STOCK TITAN

Critical Elements' 10,000-Meter Summer Drill Program at Rose West Continues to Deliver Positive Results

(Neutral)
(Neutral)
Tags

Critical Elements Lithium (TSX-V: CRE, OTCQX: CRECF) reported further assays and an update on its 10,000 m Phase 2 Summer 2026 drill program at the 100%-owned Rose West discovery in Eeyou Istchee, Québec. Drilling is expanding the lithium-tantalum mineralized footprint and defining multiple stacked pegmatites.

The company reports an additional 300 x 300 m block added to the Rose West footprint, now totaling about 1,250 x 800 m. New assays from holes RW-26-36, -37, -54, -55, -56A and -57 include intervals such as 2.05% Li2O over 7.70 m and 1.46% Li2O over 23.35 m in Pegmatites 5 and 3.

True thicknesses are estimated at 80–95% of core length, with pegmatites typically 10–40 m thick in a near-surface, sub-horizontal stacked system. Eighteen holes totaling roughly 3,000 m have been drilled in the NE Main Target Area, and assays remain pending for several spodumene-rich intervals.

Loading...
Loading translation...

Positive

  • Rose West mineralized footprint expanded to about 1,250 x 800 m, a six-fold surface increase from 2024
  • New 2026 assays include up to 2.05% Li2O over 7.70 m in Pegmatite 5 (RW-26-36)
  • Pegmatite 3 intervals such as 1.46% Li2O over 23.35 m and 0.94% Li2O over 22.40 m confirm lateral continuity
  • Stacked, generally flat-lying pegmatite system with typical thicknesses of 10–40 m and near-surface geometry
  • Eighteen holes and about 3,000 m drilled in NE Main Target Area in Summer 2026, with multiple spodumene-bearing intercepts
  • Robust QA/QC program using ALS Val-d'Or lab and multi-element fusion methods for 52 elements

Negative

  • Assay results are still pending for seven holes (RW-26-59 to RW-26-65), leaving portions of the footprint unconstrained
  • Hole RW-26-53 returned no spodumene (N.S.) over the 11.00 m interval sampled in Pegmatite 3
  • A major fault intersected in holes RW-26-53 and RW-26-55 likely explains absence of Pegmatite 3 in some holes, adding structural complexity

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

MONTRÉAL, QC / ACCESS Newswire / August 24, 2026 / Critical Elements Lithium Corporation (TSX-V:CRE)(US OTCQX:CRECF)(FSE:F12) ("Critical Elements" or the "Corporation") is pleased to provide assay results and an update on its Phase 2 Summer 2026 exploration program, including 10,000 meters of systematic drilling around the 100% owned Rose West Discovery ("Rose West"), located in Eeyou Istchee, Québec.

The program targets the expansion of the mineralized footprint to a potential of approximately 1,250 x 2,000 m and aims to expand the lateral continuity of at least two more mineralized pegmatite bodies within the system. Thus far, drilling has covered the immediate eastern extension of the Main Target, and the program is now focused on exploration drilling along the northern boundary of the defined mineralized zones.

Highlights

  • The Phase 2 Summer 2026 drill program continues to deliver positive results demonstrating the successful expansion of the Rose West mineralized footprint by adding an additional 300 x 300 m bloc expanding the lateral footprint of Pegmatite 5, 3 and 2, with thicknesses that continue to range from 10 to 30 m.

  • Pegmatite 5 is now also delivering substantial and laterally continuous intersections in the northern portion of the Main Target Area, part of a stacked and generally flat lying system. This generally flat orientation allows for rapid expansion with relatively short surface drill holes.

  • The geological model continues to prove to be highly effective and predictive.

  • All assay results have been received for the 11 holes previously drilled.

  • An additional 7 holes were drilled since then and are being prepared for assaying.

Assay results were received for holes RW-26-36, RW-26-37, RW-26-54, RW-26-55, RW-26-56A and RW-26-57, and returned some significant lithium and tantalum composite assays, as highlighted below:

  • 2.05% Li2O and 221 ppm Ta2O5 over 7.70 m, through Pegmatite 5, in hole RW-26-36

  • 1.46% Li2O and 176 ppm Ta2O5 over 23.35 m (including 2.12% Li2O and 147 ppm Ta2O5 over 6.00 m), through Pegmatite 3, in hole RW-26-36 and

  • 1.32% Li2O and 157 ppm Ta2O5 over 13.25 m, through Pegmatite 5, in hole RW-26-37

  • 0.94% Li2O and 258 ppm Ta2O5 over 22.40 m (including 1.34% Li2O and 193 ppm Ta2O5 over 13.50 m), through Pegmatite 3, in hole RW-26-37

  • 1.08% Li2O and 154 ppm Ta2O5 over 18.70 m (including 2.15% Li2O and 142 ppm Ta2O5 over 6.00 m), through Pegmatite 5, in hole RW-26-57.

    * Core length; the true thickness is between 80 to 95% of the core length.

Located approximately 10 km to the west of the Rose Lithium-Tantalum Project ("Rose"), Rose West is a near surface lithium-rich pegmatite bearing zone, initially intercepted by drilling over a 450 m x 370 m footprint area in the winter of 2024, now covering an overall footprint of 1,250 m x 800 m, (see Press Release dated August 12, 2026), a six-fold increase in surface expression. The lithium-rich pegmatites typically range from 10 to 40 m in thickness and together display a sub-horizontal stacked geometry. Recent drilling has identified three new spodumene-bearing pegmatitic bodies within the target area. The Phase 2 Summer 2026 drill program is designed to further expand this mineralized footprint, and to better define the geometry and extent of the three new mineralized pegmatites intersected during the Winter 2026 Campaign.

The Summer 2026 drill program is designed to reach three specific goals:

  1. Expand laterally all around the existing mineralized footprint;

  2. Infill drilling along Line C, to confirm grade and thickness continuity of the intersected pegmatites;

  3. Follow up on both newly discovered mineralized pegmatites (Pegmatites 6 and 7) below the current extent of mineralization.

Figure 1: Location map of drillholes from the Winter 2024 and Winter 2026 campaigns and proposed Summer 2026 drillholes.

To date, 18 holes were drilled in the NE corner of the Main Target Area for a total of approximately 3,000 meters. Figure 1 above shows the location of these holes, which are designed to intersect all three principal pegmatites, i.e., Pegmatite 5 (new), 3 (Main), and Pegmatite 2. All assay results have been received for the 11 holes previously drilled. The location of the seven recently drilled holes is also presented.

Table 1 below presents the collar coordinates, the planned length and the orientation of each of the holes drilled to date. Recently drilled holes are highlighted in grey.

Drillhole

Grid

UTM NAD 83 ZN18

Length

Azimuth

Dip

Position

Easting

Northing

(m)

(°)

(°)

RW-26-35A

G-14

411,629

5,764,025

171

245

-72

RW-26-36

G-15

411,711

5,764,082

207

245

-72

RW-26-37

G-16

411,793

5,764,140

204

245

-72

RW-26-51

G-17

411,874

5,764,197

192

245

-72

RW-26-52

G-18

411,956

5,764,254

189

245

-72

RW-26-53

H-18

411,899

5,764,336

195

245

-72

RW-26-54

H-17

411,817

5,764,278

201

245

-72

RW-26-55

H-16

411,735

5,764,222

201

245

-72

RW-26-56A

H-15

411,653

5,764,164

195

245

-72

RW-26-57

I-15

411,596

5,764,246

90

245

-72

RW-26-58

I-16

411,678

5,764,303

201

245

-72

RW-26-59

I-17

411,760

5,764,361

114

245

-72

RW-26-60

K-14

411,457

5,764,271

105

245

-72

RW-26-61

K-15

411,539

5,764,328

174

245

-72

RW-26-62

K-16

411,621

5,764,385

117

245

-72

RW-26-63

K-17

411,702

5,764,443

147

245

-72

RW-26-64

N-16

411,506

5,764,549

261

245

-72

RW-26-65

N-15

411,424

5,764,492

135

245

-72

Table 1 - 2026 Summer drillhole locations and summary descriptions.

The following Table 2 presents the composite assay results received to date. New and updated results presented in the current press release are highlighted in grey.

Drillhole

From

To

Length

Li2O

Ta2O5

Zone

(m)

(m)

(m)

(%)

(ppm)

RW-26-35A

86.95

90.50

3.55

0.61

291

5

including

89.00

90.50

1.50

1.27

231

5

104.55

131.90

27.35

1.89

161

3

including

105.00

115.50

10.50

2.70

222

3

including

120.00

129.00

9.00

1.84

115

3

152.40

161.50

9.10

0.67

265

2

including

154.10

155.55

1.45

2.89

120

2

RW-26-36

87.45

95.15

7.70

2.05

221

5

123.80

147.15

23.35

1.46

176

3

including

124.50

130.50

6.00

2.12

147

3

RW-26-37

99.90

113.15

13.25

1.32

157

5

139.30

161.70

22.40

0.94

258

3

including

144.00

157.50

13.50

1.34

193

3

189.35

195.30

5.95

1.06

87

2

RW-26-51

97.30

103.75

6.45

1.23

227

5

including

98.50

102.50

4.00

1.64

179

5

132.00

148.85

16.85

1.58

118

3

including

136.50

145.20

8.70

1.89

130

3

RW-26-52

112.40

121.20

8.80

0.24

248

5

129.10

148.50

19.40

1.00

88

3

including

129.10

135.80

6.70

1.11

176

3

including

139.50

143.50

4.00

1.43

83

3

RW-26-53

115.00

126.00

11.00

N.S

N.S

3

RW-26-54

108.60

128.10

19.50

0.48

220

3

including

114.00

118.50

4.50

1.12

156

3

RW-26-55

140.10

148.20

8.10

0.59

211

3

including

144.00

147.00

3.00

1.25

111

3

RW-26-56A

95.80

110.60

14.80

0.53

119

3

including

102.00

110.60

8.60

0.86

149

3

122.10

137.60

15.50

0.63

221

3 (?)

including

124.70

129.00

4.30

1.65

254

3 (?)

RW-26-57

45.00

63.70

18.70

1.08

154

5 (?)

Including

48.00

54.00

6.00

2.15

142

5

RW-26-58

57.05

71.10

14.05

1.33

145

5

including

60.00

69.00

9.00

1.81

122

5

* Core length; the true thickness is between 80 to 95% of the core length.

** - N.S. : No Spodumene.

Table 2 - Assay results from the Summer 2026 drill campaign.

The following Table 3 presents the intervals of spodumene-rich pegmatites intersected along the other holes drilled during this current campaign.

Drillhole

From

To

Length

Li2O

Ta2O5

(m)

(m)

(m)

(%)

(ppm)

RW-26-59

84.15

99.20

15.05

P.R.

P.R.

RW-26-60

45.80

61.90

16.10

P.R.

P.R.

RW-26-61

59.65

64.80

5.15

P.R.

P.R.

RW-26-62

72.45

81.60

9.15

P.R.

P.R.

RW-26-63

88.30

92.55

4.25

P.R.

P.R.

RW-26-64

69.60

72.80

3.20

P.R.

P.R.

RW-26-65

59.30

63.20

3.90

P.R.

P.R.

* P.R.: Pending Results.

Table 3 - Spodumene-rich pegmatite intervals from the Summer 2026 drill campaign.

As previously discussed, the stacked nature of the mineralized system allows for the intersection of multiple pegmatite bodies within a given drillhole (Table 2). While keeping the same "grid-based" systematic approach, not all drillholes are anticipated to intersect each pegmatite. Figures 2 to 4 present plan views of the individual pegmatite zones as defined in the Winter 2026 program, as well as the nature of each intersection through the given zone.

Figure 2 is a horizontal plan view on which the projection of Pegmatite 5 is presented. All holes that were drilled on Line G successfully intersected Pegmatite 5. Holes RW-26-58 and RW-26-57 appear to have intersected an offset equivalent of Pegmatite 5; Hole RW-26-57 has returned 1.08% Li2O and 154 ppm Ta2O5 over 18.70 m (including 2.15% Li2O and 145 ppm Ta2O5 over 6.00 m).

Figure 3 presents the Pegmatite 3 plan view projection. Most of the holes intersected the Main pegmatite, confirming its continuity across Lines G and H. However, a major fault has also been intersected in holes RW-26-53 and RW-26-55, likely explaining the absence of Pegmatite 3 on Line I in holes RW-26-57 and RW-26-58. As expected, Holes RW-26-36 and RW-26-37 returned Li2O above 1.00% over thicknesses from 23.35 m and 22.40 m respectively, consistent with similar thicknesses encountered throughout the Pegmatite 3 body.

Figure 4 presents the Pegmatite 2 longitudinal view. Pegmatite 2 is confirmed to be present towards the central core of the mineralized area and, as predicted by our 3D model, it appears to get cut-off or merge into Pegmatite 3 towards the north. As a result, Pegmatite 2 was only intersected in holes RW-26-35A and RW-26-37. Hole RW-26-37 returned 1.06% Li2O and 87 ppm Ta2O5 over 5.95 m.

Figure 2: Pegmatite 5 projection Plan Map - Zone outline and targeted extensions.

Figure 3: Pegmatite 3 projection Plan Map - Zone outline and targeted extensions.

Figure 4: Pegmatite 2 projection Plan Map - Zone outline and targeted extensions.

Quality assurance/quality control

Quality assurance and quality control procedures have been implemented to ensure best practices in sampling and analysis of the drill core samples. Standards, duplicate and blanks were regularly inserted into the sample stream. The drill core samples were delivered, in secure tagged bags, to the ALS Minerals laboratory facility in Val-d'Or, Québec. The samples are weighed and identified prior to sample preparation. The samples are crushed to 70% minus 2 mm, then separated and pulverized to 85% passing 75 μm. All samples are analyzed using sodium peroxide fusion ME-MS-89L, with full analysis for 52 elements. Value over 25,000 ppm Li were re-assays using Li-ICP-82b and value over 2,500 ppm Ta2O5 were re-assays using Ta-XRF10.

Qualified Person

Kenneth Williamson, Géo, M.Sc.Director of Exploration at Critical Elements, is the Qualified Person that has reviewed and approved the technical contents of this news release on behalf of the Corporation.

About Critical Elements Lithium Corporation

Critical Elements aspires to become a large, responsible supplier of lithium to the flourishing electric vehicle and energy storage system industries. To this end, Critical Elements is advancing the wholly-owned, high-purity Rose Lithium-Tantalum project in Québec, the Corporation's first lithium project to be advanced within a land portfolio of over 1,016 km2. On August 29, 2023, the Corporation announced results of a new Feasibility Study on Rose for the production of spodumene concentrate. The after-tax internal rate of return for the Project is estimated at 65.7%, with an estimated after-tax net present value of US$2.2B at an 8% discount rate. In the Corporation's view, Québec is strategically well-positioned for US and EU markets and boasts good infrastructure including a low-cost, low-carbon power grid featuring 94% hydroelectricity. The project has received approval from the Federal Minister of Environment and Climate Change on the recommendation of the Joint Assessment Committee, comprised of representatives from the Impact Assessment Agency of Canada and the Cree Nation Government, received the Certificate of Authorization under the Environment Quality Act from the Québec Minister of the Environment, the Fight against Climate Change, Wildlife and Parks, and the project mining lease from the Québec Minister of Natural Resources and Forests under the Québec Mining Act.

For further information, please contact:

Jean-Sébastien Lavallée, P. Géo.
Chief Executive Officer
819-354-5146
jslavallee@cecorp.ca
www.cecorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is described in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary statement concerning forward-looking statements

This news release contains "forward-looking information" within the meaning of Canadian Securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "scheduled", "anticipates", "expects" or "does not expect", "is expected", "scheduled", "targeted", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information contained herein include, without limitation, statements relating to the anticipated receipt of the final assay results from the 2026 drilling program on the Corporation's Rose West property, the results and completion of the 2026 exploration drilling program and its related objectives. Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

Although Critical Elements has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Factors that may cause actual results to differ materially from expected results described in forward-looking information include, but are not limited to: delays in obtaining final assay results from the laboratory facility, the final and complete results of the Corporation's 2026 exploration drilling program on the Corporation's Rose West property not delivering the anticipated results and the effects on the Corporation's stated objectives, as well as those risk factors set out in the Corporation's Management Discussion and Analysis for its most recent quarter ended May 31, 2026 and other disclosure documents available under the Corporation's SEDAR+ profile. Forward-looking information contained herein is made as of the date of this news release and Critical Elements disclaims any obligation to update any forward-looking information, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws.

Forward-looking information contained herein is made as of the date of this news release. Although the Corporation has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Corporation undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities law.

SOURCE: Critical Elements Lithium Corp.



View the original press release on ACCESS Newswire

FAQ

What did Critical Elements Lithium (CRECF) announce about its Rose West 2026 summer drilling results?

Critical Elements reported new assay results from its Phase 2 Summer 2026 10,000 m drill program at Rose West. According to the company, drilling expanded the mineralized footprint and confirmed multiple stacked lithium-tantalum pegmatites with intervals above 1% Li2O over multi-meter thicknesses.

How large is the Rose West mineralized footprint after the latest drilling by Critical Elements (CRECF)?

The Rose West mineralized footprint now covers approximately 1,250 m by 800 m. According to Critical Elements, this represents a six-fold increase in surface expression compared with the initial 450 m by 370 m footprint defined in winter 2024 drilling at the lithium-rich pegmatite zone.

What were the best lithium assay intervals reported in August 2026 for Rose West by CRECF?

Key intervals include 2.05% Li2O and 221 ppm Ta2O5 over 7.70 m in Pegmatite 5, and 1.46% Li2O over 23.35 m in Pegmatite 3. According to Critical Elements, several other holes returned over 1% Li2O across multi-meter lengths.

How many drill holes and meters has Critical Elements completed in the 2026 Rose West Summer program?

Critical Elements reports 18 holes totaling about 3,000 m drilled in the northeast corner of the Main Target Area. The overall Phase 2 Summer 2026 program is designed for approximately 10,000 m of systematic drilling around Rose West to expand and better define mineralized zones.

What is the geological setting of the Rose West lithium-tantalum mineralization reported by CRECF?

Rose West hosts near-surface, lithium-rich pegmatites with sub-horizontal, stacked geometry. According to Critical Elements, pegmatite bodies such as Pegmatites 2, 3 and 5 typically range from 10 to 40 m thick, allowing multiple intersections within a single drill hole in the Main Target Area.

Are all assay results available for the 2026 Rose West drill holes announced by Critical Elements (CRECF)?

No, assays are not yet available for all holes. According to Critical Elements, assay results were received for 11 holes, while seven additional holes (RW-26-59 to RW-26-65) have spodumene-rich intervals logged but remain pending laboratory results.

How does the Rose West discovery relate to the Rose Lithium-Tantalum project owned by CRECF?

Rose West lies about 10 km west of the Rose Lithium-Tantalum project and is 100% owned by Critical Elements. According to the company, Rose West is a separate near-surface lithium-rich pegmatite zone that complements the advanced Rose project’s spodumene concentrate development plans.