IFRS net (loss) profit for the forward-looking periods, including interest expense and foreign exchange gains (which affect the IFRS measure financial results, net) and our deferred income tax
(which affect the IFRS measure income tax expense). The information and opinions contained in this presentation are provided as of the date of this presentation and are subject to verification, completion and change without notice. This presentation
includes “forward-looking statements” concerning the future. Words such as “proposes,” “aims,” “aspires,” “believes,” “thinks,” “forecasts,” “expects,”
“anticipates,” “intends,” “should,” “seeks,” “estimates,” and “future” or similar expressions are included with the intention of identifying statements about the future. For the
avoidance of doubt, any projection, guidance or similar estimation about future results, performance or achievements is a forward-looking statement. Although the assumptions and estimates on which forward-looking statements are based are believed by
our management to be reasonable and based on the best currently available information, such forward-looking statements are based on assumptions that are inherently subject to significant uncertainties and contingencies, many of which are beyond our
control. There will be differences between actual and projected results, and actual results may be materially greater or materially lower than those contained in the projections. Projections related to production results as well as cost estimations
– including any anticipated performance and guidance of Vista included in this presentation – are based on information as of the date of this presentation and reflect numerous assumptions, including assumptions with respect to type
curves for new well designs and certain frac spacing expectations, all of which are difficult to predict and many of which are beyond our control and remain subject to several risks and uncertainties. The inclusion of the projected financial
information in this document should not be regarded as an indication that we or our management considered or consider the projections to be a reliable prediction of future events. As such, no representation can be made as to the attainability of
projections, guidances or other estimations of future results, performance or achievements. We have not warranted the accuracy, reliability, appropriateness or completeness of the projections to anyone. Neither our management nor any of our
representatives has made or makes any representation to any person regarding our future performance compared to the information contained in the projections, and none of them intends to or undertakes any obligation to update or otherwise revise the
projections to reflect circumstances existing after the date when made or to reflect the occurrence of future events in the event that any or all of the assumptions underlying the projections are shown to be in error. We may or may not refer back to
these projections in our future periodic reports filed or furnished under the Securities Exchange Act of 1934 or otherwise. These expectations and projections are subject to significant known and unknown risks and uncertainties, which may cause our
actual results, performance or achievements, or industry results, to be materially different from any expected or projected results, performance or achievements expressed or implied by such forward-looking statements. Many important factors could
cause our actual results, performance or achievements to differ materially from those expressed or implied in our forward-looking statements, including, among other things: uncertainties related to our ability to reduce our scope 1 and 2 GHG
emissions intensity to 7 kgCO2e/boe, or our ability to match the volume of our carbon credits with the scope 1 and 2 emissions generated in our operations on the timeline we expect, or at all; uncertainties relating to future government concessions
and exploration permits; adverse outcomes in litigation that may arise in the future; general political, economic, social, demographic and business conditions in Argentina, Mexico and in other countries in which we may operate in the future; the
impact of political developments and uncertainties relating to political and economic conditions in Argentina, including the policies of the current government in Argentina; significant economic or political developments in Mexico, Argentina and the
United States; changes in laws, rules, regulations and their interpretation and enforcement applicable to the Argentine and Mexican energy sectors and throughout Latin America, including changes to the regulatory environment in which we operate and
changes to programs established to promote investments in the
6