STOCK TITAN

Dakota Gold Intersects 5.24 g/t Gold and 4.43 g/t Silver over 13.5 Meters with Expansion Drilling at Richmond Hill

(Moderate)
(Very Positive)
Tags

Dakota Gold (NYSE American: DC) reported new 2026 drilling results from the Richmond Hill Oxide Heap Leach Gold Project.

Highlights include 5.24 g/t gold and 4.43 g/t silver over 13.5 m and 3.33 g/t gold over 20.9 m in northeast step-out holes up to 440 m beyond the current measured and indicated boundary. The 2025–2026 campaigns add about 30% more drill holes for a resource update and a Pre-Feasibility Study targeted for the second half of 2026.

Loading...
Loading translation...

Positive

  • RH26C-417 intersected 5.24 g/t Au and 4.43 g/t Ag over 13.5 m
  • RH26C-418 intersected 3.33 g/t Au and 5.81 g/t Ag over 20.9 m
  • Northeast drilling step-outs up to 440 m beyond current measured and indicated boundary
  • 2025–2026 drilling adds ~30% more holes versus prior resource estimate dataset
  • Over 16,390 m in 104 drill holes completed, ~94% of 2026 campaign
  • Pre-Feasibility Study for Richmond Hill planned for second half of 2026

Negative

  • None.

News Market Reaction – DC

+1.52%
8 alerts
+1.52% Session close to close
$667.63M Market Cap
0.7x Rel. Volume

In the Jun 11 session, DC gained 1.52%, reflecting a mild positive market reaction. Our momentum scanner triggered 8 alerts that day, indicating moderate trading interest and price volatility.

Data tracked by StockTitan Argus on the day of publication.

Market Context

This announcement highlights high-grade expansion drilling at Richmond Hill, with intercepts in RH26...
Analysis

This announcement highlights high-grade expansion drilling at Richmond Hill, with intercepts in RH26C-417 and RH26C-418 well above the 0.566 g/t Au mine-plan average and extending mineralization beyond the current measured and indicated boundary. The 2025–2026 dataset, including 17,273 m of 2026 drilling, is slated for a Pre-Feasibility Study in H2 2026. Investors may focus on how the PFS, ongoing drilling, and any further use of the existing S-3 framework shape project scale and funding needs.

Key Figures

Gold intercept RH26C-417: 5.24 g/t Au over 13.5 m Gold intercept RH26C-418: 3.33 g/t Au over 20.9 m Higher-grade interval RH26C-417: 12.15 g/t Au over 1.8 m +5 more
8 metrics
Gold intercept RH26C-417 5.24 g/t Au over 13.5 m Northeast expansion drilling at Richmond Hill
Gold intercept RH26C-418 3.33 g/t Au over 20.9 m Northeast expansion drilling at Richmond Hill
Higher-grade interval RH26C-417 12.15 g/t Au over 1.8 m Included within RH26C-417 intercept
2026 drill campaign 17,273 m in 112 holes Total planned 2026 Richmond Hill program
2026 drilling completed 16,390 m in 104 holes Over 94% of planned 2026 campaign completed
Average M&I grade 0.566 g/t Au Measured and indicated mine plan in July 2025 IACF
Northeast drill area 580 m x 730 m 2025–2026 northeast expansion programs beyond M&I boundary
Gram-meter highlight threshold 7 g x m Au Cut-off for highlighting intervals based on bench height and grade

Historical Context

5 past events · Latest: May 19 (Positive)
Pattern 5 events
Date Event Sentiment 24h Move Catalyst
May 19 Drill results update Positive -2.5% Higher-grade infill drilling at Richmond Hill supporting upcoming PFS.
Apr 21 Drill results update Positive -5.5% Initial 2026 infill results with thick mineralized intervals for PFS inputs.
Mar 17 Expansion drilling Positive -2.9% Expansion drilling with strong grades extending mineralization north of resource.
Feb 27 Board appointment Positive +1.3% New director with extensive legal, regulatory, and governance experience.
Feb 9 Equity offering Negative -11.2% $75M common share offering increasing equity float for corporate purposes.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Pattern Detected

Recent Richmond Hill drilling and financing news often coincided with share price weakness, even on technically positive project updates.

Recent Company History

Over the past few months, Dakota Gold has consistently reported Richmond Hill drilling results with multi-gram gold and silver intercepts feeding a Pre-Feasibility Study in H2 2026. Despite this, drill updates on Mar 17, Apr 21, and May 19 all saw negative next-day price reactions. A $75M offering on Feb 9 also weighed on the stock. Today’s high-grade step-out results extend that pattern of project advancement alongside share price volatility.

Key Terms

pre-feasibility study, measured and indicated, heap leach, cut-off, +2 more
6 terms
pre-feasibility study technical
"will be incorporated into a Pre-Feasibility Study ("PFS") in the second half of 2026."
A pre-feasibility study is an initial assessment that evaluates whether a proposed project or investment idea is worth exploring further. It involves examining basic factors like costs, potential benefits, and possible challenges, similar to conducting a preliminary check before deciding to invest more time and resources. This helps investors determine if pursuing the project further is practical and likely to be successful.
measured and indicated technical
"north of the current measured and indicated resource boundary ("M&I boundary")"
Measured and indicated are two levels of confidence used to describe the size and quality of a mineral deposit: "measured" means the quantities and grade are well tested and closely known, while "indicated" means they are reasonably estimated but with more uncertainty. Investors use these categories to judge how reliably a resource can be converted into reserves and future cash flow—think of measured like a weighed recipe and indicated like a good estimate based on past batches.
heap leach technical
"Richmond Hill Oxide Heap Leach Gold Project ("Richmond Hill" or the "Project")"
Heap leach is a mining method where crushed ore is piled into a heap and a liquid is dripped or sprayed over it to dissolve valuable metals, which are then collected from the runoff. Investors care because it is a lower-cost, scalable way to produce metals like gold or copper, but it also affects project timelines, recovery rates, capital needs and environmental or regulatory risk — like choosing a cheap, slow way to extract juice from a fruit versus pressing it quickly.
cut-off technical
"Intervals calculated based on 0.5 g/t Au cut-off and maximum dilution of 3.05 meters."
A cut-off is a specific deadline or set point that determines which items, people, or data are included or excluded for a financial, regulatory, or medical process. For investors it matters because it fixes who qualifies for dividends, shareholder votes, trial results, or financial reporting — like drawing a line on a guest list so only those on the right side participate or count. Missing a cut-off can change ownership rights, reported outcomes, or the timing of news that affects a stock.
dilution technical
"Intervals calculated based on 0.5 g/t Au cut-off and maximum dilution of 3.05 meters."
Dilution occurs when a company issues additional shares, increasing the total number of shares outstanding. This can reduce the ownership percentage and voting power of existing shareholders, similar to slicing a pie into more pieces—each piece becomes smaller. For investors, dilution can mean a reduced stake in the company and potentially lower earnings per share, affecting the value of their investment.
View in glossary
open pit technical
"Initial Assessment with Cash Flow has an open pit designed with 12.2m (40 ft) benches."
A large, surface excavation where rock and soil are removed in stepped layers to reach and extract mineral deposits; picture a terraced, man‑made quarry reaching down to the ore. It matters to investors because open‑pit operations tend to produce high volumes at lower unit cost but require large up‑front investment, long operating life, and carry visible environmental and permitting risks that can affect production, costs and company value.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Lead, South Dakota--(Newsfile Corp. - June 11, 2026) - Dakota Gold Corp. (NYSE American: DC) ("Dakota Gold" or the "Company") is pleased to report the additional assay results received from its 2026 Drill Campaign ("2026 Campaign") at the Richmond Hill Oxide Heap Leach Gold Project ("Richmond Hill" or the "Project"). The 2026 Campaign includes 17,273 meters of drilling in 112 holes and consists of a combination of infill, expansion and geotechnical drilling. Gold and silver assay data from more than 350 drill holes completed as part of the 2025 and ongoing 2026 drill campaigns at Richmond Hill will be incorporated into a Pre-Feasibility Study ("PFS") in the second half of 2026. This expanded dataset represents an approximately 30% increase in drill holes relative to the drill holes that informed the mineral resource estimate outlined in the July 2025 Initial Assessment with Cash Flow ("IACF") and will support a comprehensive update to the mineral resource estimate, as well as further refine the geo-metallurgical model, mine plan, and sequencing. Together, these advancements are designed to enhance project definition and underpin the continued advancement of Richmond Hill toward development.

Highlights from this update include:

  • Expansion drill hole RH26C-417 intersected 5.24 grams per tonne gold (g/t Au) and 4.43 g/t silver (g/t Ag) over 13.5 meters (71 gram-meters Au), including 12.15 g/t Au and 3.08 g/t Ag over 1.8 meters (22 gram-meters Au) and RH26C-418 intersected 3.33 g/t Au and 5.81 g/t Ag over 20.9 meters (70 gram-meters Au). RH26C-417 and RH26C-418 are located approximately 440 meters (1,444 feet) and 230 meters (755 feet), respectively, north of the current measured and indicated resource boundary ("M&I boundary") and represent meaningful step-outs. The 2025-2026 northeast expansion drill programs covered an area of 580 meters (1,903 feet) north - south and 730 meters (2,395 feet) east – west past the current M&I boundary. The mineralization in the northeast is only limited by drilling and remains open in all directions.

  • The 2026 drill campaign continues to deliver multiple higher-grade gold intercepts, with expansion holes RH26C-417 and RH26C-418 both exceeding the average grade of 0.566 g/t Au outlined in the IACF measured and indicated mine plan. These results build on the success of prior drilling, further highlighting the northeast area of the Project as a key zone of higher-grade gold mineralization. Notably, the highest gram-meter gold intersection from the 2025 infill and expansion drill campaign was located in the northeast area - RH25C-310 intersected 5 g/t Au and 28.64 g/t Ag over 24.9 meters (124 gram-meters Au), including 60.82 g/t Au and 61.68 g/t Ag over 1.5 meters (89 gram-meters Au).

  • Over 94% of the total planned drilling for this year's Richmond Hill Campaign has been completed to date with 16,390 meters in 104 drill holes. Drilling productivity and assay turnaround times remain on track, and the Campaign is expected to be completed at the end of June 2026.

Jack Henris, President and COO of Dakota Gold, said, "We are encouraged by the expansion drill results from the northeast, which build on last year's campaign and continue to demonstrate the scale and potential of the mineralized system at Richmond Hill. These results reinforce our strategy of expanding the known footprint through step-out drilling to grow the resource area and drive value, with multiple targets already delivering positive results and additional updates expected in the coming weeks. As we complete geotechnical drilling this month, our focus remains on advancing trade-off studies and delivering the Pre-Feasibility Study in the second half of this year."

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/300954_dd73e56a94035a85_002.jpg

Figure 1. Plan Map showing location of Dakota Gold Corp. Richmond Hill drill results reported today in Table 1. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/300954_dd73e56a94035a85_002full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/300954_dd73e56a94035a85_003.jpg

Figure 2. Plan Map showing northeast location of Dakota Gold Corp. Richmond Hill drill results beyond the current measured and indicated boundary. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/300954_dd73e56a94035a85_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/8218/300954_dd73e56a94035a85_004.jpg

Figure 3. 600-Meter-Wide Section Map of Richmond Hill Looking East. 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/8218/300954_dd73e56a94035a85_004full.jpg

Table 1. Richmond Hill Drill Results (Metric / Imperial)1,2,3,4

Hole #From
(m)
To
(m)
Interval
(m)
Grade Au
(g/t)
g x m
Au
Grade Ag
(g/t)
g x m
Ag
From
(ft)
To
(ft)
Interval
(ft)
Grade Au
(oz/ton)
RH26C-41682.197.715.51.01167.23112269.5320.551.00.029

115.8121.15.30.6742.3613379.8397.217.40.019
RH26C-41797.4104.77.21.0071.4611319.7343.423.70.029

109.6123.113.55.24714.4360359.6403.844.20.153
inc.111.5113.31.812.15223.086365.7371.65.90.354

153.9162.58.60.8275.7049505.0533.328.30.024
RH26C-41884.2106.121.90.57132.1146276.4348.271.80.017

130.1151.120.93.33705.81122427.0495.768.70.097

164.4173.69.21.631512.53115539.5569.730.20.048
RH26C-41975.088.013.02.10278.05105246.0288.742.70.061

96.9103.06.10.7754.2926317.9338.020.10.023
RH26C-42088.191.13.00.7521.695289.0299.010.00.022

101.1114.313.20.78101.5420331.8375.043.20.023

120.4131.210.81.13122.0522395.0430.435.40.033

134.4150.816.40.86143.6159441.0494.853.80.025

158.5162.03.50.8634.5316520.1531.611.50.025
RH26C-42187.094.98.01.55122.0216285.4311.526.10.045
RH26C-42272.185.313.30.811113.49179236.4279.943.50.024
RH26C-42384.693.99.30.5651.6215277.4308.030.60.016

111.5118.77.30.5241.3810365.7389.523.80.015

131.3135.44.10.7434.8820430.9444.313.40.022

160.8165.44.62.84136.7031527.7542.715.00.083
RH26C-424108.5114.35.80.8054.4426356.0375.019.00.023

119.2129.810.70.6275.2256391.0426.035.00.018
RH26C-425No significant intercepts
RH26C-426120.6124.64.00.8431.928395.6408.813.20.025

159.3169.19.70.6771.7317522.8554.731.90.020

191.2196.65.41.3672.7815627.3645.017.70.040
RH26C-4270.07.47.41.60123.00220.024.224.20.047

77.780.83.10.6224.2513254.9265.210.30.018
RH26C-428No significant intercepts
RH26C-429137.3163.125.81.66432.8473450.3535.084.70.048
RH26C-430100.3104.24.00.8037.9832329.0342.013.00.023

129.5134.44.90.9142.5112424.9441.016.10.027
RH26C-4310.018.618.61.48272.18410.061.061.00.043

88.496.68.20.69610.3485290.0317.027.00.020
RH26C-433110.5123.312.81.15153.3443362.5404.441.90.033
RH26C-438114.6121.67.00.69510.6475376.0399.023.00.020
RH26C-439105.8118.813.10.811114.56190347.0389.942.90.024
RH26C-4447.931.223.21.603730.8571726.0102.276.20.047
RH26C-45037.655.017.50.711248.04840123.2180.657.40.021

 

The table may contain rounding errors.

  1. Abbreviations in the table include ounces per ton ("oz/ton"); grams per tonne ("g/t"); feet ("ft"); meter ("m"); gram meters ("g x m").
  2. True thickness unknown.
  3. Intervals calculated based on 0.5 g/t Au cut-off and maximum dilution of 3.05 meters.
  4. The July 7, 2025 Initial Assessment with Cash Flow has an open pit designed with 12.2m (40 ft) benches. The average grade for the Measured and Indicated mine plan is 0.566 g/t Au (0.017 oz/ton). A gram-meter of 7 and above has been highlighted in Table 1 based on the bench height and average grade.

About Dakota Gold Corp.

Dakota Gold is expanding the legacy of the 145-year-old Homestake Gold Mining District by advancing the Richmond Hill Oxide Heap Leach Gold Project to commercial production as soon as 2029, and outlining a Tertiary maiden resource as well as a high-grade underground gold resource at the Maitland Gold Project, both located on private land in South Dakota.

Subscribe to Dakota Gold's e-mail list at www.dakotagoldcorp.com to receive the latest news and other Company updates.

Shareholder and Investor Inquiries

For more information, please contact:

Jack Henris
President and COO
Tel: +1 605-717-2540

Shawn Campbell
Chief Financial Officer
Tel: +1 778-655-9638

Carling Gaze
VP of Investor Relations and Corporate Communications
Tel: +1 605-679-7429
Email: info@dakotagoldcorp.com

Qualified Person and S-K 1300 Disclosure

William Gehlen, a Certified Professional Geologist (CPG-10626) with the AIPG, American Institute of Professional Geologists, a Senior Fellow with the SEG, and Senior Manager - Geology of Dakota Gold Corp., is the Company's designated qualified person (as defined in Subpart 1300 of Regulation S-K) for this news release and has reviewed and approved its scientific and technical content.

Quality Assurance/Quality Control consists of regular insertion of certified reference materials, duplicate samples, and blanks into the sample stream. Samples are submitted to the ALS Geochemistry sample preparation facility in Winnipeg, Manitoba. Gold and multi-element analyses are performed at the ALS Geochemistry laboratory in Vancouver, British Columbia. ALS Minerals is an ISO/IEC 17025:2017 accredited lab. Check samples are submitted to Bureau Veritas, Vancouver B.C. as an umpire laboratory. Assay results are reviewed, and discrepancies are investigated prior to incorporation into the Company database.

Forward-Looking Statements

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this communication, the words "plan," "target," "anticipate," "believe," "estimate," "intend," "potential," "will" and "expect" and similar expressions are intended to identify such forward-looking statements. Any express or implied statements contained in this communication that are not statements of historical fact may be deemed to be forward-looking statements, including, without limitation: our expectations regarding additional drilling, metallurgy and modeling; our expectations for the improvement and growth of the mineral resources and potential for conversion of mineral resources into reserves; completion of a pre-feasibility study, a feasibility study, and/or permitting; and our overall expectation for the possibility of near-term production at the Richmond Hill project. These forward-looking statements are based on assumptions and expectations that may not be realized and are inherently subject to numerous risks and uncertainties, which could cause actual results to differ materially from these statements. These risks and uncertainties include, among others: the execution and timing of our planned exploration activities; our use and evaluation of historic data; our ability to achieve our strategic goals; the state of the economy and financial markets generally and the effect on our industry; and the market for our common stock. The foregoing list is not exhaustive. For additional information regarding factors that may cause actual results to differ materially from those indicated in our forward-looking statements, we refer you to the risk factors included in Item 1A of the Company's Annual Report on Form 10-K for the fiscal year ended December 31, 2025, as updated by annual, quarterly and current reports that we file with the SEC, which are available at www.sec.gov. We caution investors not to place undue reliance on the forward-looking statements contained in this communication. These statements speak only as of the date of this communication, and we undertake no obligation to update or revise these statements, whether as a result of new information, future events or otherwise, except as may be required by law. We do not give any assurance that we will achieve our expectations.

All references to "$" in this communication are to U.S. dollars unless otherwise stated.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/300954

FAQ

What gold and silver grades did Dakota Gold (DC) report in June 2026 Richmond Hill drilling?

Dakota Gold reported 5.24 g/t gold and 4.43 g/t silver over 13.5 meters in hole RH26C-417. According to Dakota Gold, another hole, RH26C-418, returned 3.33 g/t gold and 5.81 g/t silver over 20.9 meters in the northeast area.

How far do the June 2026 Dakota Gold (DC) step-out holes extend beyond the Richmond Hill resource?

The June 2026 step-out holes extend up to 440 meters north of the measured and indicated boundary. According to Dakota Gold, RH26C-417 is about 440 meters and RH26C-418 about 230 meters north, within a broader 580 m by 730 m expansion area.

How much drilling has Dakota Gold (DC) completed in the 2026 Richmond Hill campaign?

Dakota Gold has completed 16,390 meters of drilling in 104 holes, about 94% of the 2026 campaign. According to Dakota Gold, total planned 2026 drilling is 17,273 meters in 112 holes, combining infill, expansion, and geotechnical work.

How will the 2025–2026 Richmond Hill drill results affect Dakota Gold (DC) resource estimates?

The 2025–2026 results will add about 30% more drill holes to the existing dataset for Richmond Hill. According to Dakota Gold, these assays will support a comprehensive mineral resource update and refine the geo-metallurgical model, mine plan, and sequencing.

When is Dakota Gold (DC) planning the Richmond Hill Pre-Feasibility Study release?

Dakota Gold plans to deliver the Richmond Hill Pre-Feasibility Study in the second half of 2026. According to Dakota Gold, gold and silver assays from more than 350 drill holes will be incorporated into this PFS to advance project definition.

How do the new Dakota Gold (DC) intercepts compare with the Richmond Hill mine plan average grade?

New intercepts in RH26C-417 and RH26C-418 exceed the 0.566 g/t gold mine plan average grade. According to Dakota Gold, these higher-grade intervals highlight the northeast area as a key zone of gold mineralization beyond the current resource envelope.

What cut-off grade and assumptions were used for Dakota Gold (DC) Richmond Hill drill intervals?

Reported intervals were calculated using a 0.5 g/t gold cut-off and maximum dilution of 3.05 meters. According to Dakota Gold, true thickness is unknown, and the open-pit design in the 2025 Initial Assessment used 12.2-meter bench heights.