Spanish Mountain Gold Receives Positive Particle Ore Sorting Results for the Phoenix Deposit Highlighting Production Upside
Highlights:
-
X-ray transmission (“XRT”) results based on the samples tested from the
Phoenix deposit show an upgrade potential of two or more times the grade of the sample through a high mass rejection of waste and lower-grade material in the order of50% to 70% of the feed mass. - Particle ore sorting resulted 85% to 92% recovery of gold from the samples.
President and CEO, Peter Mah, stated, “The amenability of the
Spanish Mountain Gold commissioned ABH Engineering (“ABH”) Inc. (see October 20, 2025 news release) to complete a Phase 1 ore sorting study as part of ongoing studies to optimize the run-of-mine (“ROM”) feed material into the Mill and Process Plant from the PEA (see July 3, 2025 news release). ABH previously completed amenability tests on the mineralization from the Main deposit that indicated positive results with XRT ore sorting to increase process plant mill feed grades and gold produced while targeting lower costs and improved project economics for the SMG project (see January 21, 2025 news release).
The particle ore sorting work on the
There are numerous benefits that stream from particle ore sorting for the SMG project, and it is an important, potential optimization to the ROM feed grade of the process plant that could result in higher metal production, lower operating capital per tonne processed, and higher metal recoveries post processing. Particle ore sorting can also aid in the rejection of barren material that leads to the reduction of fine tailings, reduced materials handling charges for transportation, reduced process plant and tailings capital expenditures, and ultimately, lower impact to the local receiving environment through reduced water, reagents and overall infrastructure footprint.
For the Phase 1 testing, a total of 96 individual, 7.5-centimeter pieces of half-core samples designed to be representative of the
Results from the testing at SRC show that, based on this Phase 1 sample set, the
Based upon these very positive results, Spanish Mountain Gold initiated the Phase 2 sample collection for the
Next Steps
With positive results received from the Phase 1, particle ore sorting work on
Qualified Person
Brent Hilscher, P.Eng., Vice President of Mineral Processing with ABH Engineering Inc., is the Independent Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.
Jason Dunning, M.Sc., P.Geo., Head of Exploration (Senior Technical Advisor) with Spanish Mountain Gold, is the non-Independent Qualified Person as defined under National Instrument 43-101 who has reviewed the technical information in this news release and has approved the content for dissemination.
Abbreviations: centimetres = cm, grams per tonne = g/t, CRM = certified reference material, gold = Au, kilograms = kg, mineral resource estimate = MRE, Spanish Mountain Gold = SMG, quality control = QC, quality assurance and quality control = QAQC, run of mine = ROM, Saskatchewan Research Council = SRC, X-ray Transmission = XRT
About Spanish Mountain Gold Ltd.
Spanish Mountain Gold Ltd. is focused on advancing its
On Behalf of the Board,
“Peter Mah”
President, Chief Executive Officer and Director
Spanish Mountain Gold Ltd.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.
FORWARD-LOOKING INFORMATION:
Certain of the statements and information in this press release constitute "forward-looking information". Any statements or information that express or involve discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "anticipates", "believes", "plans", "estimates", "intends", "targets", "goals", "forecasts", "objectives", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be considered forward-looking information. The Company's forward-looking information is based on the assumptions, beliefs, expectations and opinions of management as of the date of this press release and include but are not limited to statements with respect to, the potential to increase milled grades and expand gold production during the first decade of production for the proposed SMG mine; the potential to improve the SMG project scale and economics while derisking portions of the resource, especially lower grade feed; and the plan to make a construction decision in 2027. Other than as required by applicable securities laws, the Company does not assume any obligation to update forward-looking information if circumstances or management's assumptions, beliefs, expectations or opinions should change, or changes in any other events affecting such statements or information. For the reasons set forth above, investors should not place undue reliance on forward-looking information.
View source version on businesswire.com: https://www.businesswire.com/news/home/20260302891613/en/
For more information, contact:
Peter Mah
(604) 601-3651
info@spanishmountaingold.com
Source: Spanish Mountain Gold Ltd.