STOCK TITAN

Pacifica Silver Identifies New High-Grade Aguilarena Mineralized Shoot at Claudia Project; Provides Exploration Update

(Moderate)
(Positive)
Tags

Pacifica Silver (OTCQB: PAGFF) reported new Phase II drill results from its 100%-owned Claudia Silver-Gold Project in Durango, Mexico, highlighted by discovery of a new high-grade mineralized shoot north of the historical Aguilareña shaft. Key intercepts include 4.44 m (est. true width) grading 8.00 g/t Au and 65 g/t Ag (754 g/t AgEq) in hole 26CLAU115D, 2.54 m at 1.41 g/t Au and 866 g/t Ag (987 g/t AgEq) in 26CLAU112D, and 3.97 m at 2.00 g/t Au and 112 g/t Ag (284 g/t AgEq) in 26CLAU118D.

According to Pacifica Silver, the emerging shoot is part of the Aguilareña vein system, now drilled over nearly 2 km of strike and ~200 m down-dip, with mineralization open along strike and at depth. The fully funded 20,000 m Phase II program, started mid-January 2026, has completed 16,278 m in 71 holes, with three rigs active and additional drilling underway at the Judy anomaly.

Loading...
Loading translation...

Positive

  • High-grade intercept at Aguilareña: 4.44 m @ 8.00 g/t Au, 65 g/t Ag (754 g/t AgEq) in hole 26CLAU115D
  • Very high silver zone: 2.54 m @ 1.41 g/t Au, 866 g/t Ag (987 g/t AgEq) including 0.41 m @ 5,100 g/t Ag
  • Wide mineralized package: 14.54 m @ 0.66 g/t Au, 170 g/t Ag (226 g/t AgEq) in 26CLAU112D
  • Phase II drilling advanced: 16,278 m completed in 71 holes out of a planned 20,000 m by July 27, 2026
  • Aguilareña vein footprint: nearly 2 km strike and ~200 m down-dip tested, with mineralization remaining open
  • Increased drilling capacity: rigs expanded from two to three following improved water availability to accelerate Phase II

Negative

  • No metallurgical test work completed yet at Claudia; silver-equivalent grades use assumed recoveries of 93% Ag and 96% Au based on another mine
  • Only about half of the mapped Aguilareña vein strike length has been drill tested to date, leaving much of the system untested

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Vancouver, British Columbia--(Newsfile Corp. - July 28, 2026) - Pacifica Silver Corp. (CSE: PSIL) (OTCQB: PAGFF) ("Pacifica Silver" or the "Company") is pleased to announce assay results from an additional 14 holes from its ongoing definition and expansion Phase II 20,000-metre diamond drilling program at the 100% owned Claudia Silver-Gold Project ("Project"), located in the historic El Papantón Mining District in Durango State, Mexico. The latest results have identified a new high-grade mineralized shoot north of the historical Aguilareña shaft that hosts the highest gold and silver grades over some of the widest intervals drilled on the property to date.

Drill Result Highlights (Estimated True Widths)

  • 4.44 m @ 8.00 g/t Au and 65 g/t Ag (754 g/t AgEq*) from 65.85 m in Hole 26CLAU115D
    • including 1.99 m @ 17.40 g/t Au and 117 g/t Ag (1,613 g/t AgEq)
      • including 0.63 m @ 37.40 g/t Au and 56 g/t Ag (3,274 g/t AgEq)

  • 2.54 m @ 1.41 g/t Au and 866 g/t Ag (987 g/t AgEq) from 99.65 m in Hole 26CLAU112D
    • including 0.41 m @ 5.63 g/t Au and 5,100 g/t Ag (5,584 g/t AgEq)
  • 3.97 m @ 2.00 g/t Au and 112 g/t Ag (284 g/t AgEq) from 110.15 m in Hole 26CLAU118D
    • including 1.38 m @ 4.72 g/t Au and 271 g/t Ag (677 g/t AgEq)
      • including 0.51 m @ 9.19 g/t Au and 577 g/t Ag (1,367 g/t AgEq)

"These results are extremely encouraging and mark an important step forward at the Claudia Project," stated Todd Anthony, President and CEO of Pacifica Silver. "We have delineated a new high-grade mineralized shoot in the northern portion of the Aguilareña vein that contains the highest gold and silver grades ever drilled on the property, over significantly wider intervals than previously encountered --clearly demonstrating both the high-grade character and district-scale potential of the Aguilareña vein system. With mineralization open along strike and at depth, and with multiple drills currently turning, we have a clear opportunity to rapidly establish a meaningful inventory of high-grade ounces at relatively shallow depths."

Phase II Drilling Update

The Company's fully funded Phase II program, which commenced in mid-January 2026, remains on track for completion in the third quarter of 2026. As of July 27, 16,278 m have been drilled in 71 holes.

Drilling at the newly identified Judy anomaly (see news from July 6, 2026) continues, with three holes completed to date. The deepest hole reached a vertical depth of 402 m. All three holes intersected encouraging silica- and sulfide-cemented breccias containing visible fine-grained pyrite, galena, sphalerite and chalcopyrite. The style of alteration and mineralization indicates a deeper position in the system relative to previous drilling to the north and west. Follow-up drilling is in progress, and additional updates and assay results will be released as they become available.

Following the return of the rainy season and restoration of water availability at the Project, the Company has increased the number of active drill rigs from two to three to accelerate the Phase II drill program.

Technical Discussion of Drill Results - Aguilareña Vein

Expansion of High-Grade Aguilareña Vein System

Phase II drilling continues to successfully intercept and extend the main Aguilareña vein system. The latest results have identified an emerging mineralized shoot north of the historical Aguilareña shaft within the overall mineralized footprint of nearly 2 km of strike length and approximately 200 m down-dip.

Recent drilling north of the Aguilareña shaft included 14 drill holes that intersected the vein over approximately 325 m of strike length (Figure 1 and Figure 2, northings 2,774,300 to 2,774,625). This work filled a critical gap in drill coverage and outlined a new high-grade mineralized shoot centered around northing 2,774,400. Intercepts in this area are particularly wide, with estimated true widths of the main Aguilareña vein reaching up to 5 m, within a wider zone of mineralized hanging-wall and footwall stockwork and breccia measuring up to 14 m (estimated true width). Results are summarized in Table 1 and illustrated in Figures 1 and 2. Select holes are discussed below.

Cannot view this image? Visit: https://images.newsfilecorp.com/files/10814/306813_2e4034dfb4be8874_001.jpg

Figure 1 - Planview Map Showing 2026 Phase II Drill Holes with Reported Assays at the Claudia Project

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10814/306813_2e4034dfb4be8874_001full.jpg

Cannot view this image? Visit: https://images.newsfilecorp.com/files/10814/306813_2e4034dfb4be8874_002.jpg

Figure 2 - Longitudinal Section Showing Recent Aguilareña Vein Drilling Results

To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10814/306813_2e4034dfb4be8874_002full.jpg

  • Hole 26CLAU112D (near northing 2,774,300) intersected a thick package of veins and breccias averaging 0.66 g/t Au and 170 g/t Ag (226 g/t AgEq) over 14.54 m (est. true width). Toward the hanging wall, a high-grade silver zone returned 866 g/t Ag and 1.41 g/t Au (987 g/t AgEq) over 2.54 m (est. true width) within an oxidized quartz breccia.

  • Hole 26CLAU115D, located in the core of an emerging mineralized shoot, intersected the Aguilareña vein grading 8.00 g/t Au and 65 g/t Ag (754 g/t AgEq) over 4.44 m (est. true width). This includes a high-grade gold zone of 17.40 g/t Au and 117 g/t Ag (1,613 g/t AgEq) over 1.99 m (est. true width) within an oxidized fault zone (some core recovery loss).

  • Hole 26CLAU118D intersected another wide vein structure returning 2.00 g/t Au and 112 g/t Ag (284 g/t AgEq) over 3.97 m (est. true width), including 4.72 g/t Au and 271 g/t Ag (667 g/t AgEq) over 1.38 m (est. true width) within a quartz breccia with visible pyrite, chalcopyrite, sphalerite and silver sulfides.

Additional Structures & Exploration Potential

In addition to the main Aguilareña vein, drilling has identified several narrower, often strongly mineralized structures in the hanging wall and footwall. These may represent bifurcations, parallel structures or new veins that may potentially intersect the Aguilareña vein. An oriented-core drilling program is planned for the second half of 2026 to refine the structural interpretation of these mineralized structures and better define the locations of potential new favourable intersections.

Drilling to date has tested only about half of the mapped strike length of the Aguilareña vein system, leaving significant exploration potential along strike. Mineralization in the drilled area also remains open at depth in two zones. Vein textures and metal content indicate that the mineralization identified to date sits relatively high in the epithermal system; follow-up drilling will therefore target potential feeder zones at depth while continuing to test the vein system along strike. Several encouraging surface-mapped structures outside the main Aguilareña vein also remain untested, and detailed surface mapping and sampling are underway to prioritize these targets. A recent structural geology study has further refined drill targeting and improved understanding of the controls on mineralization.

In summary, Phase II drilling north of the Aguilareña shaft has delivered robust results, filling key data gaps while confirming strong mineralized widths, high gold-silver grades and excellent continuity with depth. The Aguilareña system remains open both down-dip and along strike, highlighting substantial potential for significant resource expansion in this priority target area.

Quality Assurance/Quality Control

The 2026 drill samples reported here were collected from HQ-diameter core and were logged and sampled at the Pacifica Silver gated and enclosed facility in Santiago Papasquiaro, Durango. Sample lengths varied from 0.30 to 1.8 m, with an average length of 0.78 m. Pacifica Silver geologists marked the core lengthwise to best divide the core into halves, perpendicular to veins, mineralized fractures and vein-breccia. Sample intervals were cut in half lengthwise and one-half of each sample was placed into pre-numbered plastic sample bags with numbered sample tickets and closed with ties. The closed sample bags were placed into numbered shipping sacks along with numbered bags of coarse preparation blanks and certified reference material (CRMs or "standards") inserted with each hole for quality control/quality assurance purposes.

Samples were transported by commercial package delivery to the ALS laboratory in Hermosillo, Sonora, Mexico. At the ALS laboratory, the samples were crushed in their entirety to 70% passing 2 mm, and riffle split to 1-kg subsamples which were pulverized to 85% at 75 µm. ALS then shipped 200 g splits of the pulverized material by air freight to the ALS assay laboratory in North Vancouver, Canada, for analysis. Gold was analyzed by 30 g fire-assay fusion with an Atomic Adsorption (AA) finish (method code Au AA23); samples with >10 g/t Au were re-assayed by fire-assay fusion and gravimetric finish. Silver plus 34 major, minor and trace elements were analyzed by ICP AES following 4-acid digestion of 0.5 g aliquots (method code MEICP-61). Samples that assayed greater than 100 g/t Ag were re-analyzed by ICP AES following a 4-acid digestion (method code Ag OG62). ALS holds accreditation under ISO/IEC 17025:2017 for specific analytical procedures and is independent of Pacifica Silver.

Qualified Person

Stephen Redak, CPG, Vice-President of Exploration for Pacifica Silver, is a Qualified Person for the purposes of National Instrument 43-101 and has reviewed and approved the technical content in this news release.

Table 1 - Significant Assay Results from Phase II Drill Program at Claudia Project

Hole IDHole
Dip
(deg)
From
(m)
To
(m)
Length
(m)
Est True Width (m)
Au
g/t
Ag
g/t
AgEq** g/tArea
26CLAU111D-45116.80130.1513.3512.10at ave1.3491206HW & Aguilareña vein
including
119.65129.7510.109.15at ave1.52111242Aguilareña vein
which includes
119.65120.350.700.63at2.61162387
and
124.25128.203.953.58at ave1.60139277
and
128.20129.751.551.40at ave1.6889234
26CLAU112D-5599.65117.4017.7514.54at ave0.66170226HW above Aguilareña vein
including
99.65102.753.102.54at ave1.41866987
which includes
99.65100.150.500.41at5.635,1005,584


121.45127.556.105.00at ave1.1730131Aguilareña vein
including
127.00127.550.550.45at3.68104421
26CLAU113D-4574.4581.156.706.07at ave0.8039107Aguilareña vein
including
80.4081.150.750.68at2.1397280
26CLAU114D-7575.7098.2022.5012.91at ave0.571969HW above Aguilareña vein
including
88.7089.150.450.26at0.72296358
and
93.7598.204.452.55at ave1.3321135
which includes
97.3098.200.900.52at4.038355


101.15108.957.804.47at ave1.0726118Aguilareña vein
including
107.35108.200.850.49at2.4448258
26CLAU115D-4565.8570.754.904.44at ave8.0065754Aguilareña vein
including
65.8568.052.201.99at ave17.401171,613
which includes
66.8067.500.700.63at37.40563,274
and
85.4086.250.850.77at1.2118122FW to Aguilareña vein
and
122.80123.400.600.54at0.23216236FW to Aguilareña vein
26CLAU116D-4577.6081.604.003.63at ave1.4592217Aguilareña vein
including
77.6078.300.700.63at3.96359700
and
99.40100.000.600.54at2.33163363FW to Aguilareña vein
26CLAU117D-6053.9056.002.101.61at ave0.11818Aguilareña vein
26CLAU118D-73110.15116.756.603.97at ave2.00112284Aguilareña vein
including
111.90114.202.301.38at ave4.72271677
which includes
113.35114.200.850.51at ave9.195771,367
which includes
113.35113.850.500.30at9.525811,400
26CLAU119D-4577.2579.652.402.18at ave0.443067Aguilareña vein
and
82.1583.301.151.04at4.219371FW to Aguilareña vein
and
107.20108.050.850.77at0.44140178FW to Aguilareña vein
26CLAU120D-4584.4586.001.551.40at ave2.8368311Aguilareña vein
26CLAU121D-5023.0530.006.956.02at ave0.522872HW & Aguilareña vein
including
26.8030.003.202.77at ave1.96103272Aguilareña vein
26CLAU122D-5562.8073.2010.408.52at ave1.6392232HW & Aguilareña vein
including
62.8064.501.701.39at ave5.92224733
including
69.7073.203.502.87at ave1.4590215Aguilareña vein
26CLAU123D-6042.8048.455.654.33at ave1.0320108HW & Aguilareña vein
including
47.2048.451.250.96at ave3.2430309Aguilareña vein
which includes
47.8548.450.600.46at6.0319538
26CLAU124D-4541.8042.801.000.91at0.6749107Aguilareña vein

 

Composites calculated with Au minimum of 0.15 g/t (0.100 g/t Au if Ag > 30 g/t) and no more than 1.0 m internal below minimum.
*Estimated true widths of the reported drilled intervals vary from 57% to 91% to with an average of 83%.
**Silver equivalent grade (AgEq) is calculated based on the following formula: AgEq (g/t) = Ag (g/t) + [Au (g/t) x (Au price / Ag price) x (Au recovery / Ag recovery)]. Metal prices for silver and gold are assumed to be US $30/oz and US $2,500/oz, respectively. At this stage, insufficient metallurgical test work has been completed to determine recoveries for silver and gold at the Claudia property. Accordingly, recoveries of 93% for silver and 96% for gold were applied, based on the 5-year historical average production data reported from First Majestic Silver Corp.'s San Dimas mine. These values are considered reasonable proxies for anticipated recoveries at Claudia due to similarities in deposit style and the relative proximity of the two properties.

About Pacifica Silver Corp.

Pacifica Silver Corp. is a Canadian resource company led by a proven management team with decades of mining and exploration experience in Mexico. The company is focused on its 100% owned Claudia Silver-Gold Project located in Durango, Mexico. Spanning 11,876 hectares, the Project encompasses most of the historic El Papantón Mining District where at least nine small mines operated intermittently during the 20th century. Since 1990, sampling and drilling within have returned high-grade silver and gold intercepts across multiple vein systems, with only 10% of over 30 kilometres of known veins having been drilled. Today, the project is a prime target for modern exploration and holds exceptional potential for new high-grade discoveries.

Signed,
Todd Anthony
Chief Executive Officer

FOR FURTHER INFORMATION, PLEASE CONTACT:
Todd Anthony
Phone: 778-999-2627

Neither the CSE nor its Market Regulator (as that term is defined in the policies of the CSE) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Information
This news release contains certain "forward-looking information" and "forward-looking statements" within the meaning of Canadian securities legislation as may be amended from time to time, including, without limitation, statements regarding the perceived merit of the Project, expected timeline for permitting additional drill sites, potential quantity and/or grade of minerals and the potential size of the mineralized zones. Forward-looking statements are statements that are not historical facts which address events, results, outcomes or developments that the Company expects to occur. Forward-looking statements are based on the beliefs, estimates and opinions of the Company's management on the date the statements are made, and they involve a number of risks and uncertainties. Certain material assumptions regarding such forward-looking statements were made, including without limitation, assumptions regarding the price of gold and silver; the accuracy of mineral resource estimations; that there will be no material adverse change affecting the Company or its properties; that all required approvals will be obtained, including concession renewals and permitting; that political and legal developments will be consistent with current expectations; that currency and exchange rates will be consistent with current levels; and that there will be no significant disruptions affecting the Company or its properties. Consequently, there can be no assurances that such statements will prove to be accurate and actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements involve significant known and unknown risks and uncertainties, which could cause actual results to differ materially from those anticipated. These risks include, but are not limited to: risks related to uncertainties inherent in the preparation of mineral resource estimates, including but not limited to changes to the cost assumptions, variations in quantity of mineralized material, grade or recovery rates, changes to geotechnical or hydrogeological considerations, failure of plant, equipment or processes, changes to availability of power or the power rates, ability to maintain social license, changes to interest or tax rates, changes in project parameters, delays and costs inherent to consulting and accommodating rights of local communities, environmental risks, title risks, including concession renewal, commodity price and exchange rate fluctuations, the ongoing war in the Ukraine, delays in or failure to receive access agreements or amended permits, risks inherent in the estimation of mineral resources; and risks associated with executing the Company's objectives and strategies, including costs and expenses, as well as those risk factors discussed in the Company's most recently filed management's discussion and analysis, available on www.sedarplus.ca. Except as required by the securities disclosure laws and regulations applicable to the Company, the Company undertakes no obligation to update these forward-looking statements if management's beliefs, estimates or opinions, or other factors, should change.


*All silver equivalent grades (AgEq) expressed in this Press Release are calculated based on the following formula: AgEq (g/t) = Ag (g/t) + [Au (g/t) x (Au price / Ag price) x (Au recovery /Ag recovery)]. Metal prices for silver and gold are assumed to be US $30/oz and US $2,500/oz, respectively. At this stage, insufficient metallurgical test work has been completed to determine recoveries for silver and gold at the Claudia property. Accordingly, recoveries of 93% for silver and 96% for gold were applied, based on the five-year historical average production data reported from First Majestic Silver Corp.'s San Dimas mine. These values are considered reasonable proxies for anticipated recoveries at Claudia due to similarities in deposit style and the relative proximity of the two properties.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/306813

FAQ

What did Pacifica Silver (PAGFF) announce about new drill results at the Claudia Project on July 28, 2026?

Pacifica Silver reported new Phase II drill results, including a newly identified high-grade mineralized shoot in the Aguilareña vein. According to Pacifica Silver, standout intercepts reached 4.44 m at 8.00 g/t gold and 65 g/t silver, with strong silver-equivalent grades over meaningful widths.

Where is the new high-grade Aguilareña mineralized shoot discovered by Pacifica Silver (PAGFF) located?

The new mineralized shoot lies north of the historical Aguilareña shaft within the Claudia Project in Durango, Mexico. According to Pacifica Silver, recent drilling there covers about 325 m of strike, within a broader Aguilareña footprint of nearly 2 km strike and ~200 m down-dip.

What are the best gold and silver intercepts reported by Pacifica Silver (PAGFF) at Claudia in July 2026?

Notable intercepts include 4.44 m at 8.00 g/t Au and 65 g/t Ag (754 g/t AgEq) in hole 26CLAU115D. According to Pacifica Silver, other key results feature 2.54 m at 1.41 g/t Au and 866 g/t Ag, and 3.97 m at 2.00 g/t Au and 112 g/t Ag.

How far along is Pacifica Silver’s Phase II 20,000-metre drill program at the Claudia Project (PAGFF)?

By July 27, 2026, the Phase II program had completed 16,278 metres in 71 diamond drill holes. According to Pacifica Silver, the fully funded 20,000-metre campaign began in mid-January 2026 and is expected to finish in the third quarter of 2026.

What exploration potential does Pacifica Silver (PAGFF) see at the Aguilareña vein system in the Claudia Project?

Pacifica Silver reports that drilling has tested only about half of the mapped Aguilareña vein strike length. According to Pacifica Silver, mineralization remains open along strike and at depth, and additional hanging-wall and footwall structures present further exploration targets.

How does Pacifica Silver calculate silver-equivalent (AgEq) grades for Claudia Project drill results (PAGFF)?

AgEq grades use the formula AgEq = Ag + [Au × (Au price / Ag price) × (Au recovery / Ag recovery)]. According to Pacifica Silver, they assume US$30/oz silver, US$2,500/oz gold, and recoveries of 93% silver and 96% gold based on a nearby mine.

What QA/QC procedures does Pacifica Silver (PAGFF) use for Claudia Project drill assays?

Drill core is halved, sampled, and sent to ALS labs for crushing, pulverizing, and analysis with fire assay and ICP methods. According to Pacifica Silver, blanks and certified reference materials are inserted, and ALS, an ISO/IEC 17025:2017 accredited lab, is independent.