Endurance Reports Encouraging Down Dip Extension of the Eagle Zone at Reliance
Rhea-AI Summary
Endurance Gold (OTCQB: ENDGF) reported a second batch of 2026 drill assays from its 100%-owned Reliance Gold Project near Gold Bridge, BC, where an Inferred Mineral Resource Estimate stands at 19.6 million tonnes grading 2.30 g/t gold for 1.45 million ounces.
Key result DDH26-135 from the Eagle Zone returned 9.27 g/t gold and 0.36% antimony over 6.1 m, including 19.40 g/t gold over 1.0 m, representing a 100 m down-dip extension of the Eagle Zone “Feeder Structure” outside the current MRE. The same hole intersected 4.33 g/t gold over 7.7 m, including 9.53 g/t gold over 2.9 m, as an infill hit within the Eagle South portion of the MRE.
DDH26-136 cut 2.21 g/t gold over 4.6 m plus a deeper 0.5 m interval at 4.22 g/t gold. As of end-July, a fully funded two-rig program has completed 7,200 m in 18 holes, with drilling expected to exceed 10,000 m focused on expanding the MRE at the Eagle, Crown and Imperial zones.
Positive
- High-grade Eagle Zone hit: 9.27 g/t Au over 6.1 m including 19.40 g/t over 1.0 m in DDH26-135
- 100 m down-dip extension of Eagle Zone “Feeder Structure” mineralization beyond current MRE footprint
- Infill at Eagle South: 4.33 g/t Au over 7.7 m including 9.53 g/t over 2.9 m within MRE area
- Additional mineralized intercepts: DDH26-136 with 2.21 g/t Au over 4.6 m plus 4.22 g/t over 0.5 m
- Active 2026 drill campaign: 7,200 m completed in 18 holes, fully funded two-rig program may exceed 10,000 m
- Established resource base: Inferred MRE of 19.6 Mt at 2.30 g/t Au for 1.45 Moz contained gold
Negative
- None.
AI-generated analysis. How Rhea-AI works. Not financial advice.
9.27 gpt Gold over 6.1 Metres including 19.40 gpt Gold over 1.0 M
Vancouver, British Columbia--(Newsfile Corp. - August 11, 2026) - Endurance Gold Corporation (TSXV: EDG) (OTCQB: ENDGF) (FSE: 3EG) (the "Company") is pleased to announce the second batch of 2026 assay results from its
Highlights include:
- DDH26-135 returned 9.27 gpt gold and
0.36% antimony over 6.1 metres ("m"), including 19.40 gpt gold and0.23% antimony over 1.0 m from the Eagle Zone commencing at 254.1 m downhole depth- This high-grade gold intersection represents a 100 m down-dip extension external to the current MRE in the Eagle Zone 'Feeder Structure' previously intersected by hole DDH22-023 (9.57 gpt Au over 1.6 m; see News Release July 18, 2022).
- Commencing at 160 m downhole depth, this same hole DDH26-135 also intersected 4.33 gpt gold and
0.03% antimony over 7.7 m, including 9.53 gpt gold and0.07% antimony over 2.9 m. This represents an infill intersection in the MRE at the Eagle South structure of the Eagle Zone. - Drilling is active with an additional eleven (11) diamond drill holes now completed. Ten of the holes are at the Crown and Imperial Zones with the objective of expanding the MRE at these areas.
"Drilling continues to deliver at Reliance with five of the seven holes reported to date hosting encouraging drill intersections consistent with our pre-2026 drilling success statistics, thus delivering growth potential for the Reliance Project," said Robert T. Boyd, President and CEO.
As of the end of July, the fully funded, two-diamond drill rig program has completed 7,200 m in 18 drill holes at the Eagle, Crown and Imperial Zones along the Royal Shear trend. In April 2026, the Company announced a planned minimum of 8,000 m of diamond drilling and current estimates indicate the 2026 program may exceed 10,000 m in the area of the MRE as we continue drilling. Additional holes and metres are being added to the MRE expansion program to follow up on the observation of mineralization intersected in 2026 along the margins of the Mineral Resource Estimate.
The drill holes reported herein were designed to test the southern and downdip extent of the Eagle Zone adjacent to the Royal Shear fault where mineralization is often disrupted by a typically unmineralized polymictic breccia melange.
Drill holes DDH26-135 and DDH26-136 intersected the Eagle Zone 'Feeder Structure' below the MRE and represent a downdip expansion of mineralization. DDH26-135 results are reported in the highlights above. Hole DDH26-136 intersected 2.21 gpt gold and
Drill holes DDH26-133 and DDH26-135 intersected the Eagle South horizon in the footwall of the Royal Shear fault. DDH26-135 intersected 4.33 gpt gold and
The two drilling rigs are currently working at the Imperial and Crown Zones where the one rig is testing the depth extent of the Imperial Zone and the second rig is testing the continuity of mineralization between the two zones. Eight (8) holes have been completed at the Imperial / Crown Zones with the ninth and tenth in progress. Assay results are pending.
All drill assay results are reported as core length intervals. True composite widths are estimated at
The Reliance Gold Project is interpreted to host a shallow-level (Epizonal) Orogenic gold system. Gold mineralization is directly related to varying amounts, though generally low concentrations of sulphides, including pyrite, arsenopyrite, and stibnite. These occur as sulphide replacement and multigenerational breccias, which are frequently associated with pervasive silicification, quartz stockwork and/or quartz breccia infill. The geological setting and drilling results to date support the Company's view that the Project has near surface and underground growth potential.
MRE Disclaimer and Qualified Person
The Mineral Resource Estimate ("MRE") was prepared for Endurance Gold Corporation by Ginto Consulting Ltd. in accordance with NI 43-101 - Standards of Disclosure for Mineral Projects with an effective date of January 8, 2026. Please see the NI 43-101 Technical Report dated March 10, 2026 for additional disclosure for the MRE. The Report, titled "NI 43-101 Mineral Resource Estimate and Technical Report on the Reliance Gold Project, British Columbia, Canada", is available on SEDAR+ under the Company's profile and on the Company's website.
Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.
Endurance Gold Corporation is a precious metals exploration and development company focused on the acquisition, exploration and development of highly prospective North American mineral properties. Our exploration focus is currently to advance the Reliance Gold Project, located near Gold Bridge B.C. in the historic Bridge River Gold Mining Camp.
ENDURANCE GOLD CORPORATION
Robert T. Boyd, President & CEO
FOR FURTHER INFORMATION, PLEASE CONTACT
Endurance Gold Corporation www.endurancegold.com
Toll Free: (877) 624 2237, info@endurancegold.com
The technical and scientific information in this news release has been reviewed and approved by Darren O'Brien, P.Geo., Vice President Exploration of the Company and a Qualified Person as defined in National Instrument 43-101. Mr. O'Brien has reviewed and approved of this news release.
Diamond drill core was logged and evaluated on the Property and samples designated for assay analysis under the supervision of a geologist at the property. Drilling was completed with HQ and NQ size tools capable of collecting 6.35 and 4.76 centimetre diameter core (respectively). Drill core was cut using a diamond saw with one half of the core sent for analysis and the remaining kept for future studies. All drill core samples have been submitted to ALS Global in North Vancouver, BC, an ISO/IEC 17025:2017 accredited laboratory, where they are crushed to
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. This news release may contain forward looking statements based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of factors beyond its control, and actual results may differ materially from the expected results.

Table 1 - 2026 Significant Composite DDH Assays Results
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4976/309128_edg-table1.jpg
Figure 1: Reliance Property – 2026 Drill Surface Plan Map with Near-Surface MRE
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4976/309128_7185e419d49ed890_003full.jpg
Figure 2: Reliance Property – Eagle Zone Vertical Section DDH26-135
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4976/309128_7185e419d49ed890_004full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/309128

