STOCK TITAN

Endurance Reports Encouraging Down Dip Extension of the Eagle Zone at Reliance

(Neutral)
(Neutral)
Tags

Endurance Gold (OTCQB: ENDGF) reported a second batch of 2026 drill assays from its 100%-owned Reliance Gold Project near Gold Bridge, BC, where an Inferred Mineral Resource Estimate stands at 19.6 million tonnes grading 2.30 g/t gold for 1.45 million ounces.

Key result DDH26-135 from the Eagle Zone returned 9.27 g/t gold and 0.36% antimony over 6.1 m, including 19.40 g/t gold over 1.0 m, representing a 100 m down-dip extension of the Eagle Zone “Feeder Structure” outside the current MRE. The same hole intersected 4.33 g/t gold over 7.7 m, including 9.53 g/t gold over 2.9 m, as an infill hit within the Eagle South portion of the MRE.

DDH26-136 cut 2.21 g/t gold over 4.6 m plus a deeper 0.5 m interval at 4.22 g/t gold. As of end-July, a fully funded two-rig program has completed 7,200 m in 18 holes, with drilling expected to exceed 10,000 m focused on expanding the MRE at the Eagle, Crown and Imperial zones.

Loading...
Loading translation...

Positive

  • High-grade Eagle Zone hit: 9.27 g/t Au over 6.1 m including 19.40 g/t over 1.0 m in DDH26-135
  • 100 m down-dip extension of Eagle Zone “Feeder Structure” mineralization beyond current MRE footprint
  • Infill at Eagle South: 4.33 g/t Au over 7.7 m including 9.53 g/t over 2.9 m within MRE area
  • Additional mineralized intercepts: DDH26-136 with 2.21 g/t Au over 4.6 m plus 4.22 g/t over 0.5 m
  • Active 2026 drill campaign: 7,200 m completed in 18 holes, fully funded two-rig program may exceed 10,000 m
  • Established resource base: Inferred MRE of 19.6 Mt at 2.30 g/t Au for 1.45 Moz contained gold

Negative

  • None.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

9.27 gpt Gold over 6.1 Metres including 19.40 gpt Gold over 1.0 M

Vancouver, British Columbia--(Newsfile Corp. - August 11, 2026) - Endurance Gold Corporation (TSXV: EDG) (OTCQB: ENDGF) (FSE: 3EG) (the "Company") is pleased to announce the second batch of 2026 assay results from its 100%-owned Reliance Gold Project (the "Project"). The road-accessible Project is located 4 kilometres ("km") east of Gold Bridge, BC in the historic Bridge River Mining Camp. In January 2026, the Company reported an inaugural Inferred Mineral Resource Estimate of 19.6 million tonnes at an average grade 2.30 grams per tonne ("gpt") Au, for 1.45 million ounces contained gold ("MRE") (see MRE Disclaimer below).

Highlights include:

  • DDH26-135 returned 9.27 gpt gold and 0.36% antimony over 6.1 metres ("m"), including 19.40 gpt gold and 0.23% antimony over 1.0 m from the Eagle Zone commencing at 254.1 m downhole depth
    • This high-grade gold intersection represents a 100 m down-dip extension external to the current MRE in the Eagle Zone 'Feeder Structure' previously intersected by hole DDH22-023 (9.57 gpt Au over 1.6 m; see News Release July 18, 2022).
  • Commencing at 160 m downhole depth, this same hole DDH26-135 also intersected 4.33 gpt gold and 0.03% antimony over 7.7 m, including 9.53 gpt gold and 0.07% antimony over 2.9 m. This represents an infill intersection in the MRE at the Eagle South structure of the Eagle Zone.
  • Drilling is active with an additional eleven (11) diamond drill holes now completed. Ten of the holes are at the Crown and Imperial Zones with the objective of expanding the MRE at these areas.

"Drilling continues to deliver at Reliance with five of the seven holes reported to date hosting encouraging drill intersections consistent with our pre-2026 drilling success statistics, thus delivering growth potential for the Reliance Project," said Robert T. Boyd, President and CEO.

As of the end of July, the fully funded, two-diamond drill rig program has completed 7,200 m in 18 drill holes at the Eagle, Crown and Imperial Zones along the Royal Shear trend. In April 2026, the Company announced a planned minimum of 8,000 m of diamond drilling and current estimates indicate the 2026 program may exceed 10,000 m in the area of the MRE as we continue drilling. Additional holes and metres are being added to the MRE expansion program to follow up on the observation of mineralization intersected in 2026 along the margins of the Mineral Resource Estimate.

The drill holes reported herein were designed to test the southern and downdip extent of the Eagle Zone adjacent to the Royal Shear fault where mineralization is often disrupted by a typically unmineralized polymictic breccia melange.

Drill holes DDH26-135 and DDH26-136 intersected the Eagle Zone 'Feeder Structure' below the MRE and represent a downdip expansion of mineralization. DDH26-135 results are reported in the highlights above. Hole DDH26-136 intersected 2.21 gpt gold and 0.02% antimony over 4.6 m, including 6.22 gpt gold and 0.04% antimony over 1.3 m. DDH26-136 also intersected a deeper mineralized splay that returned 4.22 gpt gold and 0.18% antimony over 0.5 m.

Drill holes DDH26-133 and DDH26-135 intersected the Eagle South horizon in the footwall of the Royal Shear fault. DDH26-135 intersected 4.33 gpt gold and 0.03% antimony over 7.7 m, including 9.53 gpt gold and 0.07% antimony over 2.9 m which is considered an infill intersection of the Eagle Zone MRE. Drill hole DDH26-133 intersected the southern boundary of the Eagle South horizon where mineralization bifurcates and interacts with the breccia melange. The hole returned an assay composite of 1.18 gpt gold over 18.8 m from several mineralized structures, of which the most significant was 3.16 gpt gold over 2.9 m.

The two drilling rigs are currently working at the Imperial and Crown Zones where the one rig is testing the depth extent of the Imperial Zone and the second rig is testing the continuity of mineralization between the two zones. Eight (8) holes have been completed at the Imperial / Crown Zones with the ninth and tenth in progress. Assay results are pending.

All drill assay results are reported as core length intervals. True composite widths are estimated at 80% to 100% of core length. Highlighted intervals are reported in Table 1 and the reported drill holes are shown on the surface plan map in Figure 1. A vertical section displaying DDH26-133, DDH26-135, and DDH26-136 is shown in Figure 2.

The Reliance Gold Project is interpreted to host a shallow-level (Epizonal) Orogenic gold system. Gold mineralization is directly related to varying amounts, though generally low concentrations of sulphides, including pyrite, arsenopyrite, and stibnite. These occur as sulphide replacement and multigenerational breccias, which are frequently associated with pervasive silicification, quartz stockwork and/or quartz breccia infill. The geological setting and drilling results to date support the Company's view that the Project has near surface and underground growth potential.

MRE Disclaimer and Qualified Person

The Mineral Resource Estimate ("MRE") was prepared for Endurance Gold Corporation by Ginto Consulting Ltd. in accordance with NI 43-101 - Standards of Disclosure for Mineral Projects with an effective date of January 8, 2026. Please see the NI 43-101 Technical Report dated March 10, 2026 for additional disclosure for the MRE. The Report, titled "NI 43-101 Mineral Resource Estimate and Technical Report on the Reliance Gold Project, British Columbia, Canada", is available on SEDAR+ under the Company's profile and on the Company's website.

Mineral Resources, which are not Mineral Reserves, do not have demonstrated economic viability. There is no certainty that all or any part of the mineral resources estimated will be converted into mineral reserves. The estimate of Mineral Resources may be materially affected by environmental, permitting, legal, title, taxation, sociopolitical, marketing, changes in global gold markets or other relevant issues.

Endurance Gold Corporation is a precious metals exploration and development company focused on the acquisition, exploration and development of highly prospective North American mineral properties. Our exploration focus is currently to advance the Reliance Gold Project, located near Gold Bridge B.C. in the historic Bridge River Gold Mining Camp.

ENDURANCE GOLD CORPORATION

Robert T. Boyd, President & CEO

FOR FURTHER INFORMATION, PLEASE CONTACT
Endurance Gold Corporation www.endurancegold.com
Toll Free: (877) 624 2237, info@endurancegold.com

The technical and scientific information in this news release has been reviewed and approved by Darren O'Brien, P.Geo., Vice President Exploration of the Company and a Qualified Person as defined in National Instrument 43-101. Mr. O'Brien has reviewed and approved of this news release.

Diamond drill core was logged and evaluated on the Property and samples designated for assay analysis under the supervision of a geologist at the property. Drilling was completed with HQ and NQ size tools capable of collecting 6.35 and 4.76 centimetre diameter core (respectively). Drill core was cut using a diamond saw with one half of the core sent for analysis and the remaining kept for future studies. All drill core samples have been submitted to ALS Global in North Vancouver, BC, an ISO/IEC 17025:2017 accredited laboratory, where they are crushed to 70% <2 mm then up to 250 gram pulverized to <75 microns. Samples are then submitted for four-acid digestion and analyzed for 48 element ICP-MS (ME-MS61) and gold 30g FA ICP-AES finish (AU-ICP21). Over limit samples returning greater than 10 parts per million ("ppm") gold are re-analyzed by Au-GRA21 methodology and overlimit antimony returning greater than 10,000 ppm Sb are re-analyzed by Sb-AA08 methodology. Samples with Visible Gold are re-analysed by metallics screening method Au-SCR21 which incorporates a 1 kg pulp screened to 100 microns and includes assaying of the entire oversize fraction.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. This news release may contain forward looking statements based on assumptions and judgments of management regarding future events or results that may prove to be inaccurate as a result of factors beyond its control, and actual results may differ materially from the expected results.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4976/309128_edg-table1.jpg

Table 1 - 2026 Significant Composite DDH Assays Results

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4976/309128_edg-table1.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4976/309128_7185e419d49ed890_003.jpg

Figure 1: Reliance Property – 2026 Drill Surface Plan Map with Near-Surface MRE 

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4976/309128_7185e419d49ed890_003full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/4976/309128_7185e419d49ed890_004.jpg

Figure 2: Reliance Property – Eagle Zone Vertical Section DDH26-135

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/4976/309128_7185e419d49ed890_004full.jpg

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/309128

FAQ

What were the key 2026 drill results Endurance Gold (OTCQB: ENDGF) reported from DDH26-135 at Reliance?

DDH26-135 returned 9.27 g/t gold and 0.36% antimony over 6.1 metres, including 19.40 g/t gold over 1.0 metre. According to Endurance Gold, the hole also cut 4.33 g/t gold over 7.7 metres, including 9.53 g/t over 2.9 metres within the Eagle South area.

How does the new Eagle Zone drilling affect mineralization below the current Reliance MRE for ENDGF?

The new drilling extends Eagle Zone mineralization about 100 metres down-dip beyond the current Mineral Resource Estimate footprint. According to Endurance Gold, DDH26-135 and DDH26-136 intersected the Eagle Zone “Feeder Structure” below the existing MRE, indicating potential resource expansion at depth.

What is the current Inferred Mineral Resource Estimate at Endurance Gold’s Reliance Project (symbol ENDGF)?

The Reliance Project hosts an Inferred Mineral Resource Estimate of 19.6 million tonnes grading 2.30 grams per tonne gold for 1.45 million ounces. According to Endurance Gold, this NI 43-101 compliant MRE, effective January 8, 2026, reflects near-surface mineralization along the Royal Shear trend.

How much drilling has Endurance Gold completed in its 2026 Reliance program and what is the target meterage?

By the end of July 2026, Endurance Gold had completed 7,200 metres in 18 diamond drill holes at Reliance. According to the company, the fully funded two-rig program was initially planned for at least 8,000 metres and is now expected to exceed 10,000 metres.

Which zones are being targeted by Endurance Gold’s 2026 drilling at the Reliance Project (ENDGF)?

The 2026 drilling targets the Eagle, Crown and Imperial zones along the Royal Shear trend. According to Endurance Gold, recent holes tested the down-dip and southern extents of the Eagle Zone, while two rigs are now focused on depth and continuity at the Imperial and Crown zones.

What type of gold system does Endurance Gold report at the Reliance Project and what minerals are associated?

Reliance is interpreted to host a shallow-level epizonal orogenic gold system. According to Endurance Gold, gold mineralization is associated with generally low sulphide contents, mainly pyrite, arsenopyrite and stibnite, occurring in replacement zones and multigenerational breccias with silicification and quartz stockworks.

How reliable are the reported gold grades and intervals from Endurance Gold’s 2026 Reliance drilling?

Assays are from half-core samples analyzed at ALS Global, an accredited laboratory, using four-acid digestion and fire assay methods. According to Endurance Gold, over-limit and visible-gold samples are re-analyzed with specialized protocols, and reported drill intervals represent core lengths with estimated true widths of 80–100%.