Western Copper & Gold nine-month loss widens to C$5.89M
Quarter-end cash and short-term investments stood at C$120,668,932, but Casino's development and construction will require significant additional funding.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Western Copper and Gold Corporation reported a nine-month loss of C$5,890,932 through September 30, 2026, versus C$2,155,353 in 2025. It remains an exploration- and permitting-stage company with no production revenue. Cash and short-term investments were C$120,668,932 at September 30, 2026. Its February 26, 2026 bought deal raised C$92,001,869 gross through 22,169,125 shares at C$4.15 each; net proceeds were C$86,310,810. Management expects current cash and short-term investments to fund anticipated operating activities for the next 12 months, but significant additional funding will be needed for Casino's development and construction.
Casino remains in environmental assessment and permitting. YESAB's Executive Committee requested supplemental information on February 2, 2026; Western submitted responses on July 15, 2026. If the information is deemed sufficient, YESAB will finalize the Terms of Reference, establish a Panel and begin technical review. Western also began a 2026 site program with geotechnical, permafrost and metallurgical drilling and geophysical surveys. Sandeep Singh stepped down as President and CEO and director effective October 31, 2026. Mark E. Smith was appointed Interim Chief Executive Officer and Michael Psihogios President, in addition to CFO, effective November 1, 2026.
How this balance works
Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.
It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.
Rhea-AI Sentiment measures something else, the tone of the wording.
Positive
- Minor pointNine-month operating cash outflow narrowed to C$2,233,217 from C$2,460,966 in 2025.
Negative
- Moderate pointNine-month loss rose to C$5,890,932 from C$2,155,353 in 2025.
Filing Explained
By September thirtieth, permitting spend was three million four hundred thirty-nine thousand nine hundred sixty-nine Canadian dollars against thirty million planned.
This Form 6-K furnishes Western Copper and Gold's interim report through
The reported awards were 6,321,524 stock options, 1,351,920 RSUs and 567,095 DSUs; the filing says RSUs and DSUs are equity-settled by issuing shares.
If those awards result in share issuance, the additional shares would increase the total share count and reduce existing holders' percentage ownership.
For the three listed offering uses, planned amounts were
Key Figures
Key Terms
bought deal public offering financial
sufficiency review regulatory
Environmental and Socio-economic Effects Statement regulatory
Net Smelter Return technical
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
How much cash and short-term investments did WRN have on September 30, 2026?
How much did WRN raise in its February 2026 share offering?
What is the latest Casino Project permitting milestone?
AI-generated analysis. How Rhea-AI works. Not financial advice.
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
For the month of November 2026
Commission File Number: 001-35075
WESTERN COPPER AND GOLD CORPORATION
(Translation of registrant's name into English)
Suite 907 – 1030 West Georgia Street,
Vancouver, BC, Canada V6E 2Y3
(Address of principal executive offices)
Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
[ ] Form 20-F [ x ] Form 40-F
SUBMITTED HEREWITH
Exhibits
| Exhibit | Description | |
| 99.1 | Condensed Interim Consolidated Financial Statements For the period ended September 30, 2026 | |
| 99.2 | Management's Discussion and Analysis for the period ended September 30, 2026 | |
| 99.3 | Form 52-109F2 - Certification of Interim Filings - CEO | |
| 99.4 | Form 52-109F2 - Certification of Interim Filings - CFO |
SIGNATURES
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
| Western Copper and Gold Corporation | ||
| (Registrant) | ||
| Date: November 5, 2026 | By: | /s/ Michael Psihogios |
| Michael Psihogios | ||
| Title: | Chief Financial Officer | |

Western Copper and Gold Corporation
Condensed Interim Consolidated Financial Statements
For the nine months ended September 30, 2026 and 2025
(Unaudited, Expressed in Canadian dollars)
| Western Copper and Gold Corporation Condensed Interim Consolidated Financial Statements (unaudited) |
| (Expressed in Canadian dollars) |
CONDENSED INTERIM CONSOLIDATED BALANCE SHEETS
| September 30, 2026 | December 31, 2025 | |||||||
| Note | $ | $ | ||||||
| ASSETS | ||||||||
| Cash and cash equivalents | 3 | 26,629,648 | 22,259,937 | |||||
| Short-term investments | 4 | 94,039,284 | 28,273,349 | |||||
| Marketable securities | 19,320 | 9,660 | ||||||
| Other assets | 887,178 | 772,186 | ||||||
| CURRENT ASSETS | 121,575,430 | 51,315,132 | ||||||
| Property, plant and equipment | 1,509,201 | 46,291 | ||||||
| Right-of-use assets | 654,581 | 236,112 | ||||||
| Exploration and evaluation asset | 5 | 164,245,090 | 144,292,235 | |||||
| ASSETS | 287,984,302 | 195,889,770 | ||||||
| LIABILITIES | ||||||||
| Accounts payable and accrued liabilities | 7,187,360 | 2,434,598 | ||||||
| Current portion of lease obligations | 164,855 | 172,110 | ||||||
| Current portion of financing obligations | 226,462 | - | ||||||
| CURRENT LIABILITIES | 7,578,677 | 2,606,708 | ||||||
| Lease obligations | 516,526 | 64,875 | ||||||
| Financing obligations | 698,764 | - | ||||||
| LIABILITIES | 8,793,967 | 2,671,583 | ||||||
| SHAREHOLDERS' EQUITY | ||||||||
| Share capital | 6 | 369,995,335 | 279,558,766 | |||||
| Contributed surplus | 7 | 40,057,261 | 38,630,750 | |||||
| Deficit | (130,862,261 | ) | (124,971,329 | ) | ||||
| SHAREHOLDERS' EQUITY | 279,190,335 | 193,218,187 | ||||||
| LIABILITIES AND SHAREHOLDERS' EQUITY | 287,984,302 | 195,889,770 | ||||||
Approved by the Board of Directors
| /s/ Robert Chausse | Director | /s/ Klaus Zeitler | Director |
| The accompanying notes are an integral part of these condensed interim consolidated financial statements | 2 |
| Western Copper and Gold Corporation Condensed Interim Consolidated Financial Statements (unaudited) |
| (Expressed in Canadian dollars) |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF LOSS AND COMPREHENSIVE LOSS
| Three Months Ended September 30, |
Nine Months Ended September 30, |
||||||||||||
| 2026 | 2025 | 2026 | 2025 | ||||||||||
| Note | $ | $ | $ | $ | |||||||||
| Depreciation | 98,654 | 31,333 | 213,123 | 64,715 | |||||||||
| Filing and regulatory fees | 20,813 | 25,284 | 392,660 | 303,991 | |||||||||
| Office and administration | 451,364 | 274,105 | 1,063,180 | 598,924 | |||||||||
| Professional fees | 105,289 | 180,952 | 504,588 | 536,861 | |||||||||
| Share-based payments | 7 | 740,442 | 474,126 | 2,829,493 | 1,863,782 | ||||||||
| Shareholder communication and travel | 192,256 | 216,514 | 609,176 | 570,179 | |||||||||
| Wages and benefits | 1,040,037 | 631,958 | 2,614,795 | 2,049,748 | |||||||||
| CORPORATE EXPENSES | 2,648,855 | 1,834,272 | 8,227,015 | 5,988,200 | |||||||||
| Foreign exchange loss (gain) | 2,861 | (3,223 | ) | 6,138 | (194 | ) | |||||||
| Interest income | (966,594 | ) | (406,624 | ) | (2,332,561 | ) | (1,614,346 | ) | |||||
| Gain on marketable securities | (7,350 | ) | (534,133 | ) | (9,660 | ) | (2,218,307 | ) | |||||
| LOSS AND COMPREHENSIVE LOSS | 1,677,772 | 890,292 | 5,890,932 | 2,155,353 | |||||||||
| Basic and diluted loss per share | 0.01 | 0.00 | 0.03 | 0.01 | |||||||||
| Weighted average number of common shares outstanding | 226,166,691 | 201,393,862 | 221,099,999 | 200,217,426 | |||||||||
| The accompanying notes are an integral part of these condensed interim consolidated financial statements | 3 |
| Western Copper and Gold Corporation Condensed Interim Consolidated Financial Statements (unaudited) |
| (Expressed in Canadian dollars) |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOWS
| For the nine months ended September 30, | 2026 | 2025 | |||||
| $ | $ | ||||||
| Cash flows provided by (used in) | Note | ||||||
| OPERATING ACTIVITIES | |||||||
| Loss and comprehensive loss | (5,890,932 | ) | (2,155,353 | ) | |||
| ITEMS NOT AFFECTING CASH | |||||||
| Depreciation | 213,123 | 64,715 | |||||
| Finance costs | 50,539 | 8,221 | |||||
| Gain on marketable securities | (9,660 | ) | (2,218,307 | ) | |||
| Share-based payments | 2,829,493 | 1,863,782 | |||||
| (2,807,437 | ) | (2,436,942 | ) | ||||
| Change in non-cash working capital items | 11 | 574,220 | 53,324 | ||||
| Settlement of Deferred Share Units | - | (77,348 | ) | ||||
| OPERATING ACTIVITIES | (2,233,217 | ) | (2,460,966 | ) | |||
| FINANCING ACTIVITIES | |||||||
| Financings | 6 | 92,001,869 | - | ||||
| Share issuance costs | 6 | (5,691,059 | ) | - | |||
| Exercise of stock options | 7 | 1,951,530 | 1,857,084 | ||||
| Exercise of warrants | - | 1,275,000 | |||||
| Lease payments | (160,040 | ) | (62,252 | ) | |||
| Financing obligation payments | (90,212 | ) | - | ||||
| FINANCING ACTIVITIES | 88,012,088 | 3,069,832 | |||||
| INVESTING ACTIVITIES | |||||||
| Redemption (purchase) of short-term investments, net | (64,995,970 | ) | 8,187,879 | ||||
| Exploration and evaluation asset expenditures | (15,880,857 | ) | (15,120,339 | ) | |||
| Purchase of property, plant and equipment | (532,333 | ) | (50,075 | ) | |||
| Proceeds from sale of marketable securities | - | 2,571,837 | |||||
| INVESTING ACTIVITIES | (81,409,160 | ) | (4,410,698 | ) | |||
| CHANGE IN CASH AND CASH EQUIVALENTS | 4,369,711 | (3,801,832 | ) | ||||
| Cash and cash equivalents - Beginning | 22,259,937 | 14,202,317 | |||||
| CASH AND CASH EQUIVALENTS - ENDING | 26,629,648 | 10,400,485 |
| The accompanying notes are an integral part of these condensed interim consolidated financial statements | 4 |
| Western Copper and Gold Corporation Condensed Interim Consolidated Financial Statements (unaudited) |
| (Expressed in Canadian dollars) |
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN SHAREHOLDERS' EQUITY
| Number of Shares | Share Capital | Contributed Surplus | Deficit | Shareholders' Equity | |||||||||||
| $ | $ | $ | $ | ||||||||||||
| DECEMBER 31, 2024 | 198,391,318 | 272,544,984 | 38,916,835 | (121,851,567 | ) | 189,610,252 | |||||||||
| Exercise of restricted share units | 207,940 | 370,697 | (370,697 | ) | - | - | |||||||||
| Exercise of warrants | 1,500,000 | 1,626,000 | (351,000 | ) | - | 1,275,000 | |||||||||
| Exercise of stock options | 1,383,334 | 2,907,693 | (768,609 | ) | - | 2,139,084 | |||||||||
| Exercise of deferred share units | 171,700 | 364,630 | (739,725 | ) | - | (375,095 | ) | ||||||||
| Share-based payments | - | - | 2,318,347 | - | 2,318,347 | ||||||||||
| Loss and comprehensive loss | - | - | - | (2,155,353 | ) | (2,155,353 | ) | ||||||||
| SEPTEMBER 30, 2025 | 201,654,292 | 277,814,004 | 39,005,151 | (124,006,920 | ) | 192,812,235 | |||||||||
| Exercise of restricted share units | 298,301 | 602,532 | (602,532 | ) | - | - | |||||||||
| Exercise of stock options | 384,999 | 1,142,230 | (324,278 | ) | - | 817,952 | |||||||||
| Share-based payments | - | - | 552,409 | - | 552,409 | ||||||||||
| Loss and comprehensive loss | - | - | - | (964,409 | ) | (964,409 | ) | ||||||||
| DECEMBER 31, 2025 | 202,337,592 | 279,558,766 | 38,630,750 | (124,971,329 | ) | 193,218,187 | |||||||||
| Shares issued for cash | 22,169,125 | 92,001,869 | - | - | 92,001,869 | ||||||||||
| Share issuance costs | - | (5,691,059 | ) | - | - | (5,691,059 | ) | ||||||||
| Exercise of restricted share units | 736,486 | 1,241,310 | (1,241,310 | ) | - | - | |||||||||
| Exercise of stock options | 944,568 | 2,700,528 | (748,998 | ) | - | 1,951,530 | |||||||||
| Exercise of deferred share units | 88,400 | 183,921 | (183,921 | ) | - | - | |||||||||
| Share-based payments | - | - | 3,600,740 | - | 3,600,740 | ||||||||||
| Loss and comprehensive loss | - | - | - | (5,890,932 | ) | (5,890,932 | ) | ||||||||
| SEPTEMBER 30, 2026 | 226,276,171 | 369,995,335 | 40,057,261 | (130,862,261 | ) | 279,190,335 |
| The accompanying notes are an integral part of these condensed interim consolidated financial statements | 5 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
1. NATURE OF OPERATIONS
Western Copper and Gold Corporation (together with its subsidiaries, "Western" or the "Company") is directly engaged in exploration, permitting and development of the Casino mineral property located in Yukon, Canada (the "Casino Project"). The Company is incorporated in British Columbia, Canada. Its head office is located at 907-1030 West Georgia Street, Vancouver, British Columbia.
While Western has been successful in raising sufficient capital to fund its operations, if the Company successfully progresses through permitting to the development and construction stage for the Casino Project, the Company will need to raise additional funds to complete the development and construction of the Casino Project. There can be no assurance that it will be able to raise such project financing in the future.
2. BASIS OF PRESENTATION
a. Statement of compliance
These condensed interim consolidated financial statements have been prepared in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board ("IFRS Accounting Standards") as applicable to the preparation of interim financial statements under IAS 34, Interim Financial Reporting. The condensed interim consolidated financial statements should be read in conjunction with the Company's annual consolidated financial statements for the year ended December 31, 2025, which have been prepared in accordance with IFRS Accounting Standards.
These financial statements were approved for issue by the Company's board of directors on November 5, 2026.
b. IFRS Pronouncements
Amendments to IFRS 9 and IFRS 7 - Amendments to the Classification and Measurement of Financial Instruments.
Effective January 1, 2026, the Company adopted certain amendments to the Classification and Measurement of Financial Instruments (Amendments to IFRS 9 and IFRS 7). These amendments updated classification and measurement requirements in IFRS 9 Financial Instruments and related disclosure requirements in IFRS 7 Financial Instruments: Disclosures. The IASB clarified the recognition and derecognition date of certain financial assets and liabilities, and amended the requirements related to settling financial liabilities using an electronic payment system. It also clarified how to assess the contractual cash flow characteristics of financial assets in determining whether they meet the solely payments of principal and interest criterion, including financial assets that have environmental, social and corporate governance (ESG)-linked features and other similar contingent features. The IASB added disclosure requirements for financial instruments with contingent features that do not relate directly to basic lending risks and costs and amended disclosures relating to equity instruments designated at fair value through other comprehensive income.
The amendments are effective for periods beginning on or after January 1, 2026 and adoption of these amendments did not have a material effect on our condensed interim consolidated financial statements. For financial liabilities settled in cash using an electronic payment system, we applied the election to deem these financial liabilities to be discharged before the settlement date.
| 6 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
The amendments have been applied retrospectively with no restatement of comparative information, in accordance with transition requirements on initial application of IFRS 9.
IFRS 18 - Presentation and Disclosure in Financial Statements
In April 2024, the IASB issued IFRS 18, Presentation and Disclosure in Financial Statements, which replaces IAS 1, Presentation of Financial Statements. It is effective for annual reporting periods beginning on or after January 1, 2027, including interim periods within that year, and requires retrospective application. The Company will adopt IFRS 18 on January 1, 2027 and re-present its comparative information accordingly. IFRS 18 affects presentation and disclosure only and will not change the recognition or measurement of any items, the Company's loss and comprehensive loss, or its total assets, liabilities and equity.
Management is currently completing its assessment of the standard's effect on the Company. Income and expenses will be presented in operating, investing and financing categories, with new subtotals for operating loss and for loss before financing and income taxes. The Company expects to present interest income and gains and losses on marketable securities in the investing category, and interest expense on lease and financing obligations in the financing category. In the statement of cash flows, operating activities will be reconciled from operating loss.
Based on its assessment to date, the Company does not expect to present any management-defined performance measures.
As of September 30, 2026, there are no other IFRS or IFRIC interpretations with future effective dates that are expected to have a material impact on the Company.
c. Accounting estimates and judgments
The preparation of financial statements in conformity with IFRS accounting standards requires management to exercise judgement in the process of applying its accounting policies and to make estimates that affect the reported amounts of assets and liabilities and disclosures of contingent assets and contingent liabilities at the date of the financial statements and the reported amounts of income and expenses during the period. Actual results could differ from those estimates. Differences may be material.
The Company is required to make significant judgements in assessing whether there are any indicators of impairment relating to its exploration and evaluation asset. If any such indicator exists, then an impairment test is performed by management. Indicators of impairment may include (i) the period for which the entity has the right to explore in the specific area has expired during the year or will expire; (ii) substantive expenditures on further exploration for the evaluation of mineral resources in the specific area is neither budgeted nor planned; (iii) sufficient data exists to support that extracting the resources will not be technically feasible or commercially viable; and (iv) development or sale of a specific area is unlikely to recover existing exploration and evaluation asset costs. If any of these indicators are present, management would need to assess whether the exploration and evaluation asset should be impaired. There are no indicators of impairment as of September 30, 2026.
Judgment is required in assessing whether a mineral property is in the exploration and evaluation phase and should be classified as an exploration and evaluation asset or if the exploration and evaluation phase has been completed and the mineral property should be reclassified as property and equipment. We determined that although a feasibility study for the Casino Project has been completed, the Company has not yet received the necessary licenses and permits required to consider the exploration and evaluation stage to have been completed.
| 7 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
3. CASH AND CASH EQUIVALENTS
A breakdown of the Company's cash and cash equivalents is as follows:
| As of | September 30, 2026 |
December 31, 2025 |
||||
| $ | $ | |||||
| Cash | 26,629,648 | 8,297,526 | ||||
| Cash equivalents | - | 13,962,411 | ||||
| TOTAL | 26,629,648 | 22,259,937 |
As at September 30, 2026, the Company held cash of $26,547,780 in a high-interest account with an interest rate of 2.70%. The Company held no cash equivalents as all GICs held had original terms to maturity of greater than three months and are presented as short-term investments (Note 4). At December 31, 2025, cash equivalents were comprised of cashable guaranteed investment certificates ("GICs") with a weighted average interest rate of 2.38% and term of 81 days. The GICs are issued by Schedule 1 chartered banks in Canada.
4. SHORT-TERM INVESTMENTS
As at September 30, 2026 the Company had $92,808,092 (December 31, 2025 - $27,812,122) invested in Canadian dollar denominated GICs plus total accrued interest of $1,231,192 (December 31, 2025 - $461,227). The GICs had a weighted average interest rate of 3.29% and term of 350 days (December 31, 2025 - 3.00% and term of 340 days). The GICs are issued by Schedule 1 chartered banks in Canada.
5. EXPLORATION AND EVALUATION ASSET
a. Casino (100% - Yukon, Canada)
The Casino Project is a copper-gold porphyry deposit located in Yukon, Canada. Due to its location and the northern climate, work on the Casino Project can be limited to the period of late spring through early fall, as winter conditions limit the ability to do surface work.
The Casino Property is subject to a 2.75% NSR on the claims comprising the Casino project in favour of Osisko Gold Royalties Ltd. ("Osisko Gold") pursuant to the Royalty Assignment and Assumption Agreement dated July 31, 2017 when 8248567 Canada Limited assigned to Osisko Gold all of its rights, title and interest in the 2.75% NSR.
| 8 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
b. Exploration and evaluation expenditures
| Total | |||
| $ | |||
| DECEMBER 31, 2024 | 122,690,820 | ||
| Claims and maintenance | 38,133 | ||
| Engineering | 918,454 | ||
| Exploration, drilling and camp program | 919,095 | ||
| Permitting | 17,247,920 | ||
| Salary and wages | 1,859,164 | ||
| Share-based payments | 618,649 | ||
| DECEMBER 31, 2025 | 144,292,235 | ||
| Engineering | 1,321,937 | ||
| Exploration, drilling and camp program | 8,517,586 | ||
| Permitting | 7,604,607 | ||
| Salary and wages | 1,771,603 | ||
| Share-based payments | 737,122 | ||
| SEPTEMBER 30, 2026 | 164,245,090 |
6. SHARE CAPITAL
a. Authorized share capital
The Company is authorized to issue an unlimited number of common shares without par value and an unlimited number of preferred shares without par value.
b. Financing
On February 26, 2026, the Company completed a bought deal public offering (the "Offering") of 22,169,125 common shares of the Company at a price of $4.15 per common share for gross proceeds of $92,001,869. In connection with the Offering, the Company paid the underwriters a cash commission of $4,587,830 and incurred other share issuance costs of $1,103,229.
7. EQUITY INCENTIVE PLANS
The Company has three equity incentive plans consisting of a stock option plan (the "Option Plan"), a restricted share unit plan (the "RSU Plan") and a deferred share unit plan (the "DSU Plan") (collectively the "Equity Incentive Plans"). Pursuant to the Company's annual general meeting held on June 17, 2021, it was approved that the maximum aggregate number of common shares issuable under the Equity Incentive Plans cannot exceed 10% of number of common shares issued and outstanding.
| 9 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
a. Stock Options and Share-based payments
Stock Options
Under the Option Plan, the exercise price of the stock options must be greater than, or equal to, the market value of the Company's common shares on the last trading day immediately preceding the date of grant. Stock options vest over a two-year period from the date of grant unless otherwise determined by the directors. The maximum stock option term is 10 years. At September 30, 2026, the Company could issue an additional 5,619,845 stock options under the terms of the stock option plan.
A summary of the Company's stock options outstanding and the changes for the periods then ended, is presented below:
| Number of stock options |
Weighted average exercise price |
|||||
| $ | ||||||
| DECEMBER 31, 2024 | 8,707,334 | 1.75 | ||||
| Granted | 481,225 | 1.61 | ||||
| Exercised | (1,768,333 | ) | 1.67 | |||
| Expired | (810,000 | ) | 1.68 | |||
| Forfeited | (25,262 | ) | 1.61 | |||
| DECEMBER 31, 2025 | 6,584,964 | 1.77 | ||||
| Granted | 709,609 | 4.18 | ||||
| Exercised | (944,568 | ) | 2.07 | |||
| Forfeited | (28,481 | ) | 3.81 | |||
| SEPTEMBER 30, 2026 | 6,321,524 | 1.99 |
During the three and nine months ended September 30, 2026, the Company recognized an expense in respect of stock options of $253,637 and $839,609, respectively, in the statement of loss and comprehensive loss (three and nine months ended September 30, 2025 - $198,040 and $747,872, respectively). During the three and nine months ended September 30, 2026, $27,343 and $112,446, respectively, was capitalized (three and nine months ended September 30, 2025, $22,296 and $95,602, respectively) in the exploration and evaluation asset in relation to stock options. Stock options outstanding are as follows:
| Stock options outstanding, by exercise price |
Number of Stock options |
Weighted average exercise price |
Average remaining contractual life |
||||||
| $ | years | ||||||||
| $1.11 - $1.41 | 1,000,000 | 1.35 | 2.40 | ||||||
| $1.42 - $1.66 | 2,814,600 | 1.58 | 2.59 | ||||||
| $1.67 - $2.10 | 709,668 | 2.04 | 1.63 | ||||||
| $2.11 - $2.22 | 1,112,000 | 2.19 | 2.54 | ||||||
| $2.23 - $4.18 | 685,256 | 4.18 | 4.28 | ||||||
| SEPTEMBER 30, 2026 | 6,321,524 | 1.99 | 2.63 |
| 10 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
The weighted average exercise price for options exercised during the nine months ended September 30, 2026, was $2.07 (nine months ended September 30, 2025 - $1.54). Of the total stock options outstanding, 4,821,736 were vested and exercisable at September 30, 2026. The weighted average exercise price of vested stock options is $1.74 and the average remaining contractual life is 2.39 years.
Share-based payments
During the nine months ended September 30, 2026, the Company granted 709,609 (nine months ended September 30, 2025 - 481,225) stock options to employees, directors and consultants. The fair value of each option granted is estimated on the date of grant using the Black-Scholes option pricing model. The weighted average assumptions and resulting fair values are as follows:
| Inputs and assumptions | Nine months ended September 30, 2026 |
Nine months ended September 30, 2025 |
||||
| Exercise price | $ | 4.18 | $ | 1.61 | ||
| Market price | $ | 4.18 | $ | 1.61 | ||
| Expected option term (years) | 5.0 | 5.0 | ||||
| Expected stock price volatility | 50.8% | 54.0% | ||||
| Average risk-free interest rate | 2.96% | 3.15% | ||||
| Expected forfeiture rate | - | - | ||||
| Expected dividend yield | - | - | ||||
| FAIR VALUE PER OPTION GRANTED | $ | 1.97 | $ | 0.80 |
b. Restricted Share Units
The Company granted restricted share units ("RSUs") in accordance with the RSU plan approved at the June 17, 2021 shareholders meeting. These RSUs vest in three equal tranches: Tranche one - on completion of 12 months from grant date, Tranche two - on completion of eighteen months from the grant date and Tranche three - on completion of twenty-four months from grant date. These RSUs are classified as equity settled as these awards will be settled by issuing the shares and are valued at the market price of the Company shares on the date of grant. As at September 30, 2026, the Company could issue an additional 5,319,613 RSUs under the RSU Plan.
On April 8, 2026, the Company granted 590,936 milestone-based restricted share units ("Milestone RSUs") to certain employees and executives. These awards vest upon the achievement of specified corporate milestones related to the advancement of the Casino Project. The grant-date fair value of the awards was determined using the Company's share price of $3.72 per common share, resulting in a total fair value of $2,198,282. Share-based compensation is recognized over the estimated vesting period based on management's assessment of the expected timing of achieving each performance milestone.
| 11 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
A summary of the Company's RSUs outstanding and the changes for the periods then ended, is presented below:
| Number of shares issued or issuable on vesting |
|||
| DECEMBER 31, 2024 | 655,743 | ||
| RSUs Granted | 986,682 | ||
| RSUs Converted to common shares | (506,241 | ) | |
| RSUs Forfeited | (51,796 | ) | |
| DECEMBER 31, 2025 | 1,084,388 | ||
| RSUs Granted | 1,120,935 | ||
| RSUs Converted to common shares | (736,486 | ) | |
| RSUs Forfeited | (116,917 | ) | |
| SEPTEMBER 30, 2026 | 1,351,920 |
In relation to RSUs, the Company recognized an expense of $484,623 and $1,375,247 for the three and nine months ended September 30, 2026 (three and nine months ended September 30, 2025 - $231,824 and $781,157), respectively, in the statements of loss and comprehensive loss. During the three and nine months ended September 30, 2026, $233,590 and $624,676 was capitalized (three and nine months ended September 30, 2025 - $90,687 and $381,839), respectively, to the exploration and evaluation asset.
c. Deferred Share Units
Only directors of the Company are eligible for deferred share units ("DSUs") and each DSU vests immediately and is redeemed upon a director ceasing to be a director of the Company. DSUs are classified as equity settled as these awards will be settled by issuing the shares and are valued at the market price of the Company shares on the date of grant. As at September 30, 2026, the Company could issue an additional 3,447,620 DSUs under the DSU Plan.
| Number of shares issuable |
|||
| DECEMBER 31, 2024 | 658,300 | ||
| DSUs Granted | 204,664 | ||
| DSUs Exercised/Released | (369,144 | ) | |
| DECEMBER 31, 2025 | 493,820 | ||
| DSUs Granted | 161,675 | ||
| DSUs Exercised/Released | (88,400 | ) | |
| SEPTEMBER 30, 2026 | 567,095 |
In relation to DSUs, the Company recognized an expense of $33,682 and $648,764 during the three and nine months ended September 30, 2026 (three and nine months ended September 30, 2025 - $42,136 and $311,877), respectively, in the statements of loss and comprehensive loss.
| 12 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
8. KEY MANAGEMENT COMPENSATION
The Company's key management includes its directors and officers. The remuneration of key management was as follows:
| Three Months Ended September 30, |
Nine Months Ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| $ | $ | $ | $ | |||||||||
| Salaries and director fees | 736,978 | 539,100 | 2,276,316 | 1,635,739 | ||||||||
| Share-based payments | 701,614 | 551,088 | 2,731,104 | 1,896,393 | ||||||||
| KEY MANAGEMENT COMPENSATION | 1,438,592 | 1,090,188 | 5,007,420 | 3,532,132 | ||||||||
Share-based payments represent the fair value expensed during the periods presented above for stock options, RSUs and DSUs previously granted to directors and officers. Salaries and share-based payments for certain officers are capitalized to the exploration and evaluation asset and the balance is recognized in the statement of loss and comprehensive loss.
During the three and nine months ended September 30, 2026, the Company recorded a bonus accrual of $279,103 and $837,309 (three and nine months ended September 30, 2025 - $181,501 and $544,504), respectively, which is recorded in salaries and director fees above.
All related party transactions are disclosed in the above Key Management Compensation section. There were no additional related party transactions.
9. SURETY BONDING
The Company holds a surety bonding arrangement with a third-party (the "Surety") to satisfy bonding requirements in the Yukon Territory. The total value of the Surety is $786,777 of which $nil is collateralized on the balance sheet as at September 30, 2026 (December 31, 2025 - $nil).
10. SEGMENTED INFORMATION
The Company's operations are in one segment: the acquisition, exploration, and future development of mineral resource properties. All interest income is earned in Canada, and all assets are held in Canada.
11. SUPPLEMENTAL CASH FLOW INFORMATION
Non-cash working capital items
| For the nine months ended September 30, | 2026 | 2025 | ||||
| $ | $ | |||||
| Change in other assets | 241,047 | 276,514 | ||||
| Change in accrued interest | (769,965 | ) | 599,740 | |||
| Change in accounts payable and accrued liabilities related to operations | 1,103,138 | (822,930 | ) | |||
| CHANGE IN NON-CASH WORKING CAPITAL ITEMS | 574,220 | 53,324 |
| 13 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
12. CAPITAL MANAGEMENT
The Company considers capital to be equity composed of share capital, contributed surplus, and deficit. It is the Company's objective to safeguard its ability to continue as a going concern so that it can continue to explore and develop mineral resource properties.
The Company monitors its cash position on a regular basis to determine whether sufficient funds are available to meet its short-term and long-term corporate objectives and makes adjustments to its plans for changes in economic conditions, capital markets and the risk characteristics of the underlying assets.
To maintain its objectives, the Company may attempt to issue new shares, seek debt financing, acquire or dispose of assets or change the timing of its planned exploration and development projects. There is no assurance that these initiatives will be successful.
There was no change in the Company's approach to capital management during the period. Western has no debt aside from asset-backed equipment financing obligations and does not pay dividends. The Company is not subject to any externally imposed capital restrictions.
13. FINANCIAL INSTRUMENT RISK
The Board of Directors has overall responsibility for the establishment and oversight of the Company's risk management framework. The Company has exposure to liquidity, credit, and market risk from the use of financial instruments. Financial instruments consist of cash and cash equivalents, short-term investments, marketable securities, certain other assets, accounts payable and accrued liabilities, and financing obligations.
a. Fair value information
As at September 30, 2026, the carrying amounts of cash and cash equivalents, short-term investments, marketable securities, and accounts payable and accrued liabilities are considered to be reasonable approximations of their fair values due to the short-term nature of these instruments. The fair value of the marketable securities is determined by reference to published price quotations in an active market (classified as level 1 in the fair value hierarchy). The carrying value of the financing obligations approximates fair value given the recent transaction.
b. Management of financial risks
(i) Liquidity risk
Liquidity risk is the risk that the Company will be unable to meet its financial obligations as they come due. The Company uses cash forecasts to ensure that there is sufficient cash on hand to meet short-term business requirements. Cash is invested in redeemable GICs, which are highly liquid investments and available to discharge obligations when they come due. The Company does not maintain a line of credit.
| 14 |
| Western Copper and Gold Corporation Notes to the Condensed Interim Consolidated Financial Statements For the nine months ended September 30, 2026 and 2025 (Unaudited – Prepared by management) |
| (Expressed in Canadian dollars) |
(ii) Credit risk
Financial instruments that potentially subject the Company to credit risk consist primarily of cash and cash equivalents and short-term investments. These financial instruments are at risk to the extent that the institutions issuing or holding them cannot redeem amounts when they are due or requested. To limit its credit risk, the Company uses a restrictive investment policy. Cash and cash equivalents and short-term investments are held with high quality financial institutions. Substantially all cash and cash equivalents and short-term investments held with financial institutions exceeds government-insured limits. We have established credit policies that seek to minimize our credit risk by entering into transactions with investment grade credit worthy and reputable financial institutions. The carrying amount of financial assets, other than marketable securities, recorded in the financial statements represents Western's maximum exposure to credit risk.
(iii) Market risk
The Company is exposed to market risk because of the fluctuating values of its publicly traded marketable securities. The Company has no control over these fluctuations and does not hedge its investments. Marketable securities are adjusted to fair value at each balance sheet date. A 10% fluctuation in value of its publicly traded marketable securities rate would have a minimal impact on the Company's loss and comprehensive loss.
(iv) Interest rate risk
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate due to changes in market interest rates. The Company's financial assets and liabilities are not exposed to interest rate risk due to their short-term nature and maturity. Cash and equivalents and short-term investments are subject to fixed interest rates. The Company is not subject to interest rate risk.
| 15 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
MANAGEMENT'S DISCUSSION AND ANALYSIS
FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2026
The following management discussion and analysis (the "MD&A") of Western Copper and Gold Corporation (together with its subsidiaries, "Western" or the "Company") is dated November 5, 2026, and provides an analysis of the Company's results of operations for the three and nine months ended September 30, 2026.
This discussion is intended to provide investors with a reasonable basis for assessing the financial performance of the Company as well as certain forward-looking statements relating to its potential future performance. The information should be read in conjunction with Western's condensed interim consolidated financial statements for the three and nine months ended September 30, 2026, and the notes thereto, which have been prepared in accordance with International Financial Reporting Standards as issued by the International Accounting Standards Board ("IFRS Accounting Standards") as applicable to the preparation of interim financial statements under IAS 34, Interim Financial Reporting, and Western's audited consolidated financial statements for the year ended December 31, 2025, and the notes thereto, which have been prepared in accordance with the IFRS Accounting Standards. The Company's accounting policies are described in note 3 to the audited consolidated financial statements for the year-ended December 31, 2025 and note 2 to the condensed interim consolidated financial statements for the three and nine months ended September 30, 2026. All of the financial information presented herein is expressed in Canadian dollars, unless otherwise indicated.
Western is listed on the Toronto Stock Exchange (the "TSX") and the NYSE American under the symbol WRN. The Company's Annual Information Form for the year ended December 31, 2025 (the "AIF"), is filed with Canadian regulators on SEDAR+ at www.sedarplus.ca. This information, along with Western's annual report on Form 40-F, filed with the United States Securities and Exchange Commission (the "SEC"), is also available at https://www.sec.gov/edgar/.
The operations of the Company are speculative due to the high-risk nature of the mining industry and given the Company is an exploration and permitting stage company. Western faces risks that are generally applicable to its industry and others that are specific to its operations. Certain key risks affecting the Company's current and future operations are discussed in the AIF and Form 40-F. This list is not exhaustive. Additional risks not currently known to the Company, or that the Company currently deems immaterial, may also impair the Company's operations. Such risk factors could materially affect the value of the Company's assets and future operating results, and could cause actual results to differ materially from those described in the forward-looking statements contained in this MD&A. Reference is made to the discussion of forward-looking statements under the heading "Cautionary Note Regarding Forward-Looking Statements" at the end of this document.
Unless otherwise indicated, all references to "$" are to Canadian dollars and references to "US$" are to United States dollars.
DESCRIPTION OF BUSINESS
Western Copper and Gold Corporation and its wholly-owned subsidiary, Casino Mining Corp. ("Casino Mining"), are focused on advancing the Casino project ("Casino", "Project" or "Casino Project"). The Casino Project is located in Yukon, Canada and hosts one of the largest undeveloped copper-gold deposits in Canada. Alongside an organizational commitment to sustainable mining practices, the Casino Project has the potential to become a landmark, multi-generational, critical minerals operation in Canada.
| 1 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
CORPORATE DEVELOPMENTS
Financings
On February 26, 2026, the Company completed a bought deal public offering (the "Offering") of 22,169,125 common shares of the Company at a price of $4.15 per common share for gross proceeds of $92,001,869. In connection with the Offering, the Company paid the underwriters a cash commission of $4,587,830 and incurred other share issuance costs of $1,103,229.
Strategic Investor - Rio Tinto Canada
On June 13, 2025, the Company extended and revised the investor rights agreement with Rio Tinto. As part of the revised investor rights agreement, Rio Tinto will continue to hold a seat on the Casino Project Technical and Sustainability Committee. Rio Tinto's existing standstill and trading restrictions, along with certain other obligations, remain in effect, while the previous board observer right and potential board seat rights, were extinguished. The revised investor rights agreement will expire on the earlier of November 30, 2026 and when Rio Tinto's ownership falls below 5.0% unless the Company and Rio Tinto otherwise mutually agree to extend (the "Rio Tinto Expiry Date"). Rio Tinto currently has an approximate 8.5% ownership in the Company.
Under the revised investor rights agreement, until the Rio Tinto Expiry Date, Rio Tinto has agreed:
• not to sell, transfer, offer or otherwise dispose of any shares, subject to certain exceptions,
• not to acquire any securities of the Company, subject to certain exceptions, and
• to abstain from voting or vote any shares in favor of each director nominated by the board of directors of the Company for election by shareholders.
In connection with the revised investor rights agreement, Rio Tinto has certain rights until the Rio Tinto Expiry Date, including:
• the continued right to appoint one member to the Casino Project Technical and Sustainability Committee,
• the continued right to appoint up to three secondees to the Casino Project,
• the continued right to participate in future equity issuances to maintain its ownership in the Company, and
• a continued one-time "demand registration right" and "piggy-back registration rights."
Strategic Investor - Mitsubishi Materials Corporation
On July 20, 2026, the Company announced that Mitsubishi Materials Corporation ("Mitsubishi Materials") had completed the precondition for the previously announced extension of their amended and restated investor rights agreement effective May 30, 2026. Mitsubishi Materials acquired 1.2 million common shares of the Company through open market purchases and, as such, the rights and obligations pursuant to the amended and restated investor rights agreement have been extended until the earlier of November 30, 2028 and when Mitsubishi Materials' ownership falls below 3.0% (the "Mitsubishi Materials Expiry Date"). Mitsubishi Materials' current ownership in Western has returned to approximately 5.0% from 4.5%.
Under the revised investor rights agreement, until the Mitsubishi Materials Expiry Date, Mitsubishi Materials has agreed:
• not to sell, transfer, offer or otherwise dispose of any shares, subject to certain exceptions, and
• not to acquire any securities of the Company, subject to certain exceptions.
Until November 30, 2028, Mitsubishi Materials has also agreed to abstain from voting or vote any shares in favor of each director nominated by the board of directors of the Company for election by shareholders.
| 2 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
In connection with the revised investor rights agreement, Mitsubishi Materials has certain rights until the Mitsubishi Materials Expiry Date, including:
• the continued right to appoint one member to the Casino Project Technical and Sustainability Committee,
• the continued right to appoint the greater of one director of the Company or 17% of the number of directors (rounding to the nearest whole number), if Mitsubishi Materials' ownership increases to at least 12.5%, and
• the right to participate in future equity issuances to maintain its ownership in the Company.
Until the later of November 30, 2028 and when Mitsubishi Materials' ownership falls below 3.0%, Mitsubishi Materials also has the right of first negotiation to offtake at least its proportionate share of minerals produced from the Casino Project.
Management and Board Changes
On October 26, 2026, the Company announced that Sandeep Singh will step down as President and Chief Executive Officer and as a director of the Company effective October 31, 2026. Mark E. Smith, Chairman of the Board, has been appointed Interim Chief Executive Officer of the Company, and Michael Psihogios has been appointed President of the Company in addition to his role as Chief Financial Officer of the Company, both effective November 1, 2026. The Board will initiate an executive search for a new CEO.
On August 10, 2026, the Company announced the appointment of Mr. Mark E. Smith as Chair of the board of directors (the "Board"), succeeding Raymond Threlkeld, who will continue to serve as a director of the Company.
On January 12, 2026, the Company announced the appointment of Mr. Robert Dirk as the Chief Operating Officer of the Company and Mr. Christian Roldan as Vice President, Technical of the Company.
On November 14, 2025, the Company announced the appointment of Mr. Mark E. Smith to its Board.
On June 14, 2025, following the voting results from the Company's Annual General Meeting, the Company announced the appointment of Ms. Pamela O'Hara to the Board. Dr. Bill Williams and Ms. Tara Christie did not stand for re-election.
CASINO PROJECT UPDATE
Environmental Assessment and Permitting
The Casino Project is in the environmental assessment and permitting phase. The Company submitted its Environmental and Socio-economic Effects Statement (the "ESE Statement") for the proposed Casino Project on October 6, 2025, to the Yukon Environmental and Socio-economic Assessment Board ("YESAB"), the Yukon's independent assessment body established under the Yukon Environmental and Socio-economic Assessment Act ("YESAA"). The Company is actively engaged with YESAB, relevant government agencies and First Nations in connection with the process (the "Panel" and "Panel Review").
The ESE Statement details the assessment of potential project-related and cumulative environmental and socio-economic effects for Valued Environmental and Socio-economic Components ("VESECs"). With the implementation of a comprehensive suite of environmental management measures, including mitigation measures, management and monitoring plans, and an adaptive management approach, project-related residual effects and any cumulative residual effects were assessed to be not significant across all VESECs.
The next step after submission involves a sufficiency review by YESAB's Executive Committee. The purpose of this review is to determine whether the ESE Statement contains sufficient information to move forward in the Panel Review or whether YESAB requires supplemental information. Following its review, on February 2, 2026, the Executive Committee determined that supplemental information is required and issued a series of information requests for the Company to address.
| 3 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
On July 15, 2026, the Company submitted its responses to the supplementary information and clarification requests received from the Executive Committee. The responses add to the substantial body of technical work that is the foundation for YESAB's review of the Project. Once the requested supplemental information has been deemed sufficient, YESAB will finalize the Terms of Reference, establish the Panel, and the Panel will commence its technical review of the ESE Statement through a structured information request process.
On August 10, 2026, the Company, announced it commenced a site program to support the technical analysis phase of the YESAB Panel Review for the Casino Project. The site program is designed to advance specific aspects of engineering design and optimization, positioning the Company for the next phases of technical analysis and supporting future planned permitting activities. The site program includes further geotechnical drilling and permafrost investigations across proposed mine infrastructure sites, including the tailings management facility, heap leach facility, stockpile areas, and open pit. Metallurgical drill holes are also planned within the oxide cap to provide additional sample density across key ore types and support ongoing test work focused on enhancing metal recovery. This work is complemented by test pits, ground geophysical surveys, and a drone magnetics survey.
Government of Yukon
On March 2, 2026, the Government of Yukon announced a restructuring of its Mineral Resources Branch, creating a dedicated Major Mines and Technical Services branch and establishing a Deputy Minister's Oversight Committee on Major Mines and Critical Minerals. These measures are designed to improve coordination, reduce permitting delays, and provide regulatory certainty for mine development projects in the territory.
Economic Impacts of the Casino Project
The Company engaged MNP LLP, a Canadian accounting and consulting firm, to conduct updated economic impact modeling that quantifies Casino's direct, indirect, and induced economic effects across Canada.
Study Highlights (at US$3.60/lb Cu and US$1,700/oz Au):
- Economic Growth: Over its proposed 27-year mine life, Casino is estimated to contribute over C$44 billion to Canada's GDP, including over C$37 billion in the Yukon.
- Job Creation: Casino would directly employ approximately 700 workers and create an additional 2,000 jobs across suppliers, contractors, and local businesses, generating over C$12 billion in wages and salaries over the mine life.
- Government Revenues: Each year, Casino is forecasted to generate C$175 million in tax revenue for the Government of Yukon and C$231 million for the Government of Canada.
- Critical Minerals Production in Canada: Casino is positioned to become one of North America's largest producers of copper and molybdenum - both included on Canada's official list of critical minerals, with copper designated as one of six priority critical minerals essential for economic growth.
Infrastructure
The Company continues to provide updates on infrastructure initiatives supporting the development of the Casino Project, including the Yukon-B.C. Grid Connect Project, Yukon Resource Gateway Project, and the Port of Skagway Transportation Study.
| 4 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Yukon-B.C. Grid Connect Project:
On September 17, 2024, Natural Resources Canada ("NRCan") conditionally approved $40 million in funding to advance pre-feasibility work for a high-voltage transmission energy corridor connecting the isolated Yukon electrical grid to the North American grid in British Columbia (the "Grid Connect"). Western is pleased to report that the conditions for this funding have been met by the Yukon Development Corporation ("YDC"), an entity of the Government of Yukon, which included a 25% YDC funding commitment over and above the $40 million from NRCan. Subsequently, a contribution agreement with NRCan was officially signed in Ottawa on February 14, 2025, where project planning activities have since commenced. With its significant industrial load, the Casino Project is central to the concept behind the Grid Connect - its advancement signals confidence in the Casino Project's potential and its role in shaping the Yukon's future infrastructure. While Western continues to advance LNG as the Casino Project's base case power solution, the Company looks forward to working alongside YDC and First Nations to help make the grid connection a success.
On October 1, 2025, YDC published a report on the shared benefits of the Grid Connect, noting that the project links Canada's northwest to the North American grid. The transmission line would electrify several diesel-reliant communities and significant critical mineral developments in the Yukon and B.C.'s Northwest Corridor. Additionally, according to the report, the Grid Connect could unlock up to C$7.6 billion per year in clean economic growth, support more than 36,000 long-term jobs, and enable up to 2,000 MW of new renewable energy. The report identifies the Casino Project as a potential source of stable baseload demand that could support the transmission line's economic viability.
On November 13, 2025, Prime Minister Carney referred the Northwest Critical Conservation Corridor - including the proposed Yukon-B.C. Grid Connect - to the Major Projects Office ("MPO") to accelerate the development and delivery of this nation-building project. The Company welcomes the federal recognition of this corridor and its extraordinary potential to advance critical minerals development and clean power transmission, while upholding Indigenous rights and supporting Indigenous project leadership.
On June 26, 2026, the Honourable Tim Hodgson, Minister of Energy and Natural Resources, announced that the federal government will prioritize financial and regulatory support for five transmission projects across Canada, including the Yukon-B.C. Grid Connect. The announcement builds on Canada's National Electricity Strategy, launched by Prime Minister Mark Carney on May 14, 2026, which aims to double the capacity of Canada's grid by 2050.
Yukon Resource Gateway Project:
On March 22, 2025, the Government of Yukon announced the inclusion of the Dempster Highway in the Yukon Resource Gateway Project ("Gateway Project"), expanding the scope of the initiative to include Arctic security and regional connectivity. Whilst positive for the Yukon, a portion of funding previously allocated to the Casino Copper-Gold Access Road has been redirected to support this near-term priority. Western remains in close collaboration with the Yukon government, and discussions on future funding are expected to advance as the project moves through the environmental assessment process, which includes the road.
Port of Skagway Transportation Study:
Western has completed an updated transportation study evaluating options for shipping concentrate from the Casino Project to the Port of Skagway ("Skagway"). The study, conducted in collaboration with the Municipality of Skagway and the Government of Yukon, assessed both bulk and containerized transportation methods, assessed infrastructure requirements at Skagway, and provided feasibility-level capital and operating cost estimates across multiple scenarios. Several promising transportation alternatives were identified, with costs broadly in-line with, or lower than, the Company's 2022 feasibility study estimates. The Municipality of Skagway at its Borough Assembly Meeting on August 21, 2025, re-iterated its support for the transportation study, mineral shipments and related permitting at Skagway.
| 5 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Community and First Nations Engagement
The Company prioritizes early and ongoing engagement with Yukon Communities and First Nations. Western is actively building relationships with Yukon First Nations whose Traditional Territories are affected by the Casino Project. Engagement is on-going and has consistently increased as the Casino Project advances through the environmental assessment and permitting process, including ongoing meetings, workshops, community sessions, and site visits. Input from affected First Nations has helped inform project planning and design, including environmental monitoring and key elements such as access, tailings management, heap leach facility design, water treatment and closure planning. To date, the Casino Project has completed Traditional Land Use Studies, entered into capacity and other project agreements.
Drilling Program
On March 27, 2024, the Company announced the results from the 2023 drilling program (the "Drill Program") at the Casino Project. The Drill Program was developed by Western's Technical and Sustainability Committee, which is comprised of members from Western, Rio Tinto and Mitsubishi Materials.
The 2023 Drill Program consisted of seven holes for 2,244 m ranging from 130 m to 556 m in length. The drill holes were located inside the current pit boundaries and were selected to provide a range of grades, host rocks, and mineralogy. The drill holes were also selected to convert indicated mineral resources to measured mineral resources.
Results from the Drill Program continued to show the importance of the Core Zone wherein relatively higher grades are encountered.
The Drill Program also included 783 m of geotechnical and hydrogeological drilling designed by Knight-Piesold Consulting, which targeted the ground conditions of the proposed open pit, stockpiles, tailings management facility, heap leaching facility, new airstrip, and the proposed Ranney well site.
On August 10, 2026, as part of its site program update for the Casino Project, the Company announced that for the first time in years, the Company is evaluating targets on the broader land package to support the planning of future exploration concepts, which remains largely untested. The Company has begun investigating some of those concepts for potential future exploration.
Metallurgical Program
On February 13, 2025, the Company announced results from a supplemental metallurgical program (the "Metallurgical Program") for the Casino Project.
The Metallurgical Program used drill core composites of material representing potential mill feed taken from the Drill Program with more variable copper, gold, and molybdenum levels than had been tested in previous drill campaigns and from a broader period of planned mining. The fifteen composites of approximately 200 kg were subjected to detailed mineralogy, comminution testing, flotation testing and detailed analysis of copper concentrates. Composite preparation and all metallurgical test work was completed at ALS Metallurgy in Kamloops, B.C.
Standard processing methods continue to produce good recoveries for copper and gold, consistent with previous metallurgical work. The program achieved significantly higher recoveries for molybdenum. Casino would produce a high gold grade copper concentrate and a separate molybdenum concentrate. Both are expected to be highly marketable given the very low levels of impurities.
| 6 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
The outline of the Metallurgical Program and the review of the results were completed by Western's Technical and Sustainability Committee, which is comprised of members from Western, Rio Tinto and Mitsubishi Materials.
Feasibility Study
On June 28, 2022, the Company released the results of its Feasibility Study (the "Study") on the Casino Project. The Study considered the Project being constructed as an open pit mine, with a concentrator processing 120,000 tonnes per day (t/d) to recover copper, gold, molybdenum and silver, as well as a 25,000 t/d oxide heap leach facility to recover gold, silver and copper.
The Study supersedes all previous studies and incorporates an updated mineral resource estimate with an effective date of April 29, 2022, and mineral reserve estimate with an effective date of June 13, 2022. The Study examines the development of the Casino Project, which comprises the processing of 1.43 billion tonnes of Mineral Reserve for both the mill and heap leach, with deposition of mill tailings and mine waste in the Tailings Management Facility ("TMF") consistent with the design concepts considered during the Best Available Tailings Technology ("BATT") Study as a base case development.
RESULTS
The Study indicates that the potential economic returns from the Project justify its further advancement and securing of the required permits and licenses for operation.
The financial results of the Study were developed under commodity prices that were based on analyst projections of long-term metal prices and a CAN$:US$ exchange rate of 0.80 ("Base Case" prices).
The following table summarizes the financial results:
| Base Case | |
| Copper (US$/lb) | 3.60 |
| Gold (US$/oz) | 1,700 |
| Molybdenum (US$/lb) | 14.00 |
| Silver (US$/oz) | 22.00 |
| Exchange Rate (C$:US$) | 0.80 |
| NPV pre-tax (5% discount, $millions) | 5,768 |
| NPV pre-tax (8% discount, $millions) | 3,473 |
| IRR pre-tax (100% equity) | 21.2 |
| NPV after-tax (5% discount, $millions) | 4,059 |
| NPV after-tax (8% discount, $millions) | 2,334 |
| IRR after-tax (100% equity) | 18.1 |
| LOM pre-tax free cash flow ($millions) | 13,713 |
| LOM after-tax free cash flow ($millions) | 10,019 |
| Initial Capital Costs ($millions) | 3,618 |
| Sustaining Capital Costs ($millions) | 751 |
| Total Capital Costs ($millions) | 4,369 |
| Payback period (years) | 3.3 |
| Net Smelter Return ($/t milled) | 29.08 |
| Copper Cash Cost (net of by-product credits) ($/lb) | (1.00) |
| Copper Cash Cost (co-product basis) ($/lb) | 1.92 |
| Gold Cash Cost (co-product basis) ($/oz) | 908.53 |
| 7 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
MINERAL RESERVES
The Mineral Reserve estimate is based on an updated open pit mine plan and mine production schedule using commodity prices of US$3.25 per pound copper, US$1,700 per ounce gold, US$12.00 per pound molybdenum and US$22.00 per ounce silver.
All of the mineralization included in the Mineral Reserve estimate with respect to the Casino Project is contained on mineral titles controlled by Western. The following table presents the Mineral Reserve that is the basis for this Study.
| Tonnes | NSR | Cu | Au | Mo | Ag | CuEq | Cu | Au | Mo | Ag | |
| Mill Ore Reserve: | (Mt) | ($/t) | (%) | (g/t) | (%) | (g/t) | (%) | (Mlbs) | (Moz) | (Mlbs) | (Moz) |
| Proven Mineral Reserve | 140.1 | 38.50 | 0.31 | 0.39 | 0.024 | 2.1 | 0.67 | 944 | 1.8 | 74.9 | 9.4 |
| Probable Mineral Reserve | 1,076.9 | 23.68 | 0.17 | 0.19 | 0.021 | 1.6 | 0.36 | 4,135 | 6.7 | 497.1 | 55.5 |
| Proven/Probable Reserve | 1,217.1 | 25.38 | 0.19 | 0.22 | 0.021 | 1.7 | 0.40 | 5,079 | 8.5 | 571.9 | 64.9 |
| Tonnes | NSR | Au | Cu | Mo | Ag | AuEq | Au | Cu | Mo | Ag | |
| Heap Leach Reserve: | (Mt) | ($/t) | (g/t) | (%) | (%) | (g/t) | (g/t) | (Moz) | (Mlbs) | (Mlbs) | (Moz) |
| Proven Mineral Reserve | 42.9 | 22.52 | 0.45 | 0.055 | N/A | 2.7 | 0.47 | 0.62 | 51.8 | N/A | 3.7 |
| Probable Mineral Reserve | 166.8 | 11.14 | 0.22 | 0.031 | N/A | 1.8 | 0.23 | 1.17 | 113.5 | N/A | 9.4 |
| Proven/Probable Reserve | 209.6 | 13.47 | 0.26 | 0.036 | N/A | 1.9 | 0.28 | 1.78 | 165.3 | N/A | 13.1 |
Notes:
1. The Mineral Reserve estimate has an effective date of June 13, 2022, and was prepared using the CIM Definition Standards (10 May 2014).
2. Columns may not sum exactly due to rounding.
3. Mineral Reserves are based on commodity prices of US$3.25/lb Cu, US$1550/oz Au, US$12.00/lb Mo, and US$22.00/oz Ag.
4. Mineral Reserves amenable to milling are based on NSR cutoffs that vary by time period to balance mine and plant production capacities. They range from a low of $6.11/t to a high of $25.00/t.
5. NSR value for supergene (SOX and SUS) mill material is NSR (C$/t) = $73.63 x recoverable copper (%) + $40.41 x gold (g/t) + $142.11 x moly (%) + 0.464 x silver (g/t), based on recoveries of 69% gold, 52.3% molybdenum and 60% silver. Recoverable copper = 0.94 x (total copper - soluble copper).
6. NSR value for hypogene (HYP) mill material is NSR (C$/t) = $67.88 x copper (%) + $38.66 x gold (g/t) + $213.78 x moly (%) + $0.386 x silver (g/t), based on recoveries of 92.2% copper, 66% gold, 78.6% molybdenum and 50% silver.
7. Mineral Reserves amenable to heap leaching are based on an NSR cutoff of $6.61/t.
8. NSR value for leach material is NSR (C$/t) = $14.05 x copper (%) + $47.44 x gold (g/t) + $0.210 x silver (g/t), based on recoveries of 18% copper, 80% gold and 26% silver.
9. AuEq and CuEq values are based on prices of US$ 3.25/lb Cu, US$ 1550/oz Au, US$ 12.00/lb Mo, and US$ 22.00/oz Ag, and account for all metal recoveries and smelting/refining charges.
10. The NSR calculations also account for smelter/refinery treatment charges and payables.
On August 9, 2022, the Company filed a technical report titled "Casino Project, Form NI 43-101F1 Technical Report Feasibility, Yukon, Canada" with an effective date of June 13, 2022 (the "Report"). The Report summarizes the results of the Feasibility Study on the Casino Project, which results were first reported by the Company in a news release dated June 28, 2022.
| 8 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Exploration and evaluation expenditures
Capitalized expenditures for the periods presented were as follows:
| For the nine months ended September 30, | 2026 | 2025 | ||||
| $ | $ | |||||
| Claims maintenance | - | 38,133 | ||||
| Engineering | 1,321,937 | 765,081 | ||||
| Exploration and camp support | 8,517,586 | 899,055 | ||||
| Permitting | 7,604,607 | 14,972,034 | ||||
| Salary and wages | 1,771,603 | 1,441,926 | ||||
| Share-based payments | 737,122 | 477,441 | ||||
| TOTAL | 19,952,855 | 18,593,670 |
During the nine months ended September 30, 2026, the Company advanced permitting and environmental assessment activities for the Casino Project, including the submission in July 2026 of responses to the supplementary information and clarification requests received from the YESAB Executive Committee. During the third quarter, the Company also commenced its 2026 site program, including geotechnical, permafrost and metallurgical drilling and geophysical surveys. Additionally, the Company progressed engineering studies, along with engagement and consultation with First Nations that may be impacted by the Casino Project.
During the nine months ended September 30, 2025, the Company's activity focused on the Casino Project, including the advancement of permitting and engineering activity to support the submission of the ESE Statement to the YESAB Executive Committee in 2025. In addition, the Company's activity included engagement and consultation with First Nations that may be impacted by the project.
Royalty payments
The Casino Property is subject to a 2.75% NSR on the claims comprising the Casino project in favour of Osisko Gold Royalties Ltd. ("Osisko Gold") pursuant to the Royalty Assignment and Assumption Agreement dated July 31, 2017, when 8248567 Canada Limited assigned to Osisko Gold all of its rights, title and interest in the 2.75% NSR.
| 9 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
SELECTED QUARTERLY FINANCIAL INFORMATION
The following quarterly information has been extracted from the Company's unaudited condensed interim consolidated financial statements or the audited annual consolidated financial statements.
| As at and for the quarter ended | 30-Sep-26 | 30-Jun-26 | 31-Mar-26 | 31-Dec-25 | ||||||||
| $ | $ | $ | $ | |||||||||
| Loss and comprehensive loss | 1,677,772 | 1,672,446 | 2,540,714 | 964,409 | ||||||||
| Loss per share - basic and diluted | 0.01 | 0.01 | 0.01 | 0.00 | ||||||||
| Cash and short-term investments | 120,668,932 | 128,640,227 | 134,355,648 | 50,533,286 | ||||||||
| Exploration and evaluation asset | 164,245,090 | 153,140,758 | 147,493,607 | 144,292,235 | ||||||||
| Total assets | 287,984,302 | 284,916,605 | 282,865,251 | 195,889,770 |
| As at and for the quarter ended | 30-Sep-25 | 30-Jun-25 | 31-Mar-25 | 31-Dec-24 | ||||||||
| $ | $ | $ | $ | |||||||||
| Loss and comprehensive loss | 890,292 | 627,995 | 637,066 | 1,593,628 | ||||||||
| Loss per share - basic and diluted | 0.00 | 0.00 | 0.00 | 0.01 | ||||||||
| Cash and short-term investments | 55,383,540 | 58,445,510 | 62,911,262 | 67,972,991 | ||||||||
| Exploration and evaluation asset | 141,284,490 | 135,317,346 | 128,122,617 | 122,690,820 | ||||||||
| Total assets | 198,287,325 | 197,154,774 | 193,998,798 | 192,793,386 |
Items that resulted in significant differences in the quarterly figures presented above are explained in the following narrative.
Loss and comprehensive loss
The scale and nature of the Company's corporate and administrative activity have remained relatively consistent over the periods presented above. Quarterly fluctuations in loss and comprehensive loss figures have mainly been driven by variability in gains on marketable securities, stock-based compensation, wages and benefits, and interest income.
During the three months ended September 30, 2026, the Company recognized wages and benefits of $1,040,037 and share-based payments of $740,442. Wages and benefits were higher than comparative quarters due to the expanded management team as noted below. The increase in expenses in the current quarter was partially offset by interest income of $966,594 earned during the period.
During the three months ended June 30, 2026, the Company recognized share-based payments of $1,172,064. This expense is not consistent with other quarters due to the number of stock options, restricted share units (RSUs), including milestone RSUs, and deferred share units (DSUs) granted, along with the valuation, and recognition differences relating to the underlying equity compensation grants. This increase in expense in the current quarter was partially offset by higher interest income of $968,246 earned during the period.
During the three months ended March 31, 2026, the Company incurred share-based payments totaling $916,987 due to the number of options granted, timing, valuation, and recognition differences relating to the underlying stock option grants, as well as increased wages and benefits expense due to an expanded management team, following the appointment of its Chief Operating Officer and VP, Technical.
During the three months ended December 31, 2025, the Company recognized share-based payments totaling $411,202 due to timing, valuation and recognition differences relating to the underlying stock option grants, and the recognition and amortization related to RSUs.
| 10 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
During the three months ended September 30, 2025, share-based payments totaled $474,126 due to the number of options granted, timing, valuation, and recognition differences relating to the underlying stock option grants.
During the three months ended June 30, 2025, share-based payments totaled $747,852 due to the number of options granted, timing, valuation, and recognition differences relating to the underlying stock option grants. Additionally, the Company recognized a gain on marketable securities of $909,174 during the period.
During the three months ended March 31, 2025, share-based payments totaled $641,804 due to the number of options granted, timing, valuation, and recognition differences relating to the underlying stock option grants. Additionally, the Company recognized lower professional fees and a gain on marketable securities of $775,000, during this period.
During the three months ended December 31, 2024, the Company recognized interest income of $791,360 due to higher interest-bearing balances and higher interest rates. The Company also incurred share-based payments totaling $533,224 due to timing, valuation, and recognition differences relating to the underlying stock option grants as well as the recognition and amortization related to RSUs. In addition, the Company recorded accrued severance of $449,124 during the period. The Company also recorded a loss on marketable securities of $150,000.
Exploration and evaluation asset
Expenditures incurred by the Company relating to its mineral properties are capitalized. As a result, the carrying value of the exploration and evaluation asset increases from period to period.
During the three months ended September 30, 2026, June 30, 2026 and March 31, 2026, the exploration and evaluation asset increased by $11,104,332, $5,647,151 and $3,201,372, respectively, primarily related to advancing permitting and environmental assessment activities for the Casino Project, with a focus on the sufficiency review by the YESAB Executive Committee. The increase in the three months ended September 30, 2026 also reflects the commencement of the 2026 site program. Additionally, the Company progressed engineering studies, site work, along with engagement and consultation with First Nations that may be impacted by the Casino Project.
During the three months ended December 31, 2025 and September 30, 2025, the exploration and evaluation asset increased by $3,007,745 and $5,967,144, and respectively, primarily driven by the advancement of permitting and engineering activity to support the submission of the ESE Statement to the YESAB Executive Committee, which occurred in October 2025, alongside planning for the ESE Statement sufficiency review by the YESAB Executive Committee. In addition, the Company's activity included engagement and consultation with First Nations that may be impacted by the project.
During the three months ended June 30, 2025, March 31, 2025, and December 31, 2024 the exploration and evaluation asset increased by $7,194,729, $5,431,797, and $4,673,078 respectively, which primarily included the advancement of permitting and engineering activity to support the submission of the ESE Statement to the YESAB Executive Committee in 2025.
Cash, cash equivalents, and short-term investments
Cash is used to fund ongoing operations. Unless there is a significant financing transaction, total cash, cash equivalents and short-term investments are expected to decrease from one period to the next.
As of September 30, 2026, the Company had cash held in high-interest accounts, as well as short-term investments in the form of Guaranteed Investment Certificates as follows:
| 11 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
| Classification | Weighted average rate |
Weighted average term |
Principal | Accrued Interest |
Total | ||||||||||
| % | days | $ | $ | $ | |||||||||||
| Short-term investments | 3.29 | 350 | 92,808,092 | 1,231,192 | 94,039,284 | ||||||||||
| Cash | 2.69 | - | 26,629,648 | - | 26,629,648 | ||||||||||
| Total | 3.29 | 350 | 119,437,740 | 1,231,192 | 120,668,932 |
RESULTS OF OPERATIONS
| Three Months Ended September 30, |
Nine Months Ended September 30 |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| $ | $ | $ | $ | |||||||||
| Depreciation | 98,654 | 31,333 | 213,123 | 64,715 | ||||||||
| Filing and regulatory fees | 20,813 | 25,284 | 392,660 | 303,991 | ||||||||
| Office and administration | 451,364 | 274,105 | 1,063,180 | 598,924 | ||||||||
| Professional fees | 105,289 | 180,952 | 504,588 | 536,861 | ||||||||
| Share-based payments | 740,442 | 474,126 | 2,829,493 | 1,863,782 | ||||||||
| Shareholder communication and travel | 192,256 | 216,514 | 609,176 | 570,179 | ||||||||
| Wages and benefits | 1,040,037 | 631,958 | 2,614,795 | 2,049,748 | ||||||||
| CORPORATE EXPENSES | 2,648,855 | 1,834,272 | 8,227,015 | 5,988,200 | ||||||||
| Foreign exchange loss | 2,861 | (3,223 | ) | 6,138 | (194 | ) | ||||||
| Interest income | (966,594 | ) | (406,624 | ) | (2,332,561 | ) | (1,614,346 | ) | ||||
| Gain on marketable securities | (7,350 | ) | (534,133 | ) | (9,660 | ) | (2,218,307 | ) | ||||
| LOSS AND COMPREHENSIVE LOSS | 1,677,772 | 890,292 | 5,890,932 | 2,155,353 | ||||||||
THREE MONTHS ENDED SEPTEMBER 30, 2026
The Company incurred a loss of $1,677,772 ($0.01 per common share) for the three months ended September 30, 2026, compared to a loss of $890,292 ($0.00 per common share) for the same period in 2025. The increase in the quarterly loss was primarily attributable to higher wages and benefits, share-based payments and office and administration expenses, along with a decrease in gain on marketable securities, partially offset by higher interest income earned during the quarter.
NINE MONTHS ENDED SEPTEMBER 30, 2026
The Company incurred a loss of $5,890,932 ($0.03 per common share) for the nine months ended September 30, 2026, compared to a loss of $2,155,353 ($0.01 per common share) over the same period in 2025. The scale and nature of the Company's administrative activity have remained generally consistent throughout these periods, but a few items led to differences in the comparative figures, as follows:
Share-based payments increased by $965,711, primarily due to the recognition of stock option, RSU and DSU compensation expense. The increase was driven by higher valuations of the equity instruments granted, a result of a higher share price, as well as more instruments being granted.
Wages and benefits increased by $565,047, primarily due to an expanded team in 2026.
Office and administration expenses increased by $464,256 due to higher corporate activity during the period.
| 12 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Interest income increased by $718,215, reflecting higher average cash and short-term investment balances during the period following the bought deal public offering.
The Company recognized a gain on marketable securities of $9,660, compared to $2,218,307 in the comparative period.
LIQUIDITY AND CAPITAL RESOURCES
| For the nine months ended September 30, | 2026 | 2025 | ||||
| $ | $ | |||||
| CASH PROVIDED BY (USED IN) | ||||||
| Operating activities | (2,233,217 | ) | (2,460,966 | ) | ||
| Financing activities | 88,012,088 | 3,069,832 | ||||
| Investing activities | (81,409,160 | ) | (4,410,698 | ) | ||
| CHANGE IN CASH AND EQUIVALENTS | 4,369,711 | (3,801,832 | ) | |||
| Cash and cash equivalents - beginning | 22,259,937 | 14,202,317 | ||||
| CASH AND CASH EQUIVALENTS - ENDING | 26,629,648 | 10,400,485 |
Cash and cash equivalents totaled $26,629,648 as at September 30, 2026 (December 31, 2025 - $22,259,937). Cash and cash equivalents and short-term investments totaled $120,668,932 as at September 30, 2026 (December 31, 2025 - $50,533,286). Western's net working capital (current assets less current liabilities) as at September 30, 2026 totaled $113,996,753 (December 31, 2025 - $48,708,424).
Western is an exploration and permitting stage company. As at the date of this MD&A, the Company has not earned any production revenue. It depends heavily on its working capital balance and its ability to raise funds through capital markets to finance its operations. Although the Company expects that the current cash and short-term investments on hand will be sufficient to fund anticipated operating activities in the next twelve months, it will require significant additional funding to complete the development and construction of the Casino mine.
Operating activities
The significant components of operating activities are discussed in the Results of Operations section above.
Financing activities
During the nine months ended September 30, 2026, the Company completed a bought deal public offering for net proceeds $86,310,810. Additionally, the Company received $1,951,530 from the exercise of stock options and expended $250,252 on lease and financing obligation payments.
During the nine months ended September 30, 2025, the Company received $1,857,084 from the exercise of stock options, $1,275,000 from the exercise of warrants and expended $62,252 on lease payments.
| 13 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
The table below summarizes the actual use of proceeds incurred up to September 30, 2026, compared to the expected use of proceeds from the bought deal offering documents1:
| Expected Use of Proceeds (Offering Document)1 |
Actual Use of Proceeds to Date2 |
|||||
| Permitting activities | $ | 30,000,000 | $ | 3,439,969 | ||
| Engineering activities | $ | 20,000,000 | $ | 2,063,982 | ||
| Site Activities | $ | 20,000,000 | $ | 8,255,927 |
Investing activities
Investing activities include both mineral property expenditures, and purchases and redemptions of short-term investments. Investments with an original maturity of greater than three months are considered short-term investments for accounting purposes. Purchases and redemptions of short-term investments are mainly driven by cash requirements and available interest rates.
During the nine months ended September 30, 2026, the Company purchased, on a net basis, $64,995,970 in short term investments, spent $15,880,857 on its exploration and evaluation asset and spent $532,333 on property and equipment.
During the nine months ended September 30, 2025, the Company redeemed, on a net basis, $8,187,879 in short term investments, and spent $15,120,339 on its exploration and evaluation asset and received $2,571,837 in proceeds from the sale of marketable securities.
A summary of activities relating to the Casino Project is available under the Casino Project Update section at the beginning of this MD&A.
OUTSTANDING SHARE DATA
As at the date of this MD&A, the Company has 226,276,171 common shares outstanding. The Company also has 6,721,524 stock options outstanding with exercise prices ranging from $1.35 to $4.18, 1,351,920 restricted share units and 581,854 deferred share units to be settled by way of common shares issued from treasury.
1 As per Short Form Prospectus dated February 20, 2026. Excludes expected use of proceeds for general corporate and working capital.
2 Up to September 30, 2026
| 14 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
CONTRACTUAL OBLIGATIONS
The Company leases office space and a vehicle in Whitehorse, Yukon and finances certain field equipment. In addition to other commitments already disclosed, the Company's undiscounted contractual obligations by calendar year are as follows:
| Year | Lease payments |
Financing obligations |
Total | ||||||
| $ | $ | $ | |||||||
| 2026 | 56,850 | 72,494 | 129,344 | ||||||
| 2027 | 196,630 | 289,975 | 486,605 | ||||||
| 2028 | 165,447 | 289,975 | 455,422 | ||||||
| 2029 | 170,179 | 289,975 | 460,154 | ||||||
| 2030 | 175,066 | 127,269 | 302,335 | ||||||
| 2031 | 44,075 | - | 44,075 | ||||||
| TOTAL | 808,247 | 1,069,688 | 1,877,935 |
KEY MANAGEMENT COMPENSATION
The Company's key management includes its directors and officers. The remuneration of key management during the periods presented was as follows:
| Three Months Ended September 30, |
Nine Months Ended September 30, |
|||||||||||
| 2026 | 2025 | 2026 | 2025 | |||||||||
| $ | $ | $ | $ | |||||||||
| Salaries and director fees | 736,978 | 539,100 | 2,276,316 | 1,635,739 | ||||||||
| Share-based payments | 701,614 | 551,088 | 2,731,104 | 1,896,393 | ||||||||
| KEY MANAGEMENT COMPENSATION | 1,438,592 | 1,090,188 | 5,007,420 | 3,532,132 | ||||||||
Share-based payments represent the fair value expensed during the periods presented above for stock options, RSUs and DSUs previously granted to directors and officers. Salaries and share-based payments for certain officers are capitalized to the exploration and evaluation asset and the balance is recognized in the statement of loss and comprehensive loss.
During the three and nine months ended September 30, 2026, the Company recorded a bonus accrual of $279,103 and $837,309 (three and nine months ended September 30, 2025 - $181,501 and $544,504), respectively, which is recorded in salaries and director fees above.
All related party transactions are disclosed in the above Key Management Compensation section. There were no additional related party transactions.
SIGNIFICANT ACCOUNTING ESTIMATES
Use of estimates and judgements
The preparation of financial statements in conformity with IFRS accounting standards requires the exercise of judgement in the process of applying its accounting policies and to make estimates that affect the reported amounts of assets and liabilities and disclosures of contingent assets and contingent liabilities at the date of the financial statements and the reported amounts of income and expenses during the reporting period. Actual results could differ from those estimates. Differences may be material.
| 15 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Exploration and evaluation asset
The carrying amount of the Company's exploration and evaluation asset represents costs net of write-downs and recoveries to date and does not necessarily reflect present or future values. Recovery of capitalized costs is dependent on successful development of economic mining operations or the disposition of the related mineral properties.
The Company is required to make significant judgements in assessing whether there are any indicators of impairment relating to its exploration and evaluation asset. If any such indicator exists, then an impairment test is performed by management. Indicators of impairment may include (i) the period for which the entity has the right to explore in the specific area has expired during the year or will expire; (ii) substantive expenditures on further exploration for the evaluation of mineral resources in the specific area is neither budgeted nor planned; (iii) sufficient data exists to support that extracting the resources will not be technically feasible or commercially viable; and (iv) development or sale of a specific area is unlikely to recover existing exploration and evaluation asset costs. If any of these indicators are present, management would need to assess whether the exploration and evaluation asset should be impaired. There are no indicators of impairment as of September 30, 2026.
Judgment is required in assessing whether a mineral property is in the exploration and evaluation phase and should be classified as an exploration and evaluation asset or if the exploration and evaluation phase has been completed and the mineral property should be reclassified as property and equipment. We determined that although a feasibility study for the Casino Project has been completed, the Company has not yet received the necessary licenses and permits required to consider the exploration and evaluation stage to have been completed.
ADOPTION OF NEW AND REVISED STANDARDS AND INTERPRETATIONS
Amendments to IFRS 9 and IFRS 7 - Amendments to the Classification and Measurement of Financial Instruments.
Effective January 1, 2026, the Company adopted certain amendments to the Classification and Measurement of Financial Instruments (Amendments to IFRS 9 and IFRS 7). These amendments updated classification and measurement requirements in IFRS 9 Financial Instruments and related disclosure requirements in IFRS 7 Financial Instruments: Disclosures. The IASB clarified the recognition and derecognition date of certain financial assets and liabilities, and amended the requirements related to settling financial liabilities using an electronic payment system. It also clarified how to assess the contractual cash flow characteristics of financial assets in determining whether they meet the solely payments of principal and interest criterion, including financial assets that have environmental, social and corporate governance (ESG)-linked features and other similar contingent features. The IASB added disclosure requirements for financial instruments with contingent features that do not relate directly to basic lending risks and costs and amended disclosures relating to equity instruments designated at fair value through other comprehensive income.
The amendments are effective for periods beginning on or after January 1, 2026 and adoption of these amendments did not have a material effect on our condensed interim consolidated financial statements. For financial liabilities settled in cash using an electronic payment system, we applied the election to deem these financial liabilities to be discharged before the settlement date. The amendments have been applied retrospectively with no restatement of comparative information, in accordance with transition requirements on initial application of IFRS 9.
| 16 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
IFRS 18 - Presentation and Disclosure in Financial Statements
In April 2024, the IASB issued IFRS 18, Presentation and Disclosure in Financial Statements, which replaces IAS 1, Presentation of Financial Statements. It is effective for annual reporting periods beginning on or after January 1, 2027, including interim periods within that year, and requires retrospective application. The Company will adopt IFRS 18 on January 1, 2027 and re-present its comparative information accordingly. IFRS 18 affects presentation and disclosure only and will not change the recognition or measurement of any items, the Company's loss and comprehensive loss, or its total assets, liabilities and equity.
Management is currently completing its assessment of the standard's effect on the Company. Income and expenses will be presented in operating, investing and financing categories, with new subtotals for operating loss and for loss before financing and income taxes. The Company expects to present interest income and gains and losses on marketable securities in the investing category, and interest expense on lease and asset-backed equipment financing obligations in the financing category. In the statement of cash flows, operating activities will be reconciled from operating loss.
Based on its assessment to date, the Company does not expect to present any management-defined performance measures.
As of September 30, 2026, there are no other IFRS or IFRIC interpretations with future effective dates that are expected to have a material impact on the Company.
INTERNAL CONTROL OVER FINANCIAL REPORTING
Management is responsible for designing, establishing, and maintaining a system of internal control over financial reporting ("ICFR") to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with accounting principles generally accepted in Canada.
There has been no change in the Company's ICFR system during the nine months ended September 30, 2026, that materially affected or is reasonably likely to materially affect our internal control over financial reporting.
DISCLOSURE CONTROLS AND PROCEDURES
Management is responsible for designing, establishing, and maintaining a system of disclosure controls and procedures. Disclosure controls and procedures are designed to provide reasonable assurance that material information relating to the Company is made known to management, particularly during the period in which the annual filings are being prepared and that information required to be disclosed by the Company in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation.
The President & CEO and the CFO evaluated the effectiveness of the Company's disclosure controls and procedures as of December 31, 2025. Based on this evaluation, our President & CEO and CFO concluded that the design and operation of our disclosure controls and procedures were effective as at December 31, 2025, and as of September 30, 2026, there has been no change in our disclosure controls and procedures.
FINANCIAL INSTRUMENT RISK
The Board of Directors has overall responsibility for the establishment and oversight of the Company's risk management framework. The Company has exposure to liquidity, credit, and market risk from the use of financial instruments. Financial instruments consist of cash and cash equivalents, short-term investments, marketable securities, accounts payable and accrued liabilities, and financing obligations.
| 17 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Liquidity risk
Liquidity risk is the risk that the Company will be unable to meet its financial obligations as they come due. The Company closely monitors its liquidity position and endeavours to ensure it has adequate sources of funding to finance its projects and operations. Some of the Company's cash is invested in redeemable GICs, which are highly liquid investments and available to discharge obligations when they come due. The Company does not maintain a line of credit.
Credit risk
Financial instruments that potentially subject the Company to credit risk consist primarily of cash and cash equivalents and short-term investments. These financial instruments are at risk to the extent that the institutions issuing or holding them cannot redeem amounts when they are due or requested. To limit its credit risk, the Company uses a restrictive investment policy. Cash and cash equivalents and short-term investments are held with Schedule 1 chartered banks in Canada. Substantially all cash and cash equivalents and short-term investments held with financial institutions exceed government-insured limits. We have established credit policies that seek to minimize our credit risk by entering into transactions with investment grade credit worthy and reputable financial institutions. The carrying amount of financial assets, other than marketable securities, recorded in the financial statements represents Western's maximum exposure to credit risk.
Market risk
The Company is exposed to market risk because of the fluctuating values of its publicly traded marketable securities. The Company has no control over these fluctuations and does not hedge its investments. Marketable securities are adjusted to fair value at each balance sheet date.
Interest rate risk
Interest rate risk is the risk that the fair value or future cash flows of a financial instrument will fluctuate due to changes in market interest rates. The Company's financial assets and liabilities are not exposed to interest rate risk due to their short-term nature and maturity. Cash and equivalents and short-term investments are subject to fixed interest rates. The Company is not subject to interest rate risk.
CAUTIONARY NOTE REGARDING FORWARD-LOOKING STATEMENTS
Information contained in this MD&A that are not historical facts are forward-looking information and forward-looking statements within the meaning of applicable securities legislation and involve risks and uncertainties (collectively, "forward-looking statements"). Certain forward-looking information may also be considered future-oriented financial information ("FOFI") as that term is defined in NI 51-102. The purpose of disclosing FOFI is to provide a general overview of management's expectations regarding prospective financial performance, financial position or cash flows and readers are cautioned that the assumptions used in the preparation of such information, although considered reasonable at the time of preparation, may provide to be imprecise or inaccurate and, as such, undue reliance should not be placed on FOFI. Forward-looking statements include, but are not limited to, statements with respect to the future price of metals; the estimation of mineral reserves and mineral resources, the realization of mineral reserve estimates; the results of metallurgical testing programs; the timing and amount of any estimated future production, costs of production, and capital expenditures; project schedules; the Company's proposed plan for its properties, including the development of the Casino Project; recommended work programs; costs and timing of the development of new deposits; success of exploration and permitting activities; permitting timelines; currency fluctuations; requirements for additional capital; government policy between Canada and the United States, including potential tariffs and retaliatory tariffs, regulation of mineral exploration or mining operations; environmental risks; the review of the submitted Environmental and Socio-economic Effects Statement and the timing thereof; unanticipated reclamation expenses; title disputes or claims; limitations on insurance coverage; the timing and possible outcome of potential litigation; the potential advancement of a high-voltage transmission line network connecting the Yukon electrical grid to the North American grid in British Columbia; and the impact of potential global pandemics on the Company's business and operations. In certain cases, forward-looking statements can be identified by words such as "plans", "expects", "is expected", "budget", "scheduled", "estimates", "intends", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or state that certain actions, events or results "may" or "may not", "could", "would" or "would not", "might" or "will be", "occur" or "be achieved". Such statements are included, among other places, under the heading "Casino Project Update" in this MD&A and may include, but are not limited to, statements regarding perceived merit of properties; mineral reserve and mineral resource estimates; exploration and evaluation expenditures; results of the Study (including projected economic returns, operating costs, capital costs and other financial results in connection with the Casino Project); cash flow forecasts; exploration results at the Company's properties; budgets; work programs; permitting and other timelines; the Company's engagement with local communities; estimated timing for construction of, and production from, any new projects; market price of precious and base metals; expectations regarding future price assumptions, financial performance; or other statements that are not statements of historical fact.
| 18 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Forward-looking statements are necessarily based upon a number of estimates and assumptions, including material estimates and assumptions related to the factors set forth below that, while considered reasonable by the Company as at the date of this MD&A in light of management's experience and perception of current conditions and expected developments, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The material assumptions used to develop the forward-looking statements herein include assumptions that (1) political and legal developments in jurisdictions where Western operates, or may in the future operate, being consistent with Western's current expectations, (2) prevailing and projected market prices and foreign exchange rates, exploitation and exploration estimates will not change in a materially adverse manner, (3) requisite capital and financing will be available on acceptable terms, (4) equipment and personnel required for permitting, construction and operations will be available on a continual basis, (5) no unforeseen disruptions or delays, unexpected geological or other effects, equipment failures, or permitting including any disruptions caused any future pandemics or any other unforeseen disruptions or delays that would have an adverse effect on Western's operations, (6) equipment, labour and materials costs increasing on a basis consistent with Western's current expectations, and (7) general economic, market or business conditions will not change in a materially adverse manner and as more specifically disclosed throughout this document, and in the AIF and Form 40-F.
Forward-looking statements involve known and unknown risks, uncertainties and other factors, which may cause the actual results, performance or achievements of Western and its subsidiaries to be materially different from any future results, performance or achievements expressed or implied by the forward-looking statements. Such risks and other factors include, among others, history of losses and negative operating cash flow; risks inherit to mineral exploration and development activities; uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; risks related to the potential loss of the Company's properties; uncertainty as to timely availability of permits and licenses and other governmental approvals; risks related to the Company's dependence on a single project; title risks; price fluctuations of the Common Shares; risks surrounding statutory and regulatory compliance; risks surrounding environmental laws and regulations; risks surrounding land reclamation costs; operational risks surrounding the remote location of assets; risks surrounding Western's ability to maintain its infrastructure; risks involved in fluctuations in gold, copper and other commodity prices; uncertainty of estimates of capital and operating costs, recovery rates, production estimates, and estimated economic return; changes in project parameters as plans continue to be refined; risks related to the cooperation of government agencies and Indigenous peoples in the exploration and development of Western's property; volatility in the price of metals; climate change risks; risks related to fluctuations in currency exchange rates; risks surrounding dilution of the Common Shares; dependence on members of management and key personnel; competition risks; inflation risks; risks related to macro-economic factors including global financial volatility; potential natural disasters, terrorist acts, health crises and future pandemics; risks related to the need to obtain additional financing to develop the Company's property and uncertainty as to the availability and terms of future financing; litigation risks; the possibility of delay in exploration or development programs or in construction projects and uncertainty of meeting anticipated program milestones; risks related to potential acquisitions and the integration thereof; risks related to operations; risks related to the feasibility study and the possibility that future exploration and development will not be consistent with the Company's expectations; risks related to joint venture operations; conclusions of economic evaluations; possible variations in mineral reserves, mineral resources, grade or recovery rates; insurance risk; reclamation costs; risks related to conflicts of interest; risks related to internal controls; tax risks, specifically related to the Company's classification as a "passive foreign investment company" under the meaning of Section 1297 of the U.S. Internal Revenue Code of 1986, as amended; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry; risks related to information technology and cybersecurity; risks related to regulatory compliance; the Company's history of not paying dividends; and risks related to shareholder activism; impact of any global pandemics and the Russian invasion of Ukraine; and other risks and uncertainties disclosed in the AIF and Form 40-F, each of which provide for a more detailed discussion of some of the factors underlying forward-looking statements and the risks that may affect the Company's ability to achieve the expectations set forth in the forward-looking statements contained in this MD&A.
| 19 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Although Western has attempted to identify important factors that could affect it and may cause actual actions, events or results to differ materially from those described in forward-looking statements, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. Forward-looking statements may prove to be inaccurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. Western does not undertake any obligation to release publicly any revisions to these forward-looking statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events unless required by applicable securities law.
Non-GAAP Measures and Other Financial Measures
Alternative performance measures in this MD&A, such as "cash cost" and "free cash flow", are used to provide additional information. These non-GAAP performance measures are included in this MD&A because these statistics are used as key performance measures that management uses to monitor and assess performance of the Company's property and to plan and assess the overall effectiveness and efficiency of mining operations. These performance measures do not have a standard meaning within IFRS accounting standards and, therefore, amounts presented may not be comparable to similar data presented by other mining companies. These performance measures should not be considered in isolation as a substitute for measures of performance in accordance with IFRS accounting standards.
CAUTIONARY NOTE TO U.S. INVESTORS
This MD&A has been prepared in accordance with the requirements of the securities laws in effect in Canada as of the date of this MD&A, which differ in certain material respects from the disclosure requirements of United States securities laws. The terms "mineral reserve", "proven mineral reserve" and "probable mineral reserve" are Canadian mining terms as defined in accordance with Canadian National Instrument 43-101 Standards of Disclosure for Mineral Projects ("NI 43-101") and the Canadian Institute of Mining, Metallurgy and Petroleum (the "CIM") - CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. The definitions of these terms and other mining terms, such as "inferred mineral resource," differ from the definitions of such terms, if any, for purposes of the disclosure requirements of the United States Securities and Exchange Commission (the "SEC").
| 20 |
| WESTERN COPPER AND GOLD CORPORATION | MANAGEMENT DISCUSSION AND ANALYSIS |
| Nine months ended September 30, 2026 | |
| (Expressed in Canadian dollars, unless otherwise indicated) |
Accordingly, information contained and incorporated by reference into this MD&A that describes the Company's mineral deposits may not be comparable to similar information made public by issuers subject to the SEC's reporting and disclosure requirements applicable to domestic United States issuers.
| 21 |
Form 52-109F2 - Certification of Interim Filings
I, Mark Smith, Chief Executive Officer of Western Copper and Gold Corporation, certify the following:
1. Review: I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Western Copper and Gold Corporation (the "issuer") for the interim period ended September 30, 2026.
2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
4. Responsibility: The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.
5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings
(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.
5.1 Control framework: The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is the Internal Control-Integrated Framework established by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in 2013.
5.2 N/A
5.3 N/A
6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on January 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.
Date: November 5, 2026
|
(signed) Mark E. Smith |
Mark E. Smith
Interim Chief Executive Officer
Form 52-109F2 - Certification of Interim Filings
I, Michael Psihogios, Chief Financial Officer of Western Copper and Gold Corporation, certify the following:
1. Review: I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Western Copper and Gold Corporation (the "issuer") for the interim period ended September 30, 2026.
2. No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
3. Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
4. Responsibility: The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.
5. Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings
(a) designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
(i) material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
(ii) information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
(b) designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.
5.1 Control framework: The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is the Internal Control-Integrated Framework established by the Committee of Sponsoring Organizations of the Treadway Commission (COSO) in 2013.
5.2 N/A
5.3 N/A
6. Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on January 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.
Date: November 5, 2026
| (signed) Michael Psihogios |
Michael Psihogios
Chief Financial Officer