STOCK TITAN

Notifications

Limited Time Offer! Get Platinum at the Gold price until January 31, 2026!

Sign up now and unlock all premium features at an incredible discount.

Read more on the Pricing page

Ascent Solar Technologies Enters into Teaming Agreement to Supply US-based Defense Solutions Provider with Thin-Film Solar Technology for Orbital Application

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags

Ascent Solar Technologies (Nasdaq: ASTI) has signed a Teaming Agreement to provide thin-film solar technology solutions to a US-based defense solutions provider for orbital applications. The company's CIGS PV product line, manufactured at their 5 MW facility in Thornton, CO, offers significant advantages including rapid delivery times of 6-8 weeks compared to industry standard 9-12 months.

The agreement leverages Ascent's lightweight, flexible, and durable solar technology design, which is specifically suited for space environment challenges. The company has previously received orders for spaceflight hardware assemblies scheduled for delivery in summer 2025.

Loading...
Loading translation...

Positive

  • Secured strategic partnership with US defense solutions provider for space applications
  • Superior delivery timeline of 6-8 weeks versus industry standard 9-12 months
  • Domestic manufacturing capability with 5 MW facility in Colorado
  • Existing spaceflight hardware orders scheduled for summer 2025 delivery

Negative

  • None.

THORNTON, Colo., June 27, 2025 (GLOBE NEWSWIRE) -- Ascent Solar Technologies (“Ascent” or the “Company”) (Nasdaq: ASTI), the leading U.S. innovator in the design and manufacturing of featherweight, flexible thin-film photovoltaic (PV) solutions, announced today that it has entered into a Teaming Agreement to supply a US-based defense solutions provider with its cutting edge, thin-film solar technology solutions for upcoming orbital applications and future missions.

“Our thin-film solar technology’s ability to reliably deliver power solutions on short timelines makes Ascent the perfect choice for agreements with defense tech brands,” said Paul Warley, Chief Executive Officer of Ascent Solar Technologies. “There are a number of hurdles slowing the deployment of reliable solar solutions in space that few are equipped to face. However, Ascent’s technology differentiators - specifically our lightweight, flexible and durable design -continue to provide a market-ready solution that mitigates many space environment challenges, allowing for long-term application on a wide variety of spacecraft.”

Ascent is able to offer mission-optimized solar array solutions using its CIGS PV product line that has been developed with spaceflight heritage. These high-maturity CIGS PV products are produced domestically in the Company’s 5 MW facility in Thornton, CO, enabling array deliveries in just six-to-eight weeks. In contrast, most competitors are unable to meet tight delivery deadlines, often requiring lead times of nine-to-twelve months. Earlier this year, the Company received several orders for spaceflight hardware assemblies that are on schedule to be completed and delivered this summer.

About Ascent Solar Technologies, Inc.

Backed by 40 years of R&D, 15 years of manufacturing experience, numerous awards, and a comprehensive IP and patent portfolio, Ascent Solar Technologies, Inc. is a leading provider of innovative, high-performance, flexible thin-film solar panels for use in environments where mass, performance, reliability, and resilience matter. Ascent’s photovoltaic (PV) modules have been deployed on space missions, multiple airborne vehicles, agrivoltaic installations, in industrial/commercial construction as well as an extensive range of consumer goods, revolutionizing the use cases and environments for solar power. Ascent Solar’s research and development center and 5-MW nameplate production facility is in Thornton, Colorado. To learn more, visit https://www.ascentsolar.com.

Media Contact

Spencer Herrmann
FischTank PR
ascent@fischtankpr.com


FAQ

What is the new partnership announced by Ascent Solar Technologies (ASTI)?

Ascent Solar Technologies has entered into a Teaming Agreement to supply thin-film solar technology solutions to a US-based defense solutions provider for orbital applications.

What are the key advantages of ASTI's solar technology for space applications?

ASTI's technology offers lightweight, flexible, and durable design specifically suited for space environments, with rapid delivery times of 6-8 weeks compared to industry standard 9-12 months.

Where does Ascent Solar Technologies manufacture its CIGS PV products?

ASTI manufactures its CIGS PV products domestically at their 5 MW facility in Thornton, Colorado.

What is the delivery timeline for ASTI's space solar technology compared to competitors?

ASTI can deliver solar arrays in 6-8 weeks, while competitors typically require 9-12 months lead time.

What other space-related orders does ASTI currently have?

ASTI has received several orders for spaceflight hardware assemblies that are scheduled for delivery in summer 2025.
Ascent Solar Tec

NASDAQ:ASTI

ASTI Rankings

ASTI Latest News

ASTI Latest SEC Filings

ASTI Stock Data

5.98M
3.28M
9.98%
0.75%
18.9%
Solar
Semiconductors & Related Devices
Link
United States
THORNTON