Mayfair Gold Files Technical Report for Fenn-Gib Gold Project
Rhea-AI Summary
Mayfair Gold (OTCQX: MFGCF) filed an NI 43-101 technical report for the Fenn-Gib Gold Project in the Timmins district with an effective mineral resource date of September 3, 2024 and an assay cut-off of April 30, 2024. The report raised the gold price assumption to US$2,000/oz (from US$1,765/oz), which lowered the cut-off grade from 0.4 g/t Au to 0.3 g/t Au and expanded the resource pit shell footprint.
The report adds detailed mineral processing and metallurgical testing results and is intended to support a pre-feasibility study expected later in 2025. The report was prepared by T. Maunula & Associates and Haggarty Technical Services.
Positive
- Gold price assumption increased to US$2,000/oz
- Cut-off grade lowered from 0.4 g/t to 0.3 g/t Au
- Expanded resource pit shell footprint from the updated model
- Added detailed mineral processing and metallurgical testing to support PFS
Negative
- Resource footprint increase driven primarily by the higher price assumption rather than new drilling
News Market Reaction – MFGCF
In the trading session that priced this news, MFGCF gained 9.24%, reflecting a notable positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
AI-generated analysis. How Rhea-AI works. Not financial advice.
The prior NI 43-101 Technical Report for the Fenn-Gib project was filed on July 26, 2023, with an effective date of April 6, 2023. The effective date of this updated mineral resource estimate is September 3, 2024. The assay cut-off date for drill holes included in the mineral resource was April 30, 2024. The gold price in this updated technical report was increased from
This technical report was prepared by T. Maunula & Associates Consulting Inc. and Haggarty Technical Services Corporation.
About Mayfair Gold
Mayfair Gold is a Canadian mineral exploration company focused on advancing the
Cautionary Notes to U.S. Investors Concerning Resource Estimates
This news release has been prepared in accordance with the requirements of the securities laws in effect in
Forward Looking Information
This news release contains forward-looking information which reflects management's expectations regarding the Company's growth, results of operations, performance and business prospects and opportunities. Forward-looking statements in this news release include, but are not limited to, statements regarding the design, development and execution of the Fenn-Gib Gold Project, the timing for completion of the PFS, the advancement of the Fenn-Gib Gold Project to operation and the timing thereof, the advancing of environmental approvals, permits and project designs, mitigate the upfront capital requirements, reduce execution risk and accelerate cash flow generation the ability of the Company to mitigate upfront capital requirements, reduce execution risk and accelerate cash flow generation, and the ability of the Company to commence detailed engineering work immediately following completion of the PFS. Forward-looking information is based on various reasonable assumptions including, without limitation, the expectations and beliefs of management; the assumed long-term price of gold; that the Company can access financing, appropriate equipment and sufficient labour; and that the political environment where the Company operates will continue to support the development and operation of mining projects. Should underlying assumptions prove incorrect, or one or more of the risks and uncertainties described below materialize, actual results may vary materially from those described in forward-looking statements.
Forward-looking information is subject to a variety of risks and uncertainties which could cause actual events or results to differ from those reflected in the forward-looking information, including, without limitation, risks and uncertainties relating to foreign currency fluctuations; risks inherent in mining including environmental hazards, industrial accidents, unusual or unexpected geological formations, ground control problems and flooding; delays or the inability to obtain necessary governmental permits or financing; risks associated with the estimation of mineral resources and reserves and the geology, grade and continuity of mineral deposits; the possibility that future exploration, development or mining results will not be consistent with the Company's expectations; the potential for and effects of labor disputes or other unanticipated difficulties with or shortages of labor; failure of plant, equipment or processes to operate as anticipated; actual ore mined varying from estimates of grade, tonnage, dilution and metallurgical and other characteristics; the inherent uncertainty of production and cost estimates and the potential for unexpected costs and expenses, gold price fluctuations; uncertain political and economic environments; and changes in laws or policies.
The Company undertakes no obligation to publicly update or review the forward-looking statements whether as a result of new information, future events or otherwise, other than as required under applicable securities laws. The forward-looking statements reflect management's beliefs, opinions and projections as of the date of this news release.
Neither the TSX Venture Exchange ("TSXV") nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.
View original content to download multimedia:https://www.prnewswire.com/news-releases/mayfair-gold-files-technical-report-for-fenn-gib-gold-project-302583274.html
SOURCE Mayfair Gold Corp.