the resulting impact on revenue recognized during the quarter.

 

Cost of IPP production

 

For the three months ended September 30, 2026, IPP production costs were $1,980, compared to $1,880 in the same period in the prior year, an increase of $100. Gross profit from IPP production was $1,779, representing a gross margin of 47%, compared to 51% in the same period in the prior year. The decrease in gross margin reflects slightly lower production revenue against IPP operating costs that are largely fixed, as they primarily consist of assets depreciation and amortization and plant-level maintenance expense.

 

Cost of O&M and other services

 

For the three months ended September 30, 2026, O&M and other services costs were $68, compared to nil in the same period in the prior year. Gross profit from O&M and other services was $157, representing a gross margin of 70%. There was no O&M activity in the same period in the prior year.

 

14
Management’s Discussion and Analysis

 

Operating expenses

 

Expenses consist of expenditures related to cost of services provided and costs to develop new projects, as well as corporate business development and administrative expenses.

 

   Three Months Ended September 30 
(in thousands of Canadian dollars)  2026   2025   Change 
Advertising and promotion  $4   $9   $(5)
Professional fees   1,590    2,641    (1,051)
Consulting fees   3,645    1,405    2,240 
Depreciation and amortization   41    27    14 
Salary and wages   535    419    116 
Share-based compensation   405    721    (316)
Insurance   291    308    (17)
Listing fees   7    55    (48)
Travel and events   49    72    (23)
Repairs and maintenance   45    28    17 
Other operating expense   786    252    534 
Total operating expenses  $7,398   $5,937   $1,461 

 

Advertising and Promotion

 

For the three months ended September 30, 2026, advertising and promotion expenses decreased by $5, or 55.6%, to $4, compared with $9 for the same period in the prior year, reflecting continued limited marketing activity.

 

Professional fees

 

For the three months ended September 30, 2026, professional fees decreased by $1,051, or 39.8%, to $1,590, compared with $2,641 for the same period in the prior year. The decrease was primarily due to lower accounting fees and legal expenses.

 

Consulting Fees

 

For the three months ended September 30, 2026, consulting fees increased by $2,240, or 159.4%, to $3,645, compared with $1,405 for the same period in the prior year. The increase was mainly attributable to RSU issued to consultants for services and higher fees from recurring service providers.

 

Depreciation and Amortization

 

For the three months ended September 30, 2026, depreciation and amortization expense increased by $14, or 51.9%, to $41, compared with $27 for the same period in the prior year, reflecting additions to depreciable assets.

 

Salary and wages

 

For the three months ended September 30, 2026, salary and wages increased by $116, or 27.7%, to $535, compared with $419 for the same period in the prior year, primarily reflecting higher headcount, increased compensation and bonus accruals recorded during the quarter.

 

Share-based compensation

 

For the three months ended September 30, 2026, share-based compensation expense decreased by $316, or 43.8%, to $405, compared with $721 for the same period in the prior year. The decrease was primarily due to the timing of grants and vesting of options and RSUs issued to employees.

 

Insurance

 

For the three months ended September 30, 2026, insurance expenses decreased by $17, or 5.5%, to $291, compared with $308 for the same period in the prior year, remaining relatively consistent period over period.

 

Listing Fees

 

For the three months ended September 30, 2026, listing fees decreased by $48, or 87.3%, to $7, compared with $55 for the same period in the prior year, reflecting the timing of annual listing fee charges.

 

Travel and Events

 

For the three months ended September 30, 2026, travel and events expenses decreased by $23, or 31.9%, to $49, compared with $72 for the same period in the prior year, reflecting lower corporate travel.

 

Repairs and Maintenance

 

For the three months ended September 30, 2026, repairs and maintenance expenses increased by $17, or 60.7%, to $45, compared with $28 for the same period in the prior year, reflecting higher maintenance activity during the quarter.

 

Other operating expenses

 

For the three months ended September 30, 2026, other operating expenses increased by $534, or 211.9%, to $786, compared with $252 for the same period in the prior year. The increase primarily reflects an inventory write-off and higher financing fees and commission fees.

 

15
Management’s Discussion and Analysis

 

Other income (expense):

 

   Three Months Ended September 30 
(in thousands of Canadian dollars)   2026   2025   Change 
Interest income  $140   $90   $50 
Interest expense   (1,166)   (813)   (353)
Fair value change of derivatives   1,307    66    1,241 
Fair value change of warrant liabilities   257    102    155 
Fair value change of CVR liabilities   (142)   (542)   400 
Fair value change of other liabilities due to non-controlling interest holders   (10)   (10)   - 
Other income (expense)   (174)   (90)   (84)
Total other income (expense)  $212   $(1,197)  $1,409 

 

Interest income

 

For the three months ended September 30, 2026, interest income increased by $50 to $140, compared with $90 in the same period in the prior year, primarily due to higher cash balances.

 

Interest expense

 

For the three months ended September 30, 2026, interest expense increased by $353 to $1,166, compared with $813 in the same period in the prior year, primarily due to higher loan balances.

 

Fair value change of derivatives

 

For the three months ended September 30, 2026, the Company recorded a fair value gain on derivatives of $1,307, compared to a gain of $66 in the same period in the prior year, representing a favorable variance of $1,241. The change was primarily driven by updated market inputs and valuation assumptions related to interest rate derivatives.

 

Fair value change of warrant liabilities

 

For the three months ended September 30, 2026, the Company recognized a fair value gain of $257 relating to warrant liabilities, compared to a gain of $102 in the same period in the prior year, an increase of $155. The gain reflects the remeasurement of outstanding warrants under IFRS 9, primarily driven by updated assumptions within the Black-Scholes option-pricing model, including volatility, risk-free rate, and expected term.

 

Fair value change of CVR liabilities

 

For the three months ended September 30, 2026, the Company recorded a fair value loss of $142 relating to contingent value rights (“CVR”), compared to a loss of $542 in the same period in the prior year, a favorable variance of $400. The loss reflects changes in valuation inputs and assumptions applied to the CVR liability.

 

Fair value change of other liabilities due to non-controlling interest holders

 

For the three months ended September 30, 2026, the Company recorded a fair value loss of $10 relating to other liabilities due to non-controlling interest holders, consistent with a loss of $10 in the same period in the prior year.

 

Other income (expenses)

 

For the three months ended September 30, 2026, other expenses increased by $84 to $174, compared with $90 in the same period in the prior year, partly reflecting interest and penalty charges associated with payment timing.

 

16
Management’s Discussion and Analysis

 

Discussion of Operations

 

The following summarizes the Company’s most significant recent projects.

 

Commercial and Industrial Solar Projects

 

The Company is a turn-key service provider to commercial and industrial customers for them to own BTM solar power plant on-site. The Company can also invest and own the BTM solar projects where local policies allow commercial aggregation and 3rd party ownership.

 

261 Township

 

The Company commenced construction on a 1.45 MW DC rooftop solar project in Alberta, Canada as a pilot project for Fiera Real Estate. The Company was hired by Fiera as turn-key project developer with a fee for service. This project received interconnection approval in December 2023. Construction started in July 2024 and was completed in December 2025. Commercial operation for this project was achieved in December 2025.

 

Community Solar Projects

 

Community solar refers to local solar PV facilities shared by multiple community subscribers who receive credit on their electricity bills for their share of the power produced. Community solar provides homeowners, renters, and businesses equal access to the economic and environmental benefits of solar energy generation regardless of the physical attributes or ownership of their home or business. Community solar expands access to solar for all, including in particular low-to-moderate income customers most impacted by a lack of access, all while building a stronger, distributed, and more resilient electric grid. Community solar power plants are usually less than seven (7) megawatts (MWdc) of electrical capacity, and it could power about 1,000 homes (the average American household uses approximately 10,000 kWh per year).

 

Camillus

 

In March 2025, the Company entered an agreement to sell the Camillus project, a close to NTP community solar project in New York, to Solar Advocate Development LLC and continued to build the project for the owner to commercial operation via an EPC agreement. The EPC agreement has a total value of approximately US$5.91 million. The project has reached PTO in October 2026.

 

Hardie Rd

 

In December 2024, the Company entered an agreement to sell the Hardie Rd project, a close to NTP community solar project in New York, to HQCA Energy Solutions, LLC and continued to build the project for the owner to commercial operation via an EPC agreement. The EPC agreement has a total value of approximately US$8.67 million. The project is under construction and expected to reach PTO in fiscal 2027.

 

Rice Rd

 

In December 2024, the Company entered an agreement to sell the Rice Rd project, a close to NTP community solar project in New York, to HQCA Energy Solutions, LLC and continued to build the project for the owner to commercial operation via an EPC agreement. The EPC agreement has a total value of approximately US$8.72 million. The project is under construction and expected to reach PTO in fiscal 2027.

 

Settling Basin

 

On September 18, 2023 the Company and Honeywell entered into a Membership Interest Purchase Agreement (the “Honeywell MIPA”) and an EPC agreement (the “Honeywell EPC Agreement”) pursuant to which Honeywell acquired the SB-1, SB-2 and SB-3 projects and retained the Company for their construction, with a total transaction value of US$41 million. The Company also expects to retain an operations and maintenance contract for the SB projects following the completion of construction. In April 2024, the Company completed mechanical construction for the three projects. The projects have reached PTO in Q4 fiscal 2026.

 

17
Management’s Discussion and Analysis

 

Geddes

 

On October 2, 2023, the Company announced that it had commenced major construction on the Geddes project developed by the Company in Geddes, New York. The Company intends to own and operate the Geddes project. The Geddes project which has a designed capacity of 3.7 megawatts MW DC is repurposing a closed landfill, addressing two critical challenges: the need for clean energy and the transformation of contaminated sites into valuable assets. The project reached PTO in July 2025. In October 2025, the Company received a non-repayable government grant of US$1.5 million. The project is expected to generate US$2.6 million income tax credits in fiscal 2027.

 

Utility Solar Farms Projects

 

A utility-scale solar farm is one which generates solar power and feeds it into the grid, supplying a customer with renewable solar energy. A ‘utility-scale’ solar project is usually defined as such if it is 10 MW or bigger in capacity of energy production.

 

Battery Energy Storage Systems (BESS) Projects

 

The Company won contract awards for three BESS projects in 2023 for the Solar Flow-Through Funds Ltd. (SFF) in June 2023. On October 3, 2023, the Company entered into three EPC agreements for the construction of these three separate BESS projects (the “BESS Projects”), with a total contract value of approximately $38 million. The Projects are owned by SFF and three First Nations communities in Ontario through holding companies.

 

The BESS Projects were awarded as part of a procurement process with the Ontario IESO known as “E-LT1”. Projects under the E-LT1 are expected to be operational no later than the fiscal year 2028. Each BESS Project is expected to operate under a long-term contract with guaranteed capacity payments from the IESO, provided all contract obligations are met. The BESS Projects will also earn revenue from the energy and ancillary markets in Ontario. Each has a 4.74 MW discharge capacity with a four-hour duration using lithium-iron-phosphate technology. The Company closed the acquisition of SFF in July 2024. SFF 06 has been operational since April 20th, 2026. 903 and OZ-1 are expected to get NTP in Q4 fiscal 2027.

 

See “Overview – Development of the Business – Canada” for additional information on the status of the BESS Projects.

 

18
Management’s Discussion and Analysis

 

Outlook

 

Building upon its solid core competencies in full-service development, the Company will deliver an integrated growth solution that has the capacity to generate revenue and grow the business in different revenue streams, that are discussed in this paragraph. For Commercial and Industrial (“C&I”) end users, the Company will extend its expertise in rooftop solar to behind-the-meter (“BTM”) solar and BESS projects, carports, and building-integrated photovoltaics enabling large property management firms and C&I customers like Honeywell to achieve corporate Net-Zero commitments. The Company has been in negotiations with C&I customers to achieve this goal. The Company also intends to extend its success in FIT ground mount solar gardens and Community Solar farms to large Utility Scale solar farms with a targeted size of 100 MWp or more. The Company’s track record in operations, maintenance, and asset management, create a strong foundation for it to become a successful IPP delivering long-term, sustainable, and profitable growth. The Company’s pipeline has been growing in all aspects of what is being discussed above, which is the result of an integrated growth solution.

 

The Company has an existing development pipeline of solar photovoltaic (“PV”) projects that totals approximately 201.3 MW and BESS projects that total approximately 756.0 MWh. The Company categorizes its development pipeline into the following three categories: (1) “Under Construction” means the commercial operation date for the project is expected to occur within the next six to twelve months; (2) “Advanced Development” means the project is expected to reach NTP stage within the next six to twelve months; and (3) “Development” means the project is expected to reach NTP stage in greater than twelve months. The existing operational assets and development pipeline is broken down as follows:

 

(MWdc, MWh)  Total   BESS (MWh)   PV (MW) 
Operational   57.6    22.6    35.0 
Under Construction   15.5    -    15.5 
Advanced Development   130.0    3.4    126.6 
Development   754.2    730.0    24.2 
Total   957.3    756.0    201.3 

 

In 2025 the U.S. President issued and later modified a reciprocal-tariff regime that imposes an additional duty on most imports. These reciprocal tariffs apply in addition to any other trade measures. Separately, the U.S. Department of Commerce (“Commerce”) issued final antidumping and countervailing duty determinations in April to June 2025 on crystalline-silicon photovoltaic cells/modules from Cambodia, Malaysia, Thailand, and Vietnam, resulting in significant cash-deposit requirements for many exporters. Those changes raise landed costs and increase documentation and pricing volatility for solar import supply. To mitigate the impacts, the Company (i) prioritizes U.S. and allied-country supply, (ii) pursues the domestic-content adder for the Investment Tax Credit under the Inflation Reduction Act which provides an additional 10% tax credit for projects that meet U.S. content requirements, enhancing project returns.

 

In July 2025, the U.S. government enacted The OBBBA which accelerates the phase-out of the Clean Electricity Production Credit (Section 45Y) and the Clean Electricity Investment Credit (Section 48E) for wind and solar. Under IRS Notice 2025-42, a wind or solar facility placed in service after December 31, 2027 is ineligible unless beginning of construction (BOC) occurs by July 4, 2026. OBBBA also introduces new Foreign Entity of Concern (FEOC)-related guardrails; Treasury/IRS have signaled further guidance, and Department of Energy FEOC interpretations remain the baseline for what constitutes FEOC ownership, control, or jurisdiction.

 

To mitigate the impacts of evolving regulations the Company is to secure eligibility and accelerate cash generation by (i) safe-harboring—establishing beginning of construction (BOC) on or before July 4, 2026 through physical work of a significant nature; (ii) monetizing early—selling projects and leveraging credit transferability to convert tax credits to cash, in order to monetize as many qualifying projects as quickly as possible and recycle capital into additional projects that can achieve BOC; and (iii) ensuring supply-chain compliance and offsets—pre-qualifying FEOC-clean suppliers (BESS cells/modules, inverters, BOS) against DOE FEOC criteria and pursuing the domestic-content bonus using the IRS Notice 2024-41 safe harbor where cost-effective to offset tariff-driven inflation. In addition, BESS projects will remain eligible for tax credits beyond the dates noted above. The Company is growing its pipeline in this area.

 

The statements noted above are “forward looking statements” and there are several risks associated with the development of the projects disclosed and the execution of the Company’s development pipeline. The development of any project is subject to receipt of interconnection approval, required permits, successful award of request for proposal processes, execution of contractual agreements and the continued availability of third-party financing arrangements for the Company and the risks associated with the construction of a solar power project. In addition, governments may revise, reduce or eliminate incentives and policy support schemes for solar power, which could result in future projects no longer being economic. Please refer to “Forward-Looking Statements” for additional discussion of the assumptions and risk factors associated with the statements in this section.

 

19
Management’s Discussion and Analysis

 

Legal Matters and Contingencies

 

The Company is subject to the following legal matters and contingencies:

 

First Claim of Improper Termination of FIT Contracts

 

On December 2, 2020, a Statement of Claim was filed by a predecessor entity of SFF, parties related through common management and an independent solar project developer (collectively the “First Claim Plaintiffs”) against the Ontario Ministry of Energy, Northern Development and Mines (“MOE”), the IESO, and John Doe (collectively the “First Claim Defendants”). First Claim Plaintiffs seek damages from the First Claim Defendants in the amount of $240 million in lost profits, $17.8 million in development costs, and $50 million in punitive damages for misfeasance of public office, breach of contract, inducing the breach of contract, breach of the duty of good faith and fair dealing, and conspiracy resulting in the wrongful termination of 111 FIT Contracts. This lawsuit is subject to a leave requirement under s. 17 of the Crown Liability and Proceedings Act, 2019. The Statement of Claim proceeded to leave applications for the misfeasance in public office claims as against the MOE on August 28, 2025. A decision from the courts was rendered on February 26, 2026 denying leave against the MOE. This does not affect the claim against the IESO or the quantum of damages. The Company filed an appeal of this decision on April 15, 2026 and a hearing has been scheduled for March 17, 2027. The claim against the IESO and unnamed defendants are not subject to the s.17 leave provision and will continue regardless of the outcome on the applications. No amounts are recognized in these financial statements with respect to this claim.

 

Second Claim of Improper Termination of FIT Contracts

 

On January 29, 2021, a second Statement of Claim was filed by a predecessor entity of SFF, parties related through common management and an independent solar project developer against the MOE and the IESO (collectively the “Second Claim Defendants”). This lawsuit is subject to a leave requirement under s. 17 of the Crown Liability and Proceedings Act, 2019. The Statement of Claim may proceed to leave applications for the misfeasance in public office claims as against the MOE pending the results of the leave application for the First Claim of Improper Termination of FIT Contracts. The claim against the IESO and unnamed defendants are not subject to the s.17 leave provision and may continue regardless of the outcome on the applications. No amounts are recognized in these financial statements with respect to this claim.

 

328 Passmore Landlord

 

On September 3, 2020, a fire caused damage to a large portion of the rooftop of the building. Approximately 46% of the system was disconnected as a result of the fire. The landlord delayed significantly in completing the repairs required to allow the reinstallation of the disconnected portion of the system. The landlord completed all required repairs in 2025, and in the fall of 2025 SFF determined that the repaired roof can sustain the reinstalled system. SFF expects to complete the reinstallation of the system by end of November 2026, and it has an outstanding claim for damages for lost revenue that is evaluating.

 

SFF 05 Landlord

 

The Landlord of SFF 05, Dan Walker refused to give SFF the access to the site for regular maintenance. SFF and Dan Walker attended a court hearing on June 5, 2023. Dan requested that the hearing be adjourned so that he would have more time to retain counsel, and the judge issued a court order so that SFF could access the property on June 9, 2023 for maintenance activities. Since then, SFF counsel has been in correspondence with Dan’s counsel so that SFF could schedule semi-annual maintenance, the most recent of which occurred on October 17, 2023.

 

20
Management’s Discussion and Analysis

 

OZ-1 Project

 

The OZ-1 Project does not have a project loan and remains in the permitting process. Commencement of construction remains subject to the receipt of financing and final permits. The Company submitted an application to the Municipality of Arran-Elderslie for Site Plan Approval on February 26, 2025, related to the proposed BESS and made an application for the “OZ-1 Consent”. The application for the OZ-1 Consent was made in the context of Section 50(3) of the Planning Act (Ontario) to permit a lease on the lands where the OZ-1 Project is located for a period longer than 21 years. On July 29, 2025, the County of Bruce provisionally approved Consent Application B-2024-075, subject to seven (7) conditions. Certain conditions were overly broad in scope and application, lacked certainty, and were not reasonable. As a result, the Company appealed the decision on the OZ-1 Consent to the Ontario Land Tribunal (“OLT”). Following an OLT hearing held on January 30, 2026, the OZ-1 Consent was approved with revised conditions acceptable to the Company. The remaining permitting process is being completed with the Municipality of Arran-Elderslie. On June 8, 2026, Council considered the Company’s Site Plan Approval application but elected not to vote on the application. Instead, Council directed the Company to continue working with municipal staff to address requested changes to the proposed road design and site access. The requested changes were introduced late in the permitting process and related to matters that had previously been approved through the entrance permit process. As the Company was unable to accommodate these requested changes at that stage of the permitting process, it filed an appeal with the OLT on July 7, 2026 on the basis of the Municipality’s failure to make a decision on the Site Plan Approval application. The OLT hearing has been scheduled on December 10, 2026 and the Company and the Municipality of Arran-Elderslie have reached an agreement to proceed with an uncontested hearing and enter into Minutes of Settlement in advance of the OLT hearing. A delay in obtaining the remaining permits has delayed commencement of construction and commercial operation beyond the originally planned timeline. In order to extend the deadline for commercial operation under the E-LT1 contract for the project, the Company has provided the IESO with notice of a potential force majeure event arising from the permitting delays. The timing of the remaining permitting approvals and the impact on the project schedule remain uncertain.

 

903 Project

 

The 903 project remains in the permitting process and commencement of construction remains subject to the receipt of final permits. In particular, in order to proceed with construction of the 903 project, an OPA/ZBA were required from the Town of Armour, Ontario. On November 8, 2022, the 763 ProjectCo received a Municipal Support Resolution, which was unanimously approved by the Council for the Town of Armour. However, the OPA/ZBA were delayed as a result of certain public opposition and the Council’s evaluation of how to respond to such opposition. At a Council meeting for the Town of Armour held on January 13, 2026, the Council voted against the approval of the OPA/ZBA due to public opposition. The Company appealed this decision to the OLT, and a hearing was held on July 9, 2026. Subsequent to year ended June 30, 2026, on July 21, 2026, the OLT issued its decision approving the OPA/ZBA. The IESO approved the Force Majeure claim on September 15, 2026, resulting in an extension of the Milestone Commercial Operation Date (MCOD) to July 29, 2027. The Company submitted its Site Plan Approval application to the municipality on August 27, 2026, and is currently working toward submitting the Planning Act consent application. The building permit application will follow upon receipt of Site Plan Approval. Construction of the project remains contingent upon obtaining these outstanding approvals. Accordingly, the timing of the remaining permitting approvals and their potential impact on the overall project schedule remain uncertain.

 

Gainesville Project

 

SUNN 1009 LLC (“SUNN 1009”) is the holder of the Gainesville project which is one of the projects that was sold to, and is being developed for, Qcells. As part of the transaction with Qcells, SUNN 1009 was acquired by Qcells; however, due to the termination of the agreement related to this project, SUNN 1009 will be transferred back to the Company. The Town of Gainesville Zoning Board of Appeals (“Gainesville ZBA”) denied SUNN 1009’s area variance application (“Gainesville Application”) to construct a ± 5 megawatt-AC solar energy facility (“Gainesville Project”) on property located in the Town of Gainesville. As result, SUNN 1009 has filed a petition in the Supreme Court, State of New York, County of Wyoming challenging that denial and requesting the court direct the Gainesville ZBA to grant the variances because the denial was arbitrary, capricious, an abuse of discretion, and affected by an error of law. The court has granted the company the first part of its request, confirming that the facilities is to be treated as a public utility. It is expected the rest of the suit will be dealt with in the coming months, but its outcome would not affect the court’s initial decision that the variances were wrongly decided. The Town of Gainesville has appealed that decision. On March 9, 2026, SUNN 1009 filed a motion to the court for a summary judgment in this matter. A hearing on this motion has not yet occurred. The Gainesville Project cannot commence construction until this matter is resolved. The likelihood of success in this action cannot be reasonably predicted.

 

21
Management’s Discussion and Analysis

 

Summary of Quarterly Results

 

Three months ended
(in thousands Canadian dollars except per share amounts)
  Revenue   Income (loss)
for the period
   Earnings (loss)
per share basic
   Earnings (loss)
per share diluted
 
September 30, 2026  $4,197   $(6,150)  $(0.10)  $(0.10)
June 30, 2026   5,191    (12,133)   (0.26)   (0.26)
March 31, 2026   (34)   (5,463)   (0.12)   (0.12)
December 31, 2025   3,103    (7,711)   (0.21)   (0.21)
September 30, 2025   19,150    1,011    0.03    0.02 
June 30, 2025   17,641    3,565    0.11    0.08 
March 31, 2025   4,709    (6,522)   (0.21)   (0.21)
December 31, 2024   4,122    (1,670)   (0.05)   (0.05)

 

Quarterly results are subject to variability due to the nature of the Company’s two principal revenue streams, EPC and IPP. EPC revenues are recognized under IFRS 15 based on the stage of completion of construction projects and therefore depend heavily on the specific projects under contract, and their execution schedules. As a result, EPC revenue can be uneven and is often concentrated in quarters when significant construction milestones are achieved, while in other periods revenue may be substantially lower if projects are delayed or have not yet reached the recognition stage. IPP revenues are recurring and tied to the electricity output of operating solar facilities. Significant IPP contributions only began in the first quarter of fiscal 2025 following the acquisition of SFF. From that point onward, IPP revenue has become a more stable and predictable component of results, though it remains inherently seasonal. IPP generation is generally higher in the spring and summer months, when solar irradiance levels are stronger, and lower in the winter months, when daylight hours are shorter and weather conditions less favorable.

 

Liquidity and Capital Resources

 

The following table summarizes the Company’s liquidity position:

 

(in thousands of Canadian dollars)  September 30, 2026   June 30, 2026 
Cash  $12,569   $9,953 
Working capital(1)   5,753    801 
Total assets   140,957    133,466 
Total liabilities   114,945    113,089 
Shareholders’ equity   26,012    20,377 

 

(1)Working capital is a non-IFRS financial measure with no standardized meaning under IFRS, and therefore it may not be comparable to similar measures presented by other issuers. The Company calculates working capital as current assets less current liabilities. For further information and detailed reconciliations of non-IFRS financial measures to the most directly comparable IFRS measures see “Non-IFRS Financial Measures”.

 

A material uncertainty exists that raises substantial doubt about the Company’s ability to continue as a going concern, meaning that PowerBank may not be able to continue in operation for the foreseeable future or be able to realize assets and discharge liabilities in the ordinary course of operations. The Company is already highly levered and needs to raise additional funds through the issuance of new debt, equity securities, or otherwise in order to support its current operations, liquidity needs, and business growth. Although PowerBank has successfully raised funds through the issuance of equity securities in the 2026 fiscal year, there is no assurance that sufficient financing will be available when needed to allow PowerBank to continue as a going concern. The perception that PowerBank may not be able to continue as a going concern may also make it more difficult to raise additional funds or operate the Company’s business due to concerns about its ability to meet contractual obligations.

 

For the three months ended September 30, 2026, the Company incurred a net loss of $6,150 (September 30, 2025 – net income of $1,011) and net cash used in operating activities of $3,497 (September 30, 2025 – net cash provided by operating activities of $2,310). As at September 30, 2026, the Company had cash of $12,569 and working capital of $5,753.

 

22
Management’s Discussion and Analysis

 

Based on the Company’s current level of expenditures and forecast cash flows, its existing liquidity and forecasted internally generated cash flows are not sufficient to fund its operations and meet its obligations throughout the period for at least the next twelve months from the issuance date of the condensed interim consolidated financial statements. The Company will require additional financing to fund its ongoing operations and meet its obligations as they become due. Management is pursuing additional liquidity through a combination of equity financing, debt refinancing, project financing and asset monetization. Management is also evaluating measures to conserve cash, including operating cost reductions and enhanced management of working capital.

 

As of the date the condensed interim consolidated financial statements were authorized for issuance, the Company has not obtained binding commitments sufficient to fund all of its forecast liquidity requirements. The Company’s financing initiatives are subject to market conditions, counterparty participation, regulatory approvals where applicable, and the negotiation of acceptable terms. There can therefore be no assurance that the required financing or other liquidity initiatives will be completed when needed or in amounts sufficient to fund the Company’s obligations.

 

While the Company has been successful in obtaining financing to date and believes it will be able to obtain sufficient funds in the future and ultimately achieve profitability and positive cash flows from operations, there can be no certainty that these events will occur. These events and conditions indicate that a material uncertainty exists that raises substantial doubt on the Company’s ability to continue as a going concern and, therefore, that the Company may be unable to realize its assets and discharge its liabilities in the normal course of business.

 

To assist with potential liquidity needs, on May 8, 2025 the Company filed a final short form base shelf prospectus (the “Shelf Prospectus”) with the securities regulatory authorities in each of the provinces of Canada and a registration statement for the Shelf Prospectus has been filed in the United States with the United States Securities and Exchange Commission. The Shelf Prospectus replaces the Company’s prior final short form base shelf prospectus dated May 2, 2023 which would have expired in June 2025. The Shelf Prospectus will enable the Company to make offerings of up to $200 million of common shares, warrants, subscription receipts, units and share purchase contracts or a combination thereof of the Company from time to time, separately or together, in amounts, at prices and on terms to be determined based on market conditions at the time of the offering and as set out in an accompanying prospectus supplement, during the 25-month period that the Shelf Prospectus remains valid.

 

On July 1, 2026, the Company closed a registered direct offering of 7,000,000 common shares to two new long-term institutional investors (the “2026 Offering”). U.S.$4.2 million was funded upon the closing of the 2026 Offering, before deducting placement agent fees and other estimated 2026 Offering expenses. The Company intends to use the net proceeds from the 2026 Offering for delivery of its independent power producer project portfolio, working capital and general corporate purposes. A.G.P./Alliance Global Partners acted as sole placement agent for the 2026 Offering. The use of proceeds is shown below.

 

Use of Proceeds  Initial Estimated Amount (US$)   Cost incurred as of September 30, 2026 (US$)   Remaining balance (US$)   Impact of Variances
Second and third transformer deposits for five Department of Defence solar projects in New York   433,000    -    433,000   The timeline for the development of projects have been extended
Interconnection deposits for nine community solar projects in New York   3,000,000    1,508,397    1,491,603   The timeline for the development of projects have been extended
General and administrative expense   265,000    265,000    -   No variances
Expenses of the Offering   250,000    85,000    165,000   Lower expenses were incurred in connection with the offering
Total   3,948,000    1,858,397    2,089,603    

 

23
Management’s Discussion and Analysis

 

The nature, size and timing of any such financings (if any) will depend, in part, on the Company’s assessment of its requirements for funding and general market conditions. Unless otherwise specified in the prospectus supplement relating to a particular offering of securities, the net proceeds from any sale of any securities will be used for to advance the Company’s business objectives and for general corporate purposes, including funding ongoing operations or working capital requirements, repaying indebtedness outstanding from time to time, discretionary capital programs and potential future acquisitions. The specific terms of any future offering will be established in a prospectus supplement to the Shelf Prospectus, which supplement will be filed with the applicable Canadian and United States securities regulatory authorities.

 

On March 24, 2025, the Company closed an equity offering for proceeds of approximately US$8.5 million before deducting fees and other estimated offering expenses. Up to an additional $10.65 million may be funded upon full cash exercise of the warrants issued in the offering. The use of proceeds is shown below.

 

Use of Proceeds  Initial Estimated Amount (US$)   Cost incurred as of September 30, 2026 (US$)   Remaining balance (US$)   Impact of Variances
Completion of construction payments for BESS projects located in Ontario, Canada   1,944,949    1,944,949    -   No variances
Completion of interconnection deposit, and advancement of engineering, permitting, procurement and hiring subcontractors, for 4152 Jordan Rd project located in New York, USA.   3,508,065    1,297,533    2,210,532   The timeline for the development of this project has been extended
Contractor Cost   501,986    501,986    -   No variances
IR and marketing   1,000,000    1,000,000        No variances
Insurance (D&O and Operational Property Policy Renewal)   700,000    700,000    -   No variances
Expenses of the Offering   845,000    845,000    -   No variances
Total   8,500,000    6,289,468    2,210,532    

 

The Company, H.C. Wainwright & Co., LLC (“Wainwright”), Research Capital Corporation (“RCC”), Research Capital USA Inc. (together with Wainwright and RCC, the “Agents”) entered into a new equity distribution agreement dated February 17, 2026 (the “2026 Distribution Agreement”) to establish a new at-the-‎market equity program (the “2026 ATM Program”). The Company issue up to US$50 million of ATM Offered Shares. As of September 30, 2026 the Company has issued 2,207,961 Shares for gross proceeds of approximately US$1.024 million under the 2026 ATM Program. However, the Company was not be eligible to continue to use 2026 ATM Program as a result of it currently not meeting the eligibility requirements for the multi-jurisdictional disclosure system. On September 30, 2026 the Company announced the termination of the 2026 ATM Program. In order to establish a new ATM program the Company will be required to file new prospectus and registration documentation.

 

As it relates to debt financing, as disclosed above, the Company has secured a $28.1 million debt facility for two of the three BESS projects and it has assumed it will be able to draw down on this facility. The Company is in discussions with a project finance lender for the financing for the third BESS project and has assumed this will be concluded and financing will be available in the near future. On December 30, 2025, the Company entered into the NYGB Loan for an aggregate principal amount of up to US$8 million. The proceeds of the facility are intended to fund interconnection deposits for certain projects. See “Overview - Development of the Business – Recent Developments” for additional details.

 

The Company’s cash is held in highly liquid accounts. No amounts have been or are invested in asset-backed commercial paper.

 

24
Management’s Discussion and Analysis

 

The chart below highlights the Company’s cash flows:

 

(in thousands of Canadian dollars)  September 30, 2026   September 30, 2025 
Net cash provided by (used in)          
Operating activities  $(3,497)  $2,310 
Investing activities   (2,517)   (6,888)
Financing activities   8,616    629 
Net increase (decrease) in cash   2,602    (3,949)

 

Cash flow from operating activities

 

For the three months ended September 30, 2026, net cash used in operating activities was $3,497, compared with net cash provided of $2,310 in the same period in 2025, a decrease of $5,807. The decrease primarily reflected a net loss of $6,150, compared with net income of $1,011, and higher cash outflows from changes in non-cash operating assets and liabilities of $3,471, compared with $1,727. These effects were partially offset by higher non-cash share-based compensation of $4,251, compared with $948, and income tax refunds of $1,047, compared with income taxes paid of $333. Interest paid increased to $1,100 from $678.

 

Cash flow from investing activities

 

For the three months ended September 30, 2026, net cash used in investing activities was $2,517, compared with $6,888 in the same period in 2025, a decrease of $4,371. The decrease primarily reflected lower purchases of construction in progress of $59, compared with $4,530, and a smaller increase in restricted cash of $2,458, compared with $2,748. These decreases were partially offset by the absence of proceeds from short-term investments, compared with $390 in the prior-year period.

 

Cash flow from financing activities

 

For the three months ended September 30, 2026, net cash provided by financing activities was $8,616, compared with $629 in the same period in 2025, an increase of $7,987. Current-period inflows consisted of $6,666 in net proceeds from the issuance of common shares and $3,823 in proceeds from short-term loans. These inflows were partially offset by long-term debt repayments of $1,400, lease obligation repayments of $340 and deferred fees on long-term debt of $133. The increase primarily reflected higher net proceeds from common share issuances and proceeds from short-term borrowings.

 

25
Management’s Discussion and Analysis

 

Capital Transactions

 

On September 30, 2026, the Company had 64,175,710 common shares issued and outstanding (September 30, 2025 – 36,640,486). A summary of changes in share capital is presented in the condensed interim consolidated statements of changes in shareholders’ equity:

 

(in thousands of Canadian dollars, except number of common shares)  Number of
Common shares
   Share Capital 
Balance, June 30, 2025   35,433,947   $45,285 
Common shares issued, net of costs   998,856    2,558 
RSU settled   102,067    188 
Shares issued to settle liabilities   105,616    240 
Balance, September 30, 2025   36,640,486   $48,271 
           
Balance, June 30, 2026   47,697,277    68,004 
Common shares issued, net of costs (1)   9,045,268    6,666 
RSU settled   5,764,546    4,428 
Shares issued to settle liabilities   1,668,619    1,170 
Balance, September 30, 2026   64,175,710   $80,268 

 

(1)The Company sold a total of 2,045,268 common shares through at-the-market offerings at an average price of US$0.44 per share for gross proceed of $1.2 million (US$0.9 million); On July 1, 2026, the Company completed a registered direct offering pursuant to securities purchase agreements with two institutional investors. The Company issued 7,000,000 common shares at a price of US$0.60 per share for gross proceeds of $5,956 (US$4,200). After placement agent fees and other offering expenses, the Company received net proceeds of $5,478 (US$3,863).

 

Capital Structure

 

The Company is authorized to issue an unlimited number of common shares. The table below sets out the Company’s outstanding common share and convertible securities as of September 30, 2026 and as of the date of this MD&A:

 

Security description  September 30, 2026   Date of report 
Common shares   64,175,710    64,175,710 
Warrants   7,378,987    7,378,987 
Stock options   3,436,690    3,436,690 
Restricted share units   4,473,125    4,473,125 
Contingent value rights   2,283,929    2,283,929 

 

The following table reflects the details of warrants issued and outstanding as of the date of this MD&A:

 

Date granted  Expiry  Exercise price (CAD)   Outstanding warrants 
October 3, 2022  June 10, 2027  $0.10    625,000 
March 1, 2023  March 1, 2028  $0.50    4,239,902 
March 24, 2025  March 24, 2030   $6.37 (US$ 4.45)    2,394,367 
March 24, 2025  March 24, 2030   $6.61 (US$ 4.615)    119,718 
            7,378,987 
Weighted average exercise price       $2.47 

 

The following table reflects the details of options issued and outstanding as of the date of this MD&A:

 

Date granted  Expiry  Exercise price (CAD)   Outstanding options 
November 4, 2022  November 4, 2027  $0.75    1,502,330 
May 27, 2025  May 27, 2030  $2.20    10,000 
June 24, 2025  June 24, 2030  $2.49    14,000 
July 30, 2025  July 30, 2030  $1.89    1,375,360 
August 21, 2025  August 21, 2030  $3.00    7,500 
October 07, 2025  October 07, 2030  $2.59    7,500 
February 20, 2026  February 20, 2031  $1.34    520,000 
            3,436,690 

 

26
Management’s Discussion and Analysis

 

The following table reflects the details of RSUs issued and outstanding as of the date of this MD&A:

 

Grant date  RSUs granted   RSUs outstanding   Vesting Date
February 20, 2026   100,000    100,000   25% vesting on each of April 30, 2026, July 31, 2026, October 31, 2026 and January 31, 2027
July 17, 2026   6,016,000    3,973,125   25% vesting on each of September 30, 2026, December 31, 2026, March 31, 2027 and June 30, 2027
August 21, 2026   400,000    400,000   1/3 vesting annually on August 21, 2027, 2028 and 2029.

 

Capital Management

 

The Company’s objectives in managing liquidity and capital are to safeguard the Company’s ability to continue as a going concern and to provide financial capacity to meet its strategic objectives. The capital structure of the Company consists of the following:

 

(in thousands of Canadian dollars)  September 30, 2026   June 30, 2026 
Long-term debt - non-current portion  $51,525   $51,778 
Shareholders’ Equity  $26,012   $20,377 

 

The Company manages the capital structure and makes adjustments to it in light of changes in economic conditions and the risk characteristics of the underlying assets. To maintain or adjust the capital structure, the strategies employed by the Company may include the issuance or repayment of debt, dividend payments, issuance of equity, or sale of assets. See “Liquidity and Capital Resources” above for a discussion regarding the Company’s working capital position.

 

No changes have occurred to capital management from the prior year.

 

Off-Balance Sheet Arrangements

 

The Company is not a party to any off-balance sheet arrangements or transactions.

 

27
Management’s Discussion and Analysis

 

Transactions Between Related Parties

 

As at September 30, 2026, amounts due to directors and other members of key management personnel (“KMP”) were comprised of $285 (June 30, 2026 - $157) included in trade and other payables, $801 included in other long-term liabilities (June 30, 2026 – $801), and $73 (June 30, 2026 – $73) included in trade and other receivables.

 

The following table summarizes costs incurred or recovered from related parties during the three months ended September 30, 2026 and 2025:

 

         Three months ended September 30, 
(in thousands of Canadian dollars)  Nature of Relationship  Nature of Transactions  2026   2025 
Light Voltaic Corporation  Controlled by a director  Consulting services  $200   $136 
The Phoenix Trendz Inc.  Controlled by KMP  Consulting services  $100   $118 
Art Vancouver  Controlled by a director  Consulting services  $150   $97 

 

Transactions with related parties, as described above, were for services rendered to the Company in the normal course of operations, and were measured based on the consideration established and agreed to by the related parties. Related party transactions are made without stated terms of repayment or interest. The balances with related parties are unsecured and due on demand.

 

Outstanding balances with related parties are summarized as follows:

 

   September 30, 2026  June 30, 2026
(in thousands of Canadian dollars)  Receivable/
(Payable)
   Balance Sheet Presentation  Receivable/
(Payable)
   Balance Sheet Presentation
Light Voltaic Corporation  $(247)  Trade and other payables  $(21)  Trade and other payables
The Phoenix Trendz Inc.   -   Trade and other payables   (24)  Trade and other payables
Art Vancouver   -   Trade and other payables   (6)  Trade and other payables
Wear Wolfin Design   (52)  Other long-term liabilities   (52)  Other long-term liabilities
Berkley Renewables Inc.   (749)  Other long-term liabilities   (749)  Other long-term liabilities
Big Bear Gold Corp. (formerly Westkam Gold Corp.)   7   Trade and other receivables   7   Trade and other receivables
Total  $(1,041)     $(845)   

 

Key management compensation

 

Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of members of the Company’s Board of Directors and corporate officers, including the Company’s Chief Executive Officer, Chief Financial Officer, Chief Operating Officer and Senior Vice President of Corporate Development.

 

The remuneration of directors and other members of key management personnel, for the three months ended September 30, 2026 and 2025 were as follows:

 

   Three months ended September 30, 
(in thousands of Canadian dollars)  2026   2025 
Salaries and employee benefits  $364   $303 
Share-based compensation  $1,593   $143 

 

Short-term employee benefits include consulting fees and salaries made to key management.

 

28
Management’s Discussion and Analysis

 

Critical Accounting Estimates and Policies

 

The preparation of the condensed interim consolidated financial statements in accordance with IFRS as issued by IASB requires management to make estimates and assumptions that affect the amounts reported on the consolidated financial statements. These critical accounting estimates represent management’s estimates that are uncertain and any changes in these estimates could materially impact the Company’s consolidated financial statements. Management continuously reviews its estimates and assumptions using the most current information available. The Company’s critical accounting policies and estimates are described in Note 3 of the audited consolidated financial statements for the year ended June 30, 2026.

 

Adoption of new accounting standards

 

No new or amended accounting standards had a significant impact on the Company’s financial statements during the three months ended September 30, 2026.

 

Accounting standards issued but not yet effective

 

The IASB has issued the following new and amended standards and interpretations that will become effective in a future year and could have an impact on the consolidated financial statements in future periods. The Company is currently assessing the impact of the following new and amended standards and interpretations.

 

●IFRS 18, Presentation and Disclosure in Financial Statements. IFRS 18 replaces IAS 1 and introduces a new structure for the statement of profit or loss, requiring entities to present operating, investing, and financing categories, and enhancing note disclosures. The amendments are effective for annual periods beginning on or after January 1, 2027.

 

Financial Instruments and Other Instruments (Management of Financial Risks)

 

Fair value

 

The Company’s financial assets and liabilities carried at fair value are measured and recognized according to a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets and liabilities and the lowest priority to unobservable inputs. The three levels of fair value hierarchy are as follows:

 

●Level 1: Quoted prices in active markets for identical assets or liabilities.

 

●Level 2: Inputs other than quoted prices that are observable for the asset or liability.

 

●Level 3: Inputs for the asset or liability that are not based on observable market data.

 

The Company has variable interest rate loans with interest rate swap to effectively hedge the floating rate term loans into fixed rate arrangements by receiving floating rate and paying fixed rate payments. The fair value of the interest rate swap is based on discounting estimate of future floating rate and fixed rate cash flows for the remaining term of the interest rate swap. The fair value estimate is subject to a credit risk adjustment that reflects the credit risk of the Company and of the counterparty. The fair value of the interest rate swap is determined using Level 2 inputs.

 

The carrying amounts of cash, restricted cash, short-term investments, trade and other receivables, and trade and other payables approximate their fair values due to the short-term maturities of these items.

 

The carrying amounts of short-term loans, long-term debt, lease liabilities and other liabilities due to non-controlling interest approximate their fair value as management believes the applicable interest rates approximate current market rates for debt with similar terms and security.

 

29
Management’s Discussion and Analysis

 

Other liabilities due to non-controlling interest represent amounts payable to minority shareholders under contractual arrangements that require fixed or determinable payments. Such obligations meet the definition of a financial liability under IAS 32 Financial Instruments: Presentation, as it creates a contractual obligation to deliver cash irrespective of project performance.

 

The warrants grant holders the right to acquire common shares of the Company. As the warrants are exercisable at a price denominated in U.S. dollars, the exercise price is not a fixed amount of cash in the Company’s functional currency. Consequently, the warrants do not meet the ‘fixed-for-fixed’ criterion under IAS 32 and are classified as derivative financial liabilities. They are measured at fair value at each reporting date, with changes in fair value recognized in profit or loss. Fair value is determined based on the market value of the underlying common shares at the reporting date.

 

The fair value of the Company’s embedded derivative instruments related to the CVR liabilities were determined using the income approach, which included certain assumptions about the operating, investing, and financing inputs. In estimating the fair value of the financial liability, the Company uses market-observable data to the extent it is available. As CVR does not have Level 1 inputs, management applies Level 2 or Level 3 inputs, including internally developed models, unobservable assumptions, and other inputs not derived from active market data, to determine the appropriate fair value at the reporting date.

 

Credit risk

 

Credit risk is the risk of financial loss associated with the counterparty’s inability to fulfill its payment obligations. The Company has no significant credit risk with its counterparties. The carrying amount of financial assets net of impairment, if any, represents the Company’s maximum exposure to credit risk.

 

The Company has assessed the creditworthiness of its trade and other receivables and amount determined the credit risk to be low. Receivables from projects are from reputable customers with past working relations with the Company. IPP revenues are due from local government utility with high creditworthiness. Cash and short-term investment have low credit risk as it is held by internationally recognized financial institutions.

 

Currency risk:

 

The Company conducts business in Canada and United States and has subsidiaries operating in the same countries. The Company, and its subsidiaries, do not hold significant asset and liabilities denominated in foreign currencies. As a result, the Company has low currency risk.

 

Concentration risk and economic dependence

 

The outstanding accounts receivable balance is relatively concentrated with a few large customers representing majority of the value. See table below showing a few customers who account for over 10% of total revenue as well as customers who account for over 10% percentage of outstanding accounts receivable.

 

No individual customer accounted for more than 10% of the Company’s revenue for the three months ended September 30, 2026.

 

Three months ended September 30, 2025
(in thousands of Canadian dollars)
  Revenue   % of revenue 
Customer A  $3,985    21%
Customer D  $10,646    56%

 

September 30, 2026
(in thousands of Canadian dollars)
  Accounts receivable   % of accounts receivable 
Customer A  $1,037    25%
Customer D  $530    13%

 

June 30, 2026
(in thousands of Canadian dollars)
  Accounts receivable   % of accounts receivable 
Customer A  $1,039    25%
Customer C  $830    20%

 

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they become due. The Company’s approach to managing liquidity risk is to ensure that it will have sufficient liquidity to meet liabilities when due by maintaining adequate reserves, banking facilities, and borrowing facilities. All of the Company’s financial liabilities are subject to normal trade terms.

 

30
Management’s Discussion and Analysis

 

The following are the remaining contractual obligations as at September 30, 2026:

 

(in thousands of Canadian dollars)  Total   Less than one year   1 to 2 years   3 to 5 years   More than 5 years 
Short-term loans (1)  $10,709   $10,709   $-   $-   $- 
Long-term debt (1)   63,878    12,353    9,040    15,382    27,103 
Lease liabilities   10,867    1,468    1,092    1,975    6,332 
Trade and other payable   12,758    12,758    -    -    - 
Total  $98,212   $37,288   $10,132   $17,357   $33,435 

 

(1)As at September 30, 2026, the Company did not have any events of default with its short-term loans and long-term debt.

 

Interest rate risk

 

Interest rate risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The Company’s long-term debt comprises both fixed and variable interest rate instruments. For certain variable rate borrowings, the Company has entered into interest rate swap agreements to economically fix the contractual interest rates.

 

Commitments

 

At September 30, 2026, the Company had various purchase commitments in the normal course of operations. Below is a summary of the future minimum payments for contractual obligations that are not recognized as liabilities at September 30, 2026.

 

(in thousands of Canadian dollars)  Total   Less than one year   1 to 2 years   3 to 5 years   More than 5 years 
Purchase obligations  $3,871   $3,871   $-   $-   $- 

 

Pursuant to an advisory agreement, the Company has committed to issue up to US$1.3 million of common shares to the advisor in consideration for services to be provided. The shares, when issued, will be fully paid and non-assessable common shares of the Company. As of September 30, 2026, the Company had issued 599,723 common shares under the arrangement with an aggregate fair value of approximately US$0.6 million. The remaining commitment under the agreement will be satisfied through future issuances of common shares in accordance with the terms of the advisory agreement.

 

31
Management’s Discussion and Analysis

 

Non-IFRS Financial Measures

 

The information presented within this MD&A refers to certain non-IFRS financial measures including, Adjusted EBITDA and working capital. These measures are not recognized measures under IFRS and do not have a standardized meaning prescribed by IFRS. These non-IFRS financial measures and non-IFRS ratios are widely reported in the renewable energy industry as benchmarks for performance and are used by management to monitor and evaluate the Company’s operating performance and ability to generate cash. The Company believes that, in addition to financial measures and ratios prepared in accordance with IFRS, certain investors use these non-IFRS financial measures and ratios to evaluate the Company’s performance. However, the measures do not have a standardized meaning under IFRS and may not be comparable to similar financial measures disclosed by other companies. Accordingly, non-IFRS financial measures and non-IFRS ratios should not be considered in isolation or as a substitute for measures and ratios of the Company’s performance prepared in accordance with IFRS.

 

Working Capital

 

Working capital is a non-IFRS measure that is a common measure of liquidity but does not have any standardized meaning. The most directly comparable measure prepared in accordance with IFRS is current assets net of current liabilities. Working capital is calculated by deducting current liabilities from current assets. Working capital should not be considered in isolation or as a substitute from measures prepared in accordance with IFRS. The measure is intended to assist readers in evaluating the Company’s liquidity.

 

(in thousands of Canadian dollars)  September 30, 2026   June 30, 2026 
Current assets  $47,698   $40,167 
Current liabilities   41,945    39,366 
Working capital  $5,753   $801 

 

32
Management’s Discussion and Analysis

 

Adjusted EBITDA

 

Adjusted EBITDA is a non-IFRS financial measure, which excludes the following from net earnings:

 

●Income tax (income) expense;

 

●Finance costs;

 

●Amortization and depreciation;

 

●Fair value gain/loss;

 

●Unrealized foreign exchange gain/loss;

 

●Stock based compensation;

 

●Impairment loss;

 

●Loss on investments;

 

●Non-recurring expense.

 

Adjusted EBITDA is a non-IFRS financial measure intended to provide additional information to investors and analysts. Management uses Adjusted EBITDA to evaluate the Company’s operating performance by excluding the impact of non-cash items, non-recurring charges, and other items not considered reflective of ongoing operations. This measure is also used to assess the Company’s ability to generate cash from operations, service debt, and fund growth initiatives. Adjusted EBITDA does not have any standardized meaning under IFRS and should not be considered in isolation or as a substitute for measures of operating performance prepared in accordance with IFRS. It may not be comparable to similar measures presented by other issuers. Other companies may calculate Adjusted EBITDA differently.

 

   Three months ended September 30, 
(in thousands of Canadian dollars)  2026   2025 
Net income (loss) per financial statements  $(6,150)  $1,011 
Add (Deduct):          
Depreciation and amortization   41    27 
Depreciation and amortization included in cost of goods sold   1,447    1,355 
Interest income   (140)   (90)
Interest expense   1,166    813 
Interest expense included in cost of goods sold   96    127 
Share-based compensation   4,251    721 
Current tax expense   227    302 
Deferred income tax expense   255    97 
Fair value change of derivatives   (1,307)   (66)
Fair value change of warrant liabilities   (257)   (102)
Fair value change of CVR liabilities   142    542 
Fair value change of other liabilities due to non controlling interest holders   10    10 
Inventory write-offs (reversals)   134    - 
Finance cost   88    - 
Other (income) expenses (1)   (22)   90 
Adjusted EBITDA  $(19)  $4,837 

 

(1)Other (income) expense primarily consist of unrealized foreign exchange gains and losses, along with certain one-time payments we received.

 

For the three months ended September 30, 2026, Adjusted EBITDA was a loss of $19, compared to positive Adjusted EBITDA of $4,837 in the corresponding 2025 period, representing a decrease of $4,856. The decrease was primarily attributable to lower operating profitability and higher underlying operating expenses, partially offset by adjustments for increased share-based compensation and other non-cash items.

 

33
Management’s Discussion and Analysis

 

Disclosure Controls and Internal Controls Over Financial Reporting

 

Disclosure Controls and Procedures

 

Management is responsible for establishing and maintaining adequate disclosure controls and procedures (“DC&P”) as such term is defined in National Instrument 52-109 – Certification of Disclosure in Issuers’ Annual and Interim Filings in Canada and Rules 13a-15(e) and 15d-15(e) of the Exchange Act in the United States. Management, including the Chief Executive Officer and the Chief Financial Officer, are responsible for the design of the Company’s DC&P in order to provide reasonable assurance that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in the securities legislation.

 

The Chief Executive Officer and Chief Financial Officer have certified that they have designed disclosure controls and procedures (or caused them to be designed under their supervision). In light of the material weaknesses in internal control over financial reporting described below, management has concluded that the Company’s disclosure controls and procedures were not effective as of September 30, 2026.

 

These material weaknesses were previously identified as of June 30, 2025 and 2026 and remained outstanding as of September 30, 2026.

 

Internal Control Over Financial Reporting

 

Management is also responsible for establishing and maintaining adequate internal controls over financing reporting (“ICFR”) as such term is defined in National Instrument 52-109 – Certification of Disclosure in Issuers’ Annual and Interim Filings in Canada and Rules 13a-15(f) and 15d-15(f) of the Exchange Act in the United States. The Company’s ICFR is designed to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with IFRS Accounting Standards as issued by the IASB.

 

During the period ended September 30, 2026, the Company continued to assess the previously identified control deficiencies and evaluate potential enhancements to its internal processes and controls over financial reporting.

 

Identified Material Weaknesses

 

During the period ended September 30, 2026, management assessed the effectiveness of our internal control over financial reporting based on the Internal Control — Integrated Framework (2013) issued by the Committee of Sponsoring Organizations of the Treadway Commission (COSO). Management concluded that our internal control over financial reporting was not effective due to the following material weaknesses:

 

1.The Company does not have a sufficient complement of accounting and reporting personnel with the requisite knowledge and experience. This has weakened the control environment and contributed to inadequately designed or omitted control activities over the financial close and reporting process, including un-timely preparation, analysis, and review of account reconciliations.
2.The Company does not have adequately formalized processes or sufficient experienced finance personnel to identify, analyze, and account for large or complex transactions. This reflects weaknesses in risk assessment and in review controls over non-routine transactions.
3.The Company has not retained sufficient documentary or corroborating evidence to demonstrate the consistent and timely performance of control activities. This undermines accountability in the control environment, reduces the reliability of control activities, limits the quality of information and communication, and prevents effective monitoring of whether controls are designed, implemented or operating as intended.

 

34
Management’s Discussion and Analysis

 

Remediation plan

 

Management has taken steps to address these material weaknesses and is in the process of developing and implementing a remediation plan to address them and to improve our internal control over financial reporting, which we believe will address their underlying causes. These steps include the following:

 

a)Enhanced transaction-review procedures — Management continued to evaluate and develop procedures and controls intended to improve the identification, analysis and accounting treatment of large or complex transactions. External advisors may be engaged, as needed, to supplement internal capabilities.
b)ICFR compliance program — Management continued preliminary work toward establishing a formal ICFR compliance program with the assistance of an external advisor. The gap assessment against the COSO framework remains ongoing, and management expects to implement appropriate control enhancements as recommendations are developed and evaluated.
c)Documentation, training and oversight — Management continued to assess opportunities to improve review and oversight processes, including the standardization of documentation and record-retention practices and additional training for control owners. Further development of these measures remains ongoing.
d)Finance-team capability and expertise — Management continued to assess the resources and technical expertise required within the finance function to support the Company’s increasing operational complexity and financial-reporting requirements.

 

Limitation of Controls and Procedures

 

Our management, including the CEO and CFO, does not expect that our disclosure controls and procedures or our internal control over financial reporting will prevent or detect all errors and all fraud. A control system, no matter how well-designed and operated, can provide only reasonable, not absolute, assurance that the control system’s objectives will be met. The design of a control system must reflect the fact that there are resource constraints, and the benefits of controls must be considered relative to their costs. Further, because of the inherent limitations in all control systems, no evaluation of controls can provide absolute assurance that misstatements due to error or fraud will not occur or that all control issues and instances of fraud, if any, have been detected. The design of any system of controls is based in part on certain assumptions about the likelihood of future events, and there can be no assurance that any design will succeed in achieving its stated goals under all potential future conditions. Projections of any evaluation of the effectiveness of controls to future periods are subject to risks. Over time, controls may become inadequate because of changes in conditions or deterioration in the degree of compliance with policies or procedures.

 

Changes in internal control over financial reporting

 

There was no change in our internal control over financial reporting identified during the three months ended September 30, 2026 that has materially affected, or is reasonably likely to materially affect, our internal control over financial reporting.

 

Risk Factors

 

Readers are cautioned that the risk factors discussed above in this MD&A are not exhaustive. Readers should also carefully consider the matters discussed under the heading, “Forward Looking Statements”, in this MD&A and under the heading, “Risk Factors”, in the Company’s Annual Report on Form 20-F for the year ended June 30, 2026 and filed on SEDAR+ at www.sedarplus.ca and EDGAR.

 

35
Management’s Discussion and Analysis

 

Forward-Looking Statements

 

This MD&A contains forward-looking statements and forward-looking information ‎within the meaning of Canadian and United States securities legislation (collectively, “forward-looking ‎statements”) that relate to the Company’s current expectations and views of future events. ‎Any statements that express, or involve discussions as to, expectations, beliefs, plans, ‎objectives, assumptions or future events or performance (often, but not always, through the ‎use of words or phrases such as “will likely result”, “are expected to”, “expects”, “will ‎continue”, “is anticipated”, “anticipates”, “believes”, “estimated”, “intends”, “plans”, “forecast”, ‎‎“projection”, “strategy”, “objective” and “outlook”) are not historical facts and may be ‎forward-looking statements and may involve estimates, assumptions and uncertainties ‎which could cause actual results or outcomes to differ materially from those expressed in ‎such forward-looking statements. In particular and without limitation, this MD&A ‎contains forward-looking statements pertaining to the Company’s expectations regarding its industry trends and overall market growth; the Company’s expectations about its liquidity and sufficiency of working capital for the next twelve months of operations; the Company’s growth strategies the expected energy production from the solar power and BESS projects mentioned in this MD&A; the reduction of carbon emissions; the receipt of incentives for the projects; the timelines and milestones associated with the Company’s development pipeline; the details of the Company’s planned expansion into the data center industry; the expected value of EPC Contracts; and the size of the Company’s development pipeline. No assurance ‎can be given that these expectations will prove to be correct and such forward-looking ‎statements included in this MD&A should not be unduly relied upon. These ‎statements represent only as of the date of this MD&A.‎

 

Forward-looking statements are based on certain assumptions and analyses made by the Company in light of the experience and perception of historical trends, current conditions and expected future developments and other factors it believes are appropriate and are subject to risks and uncertainties. In making the forward looking statements included in this MD&A, the Company has made various material assumptions, including but not limited to: obtaining the necessary regulatory approvals; that regulatory requirements will be maintained; general business and economic conditions; the Company’s ability to successfully execute its plans and intentions; the ability to secure a contract with a data center partner; the availability of financing on reasonable terms; the Company’s ability to attract and retain skilled staff; market competition; the products and services offered by the Company’s competitors; that the Company’s current good relationships with its service providers and other third parties will be maintained; and government subsidies and funding for renewable energy will continue as currently contemplated. Although the Company believes that the assumptions underlying these statements are reasonable, they may prove to be incorrect, and the Company cannot assure that actual results will be consistent with these forward-looking statements. Given these risks, uncertainties and assumptions, investors should not place undue reliance on these forward-looking statements.

 

Whether actual results, performance or achievements will conform to the Company’s expectations and predictions is subject to a number of known and unknown risks, uncertainties, assumptions and other factors, including those listed under “Forward-‎Looking Statements” and “Risk ‎Factors” in the Company’s Annual Information Form, and other public filings of the Company, which include: the Company may be adversely affected by volatile solar power market and industry conditions; the execution of the Company’s growth strategy depends upon the continued availability of third-party financing arrangements; the Company’s future success depends partly on its ability to expand the pipeline of its energy business in several key markets; governments may revise, reduce or eliminate incentives and policy support schemes for solar and battery storage power; general global economic conditions may have an adverse impact on our operating performance and results of operations; the Company’s project development and construction activities may not be successful; developing and operating solar projects exposes the Company to various risks; the Company faces a number of risks involving Power Purchase Agreements (“PPAs”) and project-level financing arrangements; any changes to the laws, regulations and policies that the Company is subject to may present technical, regulatory and economic barriers to the purchase and use of solar power; the markets in which the Company competes are highly competitive and evolving quickly; an anti-circumvention investigation could adversely affect the Company by potentially raising the prices of key supplies for the construction of solar power projects; foreign exchange rate fluctuations; a change in the Company’s effective tax rate can have a significant adverse impact on its business; seasonal variations in demand linked to construction cycles and weather conditions may influence the Company’s results of operations; the Company may be unable to generate sufficient cash flows or have access to external financing; the Company may incur substantial additional indebtedness in the future; the Company is subject to risks from supply chain issues; risks related to inflation; unexpected warranty expenses that may not be adequately covered by the Company’s insurance policies; if the Company is unable to attract and retain key personnel, it may not be able to compete effectively in the renewable energy market; there are a limited number of purchasers of utility-scale quantities of electricity; compliance with environmental laws and regulations can be expensive; corporate responsibility may adversely impose additional costs; the future impact of any public health threats; the Company has limited insurance coverage; the Company will be reliant on information technology systems and may be subject to damaging cyberattacks; the Company may become subject to litigation; there is no guarantee on how the Company will use its available funds; the Company will continue to sell securities for cash to fund operations, capital expansion, mergers and acquisitions that will dilute the current shareholders; and future dilution as a result of financings.

 

The Company undertakes no obligation to update or revise any ‎forward-looking statements, whether as a result of new information, future events or ‎otherwise, except as may be required by law. New factors emerge from time to time, and it ‎is not possible for the Company to predict all of them, or assess the impact of each such ‎factor or the extent to which any factor, or combination of factors, may cause results to ‎differ materially from those contained in any forward-looking statement. Any forward-‎looking statements contained in this MD&A are expressly qualified in their entirety by ‎this cautionary statement.‎

 

Approval

 

The Board of Directors of the Company has approved the disclosure contained in this MD&A.

 

36

 

Exhibit 99.2

 

POWERBANK CORPORATION

 

Condensed Interim Consolidated Financial Statements

 

(Expressed in thousands of Canadian Dollars)

 

(Unaudited)

 

For the three months ended September 30, 2026 and 2025

 

 

 

 

POWERBANK CORPORATION

Condensed Interim Consolidated Statements of Financial Position (unaudited)

(Expressed in thousands of Canadian dollars)

 

   Note  September 30, 2026   June 30, 2026 
Assets             
Current assets:             
Cash  2(e)  $12,569   $9,953 
Restricted cash      3,731    1,519 
Short-term investments      716    716 
Trade and other receivables  4   6,196    5,724 
Prepaid expenses and deposits  5   1,763    2,487 
Contract assets  7   472    815 
Inventories  8   22,251    18,953 
Total current assets      47,698    40,167 
Non-current assets:             
Restricted cash  2(e)   6,099    5,853 
Prepaid expenses and deposits  5   512    512 
Property, plant and equipment  6   47,773    48,672 
Construction in progress  9   8,326    8,234 
Right-of-use assets  12   10,377    10,590 
Intangible assets  13   16,740    17,108 
Tax equity assets      205    232 
Goodwill      1,643    1,643 
Derivative financial instruments      1,584    455 
Total non-current assets      93,259    93,299 
Total assets     $140,957   $133,466 
              
Liabilities and Shareholders’ equity             
Current liabilities:             
Trade and other payables  10  $12,758   $14,635 
Contract liabilities  11   2,872    2,227 
Lease liabilities  12   1,282    1,358 
Short-term loans  14   10,709    6,891 
Current portion of long-term debt  15   12,353    13,613 
Current tax liabilities      1,766    428 
Derivative financial instruments      -    8 
Deferred government grants  27   117    118 
Tax equity liabilities      88    88 
Total current liabilities      41,945    39,366 
Non-current liabilities:             
Lease liabilities  12   6,919    7,064 
Long-term debt  15   51,525    51,778 
Tax equity liabilities      111    136 
Provisions  16   2,539    2,498 
Other long-term liabilities  25   4,024    4,160 
Deferred tax liabilities      5,721    5,465 
Warrant liabilities      32    289 
Derivative financial instruments      -    171 
Deferred government grants  27   2,129    2,162 
Total non-current liabilities      73,000    73,723 
Total liabilities      114,945    113,089 
Shareholders’ equity:             
Share capital  19   80,268    68,004 
Contributed surplus      3,028    3,447 
Accumulated other comprehensive income (loss)      402    462 
Retained earnings (deficit)      (58,183)   (51,999)
Equity attributable to common shareholders      25,515    19,914 
Non-controlling interests      497    463 
Total equity      26,012    20,377 
Total liabilities and shareholders’ equity     $140,957   $133,466 

 

See accompanying notes to these condensed interim consolidated financial statements.

 

Approved and authorized for issuance on behalf of the Board of Directors:

 

Richard Lu, CEO, and Director _______________ Nicole Rusaw, CFO_______________

 

2

 

 

POWERBANK CORPORATION

Condensed Interim Consolidated Statements of Comprehensive Income (loss) (unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts)

 

   Note  Three months ended September 30 
      2026   2025 
Revenue from development fees     $-   $3,373 
Revenue from EPC services      213    11,932 
Revenue from IPP production      3,759    3,845 
Revenue from O&M and other services      225    - 
       4,197    19,150 
              
Cost of goods sold      2,679    10,606 
Gross profit      1,518    8,544 
Operating expense:             
Advertising and promotion      4    9 
Professional fees      1,590    2,641 
Consulting fees      3,645    1,405 
Depreciation and amortization  6,12   41    27 
Salary and wages      535    419 
Share-based compensation      405    721 
Insurance      291    308 
Listing fees      7    55 
Travel and events      49    72 
Repairs and maintenance      45    28 
Other operating expense      786    252 
Total operating expense      7,398    5,937 
Other income (expense):             
Interest income      140    90 
Interest expense      (1,166)   (813)
Fair value change of derivatives  15   1,307    66 
Fair value change of warrant liabilities  18   257    102 
Fair value change of CVR liabilities  18   (142)   (542)
Fair value change of other liabilities due to non controlling interest holders  18   (10)   (10)
Other income (expense)      (174)   (90)
Net income (loss) before income taxes      (5,668)   1,410 
Current tax recovery (expense)      (227)   (302)
Deferred tax recovery (expense)      (255)   (97)
Net income (loss) for the period     $(6,150)  $1,011 
Other comprehensive income (loss)             
Foreign currency translation gain (loss)      (60)   190 
Total comprehensive income (loss)     $(6,210)  $1,201 
Income (loss) attributable to:             
Shareholders of the Company      (6,184)   1,000 
Non-controlling interests      34    11 
Net income (loss) for the period     $(6,150)  $1,011 
Total comprehensive income (loss) attributable to:             
Shareholders of the Company      (6,244)   1,190 
Non-controlling interests      34    11 
Total comprehensive income (loss)     $(6,210)  $1,201 
              
Earnings (loss) per share             
Basic  24  $(0.10)  $0.03 
Diluted  24  $(0.10)  $0.02 

 

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

 

3

 

 

POWERBANK CORPORATION

Condensed Interim Consolidated Statements of Changes in Shareholders’ Equity (unaudited)

(Expressed in thousands of Canadian dollars, except number of common shares)

 

   Note  Number of shares   Share capital   Contributed surplus   Accumulated
other
comprehensive
income (loss)
   Retained earnings (deficit)   Equity attributable to common shareholders   Non-controlling interests   Total equity 
Balance as at June 30, 2025      35,433,947   $45,285   $1,951   $(242)  $(27,753)  $19,241   $519   $19,760 
Net income (loss) for the period      -    -    -    -    1,000    1,000    11    1,011 
Other comprehensive income (loss)      -    -    -    190    -    190    -    190 
Common shares issued, net of costs  19(b)   998,856    2,558    -    -    -    2,558    -    2,558 
Dividends declared and paid      -    -    -    -    (4)   (4)   -    (4)
RSU granted  20(b)   -    -    177    -    -    177    -    177 
RSU settled  20(b)   102,067    188    (188)   -    -    -    -    - 
Share-based compensation  20(a)   -    -    771    -    -    771    -    771 
Shares issued to settle liabilities  19(b)   105,616    240    (240)   -    -    -    -    - 
Balance as at September 30, 2025      36,640,486   $48,271   $2,471   $(52)  $(26,757)  $23,933   $530   $24,463 
                                            
Balance as at June 30, 2026      47,697,277   $68,004   $3,447   $462   $(51,999)  $19,914   $463   $20,377 
Net income (loss) for the period      -    -    -    -    (6,184)   (6,184)   34    (6,150)
Other comprehensive income (loss)      -    -    -    (60)   -    (60)   -    (60)
Common shares issued, net of costs  19(b)   9,045,268    6,666    -    -    -    6,666    -    6,666 
RSU granted  20(b)   -    -    3,860    -    -    3,860    -    3,860 
RSU settled  20(b)   5,764,546    4,428    (3,257)   -    -    1,171    -    1,171 
Share-based compensation  20(a)   -    -    148    -    -    148    -    148 
Shares issued to settle liabilities  19(b)   1,668,619    1,170    (1,170)   -    -    -    -    - 
Balance as at September 30, 2026      64,175,710   $80,268   $3,028   $402   $(58,183)  $25,515   $497   $26,012 

 

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

 

4

 

 

POWERBANK CORPORATION

Condensed Interim Consolidated Statements of Cash Flows (Unaudited)

(Expressed in thousands of Canadian dollars)

 

   Note  Three months ended September 30 
      2026   2025
Operating activities:             
Net income (loss) for the period     $(6,150)  $1,011 
Items not affecting cash:             
Depreciation and amortization  6,12,13   1,489    1,382 
Fair value change on derivatives  15   (1,307)   (66)
Fair value change of warrant liabilities  18   (257)   (102)
Fair value change of CVR liabilities  18   142    542 
Fair value change of other liabilities due to non-controlling interest holders  18   10    10 
Interest expense      1,262    940 
Current tax (recovery) expense      227    302 
Deferred tax (recovery) expense      255    97 
Lease modifications  12   -    (30)
Provisions  12,16   -    14 
Other income related to deferred government grants      (29)   - 
Inventory write-off      134    - 
Share-based compensation  19,20   4,251    948 
Changes in non-cash operating assets and liabilities  17   (3,471)   (1,727)
Interest paid      (1,100)   (678)
Income tax refund (paid)      1,047    (333)
Net cash flows from (used in) operating activities      (3,497)   2,310 
              
Investing activities:             
Increase in restricted cash      (2,458)   (2,748)
Purchase of construction in progress      (59)   (4,530)
Proceeds of short-term investments      -    390 
Net cash flows from (used in) investing activities      (2,517)   (6,888)
              
Financing activities:             
Proceeds from short-term loans      3,823    - 
Proceeds from issuance of common shares, net transaction costs  19(b)   6,666    2,558 
Repayment of long-term debt      (1,400)   (1,664)
Deferred fees on long-term debt      (133)   - 
Repayment of lease obligation  12   (340)   (261)
Dividend payments      -    (4)
Net cash flows from (used in) financing activities      8,616    629 
              
Net increase (decrease) in cash      2,602    (3,949)
Effect of changes in exchange rates on cash      14    (42)
Cash, beginning of the period  2(e)   9,953    7,624 
Cash, end of the period  2(e)  $12,569   $3,633 

 

The accompanying notes are an integral part of these condensed interim consolidated financial statements.

 

5

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

1.Nature of operations:

 

PowerBank Corporation (the “Company”) operates as an independent renewable and clean energy project developer, power producer, and asset operator in Canada and the United States. It focuses on solar photovoltaic power generation projects, and battery energy storage systems projects. The Company changed its name from Abundant Solar Energy Inc. to SolarBank Corporation on October 17, 2022 and subsequently to PowerBank Corporation on July 23, 2025. The address of the Company and the principal place of the business is 505 Consumers Rd, Suite 803, Toronto, ON, M2J 4V8.

 

On March 1, 2023, the Company closed its initial public offering (the “Offering”) of common shares. With completion of the Offering, the Company commenced trading its common shares on the Canadian Securities Exchange (the “CSE”) under the symbol “SUNN” on March 2, 2023. On February 14, 2024, the Company migrated its listing to the Cboe Canada Exchange Inc. under the existing trading symbol “SUNN”. On April 8, 2024, the Company’s common shares commenced trading on the Nasdaq Global market under the symbol “SUUN”. Effective June 3, 2026, the Company changed its trading symbol on both the Nasdaq Global Market and the Cboe Canada Exchange to “PBK”. Effective October 1, 2026, the Company transferred the listing of its common shares from the Nasdaq Global Market to the Nasdaq Capital Market under the symbol “PBK”.

 

2.Basis of presentation:

 

(a)Statement of compliance:

 

These accompanying unaudited condensed interim consolidated financial statements have been prepared in accordance with IAS 34, Interim Financial Reporting as issued by the International Accounting Standards Board (“IASB”) and do not include all of the information required for full annual financial statements by IFRS® Accounting Standards as issued by the IASB.

 

These condensed interim consolidated financial statements should be read in conjunction with the Company’s audited consolidated financial statements for the year ended June 30, 2026 which includes information necessary or useful to understanding the Company’s business and financial statement presentation.

 

The Board of Directors approved these unaudited condensed interim consolidated financial statements for issue on November 16, 2026.

 

(b)Basis of measurement:

 

These condensed interim consolidated financial statements were prepared on a going concern basis and historical cost basis with the exception of certain financial instruments as disclosed in note 18. The going concern basis presumes that the Company will be able to realize its assets and discharge its liabilities in the normal course of business for the foreseeable future.

 

For the three months ended September 30, 2026, the Company incurred a net loss of $6,150 (September 30, 2025 – net income of $1,011) and net cash used in operating activities of $3,497 (September 30, 2025 – net cash provided by operating activities of $2,310). As at September 30, 2026, the Company had cash of $12,569 and working capital of $5,753.

 

Based on the Company’s current level of expenditures and forecast cash flows, its existing liquidity and forecasted internally generated cash flows are not sufficient to fund its operations and meet its obligations throughout the period for at least the next twelve months from the issuance date of these condensed interim consolidated financial statements. The Company will require additional financing to fund its ongoing operations and meet its obligations as they become due. Management is pursuing additional liquidity through a combination of equity financing, debt refinancing, project financing and asset monetization. Management is also evaluating measures to conserve cash, including operating cost reductions and enhanced management of working capital.

 

6

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

2.Basis of presentation (continued):

 

As of the date these condensed interim consolidated financial statements were authorized for issuance, the Company has not obtained binding commitments sufficient to fund all of its forecast liquidity requirements. The Company’s financing initiatives are subject to market conditions, counterparty participation, regulatory approvals where applicable, and the negotiation of acceptable terms. There can therefore be no assurance that the required financing or other liquidity initiatives will be completed when needed or in amounts sufficient to fund the Company’s obligations.

 

While the Company has been successful in obtaining financing to date and believes it will be able to obtain sufficient funds in the future and ultimately achieve profitability and positive cash flows from operations, there can be no certainty that these events will occur. These events and conditions indicate that a material uncertainty exists that raises substantial doubt on the Company’s ability to continue as a going concern and, therefore, that the Company may be unable to realize its assets and discharge its liabilities in the normal course of business.

 

These condensed interim consolidated financial statements do not include any adjustments to the amounts and classification of assets and liabilities and related expenses that might be necessary should the Company be unable to continue as a going concern, and therefore be required to realize its assets and liquidate its liabilities and commitments in other than the normal course of business at amounts different from those stated herein. Such adjustments could be material.

 

  (c) Basis of consolidation:

 

These unaudited condensed interim consolidated financial statements include the accounts of the Company and its wholly or partially owned subsidiaries.

 

Subsidiaries are consolidated from the date on which the Company obtains control up to the date of the disposition of control. Control is achieved when the Company has power over the subsidiary, is exposed or has rights to variable returns from its involvement with the subsidiary and has the ability to use its power to affect its returns. For non-wholly owned subsidiaries over which the Company has control, the net assets attributable to outside equity shareholders are presented as “non-controlling interests” in the equity section of the consolidated statements of financial position. Net income or loss for the period that is attributable to the non-controlling interests is calculated based on the ownership of the non-controlling interest shareholders in the subsidiary.

 

Balances, transactions, income and expenses between the Company and its subsidiaries are eliminated on consolidation.

 

7

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

2.Basis of presentation (continued):

 

(d)Functional and presentation currency:

 

The Company’s consolidated financial statements are presented in Canadian dollars. The functional currency of the Canadian parent company and its Canadian subsidiaries is the Canadian dollar. The functional currency of its subsidiaries in the United States is the US dollar. Unless otherwise indicated, all amounts in these condensed interim consolidated financial statements are expressed in thousands of Canadian dollars.

 

(e)Correction of immaterial prior period errors

 

i.Cash and restricted cash

 

Subsequent to June 30, 2026, the Company identified certain bank account balances that had been incorrectly classified as cash at year-end. These balances are restricted under the Company’s long-term loan arrangements and should have been classified as non-current restricted cash. Accordingly, the June 30, 2026 comparative balances have been reclassified, decreasing cash by $777 and increasing non-current restricted cash by the same amount.

 

3.Material accounting policies and use of judgements and estimates:

 

Unless otherwise noted in the condensed interim consolidated financial statements, the material accounting policies used in preparing these condensed interim consolidated financial statements are unchanged from those presented in the audited consolidated financial statements for the year ended June 30, 2026 and have been applied consistently to all periods presented in these condensed interim consolidated financial statements.

 

In preparing these unaudited condensed interim consolidated financial statements, management has made judgements and estimates about the future that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates. The significant judgements made by management in applying the Company’s accounting policies and the key sources of estimation uncertainty were the same as those described in the last annual financial statements.

 

(a)Adoption of new accounting standards:

 

No new or amended accounting standards had a significant impact on the Company’s financial statements during the three months ended September 30, 2026.

 

(b)Accounting standards issued but not yet effective:

 

The IASB has issued the following new and amended standards and interpretations that will become effective in a future year and could have an impact on the consolidated financial statements in future periods. The Company is currently assessing the impact of the following new and amended standards and interpretations.

 

●IFRS 18, Presentation and Disclosure in Financial Statements. IFRS 18 replaces IAS 1 and introduces a new structure for the statements of profit or loss, requiring entities to present operating, investing, and financing categories, and enhancing note disclosures. The amendments are effective for annual periods beginning on or after January 1, 2027.

 

8

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

4.Trade and other receivables:

 

   September 30, 2026   June 30, 2026 
         
Accounts receivable  $4,127   $4,209 
GST/HST receivable   1,485    1,362 
Due from related party (note 21)   7    7 
Other receivable   577    146 
   $6,196   $5,724 

 

5.Prepaid expenses and deposits:

 

   September 30, 2026   June 30, 2026 
         
Project deposits  $1,166   $929 
Other prepaids and deposits   1,109    2,070 
Balance, end of the period  $2,275   $2,999 
           
Current   1,763    2,487 
Non-current   512    512 
   $2,275   $2,999 

 

9

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

6.Property, plant and equipment:

 

   Furniture and equipment   Vehicle   IPP facilities   BESS projects   Total 
Cost:                         
Balance, June 30, 2026   7   $36   $47,913   $13,815   $61,771 
Foreign currency impact   -    -    (18)   -    (18)
Balance, September 30, 2026   7   $36   $47,895   $13,815   $61,753 
                          
Accumulated depreciation:                         
Balance, June 30, 2026   7   $14   $12,146   $932   $13,099 
Depreciation   -    1    725    155    881 
Foreign currency impact   -    -    -    -    - 
Balance, September 30, 2026   7   $15    12,871    1,087    13,980 
Net book value, September 30, 2026   -   $21    35,024    12,728    47,773 

 

   Furniture and equipment   Vehicle   IPP facilities   BESS projects   Total 
Cost:                         
Balance, June 30, 2025  $7   $36   $38,269    -   $38,312 
Reclassification from construction in progress   -    -    9,614    13,815    23,429 
Adjustment - Capital expenditure refunds   -    -    (246)   -    (246)
Foreign currency impact   -    -    276    -    276 
Balance, June 30, 2026  $7   $36   $47,913    13,815   $61,771 
                          
Accumulated depreciation:                         
Balance, June 30, 2025  $7   $10   $9,017    -   $9,034 
Depreciation   -    4    2,882    128    3,014 
Impairment   -    -    247    804    1,051 
Balance, June 30, 2026  $7   $14   $12,146    932   $13,099 
Net book value, June 30, 2026  $-   $22   $35,767    12,883   $48,672 

 

Total depreciation expense of $880 for IPP facilities and BESS projects is recorded in cost of goods sold for the three months ended September 30, 2026 (September 30, 2025 - $670). The remaining $1 depreciation expense for the three months ended September 30, 2026 is recorded as operating expenses (September 30, 2025 - $2).

 

10

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

7.Contract assets:

 

As of September 30, 2026 and June 30, 2026, the Company’s contract assets consist of projects revenue recognized through percentage of completion but had not yet been invoiced.

 

   September 30, 2026   June 30, 2026 
Beginning of the period  $815   $651 
Amounts invoiced for prior period   (361)   (651)
Amount not invoiced   18    815 
End of the period  $472   $815 

 

8.Inventories:

 

As of September 30, 2026 and June 30, 2026, the Company’s inventory is comprised of development costs related to projects in the development pipeline.

 

   September 30, 2026   June 30, 2026 
Beginning of the period  $18,953   $9,001 
Development costs   4,081    18,975 
Cost of goods sold   (631)   (9,847)
Project cancellations   (134)   (1,856)
Returned inventory in-transit (note 22)   -    2,298 
Foreign currency impact   (18)   382 
End of the period  $22,251   $18,953 

 

For the three months ended September 30, 2026 and 2025, the Company recorded inventory write-offs related to project cancellations of $134 and $nil, respectively, in other operating expenses.

 

9.Construction in progress:

 

Construction in progress (“CIP”) represents costs incurred on IPP facilities and BESS projects under construction. Once the projects are completed and placed into service, the projects are reclassified to property, plant and equipment and the accumulated costs are depreciated over the useful lives of the related assets. Detail of costs as at September 30, 2026 and June 30, 2026 are as follows:

 

   IPP facilities   Battery energy storage systems   Electric vehicle charging stations   Total 
Balance, June 30, 2026  $-   $8,234   $-   $8,234 
Additions   -    97    -    97 
Foreign currency impact   -    (5)   -    (5)
Balance, September 30, 2026  $-   $8,326   $-   $8,326 
                     
Balance, June 30, 2025  $9,448   $21,632   $542   $31,622 
Additions   31    10,099    -    10,130 
Reclassification to property, plant and equipment   (9,614)   (13,815)   -    (23,429)
Write-off of previously capitalized costs   -    (6,763)   -    (6,763)
Impairment   -    (2,925)   -    (2,925)
Assets abandonment   -    -    (542)   (542)
Foreign currency impact   135    6    -    141 
Balance, June 30, 2026  $-   $8,234   $-   $8,234 

 

11

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

10.Trade and other payables:

 

   September 30, 2026   June 30, 2026 
Accounts payable  $6,477   $7,995 
Accrued liabilities   2,670    3,202 
GST/HST payable   2,206    1,531 
Other payable   1,120    1,750 
Due to related party (note 21)   285    157 
   $12,758   $14,635 

 

11.Contract liabilities:

 

As of September 30, 2026 and June 30, 2026, the Company’s contract liabilities consist of payments received for EPC services and development fees projects not started yet.

 

   September 30, 2026   June 30, 2026 
Beginning of the period  $2,227   $5,698 
Revenue recognized from opening balance   (238)   (5,698)
Advance billings   883    2,227 
End of the period  $2,872   $2,227 

 

12.Right-of-use assets and lease liabilities:

 

The continuity of the right-of-use assets as of September 30, 2026 and June 30, 2026 are as follows:

 

Right-of-use asset  Office   Vehicle   IPP facilities   Total 
Cost:                    
Balance, June 30, 2026  $714   $114   $12,036   $12,864 
Additions – asset retirement cost   -    -    25    25 
Balance, September 30, 2026  $714   $114   $12,061   $12,889 
                     
Accumulated Depreciation:                    
Balance, June 30, 2026  $373   $36   $1,865   $2,274 
Depreciation   29    11    198    238 
Balance, September 30, 2026  $402   $47   $2,063   $2,512 
Net book value, September 30, 2026  $312   $67   $9,998   $10,377 

 

12

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

12.Right-of-use assets and lease liabilities (continued):

 

Right-of-use asset  Office   Vehicle   IPP facilities   Total 
Cost:                    
Balance, June 30, 2025  $561   $33   $11,663   $12,257 
Additions   126    81    324    531 
Change in asset retirement cost   -    -    38    38 
Modifications   27    -    -    27 
Foreign currency impact   -    -    11    11 
Balance, June 30, 2026  $714   $114   $12,036   $12,864 
                     
Accumulated Depreciation:                    
Balance, June 30, 2025  $202   $8   $770   $980 
Depreciation   171    28    1,095    1,294 
Balance, June 30, 2026  $373   $36   $1,865   $2,274 
Net book value, June 30, 2026  $341   $78   $10,171   $10,590 

 

IPP facilities depreciation expense is recorded in cost of goods sold for the period ended September 30, 2026 of $198 (September 30, 2025 - $335). The remaining $40 for the period ended September 30, 2026 relate to office and vehicle lease depreciation expense, which is recorded under operating expenses (September 30, 2025 - $26).

 

The continuity of the lease liabilities as of September 30, 2026 and June 30, 2026 are as follows:

 

Lease liabilities  Office   Vehicle   IPP Facilities   Total 
Balance, June 30, 2026  $362   $81   $7,979   $8,422 
Additions   -    -    -    - 
Payments   (46)   (12)   (282)   (340)
Interest accretion   13    1    105    119 
Balance, September 30, 2026  $329   $70   $7,802   $8,201 
Current   109    41    1,132    1,282 
Non-current   220    29    6,670    6,919 
Balance, September 30, 2026  $329   $70   $7,802   $8,201 

 

Lease liabilities  Office   Vehicle   IPP facilities   Total 
Balance, June 30, 2025  $378   $25   $8,068   $8,471 
Additions   126    81    324    531 
Modifications   (3)   -    -    (3)
Payments   (198)   (28)   (883)   (1,109)
Foreign currency impact   -    -    20    20 
Interest accretion   59    3    450    512 
Balance, June 30, 2026  $362   $81   $7,979   $8,422 
Current   125    42    1,191    1,358 
Non-current   237    39    6,788    7,064 
Balance, June 30, 2026  $362   $81   $7,979   $8,422 

 

13

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

13.
Intangible assets:

 

   FIT contracts   BESS contracts   Total 
Cost:               
Balance, June 30, 2026  $18,900   $4,130   $23,030 
Additions   -    -    - 
Balance, September 30, 2026  $18,900   $4,130   $23,030 
                
Accumulated amortization:               
Balance, June 30, 2026  $4,641   $1,281   $5,922 
Amortization   349    19    368 
Balance, September 30, 2026  $4,990   $1,300   $6,290 
Net book value, September 30, 2026  $13,910   $2,830   $16,740 

 

   FIT contracts   BESS contracts   Total 
Cost:               
Balance, June 30, 2025  $18,900   $4,130   $23,030 
Additions   -    -    - 
Balance, June 30, 2026  $18,900   $4,130   $23,030 
                
Accumulated amortization:               
Balance, June 30, 2025  $3,117   $646   $3,763 
Amortization   1,392    19    1,411 
Impairment   132    616    748 
Balance, June 30, 2026  $4,641   $1,281   $5,922 
Net book value, June 30, 2026  $14,259   $2,849   $17,108 

 

Total amortization expenses of $368 are recorded in cost of goods sold for the period ended September 30, 2026 (September 30, 2025 - $349).

 

14

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

14.Short-term loans:

 

   Maturity  Interest rate  September 30, 2026   June 30, 2026 
Line of credit  N/A  Floating  $-   $- 
RE Royalty  November 26, 2026  Fixed   3,000    3,000 
NY Green Bank credit facility  within 12 months of the drawing date  Fixed   7,709    3,891 
Total        $10,709   $6,891 

 

RE Royalty

 

On November 13, 2024, the Company’s subsidiary entered into a loan agreement for a principal amount of $3,000. The loan had a maturity date of November 26, 2025. Interest on the loan shall accrue at the rate of 11% per annum, compounded and payable quarterly. Subsequent to initial execution, the maturity date of the loan was extended to November 26, 2026. Following the amendment, interest accrues at a rate of 12% per annum, compounded monthly and payable quarterly.

 

NY Green Bank credit facility

 

On December 30, 2025, the Company entered into a senior secured revolving credit facility with NY Green Bank (“NYGB”) for an aggregate principal amount of up to US$8,000. The facility is available during an initial draw period of twelve months from the closing date and matures twelve months thereafter. Amounts drawn under the facility bear interest at a rate equal to the 2-Year U.S. Dollar Secured Overnight Financing Rate (“SOFR”) ICE Swap Rate, determined at the time of drawdown, plus 7.5% per annum. The proceeds of the facility are intended to fund interconnection deposits for certain projects. As at September 30, 2026, an amount of $7,709 (US$5,433) had been drawn under the credit facility. Under the NYGB credit facility, the Company is required to maintain aggregate minimum liquidity of at least US$5,000, subject to an increase if 30% of the revolving credit commitment exceeds US$3,000.

 

As at September 30, 2026, the Company did not have any events of default with its short-term loans.

 

15

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

15.Long-term debt:

 

   September 30, 2026   June 30, 2026 
Long-term loans  $60,133   $50,876 
Construction loans   3,236    13,978 
Highly Affected Sectors Credit Availability Program   509    537 
Total   63,878    65,391 
Less: current portion   12,353    13,613 
Non-current portion  $51,525   $51,778 

 

Long-term loans

 

The Company’s long-term loans are secured by underlying solar power system assets, including power purchase agreements known as Feed-in-Tariff (“FIT”) contracts, site leases, and project agreements. The loans bear either variable interest rates ranging from 1.56% to 3.34% plus the Canadian Overnight Repo Rate Average (“CORRA”) and fixed interest rates ranging from 4.45% to 6.06%, with remaining terms of 0 to 14 years maturing between 2026 and 2040.

 

In July 2026, the Company amended the terms of certain loan agreements to extend the maturity date to October 2026. Management assessed the amendment under IFRS 9 and concluded that the modification was not substantial. Accordingly, the existing financial liability was not derecognized.

 

Certain loans within the portfolio carry an annual fixed interest rate of 4.75% through interest-rate swap agreements that convert originally variable-rate terms based on the three-month Banker’s Acceptance Rate plus 1.98%. These loans mature in December 2029, with interest payable quarterly and principal payable semi-annually.

 

During the three months ended September 30, 2026, total interest expense on long-term loans amounted to $759 (September 30, 2025 – $636).

 

Certain project debt agreements require the Company to maintain restricted cash balances in designated reserve accounts. These balances are not available for general corporate purposes and are held at the project level to satisfy financing requirements.

 

Interest rate swaps are accounted for as derivative assets or liabilities and recorded at fair value on the condensed Interim consolidated statements of financial position with change in fair value recorded in profit or loss. For the three months ended September 30, 2026, the Company recorded fair value change gain of $1,307 in the consolidated statements of comprehensive income (loss) (September 30, 2025 – gain of $171).

 

Construction loans

 

During the year ended June 30, 2025, the Company entered into a credit agreement with Royal Bank of Canada (“RBC”) as Lenders, Administrative Agent and Collateral Agent for the Lenders, and obtained an advancement of $10,091 for the construction of certain BESS projects in Ontario. RBC retained an upfront fee amount of $814. The Company entered into interest rate swap agreement on the loan to fix the annual interest rate at 5.085%. Subsequent to year-end June 30, 2025, the credit agreement was amended to increase the total credit commitment. The amendment did not result in any additional borrowings or a change in the principal amount outstanding. The amendment did not give rise to a substantial modification or extinguishment of a financial liability. In connection with the amendment, RBC retained an upfront fee amount of $92. In September 2026, the Company converted $11,255 of the outstanding construction loan into a term loan facility maturing in 2031 and incurred transaction costs of $133. The conversion did not give rise to a substantial modification or extinguishment of a financial liability. For the three months ended September 30, 2026, the Company recorded no gain or loss from changes in fair value in the consolidated statements of comprehensive income (loss) (three months ended September 30, 2025 – loss of $105).

 

16

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

15.Long-term debt (continued):

 

On June 24, 2024, the Company entered into a Construction Loan Agreement, with Seminole Financial Services, LLC., for the construction of the Geddes project (the “Geddes Construction Loan”). The Geddes Construction Loan is for a principal amount of up to USD $2,600, based on the actual cost of the project. The loan is secured against the assets associated with the Geddes project and the Company has provided a guarantee of completion and payment. Upon receiving permission to operate the Geddes Project, the loan advancement shall convert into a 6-year long-term loan with a fixed interest rate to be determined upon the conversion. Construction of the project has been completed, and the project received PTO in July 2025. The conversion was completed in January 2026. At the date of conversion, the outstanding principal balance was $1,696. Transaction costs of $36 were incurred and are netted against the carrying amount of the loan in accordance with IFRS 9. The loan bears interest at a fixed rate of 7.67% per annum.

 

Highly Affected Sectors Credit Availability Program

 

In 2021, the Company received a Highly Affected Sectors Credit Availability Program (“HASCAP”) loan for a total of $1,000 at 4% annual rate from Bank of Montreal. The loan has a ten-year amortization period with interest payment only for the first year. Principal payments commenced in May 2022. During the three months ended September 30, 2026, the interest recorded was $5 (September 30, 2025 - $6).

 

As at September 30, 2026, the Company did not have any events of default with its long-term debt.

 

16.Provisions:

 

The Company recognizes provisions for asset retirement costs associated with its leased facilities where it has obligations under lease agreements to restore premises to their original condition at the end of the lease term.

 

   September 30, 2026   June 30, 2026 
Beginning of the period  $2,498   $2,401 
Additions   -    136 
Increase (decrease) in liability   25    (98)
Accretion expense   16    59 
End of the period  $2,539   $2,498 

 

17.Change in non-cash assets and liabilities:

 

The change in non-cash working capital for the period ended September 30, 2026 and September 30, 2025 is as follows:

 

   September 30, 2026   September 30, 2025 
         
Contract assets  $343   $(4,036)
Inventories   (3,432)   (2,161)
Trade and other receivables   (476)   (1,803)
Trade and other payables   (1,269)   (847)
Other long-term liabilities   (6)   (220)
Prepaid expenses and deposits   724    6,801 
Contract liabilities   645    539 
   $(3,471)  $(1,727)

 

17

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

18.Financial instruments:

 

The Company as part of its operations carries financial instruments consisting of cash, restricted cash, short-term investments, trade and other receivables, derivative financial instruments, trade and other payables, short-term loans, long-term debt, lease liabilities, warrant liabilities, other long-term liabilities and other liabilities due to non-controlling interest holders.

 

(a)Fair value:

 

The Company’s financial assets and liabilities carried at fair value are measured and recognized according to a fair value hierarchy that prioritizes the inputs to valuation techniques used to measure fair value. The hierarchy gives the highest priority to unadjusted quoted prices in active markets for identical assets and liabilities and the lowest priority to unobservable inputs. The three levels of fair value hierarchy are as follows:

 

●Level 1: Quoted prices in active markets for identical assets or liabilities.

 

●Level 2: Inputs other than quoted prices that are observable for the asset or liability.

 

●Level 3: Inputs for the asset or liability that are not based on observable market data.

 

The Company has variable interest rate loans with interest rate swap to effectively hedge the floating rate term loans into fixed rate arrangements by receiving floating rate and paying fixed rate payments (note 15). The fair value of the interest rate swap is based on discounting estimate of future floating rate and fixed rate cash flows for the remaining term of the interest rate swap. The fair value estimate is subject to a credit risk adjustment that reflects the credit risk of the Company and of the counterparty. The fair value of the interest rate swap is determined using Level 2 inputs.

 

The carrying amounts of cash, restricted cash, short-term investments, trade and other receivables, and trade and other payables approximate their fair values due to the short-term maturities of these items.

 

The carrying amounts of short-term loans, long-term debt, lease liabilities and other liabilities due to non-controlling interest approximate their fair value as management believes the applicable interest rates approximate current market rates for debt with similar terms and security.

 

Other liabilities due to non-controlling interest holders represent amounts payable to minority shareholders under contractual arrangements that require fixed or determinable payments. Such obligations meet the definition of a financial liability under IAS 32 Financial Instruments: Presentation, as it creates a contractual obligation to deliver cash irrespective of project performance. During the three months ended September 30, 2026, the Company recognized a fair value loss of $10, which is included in the consolidated statements of comprehensive income (loss) (September 30, 2025 – loss of $10).

 

The warrants grant holders the right to acquire common shares of the Company. As the warrants are exercisable at a price denominated in U.S. dollars, the exercise price is not a fixed amount of cash in the Company’s functional currency. Consequently, the warrants do not meet the ‘fixed-for-fixed’ criterion under IAS 32 and are classified as derivative financial liabilities. They are measured at fair value at each reporting date, with changes in fair value recognized in profit or loss. Fair value is determined based on the market value of the underlying common shares at the reporting date. During the three months ended September 30, 2026, the Company recognized a fair value gain of $257, which is included in the consolidated statements of comprehensive income (loss) (September 30, 2025 – gain of $102).


 

18

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

18.Financial instruments (continued):

 

The fair value of the Company’s embedded derivative instruments related to the contingent value right (“CVR”) liabilities were determined using the income approach, which included certain assumptions about the operating, investing, and financing inputs. In estimating the fair value of the financial liability, the Company uses market-observable data to the extent it is available. As CVR does not have Level 1 inputs, management applies Level 2 or Level 3 inputs, including internally developed models, unobservable assumptions, and other inputs not derived from active market data, to determine the appropriate fair value at the reporting date. During the three months ended September 30, 2026, the Company recognized a fair value loss of $142, which is included in the consolidated statements of comprehensive income (loss) (September 30, 2025 – loss of $542).

 

(b)Financial risk management:

 

(i)Credit risk and economic dependence:

 

Credit risk is the risk of financial loss associated with the counterparty’s inability to fulfill its payment obligations. The Company has no significant credit risk with its counterparties. The carrying amount of financial assets net of impairment, if any, represents the Company’s maximum exposure to credit risk.

 

The Company has assessed the creditworthiness of its trade and other receivables and amount determined the credit risk to be low. Receivables from projects are from reputable customers with past working relations with the Company. IPP revenues are due from local government utility with high creditworthiness. Cash, restricted cash and short-term investment have low credit risk as they are held by internationally recognized financial institutions.

 

(ii)Currency risk:

 

The Company conducts business in Canada and United States and has subsidiaries operating in the same countries. The Company, and its subsidiaries, do not hold significant assets and liabilities denominated in foreign currencies. As a result, the Company has low currency risk.

 

(iii)Concentration risk and economic dependence:

 

The accounts receivable balance is relatively concentrated with a few large customers representing majority of the value. See table below showing a few customers who account for over 10% of revenue as well as customers who account for over 10% of accounts receivable.

 

No individual customer accounted for more than 10% of the Company’s revenue for the three months ended September 30, 2026.

 

Three months ended September 30, 2025  Revenue   % of revenue 
Customer A  $3,985    21%
Customer D  $10,646    56%

 

Three months ended September 30, 2026  Accounts receivable   % of accounts receivable 
Customer A  $1,037    25%
Customer D  $530    13%

 

June 30, 2026  Accounts receivable   % of accounts receivable 
Customer A  $1,039    25%
Customer C  $830    20%

 

19

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

18.Financial instruments (continued):

 

(iv)Liquidity risk:

 

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they become due. The Company’s approach to managing liquidity risk is to ensure that it will have sufficient liquidity to meet liabilities when due by maintaining adequate reserves, banking facilities, and borrowing facilities. All the Company’s financial liabilities are subject to normal trade terms.

 

The following are the remaining contractual obligations as at September 30, 2026:

 

   Total   Less than 1 year   1 to 2 years   3 to 5 years   More than 5 years 
Short-term loans  $10,709   $10,709   $-   $-   $- 
Long-term debt   63,878    12,353    9,040    15,382    27,103 
Lease liabilities   10,867    1,468    1,092    1,975    6,332 
Trade and other payables   12,758    12,758    -    -    - 
Total  $98,212   $37,288   $10,132   $17,357   $33,435 

 

(v)Interest rate risk:

 

Interest rate risk is the risk that the fair value of future cash flows of a financial instrument will fluctuate because of changes in market interest rates. The Company’s long-term debt comprises both fixed and variable interest rate instruments. For certain variable rate borrowings, the Company has entered into interest rate swap agreements to economically fix the contractual interest rates.

 

20

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

19.Share Capital:

 

  (a) Authorized share capital as at September 30, 2026 and June 30, 2026

 

Unlimited number of common shares with no par value.

 

  (b) Issued and outstanding share capital

 

On September 30, 2026, the Company had 64,175,710 common shares issued and outstanding (September 30, 2025 – 36,640,486). A summary of changes in share capital is presented in the consolidated statements of changes in shareholders’ equity:

 

   Number of
Common shares
   Share Capital 
Balance, June 30, 2025   35,433,947   $45,285 
Common shares issued, net of costs   998,856    2,558 
RSU settled (note 20b)   102,067    188 
Shares issued to settle liabilities (note 19b)   105,616    240 
Balance, September 30, 2025   36,640,486   $48,271 
           
Balance, June 30, 2026   47,697,277    68,004 
Common shares issued, net of costs   9,045,268    6,666 
RSU settled (note 20b)   5,764,546    4,428 
Shares issued to settle liabilities (note 19b)   1,668,619    1,170 
Balance, September 30, 2026   64,175,710   $80,268 

 

On July 1, 2026, the Company completed a registered direct offering pursuant to securities purchase agreements with two institutional investors. The Company issued 7,000,000 common shares at a price of US$0.60 per share for gross proceeds of $5,956 (US$4,200). After placement agent fees and other offering expenses, the Company received net proceeds of $5,478 (US$3,863).

 

During the three months ended September 30, 2026, the company issued 2,045,268 shares under its At-The-Market (“ATM”) equity offering program, at an average price of US$0.45 for net proceeds of $1,188.

 

During the three months ended September 30, 2026, the Company issued 1,297,352 common shares with a fair value of $0.63 per share and 72,463 common shares with a fair value of $0.98 (US$0.69) per share to settle outstanding liabilities. The amounts settled included professional fees incurred in the prior year, other income and expense of $171 and consulting fees of $71 (September 30, 2025 – other income and expense of nil and consulting fees of $48).

 

In July 2026, the Company issued 298,804 common shares at a fair value of $0.95 per share to former Solar Flow-Through Funds Ltd (“SFF”) directors in settlement of bonus entitlements that had been accrued by SFF in the prior fiscal year, as such, did not affect the Company’s profit and loss during three months ended September 30, 2026.

 

During the three months ended September 30, 2025, the Company issued the remaining 23,026 common shares granted for consulting services in the year ended June 30, 2025.

 

During the three months ended September 30, 2025, the Company granted 26,315 common shares at a fair value of $1.84 per share (US$1.33) in exchange for consulting services, resulting in the recognition of $48 as consulting fees expense.

 

In July 2025, the Company issued 56,275 common shares at a fair value of $2.56 per share to former SFF directors in settlement of bonus entitlements that had been accrued by SFF in the prior fiscal year, as such, did not affect the Company’s profit and loss during three months ended September 30, 2025.

 

21

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

20.Share-based compensation:

 

(a)Share-based compensation:

 

The Board of Directors has adopted the Share Compensation Plan on November 4, 2022. Under this plan, the aggregate number of common shares that may be reserved and available for grant and issuance pursuant to the exercise of options and settlement of RSUs, each under the Share Compensation Plan, shall not exceed 20% (in the aggregate) of the issued and outstanding Common Shares at the time of granting. The exercise price per common share for an option and RSU granted shall not be less than the market price. Every option and RSU shall have a term not exceeding and shall expire no later than 5 years after the date of grant.

 

Details of the share option outstanding for the three months ended September 30, 2026 and September 30, 2025 are as follows:

 

   September 30, 2026   September 30, 2025 
   Number of
options
   Weighted
average
exercise price
per share
   Number of
options
   Weighted
average
exercise price
per share
 
Outstanding, beginning of the period   3,436,690   $1.32    2,284,000   $0.78 
Granted   -    -    1,402,000    1.90 
Outstanding, end of the period   3,436,690   $1.32    3,686,000    1.20 
Exercisable share options,
 
end of period
   1,974,515    1.03    2,719,685    0.95 

 

As at September 30, 2026, the range of exercise prices, the weighted average exercise price and the weighted average remaining contractual life are as follows:

 

Range of exercise prices   Number outstanding   Weighted
average
exercise price
per share
   Weighted average remaining contractual life (years) 
$0.75    1,502,330   $0.75    1.10 
$1.34    520,000    1.34    4.39 
$1.89    1,375,360    1.89    3.83 
$2.20 - $3.00    39,000    2.53    3.80 
      3,436,690   $1.32    2.72 

 

During the three months ended September 30, 2026, the Company did not grant any share options. During the three months ended September 30, 2026, compensation expense related to share options was $148 (September 30, 2025 - $578).

 

22

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

20.Share-based compensation (continued):

 

(b)Restricted Share Units (“RSUs”)

 

Details of the RSUs outstanding as at September 30, 2026 and 2025 are as follows:

 

   Three months ended September 30 
   2026   2025 
   Number of RSU   Weighted average
grant date fair value
per RSU
   Number of RSU   Weighted average
grant date fair value
per RSU
 
Outstanding, beginning of the period   2,286,256   $1.02    276,677   $0.91 
Granted   8,203,235    0.73    75,390    1.84 
Settled   (5,764,546)   0.77    (75,390)   1.84 
Forfeited   (251,820)   0.75    -    - 
Outstanding, end of the period   4,473,125   $0.83    276,677   $0.91 

 

During the three months ended September 30, 2026, the Company granted equity settled RSUs on the grant dates in the following table. The RSUs were valued at the market price on the grant date. RSUs will generally be settled upon or shortly after vesting. The vesting schedule for RSU varies by agreement and is determined by the contractual terms. The table below presents the RSUs granted and related grant details for the three months ended September 30, 2026 and September 30, 2025.

 

Grant Date  RSUs Granted   Grant Value   Vesting date(1)
July 17, 2026   6,016,000   $4,993   June 30, 2027
August 21, 2026   400,000   $272   August 21, 2029
July 17, 2026   1,787,235   $751   September 30, 2026

 

Grant Date  RSUs Granted   Grant Value   Vesting date(1)
July 30, 2025 (1)   75,390   $143   August 15, 2025

 

(1)Vesting date reflects the final vesting date if vesting occurs in tranches over a period of time.

 

For the three months ended September 30, 2026, $703 recorded in share-based compensation expense (September 30, 2025 – $143), $2,839 recorded in consulting fees (September 30, 2025 – nil), and $318 recorded in salaries and wages (September 30, 2025 – nil),

 

21.Related Party Transactions and Balances:

 

The Company enters into transactions with related parties in the normal course of business. Related parties include subsidiaries, entities under common control, entities over which directors or key management personnel (“KMP”) have significant influence, and close family members of KMP. All related party transactions are measured at the exchange amount, which is the amount agreed to by the parties.

 

As at September 30, 2026, amounts due to directors and other members of KMP were comprised of $285 (June 30, 2026 - $157) included in trade and other payables, $801 included in other long-term liabilities (June 30, 2026 – $801), and $73 (June 30, 2026 – $73) included in trade and other receivables.

 

23

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

21.Related Party Transactions and Balances (continued):

 

(a)Transactions with related parties

 

The following table summarizes costs incurred or recovered from related parties during the three months ended September 30, 2026 and 2025:

 

   Nature of Relationship  Nature of Transactions  Three months ended September 30 
         2026   2025 
Light Voltaic Corporation  Controlled by a director  Consulting services  $200   $136 
The Phoenix Trendz Inc.  Controlled by KMP  Consulting services  $100   $118 
Art Vancouver  Controlled by a director  Consulting services  $150   $97 

 

(b)Balances with related parties

 

Outstanding balances with related parties are summarized as follows:

 

   September 30, 2026  June 30, 2026
   Receivable/
 (Payable)
   Balance Sheet Presentation  Receivable/
(Payable)
   Balance Sheet Presentation
Light Voltaic Corporation  $(247)  Trade and other payables  $(21)  Trade and other payables
The Phoenix Trendz Inc.   -   Trade and other payable   (24)  Trade and other payables
Art Vancouver   -   Trade and other payable   (6)  Trade and other payables
Wear Wolfin Design   (52)  Other long-term liabilities   (52)  Other long-term liabilities
Berkley Renewables Inc.   (749)  Other long-term liabilities   (749)  Other long-term liabilities
Big Bear Gold Corp. (formerly Westkam Gold Corp.)   7   Trade and other receivables   7   Trade and other receivables
Total  $(1,041)     $(845)   

 

(c)Key management personnel compensation

 

Key management personnel include those persons having authority and responsibility for planning, directing and controlling the activities of the Company as a whole. The Company has determined that key management personnel consist of members of the Company’s Board of Directors and corporate officers, including the Company’s Chief Executive Officer, Chief Financial Officer, Chief Operating Officer and Senior Vice President of Corporate Development.

 

The remuneration of directors and other members of key management personnel, for the period ended September 30, 2026 and 2025 were as follows:

 

   Three months ended September 30, 
   2026   2025 
Salaries and employee benefits  $364   $303 
Share-based compensation  $1,593   $143 

 

24

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

22.Segment Information:

 

Segmented information is reviewed by the Company’s chief decision maker, the CEO, to assess performance and allocate resources within the Company. The Company has two operating segments.

 

(a)Reportable segments

 

Development and EPC consist of development and construction of solar photovoltaic power generation projects. IPP consists of the operation of solar photovoltaic power facilities and BESS projects. Corporate and other includes corporate activities and the operation and maintenance of power facilities, repairs and reinstallation of power facilities, and non-recurrent solar photovoltaic power generation project related work engaged by customers.

 

The revenues from external customers and expenses for three months ended September 30, 2026 and 2025 are as follows:

 

   Three months ended September 30, 2026 
   Development & EPC   IPP Production   Corporate and other activities   Intersegment Elimination   Total 
Revenue                         
Revenue from external customers  $213   $3,759   $225   $-   $4,197 
Intersegment revenue   -    61    -    (61)   - 
Total Revenue  $213   $3,820   $225   $(61)  $4,197 
Cost of goods sold   (631)   (2,041)   (68)   61    (2,679)
Gross profit (loss)   (418)   1,779    157    -    1,518 
Operating expense  $(228)  $(393)  $(6,777)  $-   $(7,398)
Income from operating activities  $(646)  $1,386   $(6,620)  $-   $(5,880)
                          
Interest income   -    39    101    -    140 
Interest expense   -    (985)   (181)   -    (1,166)
Fair value change of derivatives   -    1,307    -    -    1,307 
Fair value change of warrant liabilities   -    -    257    -    257 
Fair value change of CVR liabilities   -    -    (142)   -    (142)
Fair value change of other liabilities due to non-controlling interest holders   -    (10)   -    -    (10)
Other income (expense)  $-   $(324)  $150   $-   $(174)
Net income (loss) before income taxes                       (5,668)

 

25

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

22.Segment Information (continued):

 

   Three months ended September 30, 2025 
   Development & EPC   IPP Production   Corporate and other activities   Intersegment Elimination   Total 
Revenue                         
Revenue from external customers  $15,305   $3,845   $-   $-   $19,150 
Intersegment revenue   -    1,489    -    (1,489)   - 
Total Revenue  $15,305   $5,334   $-   $(1,489)  $19,150 
Cost of goods sold   (8,726)   (3,369)   -    1,489    (10,606)
Gross profit   6,579    1,965    -    -    8,544 
Operating expense  $(146)  $(438)  $(5,353)  $-   $(5,937)
Income from operating activities  $6,433   $1,527   $(5,353)  $-   $2,607 
                          
Interest income   -    58    32    -    90 
Interest expense   -    (747)   (67)   -    (813)
Fair value change of derivatives   -    (94)   160    -    66 
Fair value change of warrant liabilities   -    -    102    -    102 
Fair value change of CVR liabilities   -    -    (542)   -    (542)
Fair value change of other liabilities due to non-controlling interest holders   -    (10)   -    -    (10)
Other income (expense)  $-   $(4)  $(86)  $-   $(90)
Net income before income taxes                       1,410 

 

The segment assets, segment liabilities, and other material segment items as at September 30, 2026 and June 30, 2026 are as follows:

 

As at September 30, 2026  Development & EPC   IPP Production   Corporate and other activities   Total 
Total assets  $33,083   $100,684   $7,190   $140,957 
Total liabilities   16,574    92,535    5,836    114,945 
Property, plant and equipment   -    47,752    21    47,773 

 

As at June 30, 2026  Development & EPC   IPP Production   Corporate and other activities   Total 
Total assets  $29,789   $99,490   $4,187   $133,466 
Total liabilities   12,644    94,611    5,834    113,089 
Property, plant and equipment   -    48,650    22    48,672 

 

On April 9, 2026, the Company received remedy notices from a customer indicating the occurrence of seller trigger events under certain project agreements. Under the terms of the agreements, the customer held a conditional repurchase put option exercisable upon the occurrence of specified development-related trigger events. Following the occurrence of those trigger events, the customer exercised its contractual repurchase right, requiring the Company to repurchase the related projects for an aggregate amount of approximately US$2,350. In connection with the repurchase accounting, as of June 30, 2026, returned inventory in-transit increased by $2,298.

 

26

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

22.Segment Information (continued):

 

(b)Geographic information

 

The Company is currently operating developing and constructing of solar photovoltaic power generation projects in two principal geographical areas - Canada and United States. The revenues from external customers by country for the three months ended September 30, 2026 and 2025, and the non-current assets by country as at September 30, 2026 and June 30, 2026, are presented as follows:

 

   Revenue from external customers   Non-current assets 
   Three months ended September 30,     
   2026   2025   September 30, 2026   June 30, 2026 
Canada  $3,783    3,782   $82,700    82,566 
United States   414    15,368    10,559    10,733 
   $4,197    19,150   $93,259    93,299 

 

23.
Income Tax:

 

The Company is subject to income taxes in Canada, while the subsidiaries in United States are subject to the income tax laws of the United States.

 

The income tax charge is a result of profits and withholding tax in two jurisdictions which are taxable and cannot be offset by accumulated tax benefits in other jurisdictions. Income tax expense is recognized based on management’s best estimate of the weighted average annual income tax rate expected for the full financial year. The estimated average annual tax rate used for the three months ended September 30, 2026 was 26.5% (June 30, 2026 - 26.5%).

 

The actual income tax provision differs from the expected amount calculated by applying the Canadian combined federal and provincial corporate tax rates to income before tax. For entities subject to U.S. taxation, the expected provision is calculated using the applicable U.S. federal and state statutory tax rates.

 

24.Earnings (loss) per share:

 

The calculation of earnings per share for the three months ended September 30, 2026 and 2025 are as follows:

 

   September 30, 2026   September 30, 2025 
         
Net income (loss) attributable to:          
Shareholders of the company  $(6,184)  $1,000 
           
Basic weighted average number of shares outstanding   59,280,013    36,097,994 
Diluted weighted average number of shares outstanding   59,280,013    52,030,217 
           
Earnings (loss) per share          
Basic  $(0.10)  $0.03 
Diluted  $(0.10)  $0.02 

 

As of September 30, 2026, the Company has four categories of potentially dilutive securities: 3,436,690 of share options, 4,473,125 of RSUs, 7,378,987 of warrants and 2,283,929 of CVRs.

 

All potentially dilutive securities have been excluded from the calculation of diluted loss per share for three months ended September 30, 2026, as the Company was in a net loss position during the period. Including the dilutive securities would be anti-dilutive; therefore, basic and diluted number of shares used in the calculation is the same for the period presented.

 

27

 

 

POWERBANK CORPORATION

(FORMERLY SOLARBANK CORPORATION)

Notes to Condensed Interim Consolidated Financial Statements (Unaudited)

(Expressed in thousands of Canadian dollars, except per share amounts and as otherwise indicated)

For the three months ended September 30, 2026 and 2025

 

25.Other long-term liabilities:

 

   September 30, 2026   June 30, 2026 
CVR liabilities  $2,448   $2,306 
Other liabilities due to non-controlling interest holders   629    619 
Due to related party (note 21)   801    801 
Payable to SFF previous directors   146    434 
   $4,024   $4,160 

 

26.Commitments:

 

At September 30, 2026, the Company had various purchase commitments in the normal course of operations. Below is a summary of the future minimum payments for contractual obligations that are not recognized as liabilities at September 30, 2026.

 

   Total   Less than one year   1 to 2 years   3 to 5 years   More than 5 years 
Purchase obligations  $3,871   $3,871   $-   $-   $- 

 

Pursuant to an advisory agreement, the Company has committed to issue up to US$1,300 of common shares to the advisor in consideration for services to be provided. The shares, when issued, will be fully paid and non-assessable common shares of the Company. As of September 30, 2026, the Company had issued 599,723 common shares under the arrangement with an aggregate fair value of approximately US$615. The remaining commitment under the agreement will be satisfied through future issuances of common shares in accordance with the terms of the advisory agreement.

 

27.Deferred government grants:

 

During the year ended June 30, 2026, the Company received government grants of $2,273 from the New York State Energy Research and Development Authority (NYSERDA) in connection with the completion of construction of a solar project. All conditions attached to the grants were satisfied prior to receipt, and there are no unfulfilled conditions, contingencies, or expected reimbursements as at the reporting date.

 

   September 30, 2026   June 30, 2026 
Beginning of the period  $2,280   $- 
Government grants received   -    2,273 
Government grants income recognized   (29)   (71)
Foreign currency impact   (5)   78 
Balance, end of the period  $2,246   $2,280 
           
Current   117    118 
Non-current   2,129    2,162 
   $2,246   $2,280 

 

For the three months ended September 30, 2026, the Company recognized government grant income of $29 in other income (expense) (September 30, 2025 – nil).

 

28.Subsequent Events:

 

On October 22, 2026, the Company entered into a secured term loan agreement for up to $25,434, with RBC acting as administrative agent, to refinance certain existing long-term debts. The facility matures on October 22, 2031 and is secured by the participating project entities’ assets and pledges of their ownership interests. In connection with the refinancing, the Company entered into an amortizing interest rate swap with RBC with an initial notional amount of $25,434. The swap provides for quarterly settlements and mandatory early termination and cash settlement on October 22, 2031, although its scheduled termination date is July 31, 2036.

 

On October 29, 2026, shareholders approved a share consolidation at a ratio between 10:1 and 30:1 at the Company’s Annual General and Special Meeting. The Board of Directors approved a 20:1 consolidation ratio on November 11, 2026. The effective date remains subject to approval by Cboe Canada Inc. and Nasdaq.

 

28

 

 

Exhibit 99.3

 

Form 52-109F2

Certification of Interim Filings

Full Certificate

 

I, Dr. Richard Lu, Chief Executive Officer of PowerBank Corporation, certify the following:

 

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of PowerBank Corporation (the “issuer”) for the interim period ended September 30, 2026.
  
2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
  
3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
  
4.Responsibility: The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (“DC&P”) and internal control over financial reporting (“ICFR”), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.
  
5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer and I have, as at the end of the period covered by the interim filings:

 

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that:

 

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
   
(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

 

 
 

 

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

 

5.1Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s ICFR is Internal Control – Integrated Framework, issued by the Committee of Sponsoring Organizations of the Treadway Commission.
  
5.2ICFR – material weakness relating to design: The issuer has disclosed in its interim MD&A for each material weakness relating to design existing at the end of the interim period

 

(a)a description of the material weakness;
   
(b)the impact of the material weakness on the issuer’s financial reporting and its ICFR; and
   
(c)the issuer’s current plans, if any, or any actions already undertaken, for remediating the material weakness.

 

5.3N/A.

 

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

 

Date: November 16, 2026  
   
“Dr. Richard Lu”  
   
Dr. Richard Lu  
Chief Executive Officer  

 

 

 

Exhibit 99.4

 

Form 52-109F2

Certification of Interim Filings

Full Certificate

 

I, Nicole Rusaw, Chief Financial Officer of PowerBank Corporation, certify the following:

 

1.Review: I have reviewed the interim financial report and interim MD&A (together, the “interim filings”) of PowerBank Corporation (the “issuer”) for the interim period ended September 30, 2026.
  
2.No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
  
3.Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
  
4.Responsibility: The issuer’s other certifying officer and I are responsible for establishing and maintaining disclosure controls and procedures (“DC&P”) and internal control over financial reporting (“ICFR”), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers’ Annual and Interim Filings, for the issuer.
  
5.Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer’s other certifying officer and I have, as at the end of the period covered by the interim filings:

 

(a)designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that:

 

(i)material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
   
(ii)information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and

 

 
 

 

(b)designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer’s GAAP.

 

5.1Control framework: The control framework the issuer’s other certifying officer and I used to design the issuer’s ICFR is Internal Control – Integrated Framework, issued by the Committee of Sponsoring Organizations of the Treadway Commission.
  
5.2ICFR – material weakness relating to design: The issuer has disclosed in its interim MD&A for each material weakness relating to design existing at the end of the interim period

 

(a)a description of the material weakness;
   
(b)the impact of the material weakness on the issuer’s financial reporting and its ICFR; and
   
(c)the issuer’s current plans, if any, or any actions already undertaken, for remediating the material weakness.

 

5.3N/A.

 

6.Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer’s ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer’s ICFR.

 

Date: November 16, 2026  
   

“Nicole Rusaw”

 
   

Nicole Rusaw

 
Chief Financial Officer  

 

 