Ur-Energy Q3 operating loss widens to $27.1M

Shirley Basin captured 14,697 pounds in the third quarter, while ramp-up and transfer-system optimization proceeded slower than expected.

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
10-Q

Rhea-AI Filing Summary

Ur-Energy Inc. reported $12.433 million in sales for the three months ended September 30, 2026, versus $6.323 million a year earlier; this included $12.340 million in uranium sales and $93,000 in disposal fees. It sold 190,000 pounds of U₃O₈ at an average $64.95 per pound. Net loss narrowed to $17.734 million from $27.463 million, while operating loss widened to $27.053 million from $19.811 million.

Lost Creek drummed 103,487 pounds. Shirley Basin captured 14,697 pounds and shipped 9,379 pounds to Lost Creek for processing; ramp-up and transfer-system optimization were slower than expected. Lost Creek production was below expectations amid lower-than-expected grades, wastewater-management constraints and unplanned plant maintenance. Ur-Energy was constructing a wastewater treatment facility.

For the nine months, operating activities used $63.288 million in cash, and cash and cash equivalents were $50.165 million as of September 30, 2026. Base and fixed sales agreements call for 6,405,000 pounds of deliveries from 2026 through 2033. The company has not determined whether its properties contain mineral reserves.

2 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 2 points

How the balance works

Positive

  • Moderate pointThird-quarter sales increased to $12.433 million from $6.323 million year over year.
  • Moderate pointThird-quarter net loss narrowed to $17.734 million from $27.463 million.

Negative

  • Moderate pointNine-month operating cash used rose to $63.288 million from $24.342 million.
  • Moderate pointThird-quarter operating loss widened to $27.053 million from $19.811 million.

Filing Explained

The warrant issuance is complete; the separate 2031 notes retain a conditional route to share settlement.

Form 10-Q is the unaudited quarterly report; this filing reports that warrant exercises issued 19,129,999 common shares during the nine months ended September 30, 2026, increasing the share count and reducing existing holders’ percentage ownership, absent offsetting changes.

At September 30, 2026, the company reported 398,741,181 shares outstanding and no warrants remaining; the warrant-related issuance is completed, not unused warrant capacity.

Separately, Ur-Energy reported $120 million in face amount of convertible notes due January 2031, with an initial conversion price of about $1.73 per share; conversion may be settled in cash, shares, or both, so any share issuance under those terms depends on conversion and settlement choice.

Sales revenue $12.433 million Three months ended September 30, 2026; $6.323 million in 2025
U₃O₈ pounds sold 190,000 pounds Three months ended September 30, 2026
Average U₃O₈ price per pound $64.95 per pound Three months ended September 30, 2026
Net loss Loss of $17.734 million Three months ended September 30, 2026; loss of $27.463 million in 2025
Operating loss Loss of $27.053 million Three months ended September 30, 2026; loss of $19.811 million in 2025
Net cash used in operating activities $63.288 million used Nine months ended September 30, 2026; $24.342 million used in 2025
Cash and cash equivalents $50.165 million As of September 30, 2026
Base and fixed uranium deliveries 6,405,000 pounds Delivery commitments from 2026 through 2033
in situ recovery (ISR) technical
"We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project"
In situ recovery (ISR) is a mining method that extracts minerals or uranium by circulating a fluid through an underground deposit to dissolve the target material and then pumping the loaded fluid to the surface for processing — think of drawing dissolved coffee out of a filter rather than digging up the grounds. It matters to investors because ISR projects typically have lower upfront capital costs, quicker startup and less visible surface disturbance than conventional mines, but their value depends heavily on groundwater management, permitting and regulatory risk.
U₃O₈ technical
"we drummed 103,487 pounds of U₃O₈"
Capped Call Derivative financial
"recorded at fair value on the Company’s consolidated balance sheets"
Conversion Option Derivative financial
"accounted for as a stand-alone derivative instrument"
asset retirement obligations financial
"Asset retirement obligations relate to the Lost Creek mine and Shirley Basin project"
Asset retirement obligations are a company’s recorded promise to pay for dismantling, cleaning up, or restoring property when a long-lived asset is retired — for example decommissioning a plant or removing equipment. Companies estimate the future cleanup cost today and book it as a liability (and add the cost to the asset), so it affects the balance sheet, reported profits over time, and future cash needs; investors watch it like a planned bill that can reduce cash available for returns.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How many pounds of uranium did URG sell in Q3 2026, and at what price?

Ur-Energy sold 190,000 pounds of U₃O₈ at an average price of $64.95 per pound in Q3 2026. The corresponding uranium sales line was $12.340 million, within total sales of $12.433 million.

What pricing and volume options do Ur-Energy's uranium sales agreements include?

Several agreements combine escalated fixed prices with market-related pricing subject to a floor and ceiling; others use escalated fixed pricing. Several agreements let purchasers adjust delivery amounts up or down by as much as 10% in a delivery year, while other agreements allow Ur-Energy to add quantities at market-related pricing.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
http://urg.com/20260930#DerivativesLiabilitiesAtFairValueNetNoncurrenthttp://urg.com/20260930#DerivativesLiabilitiesAtFairValueNetNoncurrent0001375205--12-312026Q3falseUnlimitedUnlimitedUnlimitedUnlimited000000-00000001P3Yhttp://urg.com/20260930#DerivativesLiabilitiesAtFairValueNetNoncurrenthttp://urg.com/20260930#DerivativesLiabilitiesAtFairValueNetNoncurrent0.33330.33330.33330001375205us-gaap:FairValueInputsLevel2Memberus-gaap:MeasurementInputSharePriceMember2025-12-310001375205us-gaap:FairValueInputsLevel2Memberus-gaap:MeasurementInputRiskFreeInterestRateMember2025-12-310001375205us-gaap:FairValueInputsLevel2Memberus-gaap:MeasurementInputPriceVolatilityMember2025-12-310001375205us-gaap:FairValueInputsLevel2Memberus-gaap:MeasurementInputExpectedTermMember2025-12-310001375205us-gaap:FairValueInputsLevel2Memberus-gaap:MeasurementInputExercisePriceMember2025-12-310001375205urg:FebruaryTwoThousandTwentyThreeWarrantMember2025-12-310001375205urg:RestrictedStockUnitsRsuOneMember2026-09-300001375205urg:RestrictedStockUnitsRsuOneMember2025-01-012025-09-300001375205us-gaap:CommonStockMember2026-07-012026-09-300001375205us-gaap:CommonStockMember2026-04-012026-06-300001375205us-gaap:RetainedEarningsMember2026-09-300001375205us-gaap:AdditionalPaidInCapitalMember2026-09-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-09-300001375205us-gaap:RetainedEarningsMember2026-06-300001375205us-gaap:AdditionalPaidInCapitalMember2026-06-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-06-3000013752052026-06-300001375205us-gaap:RetainedEarningsMember2026-03-310001375205us-gaap:AdditionalPaidInCapitalMember2026-03-310001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-03-3100013752052026-03-310001375205us-gaap:RetainedEarningsMember2025-12-310001375205us-gaap:AdditionalPaidInCapitalMember2025-12-310001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-12-310001375205us-gaap:RetainedEarningsMember2025-09-300001375205us-gaap:AdditionalPaidInCapitalMember2025-09-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-09-300001375205us-gaap:RetainedEarningsMember2025-06-300001375205us-gaap:AdditionalPaidInCapitalMember2025-06-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-06-3000013752052025-06-300001375205us-gaap:RetainedEarningsMember2025-03-310001375205us-gaap:AdditionalPaidInCapitalMember2025-03-310001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-03-3100013752052025-03-310001375205us-gaap:RetainedEarningsMember2024-12-310001375205us-gaap:AdditionalPaidInCapitalMember2024-12-310001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2024-12-310001375205us-gaap:CommonStockMember2026-09-300001375205us-gaap:CommonStockMember2026-06-300001375205us-gaap:CommonStockMember2026-03-310001375205us-gaap:CommonStockMember2025-12-310001375205us-gaap:CommonStockMember2025-09-300001375205us-gaap:CommonStockMember2025-06-300001375205us-gaap:CommonStockMember2025-03-310001375205us-gaap:CommonStockMember2024-12-310001375205urg:WarrantsOneMember2023-02-280001375205urg:ExercisePrice1.61Member2026-09-300001375205urg:ExercisePrice1.42Member2026-09-300001375205us-gaap:StockOptionMember2026-01-012026-09-300001375205us-gaap:StockOptionMember2026-09-300001375205urg:ExercisePrice1.73Member2026-09-300001375205urg:ExercisePrice1.57Member2026-09-300001375205urg:ExercisePrice1.47Member2026-09-300001375205urg:ExercisePrice1.45Member2026-09-300001375205urg:ExercisePrice1.24Member2026-09-300001375205urg:ExercisePrice1.21Member2026-09-300001375205urg:ExercisePrice1.09Member2026-09-300001375205us-gaap:ShareBasedCompensationAwardTrancheTwoMember2026-01-012026-09-300001375205us-gaap:ShareBasedCompensationAwardTrancheThreeMember2026-01-012026-09-300001375205us-gaap:ShareBasedCompensationAwardTrancheOneMember2026-01-012026-09-300001375205urg:UThreeOEightSalesMemberurg:SingleReportableSegmentMember2026-07-012026-09-300001375205urg:DisposalFeesMemberurg:SingleReportableSegmentMember2026-07-012026-09-300001375205urg:UThreeOEightSalesMemberurg:SingleReportableSegmentMember2026-01-012026-09-300001375205urg:DisposalFeesMemberurg:SingleReportableSegmentMember2026-01-012026-09-300001375205urg:UThreeOEightSalesMemberurg:SingleReportableSegmentMember2025-07-012025-09-300001375205urg:UThreeOEightSalesMemberurg:SingleReportableSegmentMember2025-01-012025-09-300001375205urg:DisposalFeesMemberurg:SingleReportableSegmentMember2025-01-012025-09-300001375205urg:RightOfUseAssetsVehiclesMember2026-09-300001375205urg:RightOfUseAssetsVehiclesMember2025-12-310001375205us-gaap:PreferredClassAMember2026-01-012026-09-300001375205us-gaap:PreferredClassAMember2025-01-012025-12-310001375205us-gaap:PreferredClassAMember2026-09-300001375205us-gaap:PreferredClassAMember2025-12-310001375205urg:NfuWyomingLlcMember2005-01-012005-12-310001375205urg:ShirleyBasinMember2026-09-300001375205urg:OtherUSPropertiesPropertiesMember2026-09-300001375205urg:LostCreekPropertyMember2026-09-300001375205urg:ShirleyBasinMember2025-12-310001375205urg:OtherUSPropertiesPropertiesMember2025-12-310001375205urg:LostCreekPropertyMember2025-12-310001375205srt:MinimumMember2026-09-300001375205srt:MaximumMember2026-09-300001375205srt:MaximumMemberurg:RightOfUseAssetsVehiclesMember2026-09-300001375205us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205us-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205srt:MaximumMember2025-01-012025-09-300001375205urg:RestrictedStockUnitsRsuOneMember2026-01-012026-09-300001375205srt:MinimumMemberurg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputPriceVolatilityMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputPriceVolatilityMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputExpectedTermMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputExercisePriceMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputCommodityMarketPriceMember2026-09-300001375205srt:MinimumMemberurg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputPriceVolatilityMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputRiskFreeInterestRateMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputPriceVolatilityMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputExpectedTermMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputExercisePriceMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:MeasurementInputCommodityMarketPriceMember2025-12-310001375205urg:InventoryDerivativeObligationNetMemberus-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205urg:InventoryDerivativeObligationNetMemberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205urg:ConversionOptionDerivativeMemberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205urg:ConversionOptionDerivativeMember2026-09-300001375205urg:InventoryDerivativeObligationNetMemberus-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:FairValueInputsLevel3Memberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205urg:InventoryDerivativeObligationNetMemberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205urg:ConversionOptionDerivativeMemberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205urg:ConversionOptionDerivativeMember2025-12-310001375205urg:CappedCallDerivativeMember2026-09-300001375205urg:CappedCallDerivativeMember2025-12-310001375205srt:MinimumMemberus-gaap:MeasurementInputPriceVolatilityMember2026-09-300001375205srt:MaximumMemberus-gaap:MeasurementInputPriceVolatilityMember2026-09-300001375205us-gaap:MeasurementInputRiskFreeInterestRateMember2026-09-300001375205us-gaap:MeasurementInputExpectedTermMember2026-09-300001375205us-gaap:MeasurementInputCommodityMarketPriceMember2026-09-300001375205urg:MeasurementInputExercisePriceCappedCallFloorMember2026-09-300001375205urg:MeasurementInputExercisePriceCappedCallCeilingMember2026-09-300001375205srt:MinimumMemberus-gaap:MeasurementInputPriceVolatilityMember2025-12-310001375205srt:MaximumMemberus-gaap:MeasurementInputPriceVolatilityMember2025-12-310001375205us-gaap:MeasurementInputRiskFreeInterestRateMember2025-12-310001375205us-gaap:MeasurementInputExpectedTermMember2025-12-310001375205us-gaap:MeasurementInputCommodityMarketPriceMember2025-12-310001375205urg:MeasurementInputExercisePriceCappedCallFloorMember2025-12-310001375205urg:MeasurementInputExercisePriceCappedCallCeilingMember2025-12-310001375205urg:RightOfUseAssetsVehiclesMember2026-01-012026-09-300001375205urg:RightOfUseAssetsVehiclesMember2025-01-012025-09-300001375205us-gaap:SubsequentEventMember2026-10-010001375205us-gaap:ConvertibleDebtSecuritiesMember2025-12-152025-12-150001375205us-gaap:ConvertibleDebtSecuritiesMember2025-12-150001375205urg:UsFederalDepositInsuranceCorporationMember2026-09-300001375205us-gaap:ConvertibleDebtSecuritiesMember2025-12-310001375205us-gaap:RetainedEarningsMember2026-07-012026-09-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-07-012026-09-300001375205us-gaap:RetainedEarningsMember2026-04-012026-06-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-04-012026-06-300001375205us-gaap:RetainedEarningsMember2026-01-012026-03-310001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2026-01-012026-03-310001375205us-gaap:RetainedEarningsMember2025-07-012025-09-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-07-012025-09-300001375205us-gaap:RetainedEarningsMember2025-04-012025-06-300001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-04-012025-06-300001375205us-gaap:RetainedEarningsMember2025-01-012025-03-310001375205us-gaap:AccumulatedOtherComprehensiveIncomeMember2025-01-012025-03-3100013752052025-01-012025-12-3100013752052024-12-3100013752052025-09-300001375205urg:ShirleyBasinMember2026-01-012026-09-300001375205urg:PathfinderPropertiesMember2013-01-012013-12-310001375205us-gaap:AdditionalPaidInCapitalMember2026-04-012026-06-3000013752052026-04-012026-06-300001375205us-gaap:AdditionalPaidInCapitalMember2025-07-012025-09-300001375205us-gaap:AdditionalPaidInCapitalMember2025-04-012025-06-3000013752052025-04-012025-06-300001375205urg:LostCreekPropertyMember2026-01-012026-09-300001375205us-gaap:MachineryAndEquipmentMember2026-09-300001375205us-gaap:FurnitureAndFixturesMember2026-09-300001375205urg:RollingStockMember2026-09-300001375205urg:InformationTechnologyMember2026-09-300001375205urg:EnclosuresMember2026-09-300001375205us-gaap:MachineryAndEquipmentMember2025-12-310001375205us-gaap:FurnitureAndFixturesMember2025-12-310001375205urg:RollingStockMember2025-12-310001375205urg:InformationTechnologyMember2025-12-310001375205urg:EnclosuresMember2025-12-310001375205urg:AgreementForPurchaseOfUraniumMember2025-12-310001375205urg:VestingDateTwoMember2026-01-012026-09-300001375205urg:VestingDateOneMember2026-01-012026-09-300001375205urg:ExercisePrice1.73Member2026-01-012026-09-300001375205urg:ExercisePrice1.61Member2026-01-012026-09-300001375205urg:ExercisePrice1.57Member2026-01-012026-09-300001375205urg:ExercisePrice1.47Member2026-01-012026-09-300001375205urg:ExercisePrice1.45Member2026-01-012026-09-300001375205urg:ExercisePrice1.42Member2026-01-012026-09-300001375205urg:ExercisePrice1.24Member2026-01-012026-09-300001375205urg:ExercisePrice1.21Member2026-01-012026-09-300001375205urg:ExercisePrice1.09Member2026-01-012026-09-300001375205urg:VestingDateTwoMember2026-09-300001375205urg:VestingDateOneMember2026-09-300001375205urg:UThreeOEightSalesMember2026-07-012026-09-300001375205urg:DisposalFeesMember2026-07-012026-09-300001375205urg:CustomerEMember2026-07-012026-09-300001375205urg:CustomerDMember2026-07-012026-09-300001375205urg:CustomerCMember2026-07-012026-09-300001375205urg:CustomerBMember2026-07-012026-09-300001375205urg:CustomerAMember2026-07-012026-09-300001375205urg:UThreeOEightSalesMember2026-01-012026-09-300001375205urg:DisposalFeesMember2026-01-012026-09-300001375205urg:CustomerEMember2026-01-012026-09-300001375205urg:CustomerDMember2026-01-012026-09-300001375205urg:CustomerCMember2026-01-012026-09-300001375205urg:CustomerBMember2026-01-012026-09-300001375205urg:CustomerAMember2026-01-012026-09-300001375205urg:UThreeOEightSalesMember2025-07-012025-09-300001375205urg:DisposalFeesMember2025-07-012025-09-300001375205urg:CustomerEMember2025-07-012025-09-300001375205urg:CustomerDMember2025-07-012025-09-300001375205urg:CustomerCMember2025-07-012025-09-300001375205urg:CustomerBMember2025-07-012025-09-300001375205urg:CustomerAMember2025-07-012025-09-300001375205urg:UThreeOEightSalesMember2025-01-012025-09-300001375205urg:DisposalFeesMember2025-01-012025-09-300001375205urg:CustomerEMember2025-01-012025-09-300001375205urg:CustomerDMember2025-01-012025-09-300001375205urg:CustomerCMember2025-01-012025-09-300001375205urg:CustomerBMember2025-01-012025-09-300001375205urg:CustomerAMember2025-01-012025-09-300001375205us-gaap:FairValueInputsLevel1Memberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205us-gaap:FairValueInputsLevel1Memberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205us-gaap:AdditionalPaidInCapitalMember2026-07-012026-09-300001375205us-gaap:AdditionalPaidInCapitalMember2026-01-012026-03-310001375205us-gaap:CommonStockMember2025-01-012025-03-310001375205us-gaap:AdditionalPaidInCapitalMember2025-01-012025-03-3100013752052025-01-012025-03-310001375205us-gaap:SuretyBondMember2026-09-300001375205us-gaap:SuretyBondMember2025-12-310001375205us-gaap:ConvertibleDebtSecuritiesMember2026-07-012026-07-310001375205urg:AgreementForPurchaseOfUraniumMember2025-10-162025-10-160001375205urg:PathfinderPropertiesMember2013-12-310001375205urg:NfuWyomingLlcMember2005-12-310001375205urg:AgreementForPurchaseOfUraniumMember2024-11-202024-11-200001375205urg:AgreementForPurchaseOfUraniumMember2024-12-012024-12-010001375205urg:AgreementForPurchaseOfUraniumMember2025-10-160001375205urg:AgreementForPurchaseOfUraniumMember2024-12-010001375205srt:MaximumMember2024-11-200001375205urg:SingleReportableSegmentMember2025-07-012025-09-300001375205urg:ConversionOptionDerivativeMember2026-07-012026-09-300001375205urg:CappedCallDerivativeMember2026-07-012026-09-300001375205urg:AgreementForPurchaseOfUraniumMember2026-07-012026-09-300001375205urg:ConversionOptionDerivativeMember2026-01-012026-09-300001375205urg:CappedCallDerivativeMember2026-01-012026-09-300001375205urg:AgreementForPurchaseOfUraniumMember2026-01-012026-09-300001375205us-gaap:EmployeeStockOptionMember2026-01-012026-09-300001375205urg:SingleReportableSegmentMember2026-07-012026-09-300001375205urg:SingleReportableSegmentMember2026-01-012026-09-300001375205urg:SingleReportableSegmentMember2025-01-012025-09-300001375205us-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205us-gaap:FairValueMeasurementsRecurringMember2026-09-300001375205us-gaap:FairValueInputsLevel2Memberus-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205us-gaap:FairValueMeasurementsRecurringMember2025-12-310001375205us-gaap:ConvertibleDebtSecuritiesMember2026-09-300001375205srt:MinimumMemberus-gaap:EmployeeStockOptionMember2026-01-012026-09-300001375205srt:MaximumMemberus-gaap:EmployeeStockOptionMember2026-01-012026-09-300001375205us-gaap:CommonStockMember2026-01-012026-03-3100013752052026-01-012026-03-310001375205us-gaap:CommonStockMember2025-07-012025-09-3000013752052025-07-012025-09-300001375205urg:FebruaryTwoThousandTwentyThreeWarrantMember2026-01-012026-09-300001375205srt:MinimumMember2026-01-012026-09-300001375205srt:MaximumMember2026-01-012026-09-300001375205us-gaap:SubsequentEventMember2026-10-012026-10-010001375205us-gaap:ConvertibleDebtSecuritiesMember2026-01-012026-09-300001375205urg:FebruaryTwoThousandTwentyThreeWarrantMember2023-02-280001375205urg:WarrantsOneMember2023-02-012023-02-2800013752052026-09-3000013752052025-12-310001375205urg:AgreementForPurchaseOfUraniumMember2026-09-300001375205urg:AgreementForPurchaseOfUraniumMember2026-07-310001375205urg:AgreementForPurchaseOfUraniumMember2024-11-2000013752052025-01-012025-09-3000013752052026-07-012026-09-3000013752052026-10-3100013752052026-01-012026-09-30xbrli:sharesiso4217:USDiso4217:USDutr:lbiso4217:USDxbrli:sharesiso4217:CADxbrli:sharesutr:lbxbrli:pureurg:Yurg:segment

Table of Contents

​

​

​

United States

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

​

FORM 10-Q

(Mark One)

​

​

​

☑

QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934

​

​

​

FOR THE QUARTERLY PERIOD ENDED September 30, 2026

​

​

​

​

☐

TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(D) OF THE SECURITIES EXCHANGE ACT OF 1934

​

​

​

FOR THE TRANSITION PERIOD OF _________ TO _________.

​

Commission File Number: 001-33905

​

UR-ENERGY INC.

(Exact name of registrant as specified in its charter)

​

​

​

Canada

Not Applicable

State or other jurisdiction of incorporation or organization

(I.R.S. Employer Identification No.)

​

1478 Willer Drive

Casper, Wyoming 82604

(Address of principal executive offices, including zip code)

​

Registrant’s telephone number, including area code: 720-981-4588

​

Securities registered pursuant to Section 12(b) of the Act:

​

Title of each class:

  ​ ​ ​

Trading Symbol

  ​ ​ ​

Name of each exchange on which registered:

Common stock

​

URG (NYSE American); URE (TSX)

​

NYSE American; TSX

​

Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes ☑ No ◻

​

Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T (§232.405 of this chapter) during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).

Yes ☑   No ◻

​

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, smaller reporting company or an emerging growth company. See definitions of “large accelerated filer,” “accelerated filer,” “smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act.

Large accelerated filer ◻    Accelerated filer ◻   Non-accelerated filer ☑    Smaller reporting company ☑    Emerging growth company ☐

​

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ◻

​

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Exchange Act).

Yes ☐ No ☑

​

As of October 31, 2026, there were 398,741,181 shares of the registrant’s no par value Common Shares (“Common Shares”) outstanding, which is the registrant’s only class of outstanding voting securities.

​

​

​

Table of Contents

UR-ENERGY INC.

TABLE OF CONTENTS

​

​

​

​

​

Page

​

​

​

PART I – FINANCIAL INFORMATION

​

​

​

Item 1.

Financial Statements

6

Item 2.

Management’s Discussion and Analysis of Financial Condition and Results of Operations

29

Item 3.

Quantitative and Qualitative Disclosures about Market Risk

47

Item 4.

Controls and Procedures

48

​

​

​

PART II – OTHER INFORMATION

​

​

​

Item 1.

Legal Proceedings

49

Item 1A.

Risk Factors

49

Item 2.

Unregistered Sales of Equity Securities and Use of Proceeds

49

Item 3.

Defaults Upon Senior Securities

49

Item 4.

Mine Safety Disclosure

50

Item 5.

Other Information

50

Item 6.

Exhibits

51

​

​

​

SIGNATURES

52

​

​

​

​

​

Table of Contents

When we use the terms “Ur-Energy,” “we,” “us,” “our,” or the “Company,” we are referring to Ur-Energy Inc. and its subsidiaries, unless the context otherwise requires. Throughout this document we make statements that are classified as “forward-looking.” Please refer to the “Cautionary Statement Regarding Forward-Looking Statements” section below for an explanation of these types of assertions.

Cautionary Statement Regarding Forward-Looking Statements

This Quarterly Report on Form 10-Q contains “forward-looking statements” within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. These forward-looking statements can be identified by the use of words such as “expect,” “anticipate,” “estimate,” “believe,” “may,” “potential,” “intend,” “plan,” and other similar expressions or statements that an action, event, or result “may,” “could,” or “should” be taken, occur, or be achieved or the negative thereof or other similar statements. These statements include, but are not limited to, statements regarding:

​

●our ability and the expected or planned timing at Lost Creek to manage fine particles from the wellfield, optimize operation of the sand filtration system, manage wastewater, further optimize lixiviant chemistry, construct a wastewater treatment facility, and implement maintenance improvements and other initiatives to continue to ramp up and increase production;
●our ability and the expected or planned timing at Shirley Basin to optimize lixiviant chemistry and improve other operating parameters associated with the early ramp up and optimization of the newly commissioned mine, ramp up to commercial operations, complete remaining construction and commissioning of reverse osmosis and other wastewater systems, and to install wastewater treatment equipment;
●our ability to improve the transportation, transfer system, and processing of Shirley Basin production at Lost Creek;
●our ability and the expected or planned timing at both Lost Creek and Shirley Basin to execute our drilling plans, install and bring additional header houses online, and move into, commence wellfield construction in, and successfully produce in additional mine units;
●our ability to complete construction activities at Shirley Basin and Lost Creek within current cost projections;
●the technical and economic viability of the Lost Creek Property or the Shirley Basin Project as set forth in the applicable technical reports;
●the production rates and life of the Shirley Basin Project and the Lost Creek Project and subsequent development of and production from Adjoining Projects within the Lost Creek Property;
●the potential of Lost Creek South and other exploration targets throughout the Lost Creek Property (including the ability to expand resources);
●our ability and the expected or planned timing at Lost Soldier to complete baseline environmental studies or a new technical report and to make a development decision;
●expectations for our exploration programs, including Lost Soldier, North Hadsell, and Lost Creek South, including whether drilling programs will continue, further work will support preliminary interpretations, the resource potential will be adequate for in-situ recovery mining, we will commence or complete permitting, or the projects will be scalable or allow us to leverage existing infrastructure or operating expertise;
●our ability to maintain and conduct operations and other activities in a safe and compliant manner;
●our ability and the timing to apply for and obtain permits and authorizations and regulatory approvals for ongoing or new exploration, development, or operations;
●our ability to meet our commitments to sell and deliver product or meet sales projections, and our ability to defer deliveries or implement contingency plans if our production and inventory are not sufficient to meet such commitments;
●our ability to satisfy our inventory loan or convertible notes obligations;
●whether the sales prices in our contracts will be profitable on an all-in production cost basis;
●our ability and the timing to complete additional favorable uranium sales agreements, including spot sales as may be warranted;
●whether our cash resources will be sufficient for our capital requirements and operating costs without additional financing;
●conditions in the uranium market, including the major influences of climate change and environmental objectives, geopolitics, trade actions, and demands of artificial intelligence and data centers, and how they will affect our operations and business; and
●expectations regarding government initiatives regarding nuclear energy and uranium and their potential impacts on our industry and the markets for uranium.

​

3

Table of Contents

Where we express an expectation or belief as to future events or results, such expectation or belief is expressed in good faith and believed to have a reasonable basis. Our forward-looking statements, however, are only predictions and are subject to known and unknown risks, uncertainties, and other factors that may cause our actual results, performance, achievements, or industry results, to be materially different from future results, performance, or achievements expressed, projected, or implied by those forward-looking statements. Such risks include, but are not limited to: the accuracy of or changes to our future estimates of production, development, and operations, capital expenditures, operating costs, mineral resources, recovery rates, grades, market prices, goals for expansion and growth of our business and operations, or plans and references to future successes; the effectiveness of our business strategies and measures to implement such strategies; our competitive strengths; our history of operating losses and uncertainty of future profitability; our status as an exploration stage company; our lack of mineral reserves; risks associated with obtaining permits and other authorizations in the U.S.; risks associated with maintaining our mineral properties; risks associated with current variable economic conditions; the impacts of our convertible notes financing; risks associated with our ability to obtain financing in the future and the possible impact of future financings; the hazards associated with mining production; compliance with environmental laws and regulations; uncertainty regarding the pricing and collection of accounts; the possibility for adverse results in potential litigation; uncertainties associated with changes in government policy and regulation; uncertainties associated with a Canada Revenue Agency or U.S. Internal Revenue Service audit of any of our cross border transactions; adverse changes in general business conditions in any of the countries in which we do business; changes in our size and structure; the effectiveness of our management and strategic relationships; our ability to attract, retain, train, and develop skilled personnel; our ability to innovate and implement new technologies, including artificial intelligence; our ability to manage and address cybersecurity risks; uncertainties regarding our need for and ability to raise additional capital; uncertainty regarding the fluctuations of our quarterly results; foreign currency exchange risks; the inability to enforce civil liabilities against the Company or its directors and officers; our ability to maintain our listing on the NYSE American LLC (“NYSE American”) and Toronto Stock Exchange (“TSX”); risks associated with our expected classification as a “passive foreign investment company” under the U.S. Internal Revenue Code of 1986, as amended; risks associated with various trade actions and tariffs; risks associated with global conflicts and geopolitical tensions, including armed conflicts in Iran and the broader Middle East, tensions over the Strait of Hormuz, the war in Ukraine, and tensions between the U.S. and China; risks associated with our investments; and other risks and uncertainties described under the heading “Risk Factors” in our Annual Report on Form 10-K for the fiscal year ended December 31, 2025 (the “Annual Report”) this Quarterly Report on Form 10-Q.

Any forward-looking statements and information are based on estimates and assumptions only as of the date of this Quarterly Report on Form 10-Q, and the Company undertakes no obligation to update or revise any forward-looking statement or information to reflect new information, events, results, or circumstances or the occurrence of unanticipated events, except as required by applicable law. New factors emerge from time to time, and it is not possible for management to predict all such factors and to assess in advance the impact of each such factor on the Company’s business or the extent to which any factor, or combination of factors, may cause actual results to differ materially from those contained in any forward-looking statements or information.

Cautionary Note to Investors Concerning Disclosure of Mineral Resources

Unless otherwise indicated, all mineral resource estimates that are material to our business or financial condition in this Quarterly Report on Form 10-Q and in the documents incorporated by reference have been prepared in accordance with Regulation S-K, Subpart 1300 (“S-K 1300”) and are supported by initial assessments prepared under S-K 1300. Our mineral resource estimates also comply with Canadian National Instrument 43-101, Standards of Disclosure for Mineral Projects (“NI 43-101”), and the CIM Definition Standards. Our technical report summaries are the Technical Report on the Lost Creek ISR Uranium Property, Sweetwater County, Wyoming, USA (March 10, 2026), and the Initial Assessment Technical Report Summary on the Shirley Basin ISR Uranium Project Carbon County, Wyoming USA, as amended (March 11, 2024).

4

Table of Contents

Investors should note that “mineral resource” does not equate to “mineral reserve.” Mineralization may not be classified as a mineral reserve unless the determination has been made that the mineralization could be economically and legally produced or extracted at the time of the reserve determination. “Inferred mineral resources” have significant uncertainty as to their existence, economic feasibility, and legal feasibility, and it cannot be assumed that any part of an inferred mineral resource will ever be upgraded to a higher category. Under S-K 1300, inferred mineral resources may not form the basis of feasibility or pre-feasibility studies. As required under S-K 1300, our Lost Creek Property report includes two economic analyses—one including and one excluding inferred mineral resources—to account for the possibility that inferred mineral resources are not upgraded. Investors are cautioned not to assume that any inferred mineral resource exists or is economically or legally mineable.

Cautionary Note Concerning Industry and Market Data

This Quarterly Report on Form 10-Q includes industry, market, and regulatory information obtained from government agencies, industry publications, trade associations, and other publicly available sources, including the U.S. Nuclear Regulatory Commission, the U.S. Department of Energy, and the U.S. Energy Information Administration. Although the Company believes these sources are reliable, it has not independently verified the information, and such information is subject to change. Industry and market data also involve estimates, assumptions, and projections that are subject to risks and uncertainties, including those described under “Cautionary Statement Regarding Forward-Looking Statements” above and in in the Risk Factors in the Company’s Annual Report on Form 10-K for the fiscal year-ended December 31, 2025.

​

5

Table of Contents

PART I

Item 1. FINANCIAL STATEMENTS

Ur-Energy Inc.

Interim Condensed Consolidated Balance Sheets (Unaudited)

(expressed in thousands of U.S. dollars)

(the accompanying notes are an integral part of these condensed consolidated financial statements)

​

​

​

​

​

​

​

​

​

​

Note

​

September 30, 2026

​

December 31, 2025

Assets

​

​

​

​

​

​

Current assets

​

​

​

​

​

​

Cash and cash equivalents

​

3

​

50,165

​

123,863

Marketable securities

​

​

​

286

​

—

Trade receivables

​

4

​

6,576

​

—

Inventory

​

5

​

16,422

​

24,291

Prepaid expenses and other current assets

​

​

​

3,026

​

1,568

Deposits

​

19

​

4,127

​

—

Current portion of lease receivables (net)

​

6

​

673

​

708

Total current assets

​

​

​

81,275

​

150,430

​

​

​

​

​

​

​

Non-current assets

​

​

​

​

​

​

Lease receivables (net)

​

6

​

1,354

​

1,814

Restricted cash and cash equivalents

​

7

​

12,994

​

11,484

Mineral properties (net)

​

8

​

46,168

​

43,881

Capital assets (net)

​

9

​

88,638

​

49,742

Capped call derivative

​

10

​

10,591

​

15,108

Deposits

​

19

​

4,200

​

—

Total non-current assets

​

​

​

163,945

​

122,029

Total assets

​

​

​

245,220

​

272,459

​

​

​

​

​

​

​

Liabilities and shareholders’ equity

​

​

​

​

​

​

Current liabilities

​

​

​

​

​

​

Accounts payable and accrued liabilities

​

11

​

15,440

​

10,369

Current portion of financing lease liabilities

​

12

​

636

​

484

Inventory derivative obligation (net)

​

13

​

—

​

16,638

Environmental remediation accrual

​

​

​

6

​

164

Total current liabilities

​

​

​

16,082

​

27,655

​

​

​

​

​

​

​

Non-current liabilities

​

​

​

​

​

​

Financing lease liabilities

​

12

​

1,389

​

1,312

Inventory derivative obligation (net)

​

13

​

17,408

​

—

Long-term debt

​

14

​

71,168

​

66,421

Conversion option derivative

​

15

​

33,235

​

52,258

Warrant liability

​

16

​

—

​

1,541

Asset retirement obligations

​

17

​

52,174

​

44,474

Stock option liabilities

​

18

​

859

​

1,346

Total non-current liabilities

​

​

​

176,233

​

167,352

​

​

​

​

​

​

​

Shareholders’ equity

​

​

​

​

​

​

Share capital

​

18

​

468,126

​

432,761

Contributed surplus

​

​

​

20,717

​

19,645

Accumulated other comprehensive income

​

​

​

6,261

​

4,044

Accumulated deficit

​

​

​

(442,199)

​

(378,998)

Total shareholders’ equity

​

​

​

52,905

​

77,452

Total liabilities and shareholders’ equity

​

​

​

245,220

​

272,459

​

​

​

​

​

​

​

Commitments and contingencies

​

22

​

​

​

​

​

​

6

Table of Contents

Ur-Energy Inc.

Interim Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited)

(expressed in thousands of U.S. dollars, except share and per share data)

(the accompanying notes are an integral part of these condensed consolidated financial statements)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Three Months Ended

​

Nine Months Ended

​

​

​

​

September 30,

​

September 30,

​

​

Note

​

2026

​

2025

​

2026

​

2025

​

​

​

​

​

​

​

​

​

​

​

Sales

​

19

​

12,433

​

6,323

​

30,737

​

16,758

Cost of sales

​

20

​

(13,779)

​

(7,063)

​

(28,945)

​

(18,156)

Gross profit (loss)

​

​

​

(1,346)

​

(740)

​

1,792

​

(1,398)

​

​

​

​

​

​

​

​

​

​

​

Operating costs

​

21

​

(25,707)

​

(19,071)

​

(67,614)

​

(50,011)

Operating profit (loss)

​

​

​

(27,053)

​

(19,811)

​

(65,822)

​

(51,409)

​

​

​

​

​

​

​

​

​

​

​

Interest income

​

​

​

648

​

518

​

2,442

​

2,086

Interest expense

​

​

​

(2,311)

​

(364)

​

(8,017)

​

(920)

Mark to market gain (loss)

​

​

​

10,883

​

(7,854)

​

9,317

​

(9,166)

Foreign exchange gain (loss)

​

​

​

56

​

5

​

(1,940)

​

(19)

Other income (loss)

​

​

​

43

​

43

​

819

​

111

Net income (loss)

​

​

​

(17,734)

​

(27,463)

​

(63,201)

​

(59,317)

​

​

​

​

​

​

​

​

​

​

​

Foreign currency translation adjustment

​

​

​

(136)

​

100

​

2,217

​

145

Comprehensive income (loss)

​

​

​

(17,870)

​

(27,363)

​

(60,984)

​

(59,172)

​

​

​

​

​

​

​

​

​

​

​

Income (loss) per common share:

​

​

​

​

​

​

​

​

​

​

Basic

​

​

​

(0.04)

​

(0.07)

​

(0.16)

​

(0.16)

Diluted

​

​

​

(0.04)

​

(0.07)

​

(0.16)

​

(0.16)

​

​

​

​

​

​

​

​

​

​

​

Weighted average common shares:

​

​

​

​

​

​

​

​

​

​

Basic

​

​

​

398,195,265

​

367,148,807

​

394,851,826

​

365,477,399

Diluted

​

​

​

398,195,265

​

367,148,807

​

394,851,826

​

365,477,399

​

​

​

​

​

​

7

Table of Contents

Ur-Energy Inc.

Interim Condensed Consolidated Statements of Changes in Shareholders’ Equity (Unaudited)

(expressed in thousands of U.S. dollars, except share data)

(the accompanying notes are an integral part of these condensed consolidated financial statements)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Nine Months Ended September 30, 2026

​

Note

​

Shares

​

Share
Capital

​

Contributed
Surplus

​

Accumulated
Other
Comprehensive
Income

​

Accumulated
Deficit

​

Shareholders'
Equity

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

December 31, 2025

​

​

​

378,169,709

​

432,761

​

19,645

​

4,044

​

(378,998)

​

77,452

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Exercise of warrants

​

18

​

19,129,999

​

33,031

​

—

​

—

​

—

​

33,031

Exercise of stock options

​

18

​

32,145

​

65

​

—

​

—

​

—

​

65

Redemption of RSUs

​

18

​

—

​

—

​

(35)

​

—

​

—

​

(35)

Stock compensation

​

18

​

—

​

—

​

224

​

—

​

—

​

224

Net income (loss)

​

​

​

—

​

—

​

—

​

914

​

(28,775)

​

(27,861)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

March 31, 2026

​

​

​

397,331,853

​

465,857

​

19,834

​

4,958

​

(407,773)

​

82,876

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Exercise of stock options

​

18

​

442,860

​

836

​

—

​

—

​

—

​

836

Stock compensation

​

18

​

—

​

—

​

487

​

—

​

—

​

487

Net income (loss)

​

​

​

—

​

—

​

—

​

1,439

​

(16,692)

​

(15,253)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

June 30, 2026

​

​

​

397,774,713

​

466,693

​

20,321

​

6,397

​

(424,465)

​

68,946

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Exercise of stock options

​

18

​

966,468

​

1,433

​

(286)

​

—

​

—

​

1,147

Redemption of RSUs

​

18

​

—

​

—

​

(10)

​

—

​

—

​

(10)

Stock compensation

​

18

​

—

​

—

​

692

​

—

​

—

​

692

Net income (loss)

​

​

​

—

​

—

​

—

​

(136)

​

(17,734)

​

(17,870)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

September 30, 2026

​

​

​

398,741,181

​

468,126

​

20,717

​

6,261

​

(442,199)

​

52,905

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

8

Table of Contents

Ur-Energy Inc.

Interim Condensed Consolidated Statements of Changes in Shareholders’ Equity (Unaudited) (Continued)

(expressed in thousands of U.S. dollars, except share data)

(the accompanying notes are an integral part of these condensed consolidated financial statements)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Nine Months Ended September 30, 2025

​

Note

​

Shares

​

Share
Capital

​

Contributed
Surplus

​

Accumulated
Other
Comprehensive
Income

​

Accumulated
Deficit

​

Shareholders'
Equity

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

December 31, 2024

​

​

​

364,101,038

​

413,242

​

19,468

​

4,189

​

(304,100)

​

132,799

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Exercise of stock options

​

18

​

464,807

​

405

​

213

​

—

​

—

​

618

Redemption of RSUs

​

18

​

253,415

​

283

​

(343)

​

—

​

—

​

(60)

Stock compensation

​

18

​

—

​

—

​

668

​

—

​

—

​

668

Net income (loss)

​

​

​

—

​

—

​

—

​

(28)

​

(10,898)

​

(10,926)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

March 31, 2025

​

​

​

364,819,260

​

413,930

​

20,006

​

4,161

​

(314,998)

​

123,099

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Stock compensation

​

18

​

—

​

—

​

(123)

​

—

​

—

​

(123)

Net income (loss)

​

​

​

—

​

—

​

—

​

73

​

(20,956)

​

(20,883)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

June 30, 2025

​

​

​

364,819,260

​

413,930

​

19,883

​

4,234

​

(335,954)

​

102,093

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Shares issued for cash

​

18

​

9,980,095

​

15,168

​

—

​

—

​

—

​

15,168

Share issue costs

​

18

​

—

​

(379)

​

—

​

—

​

—

​

(379)

Exercise of warrants

​

18

​

257,500

​

501

​

—

​

—

​

—

​

501

Exercise of stock options

​

18

​

795,754

​

999

​

(46)

​

—

​

—

​

953

Stock compensation

​

18

​

—

​

—

​

(298)

​

—

​

—

​

(298)

Net income (loss)

​

​

​

—

​

—

​

—

​

100

​

(27,463)

​

(27,363)

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

September 30, 2025

​

​

​

375,852,609

​

430,219

​

19,539

​

4,334

​

(363,417)

​

90,675

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

9

Table of Contents

Ur-Energy Inc.

Interim Condensed Consolidated Statements of Cash Flows (Unaudited)

(expressed in thousands of U.S. dollars)

(the accompanying notes are an integral part of these condensed consolidated financial statements)

​

​

​

​

​

​

​

​

​

​

​

​

Nine Months Ended

​

​

​

​

September 30,

​

​

Note

​

2026

​

2025

​

​

​

​

​

​

​

Operating activities

​

​

​

​

​

​

Net income (loss)

​

​

​

(63,201)

​

(59,317)

​

​

​

​

​

​

​

Adjustments to reconcile net loss to net cash used in operating activities:

​

​

​

​

​

​

Stock based compensation

​

18

​

1,403

​

2,225

Payment of deposit on borrowed inventory

​

​

​

(1,250)

​

—

Net realizable value adjustments

​

​

​

624

​

2,696

Amortization of mineral properties

​

​

​

3,947

​

1,213

Depreciation of capital assets

​

​

​

3,342

​

2,741

Accretion of asset retirement obligations

​

17

​

1,466

​

902

Amortization of debt discount

​

14

​

5,028

​

—

Provision for reclamation

​

​

​

(158)

​

59

Mark to market loss (gain)

​

​

​

(9,317)

​

9,166

Loss (gain) on disposal of assets

​

​

​

(700)

​

95

Unrealized foreign exchange loss (gain)

​

​

​

1,938

​

21

Changes in non-cash working capital:

​

​

​

​

​

​

Trade receivables

​

​

​

(6,576)

​

14,428

Inventory

​

5

​

7,245

​

(1,131)

Lease receivables

​

6

​

450

​

419

Prepaid expenses and other current assets

​

​

​

(608)

​

(678)

Deposit collateral on sales deferrals

​

​

​

(8,327)

​

—

Accounts payable and accrued liabilities

​

11

​

1,406

​

2,819

Net cash provided by (used in) operating activities

​

​

​

(63,288)

​

(24,342)

​

​

​

​

​

​

​

Investing activities

​

​

​

​

​

​

Investment in marketable securities

​

​

​

(44)

​

—

Proceeds from sale of capital assets

​

​

​

147

​

—

Purchase of capital assets

​

9

​

(38,492)

​

(14,236)

Net cash provided by (used in) investing activities

​

​

​

(38,389)

​

(14,236)

​

​

​

​

​

​

​

Financing activities

​

​

​

​

​

​

Issuance of common shares for cash

​

18

​

—

​

15,168

Share issue costs

​

18

​

—

​

(379)

Payment of convertible note financing costs

​

14

​

(271)

​

—

Proceeds from exercise of warrants and stock options

​

18

​

30,235

​

573

RSU redeemed for cash

​

18

​

(45)

​

(60)

Payments on financing lease liability

​

​

​

(400)

​

(449)

Net cash provided by (used in) financing activities

​

​

​

29,519

​

14,853

​

​

​

​

​

​

​

Effects of foreign exchange rate changes on cash

​

​

​

(30)

​

53

​

​

​

​

​

​

​

Increase (decrease) in cash and cash equivalents, and restricted cash and cash equivalents

​

​

​

(72,188)

​

(23,672)

Beginning cash and cash equivalents, and restricted cash and cash equivalents

​

​

​

135,347

​

87,078

Ending cash and cash equivalents, and restricted cash and cash equivalents

​

22

​

63,159

​

63,406

​

​

​

​

​

10

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

1.

Nature of Operations

Ur-Energy Inc. (the “Company”) was incorporated on March 22, 2004, under the laws of the Province of Ontario. The Company continued under the Canada Business Corporations Act on August 8, 2006. The Company is an exploration stage issuer. The Company is engaged in uranium mining and recovery operations, with activities including the acquisition, exploration, development, and production of uranium mineral resources located primarily in Wyoming. The Company commenced uranium production at its Lost Creek Project in Wyoming in 2013 and commenced uranium mining operations at its Shirley Basin Project in April 2026.

Due to the nature of the uranium recovery methods used by the Company at the Lost Creek Property and the Shirley Basin Project, the Company has not determined whether the properties contain mineral reserves. The recoverability of amounts recorded for mineral properties is dependent upon the discovery of economic resources, the ability of the Company to obtain the necessary financing to develop the properties, and attaining future profitable production from the properties or sufficient proceeds from the disposition of the properties.

2.

Summary of Significant Accounting Policies

Basis of presentation

These unaudited interim condensed consolidated financial statements do not conform in all respects to the requirements of accounting principles generally accepted in the United States of America (“US GAAP”) for annual financial statements. These unaudited interim condensed consolidated financial statements reflect all the normal and recurring adjustments which in the opinion of management are necessary for a fair presentation of the results for the periods presented and contain sufficient disclosures so as to make the interim condensed consolidated financial statement not misleading. These unaudited interim condensed consolidated financial statements should be read in conjunction with the audited annual consolidated financial statements for the year ended December 31, 2025. We applied the same accounting policies as in the prior year. Certain information and footnote disclosures required by US GAAP have been condensed or omitted in these interim consolidated financial statements.

Segments

We regularly review our operating segments and the approach used by management to evaluate performance and allocate resources. The Company operates as a single reportable segment. Our determination that we operate as a single segment is consistent with the financial information as presented in the consolidated statements of operations and comprehensive loss, which is regularly reviewed by the chief operating decision maker (CODM), considered to be the Chief Executive Officer, Chief Operating Officer, Chief Financial Officer, Vice President Finance, and General Counsel, for purposes of evaluating performance, allocating resources, setting incentive compensation targets, and planning and forecasting for future periods. Our CODM allocates resources and assesses financial performance on a consolidated basis with consideration given to key financial metrics, including gross loss, operating loss, and net loss. All revenues are earned within the U.S., and all of the Company’s long-lived assets are within the U.S. As the Company operates as a single reportable segment, segment assets represent total assets as presented in the consolidated balance sheets. Significant expenses reviewed by the CODM are consistent with the presentation of expenses in the Company’s consolidated statements of operations and comprehensive loss, note 20, and note 21, as shown in the following table.

​

11

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

​

​

​

​

​

​

​

​

​

​

​

Three Months Ended

​

Nine Months Ended

​

​

September 30,

​

September 30,

Single Reportable Segment

​

2026

​

2025

​

2026

​

2025

​

​

​

​

​

​

​

​

​

U3O8 sales

​

12,340

​

6,323

​

30,617

​

16,751

Disposal fees

​

93

​

—

​

120

​

7

Sales

​

12,433

​

6,323

​

30,737

​

16,758

​

​

​

​

​

​

​

​

​

U3O8 product costs

​

13,308

​

7,063

​

28,321

​

15,460

Lower of cost or NRV adjustments

​

471

​

—

​

624

​

2,696

Cost of sales

​

13,779

​

7,063

​

28,945

​

18,156

​

​

​

​

​

​

​

​

​

Gross profit (loss)

​

(1,346)

​

(740)

​

1,792

​

(1,398)

​

​

​

​

​

​

​

​

​

Exploration and evaluation

​

1,153

​

1,477

​

4,623

​

3,682

Development

​

21,569

​

14,379

​

52,455

​

38,184

General and administration

​

2,435

​

2,871

​

9,070

​

7,243

Accretion of asset retirement obligations

​

550

​

344

​

1,466

​

902

Operating costs

​

25,707

​

19,071

​

67,614

​

50,011

​

​

​

​

​

​

​

​

​

Operating profit (loss)

​

(27,053)

​

(19,811)

​

(65,822)

​

(51,409)

​

​

​

​

​

​

​

​

​

Interest income

​

648

​

518

​

2,442

​

2,086

Interest expense

​

(2,311)

​

(364)

​

(8,017)

​

(920)

Mark to market gain (loss)

​

10,883

​

(7,854)

​

9,317

​

(9,166)

Foreign exchange gain (loss)

​

56

​

5

​

(1,940)

​

(19)

Other income (loss)

​

43

​

43

​

819

​

111

Net income (loss)

​

(17,734)

​

(27,463)

​

(63,201)

​

(59,317)

​

Fair values

Assets and liabilities are classified in their entirety based on the lowest level of input that is significant to the fair value measurement.

The Company follows ASC 820 for measuring the fair value of financial assets and liabilities. Fair value is the price that would be received in the sale of an asset or paid to transfer a liability in an orderly transaction between market participants at the measurement date. Where available, fair value is based on observable market prices or parameters or derived from such prices or parameters. Where observable prices or inputs are not available, valuation models are applied. These valuation models involve some level of management estimation and judgment, the degree of which is dependent on the price transparency for the instruments or market and the instruments’ complexity. The valuation hierarchical levels are based upon the transparency of the inputs to the valuation of the asset or liability as of the measurement date. The three levels are defined below:

Level 1 - Valuations based on quoted prices in active markets for identical assets or liabilities at the measurement date.

Level 2 - Valuations based on quoted prices in markets that are not active or for which all significant inputs are observable, either directly or indirectly.

Level 3 - Valuations based on inputs that are unobservable and significant to the overall fair value measurement.

12

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

The Company’s financial assets and liabilities that are carried at cost as of September 30, 2026 and December 31, 2025 include cash, trade receivables, lease receivables, restricted cash, accounts payable and accrued liabilities, and lease liabilities. These financial assets and liabilities are carried at cost, which approximate fair value due to their short-term maturities. Long-term debt is also carried at cost in the consolidated balance sheets. Financial instruments, including the capped call derivative, marketable securities, conversion option derivative, inventory derivative obligation, warrant liabilities, and stock option liabilities are adjusted to fair value on a recurring basis. The Company has certain non-financial assets that are measured at fair value on a non-recurring basis when there is an indicator of impairment, and they are recorded at fair value only when impairment is recognized. These assets include mineral properties and capital assets. The Company did not record impairment to any non-financial assets in the nine months ended September 30, 2026 and 2025, and does not have any non-financial liabilities measured and recorded at fair value on a non-recurring basis.

The following table sets forth the estimated fair value hierarchies of the Company’s financial instrument assets and liabilities that are measured at fair value on a recurring basis as of September 30, 2026 and December 31, 2025:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Fair Value Hierarchy as of September 30, 2026

​

Fair Value Hierarchy as of December 31, 2025

​

​

Level 1

​

Level 2

​

Level 3

​

Total

​

Level 1

​

Level 2

​

Level 3

​

Total

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Financial instrument assets

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Cash equivalents

​

23,450

​

—

​

—

​

23,450

​

2,938

​

—

​

—

​

2,938

Marketable securities

​

286

​

—

​

—

​

286

​

—

​

—

​

—

​

—

Restricted cash equivalents

​

12,934

​

—

​

—

​

12,934

​

11,472

​

—

​

—

​

11,472

Capped call derivative

​

—

​

10,591

​

—

​

10,591

​

—

​

15,108

​

—

​

15,108

​

​

36,670

​

10,591

​

—

​

47,261

​

14,410

​

15,108

​

—

​

29,518

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Financial instrument liabilities

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Inventory derivative
obligation (net)

​

—

​

17,408

​

—

​

17,408

​

—

​

16,638

​

—

​

16,638

Warrant liability

​

—

​

—

​

—

​

—

​

—

​

1,541

​

—

​

1,541

Stock option liabilities

​

—

​

859

​

—

​

859

​

—

​

1,346

​

—

​

1,346

Conversion option derivative

​

—

​

—

​

33,235

​

33,235

​

—

​

—

​

52,258

​

52,258

​

​

—

​

18,267

​

33,235

​

51,502

​

—

​

19,525

​

52,258

​

71,783

​

3.

Cash and Cash Equivalents

The Company’s cash and cash equivalents consist of the following:

​

​

​

​

​

​

Cash and cash equivalents

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Cash on deposit

​

26,715

​

120,925

Money market and short-term government bond investment accounts

​

23,450

​

2,938

​

​

50,165

​

123,863

​

​

​

​

​

13

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

4.

Trade Receivables

The Company’s trade receivables consist of the following:

​

​

​

​

​

​

Trade Receivables

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Uranium sales

​

6,506

​

—

Disposal fees

​

70

​

—

​

​

6,576

​

—

​

​

5.

Inventory

The Company’s inventory consists of the following:

​

​

​

​

​

​

Inventory by Type

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

In-process inventory

​

974

​

201

Plant inventory

​

2,342

​

1,097

Conversion facility inventory

​

13,106

​

22,993

​

​

16,422

​

24,291

​

Using lower of cost or net realizable value (“NRV”) calculations, the Company reduced the inventory valuation by $0.6 million and $2.7 million for the nine months ended September 30, 2026 and 2025, respectively.

6.

Lease Receivables

The Company’s lease receivables consist of the following:

​

​

​

​

​

​

Lease Receivables

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Current

​

​

​

​

Lease receivables

​

792

​

863

Unearned income

​

(119)

​

(155)

​

​

673

​

708

​

​

​

​

​

Long-term

​

​

​

​

Leases receivable

​

1,462

​

2,006

Unearned income

​

(108)

​

(192)

​

​

1,354

​

1,814

​

The leases are direct financing leases of drilling equipment. The lease terms are three to five years with a residual payment at the end of the term. The lease terms include provisions for prepayment after a certain period dependent on the executed contract.

​

For the nine months ended September 30, 2026 and 2025, lease payments received totaled $0.6 million and $0.5 million, respectively. Lease income was $0.1 million and $0.1 million for the nine months ended September 30, 2026 and 2025, respectively.

​

14

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

Lease receivable maturities including residual values are as follows:

​

​

​

​

Lease Receivable Maturities

​

September 30, 2026

​

​

​

2026

​

247

2027

​

726

2028

​

736

2029

​

393

2030

​

151

Total

​

2,253

Less unearned income

​

226

Present value of lease receivables

​

2,027

​

​

​

Current portion of lease receivables

​

673

Non-current portion of lease receivables

​

1,354

Total lease receivables (net)

​

2,027

​

​

7.

Restricted Cash and Cash Equivalents

The Company’s restricted cash and cash equivalents consist of the following:

​

​

​

​

​

​

Restricted Cash and Cash Equivalents

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Reclamation related restricted cash and cash equivalents

​

12,934

​

11,423

Other restricted cash and cash equivalents

​

60

​

61

​

​

12,994

​

11,484

​

The Company’s restricted cash equivalents consist of money market and short-term government bond instruments.

The bonding requirements for reclamation obligations on various properties have been reviewed and approved by the Wyoming Department of Environmental Quality (“WDEQ”), the Wyoming Uranium Recovery Program (“URP”), and the U.S. Bureau of Land Management (“BLM”), as applicable. The restricted cash and cash equivalents are pledged as collateral against performance surety bonds, which secure the estimated costs of reclamation related to the properties. Surety bonds providing $47.3 million and $50.4 million of coverage towards reclamation obligations were collateralized by the restricted cash as of September 30, 2026 and December 31, 2025, respectively.

8.

Mineral Properties

The Company’s mineral properties consist of the following:

​

​

​

​

​

​

​

​

​

​

Mineral Property Activity

​

Lost Creek Property

​

Shirley Basin
Project

​

Other U.S. Properties

​

Total

​

​

​

​

​

​

​

​

​

December 31, 2025

​

9,183

​

19,984

​

14,714

​

43,881

​

​

​

​

​

​

​

​

​

Change in estimated asset retirement costs

​

5,150

​

1,084

​

—

​

6,234

Depletion and amortization

​

(3,947)

​

—

​

—

​

(3,947)

​

​

​

​

​

​

​

​

​

September 30, 2026

​

10,386

​

21,068

​

14,714

​

46,168

​

15

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

Lost Creek Property

The Company acquired certain Wyoming properties in 2005 when Ur-Energy USA Inc. purchased 100% of NFU Wyoming, LLC. Assets acquired in this transaction include the Lost Creek Project, other Wyoming properties, and development databases. NFU Wyoming, LLC was acquired for aggregate consideration of $20 million plus interest. Since 2005, the Company has increased its holdings adjacent to the initial Lost Creek acquisition through staking additional claims and making additional property purchases and leases.

There is a royalty on each of the State of Wyoming sections under lease at the Lost Creek, LC West, and EN Projects, as required by law. We are not recovering U3O8 within the State section under lease at Lost Creek and therefore are not subject to royalty payments currently. Other royalties exist on certain mining claims at the LC South, LC East, and EN Projects. There are no royalties on the mining claims in the Lost Creek, LC North, or LC West Projects.

Shirley Basin Project

The Company acquired additional Wyoming properties in 2013 when Ur-Energy USA Inc. purchased 100% of Pathfinder Mines Corporation (“Pathfinder”). Assets acquired in this transaction include the Shirley Basin Project, other Wyoming properties, and development databases. Pathfinder was acquired for aggregate consideration of $6.7 million, the assumption of $5.7 million in estimated asset reclamation obligations, and other consideration.

Other U.S. Properties

Other U.S. properties include the acquisition costs of several prospective mineralized properties, which the Company continues to maintain through claim payments, lease payments, insurance, and other holding costs in anticipation of future exploration efforts.

​

9.

Capital Assets

The Company’s capital assets consist of the following:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

September 30, 2026

​

December 31, 2025

Capital Assets

​

Cost

​

Accumulated
Depreciation

​

Net Book
Value

​

Cost

​

Accumulated
Depreciation

​

Net Book
Value

​

​

​

​

​

​

​

​

​

​

​

​

​

Rolling stock

​

13,544

​

(7,194)

​

6,350

​

11,182

​

(5,879)

​

5,303

Enclosures

​

79,803

​

(21,630)

​

58,173

​

52,146

​

(20,281)

​

31,865

Machinery and equipment

​

20,804

​

(1,751)

​

19,053

​

11,328

​

(1,442)

​

9,886

Furniture and fixtures

​

3,946

​

(205)

​

3,741

​

2,024

​

(191)

​

1,833

Information technology

​

2,461

​

(1,140)

​

1,321

​

1,819

​

(964)

​

855

​

​

120,558

​

(31,920)

​

88,638

​

78,499

​

(28,757)

​

49,742

​

​

​

10. Capped Call Derivative

​

The Capped Call is expected generally to reduce the potential dilution to the Company’s common shares upon any conversion of Convertible Notes and/or offset any potential cash payments that the Company is required to make in excess of the principal amount of converted Convertible Notes, as the case may be, with such reduction and/or offset subject to a cap, based on the cap price of the Capped Call.

​

16

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

The Company’s functional currency is the Canadian dollar and because the Capped Call’s floor and ceiling exercise prices are priced in U.S. dollars, relative to the Company’s functional currency, US GAAP requires the Capped Call to be accounted for as a stand-alone derivative instrument (the “Capped Call Derivative”). The Capped Call Derivative matures in January 2031, and is recorded at fair value on the Company’s consolidated balance sheets and mark-to-market changes in fair value are recorded in earnings. Using Level 2 inputs of the fair value hierarchy under US GAAP, the Capped Call Derivative is measured and recorded at fair value using the Black-Scholes model described below as there is no active market for the Capped Call.

​

The fair value of the Capped Call Derivative asset was $10.6 million and $15.1 million as of September 30, 2026 and December 31, 2025, respectively, which resulted in mark-to-market losses of $3.3 million and $4.5 million for the three and nine months ended September 30, 2026, respectively.

​

The Capped Call Derivative fair value was determined using a fair value model with the following assumptions:

​

​

​

​

​

​

​

​

​

Capped Call Derivative Fair Value Model Assumptions

​

September 30, 2026

December 31, 2025

​

​

​

​

Expected life (years)

​

4.3

5.0

Volatility

​

51.4% - 70.0%

49.8% - 70.4%

Risk free rate

​

5.0%

3.7%

Expected dividend rate

​

—%

—%

Exercise prices (capped call floor)

​

$ 1.73

$ 1.73

Exercise prices (capped call ceiling)

​

$ 2.72

$ 2.72

Current market price

​

$ 1.08

$ 1.39

​

​

11.

Accounts Payable and Accrued Liabilities

Accounts payable and accrued liabilities consist of the following:

​

​

​

​

​

​

Accounts Payable and Accrued Liabilities

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Accounts payable

​

11,889

​

8,398

Accrued payroll liabilities

​

1,705

​

1,123

Accrued cash interest payable

​

1,188

​

238

Accrued severance, ad valorem, and other taxes payable

​

658

​

610

​

​

15,440

​

10,369

​

​

12.

Financing Lease Liabilities

The Company’s financing lease liabilities consist of the following:

​

​

​

​

​

​

Financing Lease Liabilities

  ​ ​ ​

September 30, 2026

  ​ ​ ​

December 31, 2025

​

​

​

​

​

Current portion of financing lease liabilities

 

636

 

484

Financing lease liabilities

 

1,389

 

1,312

Total financing lease liabilities

 

2,025

 

1,796

​

The Company has lease arrangements for certain vehicles. These leases typically have original terms not exceeding four years and contain residual value purchase options, which are reasonably certain of exercising. As of September 30, 2026 and December 31, 2025, the Company had $2.4 million and $2.0 million, respectively, of leased vehicles included in capital assets, rolling stock (net).

17

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

For the nine months ended September 30, 2026 and 2025, lease principal payments totaled $0.4 million and $0.4 million, respectively, and lease interest payments totaled $0.2 million and $0.2 million, respectively, for a combined lease payment total of $0.6 million and $0.6 million, respectively.

For the nine months ended September 30, 2026 and 2025, the Company recorded depreciation of $0.6 million and $0.5 million and total expense reflected in the consolidated statement of operations was $0.8 million and $0.7 million, respectively.

The weighted average discount rate of the leases is 14.0 percent, and the weighted average remaining life was 2.7 years as of September 30, 2026.

Lease liability maturities including residuals as of September 30, 2026 were as follows:

​

​

​

​

Financing Lease Liability Maturities

​

September 30, 2026

​

​

​

2026

​

212

2027

​

887

2028

​

691

2029

​

531

2030

​

193

Total

​

2,514

Less imputed interest

​

(489)

Present value of financing lease liabilities

​

2,025

​

​

13.

Inventory Derivative Obligation

On November 20, 2024, we executed an agreement to borrow up to 250,000 pounds of U3O8 from a counterparty. The agreement was for one year and called for interest payments of 5.25% per annum on the value of any uranium borrowed. In addition, there is a requirement to pay 1.5% per annum interest on any pounds not borrowed. The uranium loan value and interest expense calculations are based on the current average spot price. At the end of each period, the uranium loan is subject to mark-to-market adjustments to reflect the current loan valuation. In addition, the Company was required to post a minimum deposit of $15 per pound on any pounds borrowed. If the average uranium prices increase above certain thresholds, an additional $5 per pound will be deposited with the counterparty. Conversely, if the average uranium price declines below the thresholds, the Company can request a deposit refund of $5 per pound, subject to the minimum $15 per pound deposit. The uranium loan was originally due November 30, 2025, was extended to November 30, 2026, and in the third quarter of 2026, was further extended to November 30, 2027. On October 16, 2025, we executed a second agreement to borrow up to 150,000 pounds of U3O8 from the same counterparty with similar provisions, except that the Company is required to post a minimum deposit of $25 per pound on any pounds borrowed. No minimum has been borrowed under the second agreement. If uranium is borrowed under the second agreement, the loan will be due November 30, 2027.

On December 1, 2024, the Company exercised the option to borrow 250,000 pounds, which were subsequently sold into a uranium sales agreement, and posted the minimum $15 per pound deposit. An additional $5 per pound deposit was posted in July 2026. The Company can return borrowed uranium at any time with 30 days’ notice without penalty and with the right to re-borrow the uranium before the termination of the loan. Upon return of borrowed uranium, the counterparty will refund the respective posted deposits to the Company. The loan value was recorded at $81.55 per pound as of December 31, 2025. As of September 30, 2026, the loan value was adjusted to $89.63 per pound, resulting in mark-to-market losses of $1.2 million and $2.0 million, for the three and nine months ended September 30, 2026, respectively.

18

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

The following table summarizes the Company’s inventory derivative obligation as of September 30, 2026 and December 31, 2025.

​

​

​

​

Inventory Derivative Obligation

September 30, 2026

December 31, 2025

​

​

​

Uranium inventory loan fair value, gross

22,408

20,388

Uranium inventory loan deposit

(5,000)

(3,750)

Inventory loan fair value, net

17,408

16,638

​

​

14.  Long-Term Debt

​

Convertible Notes

On December 15, 2025, the Company issued $120.0 million aggregate principal amount of Convertible Senior Notes (the “Convertible Notes”). The Convertible Notes bear interest at a rate of 4.75% annually, payable semiannually in arrears, beginning July 15, 2026, and mature on January 15, 2031. The initial conversion rate for the Convertible Notes is 576.7013 shares per $1,000 principal amount of Convertible Notes, which represents an initial conversion price of approximately $1.73 per common share, and is subject to adjustment upon the occurrence of certain specified events as set forth in the indenture governing the Convertible Notes. Upon conversion, the Company will pay or deliver, as applicable, cash, common shares, or a combination of cash and common shares. The Convertible Notes’ components as of September 30, 2026 and December 31, 2025, were as follows:

​

​

​

​

​

​

Convertible Senior Notes due January 2031

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Notes issued at face value

​

120,000

​

120,000

​

​

​

​

​

Unamortized debt discount

​

(44,135)

​

(48,375)

Unamortized debt issuance costs (debt discount)

​

(4,697)

​

(5,204)

​

​

​

​

​

Long-term debt, net

​

71,168

​

66,421

​

Carrying value and fair value information for the Convertible Notes from December 31, 2025 to September 30, 2026 is presented below:

​

​

​

​

​

​

​

​

Convertible Senior Notes due January 2031

​

Carrying Value

​

Fair Value (1)

​

Valuation Level

​

​

​

​

​

​

​

Balance, December 31, 2025

​

66,421

​

137,672

​

Level 3

​

​

​

​

​

​

​

Amortization of debt discount

​

5,028

​

​

​

​

Foreign exchange loss (gain)

​

(281)

​

​

​

​

​

​

​

​

​

​

​

Balance, September 30, 2026

​

71,168

​

118,333

​

Level 3

​

​

​

​

​

​

​

(1)The reported fair value of Convertible Notes relates to the entire debt instrument inclusive of the fair value associated with the related Conversion Option Derivative that has been bifurcated and accounted for separately. Refer to note 15 for fair value information related to the Conversion Option Derivative.

The Conversion Option Derivative (see note 15) is treated as a debt discount, and its initial issuance fair value amount is amortized to interest expense with an increase to the Convertible Notes’ carrying amount over its five-year term.

19

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

Using Level 3 inputs of the fair value hierarchy under US GAAP, the Conversion Option Derivative is measured and recorded at fair value using a binomial lattice model which utilizes a debt host (without) methodology.

For the nine months ended September 30, 2026, the Company recognized Convertible Notes’ interest expense associated with the 4.75% coupon of $4.3 million and amortization of debt discount, inclusive of debt issuance cost amortization of $5.0 million, which are recorded as interest expense in the consolidated statements of operations and comprehensive loss. A $3.3 million coupon interest payment was made in July 2026. The effective interest rate on the Convertible Notes is 18.6%.

​

15.

Conversion Option Derivative

The Company’s functional currency is the Canadian dollar, and as discussed in note 14, the Convertible Notes’ conversion price is approximately $1.73 per common share. Because the conversion option is priced in U.S. dollars, relative to the Company’s functional currency, US GAAP requires the embedded conversion option to be bifurcated and accounted for as a stand-alone derivative instrument (the “Conversion Option Derivative”). The Conversion Option Derivative is recorded at fair value on the Company’s consolidated balance sheets and mark-to-market changes in fair value are recorded in earnings.

The fair value of the Conversion Option Derivative liability was $33.2 million and $52.3 million as of the September 30, 2026 and December 31, 2025, respectively, which resulted in mark-to-market gains of $15.4 million and $19.0 million for the three and nine months ended September 30, 2026, respectively.

Fair value was determined using a binomial lattice model utilizing Level 3 inputs of the fair value hierarchy under US GAAP with the following assumptions:

​

​

​

​

​

​

Conversion Option Derivative Fair Value Model Assumptions

​

September 30, 2026

​

December 31, 2025

​

​

​

​

​

Expected life (years)

​

4.3

​

5.0

Volatility

​

60.0%

​

60.0%

Risk free rate

​

5.0%

​

3.7%

Expected dividend rate

​

—%

​

—%

Exercise price

​

$ 1.73

​

$ 1.73

Market price

​

$ 1.08

​

$ 1.39

​

​

​

​

16.

Warrant Liability

In February 2023, the Company issued 39,100,000 warrants to purchase 19,550,000 common shares at $1.50 per whole common share for a term of three years.

The Company’s functional currency is the Canadian dollar, and because the warrants are priced in U.S. dollars, a derivative financial liability was created (the “Warrant Liability”). The Warrant Liability is recorded at fair value on the Company’s consolidated balance sheets and mark-to-market adjustments in fair value are recorded in earnings. Using Level 2 inputs of the fair value hierarchy under US GAAP, the liability created is measured and recorded at fair value using the Black-Scholes model as there is no active market for the warrants.

20

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

Activity with respect to the warrant liabilities is presented in the following table:

​

​

​

​

​

​

​

​

Feb-2023

​

​

Warrant Liability Activity

​

Warrants

​

Total

​

​

​

​

​

December 31, 2025

​

1,541

​

1,541

​

​

​

​

​

Warrants issued

​

—

​

—

Warrants exercised

​

(4,336)

​

(4,336)

Warrants expired

​

(1)

​

(1)

Warrant liability revaluation loss (gain)

​

2,780

​

2,780

Effects of foreign exchange rate changes

​

16

​

16

​

​

​

​

​

September 30, 2026

​

—

​

—

​

There were no remaining warrants on September 30, 2026. The fair value of the warrant liabilities on December 31, 2025 was determined using the Black-Scholes model with the following assumptions:

​

​

​

​

Warrant Liability Assumptions

​

December 31, 2025

​

​

​

Expected life (years)

​

0.1

Volatility

​

58.2%

Risk free rate

​

2.6%

Expected dividend rate

​

—%

Exercise price

​

$ 1.50

Market price

​

$ 1.39

​

D

​

17.

Asset Retirement Obligations

Asset retirement obligations (“ARO”) relate to the Lost Creek mine and Shirley Basin project and are equal to the current estimated reclamation cost escalated at inflation rates ranging from 0.74% to 5.20% and then discounted at credit-adjusted, risk-free rates ranging from 0.33% to 9.61%. Current estimated reclamation costs include costs of closure, reclamation, demolition and stabilization of the wellfields, processing plants, infrastructure, aquifer restoration, waste dumps, and ongoing post-closure environmental monitoring and maintenance costs. The schedule of payments required to settle the future reclamation extends through 2040.

The present value of the estimated future closure estimate is presented in the following table:

​

​

​

​

Asset Retirement Obligation Activity

​

Total

​

​

​

December 31, 2025

​

44,474

​

​

​

Change in estimated asset retirement costs

​

6,234

Accretion expense

​

1,466

​

​

​

September 30, 2026

​

52,174

​

The restricted cash and cash equivalents discussed in note 7 relate to the surety bonds provided to the governmental agencies for these and other reclamation obligations.

​

​

21

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

18.

Shareholders’ Equity and Capital Stock

Common shares

The Company’s share capital consists of an unlimited amount of Class A preferred shares authorized, without par value, of which no shares are issued and outstanding; and an unlimited amount of common shares authorized, without par value, of which 398,741,181 shares and 378,169,709 shares were issued and outstanding as of September 30, 2026 and December 31, 2025, respectively.

Stock options

In 2005, the Company’s Board of Directors approved the adoption of the Company’s stock option plan (the “Option Plan”). The Option Plan was most recently approved by the shareholders on June 4, 2026. Eligible participants under the Option Plan include directors, officers, employees, and consultants of the Company. All options currently outstanding vest over a three-year period: one-third on the first anniversary, one-third on the second anniversary, and one-third on the third anniversary of the grant. The Company uses the straight-line method when recognizing stock option compensation. The options currently outstanding expire five years after the dates they were granted.

Activity with respect to stock options outstanding is summarized as follows:

​

​

​

​

​

​

​

​

Outstanding

​

Weighted-average

​

​

Options

​

Exercise Price

Stock Option Activity

​

#

​

$

​

​

​

​

​

December 31, 2025

​

8,883,608

​

1.31

​

​

​

​

​

Granted

​

120,000

​

1.65

Exercised

​

(1,441,473)

​

1.06

Forfeited

​

(146,259)

​

1.42

Expired

​

(19,250)

​

1.48

​

​

​

​

​

September 30, 2026

​

7,396,626

​

1.36

​

The exercise price of a new grant is set at the closing price for the shares on the Toronto Stock Exchange (TSX) on the trading day immediately preceding the grant date, and there is no intrinsic value as of the date of grant.

The total intrinsic value of options exercised was $0.7 million and $1.0 million in the nine months ended September 30, 2026 and 2025, respectively.

We received $1.5 million and $0.5 million from options exercised in the nine months ended September 30, 2026 and 2025, respectively.

Stock-based compensation expense from stock options for the nine months ended September 30, 2026 and 2025 was $1.2 million and $0.8 million, respectively.

As of September 30, 2026, there was approximately $2.1 million of unamortized stock-based compensation expense related to the Option Plan. The expenses are expected to be recognized over the remaining weighted-average vesting period of 1.9 years under the Option Plan.

22

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

As of September 30, 2026, outstanding stock options were as follows (expressed in U.S. dollars):

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Options Outstanding

​

Options Exercisable

​

​

Weighted-

​

​

​

Weighted-

​

​

​

​

​

Weighted-

​

​

​

​

average

​

​

​

average

​

Aggregate

​

​

​

average

​

Aggregate

​

​

exercise

​

Number

​

remaining

​

intrinsic

​

Number

​

remaining

​

intrinsic

​

​

Price

​

of options

​

contractual

​

value

​

of options

​

contractual

​

value

​

​

$

​

#

​

life (years)

​

$

​

#

​

life (years)

​

$

​

Expiry

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

1.57

​

175,000

​

0.5

​

—

​

175,000

​

0.5

​

—

​

2027-03-14

1.09

​

1,019,830

​

1.3

​

—

​

1,019,830

​

1.3

​

—

​

2028-01-04

1.45

​

994,811

​

2.2

​

—

​

656,176

​

2.2

​

—

​

2028-12-07

1.73

​

500,000

​

2.6

​

—

​

333,332

​

2.6

​

—

​

2029-05-08

1.24

​

1,792,043

​

3.2

​

—

​

568,107

​

3.2

​

—

​

2029-12-12

1.21

​

175,000

​

3.9

​

—

​

58,333

​

3.9

​

—

​

2030-08-07

1.47

​

120,000

​

4.0

​

—

​

40,000

​

4.0

​

—

​

2030-09-19

1.42

​

2,499,942

​

4.2

​

—

​

—

​

—

​

—

​

2030-12-22

1.61

​

120,000

​

4.3

​

—

​

—

​

—

​

—

​

2031-01-12

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

1.36

​

7,396,626

​

3.1

​

—

​

2,850,778

​

2.1

​

—

​

​

​

The aggregate intrinsic value of options outstanding and options exercisable is calculated as the difference between the exercise price of the underlying options and the fair value of the Company’s shares. The aggregate intrinsic value of the options in the preceding table represents the total pre-tax intrinsic value for stock options, with an exercise price less than the Company’s TSX closing stock price of CAD$1.56 (approximately US$1.08) as of the last trading day in the period ended September 30, 2026, that would have been received by the option holders had they exercised their options on that date. There were no in-the-money stock options outstanding and no in-the-money stock options exercisable as of September 30, 2026.

​

The fair value of the options on their respective grant dates was determined using the Black-Scholes model.

Liability-classified stock options

Activity with respect to liability-classified stock options outstanding is summarized as follows:

​

​

​

​

Liability-classified Stock Option Activity

​

Total

​

​

​

December 31, 2025

​

1,346

​

​

​

Stock compensation expense as adjusted

​

766

Options exercised

​

(421)

Options forfeited

​

(7)

Foreign exchange adjustments

​

(68)

Increase (decrease) in liability due to fair value recalculations

​

(757)

​

​

​

September 30, 2026

​

859

​

23

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

The fair value of the liability-classified options as at September 30, 2026 was determined using the Black-Scholes model with the following assumptions:

​

​

​

​

Black-Scholes assumptions

​

September 30, 2026

​

​

​

Expected life (years)

 

0.2 - 3.4

Volatility

 

60.7% -70.0%

Risk free rate

​

3.3% -3.5%

Expected dividend rate

​

—%

Exercise price (CAD$)

​

$1.53 - $2.46

Market price (CAD$)

​

$ 1.56

​

Restricted share units

On June 24, 2010, the Company’s shareholders approved the adoption of the Company’s restricted share unit plan (the “RSU Plan”). Amendments to the RSU Plan were approved by our shareholders on June 3, 2021, and the plan is now known as the Amended and Restated Restricted Share Unit and Equity Incentive Plan (the “RSU&EI Plan”). The RSU&EI Plan was approved most recently by our shareholders on June 5, 2025.

Eligible participants under the RSU&EI Plan include directors and employees of the Company. Outstanding RSUs are redeemable on the second anniversary of the grant. Upon an RSU redemption, the holder of the RSU will receive one common share, for no additional consideration, for each RSU held.

Activity with respect to RSUs outstanding is summarized as follows:

​

​

​

​

​

​

​

  ​ ​ ​

​

  ​ ​ ​

Weighted-average

​

​

Outstanding

​

grant date

​

​

RSUs

​

fair value

Restricted Share Unit Activity

​

#

​

$

​

​

​

​

​

December 31, 2025

​

1,127,706

​

1.38

​

​

​

​

​

Redeemed

​

(31,359)

​

1.39

Forfeited

​

(6,571)

​

1.41

​

​

​

​

​

September 30, 2026

​

1,089,776

​

1.38

​

Stock-based compensation expense from RSUs for the nine months ended September 30, 2026 and 2025 was $0.6 million and $0.4 million, respectively.

The total fair value of vested RSUs was zero for the nine months ended September 30, 2026.

As of September 30, 2026, there was approximately $0.6 million of unamortized stock-based compensation expense related to the RSU&EI Plan. The expenses are expected to be recognized over the remaining weighted-average vesting periods of 1.1 years under the RSU&EI Plan.

24

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

As of September 30, 2026, outstanding RSUs were as follows (expressed in U.S. dollars):

​

​

​

​

​

​

​

RSUs Outstanding

​

​

Weighted-

​

​

​

​

​

​

Average

​

Aggregate

​

​

Number

​

Remaining

​

Fair

​

​

of RSUs

​

contractual

​

Value

​

Vesting

#

​

life (years)

​

$

​

Date

​

​

​

​

​

​

​

464,782

​

0.2

​

501,965

​

2026-12-12

624,994

​

1.2

​

674,994

​

2027-12-22

1,089,776

​

0.8

​

1,176,959

​

​

​

The fair value of restricted share units on their respective grant dates is determined using the respective grant dates’ fair value of common shares. There were no restricted share units granted in the nine months ended September 30, 2026.

Warrants

In February 2023, the Company issued 39,100,000 warrants to purchase 19,550,000 of our common shares at $1.50 per full share.

Activity with respect to warrants is summarized as follows:

​

​

​

​

​

​

​

​

​

  ​ ​ ​

​

  ​ ​ ​

Number of

  ​ ​ ​

Weighted-

​

​

​

​

shares to

​

Average

​

​

Outstanding

​

be issued

​

exercise price

​

​

Warrants

​

upon exercise

​

per common share

Warrant Activity

​

#

​

#

​

$

​

​

​

​

​

​

​

December 31, 2025

​

38,273,500

​

19,136,750

​

1.50

​

​

​

​

​

​

​

Exercised

​

(38,259,998)

​

(19,129,999)

​

1.50

Expired

​

(13,502)

​

(6,751)

​

1.50

​

​

​

​

​

​

​

September 30, 2026

​

—

​

—

​

—

​

There were no remaining warrants on September 30, 2026.

​

The fair value of the warrants on their issue date was determined using the Black-Scholes model. There were no warrants issued in the nine months ended September 30, 2026.

Fair value calculation assumptions for stock options and restricted share units

The Company estimates expected future volatility based on daily historical trading data of the Company’s common shares. The risk-free interest rates are determined by reference to Canadian Benchmark Bond Yield rates with maturities that approximate the expected life. The Company has never paid dividends and currently has no plans to do so. Forfeitures and expected lives were estimated based on actual historical experience.

​

25

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

19.

Sales

Revenue is primarily derived from the sale of U3O8 under multi-year agreements or spot sales agreements. The Company also receives disposal fee revenues, which are not related to the sale of U3O8.

From time to time and to enhance our ability to satisfy and manage current or future delivery commitments, we may enter into third-party transactions to defer deliveries of U3O8 into future years. During the nine months ended September 30, 2026, the Company entered into transactions to defer delivery of 150,000 pounds from 2026 to 2027, and 150,000 pounds from 2026 to 2029. The Company posted refundable cash collateral deposits for each of these transactions of $4.1 million and $4.2 million, respectively, which are classified in the Company’s consolidated balance sheets within current assets and non-current assets, respectively.

Subsequent to September 30, 2026, the Company entered into a transaction to defer delivery of 300,000 pounds from 2026 to 2029. The Company posted a refundable cash collateral deposit for this transaction of $9.0 million.

Revenues for the three and nine months ended September 30, 2026 and 2025, were as follows:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Three months ended

​

Nine months ended

​

​

September 30,

​

September 30,

​

​

2026

​

2025

​

2026

​

2025

Revenue Summary

​

Amount

​

%

​

Amount

​

%

​

Amount

​

%

​

Amount

​

%

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Customer A

​

—

​

0.0%

​

—

​

0.0%

​

10,692

​

34.8%

​

10,428

​

62.2%

Customer B

​

4,078

​

32.8%

​

—

​

0.0%

​

7,982

​

26.0%

​

—

​

0.0%

Customer C

​

6,506

​

52.3%

​

6,323

​

100.0%

​

6,506

​

21.2%

​

6,323

​

37.7%

Customer D

​

—

​

0.0%

​

—

​

0.0%

​

3,681

​

12.0%

​

—

​

0.0%

Customer E

​

1,756

​

14.1%

​

—

​

0.0%

​

1,756

​

5.7%

​

—

​

0.0%

U3O8 sales

​

12,340

​

99.2%

​

6,323

​

100.0%

​

30,617

​

99.7%

​

16,751

​

99.9%

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Disposal fees

​

93

​

0.8%

​

—

​

0.0%

​

120

​

0.3%

​

7

​

0.1%

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

12,433

​

100.0%

​

6,323

​

100.0%

​

30,737

​

100.0%

​

16,758

​

100.0%

​

​

​

​

​

​

20.

Cost of Sales

Cost of sales includes ad valorem and severance taxes related to the extraction of uranium, all costs of wellfield and plant operations including the related depreciation and amortization of capitalized assets, asset retirement costs, and mineral property costs, plus product distribution costs. These costs are also used to value inventory. The resulting inventoried cost per pound is compared to the NRV of the product, which is based on the estimated sales price of the product, net of any necessary costs to finish the product. Any inventory value in excess of the NRV is charged to cost of sales.

Cost of sales consists of the following:

​

​

​

​

​

​

​

​

​

​

​

​

Three months ended

​

Nine months ended

​

​

September 30,

​

September 30,

Cost of Sales

​

2026

​

2025

​

2026

​

2025

​

​

​

​

​

​

​

​

​

U3O8 product costs

​

13,308

​

7,063

​

28,321

​

15,460

Lower of cost or NRV adjustments

​

471

​

—

​

624

​

2,696

​

​

13,779

​

7,063

​

28,945

​

18,156

​

​

​

26

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

​

21.

Operating Costs

Operating expenses include exploration and evaluation expense, development expense, general and administration (“G&A”) expense, and accretion. Exploration and evaluation expenses consist of labor and the associated costs of the exploration and evaluation departments as well as land holding and exploration costs, including drilling and analysis on properties which have not reached the permitting or operations stage. Development expenses relate to properties that have reached the permitting or operations stage and include costs associated with exploring, delineating, and permitting a property. Once permitted, development expenses also include the costs associated with the construction and development of the permitted property that are otherwise not eligible to be capitalized. G&A expenses relate to the administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs.

Operating costs consist of the following:

​

​

​

​

​

​

​

​

​

​

​

​

Three months ended

​

Nine Months Ended

​

​

September 30,

​

September 30,

Operating Costs

​

2026

​

2025

​

2026

​

2025

​

​

​

​

​

​

​

​

​

Exploration and evaluation

​

1,153

​

1,477

​

4,623

​

3,682

Development

​

21,569

​

14,379

​

52,455

​

38,184

General and administration

​

2,435

​

2,871

​

9,070

​

7,243

Accretion of asset retirement obligations

​

550

​

344

​

1,466

​

902

​

​

25,707

​

19,071

​

67,614

​

50,011

​

​

​

​

​

22.

Supplemental Information for Statements of Cash Flows

Cash and cash equivalents and restricted cash and cash equivalents with the consolidated statements of cash flows consist of the following:

​

​

​

​

​

​

Cash and Cash Equivalents, and Restricted Cash and Cash Equivalents

​

September 30, 2026

​

September 30, 2025

​

​

​

​

​

Cash and cash equivalents

​

50,165

​

52,033

Restricted cash and cash equivalents

​

12,994

​

11,373

​

​

63,159

​

63,406

Drill rigs converted from capital assets to leases receivable are non-cash transactions.

​

​

​

​

​

​

Non-cash Operating Activity

​

September 30, 2026

​

September 30, 2025

​

​

​

​

​

Drill rigs converted from capital assets to leases receivable

​

—

​

1,620

​

The increases in reclamation costs were a non-cash transaction.

​

​

​

​

​

​

Non-cash Investing Activity

​

September 30, 2026

​

September 30, 2025

​

​

​

​

​

Capital assets included in payables at period end

​

4,184

​

1,510

Capitalized interest

​

2,519

​

—

Additional equipment financing incurred

​

616

​

1,625

Change in estimated reclamation costs on mineral properties

​

6,234

​

2,710

​

27

Table of Contents

​

Ur-Energy Inc.

Notes to Condensed Consolidated Financial Statements (Unaudited)

September 30, 2026

(expressed in thousands of U.S. dollars, except share data)

Interest expense paid in cash was $4.6 million and $0.9 million for the nine months ended September 30, 2026 and 2025, respectively. As discussed in note 14, interest expense associated with the Convertible Notes’ debt discount amortization of $5.0 million for the nine months ended September 30, 2026 is non-cash in nature. Further, accrued interest expense associated with the 4.75% coupon of $1.2 million is non-cash in nature and included within accounts payable as of September 30, 2026.

​

​

​

​

​

​

Cash and Non-cash Interest Expense

​

September 30, 2026

​

September 30, 2025

​

​

​

​

​

Cash interest expense

​

4,558

​

920

Non-cash interest expense

​

5,978

​

—

Capitalized interest on construction

​

(2,519)

​

—

​

​

​

​

​

​

​

8,017

​

920

​

​

23.

Financial Instruments

The Company’s financial instruments consist of cash and cash equivalents, marketable securities, trade receivables, lease receivables, restricted cash and cash equivalents, the Capped Call Derivative, accounts payable and accrued liabilities, lease liabilities, the inventory derivative obligation, and the Conversion Option Derivative. The Company is exposed to risks related to changes in interest rates, counterparty credit risk, and management of cash and cash equivalents.

Credit risk

Financial instruments that potentially subject the Company to concentrations of credit risk consist of cash and cash equivalents and restricted cash and cash equivalents. These assets include Canadian dollar and U.S. dollar denominated certificates of deposit, money market accounts, and demand deposits. These instruments are maintained at financial institutions in Canada and the U.S. Of the amount held on deposit, approximately $25.5 million is covered by the Canada Deposit Insurance Corporation, the Securities Investor Protection Corporation, or the U.S. Federal Deposit Insurance Corporation, leaving approximately $37.6 million at risk on September 30, 2026, if the financial institutions with which these amounts are invested are rendered insolvent. The Company’s marketable securities and Capped Call Derivative also potentially subject the Company to concentrations of credit risk. The Company does not consider any of its financial assets to be impaired as of September 30, 2026.

​

​

28

Table of Contents

Item 2. MANAGEMENT’S DISCUSSION AND ANALYSIS OF FINANCIAL CONDITION AND RESULTS OF OPERATION

The following discussion and analysis by management is designed to provide information that we believe is necessary for an understanding of our financial condition, changes in financial condition, and results of our operations and should be read in conjunction with the audited financial statements and MD&A contained in our Annual Report on Form 10-K for the year ended December 31, 2025.

Business Overview

Incorporated on March 22, 2004, Ur-Energy is an exploration stage issuer, as that term is defined by the U.S. Securities and Exchange Commission (“SEC”), with its corporate headquarters in Casper, Wyoming. We are engaged in uranium recovery and processing activities, including the acquisition, exploration, development, and operation of uranium mineral properties in the U.S. We are operating our Lost Creek Project, our flagship in situ recovery (“ISR”) mining facility, and our Shirley Basin Project, our second ISR uranium mine. When sold and further processed, our uranium production fuels nuclear power, which is a cost-effective, safe, and reliable source of electrical power that provides more than 40% of carbon-free electricity and the vast majority of carbon-free baseload electricity in the U.S.

Ur-Energy is a corporation continued under the Canada Business Corporations Act on August 8, 2006. Our common shares are listed on the NYSE American under the symbol “URG” and on the TSX under the symbol “URE.” Our corporate structure and material U.S. subsidiaries remain unchanged since the filing of our Annual Report.

We utilize ISR to recover uranium at our Lost Creek Property and Shirley Basin Project, which are both located in Wyoming and are the only two mineral properties that we currently deem to be individually material. The ISR technique is employed in uranium extraction because it allows for an effective recovery of roll front uranium mineralization at a low cost.

At Lost Creek, we extract and process uranium oxide (“U3O8”) at the Lost Creek processing plant, which includes all circuits for processing, drying, and drumming. After drumming, U3O8 is shipped to a third-party conversion facility to be weighed, assayed, and stored until sold.

Our second ISR operation in Wyoming, Shirley Basin is a satellite mine and facility, with U3O8 extracted and captured at Shirley Basin transported to Lost Creek for processing, drying, and drumming. We commenced initial operations to extract and capture U3O8 at Shirley Basin in April 2026 and commenced transporting U3O8 from Shirley Basin to Lost Creek for processing in August 2026. Although Shirley Basin is currently operated as a satellite facility, we have the licensed capacity to construct a full processing plant at Shirley Basin to process U3O8 that we may extract and capture at our properties or to toll process for other producers as may be dictated by future market conditions.

Our combined licensed capacity at Lost Creek and Shirley Basin totals 4.2 million pounds of U3O8 per year. We currently have multi-year sales agreements with 12 global nuclear energy and trading companies with base delivery commitments of 6.4 million pounds of U3O8 from 2026 through 2033, including pounds that we delivered in the first three quarters of 2026.

Industry and Market Update

Energy-security and national-security priorities, together with federal and state policy initiatives, continued to support the nuclear industry and domestic uranium production during the third quarter of 2026. Developments during the period included regulatory reforms affecting uranium recovery, restrictions on Russian nuclear fuel, potential new federal demand for U.S.-origin uranium, and progress on reactor construction, restarts, and domestic enrichment.

Electricity demand growth, especially related to artificial intelligence and data centers, remains a significant factor supporting interest in nuclear energy as a source of reliable, baseload, low-carbon power. The most recent projections of the International Atomic Energy Agency are that global nuclear capacity could more than double by 2050, and the World Nuclear Association has called for nuclear power generation to triple by 2050.

29

Table of Contents

Federal nuclear regulatory policy continued to be shaped by the ADVANCE Act of 2024 and four nuclear-related Executive Orders (“EOs”) issued on May 23, 2025, including EO 14300, which directs the U.S. Nuclear Regulatory Commission (“NRC”) to revise its regulations to support expanded U.S. nuclear generating capacity. During the third quarter of 2026, the NRC advanced several proposed rules under EO 14300 that could affect the Company.

The most consequential of these for the ISR industry, “In-situ Recovery Monitoring and Decommissioning Timeliness,” was published by the NRC on September 10, 2026. It would codify risk-informed groundwater protection standards for ISR facilities and provide more flexibility in decommissioning timelines, including site-specific extensions. The Company played a leading role in preparing industry comments, which were submitted before the comment period closed on October 13, 2026. The NRC has targeted March 2027 to issue the final rule. Public comment periods also closed during the third quarter on proposed rules to overhaul the NRC’s National Environmental Policy Act regulations to streamline environmental reviews and to modernize the NRC’s radiation-protection standards under 10 CFR Part 20. The NRC expects to issue both final rules in February 2027.

Wyoming is an NRC Agreement State and administers licenses for the Company’s uranium recovery facilities through its Uranium Recovery Program (“URP”). Some NRC rule changes may require corresponding state action, while others may have limited direct effect on the Company. The effects of the proposed ISR rule cannot be determined until the NRC issues a final rule and Wyoming determines what corresponding changes to the URP are required.

Federal policy also continued to focus on reducing reliance on Russian nuclear fuel. On September 18, 2026, the President signed the Sanctioning Russia and Iran Act of 2026, which directs implementation of existing restrictions on Russian uranium imports and requires sanctions on the leadership of Rosatom beginning January 1, 2028, when existing waivers permitting imports of Russian low-enriched uranium must end.

During the quarter, the National Nuclear Security Administration issued a request for information (“RFI”) to evaluate domestic sources of unobligated U.S.-origin uranium and conversion services, identifying a potential requirement of approximately four million pounds of U₃O₈ per year beginning as early as 2030, roughly twice total U.S. production in 2025. In addition, on August 26, 2026, the U.S. Army selected five companies to build microreactors at military installations, which may require fuel made from unobligated U.S.-origin uranium. Although an RFI is not a commitment to purchase, these potential sources of federal government demand could widen the gap between demand and domestic supply and support higher long-term price premiums for domestic uranium.

Broader industry developments during the quarter included the NRC’s issuance of a construction permit to the Tennessee Valley Authority for the first commercial small modular reactor in the United States, Holtec’s commencement of fuel loading at the Palisades plant in Michigan, the U.S. Department of Energy’s closing of a loan of up to $1.9 billion to support the restart of NextEra Energy’s Duane Arnold plant in Iowa, and General Matter’s submission of an NRC license application for a uranium-enrichment facility in Paducah, Kentucky.

Although many of these initiatives remain in proposed or early stages, and their timing, final form, and ultimate effect on the Company cannot be predicted with certainty, they collectively reflect a sustained commitment to nuclear energy and domestic fuel-supply security that the Company believes strengthens the long-term demand outlook for domestic uranium production.

Lost Creek

​

During the third quarter of 2026 at Lost Creek, we drummed 103,487 pounds of U₃O₈ and shipped 73,987 pounds of U₃O₈ to the conversion facility.

We operated a total of 18 header houses (“HHs”) at Lost Creek during the quarter, including 12 HHs (HH 2-4 through HH 2-15) in our second mine unit (“MU2”) and six HHs (HH 1-14 through HH 1-19) in the second phase of our first mine unit (“MU1 Phase 2”). All these MU1 Phase 2 HHs were brought online in 2026, including two in each of the first three quarters.

Production at Lost Creek was less than expected during the third quarter of 2026 due to factors that impacted production grade and flow rates. Although we expected the average production grade from wells in MU2 to decrease because the HHs

30

Table of Contents

are now in the latter part of their production curve, for the reasons described below, we were unable to offset that decrease as expected by continuing to add HHs in MU1 Phase 2, increasing flow rates by bringing a sand filtration system online, and other process improvements.

Production grades are expected to vary from quarter to quarter as we move through mine units, and average production grades in Lost Creek mine units, including MU1 and MU2, have generally outperformed our estimates in total. However, production grades of wells in MU1 Phase 2 during the third quarter were mixed, with lower than expected grades in certain patterns due to greater than expected impacts of previous mining in the first phase of MU1.

Average production grades are expected to increase as we move into new mine units that have not previously been subject to ISR operations, including mine unit five (“MU5”), which is our next planned mine unit.

In addition to completing construction and installation of HHs 1-18 and 1-19 and substantially completing installation of the 257 production and injection wells planned for the remaining four HHs (HH 1-20 through HH 1-23) in MU1 Phase 2, wellfield development and surface construction at Lost Creek in the third quarter of 2026 focused on pattern planning and drilling in MU5, along with delineation drilling in mine unit four (“MU4”). At September 30, 2026, approximately 88% of the production and injection wells in the first HH in MU5 (HH 5-1) had been drilled and cased and approximately 14% had been completed, and we had 19 drill rigs on site supporting well installation, delineation drilling, and other drilling operations.

As previously disclosed, during the first quarter of 2026, we received approval of an amended aquifer exemption for Lost Creek that covered MU5 and substantially expanded the scope of the exemption. During the third quarter of 2026, we completed hydrologic testing and the compilation of other data for the regulatory approval package for the first phase of MU5, which we submitted to the Wyoming Department of Environmental Quality (“WDEQ”) in September 2026.

Production flow rates at Lost Creek increased during the third quarter of 2026, but less than expected, from an average of 2,519 gallons per minute (“gpm”) in the second quarter of 2026 to 3,181 gpm in the third quarter of 2026.

As previously disclosed, production flow to the plant has been negatively affected by the introduction of fine particles (“fines”) from the host formation into the plant. To mitigate these fines, we installed a sand filtration system in the second quarter of 2026 that was commissioned and began operation in July 2026. The filtration system has been effective in decreasing fines and increasing production flow rates, but our ability to utilize the system effectively was impacted more than we expected by constraints in our capacity to manage wastewater generated when backflushing the filtration system. Overall wastewater disposal was partially impacted by the inability to operate wells to receive the clean water component of the wastewater due to unexpected maintenance and testing of wastewater treatment equipment. Flow rate capacity at Lost Creek was also impacted during the quarter by unplanned maintenance to the elution and ion exchange (“IX”) systems at the plant, which was also related to fines from the formation.

During the third quarter of 2026, we continued to advance longer-term solutions to manage wastewater at Lost Creek and increase flow rates. For the wastewater treatment facility that is under construction at Lost Creek, we completed excavation, grading, and the exterior concrete foundation, began erection of the building, and continued to procure internal equipment components during the quarter. We also continued to advance improvements to the reverse osmosis (“RO”) system in the plant and submitted a data package requested by the federal Bureau of Land Management (“BLM”) for its approval for the Company to conduct surface discharge of non-hazardous wastewater, which has already been approved by the WDEQ.

Earlier in 2026, we engaged a contractor to evaluate short and long term required maintenance activities and develop a clearly defined maintenance program to better prevent unexpected maintenance. In September 2026, the contractor completed its evaluation and provided its recommendations.

​

Shirley Basin

​

Because Shirley Basin is operated as a satellite facility, with U₃O₈ captured at Shirley Basin transported to Lost Creek for processing, drying, and drumming, the drummed and shipped pounds of U₃O₈ from Shirley Basin are included in drummed and shipped pounds at Lost Creek above.

31

Table of Contents

As previously disclosed, we brought the first HH at Shirley Basin (HH 1-1) online and commenced initial operations to extract and capture U₃O₈ at Shirley Basin in April 2026. We made our first shipment of U₃O₈ captured in the Shirley Basin satellite plant to Lost Creek for processing in August 2026.

The ramp up of production operations at Shirley Basin and optimization of the transfer system from Shirley Basin to Lost Creek proceeded slower than expected during the third quarter of 2026. We captured 25,330 pounds of U₃O₈ at Shirley Basin to build base in-circuit inventory during the second and third quarters of 2026, including 14,697 pounds during the third quarter. We shipped 9,379 pounds of U₃O₈ from Shirley Basin to Lost Creek for processing during the third quarter.

Production activity at Shirley Basin during the third quarter was limited to a small area of MU1, consisting of 158 injection and production wells, to improve operating parameters associated with the early ramp up and optimization of ISR operations at the newly commissioned mine, including gravel packing, screen-slot sizing, optimization of lixiviant chemistry, and the workover of wells, where necessary.

Production during the third quarter from Shirley Basin was also affected by factors that limited the pounds of U₃O₈ captured that could be processed at Lost Creek, including unexpected modifications needed at Lost Creek to efficiently unload unprocessed uranium from Shirley Basin; the need to procure temporary trailer solutions due to significant manufacturer delays in delivering specialty trailers to transport uranium from Shirley Basin to Lost Creek; and the unplanned maintenance to the elution and IX systems at the Lost Creek plant discussed above.

During the third quarter at Shirley Basin, we advanced wellfield drilling and installation of wells for nine additional HHs in MU1 (HH 1-3 through HH 1-11). At September 30, 2026, of the 696 production and injection wells planned for these HHs, approximately 94% had been drilled, approximately 65% had been cased, and approximately 58% had been completed; substantially all work was complete for the installation of HH 1-3 other than pipeline connections to the plant; the main pipeline was complete to HH 1-4; and we had eight drill rigs on site supporting drilling, casing, and completion work. We also substantially completed the remaining plant construction activities that were not essential for production operations, including interior offices and most instrumentation.

​

Exploration Programs

​

Lost Soldier

We renewed exploration activities in the Great Divide Basin (“GDB”), Wyoming in the third quarter of 2025, beginning with our Lost Solider Project. Located approximately 17 road miles northeast of Lost Creek, Lost Soldier has the potential to be developed as a satellite operation. Although the geology of the project is largely understood with the benefit of data from approximately 4,000 historical drill holes, additional hydrogeologic data gathering and characterization are underway to enable us to better plan for potential permitting and development of the site.

​

During the third quarter of 2026, we completed pump testing of the last of three aquifer-test well clusters that we installed prior to the quarter and continued work on baseline environmental studies in anticipation of possible permitting of the project. We also significantly advanced work on a technical report for the project during the quarter.

​

Lost Creek South

The Lost Creek South Project totals approximately 16 square miles and is located immediately adjacent to the Lost Creek Project. Historical drilling on the Lost Creek South Project consisted of 488 drill holes. In 2010, we drilled 159 exploration holes (for a total of 101,950 feet) that confirmed numerous individual roll front systems occurring within several stratigraphic horizons correlative to mineralized horizons in the Lost Creek Project. A series of wide-spaced drill holes were also part of this exploration program which identified deep oxidation (alteration) that represents the potential for several additional roll front horizons.

​

During the third quarter of 2026, we carried out additional planning and preparation activities for a 120-hole exploration program at Lost Creek South, including the submission of a bond to the WDEQ to begin drilling activities.

​

32

Table of Contents

North Hadsell

In the fourth quarter of 2025, we began exploration drilling at our North Hadsell Project, also in the GDB north of Lost Creek. Through mid-March 2026, when seasonal sage grouse restrictions began, we had drilled 33 wide-spaced framework holes, each approximately 1,000 feet deep, for a total of 33,815 feet. Seven of these initial drill holes returned significant mineralization, indicating the presence of a stacked roll-front system containing 13 individual intercepts exceeding 0.20 GT (Grade (%eU3O8) times Thickness (ft)). These grades and thicknesses closely resemble the mineralization at Lost Creek, where the Company applies a 0.20 GT cut-off in evaluating economic mineral resources. Preliminary interpretation suggested the potential for up to eight individual roll fronts within a depth range of approximately 300 to 800 feet below surface, ideal for ISR mining, with indications of additional mineralized horizons at depth. During the third quarter of 2026, we completed all surface reclamation of all the disturbance from our previous drilling program at North Hadsell.

​

Research and Development

​

During the third quarter of 2026, the Company advanced several research and development initiatives. Notably, the Company received approval during the quarter of a Gateway for Accelerated Innovation in Nuclear (“GAIN”) technical collaboration award from the U.S. Department of Energy (“DOE”) for the Pacific Northwest National Laboratory (“PNNL”) to perform analysis of select groundwater restoration methods.

​

The DOE also approved a proposal during the third quarter for the Company to collaborate with PNNL to investigate the use of artificial intelligence to evaluate wellfield operations and better balance the wellfield to prevent excursions and improve recoveries.

​

In another project and industry first, various mine solutions at the Company’s Lost Creek plant were being tested during the third quarter utilizing experimental UVvis technology capable of continuously measuring uranium concentration. The measurement and testing are being conducted in collaboration with Los Alamos National Laboratory supported by DOE funding.

​

Casper Construction Shop and Lab

​

Our Casper, Wyoming construction shop supplies HHs to both Lost Creek and Shirley Basin. All our HHs are fabricated and built in Casper, allowing for efficiency, cost savings, and greater safety due to minimized travel requirements. Our Casper chemistry lab continued to support mine unit analysis at both Lost Creek and Shirley Basin through uranium analysis, product quality testing, and water sampling analysis. The lab staff also support ongoing research and development programs.

​

Sales Agreements

​

During the third quarter of 2026, we sold 190,000 pounds of U₃O₈ at an average price of $64.95 per pound, generating sales revenue of $12.3 million. At September 30, 2026, our finished inventory at the third-party conversion facility totaled 233,378 pounds of U₃O₈.

​

We currently have sales agreements with 12 global nuclear energy and uranium trading companies. During the third quarter of 2026, we entered into a sales agreement that calls for annual deliveries of 200,000 pounds of U₃O₈ in each of 2030, 2031, and 2032. As previously disclosed, during the third quarter we also entered into transactions to defer 2026 deliveries under sales contracts of 150,000 pounds of U₃O₈ to 2027 and 150,000 pounds to 2029. During the third quarter, we also amended the inventory loan under which we previously borrowed 250,000 pounds of U₃O₈ by extending the maturity date for repayment from November 2026 to November 2027.

​

After the additional deferral transaction described below under “Looking Ahead,” our sales agreements call for total base and fixed annual deliveries of 700,000 pounds of U₃O₈ in 2026, including pounds that we delivered in the first three quarters of 2026, and for base and fixed annual deliveries of 1,355,000 pounds in 2027, 1,400,000 pounds in 2028, 1,350,000 pounds in 2029, 1,000,000 pounds in 2030, 200,000 pounds in 2031, 300,000 pounds in 2032, and 100,000 pounds in 2033. These combined base and fixed deliveries from 2026 through 2033 total 6,405,000 pounds of U₃O₈.

​

33

Table of Contents

Several of our sales agreements provide for a combination of escalated fixed price and market-related pricing, subject to a floor and ceiling, while others are escalated fixed pricing. Also, several of the agreements include provisions by which the purchaser may flex the delivery amount (up or down) as much as 10% in a delivery year, and others provide options for us to add sales quantities in the same or additional delivery years at market-related pricing.

​

Results of Operations

Reconciliation of Non-GAAP measures with US GAAP financial statement presentation

The following tables include measures specific to U3O8 sales, product cost, product profit, pounds sold, price per pound sold, cost per pound sold, and product profit per pound sold. These measures do not have standardized meanings within US GAAP or a defined basis of calculation. These measures are used by management to assess business performance and determine production and pricing strategies. They may also be used by certain investors to evaluate performance. The following two tables provide a reconciliation of U3O8 price per pound sold and U3O8 cost per pound sold to the consolidated financial statements.

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Price per Pound Sold Calculation

  ​ ​ ​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

2026 YTD

​

​

​

​

​

​

​

​

​

​

​

​

​

Sales per financial statements

​

$000

​

10,449

​

3,931

​

14,373

​

12,433

​

30,737

Disposal fees

​

$000

​

(21)

​

(27)

​

—

​

(93)

​

(120)

U3O8 sales

​

$000

​

10,428

​

3,904

​

14,373

​

12,340

​

30,617

U3O8 pounds sold

​

lb

​

165,000

​

55,000

​

215,000

​

190,000

​

460,000

U3O8 price per pound sold

​

$/lb

​

63.20

​

70.98

​

66.85

​

64.95

​

66.56

​

Sales per the financial statements include U3O8 sales and disposal fees. Fees received for disposal at Shirley Basin do not relate to the sale of U3O8 and are excluded from the U3O8 sales and U3O8 price per pound sold measures.

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Cost per Pound Sold Calculation

​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

2026 YTD

​

​

​

​

​

​

​

​

​

​

​

​

​

Cost of sales per financial statements

​

$000

​

8,977

​

2,687

​

12,479

​

13,779

​

28,945

Lower of cost or NRV adjustment

​

$000

​

(9)

​

—

​

(153)

​

(471)

​

(624)

U3O8 product costs

​

$000

​

8,968

​

2,687

​

12,326

​

13,308

​

28,321

U3O8 pounds sold

​

lb

​

165,000

​

55,000

​

215,000

​

190,000

​

460,000

U3O8 cost per pound sold

​

$/lb

​

54.35

​

48.85

​

57.33

​

70.06

​

61.57

​

Cost of sales per the financial statements includes U3O8 costs of sales and lower of cost or NRV adjustments. U3O8 cost of sales includes ad valorem and severance taxes related to the extraction of uranium, all costs of wellfield and plant operations, including the related depreciation and amortization of capitalized assets, asset retirement costs, and mineral property costs, plus product distribution costs. These costs are also used to value inventory. The resulting inventoried cost per pound is compared to the NRV of the product, which is based on the estimated sales price of the product, net of any necessary costs to finish the product. Any inventory value in excess of the NRV is charged to cost of sales in the financial statements. NRV adjustments, if any, relate to U3O8 inventories and do not relate to the sale of U3O8, and are excluded from the U3O8 product costs and U3O8 cost per pound sold measures.

34

Table of Contents

U3O8 Product Sales

The following table provides information on our U3O8 product sales:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Sales

​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

2026 YTD

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Sales

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

$000

​

10,428

​

3,904

​

10,692

​

592

​

15,188

Non-produced

​

$000

​

—

​

—

​

3,681

​

11,748

​

15,429

​

​

$000

​

10,428

​

3,904

​

14,373

​

12,340

​

30,617

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Pounds Sold

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

lb

​

165,000

​

55,000

​

165,000

​

10,000

​

230,000

Non-produced

​

lb

​

—

​

—

​

50,000

​

180,000

​

230,000

​

​

lb

​

165,000

​

55,000

​

215,000

​

190,000

​

460,000

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Price per Pound Sold

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

$/lb

​

63.20

​

70.98

​

64.80

​

59.15

​

66.03

Non-produced

​

$/lb

​

—

​

—

​

73.62

​

65.27

​

67.08

​

​

$/lb

​

63.20

​

70.98

​

66.85

​

64.95

​

66.56

​

In 2025, we sold 440,000 pounds of U3O8 at an average price per pound sold of $61.77 for revenues of $27.2 million. The deliveries were made into base-escalated contracts negotiated in 2022 and 2023 when the long-term price was between $43 and $57 per pound.

In the third quarter of 2026, we sold 190,000 pounds of U3O8 at an average price of $64.95 per pound for revenues of $12.3 million. In the nine months ended September 30, 2026, we sold 460,000 pounds of U3O8 at an average price of $66.56 per pound for revenues of $30.6 million. The deliveries were made under contracts negotiated in 2024 that included a combination of base-escalated and market-based pricing, which led to the higher pricing for 2026 sales compared to 2025 pricing.

In 2026, we expect to sell a total of 700,000 pounds of U3O8 at an average price per pound sold of approximately $67.00 for revenues of approximately $46.9 million. Of those 700,000 pounds, 210,000 pounds were contracted in 2024 with a combination of base-escalated and market-based pricing, 75,000 pounds of which we expect to deliver in the fourth quarter of 2026. The remaining 490,000 pounds were negotiated as base-escalated contracts in 2022 and 2023 when the long-term price was between $43 and $57.

Deliveries for 2026 are committed to five customers with a larger portion of deliveries occurring in the latter part of the year. We expect to deliver a total of 700,000 pounds of U3O8 in 2026, including the 460,000 pounds that we delivered  during the first three quarters and 240,000 pounds that we expect to deliver in the fourth quarter.

​

35

Table of Contents

U3O8 Product Costs

The following table provides information on our U3O8 product costs:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Costs

​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

2026 YTD

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Costs

​

​

​

​

​

​

​

​

​

​

​

​

Ad valorem and severance taxes

​

$000

​

700

​

211

​

732

​

43

​

986

Cash costs

​

$000

​

6,386

​

1,852

​

5,901

​

361

​

8,114

Non-cash costs

​

$000

​

1,882

​

624

​

2,105

​

151

​

2,880

Produced

​

$000

​

8,968

​

2,687

​

8,738

​

555

​

11,980

Non-produced

​

$000

​

—

​

—

​

3,587

​

12,754

​

16,341

​

​

$000

​

8,968

​

2,687

​

12,325

​

13,309

​

28,321

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Pounds Sold

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

lb

​

165,000

​

55,000

​

165,000

​

10,000

​

230,000

Non-produced

​

lb

​

—

​

—

​

50,000

​

180,000

​

230,000

​

​

lb

​

165,000

​

55,000

​

215,000

​

190,000

​

460,000

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Cost per Pound Sold

​

​

​

​

​

​

​

​

​

​

​

​

Ad valorem and severance taxes

​

$/lb

​

4.24

​

3.84

​

4.44

​

4.30

​

4.29

Cash costs

​

$/lb

​

38.70

​

33.67

​

35.76

​

36.10

​

35.27

Non-cash costs

​

$/lb

​

11.41

​

11.34

​

12.76

​

15.10

​

12.53

Produced

​

$/lb

​

54.35

​

48.85

​

52.96

​

55.50

​

52.09

Non-produced

​

$/lb

​

—

​

—

​

71.74

​

70.87

​

71.06

​

​

$/lb

​

54.35

​

48.85

​

57.32

​

70.06

​

61.57

​

In 2025, we delivered 330,000 produced pounds at an average cost per pound sold of $52.62. Production at Lost Creek increased during the year leading to lower average costs per produced pound. The cost per produced pound in ending inventory was $46.36 at December 31, 2025. In 2025, we delivered 110,000 non-produced pounds at an average cost per pound sold of $64.23.

In the third quarter of 2026, we delivered 10,000 produced pounds at an average cost per pound sold of $55.50. In the nine months ended September 30, 2026, we delivered 230,000 produced pounds at an average cost per pound sold of $52.08. Production rates modestly increased in the first nine months of 2026, leading to the consistent average cost per produced pound sold in the nine months ended September 30, 2026 as compared to 2025.

In the third quarter of 2026, we delivered 180,000 non-produced pounds at an average cost per pound sold of $70.87. In the nine months ended September 30, 2026, we delivered 230,000 non-produced pounds at an average cost per pound sold of $71.06. The average cost per non-produced pound sold in 2026 is higher as compared to 2025, due to prior period non-produced pound NRV adjustments, which lowered the 2025 average cost basis.

​

36

Table of Contents

U3O8 Product Profit (Loss)

The following table provides information on our U3O8 product profit and loss:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Profit (Loss)

​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

2026 YTD

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Sales

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

$000

​

10,428

​

3,904

​

10,692

​

592

​

15,188

Non-produced

​

$000

​

—

​

—

​

3,681

​

11,748

​

15,429

​

​

$000

​

10,428

​

3,904

​

14,373

​

12,340

​

30,617

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Costs

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

$000

​

8,968

​

2,687

​

8,738

​

555

​

11,980

Non-produced

​

$000

​

—

​

—

​

3,587

​

12,754

​

16,341

​

​

$000

​

8,968

​

2,687

​

12,325

​

13,309

​

28,321

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Product Profit (Loss)

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

$000

​

1,460

​

1,217

​

1,955

​

37

​

3,209

Non-produced

​

$000

​

—

​

—

​

94

​

(1,006)

​

(912)

​

​

$000

​

1,460

​

1,217

​

2,049

​

(969)

​

2,297

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Pounds Sold

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

lb

​

165,000

​

55,000

​

165,000

​

10,000

​

230,000

Non-produced

​

lb

​

—

​

—

​

50,000

​

180,000

​

230,000

​

​

lb

​

165,000

​

55,000

​

215,000

​

190,000

​

460,000

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Price per Pound Sold

​

​

​

​

​

​

​

​

​

​

​

​

Produced

​

$/lb

​

63.20

​

70.98

​

64.80

​

59.15

​

66.03

Non-produced

​

$/lb

​

—

​

—

​

73.62

​

65.27

​

67.08

​

​

$/lb

​

63.20

​

70.98

​

66.85

​

64.95

​

66.56

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Cost per Pound Sold

​

​

​

​

​

​

​

​

​

​

​

​

Ad valorem and severance taxes

​

$/lb

​

4.24

​

3.84

​

4.44

​

4.30

​

4.29

Cash costs

​

$/lb

​

38.70

​

33.67

​

35.76

​

36.10

​

35.27

Non-cash costs

​

$/lb

​

11.41

​

11.34

​

12.76

​

15.10

​

12.52

Produced

​

$/lb

​

54.35

​

48.85

​

52.96

​

55.50

​

52.08

Non-produced

​

$/lb

​

—

​

—

​

71.74

​

70.87

​

71.06

​

​

$/lb

​

54.35

​

48.85

​

57.32

​

70.06

​

61.57

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Profit (Loss) per Pound Sold

​

​

​

​

​

​

​

​

​

​

​

​

Cash costs

​

$/lb

​

24.50

​

37.31

​

29.04

​

23.05

​

30.76

Less ad valorem and severance taxes

​

$/lb

​

(4.24)

​

(3.84)

​

(4.44)

​

(4.30)

​

(4.29)

Less non-cash costs

​

$/lb

​

(11.41)

​

(11.34)

​

(12.76)

​

(15.10)

​

(12.52)

Produced

​

$/lb

​

8.85

​

22.13

​

11.84

​

3.65

​

13.95

Non-produced

​

$/lb

​

—

​

—

​

1.88

​

(5.60)

​

(3.98)

​

​

$/lb

​

8.85

​

22.13

​

9.53

​

(5.11)

​

4.99

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Profit (Loss) Margin

​

​

​

​

​

​

​

​

​

​

​

​

Cash costs

​

%

​

38.8

​

52.6

​

44.8

​

39.0

​

46.6

Less ad valorem and severance taxes

​

%

​

(6.7)

​

(5.4)

​

(6.9)

​

(7.3)

​

(6.5)

Less non-cash costs

​

%

​

(18.1)

​

(16.0)

​

(19.6)

​

(25.5)

​

(19.0)

Produced

​

%

​

14.0

​

31.2

​

18.3

​

6.2

​

21.1

Non-produced

​

%

​

—

​

—

​

2.6

​

(8.6)

​

(5.9)

​

​

%

​

14.0

​

31.2

​

14.3

​

(7.9)

​

7.5

37

Table of Contents

In 2025, the average price per pound sold was $61.77 and the average cost per pound sold was $55.52, which resulted in an average profit per pound sold of $6.25 and an average profit margin of about 10%. The non-produced pounds sold in 2025 resulted in a loss per pound sold of $6.75 due to the higher average cost per purchased pound sold, which was $64.23. The average cost per produced pound sold was $52.62, which resulted in an average gain per produced pound sold of $10.58 and an average profit margin per pound sold of about 17%.

In the third quarter of 2026, we sold 10,000 produced pounds at an average price per pound sold of $59.15 and an average cost per pound sold of $55.50, which resulted in an average profit per pound sold of $3.65, and an average profit margin per pound sold of about 6%. In the nine months ended September 30, 2026, we sold 230,000 produced pounds at an average price per pound sold of $66.03 and an average cost per pound sold of $52.08, which resulted in an average profit per pound sold of $13.95 and an average profit margin per pound sold of about 21%. On a cash cost basis, the average profit per pound sold was $30.76 and the profit margin per pound sold was about 47%. The improvement in average profit per pound sold and profit margin per pound sold in the first nine months of 2026 compared to 2025 was due to higher sales prices received partially offset by a slightly higher cost per pound sold.

In the third quarter of 2026, we sold 180,000 non-produced pounds at an average price per pound sold of $65.27 and an average cost per pound sold of $70.87, which resulted in an average loss per pound sold of $5.60, and an average loss margin per pound sold of about 9%. In the nine months ended September 30, 2026, we sold 230,000 non-produced pounds at an average price per pound sold of $67.08 and an average cost per pound sold of $71.06, which resulted in an average loss per pound sold of $3.98 and an average loss margin per pound sold of about 6%. The lower average loss per pound sold and loss margin per pound sold in the first nine months of 2026 compared to 2025 was due to higher sales prices received partially offset by a higher cost per pound sold.

​

38

Table of Contents

U3O8 Production and Ending Inventory

The following tables provide information on our production and ending inventory of U3O8 pounds:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Production

​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

2026 YTD

​

​

​

​

​

​

​

​

​

​

​

​

​

Pounds captured

​

lb

​

78,177

​

110,314

​

105,016

​

154,667

​

369,997

Pounds drummed in

​

lb

​

121,818

​

95,599

​

140,873

​

104,586

​

341,058

Pounds shipped

​

lb

​

138,337

​

103,956

​

149,747

​

75,087

​

328,790

Non-produced pounds acquired

​

lb

​

100,000

​

—

​

—

​

—

​

—

​

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 Ending Inventory

​

Unit

  ​ ​ ​

2025 Q4

  ​ ​ ​

2026 Q1

  ​ ​ ​

2026 Q2

  ​ ​ ​

2026 Q3

  ​ ​ ​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Pounds

​

​

​

​

​

​

​

​

​

​

​

​

In-process inventory

​

lb

​

17,203

​

26,794

​

12,430

​

49,200

​

​

Plant inventory

​

lb

​

24,295

​

15,939

​

7,066

​

36,508

​

​

Conversion inventory - produced

​

lb

​

124,591

​

177,231

​

158,292

​

223,378

​

​

Conversion inventory - non-produced

​

lb

​

240,000

​

240,000

​

190,000

​

10,000

​

​

​

​

lb

​

406,089

​

459,964

​

367,788

​

319,086

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Value

​

​

​

​

​

​

​

​

​

​

​

​

In-process inventory

​

$000

​

201

​

681

​

43

​

974

​

​

Plant inventory

​

$000

​

1,097

​

995

​

373

​

2,342

​

​

Conversion inventory - produced

​

$000

​

5,776

​

9,133

​

8,707

​

12,404

​

​

Conversion inventory - non-produced

​

$000

​

17,217

​

17,217

​

13,484

​

702

​

​

​

​

$000

​

24,291

​

28,026

​

22,607

​

16,422

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Cost per Pound

​

​

​

​

​

​

​

​

​

​

​

​

In-process inventory

​

$/lb

​

11.68

​

25.42

​

3.46

​

19.80

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Plant inventory

​

$/lb

​

45.15

​

62.43

​

52.79

​

64.15

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Conversion inventory:

​

​

​

​

​

​

​

​

​

​

​

​

Ad valorem and severance tax

​

$/lb

​

3.89

​

3.95

​

4.79

​

4.26

​

​

Cash cost

​

$/lb

​

31.89

​

35.52

​

35.69

​

36.09

​

​

Non-cash cost

​

$/lb

​

10.58

​

12.06

​

14.53

​

15.18

​

​

Conversion inventory - produced

​

$/lb

​

46.36

​

51.53

​

55.01

​

55.53

​

​

Conversion inventory - non-produced

​

$/lb

​

71.74

​

71.74

​

70.97

​

70.20

​

​

​

​

$/lb

​

63.07

​

63.15

​

63.71

​

56.16

​

​

​

In 2025, we captured 370,893 pounds, drummed 410,440 pounds, and shipped 420,144 pounds.

In the third quarter of 2026, we captured 154,667 pounds, an increase of 47% compared to the second quarter of 2026, and in the nine months ended September 30, 2026, we captured 369,997 pounds, nearly equaling total pounds captured in all of 2025. Pounds captured in the third quarter of 2026 included 14,697 pounds from Shirley Basin as full operations began. Flow rates at Lost Creek were intentionally lowered in late 2025 to allow the plant to make processing modifications and perform additional equipment repairs. The work related to plant systems was mostly completed in the fourth quarter of 2025, which allowed us to maintain better average flow rates. However, fine particles from the host formation inhibited our ability to further increase flow rates into the plant during the first nine months of 2026. To address this issue, we installed a sand filtration system to remove fine particles before they enter the plant. Operation of the sand filtration system commenced in July 2026, and while it has been effective in decreasing fines and increasing production flow rates, our ability to utilize the system effectively was impacted more than expected by constraints in our capacity to manage wastewater generated when backflushing the system. As discussed under “Lost Creek” and “Looking Ahead” below, we have implemented process and other measures to better manage wastewater, and the wastewater treatment facility that is

39

Table of Contents

under construction at Lost Creek and planned to be in operation in the second quarter of 2027 is expected to fully address wastewater capacity constraints.

Pounds drummed and shipped in the third quarter of 2026 decreased to 104,586 and 75,087, respectively, and were predominantly comprised of Lost Creek pounds. The decrease in pounds drummed is due to lower captured pounds in the previous quarter and unplanned maintenance and modifications at the Lost Creek plant to efficiently unload unprocessed uranium from Shirley Basin.  The decrease in pounds shipped is due to fewer drummed pounds during the quarter and partially relates to a timing difference in shipment schedules. We received positive assay adjustments totaling 1,099 pounds during the third quarter of 2026, bringing the year-to-date total to 12,528 pounds and indicating that we previously drummed and shipped more pounds than estimated. The positive assay adjustments are included in pounds at Lost Creek drummed and shipped during the quarter.

Conversion facility inventories decreased during the third quarter to 233,378 pounds at September 30, 2026. The decrease was due to selling more pounds than were shipped to the conversion facility during the quarter. The ending produced inventory cost per pound increased slightly from $55.01 to $55.53 during the quarter, reflecting higher average production costs per pound shipped to the facility.

Summary of Results of Operations

The following table summarizes the results of operations for the three and nine months ended September 30, 2026 and 2025:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Results of Operations

​

Three Months Ended

​

Nine Months Ended

(expressed in thousands of U.S. dollars,

​

September 30,

​

September 30,

except per share and non-GAAP per pound data)

​

2026

​

2025

​

Change

​

2026

​

2025

​

Change

​

​

​

​

​

​

​

​

​

​

​

​

​

Sales

​

12,433

​

6,323

​

6,110

​

30,737

​

16,758

​

13,979

Cost of sales

​

(13,779)

​

(7,063)

​

(6,716)

​

(28,945)

​

(18,156)

​

(10,789)

Gross profit (loss)

​

(1,346)

​

(740)

​

(606)

​

1,792

​

(1,398)

​

3,190

​

​

​

​

​

​

​

​

​

​

​

​

​

Operating costs

​

(25,707)

​

(19,071)

​

(6,636)

​

(67,614)

​

(50,011)

​

(17,603)

Operating profit (loss)

​

(27,053)

​

(19,811)

​

(7,242)

​

(65,822)

​

(51,409)

​

(14,413)

​

​

​

​

​

​

​

​

​

​

​

​

​

Interest income

​

648

​

518

​

130

​

2,442

​

2,086

​

356

Interest expense

​

(2,311)

​

(364)

​

(1,947)

​

(8,017)

​

(920)

​

(7,097)

Mark to market gain (loss)

​

10,883

​

(7,854)

​

18,737

​

9,317

​

(9,166)

​

18,483

Foreign exchange gain (loss)

​

56

​

5

​

51

​

(1,940)

​

(19)

​

(1,921)

Other income (loss)

​

43

​

43

​

—

​

819

​

111

​

708

Net income (loss)

​

(17,734)

​

(27,463)

​

9,729

​

(63,201)

​

(59,317)

​

(3,884)

​

​

​

​

​

​

​

​

​

​

​

​

​

Foreign currency translation adjustment

​

(136)

​

100

​

(236)

​

2,217

​

145

​

2,072

Comprehensive income (loss)

​

(17,870)

​

(27,363)

​

9,493

​

(60,984)

​

(59,172)

​

(1,812)

​

​

​

​

​

​

​

​

​

​

​

​

​

Earnings (loss) per common share:

​

​

​

​

​

​

​

​

​

​

​

​

Basic

​

(0.04)

​

(0.07)

​

0.03

​

(0.16)

​

(0.16)

​

—

Diluted

​

(0.04)

​

(0.07)

​

0.03

​

(0.16)

​

(0.16)

​

—

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 pounds sold

​

190,000

​

110,000

​

80,000

​

460,000

​

275,000

​

185,000

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 price per pound sold

​

64.95

​

57.48

​

7.47

​

66.56

​

60.91

​

5.65

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 cost per pound sold

​

70.06

​

64.21

​

5.85

​

61.57

​

56.22

​

5.35

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 profit (loss) per pound sold

​

(5.11)

​

(6.72)

​

1.61

​

4.99

​

4.69

​

0.30

40

Table of Contents

​

Sales

Sales per the financial statements include U3O8 sales and disposal fees as shown in the following table:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Three Months Ended

​

Nine Months Ended

Sales

​

September 30,

​

September 30,

(expressed in thousands of U.S. dollars)

​

2026

​

2025

​

Change

​

2026

​

2025

​

Change

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 product sales

​

12,340

​

6,323

​

6,017

​

30,617

​

16,751

​

13,866

Disposal fees

​

93

​

—

​

93

​

120

​

7

​

113

​

​

12,433

​

6,323

​

6,110

​

30,737

​

16,758

​

13,979

​

Due to the nature of our contracts, we have a limited number of deliveries, which do not occur consistently during the year. Sales revenues are recognized when the product is transferred to the purchaser.

We sold 190,000 pounds at an average price of $64.95 for $12.3 million in the third quarter of 2026, compared to 110,000 pounds at $57.48 for $6.3 million in the third quarter of 2025. We sold 460,000 pounds at an average price of $66.56 for $30.6 million in the nine months ended September 30, 2026, and sold 275,000 pounds at $60.91 for $16.8 million in the same period in 2025. The increase in pounds and prices was driven by the terms of the underlying sales contracts.

We also had transactions totaling $120 thousand in disposal fee revenue in the nine months ended September 30, 2026, and $7 thousand in disposal fee revenues in the same period in 2025. Our disposal income is dependent on the operating and reclamation programs of other companies and varies based on their level of activity.

Cost of Sales

Cost of sales per the financial statements includes U3O8 product costs and lower of cost or NRV adjustments as shown in the following table:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Three Months Ended

​

Nine Months Ended

Cost of Sales

​

September 30,

​

September 30,

(expressed in thousands of U.S. dollars)

​

2026

​

2025

​

Change

​

2026

​

2025

​

Change

​

​

​

​

​

​

​

​

​

​

​

​

​

U3O8 product costs

​

13,308

​

7,063

​

6,245

​

28,321

​

15,460

​

12,861

Lower of cost or NRV adjustments

​

471

​

—

​

471

​

624

​

2,696

​

(2,072)

​

​

13,779

​

7,063

​

6,716

​

28,945

​

18,156

​

10,789

​

For the three months ended September 30, 2026, we sold 10,000 pounds from inventory produced at Lost Creek and 180,000 pounds from non-produced inventory. For the nine months ended September 30, 2026, we sold 230,000 pounds from inventory produced at Lost Creek and 230,000 pounds from non-produced inventory.

U3O8 product costs included in cost of sales were greater in the three and nine months ended September 30, 2026, compared to 2025 because of the increase in pounds sold, higher labor and services costs, and the use of purchased pounds to fill orders in 2026. The purchased pounds have a higher cost than our produced pounds.

The $0.6 million in NRV adjustments for the nine months ended September 30, 2026 primarily related to expected future sales of non-produced inventory at an average sales price below carrying cost, while $2.7 million in NRV adjustments for the nine months ended September 30, 2025 predominantly related to a decline in the market price of U3O8, which reduced the value of the non-produced inventory that was acquired in 2024 and 2025.

41

Table of Contents

Gross Profit (Loss)

For the three months ended September 30, 2026, the $1.3 million gross loss was $0.6 million higher than the same period in 2025 due primarily to the NRV adjustment in 2026. For the nine months ended September 30, 2026, gross profit increased to $1.8 million from a gross loss of $1.4 million in the same period in 2025. The primary reason for the increase was higher 2026 sales volumes that resulted in a lower cost per pound sold, partially offset by higher labor costs, services costs, and depreciation.

Operating Costs

The following table summarizes operating costs for the three and nine months ended September 30, 2026 and 2025:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Three Months Ended

​

Nine Months Ended

Operating Costs

​

September 30,

​

September 30,

(expressed in thousands of U.S. dollars)

​

2026

​

2025

​

Change

​

2026

​

2025

​

Change

​

​

​

​

​

​

​

​

​

​

​

​

​

Exploration and evaluation

​

1,153

​

1,477

​

(324)

​

4,623

​

3,682

​

941

Development

​

21,569

​

14,379

​

7,190

​

52,455

​

38,184

​

14,271

General and administration

​

2,435

​

2,871

​

(436)

​

9,070

​

7,243

​

1,827

Accretion of asset retirement obligations

​

550

​

344

​

206

​

1,466

​

902

​

564

​

​

25,707

​

19,071

​

6,636

​

67,614

​

50,011

​

17,603

​

Total operating costs increased $6.6 million and $17.6 million in the three and nine months ended September 30, 2026, compared to the same periods in 2025, respectively. The primary reasons were increased development activities, including higher labor costs due to increased employee levels and increased development activities associated with pre-operational and wellfield development costs at Shirley Basin, and increases in exploration and general and administration expenses.

Exploration and evaluation expense consists of labor and the associated costs of the exploration, evaluation, and regulatory departments, as well as land holding and exploration costs on properties that have not reached the development or operations stage. For the nine months ended September 30, 2026, these costs increased $0.9 million over the same period in 2025. Labor costs accounted for nearly all the increase, due to increases in staffing levels and increased exploration and evaluation activity, including exploration drilling on properties other than Lost Creek and Shirley Basin.

Development expense, a component of operating costs, increased $7.2 million and $14.3 million in the three and nine months ended September 30, 2026, compared to the same periods in 2025, respectively. The following table summarizes the development costs included in operating costs for the three and nine months ended September 30, 2026, and 2025:

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Three Months Ended

​

Nine Months Ended

Development Costs

​

September 30,

​

September 30,

(expressed in thousands of U.S. dollars)

​

2026

​

2025

​

Change

​

2026

​

2025

​

Change

​

​

​

​

​

​

​

​

​

​

​

​

​

Lost Creek mine unit development

​

11,688

​

9,041

​

2,647

​

26,784

​

28,598

​

(1,814)

Lost Creek disposal well development

​

44

​

90

​

(46)

​

83

​

130

​

(47)

Shirley Basin mine unit development

​

9,824

​

5,248

​

4,576

​

25,504

​

9,389

​

16,115

Other development

​

13

​

-

​

13

​

84

​

67

​

17

​

​

21,569

​

14,379

​

7,190

​

52,455

​

38,184

​

14,271

​

The Company is considered an exploration stage issuer and expenses its pre-production development costs. These development costs are incurred in advance of production from the related mining areas. Development expense includes costs incurred at Lost Creek not directly attributable to current production activities, including wellfield construction, drilling, and development costs. It also includes costs incurred at Shirley Basin not directly attributable to the construction of the capitalizable assets of the project, including the installation of the first two mine units which are in progress.

42

Table of Contents

Production stage issuers, as defined by the SEC, having established proven and probable reserves, typically capitalize expenditures relating to ongoing development activities with corresponding depletion calculated over proven and probable reserves using the units-of-production method. Depletion is then allocated to inventory, and as the inventory is sold, to cost of sales. We are an exploration stage issuer, which has resulted in the Company reporting larger losses than if it was a production stage issuer due to the expensing, instead of capitalization, of expenditures relating to ongoing mine development activities. Correspondingly, there will be no depletion allocated to future periods of the Company since those costs were expensed previously, resulting in both lower inventory costs and cost of sales, and results of operations with higher gross profit and lower gross loss than if we would have been in the production stage. As a result, our consolidated financial statements may not be directly comparable to the financial statements of production stage issuers.

As noted, development expenses increased approximately $7.2 million and $14.3 million during the three and nine months ended September 30, 2026, compared to the same periods in 2025, respectively. Development activities at Shirley Basin accounted for the majority of the increase, which was partially offset by a decrease in development costs at Lost Creek. The Company reached full staffing levels for the development and operations at Shirley Basin, has substantially completed initial plant construction, and has commenced capturing and shipping U3O8, from Shirley Basin to Lost Creek for processing, but because Shirley Basin has not commenced commercial production operations, all wellfield, plant, and site administration costs are treated as development costs. Drilling costs, labor, supplies, and related services as well as repairs, fuel, and overhead, such as insurance and bonding costs, related to these heightened efforts are being expensed to development costs.

General and administration expenses relate to administration, finance, investor relations, land, and legal functions, and consist principally of personnel, facility, and support costs. For the three and nine months ended September 30, 2026, these expenses decreased $0.4 million and increased $1.8 million, compared to the same periods in 2025, respectively. The increase was primarily driven by labor, which increased $1.6 million for the nine months ended September 30, 2026 compared to 2025, due to an increase in the number of executive staff, as well as higher bonus costs due to higher employee headcount and increased stock-based compensation.

Other Income and Expenses

Interest income was $0.1 million and $0.4 million higher for the three and nine months ended September 30, 2026, as compared to the same periods in 2025, respectively. The increases were primarily driven by higher invested cash balances in 2026 relative to 2025, due to the net proceeds received in connection with our 4.75% Convertible Senior Notes due 2031 (the “Convertible Notes”) issued in December 2025. Interest expense significantly increased in 2026, due to the sale of our Convertible Notes in December 2025. The coupon interest expense and the related amortization of debt discounts, including debt issuance costs, for the Convertible Notes in 2026 were not present during the comparable 2025 periods.

The mark to market adjustments in the three and nine months periods ended September 30, 2026, include changes in the values of the capped call and conversion option derivative instruments associated with the Convertible Notes, and changes in the market value of marketable securities that we received in connection with the sale of drilling data in the first quarter of 2026, as described below. They also include mark-to-market adjustments to the warrant liability during the first quarter of 2026, prior to their exercise and expiration, as well as the inventory derivative obligation. The mark-to-market losses in the three and nine months ended September 30, 2025 include adjustments to the warrant liability and inventory derivative obligation. The primary reason for the mark-to-market gain for the 2026 periods relates to our stock price, which as of September 30, 2026, had decreased relative to prior periods.

Other income includes the sale of certain drilling data in January 2026 for $0.1 million of cash and marketable securities valued at $0.6 million.

43

Table of Contents

Earnings (Loss) Per Common Share

The basic and diluted losses per common share for the three and nine months ended September 30, 2026, were $0.04 per share and $0.16 per share, respectively. The basic and diluted losses per common share for the same periods in 2025 were $0.07 per share and $0.16 per share, respectively. The diluted losses per common share are equal to the basic losses per common share due to the anti-dilutive effect of outstanding stock awards and convertible securities in periods of loss.

Liquidity and Capital Resources

As shown in the Interim Consolidated Statements of Cash Flows, our cash, cash equivalents, and restricted cash and cash equivalents decreased from the December 31, 2025 balance of $135.3 million to $63.2 million as of September 30, 2026. During the nine months ended September 30, 2026, we used $63.1 million for operating activities and $38.4 million for investing activities, and raised $29.5 million through financing activities.

Operating activities used $63.3 million in the nine months ended September 30, 2026. We collected $24.0 million from sales and received $2.4 million of interest income. We spent $4.6 million on interest expense, $8.3 million on refundable cash collateral deposits to defer certain 2026 deliveries, $1.3 million on increased deposits on borrowed inventory,  $15.1 million on production costs, and $63.7 million on operating costs. We had $3.4 million in favorable working capital movements, primarily related to increases in prepaid expenses and other current assets.

Investing activities used $38.4 million during the nine months ended September 30, 2026. We spent $29.7 million on construction costs and $1.0 million on rolling stock at Shirley Basin, $6.6 million on construction costs at Lost Creek, primarily related to the sand filtration system and wastewater treatment facility, $0.6 million on rolling stock at Lost Creek, and $0.4 million on other miscellaneous investing activities, and received $0.1 million from the sale of drilling data.

Financing activities generated $29.5 million in the nine months ended September 30, 2026. We received $28.7 million from the exercise of 38.3 million warrants for 19.1 million shares at $1.50 per share and $1.5 million from the exercise of stock options. These receipts were partially offset by $0.3 million of debt issuance costs related to the Convertible Notes financing and $0.4 million for principal payments on finance leases.

Universal Shelf Registration and At Market Facility

We are a party to an At Market Issuance Sales Agreement, as amended (the “Sales Agreement”), with B. Riley Securities, Inc. and Cantor Fitzgerald & Co. (the “Agents”). Under the Sales Agreement, we may from time to time issue and sell our common shares at market prices on the NYSE American or other U.S. market.

We have filed with the SEC a universal shelf registration statement, declared effective on April 16, 2026, under which we may sell up to $50 million of our common shares from time to time through or to the Agents, in addition to amounts previously sold under the Sales Agreement.

For the three and nine months ended September 30, 2026, we have not utilized the Sales Agreement.

Liquidity Outlook

As of September 30, 2026, our unrestricted cash position was $50.2 million. As of October 31, 2026, our unrestricted cash position was $40.2 million.

Including the 460,000 pounds that we delivered during the first three quarters and 240,000 pounds that we expect to deliver in the fourth quarter of 2026, we expect to make deliveries under sales contracts of 700,000 pounds of U3O8 in 2026, which is 300,000 pounds less than our previous guidance, at an average price of $67 per pound for total product sales revenue of $46.9 million. These deliveries are expected to be made from existing conversion facility inventory and production from Lost Creek and Shirley Basin.

44

Table of Contents

As previously disclosed, in the third quarter of 2026, we entered into transactions to defer delivery of 150,000 pounds of U3O8 from 2026 to 2027 and defer delivery of 150,000 pounds from 2026 to 2029. As discussed above, we also extended the maturity date of our 250,000 pound inventory loan from November 2026 to 2027 in the third quarter. In October 2026, we entered into a transaction to defer delivery of an additional 300,000 pounds of U3O8 from the fourth quarter of 2026 to 2029. The Company posted a refundable cash collateral deposit for this transaction of $9.0 million. Due to lower than expected production in 2026, we entered into these transactions to increase our ability to satisfy delivery commitments in the fourth quarter of 2026 and in 2027 from our inventory and new production and avoid purchasing pounds of U3O8 at spot prices.

The current combined 2026 and 2027 capital expenditure estimate for Shirley Basin construction is $37.5 million, which includes all the production and wastewater treatment systems required for full commercial production operations. We spent $29.1 million of that amount during the nine months ended September 30, 2026 (including $10.1 million that we deferred from 2025 planned expenditures). We expect to spend approximately $4.6 million during the fourth quarter of 2026 and approximately $3.8 million in 2027 to finalize the production facility. We expect to incur additional capital expenditures for Shirley Basin in 2028 or later for additional wastewater treatment equipment to facilitate restoration activities that is not essential for production operations.

​

As described above, at Lost Creek we installed a sand filtration system that began operations in the third quarter of 2026, and are constructing a wastewater treatment facility. Including the sand filtration system, the current capital expenditure estimate for the wastewater treatment facility is $33 to $35 million. We expect to spend approximately $23 million on this project during 2026 and approximately $11 million in 2027 to complete the facility. During the nine months ended September 30, 2026, we spent $7.7 million on capital expenditures related to this project. We may elect to defer capital expenditures related to this facility, which will be required for future restoration activities and is expected to allow us to increase flow rates and production, but is not essential for production operations at current levels.

​

Although we may elect to defer capital expenditures as described above, we anticipate the planned capital projects at Shirley Basin and Lost Creek will be funded by cash on hand, expected operating cash flow, and additional funding, if necessary. We may issue additional securities under the Sales Agreement or obtain additional financing to fund working capital requirements and remaining capital expenditures due to the continued ramp up and optimization of operations at Shirley Basin and Lost Creek and the uneven nature of cash flows generated from operations or used for construction-related activities.

Looking Ahead

Lost Creek

Recognizing that production rates are expected to vary from quarter to quarter, we believe the rate of U3O8 pounds drummed at Lost Creek from U3O8 captured at Lost Creek and Shirley Basin will increase over time as we install additional infrastructure, continue optimization of operations, and implement process improvements.

As described above, our ability to consistently utilize our sand filtration system at Lost Creek to manage fine particles from the host formation and increase flow rates was hampered in the third quarter by wastewater treatment and disposal system capacities. We have advanced several initiatives at Lost Creek since the end of the third quarter to improve our ability and flexibility to manage wastewater until we complete construction and commence operation of the wastewater treatment facility under construction.

We have been continually optimizing our operating process for the sand filtration system to reduce the quantity of wastewater generated from the system. We have also installed built-in production fluid filters in all new HHs beginning in January 2026. In October 2026, we completed the maintenance and testing of equipment required to treat wastewater to regulatory standards and re-commenced injection of the clean water portion of the wastewater stream into shallow wells. In addition, we expect to receive final regulatory approval for surface discharge of non-hazardous wastewater, which should not only increase flexibility for wastewater management, but will also provide a water source for flora and fauna.

As a longer-term solution to manage wastewater streams, address constraints on our filtration system, and increase flow rates, we expect to complete construction and commence operation of the wastewater treatment facility at Lost Creek in

45

Table of Contents

the first half of 2027. Since the end of the third quarter, the building for the facility was installed and additional work continued on the installation of internal foundations and components.

To address unplanned maintenance at the Lost Creek plant that has hampered production, we plan to implement the short- and long-term maintenance strategy that was completed in the third quarter of 2026.

To increase average grades at Lost Creek, we plan to move into and commence operations in MU5. As described above, we commenced well installations and wellfield construction in MU5 and submitted the regulatory approval package for the first phase of MU5 to the WDEQ during the third quarter of 2026. We expect to receive regulatory approval in sufficient time to allow us to commence production operations in MU5 in the first quarter of 2027. We also continue optimization of the lixiviant chemistry to increase average grades at Lost Creek.

Shirley Basin

We expect pounds of U3O8 captured at Shirley Basin to increase as we improve operating parameters associated with the early ramp up and optimization of ISR operations.

To further the ramp up of production from the wellfield, in the fourth quarter of 2026, we expect to complete the workover, gravel packing, and other improvements to the wells in HH 1-1 and HH 1-2 that are underway. We also expect to bring online 76 additional production and injection wells in HH 1-3. We continue to optimize lixiviant chemistry, and subsequent to the end of the quarter, have seen positive results.

With production circuits in the plant substantially complete, work within the plant is focused on the design, procurement, and installation of permanent lixiviant mixing and injection systems, and the next phase of construction to install RO and other wastewater management systems. We expect to install wastewater treatment equipment at Shirley Basin in 2028 or later to facilitate restoration activities that is not essential for production operations, with the engineering design based substantially on the design of the Lost Creek wastewater treatment facility.

In addition, we have advanced the mitigation of many of the issues that hampered the transfer and processing of uranium from Shirley Basin at Lost Creek during the third quarter. In October 2026, we received a specialty trailer from the manufacturer to transport uranium from Shirley Basin to Lost Creek and expect to receive an additional trailer in the fourth quarter. We also completed maintenance of the elution and IX systems at the Lost Creek plant that hindered processing in October 2026, and we continue to optimize processes and systems at the Lost Creek plant to process U3O8 captured at Shirley Basin.

Exploration Programs

We plan to continue our exploration programs to enhance our ability to leverage existing infrastructure and expand our uranium resource base. For our Lost Soldier Project, we continue to advance work on a new technical report, which we expect to complete by year-end 2026. For our Lost Creek South Project, we received regulatory approval from the BLM in October 2026 and have commenced drilling operations of our planned 120-hole drill program, which we expect to complete in the first half of 2027.

Transactions with Related Parties

There were no reportable transactions with related parties during the quarter.

Critical Accounting Estimates

There have been no significant changes to the critical accounting estimates disclosed in our Annual Report on Form 10-K for the year ended December 31, 2025.

Off Balance Sheet Arrangements

We have not entered into any material off balance sheet arrangements such as guaranteed contracts, contingent interests in assets transferred to unconsolidated entities, derivative instrument obligations, or with respect to any obligations under a variable interest entity arrangement.

46

Table of Contents

Outstanding Share Data

As of September 30, 2026, we had 398,741,181 common shares, 7,396,626 stock options to acquire common shares, and 1,089,776 restricted share units outstanding. Each option and restricted share unit entitle the holder to acquire or receive one common share upon exercise or vesting, as applicable.

Item 3. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISK

Market risk

Market risk is the risk to the Company of adverse financial impact due to changes in the fair value or future cash flows of financial instruments because of fluctuations in interest rates and foreign currency exchange rates.

Credit risk

Financial instruments that potentially subject the Company to concentrations of credit risk consist of cash and cash equivalents, and restricted cash and cash equivalents. These assets include Canadian dollar and U.S. dollar denominated certificates of deposit, money market accounts, and demand deposits. These instruments are maintained at financial institutions in Canada and the U.S. Of the amount held on deposit, approximately $25.5 million is covered by the Canada Deposit Insurance Corporation, the Securities Investor Protection Corporation, or the U.S. Federal Deposit Insurance Corporation (“FDIC”), leaving approximately $37.6 million at risk on June 30, 2026 if the financial institutions with which these amounts are invested are rendered insolvent. The Company does not consider any of its financial assets to be impaired as of September 30, 2026.

Currency risk

As of September 30, 2026, we maintained a balance of approximately $3.5 million Canadian dollars. The funds will be used to pay Canadian dollar expenses and are considered to be a low currency risk to the Company.

Liquidity risk

Liquidity risk is the risk that the Company will not be able to meet its financial obligations as they come due. As of September 30, 2026, the Company’s current financial liabilities consisted of accounts payable and accrued liabilities of $15.4 million and the current portion of leases payable of $0.6 million. As of September 30, 2026, we had $50.2 million in unrestricted cash and cash equivalents, $6.6 million in trade receivables, and $16.4 million in inventory.

Interest rate risk

The Company has completed a sensitivity analysis to estimate the impact that a change in interest rates would have on the net loss and considers the change to be a low interest rate risk to the Company.

Commodity Price Risk

The Company is subject to commodity price risk related to the market price of uranium. Future sales would be impacted by both spot and long-term uranium price fluctuations. Historically, uranium prices have been subject to fluctuation, and the price of uranium has been and will continue to be affected by numerous factors beyond our control, including the demand for nuclear power, political and economic conditions, governmental legislation in uranium producing and consuming countries, and production levels and costs of production of other producing companies. The average spot market price of U3O8 was $91.55 per pound as of October 31, 2026.

​

47

Table of Contents

Item 4. CONTROLS AND PROCEDURES

(a) Evaluation of Disclosure Controls and Procedures

As of the end of the period covered by this MD&A, under the supervision of the Chief Executive Officer and the Chief Financial Officer, the Company evaluated the effectiveness of its disclosure controls and procedures, as such term is defined in Rule 13a-15(e) and Rule 15d-15(e) under the Securities Exchange Act of 1934 (the “Exchange Act”). Based on this evaluation, the Chief Executive Officer and the Chief Financial Officer have concluded that the Company’s disclosure controls and procedures are effective to ensure that information the Company is required to disclose in reports that are filed or submitted under the Exchange Act: (1) is recorded, processed and summarized effectively and reported within the time periods specified in SEC rules and forms, and (2) is accumulated and communicated to Company management, including the Chief Executive Officer and the Chief Financial Officer, as appropriate, to allow timely decisions regarding required disclosure. The Company’s disclosure controls and procedures include components of internal control over financial reporting. No matter how well designed and operated, internal controls over financial reporting can provide only reasonable, but not absolute, assurance that the control system’s objectives will be met.

(b) Changes in Internal Controls over Financial Reporting

No changes in our internal controls over financial reporting occurred during the three months ended September 30, 2026, that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.

​

​

48

Table of Contents

PART II

Item 1. LEGAL PROCEEDINGS

We are not aware of any material pending or threatened litigation or of any proceedings known to be contemplated by governmental authorities that are or would be likely to have a material adverse effect upon us or our operations, taken as a whole, that was not disclosed in our Annual Report for the year ended December 31, 2025 or in this Quarterly Report on Form 10-Q for the three months ended September 30, 2026.

​

Item 1A. RISK FACTORS

As of the date of this Quarterly Report on Form 10-Q, there have been no material changes in our risk factors from those disclosed in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2025 and our Quarterly Report on Form 10-Q for the three months ended June 30, 2026, except that the risk factor entitled “Operational and related challenges may continue as we return to steady-state operations at Lost Creek and complete the build out and commissioning of production operations at Shirley Basin. Delays may affect our timely delivery into contractual commitments.” is replaced in its entirety with the following to reflect the commencement of full operations at Shirley Basin and other risks associated with our mining operations:

​

“Operational challenges at Lost Creek and the commencement and ramp up of operations at Shirley Basin may affect our ability to achieve production plans and deliver into contractual commitments.

Challenges have continued in our production operations at Lost Creek as we work to achieve sustained higher production rates. The extended time the site was maintained on reduced production operations, the required operational refinements and maintenance as operations were restored, and other commissioning issues have caused delays in achieving higher production rates. For example, fine particles from the host formation have inhibited our ability to increase flow rates into the plant. We installed a sand filtration system to address the fine particles but have encountered wastewater capacity constraints that have limited our ability to fully utilize the system until we complete a planned wastewater treatment facility. These and other operational challenges at Lost Creek may continue. The construction of the planned wastewater treatment facility at Lost Creek may also encounter challenges and delays.

​

In April 2026, we commenced initial operations at Shirley Basin, and in August 2026, commenced shipments of U₃O₈ to Lost Creek. Shirley Basin is designed as a satellite facility, with U₃O₈ captured on resin transported to Lost Creek for processing, drying, and drumming. We have encountered operational, logistical, and commissioning challenges, including those associated with the satellite processing model, in connection with the commencement and ramp up of operations at Shirley Basin. These and other operational challenges at Shirley Basin may continue. Initial production costs at Shirley Basin are expected to be higher than at Lost Creek until production rates increase. Certain plant construction activities at Shirley Basin are expected to continue concurrently with operations through 2026 and into 2027, which may create additional challenges. The planned installation of wastewater treatment equipment at Shirley Basin in 2028 or later may also encounter challenges and delays.

​

Continuing challenges in operations at Lost Creek and Shirley, and challenges relating to ongoing or planned construction at Lost Creek and Shirley Basin, have and could continue to affect our ability to achieve our production plans and make expected deliveries to our customers, and could affect our ability to meet our contractual commitments or repay our inventory loans, or otherwise negatively affect our business, financial condition, results of operations, and cash flows.”

​

Additional risks and uncertainties that the Company does not presently know about or that it currently deems immaterial may also impair our business operations.

​

Item 2. UNREGISTERED SALES OF EQUITY SECURITIES AND USE OF PROCEEDS

None.

​

Item 3. DEFAULTS UPON SENIOR SECURITIES

None.

49

Table of Contents

​

Item 4. MINE SAFETY DISCLOSURE

Our operations and exploration activities at Lost Creek and Shirley Basin are not subject to regulation by the federal Mine Safety and Health Administration under the Federal Mine Safety and Health Act of 1977.

​

Item 5. OTHER INFORMATION

During the quarter ended September 30, 2026, none of our directors or officers (as defined in Rule 16a-1(f) of the Exchange Act) adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408 of Regulation S-K.

​

On July 13, 2026, as part of the board of directors’ regular review of its leadership structure and board responsibilities, independent director Kathy E. Walker was appointed chair of the board of directors. Ms. Walker succeeded John W. Cash, who continues to serve as a director of the Company.

​

​

​

50

Table of Contents

Item 6. EXHIBITS

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

​

Incorporated by Reference

Exhibit
Number

​

Exhibit Description

​

Form

​

Date of
Report

​

Exhibit

​

Filed
Herewith

​

​

​

​

​

​

​

​

​

​

​

31.1

​

Certification of CEO Pursuant to Exchange Act Rules 13a-14 and 15d-14, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

31.2

​

Certification of CFO Pursuant to Exchange Act Rules 13a-14 and 15d-14, as adopted pursuant to Section 302 of the Sarbanes-Oxley Act of 2002.

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

32.1

​

Certification of CEO Pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

32.2

​

Certification of CFO Pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002.

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

101.INS

​

Inline XBRL Instance Document

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

101.SCH

​

Inline XBRL Schema Document

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

101.CAL

​

Inline XBRL Calculation Linkbase Document

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

101.DEF

​

Inline XBRL Definition Linkbase Document

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

101.LAB

​

Inline XBRL Labels Linkbase Document

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

101.PRE

​

Inline XBRL Presentation Linkbase Document

​

​

​

​

​

​

​

X

​

​

​

​

​

​

​

​

​

​

​

104

​

Cover Page Interactive Data File (formatted as inline XBRL and contained in Exhibit 101)

​

​

​

​

​

​

​

X

​

​

​

​

51

Table of Contents

SIGNATURES

Pursuant to the requirements of Section 13 or 15(d) of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

​

UR-ENERGY INC.

​

​

Date: November 9, 2026

By:

/s/ Matthew D. Gili

​

​

Matthew D. Gili

​

​

Chief Executive Officer

​

​

(Principal Executive Officer)

​

​

​

​

Date: November 9, 2026

By:

/s/ Roger L. Smith

​

​

Roger L. Smith

​

​

Chief Financial Officer

​

​

(Principal Financial Officer and

​

​

Principal Accounting Officer)

​

52

Keep reading