G Mining Ventures (OTCQX:GMINF) reported strong Q2 2025 results, with gold production reaching 42,587 ounces, a 20% increase from the previous quarter. The company achieved record quarterly revenue of $129.6 million and generated $60.2 million in free cash flow. Key financial metrics include net income of $48.6 million ($0.21 per share) and adjusted EBITDA of $92.9 million.

The company's Tocantinzinho (TZ) processing plant reached nameplate capacity, operating at 96% of designed throughput of 12,890 tonnes per day. The cash balance strengthened to $156.1 million, supporting development activities at Oko West and Gurupi projects. The company maintains its 2025 production guidance of 175,000-200,000 ounces while adjusting AISC guidance to $1,025-$1,155 per ounce due to increased mining taxes.

The company received favorable court ruling for the Gurupi Project in Brazil and expects to finalize project financing for Oko West in H2 2025.

G Mining Ventures (OTCQX:GMINF) ha registrato solidi risultati nel secondo trimestre 2025, con una produzione d'oro pari a 42.587 once, in aumento del 20% rispetto al trimestre precedente. La società ha realizzato un ricavo trimestrale record di 129,6 milioni di dollari e ha generato 60,2 milioni di dollari di flusso di cassa libero. Tra i principali indicatori finanziari, il reddito netto è stato di 48,6 milioni di dollari (0,21 dollari per azione) e l'EBITDA rettificato si è attestato a 92,9 milioni di dollari.

L'impianto di lavorazione Tocantinzinho (TZ) ha raggiunto la capacità nominale, operando al 96% della portata progettata di 12.890 tonnellate al giorno. La posizione di cassa si è rafforzata a 156,1 milioni di dollari, a supporto delle attività di sviluppo nei progetti Oko West e Gurupi. La società conferma la guidance di produzione per il 2025 di 175.000-200.000 once, aggiornando però la guidance sull'AISC a 1.025-1.155 dollari per oncia a causa dell'aumento delle imposte minerarie.

La società ha ottenuto una decisione favorevole in tribunale per il progetto Gurupi in Brasile e prevede di finalizzare il finanziamento del progetto Oko West nella seconda metà del 2025.

G Mining Ventures (OTCQX:GMINF) informó sólidos resultados en el segundo trimestre de 2025, con una producción de oro de 42.587 onzas, un aumento del 20% respecto al trimestre anterior. La compañía alcanzó un ingreso trimestral récord de 129,6 millones de dólares y generó 60,2 millones de dólares de flujo de caja libre. Entre las métricas financieras clave, el ingreso neto fue de 48,6 millones de dólares (0,21 dólares por acción) y el EBITDA ajustado fue de 92,9 millones de dólares.

La planta de procesamiento Tocantinzinho (TZ) alcanzó la capacidad nominal, operando al 96% del rendimiento diseñado de 12.890 toneladas por día. El saldo de efectivo se fortaleció hasta 156,1 millones de dólares, apoyando las actividades de desarrollo en los proyectos Oko West y Gurupi. La empresa mantiene su guía de producción para 2025 de 175.000-200.000 onzas, ajustando la guía de AISC a 1.025-1.155 dólares por onza debido al incremento de impuestos mineros.

La compañía recibió una sentencia judicial favorable para el proyecto Gurupi en Brasil y espera finalizar la financiación del proyecto Oko West en la segunda mitad de 2025.

G Mining Ventures (OTCQX:GMINF)는 2025년 2분기 실적이 호조를 보였으며, 금 생산량은 42,587 온스로 전분기 대비 20% 증가했습니다. 회사는 분기별 사상 최대 매출 1억 2,960만 달러를 기록했고 6,020만 달러의 잉여현금흐름을 창출했습니다. 주요 재무 지표로는 순이익 4,860만 달러(주당 0.21달러)와 조정 EBITDA 9,290만 달러가 있습니다.

토칸틴지노(TZ) 처리 공장은 명목(설계) 용량에 도달해 설계 처리량인 일일 12,890톤의 96%로 운영되고 있습니다. 현금 잔고는 1억 5,610만 달러로 강화되어 Oko West 및 Gurupi 프로젝트의 개발 활동을 지원합니다. 회사는 2025년 생산 가이던스를 175,000–200,000 온스로 유지하되, 광산세 증가로 인해 AISC 가이던스를 온스당 1,025–1,155달러로 조정했습니다.

회사 측은 브라질 Gurupi 프로젝트와 관련해 유리한 법원 판결을 받았으며 Oko West 프로젝트 자금 조달을 2025년 후반기에 마무리할 것으로 예상합니다.

G Mining Ventures (OTCQX:GMINF) a publié de solides résultats au deuxième trimestre 2025, avec une production d'or de 42 587 onces, soit une hausse de 20 % par rapport au trimestre précédent. La société a enregistré un chiffre d'affaires trimestriel record de 129,6 millions de dollars et généré 60,2 millions de dollars de flux de trésorerie disponible. Parmi les principaux indicateurs financiers figurent un résultat net de 48,6 millions de dollars (0,21 dollar par action) et un EBITDA ajusté de 92,9 millions de dollars.

L'usine de traitement Tocantinzinho (TZ) a atteint sa capacité nominale, fonctionnant à 96 % du débit conçu de 12 890 tonnes par jour. La trésorerie s'est renforcée pour atteindre 156,1 millions de dollars, soutenant les activités de développement des projets Oko West et Gurupi. La société maintient ses prévisions de production 2025 entre 175 000 et 200 000 onces, tout en ajustant la prévision de l'AISC à 1 025–1 155 dollars par once en raison de l'augmentation des taxes minières.

La société a obtenu une décision judiciaire favorable concernant le projet Gurupi au Brésil et s'attend à finaliser le financement du projet Oko West au second semestre 2025.

G Mining Ventures (OTCQX:GMINF) meldete starke Ergebnisse für das zweite Quartal 2025: die Goldproduktion erreichte 42.587 Unzen, ein Anstieg von 20% gegenüber dem Vorquartal. Das Unternehmen erzielte einen rekordmäßigen Quartalsumsatz von 129,6 Mio. USD und generierte 60,2 Mio. USD freien Cashflow. Zu den wichtigsten Finanzkennzahlen gehören ein Nettogewinn von 48,6 Mio. USD (0,21 USD je Aktie) und ein bereinigtes EBITDA von 92,9 Mio. USD.

Die Aufbereitungsanlage Tocantinzinho (TZ) erreichte die Nennkapazität und arbeitete mit 96% der Auslegungsdurchsatzmenge von 12.890 Tonnen pro Tag. Die Barreserve stieg auf 156,1 Mio. USD und unterstützt die Entwicklungsaktivitäten in den Projekten Oko West und Gurupi. Das Unternehmen bestätigt seine Produktionsprognose für 2025 von 175.000–200.000 Unzen, passt jedoch die AISC-Prognose aufgrund gestiegener Bergbausteuern auf 1.025–1.155 USD pro Unze an.

Für das Gurupi-Projekt in Brasilien lag ein positives Gerichtsurteil vor, und das Unternehmen erwartet, die Projektfinanzierung für Oko West in der zweiten Hälfte des Jahres 2025 abzuschließen.

Positive
  • Record quarterly revenue of $129.6 million, up 32% from previous quarter
  • Strong free cash flow generation of $60.2 million in Q2
  • Net income of $48.6 million ($0.21 per share)
  • Gold production increased 20% to 42,587 ounces
  • Processing plant achieved nameplate capacity at 96% of designed throughput
  • Robust cash position of $156.1 million, up $7 million from Q1
  • Favorable court ruling for Gurupi Project advancement
Negative
  • AISC guidance increased by $30 per ounce due to new mining tax legislation
  • Production guidance expected to be at lower end of 175,000-200,000 ounce range
  • Higher AISC of $1,355 per ounce in Q2 due to timing of sustaining capital expenditures

BROSSARD, QC, Aug. 14, 2025 /PRNewswire/ - G Mining Ventures Corp. ("GMIN" or the "Corporation") (TSX: GMIN) (OTCQX: GMINF) is pleased to report its financial and operational (1) results for the three and six months ended June 30, 2025. Unless otherwise stated, all dollar amounts in this news release are expressed in U.S. dollars.

Second Quarter 2025 Operational and Financial Highlights

  • Increased production: In the second quarter of 2025, gold production was 42,587 ounces, representing a 20% increase over the prior quarter.
  • Record free cash flow generation: $60.2 million of free cash flow (2) and $79.8 million of cash provided by operating activities were generated in the second quarter. The Corporation expects strong ongoing free cash flow (2) at current gold prices through the remainder of 2025.
  • Generating robust margins: Reported all-in sustaining cost (2) ("AISC") per ounce of gold sold of $1,170, compared to an average realized gold price (2) of $3,014 per ounce year to date.
  • Record quarterly revenue of $129.6 million, representing a 32% increase over the prior quarter.
  • Record adjusted EBITDA (Earnings before Interest, Taxes, Depreciation and Amortization) (2) of $92.9 million during the quarter and $161.0 million year to date.
  • Strong profitability: Reported net income of $48.6 million, or $0.21 per share, and $73.1 million, or $0.32 per share year to date.
  • Strong liquidity: Cash balance was $156.1 million at the end of the second quarter, an increase of $7 million over the prior quarter.
  • Advancing Oko West: Early works activities continue to progress rapidly with $63 million of development capital spent year to date. Detailed engineering is 19% complete, with approximately $190 million committed.

Recent Corporate Highlights

  • Achieved nameplate capacity at the Tocantinzinho ("TZ") processing plant operating at 96% of designed throughput of 12,890 tonnes per day during May and June.
  • Received a court ruling (State) that removes a longstanding regulatory constraint on the Gurupi Project in Brazil, providing GMIN with the green light to advance the project with clarity.
  • Published GMIN's third annual environmental, social and governance ("ESG") report.

"Q2 was a pivotal quarter for GMIN, as we achieved nameplate throughput at TZ and delivered a step-change in gold production and free cash flow," said Louis-Pierre Gignac, President & Chief Executive Officer. "With strong operating performance and disciplined cost management, we generated over $60 million in free cash flow (2), strengthening our balance sheet and enabling us to advance our high-potential growth pipeline. The completion of the Oko West Feasibility Study and immanent receipt of the Final Environmental Permit, along with resolution of legacy permitting issues at Gurupi provide clear visibility on our next phases of development. These results reflect the strength of both our team and our strategy to build GMIN into the next multi-asset, mid-tier gold producer."

TZ Operational Results(1):


Q2 2025

Q2 2024

YTD 2025

YTD 2024

In thousands of $, except as otherwise noted







Mining Activities






Ore Tonnes Mined

kt

1,649

-

3,161

-

Waste Tonnes Mined

kt

2,707

-

4,902

-

Total Tonnes Mined

kt

4,356

-

8,063

-

Strip Ratio

Waste/ore

1.64

-

1.55

-

Average Gold Grade of Ore Mined

g/t Au

1.35


1.19


Processing Activities






Total Tonnes Processed

kt

1,011

-

1,915

-

Average Plant Throughput

tpd

11,107

-

10,579

-

Average Gold Recovery

%

90.30

-

89.10

-

Average Gold Grade of Ore Processed

g/t Au

1.45

-

1.43

-

Gold Produced

oz

42,587

-

78,165

-

Gold Sold

oz

40,082

-

75,517

-

Unit Costs






Average Realized Gold Price (2)

$/oz

3,233

-

3,014

-

Average Gold Price Received (2) (4)

$/oz

2,992

-

2,787

-

Total Cash Costs (2)

$/oz

763

-

728

-

Site-Level AISC (2)

$/oz

1,246

-

1,053

-

AISC (2)

$/oz

1,355

-

1,170

-

Financial Results (1):


Q2 2025

Q2 2024

YTD 2025

YTD 2024

In thousands of $, except as otherwise noted






Revenue

$

129,594

-

227,612

-

Cost of Goods Sold

$

(44,317)

-

(82,450)

-

Net Income (Loss)

$

48,626

(5,339)

73,055

(9,899)

   Per Share – Basic

$/share

0.21

(0.05)

0.32

(0.09)

Adjusted Net Income (Loss) (2)

$

36,502

(2,626)

71,477

(4,440)

   Per share – Basic

$/share

0.16

(0.02)

0.32

(0.04)

EBITDA (2)

$

104,258

(5,306)

170,972

(9,820)

Adjusted EBITDA (2)

$

92,851

(2,593)

160,987

(4,361)

Cash Provided by Operating Activities

$

79,767

(6,766)

110,291

(16,571)

   Per share – Basic

$/share

0.35

(0.06)

0.49

(0.15)

Free Cash Flow (2)

$

60,224

(6,766)

96,186

(16,571)

   Per share – Basic

$/share

0.27

(0.06)

0.43

(0.15)

 

Financial Position

As at June 30,

As at December 31,

In thousands of $, except as otherwise noted

2025

2024

Cash and Cash Equivalents

$

156,119

141,215

Financial Highlights

Gold sales totaled 40,082 ounces, generating $129.6 million in revenue at an average realized gold price(2) of $3,233 per ounce — benefiting from both higher production and stronger gold prices compared to Q1 2025.

Cash costs (2) were $763 per ounce, while AISC (2) totaled $1,355 per ounce, largely driven by the timing of sustaining capital expenditures, including non-recurring mobile fleet purchases. As these one-time investments are now complete, the Corporation anticipates AISC will decline in the second half of the year.

Cash flow from operations totaled $79.8 million, resulting in free cash flow (2) of $60.2 million ($0.27 per share) and a cash balance of $156.1 million at quarter-end.

Adjusted EBITDA (2) totaled $92.9 million, reflecting the combination of higher gold sales and continued cost discipline.

Adjusted net income (2) was $36.5 million ($0.16 per share).

The Corporation ended the quarter with $156.1 million in cash and equivalents, up from $149.0 million in Q1. This increase reflects strong free cash flow (2) generation, partially offset by continued investment in Oko West, exploration activities and working capital.

This robust liquidity position provides the Corporation with the flexibility to fund ongoing development at Oko West and Gurupi without requiring near-term external capital.

Reconciliation of Cash Costs and AISC (2) 

Q2 2025

Q2 2024

YTD 2025

YTD 2024

In thousands of $, except as otherwise noted






Operating Expenses

$

26,572

-

47,915

-

Royalties

$

4,019

-

7,096

-

Total Cash Costs

$

30,591

-

55,011

-

Sustaining Capital and others*

$

19,358

-

24,517

-

Site Level AISC (2)

$

49,949

-

79,528

-

G&A Expenses (3)

$

4,376

-

8,830

-

Total AISC (2)

$

54,325

-

88,358

-

Cash Costs (2)

$/oz

763

-

728

-

Site Level AISC (2)

$/oz

1,246

-

1,053

-

AISC (2)

$/oz

1,355

-

1,170

-

*Comprised of Sustaining capital expenditures, capitalized stripping (sustaining), exploration (sustaining) and accretion to rehabilitation provision (ARO).

TZ – Q2 2025 Operating Summary

The second quarter marked a key milestone in the ramp-up of TZ Gold Mine. In June, the plant achieved nameplate throughput, averaging 12,890 tonnes per day over a 30-day period, following the installation of new steel liners in the semi-autogenous grinding mill. This upgrade has resulted in improved equipment availability and metallurgical performance.

  • Gold production of 42,587 ounces represents approximately 23% of full-year midpoint guidance of 187,500 ounces.
  • Average plant throughput for the quarter was 11,107 tpd, or 86% of nameplate capacity, compared to 78% in Q1.
  • Gold recovery raised to 90.3%, compared to 87.7% in Q1, supported by improved plant stability and efficient operation assisted by the expert control system.
  • Processed grade averaged 1.45 g/t Au, in line with the mine plan.
  • Mining rate increased to approximately 4.4 million tonnes, including 1.6 million tonnes of ore, resulting in a strip ratio of 1.64x.
  • Ore stockpiles at quarter-end totaled 6.0 million tonnes at 0.77 g/t Au, providing flexibility for blending and mill feed optimization in H2 2025.

TZ – Sustaining Capital

Q2 2025 sustaining capital totaled $18.6 million, primarily for additions to the mobile fleet, tailings management, and mill optimization. Full-year sustaining capital remains forecast between $60–70 million, with $36–46 million expected in H2, ~40% of which is allocated to capitalized stripping as TZ transitions to steady-state operations.

Now entering steady-state operations, TZ will focus on maintaining throughput, improving recovery, and lowering unit costs.

Oko West Development Update

In April 2025, GMIN published the results of the Feasibility Study for Oko West, outlining a long-life, low-cost, and high-margin operation. Key highlights include:

  • Average annual production of 350,000 ounces over a 12.3-year mine life
  • AISC of $1,123 per ounce and initial capital cost of $972 million
  • Base case after-tax NPV5% of $2.2 billion and IRR of 27% at a gold price of $2,500 per ounce
  • Upside case after-tax NPV5% of $3.2 billion and IRR of 35% at a gold price of $3,000 per ounce

Early works construction commenced in March and is progressing on schedule, including road access, camp construction, and a wharf facility. With substantial completion targeted by year-end, these activities will position the project to move confidently into full construction in the coming year.

Environmental permitting advanced during the quarter. Following the submission of the full Environmental and Social Impact Assessment ("ESIA") to Guyana's Environmental Protection Agency ("EPA") in late May, the EPA has now approved the ESIA, and we are imminently awaiting the grant of the Full Environment Permit, marking a key regulatory milestone for construction readiness.

Exploration activities at Oko West continued during the quarter, with drilling focused on near-pit extensions based on a new interpretation of the mineralized zone known as the "splay model." Trenching and mapping also progressed along the main shear zone south of the pit. The Corporation's 2025 exploration strategy remains focused on expanding mineral resources along the shear zone and identifying additional targets across the broader land package.

Gurupi – Regulatory Clarity and Path Forward

In July 2025, the Corporation announced a favourable decision by the Federal Court of Maranhão in Brazil, confirming its right to restart the permitting process for the Gurupi Project under its current ownership. This ruling invalidated outdated licenses issued to prior operators and cleared the way for GMIN to pursue new environmental and mining permits.

Following this legal resolution, the Corporation is progressing toward the receipt of exploration permits to restart drilling activities. In parallel, new baseline environmental and social studies will be initiated, and early engagement has begun with local communities and stakeholders.

The Gurupi Project, located in Maranhão State, Brazil, hosts 1.83 million ounces of indicated and 0.77 million ounces of inferred mineral resources across a large and prospective land package. The Corporation is reviewing historical exploration data and assessing future drilling opportunities to evaluate potential resource expansion and further validate the geological model. In light of recent positive developments, an additional $4 million budget has been allocated to launch an inaugural drill program in the second half of the year.

ESG Highlights

On July 30, 2025 GMIN published its 2024 ESG Report, outlining key achievements and future targets:

  • Total Recordable Injury Frequency Rate (TRIFR) of 0.08 over 2.5 million hours worked
  • 94% of process water recycled; 74% of solid waste reused
  • 33 hectares reforested and over 10,000 plants and animals monitored
  • More than R$174 million (US$32 million) spent with local suppliers in 2024

In H2 2025, the Corporation will expand reforestation efforts and enhance stakeholder engagement programs across its portfolio.

Liquidity and Capital Resources

The Corporation ended Q2 2025 with a cash and cash equivalents balance of $156.1 million, compared to $149.0 million at the end of Q1 2025, reflecting continued strong free cash flow generation and disciplined capital deployment.

The $7 million increase in cash, quarter over quarter is primarily attributed to the following:

  • Free cash flow (2) totaled $60 million, driven by higher gold sales and improved operational performance at the TZ Mine
  • Non-sustaining investments (2) of $51 million, largely directed toward the continued development of the Oko West Project, including early works and long-lead equipment purchases and
  • Net financing outflows, investments in long term inventories and foreign exchange adjustments of approximately $2 million

This strong cash position supports the Corporation's self-funded growth strategy and provides financial flexibility to continue advancing both Oko West and Gurupi without the need for immediate external capital.

Figure 1: Cash Position Bridge for the three-month period ended June 30, 2025 (CNW Group/G Mining Ventures Corp)

 (1) These measures are non-IFRS financial measures. Refer to section "Non-IFRS Financial Performance Measures" in the associated MD&A for further information and a detailed reconciliation to comparable IFRS measures.

2025 Outlook

GMIN reaffirms its full-year 2025 production guidance of 175,000 to 200,000 ounces of gold with an expectation of being at the lower end of guidance. As planned, production is weighted toward the second half of the year, reflecting improved throughput and recoveries as the TZ Mine transitions to steady-state operations. During the first half of the year, TZ produced 78,165 ounces, 45% of the lower end of our annual guidance range.

Cost guidance is increased by $30 per ounce to reflect the impact of State of Pará enacted legislation increasing the Tax for Control, Monitoring, and Oversight of Mining Activities ("TRFM"), effective March 27, 2025, and subsequently revised on May 21, 2025, through Decree No. 4,677.  The AISC guidance is therefore adjusted at $1,025 to $1,155 per ounce sold.

The Corporation also maintains its full-year capital and cost guidance with an increased exploration budget for Gurupi, as summarized below:

Operational & Cost Guidance


Guidance 2025

TZ Mine



Gold Production

k oz

175 to 200

Cash Costs

$/oz Au sold

$620 to $685

was $590 to $655

AISC(2)

$/oz Au sold

$1,025 to $1,155

was $995 to $1,125

Sustaining Capital Expenditures



Sustaining

$M

$35 to $45

Near-mine exploration

$M

$2

Capitalized Waste Stripping

$M

$23

Total Sustaining

$M

$60 to $70

Non-Sustaining Capital Expenditures



TZ Regional Exploration

$M

$9

Oko West Exploration

$M

$8

Oko West Project

$M

$200 to $240

Gurupi

$M

$6 to $8

was $2 to $4

Total Non-Sustaining

$M

$223 to $265
was $219 to $261

Note: Guidance assumes a realized gold price of $2,350 and BRL/USD of 5.25

The Corporation remains focused on operational excellence, disciplined capital deployment, and delivering long-term value through its self-funded growth strategy. Development milestones at Oko West and Gurupi remain on track.

2025 Catalysts

In the second half of 2025, the Corporation expects to:

  • Finalize project financing and make a construction decision for Oko West (H2 2025)
  • Advance detailed engineering and continue early works activities at Oko West (2025)
  • Continue environmental permitting activities at both Oko West (Q3 2025) and Gurupi
  • Progress exploration initiatives-both greenfield and brownfield-across TZ, Oko West and Gurupi

Second Quarter 2025 Results Conference Call and Webcast 

A conference call to discuss details of GMIN's second quarter 2025 results will be held by senior management on Friday, August 15, 2025, at 9:00 AM (E.S.T.). Participants may join the conference call using the following call-in details:

  • Conference ID: 2442486
  • Participant Toll-Free Dial-In Number: 1-800-715-9871
  • Participant International Dial-In Number: 1-646-307-1963

Participants can also access a live webcast of the conference call via https://edge.media-server.com/mmc/p/vnz2p26e or via the GMIN website at: https://gmin.gold/investors/presentations-and-events/

A replay of this conference call will be available via the webcast for 12 months. Replay details will be provided on the GMIN website 24 hours after the call at: https://gmin.gold/investors/presentations-and-events/.

Qualified Person

Louis-Pierre Gignac, President & Chief Executive Officer of GMIN, a QP as defined in NI 43-101, has reviewed the press release on behalf of the Corporation and has approved the technical disclosure contained in this press release.

About G Mining Ventures Corp.

G Mining Ventures Corp. is a mining company engaged in the acquisition, exploration and development of precious metal projects to capitalize on the value uplift from successful mine development. GMIN is well-positioned to grow into the next mid-tier precious metals producer by leveraging strong access to capital and proven development expertise. GMIN is currently anchored by the Tocantinzinho Mine in Brazil, supported by the Gurupi Project in Brazil and the Oko West Project in Guyana — all with significant exploration upside and located in mining-friendly jurisdictions. GMIN trades on the TSX under the symbol "GMIN".

Cautionary Statement on Forward-Looking Information

All statements, other than statements of historical fact, contained in this press release constitute "forward-looking information" and "forward-looking statements" within the meaning of certain securities laws and are based on expectations and projections as of the date of this press release. Forward-looking statements contained in this press release include, without limitation, those related to (i) the Corporation being on track to deliver 2025 production, cost and capital guidance; (ii) the AISC at TZ being expected to decline in H2-2025; (iii) higher-grade ore to become accessible at TZ during H2-2025; (iv) the expected ramp-up of TZ, notably as a result of improved equipment availability and metallurgical performance; (v) the ore stockpiles providing flexibility for mill feed optimization in H2-2025; (vi) the full-year forecasted sustaining capital expenditures for TZ; (vii) the Oko West mining license anticipated in Q3-2025; (viii) a project financing package expected later this year and the expected full-scale construction at Oko West in 2026; (ix) the feasibility study outlining a robust, long-life and economically viable high-margin Oko West; * the long-lead equipment purchases for Oko West; (xi) the start of a new baseline environmental and social studies for Gurupi and the additional exploration budget therefor; (xii) GMIN's 2025 exploration strategy and the expected expansion of mineral resources resulting therefrom; (xiii) the quoted comments and expectations of GMIN's President & Chief Executive Officer; and (xiv) more generally, the sections entitled "2025 Outlook" (notably the table setting forth the Corporation's operational & cost guidance), "2025 Catalysts" and "About G Mining Ventures Corp.".

Forward-looking statements are based on expectations, estimates and projections as of the time of this press release. Forward-looking statements are necessarily based upon several estimates and assumptions that, while considered reasonable by the Corporation as of the time of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. These estimates and assumptions may prove to be incorrect. Such assumptions include, without limitation, those relating to the price of gold and currency exchange rates, those outlined in the feasibility and other technical studies relating to TZ, Oko West, Gurupi and GMIN's other projects, and those underlying the items listed on the above sections entitled "2025 Outlook", "2025 Catalysts" and "About G Mining Ventures Corp.".

Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, actual results to differ materially from those expressed or implied in any forward-looking statements. There can be no assurance that, notably but without limitation, (i) GMIN's positive safety record will continue over time and GMIN will continue to deliver free cash flow in subsequent quarters; (ii) any of GMIN's exploration targets at TZ, Oko West and Gurupi will lead to additional resources and eventually to gold production; (iii) GMIN will continue to experience gold sales at a high price combined with cost discipline; (iv) GMIN will continue to benefit from the TZ plant stability and efficient control thereat, and from a processed grade that will remain in line with the mine plan; (v) the early works construction will prove a major step forward for advancing Oko West and will be substantially completed by year-end; (vi) a construction decision will be made in respect of Oko West later in 2025, or at all, (vii) Oko West will be brought into commercial production, (viii) gold recoveries at TZ will remain strong and in line with feasibility study expectations,  (ix) the Oko West economics (e.g., AISC, NPV, IRR) will materialize as set out in its feasibility study; * GMIN will receive the mining license for Oko West in Q3 2025, or at all; (xi) GMIN will receive the relevant exploration permits to restart drilling activities at Gurupi and, following the court ruling, the project will effectively advance with clarity; or (xii) GMIN will use TZ and Oko West to grow into the next intermediate producer, as future events could differ materially from what is currently anticipated by the Corporation. In addition, there can be no assurance that Brazil and/or Guyana will remain mining friendly and prospective jurisdictions.

By their very nature, forward-looking statements involve inherent risks and uncertainties, both general and specific, and risks exist that estimates, forecasts, projections and other forward-looking statements will not be achieved or that assumptions do not reflect future experience. Forward-looking statements are provided for the purpose of providing information about management's expectations and plans relating to the future. Readers are cautioned not to place undue reliance on these forward-looking statements as several important risk factors and future events could cause the actual outcomes to differ materially from the beliefs, plans, objectives, expectations, anticipations, estimates, assumptions and intentions expressed in such forward-looking statements. All of the forward-looking statements made in this press release are qualified by these cautionary statements and those made in the Corporation's other filings with the securities regulators of Canada including, but not limited to, the cautionary statements made in the relevant sections of the Corporation's (i) Annual Information Form dated March 27, 2025, for the financial year ended December 31, 2024, and (iii) Management Discussion & Analysis. The Corporation cautions that the foregoing list of factors that may affect future results is not exhaustive, and new, unforeseeable risks may arise from time to time. The Corporation disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

__________

(1) Additional details are available in the Corporation's Consolidated Financial Statement and Management's Discussion and Analysis (MD&A), filed on SEDAR+ at www.sedarplus.com under the Corporation's profile.

(2) These measures are non-IFRS financial measures. Refer to section "Non-IFRS Financial Performance Measures" for further information and a detailed reconciliation to comparable IFRS measures.

(3) This amount excludes corporate depreciation and amortization expenses totaling $38,000 and $72,000 for the three and six months ended June 30, 2025. This amount also excludes non-sustaining allocation of G&A Costs totaling $(629,000) and $402,000 for the three and six months ended June 30, 2025.

(4) The average gold price received excludes non-cash portion of the average realized gold price

Consolidated Statements of Financial Position
(Tabular amounts expressed in Thousands of United States Dollars)


June 30,


December 31,

2025

2024


$


$

Assets




Current




Cash and Cash Equivalents

156,119


141,215

Receivables and Other Current Assets

4,439


5,155

Inventories

50,970


37,588

Prepaid Expenses and Deposits

3,562


2,640


215,090


186,598

Non-current




Deferred Financing Fees

751


743

Derivative Financial Assets

1,737


-

Inventories

40,229


21,183

Long Term Deposits on Equipment

33,965


876

Property, Plant & Equipment and Mineral Property

550,987


498,105

Intangible Assets

32,731


31,146

Exploration and Evaluation Assets

780,173


702,336

Income Tax Recoverable

8,322


-

Investment in Associate

3,522


3,546

Other Non-current Assets

41,773


28,976


1,709,280


1,473,509





Liabilities




Current




Accounts Payable and Accrued Liabilities

35,893


25,065

Income Tax Payable

42,485


-

Deferred Consideration Payable

60,000


60,000

Current Portion of Contract Liability

37,350


36,197

Current Portion of Lease Liability

543


104

Current Portion of Long-term Debt

34,393


24,572


210,664


145,938

Non-current




Long-term Contract Liability

207,160


220,426

Long-term Debt

73,065


89,182

Long-term Lease Liability

463


902

Deferred Tax Liability

11,815


3,407

Rehabilitation Provision

4,739


2,976


297,242


316,893

Shareholders' Equity




Share Capital

1,095,114


1,082,691

Share-based Payments Reserve

14,584


19,433

Accumulated Other Comprehensive Income (Loss)

2,406


(107,916)

Retained Earnings

89,270


16,470


1,201,374


1,010,678


1,709,280


1,473,509

Refer to Q2 2025 Financial Statements for accompanying notes

Consolidated Statements of Income (Loss)
(Tabular amounts expressed in Thousands of United States Dollars, except for number of shares)


Three Months Ended June 30,


Six Months Ended June 30,


2025


2024


2025


2024


$


$


$


$

Revenue

129,594


-


227,612


-

Cost of Goods Sold

(44,317)


-


(82,450)


-

Income From Mining Operations

85,277


-


145,162


-









Other (Income) Expenses








General & Administrative Expenses

3,785


1,875


9,304


4,171

Finance Expense

5,685


-


11,435


-

Change in Fair Value of Financial Instruments

(7,883)


2,445


(8,300)


5,090

Foreign Exchange

(151)


918


2,325


1,020

Other (Income) Expenses

(968)


101


(1,627)


(382)


468


5,339


13,137


9,899

Income (Loss) Before Income Tax

84,809


(5,339)


132,025


(9,899)

Current and Deferred Income Tax Expense

(36,183)


-


(58,970)


-

















Net Income (Loss) for the Period

48,626


(5,339)


73,055


(9,899)

Net Income (Loss) per Share








Basic

0.21


(0.05)


0.32


(0.09)

Diluted

0.21


(0.05)


0.32


(0.09)

Weighted Average Number of Common Shares








Basic

226,205,719


112,974,114


225,735,715


112,431,055

Diluted

229,868,055


112,974,114


229,191,425


112,431,055

Refer to Q2 2025 Financial Statements for accompanying notes

Consolidated Statements of Comprehensive Income (Loss)
(Tabular amounts expressed in Thousands of United States Dollars, except for number of shares)



Three Months Ended June 30,


Six Months Ended June 30,



2025


2024


2025


2024



$


$


$


$

Net Income (Loss) for the Period


48,626


(5,339)


73,055


(9,899)










Currency Translation Adjustment


72,178


(55,337)


110,322


(72,498)

Net Comprehensive Income (Loss) for the Period


120,804


(60,676)


183,377


(82,397)

Refer to Q2 2025 Financial Statements for accompanying notes

Consolidated Statements of Cash Flows
(Tabular amounts expressed in Thousands of United States Dollars, except for number of shares)


Three Months Ended June 30,


Six Months Ended June 30,


2025


2024


2025


2024


$


$


$


$

Operating Activities








Net Income (Loss) for the Period

48,626


(5,339)


73,055


(9,899)

Items Not Involving Cash








Depreciation

13,763


33


27,511


79

Share-based Compensation

1,352


143


2,665


368

Unrealized Foreign Exchange Loss (Gain)

(3,524)


702


(1,685)


802

Deferred Income Tax Expense

(717)


-


8,407


-

Depletion of Gold Streaming Agreement Deposit

(6,445)


-


(12,883)


-

Finance Expense

5,685


-


11,435


-

Current Income Tax in Comprehensive Income

(2,177)


-


(11,215)


-

Change in Fair Value of Financial Instruments

(7,883)


2,445


(8,300)


5,096

Cumulative Catch-up Adjustment on Gold Streaming Agreement

(3,208)


-


(4,240)


-

Other

289


157


446


272


45,761


(1,859)


85,196


(3,282)

Change in Operating Assets and Liabilities








Receivables and Other Assets

(375)


(300)


(8,514)


(905)

Inventories

(6,454)


(9,695)


(17,285)


(16,641)

Prepaid Expenses and Deposits

(1,169)


533


(570)


191

Accounts Payable and Accrued Liabilities

42,004


4,555


51,464


4,066

Cash Provided by (Used in) Operating Activities

79,767


(6,766)


110,291


(16,571)

Investing Activities








Additions of PP&E and Mineral Property, net of Long-term Deposit

(39,859)


(41,502)


(55,035)


(101,894)

Deferred Costs

-


(3,723)


-


(4,023)

Exploration and Evaluation Expenditures

(28,923)


138


(38,406)


(381)

Cash Used in Investing Activities

(68,782)


(45,087)


(93,441)


(106,298)

Financing Activities








Replacement Options Exercised

2,595


-


4,644


-

Repayment of Long-term Debt

(7,848)


(2,186)


(12,721)


(2,347)

Net Proceeds from the Drawdowns of Long-term Debt

-


35,688


-


76,848

Proceeds From the Exercise of Warrants

-


10,647


-


10,647

Other

111


(45)


11


(90)

Cash Provided by (Used in) Financing Activities

(5,142)


44,104


(8,066)


85,058

Effect on Foreign Exchange Rate Differences on Cash and Cash Equivalents

1,306


202


6,120


(1,328)

Increase (Decrease) in Cash and Cash Equivalents

7,149


(7,547)


14,904


(39,139)

Cash and Cash Equivalents, Beginning of the Period

148,970


20,806


141,215


52,398

Cash and Cash Equivalents, End of the Period

156,119


13,259


156,119


13,259

Refer to Q2 2025 Financial Statements for accompanying notes

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/g-mining-ventures-reports-strong-q2-2025-results-302530619.html

SOURCE G Mining Ventures Corp

FAQ

What were G Mining Ventures' (GMINF) Q2 2025 financial results?

G Mining reported revenue of $129.6 million, net income of $48.6 million ($0.21 per share), and free cash flow of $60.2 million in Q2 2025.

How much gold did G Mining Ventures produce in Q2 2025?

The company produced 42,587 ounces of gold in Q2 2025, representing a 20% increase from the previous quarter.

What is G Mining's cash position as of Q2 2025?

G Mining ended Q2 2025 with a cash balance of $156.1 million, an increase of $7 million from the previous quarter.

What is G Mining's production guidance for 2025?

The company maintains its 2025 production guidance of 175,000 to 200,000 ounces but expects to be at the lower end of the range.

What was G Mining's AISC in Q2 2025 and updated guidance?

Q2 2025 AISC was $1,355 per ounce, and the company updated its 2025 AISC guidance to $1,025-$1,155 per ounce due to increased mining taxes.

What is the status of G Mining's Oko West project?

Oko West is advancing with early works construction on schedule, completed Feasibility Study showing 350,000 ounces annual production over 12.3 years, and expects project financing finalization in H2 2025.
G Mining Ventures Corp.

OTC:GMINF

GMINF Rankings

GMINF Latest News

GMINF Stock Data

2.70B
60.91M
22.5%
42.63%
Other Precious Metals & Mining
Basic Materials
Link
Canada
Québec