[8-K] Vista Gold Corp. Reports Material Event
Vista Gold Corp. reports Mineral Reserves of 5.2 million ounces of gold (172 million tonnes at 0.94 g Au/t) using a $1,800/oz gold price and a 0.50 g Au/t cut-off. The Mt Todd feasibility metrics include initial capital of $425 million (a 59% reduction from a prior 50 ktpd case), capital efficiency $93/oz, after-tax NPV5% $1.1 billion and IRR 27.8% at $2,500/oz. Projected average grade is 1.04 g Au/t years 1–15 with average annual production of 153,000 oz (years 1–15) and 146,000 oz life of mine. Reported AISC is $1,449/oz (years 1–15) and $1,499/oz life of mine. The filing summarizes mine layout, processing flowsheet, sampling and QA/QC, infrastructure needs, and numerous operational, permitting and financing risks disclosed by the company.
Vista Gold Corp. riferisce riserve minerarie di 5,2 milioni di once d'oro (172 milioni di tonnellate a 0,94 g Au/t) usando un prezzo dell'oro di 1.800 $/oz e una soglia di taglio di 0,50 g Au/t. Le metriche di fattibilità per Mt Todd includono capitale iniziale di 425 milioni di dollari (una riduzione del 59% rispetto a un precedente scenario da 50 ktpd), rendita di capitale 93 $/oz, NPV dopo tasse a 5% 1,1 miliardi di dollari e IRR 27,8% a 2.500 $/oz. La gradazione media prevista è di 1,04 g Au/t per gli anni 1–15 con una produzione annua media di 153.000 oz (anni 1–15) e 146.000 oz su tutta la vita della miniera. L'AISC riportato è $1.449/oz (anni 1–15) e $1.499/oz per l'intera vita della miniera. Il deposito riporta la disposizione della miniera, il flusso di processo, campionamento e QA/QC, necessità infrastrutturali e numerosi rischi operativi, di permessi e di finanziamento come divulgato dall'azienda.
Vista Gold Corp. informa Reservas Mineras de 5,2 millones de onzas de oro (172 millones de toneladas a 0,94 g Au/t) usando un precio del oro de 1.800 $/oz y un corte de 0,50 g Au/t. Las métricas de factibilidad del Mt Todd incluyen capital inicial de 425 millones de dólares (una reducción del 59% desde un caso anterior de 50 ktpd), rendimiento de capital 93 $/oz, NPV después de impuestos a 5% de $1,1 mil millones y IRR 27,8% a $2.500/oz. La ley de gradación promedia 1,04 g Au/t en los años 1–15 con una producción anual promedio de 153.000 oz (años 1–15) y 146.000 oz a lo largo de la vida útil de la mina. El AISC reportado es $1.449/oz (años 1–15) y $1.499/oz a lo largo de la vida de la mina. El informe resume el diseño de la mina, el diagrama de procesamiento, muestreo y QA/QC, necesidades de infraestructura y numerosos riesgos operativos, de permisos y de financiación divulgados por la empresa.
Vista Gold Corp.는 5.2백만 온스의 금의 광상 보유량(172백만 톤, 0.94 g Au/t)을 1,800달러/oz의 금가와 0.50 g Au/t의 커트오프를 사용해 보고합니다. Mt Todd 타당성 지표에는 초기 자본 4억 2500만 달러(이전 5ktpd 케이스 대비 59% 감소), 자본 효율성 93달러/온스, 세후 NPV5% 11억 달러 및 IRR 27.8% (금 2,500$/oz) 가 포함됩니다. 1~15년 평균 등급은 1.04 g Au/t이고 연평균 생산은 153,000 oz(1~15년)이며 광산 수명 동안 146,000 oz입니다. 보고된 AISC는 1,449$/oz(1–15년) 및 1,499$/oz 광산 수명 동안입니다. 이 filing은 광산 배치, 처리 흐름도, 시료 채취 및 QA/QC, 인프라 필요성 및 회사가 공개한 다수의 운영, 허가 및 자금 조달 위험을 요약합니다.
Vista Gold Corp. annonce des réserves minérales de 5,2 millions d’onces d’or (172 millions de tonnes à 0,94 g Au/t) en utilisant un prix de l’or de 1 800 $/oz et une coupure à 0,50 g Au/t. Les métriques de faisabilité Mt Todd comprennent un capital initial de 425 millions de dollars (une réduction de 59 % par rapport à un cas antérieur à 50 ktpd), l’efficacité du capital 93 $/oz, PNV après impôt à 5 % 1,1 milliard de dollars et IRR 27,8 % à 2 500 $/oz. La teneur moyenne projetée est de 1,04 g Au/t sur les années 1–15 avec une production annuelle moyenne de 153 000 oz (années 1–15) et 146 000 oz sur l’ensemble de la durée de vie de la mine. L’AISC rapporté est de 1 449 $/oz (années 1–15) et 1 499 $/oz sur toute la durée de vie de la mine. Le rapport résume l’aménagement de la mine, le schéma de traitement, l’échantillonnage et les QA/QC, les besoins en infrastructure et de nombreux risques opérationnels, d’obtention de permis et de financement divulgués par la société.
Vista Gold Corp. meldet Mineralreserven von 5,2 Millionen Unzen Gold (172 Millionen Tonnen bei 0,94 g Au/t) unter Verwendung eines Goldpreises von 1.800 $/oz und einer Cut-off-Grenze von 0,50 g Au/t. Die Machbarkeitskennzahlen von Mt Todd beinhalten Anfangskapital von 425 Millionen Dollar (eine Reduktion von 59 % gegenüber einem früheren 50 ktpd-Fall), Kapitalrendite 93 $/oz, Nachsteuer-NPV5% 1,1 Milliarden Dollar und IRR 27,8 % bei 2.500 $/oz. Die prognostizierte Durchschnittsqualität beträgt 1,04 g Au/t in den Jahren 1–15 mit einer durchschnittlichen Jahresproduktion von 153.000 oz (Jahre 1–15) und 146.000 oz lebenslang. Das berichtete AISC liegt bei 1.449 $/oz (Jahre 1–15) und 1.499 $/oz lebenslang. Der Bericht fasst das Minenlayout, das Verarbeitungsflussdiagramm, Probennahme und QA/QC, Infrastrukturbedarf und zahlreiche operative, Genehmigungs- und Finanzierungsrisiken zusammen, wie vom Unternehmen offengelegt.
Vista Gold Corp. تقر بإحتياطيات معدنية قدرها 5.2 مليون أونصة من الذهب (172 مليون طن عند 0.94 جرام Au/t) باستخدام سعر ذهب قدره 1,800 دولار/أونصة وحدّ قطع 0.50 جرام Au/t. تشمل مقاييس جدوى Mt Todd رأس المال الأولي 425 مليون دولار (بانخفاض 59% عن حالة سابقة بسعة 50 ktpd)، كفاءة رأس المال 93 دولار/أونصة، صافي القيمة الحالية بعد الضرائب عند 5% 1.1 مليار دولار و معدل العائد الداخلي 27.8% عند 2,500 دولار/أونصة. يبلغ المعدل المتوسط المتوقع 1.04 جرام Au/t في السنوات 1–15 مع إنتاج سنوي متوسط قدره 153,000 أونصة (السنوات 1–15) و 146,000 أونصة طوال عمر المنجم. AISC المعلن هو 1,449 دولار/أونصة (السنوات 1–15) و 1,499 دولار/أونصة طوال عمر المنجم. يلخّص التقرير تصميم المنجم وتدفق المعالجة، العيّنات و QA/QC، احتياجات البنية التحتية والعديد من المخاطر التشغيلية والتصاريح والتمويل التي كشفتها الشركة.
Vista Gold Corp. 报告矿产储量为520万盎司黄金(1.72亿吨,0.94 g Au/t),使用1,800美元/盎司的金价和0.50 g Au/t的界限值。Mt Todd可行性指标包括初始资本4.25亿美元(较先前5ktpd情景下降59%)、资本效率93美元/盎司、税后NPV5%11亿美元以及在2,500美元/盎司时的内部收益率27.8%。预计平均品位为1.04 g Au/t,覆盖1–15年,年平均产量为153,000盎司(1–15年),整个矿山生命周期为146,000盎司。披露的AISC为1,449美元/盎司(1–15年)和1,499美元/盎司,覆盖矿山生命周期。该报告概述了矿山布局、加工流程、取样和QA/QC、基础设施需求以及公司披露的众多运营、许可和融资风险。
- 5.2 million ounces of Proven and Probable Mineral Reserves (172 million tonnes at 0.94 g Au/t) reported
- Initial capital reduced to $425 million, a 59% reduction from the Company's prior 50 ktpd feasibility case
- After-tax NPV5% of $1.1 billion and IRR of 27.8% at a gold price of $2,500/oz
- Strong early production: average ~153,000 oz/yr during years 1–15 supporting cashflow generation
- Capital efficiency $93/oz indicating lower capital intensity per ounce produced
- All-in Sustaining Cost of $1,449–$1,499/oz reduces per-ounce margin sensitivity
- Significant permitting, financing and execution risks explicitly disclosed (licenses, third-party power, approvals)
- Technical and operational uncertainties including variability in metallurgical recoveries (heap ~30% vs CIP ~72%) and ore hardness differences
- Need for additional capital or development partner noted; failure to secure financing could delay or prevent development
Insights
TL;DR Strong project economics with meaningful NPV and IRR driven by large reserves and reduced initial capital.
Vista's reported 5.2 Moz reserve base and $1.1B after-tax NPV at $2,500/oz indicate material project value. The $425M initial capital and $93/oz capital efficiency improve the project's capital intensity compared with prior work. Production profile (average ~153k oz/yr early years) supports sizeable cashflow potential if metallurgical recoveries and cost assumptions hold. Key technical disclosures—detailed flowsheet, mill design parameters, ore sorting metrics, and recovery test ranges—support the engineering basis of the study.
TL;DR Economics look attractive but multiple execution, permitting, processing and financing risks could materially affect outcomes.
The filing explicitly lists extensive risks: permit and license approvals, reliance on third-party power, potential cost escalation, supply-chain and staffing constraints, environmental and reclamation liabilities, and the need for additional financing or partners. Reported AISC near $1,450–1,500/oz narrows margin sensitivity to gold price movement. The technical variability in recoveries (heap vs CIP) and ore hardness metrics imply operational uncertainty that could affect cashflow and capital requirements.
Vista Gold Corp. riferisce riserve minerarie di 5,2 milioni di once d'oro (172 milioni di tonnellate a 0,94 g Au/t) usando un prezzo dell'oro di 1.800 $/oz e una soglia di taglio di 0,50 g Au/t. Le metriche di fattibilità per Mt Todd includono capitale iniziale di 425 milioni di dollari (una riduzione del 59% rispetto a un precedente scenario da 50 ktpd), rendita di capitale 93 $/oz, NPV dopo tasse a 5% 1,1 miliardi di dollari e IRR 27,8% a 2.500 $/oz. La gradazione media prevista è di 1,04 g Au/t per gli anni 1–15 con una produzione annua media di 153.000 oz (anni 1–15) e 146.000 oz su tutta la vita della miniera. L'AISC riportato è $1.449/oz (anni 1–15) e $1.499/oz per l'intera vita della miniera. Il deposito riporta la disposizione della miniera, il flusso di processo, campionamento e QA/QC, necessità infrastrutturali e numerosi rischi operativi, di permessi e di finanziamento come divulgato dall'azienda.
Vista Gold Corp. informa Reservas Mineras de 5,2 millones de onzas de oro (172 millones de toneladas a 0,94 g Au/t) usando un precio del oro de 1.800 $/oz y un corte de 0,50 g Au/t. Las métricas de factibilidad del Mt Todd incluyen capital inicial de 425 millones de dólares (una reducción del 59% desde un caso anterior de 50 ktpd), rendimiento de capital 93 $/oz, NPV después de impuestos a 5% de $1,1 mil millones y IRR 27,8% a $2.500/oz. La ley de gradación promedia 1,04 g Au/t en los años 1–15 con una producción anual promedio de 153.000 oz (años 1–15) y 146.000 oz a lo largo de la vida útil de la mina. El AISC reportado es $1.449/oz (años 1–15) y $1.499/oz a lo largo de la vida de la mina. El informe resume el diseño de la mina, el diagrama de procesamiento, muestreo y QA/QC, necesidades de infraestructura y numerosos riesgos operativos, de permisos y de financiación divulgados por la empresa.
Vista Gold Corp.는 5.2백만 온스의 금의 광상 보유량(172백만 톤, 0.94 g Au/t)을 1,800달러/oz의 금가와 0.50 g Au/t의 커트오프를 사용해 보고합니다. Mt Todd 타당성 지표에는 초기 자본 4억 2500만 달러(이전 5ktpd 케이스 대비 59% 감소), 자본 효율성 93달러/온스, 세후 NPV5% 11억 달러 및 IRR 27.8% (금 2,500$/oz) 가 포함됩니다. 1~15년 평균 등급은 1.04 g Au/t이고 연평균 생산은 153,000 oz(1~15년)이며 광산 수명 동안 146,000 oz입니다. 보고된 AISC는 1,449$/oz(1–15년) 및 1,499$/oz 광산 수명 동안입니다. 이 filing은 광산 배치, 처리 흐름도, 시료 채취 및 QA/QC, 인프라 필요성 및 회사가 공개한 다수의 운영, 허가 및 자금 조달 위험을 요약합니다.
Vista Gold Corp. annonce des réserves minérales de 5,2 millions d’onces d’or (172 millions de tonnes à 0,94 g Au/t) en utilisant un prix de l’or de 1 800 $/oz et une coupure à 0,50 g Au/t. Les métriques de faisabilité Mt Todd comprennent un capital initial de 425 millions de dollars (une réduction de 59 % par rapport à un cas antérieur à 50 ktpd), l’efficacité du capital 93 $/oz, PNV après impôt à 5 % 1,1 milliard de dollars et IRR 27,8 % à 2 500 $/oz. La teneur moyenne projetée est de 1,04 g Au/t sur les années 1–15 avec une production annuelle moyenne de 153 000 oz (années 1–15) et 146 000 oz sur l’ensemble de la durée de vie de la mine. L’AISC rapporté est de 1 449 $/oz (années 1–15) et 1 499 $/oz sur toute la durée de vie de la mine. Le rapport résume l’aménagement de la mine, le schéma de traitement, l’échantillonnage et les QA/QC, les besoins en infrastructure et de nombreux risques opérationnels, d’obtention de permis et de financement divulgués par la société.
Vista Gold Corp. meldet Mineralreserven von 5,2 Millionen Unzen Gold (172 Millionen Tonnen bei 0,94 g Au/t) unter Verwendung eines Goldpreises von 1.800 $/oz und einer Cut-off-Grenze von 0,50 g Au/t. Die Machbarkeitskennzahlen von Mt Todd beinhalten Anfangskapital von 425 Millionen Dollar (eine Reduktion von 59 % gegenüber einem früheren 50 ktpd-Fall), Kapitalrendite 93 $/oz, Nachsteuer-NPV5% 1,1 Milliarden Dollar und IRR 27,8 % bei 2.500 $/oz. Die prognostizierte Durchschnittsqualität beträgt 1,04 g Au/t in den Jahren 1–15 mit einer durchschnittlichen Jahresproduktion von 153.000 oz (Jahre 1–15) und 146.000 oz lebenslang. Das berichtete AISC liegt bei 1.449 $/oz (Jahre 1–15) und 1.499 $/oz lebenslang. Der Bericht fasst das Minenlayout, das Verarbeitungsflussdiagramm, Probennahme und QA/QC, Infrastrukturbedarf und zahlreiche operative, Genehmigungs- und Finanzierungsrisiken zusammen, wie vom Unternehmen offengelegt.