Contango Silver & Gold Intersects 972.10 g/t Gold at Lucky Shot and Continues Underground Exploration Development Program
Rhea-AI Summary
Contango Silver and Gold (NYSE American: CTGO) reported final assays from the initial 2025/2026 underground drilling phase at the Lucky Shot project in Alaska and restart of underground exploration development.
Highlights include 0.17 m grading 972.10 g/t gold and plans for ~800 m of new underground workings to support ~12,000 m of follow-up drilling and future technical studies.
Positive
- High-grade intercept of 0.17 m grading 972.10 g/t Au in LSU26091
- Initial underground phase completed: 65 drill holes totaling ~6,020 meters
- Multiple additional intercepts above 8 g/t Au across several veins
- Commencement of ~800 meters of underground exploration development
- Planned ~12,000 meters of further underground drilling starting mid-August 2026
- Development work expected to support a Feasibility Study targeted for H1 2027
Negative
- Reported drill intervals are downhole lengths; true widths not yet known
- Future development and drilling remain subject to permitting, contractor availability and exploration results
News Market Reaction – CTGO
In the Jun 16 session, CTGO declined 0.64%, reflecting a mild negative market reaction.
Data tracked by StockTitan Argus on the day of publication.
Key Figures
Historical Context
| Date | Event | Sentiment | 24h Move | Catalyst |
|---|---|---|---|---|
| May 26 | Drill program launch | Positive | +1.1% | Announced 40,000 m 2026 Kitsault Valley surface drill program and resource work. |
| May 14 | Quarterly results | Negative | -6.3% | Reported Q1 2026 net loss driven by derivative losses despite operational income. |
| May 05 | Lucky Shot acquisition | Positive | +1.7% | Highlighted high‑grade Lucky Shot drilling and agreement to acquire project and royalty. |
| Apr 22 | JV distribution, budgets | Positive | +6.0% | Received $9M JV cash distribution and detailed funded 2026 exploration budgets. |
| Apr 13 | TSX listing | Positive | +3.4% | Commenced trading on TSX to enhance visibility and liquidity for projects. |
24h Move is the share-price change in the day after each event; other market factors may also have contributed.
Price reactions have generally aligned with news tone, with positive operational and listing updates followed by gains and a weaker quarter followed by a decline.
Over recent months, CTGO reported several growth-focused updates. A TSX listing on Apr 13, 2026 and a $9M JV distribution supporting a 2026 exploration program both coincided with positive price moves. High‑grade results and the Lucky Shot acquisition, plus a 40,000 m Kitsault Valley drill program, also saw shares react positively. In contrast, Q1 2026 results featuring a $14.3M net loss led to a negative move. Today’s high‑grade Lucky Shot assays and development progress extend this exploration‑driven growth narrative.
Key Terms
photonassay technical
qualified person regulatory
chain-of-custody technical
fire assay technical
gravimetric finish technical
icp-ms technical
feasibility study financial
AI-generated analysis. How Rhea-AI works. Not financial advice.
The final assay results include several significant gold intercepts from the Lucky Shot vein system, highlighted by 0.17 meters grading 972.10 grams per tonne ("g/t") gold ("Au") in drill hole LSU26091, which intercepted the L1d Vein and included visible gold observed during core logging. The Company also announces that underground exploration development work has re-commenced at Lucky Shot, with our contract miner, GMS Mine Repair & Maintenance, Inc. ("GMS") mobilized to site and is currently advancing exploration access and future underground drill platforms.
Select highlights from the final assay results include:
- LSU26091: 0.17 m grading 972.10 g/t Au from the L1d Vein, with visible gold observed;
- LSU26078: 5.30 m grading 8.89 g/t Au from the L1c Vein, including 0.60 m grading 35.15 g/t Au, with visible gold observed;
- LSU26085: 0.30 m grading 38.97 g/t Au from the CK Vein, with visible gold observed;
- LSU26084: 0.63 m grading 17.75 g/t Au from the CK Vein;
- LSU26081: 0.21 m grading 15.41 g/t Au from the CK Vein;
- LSU26092: 0.85 m grading 9.45 g/t Au from an unassigned vein structure, with visible gold observed;
- LSU26082: 0.71 m grading 8.56 g/t Au from the CK Vein;
- LSU26079: 0.87 m grading 2.24 g/t Au from the L2 Vein; and
- LSU26088: 0.82 m grading 4.47 g/t Au from the L1e Vein, with visible gold observed.
Rick Van Nieuwenhuyse, Chief Executive Officer of Contango, stated: "These assays complete the first phase of underground drilling at Lucky Shot and continue to highlight the high-grade potential and structural complexity of the system. The 972.10 g/t gold intercept in LSU26091 is an exceptional result and reinforces what our team has been seeing in core: visible gold, multiple mineralized vein structures, and a geologic model that continues to improve as drilling advances eastward toward the Enserch Tunnel. Just as importantly, we have now re-started underground exploration development, which is a critical step in establishing the access and drill platforms needed for the next phase of drilling and technical studies. I am particularly excited to continue to explore and test the very high grade KM vein, which intersected approximately 6 meters grading 60 g/t encountered at the very end of the West Drift. By extending the West Drift 100 meters we will be able to test the extent and continuity of this very exciting new discovery."
Final Assay Results Complete Initial Underground Drilling Phase
The 2025/2026 underground diamond drilling program was initiated in November 2025 from existing underground infrastructure along the West Drift. The initial phase of drilling is now complete and consists of 65 HQ diamond drill holes totaling approximately 6,020 meters. This phase was designed to test and refine the Company's understanding of the Lucky Shot vein system, including the historically mined Lucky Shot Vein, also referred to as the L2 Vein, and multiple subparallel vein structures including the L1b, L1c, L1d, L1e, CK and KM veins (see figure 1).

The final drill holes reported in this release completed fan drilling from the 587 and 612 drill stations and continued definition drilling across the Lucky Shot vein system eastward toward the Enserch Tunnel. The cross-sections shown in Figures 2 and 3 illustrate the Company's updated interpretation of the Lucky Shot vein architecture across these drill stations and highlight the improved understanding of the complex, structurally controlled vein system. By tracking mineralized intercepts through successive drill fans from the previously reported drill stations into the current 587 and 612 drill stations, Contango has been able to model the principal vein structures with improved geological confidence and better constrain their relative positions within the broader shear-vein system.

This work has improved the interpreted continuity and geometry of the Lucky Shot L2 Vein and several underlying subparallel vein structures, including the L1c, L1d and CK veins. The updated cross-sectional interpretation also supports a more coherent kinematic model for the vein system, helping to explain the spatial relationship between the historically mined Lucky Shot Vein, newly modeled vein structures, and observed high-grade gold intercepts. Detailed geological logging continued to identify visible gold in multiple intercepts, while updated modeling has refined the Company's understanding of vein architecture, structural controls on mineralization, and follow-up target areas for the next phase of underground drilling.


Figure 4 provides a comparison of the Company's prior model to the updated geological interpretation of the Lucky Shot vein system. Figures 4A and 4B show the earlier interpretation of the Lucky Shot vein model, which was constrained by a more limited drilling dataset and relied on broader correlation of vein intercepts across areas with less underground drill density. The narrow black lines shown in Figures 4A and 4B represent the previous interpreted vein surfaces supported by the drilling available at that time. Following completion of the initial phase of underground drilling, Figures 4C and 4D show the updated vein model, which incorporates the additional drill information collected from the West Drift program and reflects a more detailed interpretation of the structurally controlled mineralized system. The updated model better defines the geometry and relative position of the Lucky Shot L2 Vein and associated subparallel vein structures, while also highlighting the increased complexity of the vein architecture identified through this phase of drilling. This before-and-after comparison demonstrates how the additional drilling has improved the Company's geological framework, increased confidence in the interpreted position of key vein structures, and provides a more robust basis for planning the next phase of underground drilling and exploration development.

The Company cautions that drill intercept lengths reported in this release are downhole core lengths. True widths are not yet known and may be materially different from reported interval lengths. Visible gold observations are qualitative geological observations made during core logging and do not necessarily correlate with higher gold grades, mineral continuity, metallurgical performance or economic significance. Gold assay results are derived from laboratory analysis and are the only quantitative measure of gold content.
Quality Assurance and Quality Control
Contango's drilling and sampling programs are conducted in accordance with industry best practices and applicable SEC S-K 1300 requirements. All drill cores are systematically logged, photographed and sampled under the supervision of the Company's Qualified Person.
Quality assurance and quality control procedures include the regular insertion of certified reference materials, blanks and duplicate samples into the analytical stream. Mineralized intervals are sampled as whole core, with shoulder samples extending beyond mineralized zones where appropriate. Samples are sealed and transported under documented chain-of-custody procedures to the laboratory.
Analytical testing was performed by Bureau Veritas North America, with sample preparation conducted in
Commencement of Underground Exploration Development Work
Contango has commenced the next phase of work at Lucky Shot: underground exploration development designed to establish access and drill platforms for continued exploration of the Lucky Shot vein system. GMS mobilized to site on May 27, 2026, and has completed 43m of lateral advancement.
Contango selected GMS Mine Repair & Maintenance, Inc. as the mining contractor for the underground exploration development program. GMS is a leading mining and tunneling contractor with more than 40 years of experience serving underground mining operations across

The planned underground exploration development program consists of approximately 800 linear meters of underground excavation and is currently anticipated to take approximately five months to complete. The work has been designed to provide strategic underground access for the next phase of approximately 12,000 meters of underground drilling. This work is expected to support the Company's ongoing exploration and technical-study program, including work intended to inform a Feasibility Study at Lucky Shot assuming a Direct Shipping Ore approach targeted for H1 2027.
Initial priorities for the underground exploration development program include the West Drift extension to further explore the KM vein, where multiple hits of multi-ounce gold have been intersected and sampled (reference appropriate press release). The KM vein is at right angles to the Lucky Shot vein series and opens up another dimension to exploring the Lucky Shot mine area as well as the entire Willow district. After the West Drift extension is extended approximately 100 meters, underground development will start on the 2070 East Drift (see Figure 6). These workings are expected to facilitate new drill platforms for the next phase of underground drilling, which is currently expected to commence in mid-August 2026. Subsequent exploration development is expected to include extension of the Enserch Tunnel and development of the 2208 West and 2300 East drifts, subject to operational progress, contractor availability, permitting, technical priorities and ongoing exploration results.

Conference Call and Webcast
Contango will host a conference call and webcast to discuss the Lucky Shot drill results in this report with VP Exploration Dave Larimer and CEO Rick Van Nieuwenhuyse on Wednesday, June 17, 2026, at 2:00pm EST / 11:00am PST. Participants may join the webcast using the following call-in details: https://6ix.com/event/lucky-shot-project-updated-contango-silver-and-gold
Qualified Person
The scientific and technical information contained in this news release has been reviewed and approved by Dave Larimer, CPG, Vice President, Exploration for Contango, who is a Qualified Person as defined by SEC Regulation S-K 1300. Mr. Larimer is not independent of the Company.
ABOUT CONTANGO
Contango is a NYSE American and TSX listed company that engages in the exploration for and development and production of gold and associated minerals in Alaska and in the Golden Triangle in British Columbia. Contango holds a
Additional information can be found on our web page at www.contangoore.com.
FORWARD-LOOKING STATEMENTS
This press release contains forward-looking information and forward-looking statements within the meaning of applicable securities ("Forward-looking Statements"). These include statements regarding Contango's plans and expectations for its properties and operations, the content within future annual filings, operations in respect of Contango mineral properties and any benefits of investment in Contango. The Forward-looking Statements regarding Contango are intended to be covered by the safe harbor for "forward-looking statements" provided by the Private Securities Litigation Reform Act of 1995, based on Contango's current expectations and includes statements regarding future results of operations, quality and nature of the asset base, the assumptions upon which estimates are based and other expectations, beliefs, plans, objectives, assumptions, strategies or statements about future events or performance (often, but not always, using words such as "expects", "projects", "anticipates", "plans", "estimates", "intends", "believes", "ensures", "forecasts", "predicts", "proposes", "contemplates", "aims", "seeks", "continues", "potential", "positioned", "strategy", "outlook", "future", "going forward", "designed to", and similar expressions or other words of similar meaning, and the negatives thereof, or stating that certain actions, events or results "may", "might", "will", "should", "would", or "could" be taken, or that they are "possible", "probable", or "likely" to occur or be achieved). However, the absence of these words does not mean that the statements are not forward-looking. Forward-looking Statements are based on current expectations, estimates and projections that involve a number of risks and uncertainties, which could cause actual results to differ materially from those reflected in the statements. These risks include, but are not limited to: the risks of the exploration and the mining industry (for example, operational risks in exploring for and developing mineral reserves); risks and uncertainties involving geology; the speculative nature of the mining industry; the uncertainty of estimates and projections relating to future production, costs and expenses; the volatility of natural resources prices, including prices of gold and associated minerals; the existence and extent of commercially exploitable minerals in properties acquired by Contango or the Peak Gold JV; ability to realize the anticipated benefits of the Peak Gold JV; potential delays or changes in plans with respect to exploration or development projects or capital expenditures; the interpretation of exploration results and the estimation of mineral resources; the loss of key employees or consultants; health, safety and environmental risks; risks related to weather and other natural disasters; uncertainties as to the availability and cost of financing; Contango's inability to retain or maintain its relative ownership interest in the Peak Gold JV; inability to realize expected value from acquisitions; inability of our management team to execute its plans to meet its goals; the extent of disruptions caused by an outbreak of disease, such as the COVID-19 pandemic; and the possibility that government policies may change, political developments may occur or governmental approvals may be delayed or withheld, including as a result of presidential and congressional elections in the U.S. or the inability to obtain mining permits. Additional information on these and other factors which could affect Contango's operations or financial results are included in Contango's other reports on file with the U.S. Securities and Exchange Commission. Investors are cautioned that any Forward-looking Statements are not guarantees of future performance and actual results or developments may differ materially from the projections in the Forward-looking Statements. Forward-looking Statements are based on the estimates and opinions of management at the time the statements are made. Contango does not assume any obligation to update Forward-looking Statements should circumstances or management's estimates or opinions change.
View original content to download multimedia:https://www.prnewswire.com/news-releases/contango-silver--gold-intersects-972-10-gt-gold-at-lucky-shot-and-continues-underground-exploration-development-program-302801295.html
SOURCE Contango Silver & Gold Inc.