STOCK TITAN

Altura Energy Commences Pipeline Replacement Program at Saddle Horse Draw Producing Helium Field

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Positive)
Tags

Altura Energy (TSXV: ALTUF) has started a pipeline replacement and infrastructure upgrade at the Saddle Horse Draw target in the Pinta South Helium Field, Holbrook Basin, Arizona. After completion, two recompleted wells that previously flowed 123 mcfd and 118 mcfd are expected to resume production.

The program includes a new pipeline to the processing plant, SCADA installation for real-time monitoring, and workovers on four remaining wells to support scalable development and improved operational reliability.

Loading...
Loading translation...

Positive

  • Recompleted wells flowed 123 mcfd and 118 mcfd prior to shutdown
  • Pipeline replacement to connect wells directly to the processing plant
  • SCADA installation for real-time field monitoring and improved reliability

Negative

  • Four remaining wells require workovers before returning to production
  • Project completion timing tied to additional well work and plant connectivity

New pipeline to set the stage for scalable development across a prospective land package

Vancouver, British Columbia--(Newsfile Corp. - March 31, 2026) - Altura Energy Corp. (TSXV: ALTU) (FSE: Y020) ("Altura" or the "Company") is pleased to announce the commencement of the previously announced (see March 19, 2026 news release) pipeline replacement and infrastructure upgrade program at the Saddle Horse Draw target within the Pinta South Helium Field (PSHF) in the Holbrook Basin of Arizona.

After pipeline completion, it is expected the recompleted wells from last year, which flowed 123 mcfd and 118 mcfd respectively, will be returned to production, workovers will begin on the remaining four wells, and Supervisory Control and Data Acquisition (SCADA) systems will be added to real time monitoring across the pipeline infrastructure.

"Advancing this pipeline replacement and infrastructure upgrade program marks an important step in strengthening the long-term reliability and efficiency of our operations at Saddle Horse Draw," said Altura CEO Ashley Lastinger. "As global helium markets face increasing supply uncertainty, we are focused on positioning Altura as a dependable North American source by investing in critical infrastructure that supports sustainable production, enhanced monitoring, and operational resilience."

The infrastructure upgrade program is expected to be completed in tandem with additional well work. This includes the installation of a new pipeline connecting the wells to the processing plant, along with additional operational enhancements designed to improve field monitoring, reliability, and ongoing maintenance.

Helium Market Context

Recent geopolitical developments have underscored the vulnerability of global helium supply chains. Qatar, which represents a significant portion of the world's helium production, has experienced disruptions to natural gas processing operations amid escalating tensions in the Middle East. Because helium is produced as a by-product of natural gas processing, interruptions to LNG production and export logistics can materially impact global helium availability. These events highlight the importance of developing diversified and geopolitically secure sources of helium supply, particularly in North America, to support industries such as medical imaging, semiconductor manufacturing, aerospace and advanced technology that rely on consistent access to the gas.

ABOUT ALTURA ENERGY CORP.

Altura Energy Corp. is an exploration and production company with interests in the Holbrook basin of Arizona. For more information, please visit SEDAR+ (www.sedarplus.ca).

FOR FURTHER INFORMATION

Robert Johnston
Chairman
604-609-6110

Investor Relations
KIN Communications Inc
604-684-6730
altu@kincommunications.com

Forward-Looking Statements

Statements included in this announcement, including statements concerning our plans, intentions and expectations, which are not historical in nature are intended to be, and are hereby identified as, "forward-looking statements". Forward-looking statements may be identified by words including "anticipates", "believes", "intends", "estimates", "expects" and similar expressions. The Company cautions readers that forward-looking statements, including, without limitation those relating to the Company's business plans, objectives and strategies of operations; the completion of the pipeline replacement and infrastructure upgrade program, including, without limitation, the return of the recompleted wells to production, the workovers being completed for the remaining four wells and the integration and performance of the SCADA systems, including the related benefits therefrom; the completion of additional well work, including, without limitation, the installation of a new pipeline connecting the wells to a processing plant and additional operational enhancements to improve field monitoring, reliability and ongoing maintenance; and the global helium market and related supply chains, are subject to certain risks and uncertainties that could cause actual results to differ materially from those indicated in the forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/290598

FAQ

What did Altura Energy (ALTUF) announce about the Saddle Horse Draw pipeline on March 31, 2026?

Altura announced the start of a pipeline replacement and infrastructure upgrade at Saddle Horse Draw. According to the company, the work includes a new pipeline, SCADA installation, and well workovers to restore production and improve monitoring.

Which wells will return to production after the ALTUF pipeline project completes?

Two recompleted wells that previously flowed 123 mcfd and 118 mcfd are expected to return to production. According to the company, those wells were flow-tested last year and will be reconnected after pipeline work.

How will the ALTUF SCADA upgrade affect field operations and monitoring?

The SCADA upgrade will enable real-time monitoring across the pipeline infrastructure for faster response and maintenance. According to the company, this aims to strengthen operational reliability and support scalable development at the field.

What additional well work does Altura plan at the Pinta South Helium Field (ALTUF)?

Altura plans workovers on four remaining wells to return them to service after pipeline completion. According to the company, these workovers are part of the broader infrastructure upgrade and phased completion plan.

Why is North American helium development important according to Altura (ALTUF)?

Altura highlights the need for diversified, geopolitically secure helium supply in North America amid global disruptions. According to the company, secure regional sources support industries reliant on consistent helium access.

Will the ALTUF pipeline replacement enable scalable development at Saddle Horse Draw?

Yes, the new pipeline and infrastructure upgrades are intended to support scalable development across the prospective land package. According to the company, the upgrades improve connectivity, monitoring, and long-term operational resilience.
Altura Energy Corp

OTC:ALTUF

View ALTUF Stock Overview

ALTUF Rankings

ALTUF Latest News

Jun 4, 2021
PDMR Notification
Jun 1, 2021
PDMR Dealings

ALTUF Stock Data

75.30M
61.52M
Financial Conglomerates
Finance
Link
GB
Didcot