STOCK TITAN

Critical Elements 10,000-Meter Summer Drill Program at Rose West Resumes with Positive Results

(Neutral)
(Neutral)
Tags

Critical Elements Lithium (TSX-V:CRE, OTCQX:CRECF) reported new assay results and an update on its Phase 2 Summer 2026 10,000‑meter drill program at the 100% owned Rose West discovery in Eeyou Istchee, Québec. Two drill rigs are executing a 100 m grid to expand the known mineralized volume, targeting a potential footprint of about 1,250 x 2,000 m. The current Rose West footprint has already grown six-fold since winter 2024 to 1,250 x 800 m.

Assays from holes RW‑26‑35A, ‑51, ‑52 and ‑58 returned notable lithium and tantalum intervals, including up to 2.70% Li2O over 10.50 m and broad zones of 1.0–1.9% Li2O over 14–27 m in Pegmatites 2, 3 and 5. Eleven holes totaling 2,073 m have been drilled in the NE Main Target Area, expanding or closing off pegmatites over roughly 300 x 300 m. The stacked, near-surface pegmatite system continues to show lateral continuity, while QA/QC protocols and independent lab analysis at ALS Val‑d'Or are in place. According to Critical Elements, the geological model is proving predictive and supports ongoing footprint growth.

Loading...
Loading translation...

Positive

  • High-grade lithium intercepts up to 2.70% Li2O over 10.50 m in RW-26-35A
  • Broad mineralized intervals around 1.0–1.9% Li2O over 14–27 m in multiple holes
  • Rose West footprint expanded to 1,250 x 800 m, a six-fold increase since winter 2024
  • Additional 300 x 300 m block added to the mineralized footprint in the Main Target Area
  • Stacked pegmatite system with multiple lithium-tantalum pegmatites showing lateral continuity
  • Systematic 10,000 m program with two rigs and predictive 3D geological model guiding drilling

Negative

  • None.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

MONTRÉAL, QC / ACCESS Newswire / August 12, 2026 / Critical Elements Lithium Corporation (TSX-V:CRE)(US OTCQX:CRECF)(FSE:F12) ("Critical Elements" or the "Corporation") is pleased to provide assay results and an update on its Phase 2 Summer 2026 exploration program, including 10,000 meters of systematic drilling around the 100% owned Rose West Discovery ("Rose West"), located in Eeyou Istchee, Québec.

The Corporation has deployed two drill rigs to optimize the duration of the program. The drilling strategy is straightforward: based on our current geological model and interpretation, apply a 100 m grid approach to grow the known mineralized volume from its current boundary outward. The program targets the expansion of the mineralized footprint to a potential of approximately 1,250 x 2,000 m and aims to expand the lateral continuity of at least two (2) more mineralized pegmatite bodies within the system.

Highlights

  • The Phase 2 Summer 2026 drill program continues to deliver positive results demonstrating the successful expansion of the Rose West mineralized footprint by adding up an additional 300 x 300 m bloc expanding the lateral footprint of Pegmatite 5, 3 and 2, with thicknesses that continue to range from 10 to 30 m.

  • Pegmatite 5 is now also delivering substantial and laterally continuous intersections in the northern portion of the Main Target Area, part of a stacked and generally flat lying system.

  • The geological model continues to prove to be highly effective and predictive.

  • A total of 11 holes were drilled and prepared for assaying while the forest fire situation evolved towards a safe return to site.

Assay results were received for holes RW-26-35A, RW-26-51, RW-26-52 and RW-26-58, and returned some significant lithium and tantalum composite assays, as highlighted below:

  • 1.89% Li2O and 161 ppm Ta2O5 over 27.35 m (including 2.70% Li2O and 222 ppm Ta2O5 over 10.50 m and 1.84% Li2O and 115 ppm Ta2O5 over 9.00 m), through Pegmatite 3, in hole RW-26-35A

  • 1.23% Li2O and 227 ppm Ta2O5 over 6.45 m (including 1.64% Li2O and 179 ppm Ta2O5 over 4.00 m), through Pegmatite 5, in hole RW-26-51 and

  • 1.58% Li2O and 118 ppm Ta2O5 over 16.85 m, through Pegmatite 3, in hole RW-26-51

  • 1.00% Li2O and 88 ppm Ta2O5 over 19.40 m (including 1.11% Li2O and 176 ppm Ta2O5 over 6.70 m and 1.43% Li2O and 83 ppm Ta2O5 over 4.00 m), through Pegmatite 3, in hole RW-26-52

  • 1.33% Li2O and 145 ppm Ta2O5 over 14.05 m (including 1.81% Li2O and 122 ppm Ta2O5 over 9.00 m), through Pegmatite 5, in hole RW-26-58.

    * Core length; the true thickness is between 80 to 95% of the core length.

Located approximately 10 km to the west of the Rose Lithium-Tantalum Project ("Rose"), Rose West is a near surface lithium-rich pegmatite bearing zone, initially intercepted by drilling over a 450 m x 370 m footprint area in the winter of 2024, now covering an overall footprint of 1,250 m x 800 m (see Press Release dated June 9, 2026), a six-fold increase in surface expression. The lithium-rich pegmatites typically range from 10 to 40 m in thickness and together display a sub-horizontal stacked geometry. Recent drilling has identified three (3) new spodumene-bearing pegmatitic bodies within the target area. The Phase 2 Summer 2026 drill program is designed to further expand this mineralized footprint, and to better define the geometry and extent of the three new mineralized pegmatites intersected during the Winter 2026 Campaign.

The Summer 2026 drill program is designed to reach three (3) specific goals:

  1. Expand laterally all around the existing mineralized footprint;

  2. Infill drilling along Line C (Figure 1), to confirm grade and thickness continuity of the intersected pegmatites;

  3. Follow up on both newly discovered mineralized pegmatites (6 and 7) below the current extent of mineralization.

Figure 1: Location map of drillholes from the winter 2024 and winter 2026 campaigns and proposed Summer 2026 drillholes.

To date, eleven (11) holes were drilled in the NE corner of the Main Target Area for a total of 2,073 meters. Figure 1 above shows the location of these holes, which are designed to intersect all three principal pegmatites, i.e., Pegmatite 5 (new), 3 (Main), and Pegmatite 2. Table 1 below presents the collar coordinates, the planned length and the orientation of each of the holes drilled to date.

Drillhole

Grid

UTM NAD 83 ZN18

Length

Azimuth

Dip

Position

Easting

Northing

(m)

(°)

(°)

RW-26-35A

G-14

411,629

5,764,025

171

245

-72

RW-26-36

G-15

411,711

5,764,082

207

245

-72

RW-26-37

G-16

411,793

5,764,140

204

245

-72

RW-26-51

G-17

411,874

5,764,197

192

245

-72

RW-26-52

G-18

411,956

5,764,254

189

245

-72

RW-26-53

H-18

411,899

5,764,336

195

245

-72

RW-26-54

H-17

411,817

5,764,278

201

245

-72

RW-26-55

H-16

411,735

5,764,222

201

245

-72

RW-26-56A

H-15

411,653

5,764,164

195

245

-72

RW-26-57

I-15

411,596

5,764,246

90

245

-72

RW-26-58

I-16

411,678

5,764,303

201

245

-72

Table 1 - 2026 Summer drillhole locations and summary descriptions.

The following Table 2 presents the composite assay results received to date, and the intervals of anticipated mineralization along the other holes drilled during this current campaign. New and updated results presented in the current press release are highlighted in grey.

Drillhole

From

To

Length

Li2O

Ta2O5

Zone

(m)

(m)

(m)

(%)

(ppm)

RW-26-35A

86.95

90.50

3.55

0.61

291

5

including

89.00

90.50

1.50

1.27

231

5

104.55

131.90

27.35

1.89

161

3

including

105.00

115.50

10.50

2.70

222

3

including

120.00

129.00

9.00

1.84

115

3

152.40

161.50

9.10

0.67

265

2

Including

154.10

155.55

1.45

2.89

120

2

RW-26-36

87.45

95.15

7.70

P.R.

P.R.

5

123.80

147.15

23.35

P.R.

P.R.

3

RW-26-37

99.90

113.15

13.25

P.R.

P.R.

5

139.30

161.70

22.40

P.R.

P.R.

3

189.35

195.30

5.95

P.R.

P.R.

2

RW-26-51

97.30

103.75

6.45

1.23

227

5

Including

98.50

102.50

4.00

1.64

179

5

132.00

148.85

16.85

1.58

118

3

including

136.50

145.20

8.70

1.89

130

3

RW-26-52

112.40

121.20

8.80

0.24

248

5

129.10

148.50

19.40

1.00

88

3

including

129.10

135.80

6.70

1.11

176

3

including

139.50

143.50

4.00

1.43

83

3

RW-26-53

115.00

126.00

11.00

N.S

N.S

3

RW-26-54

108.60

128.10

19.50

P.R.

P.R.

3

RW-26-55

140.10

148.20

8.10

P.R.

P.R.

3

RW-26-56A

95.80

110.60

14.80

P.R.

P.R.

3

122.10

137.60

15.50

P.R.

P.R.

3 (?)

RW-26-57

45.00

63.70

18.70

P.R.

P.R.

5 (?)

RW-26-58

57.05

71.10

14.05

1.33

145

5

including

60.00

69.00

9.00

1.81

122

5

* Core length; the true thickness is between 80 to 95% of the core length.
** P.R.: Pending Results, N.S.: No Spodumene.

Table 2 - Spodumene-rich pegmatite intervals and assay results from the Summer 2026 drill campaign.

As previously discussed, the stacked nature of the mineralized system allows for the intersection of multiple pegmatite bodies within a given drillhole (Table 2). While keeping the same "grid-based" systematic approach, not all drillholes are anticipated to intersect each pegmatite. Figures 2 to 4 present plan views of the individual pegmatite zones as defined in the Winter 2026 program, as well as the nature of each intersection through the given zone.

Figure 2 is a horizontal plan view on which the projection of Pegmatite 5 is presented. All holes that were drilled on Line G successfully intersected Pegmatite 5. Holes RW-26-56A and RW-26-55 on Line H, also intersected Pegmatite 5, although the zone is less strongly expressed. Holes RW-26-58 and RW-26-57 appear to have intersected an offset equivalent of Pegmatite 5; Hole RW-26-58 has returned 1.33% Li2O and 145 ppm Ta2O5 over 14.05 m (including 1.81% Li2O and 122 ppm Ta2O5 over 9.00 m).

Figure 3 presents the Pegmatite 3 plan view projection. Most of the holes intersected the Main pegmatite, confirming its continuity across Lines G and H. However, a major fault has also been intersected in holes RW-26-53 and RW-26-55, likely explaining the absence of Pegmatite 3 on Line I in holes RW-26-57 and RW-26-58. However, Holes RW-26-35A, RW-26-51 and RW-26-52 all returned Li2O above 1.00% over thickness from 16.85 to 27.20 m, consistent with similar thickness encountered throughout the Pegmatite 3 body. Assays are pending for holes RW-26-36, RW-26-37, RW-26-54 and RW-26-56A which also intersected Pegmatite 3.

Figure 4 presents the Pegmatite 2 longitudinal view. Pegmatite 2 is confirmed to be present towards the central core of the mineralized area, and as predicted by our 3D model, it appears to get cut-off or merge into Pegmatite 3 towards the north. As a result, Pegmatite 2 was only intersected in holes RW-26-35A to RW-26-37. Hole RW-26-35A returned 0.67% Li2O and 265 ppm Ta2O5 over 9.10 m.

"The Summer 2026 drilling program continue to demonstrate the continuity of not just one, but several lithium- and tantalum-rich pegmatites. The results presented in this press release allow to expand and/or close off the know pegmatites in an area that covers approximately 300 by 300 m. Moreover, each hole reveals a little piece of the structural framework controlling the geometry of the pegmatitic bodies. So far, most of these pieces are adding up volume, while lithium and tantalum content remains consistent. The model seems to have become predictive, increasing the level of confidence we have in our drilling program", commented Kenneth Williamson, Director of Exploration of the Corporation.

Figure 2: Pegmatite 5 projection Plan Map - Zone outline and targeted extensions.

Figure 3: Pegmatite 3 projection Plan Map - Zone outline and targeted extensions.

Figure 4: Pegmatite 2 projection Plan Map - Zone outline and targeted extensions.

Quality assurance/quality control

Quality assurance and quality control procedures have been implemented to ensure best practices in sampling and analysis of the drill core samples. Standards, duplicate and blanks were regularly inserted into the sample stream. The drill core samples were delivered, in secure tagged bags to the ALS Minerals laboratory facility in Val-d'Or, Québec. The samples are weighed and identified prior to sample preparation. The samples are crushed to 70% minus 2 mm, then separated and pulverized to 85% passing 75 μm. All samples are analyzed using sodium peroxide fusion ME-MS-89L, with full analysis for 52 elements. Value over 25,000 ppm Li were re-assays using Li-ICP-82b and value over 2,500 ppm Ta2O5 were re-assays using Ta-XRF10.

Qualified Person

Kenneth Williamson, Géo, M.Sc.Director of Exploration at Critical Elements, is the Qualified Person that has reviewed and approved the technical contents of this news release on behalf of the Corporation.

About Critical Elements Lithium Corporation

Critical Elements aspires to become a large, responsible supplier of lithium to the flourishing electric vehicle and energy storage system industries. To this end, Critical Elements is advancing the wholly-owned, high-purity Rose Lithium-Tantalum project in Québec, the Corporation's first lithium project to be advanced within a land portfolio of over 1,016 km2. On August 29, 2023, the Corporation announced results of a new Feasibility Study on Rose for the production of spodumene concentrate. The after-tax internal rate of return for the Project is estimated at 65.7%, with an estimated after-tax net present value of US$2.2B at an 8% discount rate. In the Corporation's view, Québec is strategically well-positioned for US and EU markets and boasts good infrastructure including a low-cost, low-carbon power grid featuring 94% hydroelectricity. The project has received approval from the Federal Minister of Environment and Climate Change on the recommendation of the Joint Assessment Committee, comprised of representatives from the Impact Assessment Agency of Canada and the Cree Nation Government, received the Certificate of Authorization under the Environment Quality Act from the Québec Minister of the Environment, the Fight against Climate Change, Wildlife and Parks, and the project mining lease from the Québec Minister of Natural Resources and Forests under the Québec Mining Act.

For further information, please contact:

Jean-Sébastien Lavallée, P. Géo.
Chief Executive Officer
819-354-5146
jslavallee@cecorp.ca
www.cecorp.ca

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is described in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Cautionary statement concerning forward-looking statements

This news release contains "forward-looking information" within the meaning of Canadian Securities legislation. Generally, forward-looking information can be identified by the use of forward-looking terminology such as "scheduled", "anticipates", "expects" or "does not expect", "is expected", "scheduled", "targeted", or "believes", or variations of such words and phrases or statements that certain actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved". Forward-looking information contained herein include, without limitation, statements relating to the anticipated receipt of the final assay results from the 2026 drilling program on the Corporation's Rose West property, the results and completion of the 2026 exploration drilling program and its related objectives. Forward-looking information is based on assumptions management believes to be reasonable at the time such statements are made. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking information.

Although Critical Elements has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Factors that may cause actual results to differ materially from expected results described in forward-looking information include, but are not limited to: delays in obtaining final assay results from the laboratory facility, the final and complete results of the Corporation's 2026 exploration drilling program on the Corporation's Rose West property not delivering the anticipated results and the effects on the Corporation's stated objectives, as well as those risk factors set out in the Corporation's Management Discussion and Analysis for its most recent quarter ended May 31, 2026 and other disclosure documents available under the Corporation's SEDAR+ profile. Forward-looking information contained herein is made as of the date of this news release and Critical Elements disclaims any obligation to update any forward-looking information, whether as a result of new information, future events or results or otherwise, except as required by applicable securities laws.

Forward-looking information contained herein is made as of the date of this news release. Although the Corporation has attempted to identify important factors that could cause actual results to differ materially from those contained in the forward-looking information or implied by forward-looking information, there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Corporation undertakes no obligation to update or reissue forward-looking information as a result of new information or events except as required by applicable securities law

SOURCE: Critical Elements Lithium Corp.



View the original press release on ACCESS Newswire

FAQ

What did Critical Elements Lithium (CRECF) announce about the Rose West 10,000-meter drill program on August 12, 2026?

Critical Elements Lithium reported new assay results and an update on its 10,000-meter Phase 2 Summer 2026 drill program at Rose West. According to the company, recent drilling expanded the mineralized footprint and confirmed multiple stacked lithium-tantalum pegmatites with significant lithium grades in several holes.

What are the key lithium assay results from Critical Elements Lithium’s Rose West drilling (CRECF) in 2026?

The strongest interval reported is 1.89% Li2O over 27.35 m, including 2.70% Li2O over 10.50 m in hole RW-26-35A. According to Critical Elements, other holes returned 1.00–1.58% Li2O over 14–19 m, confirming substantial mineralization in Pegmatites 2, 3 and 5.

How much has the Rose West mineralized footprint grown in Critical Elements Lithium’s 2026 program (CRECF)?

Rose West has expanded from an initial 450 x 370 m footprint in winter 2024 to about 1,250 x 800 m. According to Critical Elements, the 2026 drilling added an extra 300 x 300 m block in the Main Target Area, with further lateral growth targeted by the ongoing program.

How many drill holes and meters has Critical Elements Lithium completed at Rose West in Summer 2026?

By this update, Critical Elements has completed eleven holes totaling 2,073 meters in the northeast corner of the Main Target Area. According to the company, these holes are part of a larger 10,000-meter Phase 2 grid-based drill program designed to test and expand multiple pegmatite bodies.

What drilling strategy is Critical Elements Lithium using at Rose West (CRECF)?

The company is applying a systematic 100-meter grid drilling approach guided by a 3D geological model. According to Critical Elements, this strategy aims to grow the mineralized volume, infill Line C to confirm continuity, and follow up on new pegmatites 6 and 7 below current mineralization.

How does the Rose West discovery relate to the Rose Lithium-Tantalum Project for Critical Elements Lithium?

Rose West lies about 10 km west of the Rose Lithium-Tantalum Project and is 100% owned by Critical Elements. According to the company, Rose West hosts near-surface, stacked lithium-rich pegmatites that complement the advanced Rose project, which already has a feasibility study and key permits.

What quality assurance and lab methods does Critical Elements Lithium use for Rose West drill samples?

Critical Elements applies QA/QC protocols with standards, duplicates and blanks inserted into the sample stream. According to the company, core is processed at ALS Minerals Val-d'Or and analyzed using sodium peroxide fusion ME-MS-89L, with high lithium and tantalum values re-assayed using Li-ICP-82b and Ta-XRF10.