STOCK TITAN

Workhorse signs $10M TerraPod manufacturing agreement

The contemplated 150-system first order remains conditional, while Workhorse believes TerraPod production can begin in late 2027 or early 2028.

(High)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
8-K

Rhea-AI Filing Summary

Workhorse Group Inc. entered into a Manufacturing Spec Unit Purchase Agreement under which Rhaelm Holdings Limited will pay $10,000,000 in three installments for Workhorse to build a full-scale TerraPod manufacturing spec unit at its Union City, Indiana facility.

Separately, the companies signed a non-binding letter of intent targeting a definitive supply agreement by December 31, 2026. The contemplated agreement would provide for joint engineering, milestone-based prepayments toward a first order, and a U.S. right of first refusal for Workhorse to supply RHAELM’s U.S. modular data center projects. The letter of intent contemplates an initial order for 150 TerraPod systems, conditional on signing the supply agreement, RHAELM’s acceptance of the co-developed platform, definitive documentation and RHAELM’s required internal approvals. The companies also intend for Workhorse to become a supply-chain provider to RHAELM’s blueprint collaboration, subject to consortium-partner consent. Workhorse believes TerraPod production can begin in late 2027 or early 2028; the companies state there is no assurance the supply agreement will be signed or an order placed.

Filing Explained

Although the release calls this an entry into the modular AI infrastructure market, the signed work is a reference build for checking equipment fit, service access and assembly sequence before final prototypes—not commercial production.

Item 1.01 Entry into a Material Definitive Agreement Business
The company signed a significant contract such as a merger agreement, credit facility, or major partnership.
Item 7.01 Regulation FD Disclosure Disclosure
Material non-public information disclosed under Regulation Fair Disclosure, often investor presentations or guidance.
Item 8.01 Other Events Other
Voluntary disclosure of events the company deems important to shareholders but not covered by other items.
Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, or exhibit attachments filed with this report.
Spec unit purchase agreement payment $10,000,000 RHAELM will pay Workhorse to build the TerraPod manufacturing spec unit
Payment installments Three installments Payment under the Manufacturing Spec Unit Purchase Agreement
Contemplated initial order 150 TerraPod systems Contingent order contemplated in the non-binding letter of intent
Target supply agreement date December 31, 2026 The companies are targeting execution by this date
Expected production start Late 2027 or early 2028 Workhorse believes TerraPod production can begin during this period
Manufacturing Spec Unit Purchase Agreement technical
"entered into a Manufacturing Spec Unit Purchase Agreement"
Letter of Intent financial
"entered into a non-binding Letter of Intent"
A letter of intent is a document that shows an agreement in principle between parties to work towards a future deal or transaction. It outlines their intentions and key terms, acting like a roadmap before a formal contract is signed. For investors, it signals serious interest and helps clarify expectations early in the process.
milestone-based prepayments financial
"a structure for milestone-based prepayments toward a first order"
right of first refusal financial
"a U.S. right of first refusal giving Workhorse the opportunity to supply"
A right of first refusal gives an existing shareholder or party the chance to buy an asset or shares before the owner can sell them to someone else. Think of it like being offered the first option to buy a house when the owner decides to sell; it matters to investors because it can limit who can acquire a stake, slow or block transactions, and affect the price and liquidity of an investment by restricting open-market sales or new buyers.
blueprint collaboration technical
"an official modular data center supply-chain provider to the RHAELM blueprint collaboration"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much is RHAELM paying Workhorse (WKHS) for the TerraPod spec unit?

RHAELM will pay Workhorse $10,000,000 in three installments under the Manufacturing Spec Unit Purchase Agreement to build a full-scale TerraPod manufacturing spec unit at Workhorse’s Union City, Indiana facility.

What is the planned TerraPod order in the Workhorse (WKHS) agreement?

The non-binding letter of intent contemplates an initial order for 150 TerraPod systems, conditional on execution of a definitive supply agreement, RHAELM’s acceptance of the co-developed platform, definitive documentation and RHAELM’s required internal approvals. The companies are targeting signing the supply agreement by December 31, 2026.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
0001425287falseNasdaq00014252872026-10-282026-10-28

___________________________________
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
___________________________________
FORM 8-K
CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): October 28, 2026
___________________________________
WORKHORSE GROUP INC.
(Exact name of registrant as specified in its charter)
___________________________________
Nevada
001-37673
26-1394771
(State or Other Jurisdiction of Incorporation)(Commission File Number)(IRS Employer Identification Number)
48443 Alpha Drive #190, Wixom, Michigan 48393
(Address of principal executive offices and zip code)

Registrant’s telephone number, including area code: (888) 646-5205


(Former name or former address, if changed since last report)
___________________________________
Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:
☐
Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
☐
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
☐
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
☐
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))
Securities registered pursuant to Section 12(b) of the Act:
Title of each class
Trading Symbol(s)
Name of each exchange on which registered
Common Stock, $0.001 par value
WKHS
The Nasdaq Capital Market

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

Emerging growth company ☐

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐



Item 1.01. Entry into a Material Definitive Agreement

On October 28, 2026, Workhorse Group Inc. (the “Company”) entered into a Manufacturing Spec Unit Purchase Agreement (the “MSPA”) with Rhaelm Holdings Limited (“RHAELM”), a UK-based developer of sovereign AI infrastructure, pursuant to which RHAELM will pay the Company $10,000,000 over three installments to build a full-scale TerraPod manufacturing spec unit at the Company’s Union City, Indiana facility.

The foregoing description of the MSPA does not purport to be complete and is qualified in its entirety by reference to the full text of the MSPA, a copy of which is filed as Exhibit 10.1 to this Current Report on Form 8-K and incorporated herein by reference.

Item 7.01. Regulation FD Disclosure.

On October 29, 2026, the Company issued a press release announcing the MSPA and the letter of intent described in Item 8.01 below. A copy of the press release is furnished as Exhibit 99.1 to this Current Report on Form 8-K.

The information in this Item 7.01, including Exhibit 99.1, is being furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference in any filing under the Securities Act of 1933, as amended, or the Exchange Act, except as expressly set forth by specific reference in such a filing.

Item 8.01. Other Events.

On October 28, 2026, the Company and RHAELM also entered into a non-binding letter of intent (the “LOI”) reflecting the parties’ intention to work towards executing a definitive supply agreement, which the parties are targeting to sign by December 31, 2026. Pursuant to the LOI, the supply agreement would include joint engineering work, milestone-based prepayments toward a first order and a right of first refusal for the Company to supply RHAELM’s U.S. modular data center projects. The LOI also contemplates a contingent initial order by RHAELM for 150 TerraPod systems, which is conditioned on execution of the supply agreement, RHAELM’s acceptance of the co-developed platform, definitive documentation and required internal approvals by RHAELM. There can be no assurance that a definitive supply agreement will be signed or that any order will be placed.

Forward-Looking Statements

All statements other than statements of present or historical fact contained in this press release are “forward-looking statements” within the meaning of Section 27A of the Securities Act and Section 21E of the Exchange Act, including Workhorse’s or its management team’s current expectations, objectives, beliefs, intentions or strategies regarding the future. These statements may include, but are not limited to, statements concerning the development, production readiness and potential commercialization of the TerraPod modular data center platform; the development, completion and acceptance of the manufacturing spec unit and the payment of consideration by RHAELM under the Spec Unit Agreement; the negotiation, execution and timing of a definitive Supply Agreement; the contemplated contingent initial order for 150 TerraPod systems, any first-order prepayment and the U.S. right of first refusal; Workhorse's potential admission to the blueprint collaboration as a supply-chain provider; anticipated production timing and volumes; and potential future commercial production and deployment of modular data center systems. Readers are cautioned not to put undue reliance on forward-looking statements and Workhorse cautions you that these forward-looking statements are subject to numerous risks and uncertainties, many of which are difficult to predict and many of which are beyond the control of Workhorse, including the following factors: the Letter of Intent described in this press release is non-binding, and there can be no assurance that a definitive Supply Agreement will be entered into; the contemplated 150-unit contingent initial order is conditioned on RHAELM’s acceptance of the platform, definitive documentation and required internal approvals by RHAELM and there is no guarantee that such conditions will be met, that the order will be placed or that it will be placed on terms consistent with Workhorse’s expectations; Workhorse may not be able to successfully complete the manufacturing spec unit and/or the TerraPod systems, secure reliable sources of critical components, or retain or hire personnel necessary to
1


support production of modular AI infrastructure products; changing technologies, regulatory requirements and competitive pressures may negatively affect the anticipated production or deployment of the systems; market adoption and customer demand for the TerraPod systems may not materialize as expected; the costs involved in developing and manufacturing the manufacturing spec unit and/or the TerraPod systems may exceed Workhorse’s expectations and Workhorse may be unable to obtain sufficient funds from commercial partners or investors to offset such costs; and risks relating to macroeconomic conditions, global events, and geopolitical events, including but not limited to inflationary pressures, supply chain interruptions and changes in market conditions, and Workhorse’s ability to manage these risks and uncertainties. Additional information concerning these and other factors that may impact the statements discussed in this press release and other factors related more broadly related to Workhorse’s business, can be found in Workhorse's filings with the U.S. Securities and Exchange Commission, including its most recent reports on Form 10-K and Form 10-Q, all of which are available on the SEC’s website at www.sec.gov. Forward-looking statements are not guarantees of future performance, speak only as of the date they are made, and Workhorse undertakes no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, the occurrence of future events, or otherwise, except as required by law.




2



Item 9.01. Financial Statements and Exhibits.

(a) Exhibits.

Exhibit NumberDescription
10.1*
Manufacturing Spec Unit Purchase Agreement, dated October 28, 2026, by and between Workhorse Group Inc. and Rhaelm Holdings Limited.
99.1
Press Release, dated October 29, 2026.
104Cover Page Interactive Data File (embedded within the Inline XBRL document)

*Certain schedules and exhibits to this agreement have been omitted pursuant to Item 601(a)(5) of Regulation S-K. The Company agrees to furnish supplementally a copy of any omitted schedule or exhibit to the Securities and Exchange Commission upon request.

3


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

WORKHORSE GROUP INC.
Date: October 29, 2026By: /s/ Scott Griffith
Name: Scott Griffith
Title: Chief Executive Officer

4
EXHIBIT 99.1
Press Release
Workhorse Enters Modular AI Infrastructure Market Through Foundational TerraPodTM Partnership with UK-Based RHAELM
Initial Agreement to develop a full-scale TerraPod manufacturing spec unit
Non-Binding LOI to further expand the partnership, including a Supply agreement and contemplated contingent initial order for 150 TerraPod systems
WIXOM, Mich. and LONDON, October 29, 2026 — Workhorse Group, Inc. (Nasdaq: WKHS) ("Workhorse") and Rhaelm Holdings Limited ("RHAELM"), a UK-based developer of vertically integrated AI infrastructure, today announced a strategic partnership to jointly commercialize TerraPodTM Workhorse's new modular data center platform. The partnership pairs Workhorse's U.S. engineering and manufacturing capabilities with RHAELM’s global energy partnerships and AI customer relationships.
Workhorse and RHAELM have entered into a Manufacturing Spec Unit Purchase Agreement (the “Spec Unit Agreement”), under which RHAELM will pay Workhorse $10 million to build a full-scale TerraPod manufacturing spec unit at Workhorse's Union City, Indiana facility. The companies also signed a non-binding Letter of Intent that sets a path to sign a definitive Supply Agreement, which is framed to include a first order provision for 150 TerraPod systems. The companies are targeting execution of the Supply Agreement by December 31, 2026.
Demand for AI compute is growing faster than traditional data centers can be built. TerraPod is being designed to help speed time-to-market for new data centers with factory-built, modular units that will bring compute, power distribution, cooling, communications, systems control and fire suppression together into rapidly deployable integrated systems.
TerraPod systems will be built on a production line rather than a construction site and designed to be sited on deployment-ready foundations, produced at scale and put into commercial use far faster than conventional facilities. RHAELM is working with partners in a blueprint collaboration to set reference design requirements for its modular compute offering and related standards, and through this relationship, the companies intend for TerraPod to be developed as a modular physical platform designed to meet those standards.
“As industry leaders in AI compute and infrastructure continue to develop standardized requirements, we believe the modular data center industry is approaching its ‘Model-T’ moment,” said Scott Griffith, Chief Executive Officer of Workhorse. “Our partnership announcement with RHAELM goes beyond acting as a launchpad for our TerraPod product; we believe it’s the beginning of an era of mass production of the systems that will enable rapid deployment of cost-effective, secure and highly distributed AI compute capabilities.”
1



Three Phase Partnership
The companies have deliberately structured the partnership in stages, with an initial commitment starting immediately and a non-binding framework laying the groundwork for further planned expansion.
Phase 1: Build the reference unit. Under the Spec Unit Agreement, Workhorse will build a TerraPod manufacturing spec unit, consistent with the standard modular data center blueprint being developed by RHAELM and its partners. The unit will serve as a physical reference for equipment fitment, service access and assembly sequence. This approach enables RHAELM and its commercial partners, equipment suppliers and prospective customers to view, interact with and refine the design before committing the capital needed to deliver final prototypes and ultimately begin production.
Phase 2: Sign the Supply Agreement. The companies also have created a framework for expansion of the relationship through a Supply Agreement that they are targeting for execution by year-end 2026. Under the contemplated framework, the Supply Agreement would allow for expanded joint engineering efforts, a structure for milestone-based prepayments toward a first order, and a U.S. right of first refusal giving Workhorse the opportunity to supply modular data center units for all future RHAELM projects in the United States.
Phase 3: Scale to production. The Letter of Intent also expresses the companies’ intention that once the Supply Agreement is signed and RHAELM accepts the co-developed platform, RHAELM would place an initial order for production of 150 TerraPod systems, subject to definitive documentation and required internal approvals. The companies also intend to have Workhorse become an official modular data center supply-chain provider to the RHAELM blueprint collaboration, subject to the consents of its consortium partners. This could give TerraPod access to RHAELM's prospective global project pipeline, serving the world’s AI builders. Workhorse believes TerraPod production can begin in late 2027 or early 2028.
“This ‘walk-before-you-run approach' is designed to streamline and accelerate time to full production, while also providing a structure that puts our teams together on initial work right now,” said Griffith. “Just as important, this structure gives us a seat at the table with RHAELM and a highly complementary set of partners as the industry standardizes modular designs. We believe the Supply Agreement we are targeting by year-end will chart the course to full scale production and give us a clear pathway to significant future commercial volume for TerraPod."
“AI’s limiting factor today isn’t ambition, it’s power and compute,” said Bradd Lewis, CEO, RHAELM. “We partner with generators that already hold committed capacity, and as standardization continues, turning that power into compute moves from the field to the factory. In Workhorse, we have the manufacturing partner to make that happen. Together, we believe we can deliver AI compute at scale, years ahead of the conventional timeline.”


ABOUT RHAELM
2



RHAELM converts power into compute at speed and scale, powering the potential of AI. The company partners with power generators that hold committed capacity and builds AI infrastructure behind the meter, bringing power, compute and capital together in one integrated project. The result is AI compute at scale, years ahead of the conventional timeline. Headquartered in London, RHAELM is developing projects globally.

ABOUT WORKHORSE GROUP
Headquartered in the Detroit area, Workhorse Group Inc. (Nasdaq: WKHS) is an American industrial technology company that designs, engineers, and produces the intelligent industrial machines that are the lifeblood of modern economies. From its manufacturing facility in Union City, Indiana, Workhorse applies its electrification, high-voltage systems integration, ruggedized platform manufacturing and distributed energy capabilities to its electric commercial vehicles and modular AI infrastructure products. More information is available at www.workhorse.com.

Media Relations Contacts:
Workhorse
John Williams, Chief Communications Officer
+1-206-660-5503,
john.williams@workhorse.com
ICR, Inc.
workhorse@icrinc.com
Investor Relations Contact:
ir@workhorse.com
RHAELM
Ingrid Salte, Global Head of Communications
pr@rhaelm.com

FORWARD-LOOKING STATEMENTS
All statements other than statements of present or historical fact contained in this press release are “forward-looking statements” within the meaning of Section 27A of the Securities Act and Section 21E of the Exchange Act, including Workhorse’s or its management team’s current expectations, objectives, beliefs, intentions or strategies regarding the future. These statements may include, but are not limited to, statements concerning the development, production readiness and potential commercialization of the TerraPod modular data center platform; the development, completion and acceptance of the manufacturing spec unit and the payment of consideration by RHAELM under the Spec Unit Agreement; the negotiation, execution and timing of a definitive Supply Agreement; the contemplated contingent initial order for 150 TerraPod systems, any first-order prepayment and the U.S. right of first refusal; Workhorse's
3



potential admission to the blueprint collaboration as a supply-chain provider; anticipated production timing and volumes; and potential future commercial production and deployment of modular data center systems. Readers are cautioned not to put undue reliance on forward-looking statements and Workhorse cautions you that these forward-looking statements are subject to numerous risks and uncertainties, many of which are difficult to predict and many of which are beyond the control of Workhorse, including the following factors: the Letter of Intent described in this press release is non-binding, and there can be no assurance that a definitive Supply Agreement will be entered into; the contemplated 150-unit contingent initial order is conditioned on RHAELM’s acceptance of the platform, definitive documentation and required internal approvals by RHAELM and there is no guarantee that such conditions will be met, that the order will be placed or that it will be placed on terms consistent with Workhorse’s expectations; Workhorse may not be able to successfully complete the manufacturing spec unit and/or the TerraPod systems, secure reliable sources of critical components, or retain or hire personnel necessary to support production of modular AI infrastructure products; changing technologies, regulatory requirements and competitive pressures may negatively affect the anticipated production or deployment of the systems; market adoption and customer demand for the TerraPod systems may not materialize as expected; the costs involved in developing and manufacturing the manufacturing spec unit and/or the TerraPod systems may exceed Workhorse’s expectations and Workhorse may be unable to obtain sufficient funds from commercial partners or investors to offset such costs; and risks relating to macroeconomic conditions, global events, and geopolitical events, including but not limited to inflationary pressures, supply chain interruptions and changes in market conditions, and Workhorse’s ability to manage these risks and uncertainties. Additional information concerning these and other factors that may impact the statements discussed in this press release and other factors related more broadly related to Workhorse’s business, can be found in Workhorse's filings with the U.S. Securities and Exchange Commission, including its most recent reports on Form 10-K and Form 10-Q, all of which are available on the SEC’s website at www.sec.gov. Forward-looking statements are not guarantees of future performance, speak only as of the date they are made, and Workhorse undertakes no obligation to publicly update or revise any forward-looking statement, whether as a result of new information, the occurrence of future events, or otherwise, except as required by law.

4

Filing Exhibits & Attachments

5 documents

Keep reading