STOCK TITAN

Pyramid Highway Project Nets Granite an Approximately $58 Million Contract

Rhea-AI Impact
(Neutral)
Rhea-AI Sentiment
(Very Positive)
Tags
Rhea-AI Summary
Granite (NYSE:GVA) has been selected by the Nevada Department of Transportation (NDOT) to reconstruct a section of highway in Sparks, Nevada. The project is valued at approximately $58 million and will convert a four-lane highway into a six-lane high-access arterial road. Funding will come from the Federal Highway Administration (FHWA) and the project is expected to start in May 2023 and be completed in February 2025.
Positive
  • None.
Negative
  • None.

WATSONVILLE, Calif.--(BUSINESS WIRE)-- Granite (NYSE:GVA) has been selected by the Nevada Department of Transportation (NDOT) to reconstruct a section of highway in Sparks, Nevada. The project, valued at approximately $58 million, is an extension of the company’s award-winning Pyramid and McCarran Intersection Improvement Project, completed in 2017. Funding will come from the Federal Highway Administration (FHWA) and was included in Granite’s first-quarter CAP.

This press release features multimedia. View the full release here: https://www.businesswire.com/news/home/20230510005056/en/

The Pyramid Highway expansion will convert the four-lane highway into a six-lane high-access arterial road, spanning from Queen Way to Los Altos Parkway. The reconstruction project will include three travel lanes in each direction, bike lanes, curb and gutter enhancements, a wide median, shoulder improvements, and a barrier-protected shared-use path on the east side of the road. Additionally, the stretch between Los Altos Parkway and Golden View Drive will have four travel lanes and improvements, such as sound/screen walls and a protected sidewalk on the west side of the road. (Photo: Business Wire)

The Pyramid Highway expansion will convert the four-lane highway into a six-lane high-access arterial road, spanning from Queen Way to Los Altos Parkway. The reconstruction project will include three travel lanes in each direction, bike lanes, curb and gutter enhancements, a wide median, shoulder improvements, and a barrier-protected shared-use path on the east side of the road. Additionally, the stretch between Los Altos Parkway and Golden View Drive will have four travel lanes and improvements, such as sound/screen walls and a protected sidewalk on the west side of the road. (Photo: Business Wire)

The Pyramid Highway expansion will convert the four-lane highway into a six-lane high-access arterial road, spanning from Queen Way to Los Altos Parkway. The reconstruction project will include three travel lanes in each direction, bike lanes, curb and gutter enhancements, a wide median, shoulder improvements, and a barrier-protected shared-use path on the east side of the road. Additionally, the stretch between Los Altos Parkway and Golden View Drive will have four travel lanes and improvements, such as sound/screen walls and a protected sidewalk on the west side of the road.

“Granite has a longstanding working relationship with the Nevada Department of Transportation, we are excited about delivering another quality project,” said Granite Area Manager, Taylor Polan. “This project suits our strengths in northern Nevada, and we look forward to improving our community by helping relieve traffic congestion on this heavily traveled corridor.”

The project is planned to begin in May 2023 and is expected to be completed in February 2025.

About Granite

Granite is America’s Infrastructure Company™. Incorporated since 1922, Granite (NYSE:GVA) is one of the largest diversified construction and construction materials companies in the United States as well as a full-suite civil construction provider. Granite’s Code of Conduct and strong Core Values guide the Company and its employees to uphold the highest ethical standards. Granite is an industry leader in safety and an award-winning firm in quality and sustainability. For more information, visit the Granite website, graniteconstruction.com, and connect with Granite on LinkedIn, Twitter, Facebook, and Instagram.

Media

Erin Kuhlman 831-768-4111

Investors

Wenjun Xu - 831-761-7861

Source: Granite

Granite (NYSE:GVA) has been selected for the project.

The project is valued at approximately $58 million.

The project is planned to begin in May 2023 and is expected to be completed in February 2025.

The reconstruction project will take place in Sparks, Nevada.

The funding will come from the Federal Highway Administration (FHWA).
Granite Construction Inc.

NYSE:GVA

GVA Rankings

GVA Latest News

GVA Stock Data

Highway, Street, and Bridge Construction
Construction
Link
Industrial Services, Engineering & Construction, Construction, Highway, Street, and Bridge Construction
US
Watsonville

About GVA

since 1922, granite has continued a long-standing commitment to our clients at the private, local, state, and federal level, providing award-winning infrastructure and heavy civil construction services in mining, earthwork, water/sewer, power, tunneling, rail, highway and bridge construction. granite continues to be an industry pioneer in alternative project delivery (design-build, cmar/cmgc, best value) establishing true partnerships with both the owner and designer to guarantee a cohesive project team. granite constructs approximately $800 million of apdm projects annually, and has completed over $12 billion in alternative procurement projects in the last decade. headquartered in watsonville, ca, granite construction, inc is publicly traded on the new york stock exchange (nyse: gva). disclaimer regarding official "granite"​ job postings: all open positions available with granite construction inc., and its subsidiary companies, are available to apply on www.graniteconstruction.com/car