Silver Storm Drills 215 g/t Ag.Eq(1,2) over 11.9 m and 200 g/t Ag.Eq over 15.4 m at the Rosarios Zone
Rhea-AI Summary
Silver Storm Mining (OTCQX:SVRSF) reported new diamond drilling results from the Rosarios Zone at its 100%-owned La Parrilla Silver Mine Complex in Durango, Mexico. Key intercepts include 215 g/t Ag.Eq over 11.9 m in hole IDP-RO-26-004 and 200 g/t Ag.Eq over 15.35 m (ETW 13.3 m) in hole IDP-RO-26-007.
Additional intervals include 297 g/t Ag.Eq over 7.30 m in IDP-RO-26-005, 239 g/t Ag.Eq over 5.90 m in IDP-RO-26-002, and a high-grade 481 g/t Ag.Eq over 1.65 m in IDP-RO-26-008. According to Silver Storm, these infill holes indicate potential to extend Indicated Resources by about 100 m toward surface along a 125 m strike.
The Rosarios Zone remains open along strike and at depth, with mineralization traced over 2 km of strike and 900 m vertically. Underground rehabilitation and development at the past-producing Rosarios mine are underway, and two underground plus one surface drill rig have completed 115 holes (~13,000 m) toward a 15,000 m program.
Positive
- IDP-RO-26-004: 215 g/t Ag.Eq over 11.90 m (ETW 11.85 m) in Rosarios Zone
- IDP-RO-26-007: 200 g/t Ag.Eq over 15.35 m (ETW 13.29 m) in oxide mineralization
- IDP-RO-26-005: 297 g/t Ag.Eq over 7.30 m plus 160 & 196 g/t Ag.Eq over shorter intervals
- IDP-RO-26-008: 481 g/t Ag.Eq over 1.65 m and 149 g/t Ag.Eq over 4.10 m
- Infill drilling indicates potential to extend Indicated Resources by ~100 m toward surface along 125 m strike
- Current program advanced with 115 drill holes (~13,000 m) completed using three rigs and ongoing underground rehabilitation
Negative
- None.
News Explained
The disclosure remains an exploration update: Silver Storm reports assay intervals from infill drilling and says they could extend Indicated Resources, but it does not report a completed resource change; reported widths are core lengths rather than true widths.
News Market Reaction – SVRSF
In the Aug 6 session, SVRSF gained 2.21%, reflecting a moderate positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
AI-generated analysis. How Rhea-AI works. Not financial advice.
TORONTO, ON / ACCESS Newswire / August 6, 2026 / Silver Storm Mining Ltd. ("Silver Storm" or the "Company") (TSXV:SVRS)(OTCQX:SVRSF)(FSE:SVR), is pleased to announce drill results from the diamond drilling program at the Company's
Key highlights include:
Hole IDP-RO-26-004 returned 215 g/t Ag.Eq over 11.90 metres ("m") (ETW 11.9 m).
Hole IDP-RO-26-007 returned 200 g/t Ag.Eq(1,2) over 15.35 m (ETW(3) 13.3 m).
Hole IDP-RO-26-005 returned 297 g/t Ag.Eq over 7.30 m (ETW 7.2 m), 160 g/t Ag.Eq over 4.85 m (ETW 4.8 m), and 196 g/t Ag.Eq over 3.85 m (ETW 3.8 m).
Hole IDP-RO-26-002 returned 239 g/t Ag.Eq over 5.90 m (ETW 5.7 m).
Hole IDP-RO-26-008 returned 481 g/t Ag.Eq over 1.65 m (ETW 1.6 m) and 149 g/t Ag.Eq over 4.10 m (ETW 3.9 m).
Hole IDP-RO-26-003 returned 442 g/t Ag.Eq over 1.00 m (ETW 0.9 m).
The infill drill results from the Rosarios Zone highlighted the potential to extend the Indicated Resources by additional 100 m toward the surface along a strike length of 125 m.
Greg McKenzie, President and CEO, stated: "We are pleased to deliver yet another impressive set of drill results, this time demonstrating the potential to increase the La Parrilla Mineral Resource at the Rosarios Zone. We will continue our 15,000 m drilling program to grow the resource footprint while operations ramp up at La Parrilla."
Rosarios Zone
The Rosarios Zone has historically been an important part of La Parrilla and is characterized by a sulphide-bearing quartz-carbonate vein hosted within a fault zone striking west-northwest and dipping 64 degrees to the northeast over a known strike length of approximately 2 km. The mineralization at Rosarios extends vertically for 900 m, and its true width varies by up to 14 m. The Rosarios vein is located roughly at the northern contact of sediments and granodiorite stock. Stockwork zones are developed either in the footwall or hanging wall of the Rosarios vein, while vein splays and sulphide replacement zones are typically developed in the hanging wall. The Rosarios Zone remains open both along strike and at depth.
Table 1 summarizes the results from the 8 infill holes drilled at the Rosarios Zone targeting the oxide mineralization.
Highlights from the near-surface drilling conducted in the western portion of the Rosarios Zone include:
Hole IDP-RO-26-007 returned 200 g/t Ag.Eq over 15.35 m (ETW 13.3 m) in oxide mineralization.
Hole IDP-RO-26-004 returned 215 g/t Ag.Eq over 11.90 m (ETW 11.9 m) in oxide mineralization.
Hole IDP-RO-26-005 returned 297 g/t Ag.Eq over 7.30 m (ETW 7.2 m) in sulphide mineralization, as well as 160 g/t Ag.Eq over 4.85 m (ETW 4.8 m) and 196 g/t Ag.Eq over 3.85 m (ETW 3.8 m) in oxide mineralization.
Hole IDP-RO-26-002 returned 239 g/t Ag.Eq over 5.90 m (ETW 5.7 m) in oxide mineralization.
Hole IDP-RO-26-008 returned 481 g/t Ag.Eq over 1.65 m (ETW 1.6 m) in oxide mineralization and 149 g/t Ag.Eq over 4.10 m (ETW 3.9 m) in oxide mineralization.
Hole IDP-RO-26-003 returned 442 g/t Ag.Eq over 1.00 m (ETW 0.9 m) in oxide mineralization.
The infill drill results from the Rosarios Zone demonstrate the potential to extend the Indicated Resources by additional 100 m toward the surface along a strike length of 125 m.
Underground rehabilitation and development activities within the past-producing Rosarios mine are underway. All mineralized intersections reported in this release are proximal to existing infrastructure and development within the mine.
Silver Storm has two underground drill rigs and one surface drill rig in operation to advance the current drilling program. A total of 115 holes have been completed to date (~13,000 m).
For further information, the National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") Technical Report entitled "Independent Technical Report for the La Parrilla Silver Mine, Durango State, Mexico" with an effective date of March 24, 2025 is available for review on SEDAR (www.sedarplus.ca) and on the Company's website (www.silverstorm.ca).
Figure 1: Longitudinal section of the Rosarios Zone (view to the north)

Table 1(1) - Select assay intervals from the 2026 holes drilled at the Rosarios Zone and historic assay results
Zone | Hole | From | To | Length | ETW(3) (m) | Ag.Eq(2) | Ag | Au | Pb | Zn |
RO | IDP-RO-26-001 | 48.65 | 50.80 | 2.15 | 2.14 | 154 | 144 | 0.10 | - | - |
340FW | IDP-RO-26-002 | 87.60 | 93.50 | 5.90 | 5.70 | 239 | 222 | 0.18 | - | - |
RO | IDP-RO-26-003 | 60.20 | 61.20 | 1.00 | 0.91 | 442 | 397 | 0.48 | - | - |
RO | IDP-RO-26-003 | 67.85 | 70.00 | 2.15 | 1.95 | 143 | 140 | 0.03 | - | - |
NEW | IDP-RO-26-004 | 6.35 | 6.65 | 0.30 | 0.30 | 216 | 209 | 0.07 | - | - |
RO | IDP-RO-26-004 | 36.10 | 48.00 | 11.90 | 11.85 | 215 | 203 | 0.12 | - | - |
NEW | IDP-RO-26-005 | 29.95 | 30.55 | 0.60 | 0.59 | 252 | 179 | 0.04 | - | - |
RO | IDP-RO-26-005 | 53.70 | 61.00 | 7.30 | 7.19 | 297 | 223 | 0.04 | 2.82 | 0.72 |
RO | IDP-RO-26-005 | 61.00 | 65.85 | 4.85 | 4.78 | 160 | 148 | 0.13 | - | - |
RO | IDP-RO-26-005 | 74.75 | 78.60 | 3.85 | 3.79 | 196 | 187 | 0.10 | - | - |
RO | IDP-RO-26-006 | 64.90 | 65.40 | 0.50 | 0.41 | 217 | 164 | 0.57 | - | - |
NEW | IDP-RO-26-007 | 27.15 | 27.55 | 0.40 | 0.35 | 319 | 222 | 0.04 | 2.44 | 2.34 |
NEW | IDP-RO-26-007 | 30.50 | 31.15 | 0.65 | 0.56 | 364 | 250 | 0.10 | 2.94 | 2.45 |
RO | IDP-RO-26-007 | 40.15 | 55.50 | 15.35 | 13.29 | 200 | 183 | 0.19 | - | - |
NEW | IDP-RO-26-008 | 24.70 | 26.35 | 1.65 | 1.55 | 481 | 358 | 0.13 | 3.16 | 2.51 |
RO | IDP-RO-26-008 | 55.45 | 56.45 | 1.00 | 0.94 | 151 | 148 | 0.04 | - | - |
RO | IDP-RO-26-008 | 79.45 | 80.00 | 0.55 | 0.52 | 161 | 151 | 0.11 | - | - |
RO | IDP-RO-26-008 | 83.00 | 87.10 | 4.10 | 3.85 | 149 | 140 | 0.09 | - | - |
HISTORICAL RESULTS | ||||||||||
RO | LB-12 | 80.70 | 82.35 | 1.65 | 1.06 | 170 | 86 | 0.89 | - | - |
RO | LB-13 | 104.80 | 111.15 | 6.35 | 4.86 | 231 | 217 | 0.15 | - | - |
including | 108.25 | 111.15 | 2.90 | 2.22 | 440 | 412 | 0.30 | - | - | |
RO | LB-22 | 109.25 | 110.75 | 1.50 | 0.51 | 160 | 155 | 0.06 | - | - |
RO | LB-22 | 115.80 | 116.95 | 1.15 | 0.39 | 255 | 196 | 0.63 | - | - |
The individual grades of the metals that were used as inputs into the metal equivalent Ag.Eq g/t are provided in Table 1.
All results in this release are rounded. Assays are uncut and undiluted. Widths are core-lengths, not true widths. Silver equivalent: Ag.Eq g/t was calculated using commodity prices of US
$30.00 /oz Ag, US$2,500 /oz Au, US$0.95 /lb Pb, and US$1.25 /lb Zn applying metallurgical recoveries of70.1% for silver and82.8% for gold in oxides and79.6% for silver,80.1% for gold,74.7% for lead and58.8% for zinc in sulphides. Metal payable used was99.6% for silver and95% for gold in doré produced from oxides, and95% for silver, gold, and lead and85% for zinc in concentrates produced from sulphides. Cut-off grades considered for oxide and sulphide were 135 g/t Ag.Eq and 115 g/t Ag.Eq, respectively. The cut-off grades were based on 2017 costs adjusted by the inflation rate and include sustaining costs.Estimated true widths ("ETW") of mineralization have been calculated from core-lengths for drill core where orientation of the zone is known.
Sample Analysis and QA/QC Program
Silver Storm uses a quality assurance/quality control (QA/QC) program that monitors the chain of custody of samples and includes the insertion of blanks, duplicates, and reference standards in each batch of samples sent for analysis. The drill core is photographed, logged, and cut in half, with one half retained in a secured location for verification purposes and one half shipped for analysis. Sample preparation (crushing and pulverizing) is performed at ALS Geochemistry, an independent ISO 9001: 2001 certified laboratory, in Zacatecas, Mexico and pulps are sent to ALS Geochemistry in Vancouver, Canada for analysis. The entire sample is crushed to
Qualified Person
The scientific and technical information in this document has been reviewed and approved by Bruce Robbins, P.Geo., Chief Geologist of the Company, engaged as a consultant to the Company, a Qualified Person as defined by NI 43-101.
About Silver Storm Mining Ltd.
Silver Storm Mining Ltd. holds advanced-stage silver projects located in Durango State, Mexico. Silver Storm is committed to advancing toward a potential near-term restart of its
For additional information, please contact:
Greg McKenzie, President & CEO
Ph: +1 (416) 504-2024
info@silverstorm.ca
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.
Cautionary Note Regarding Forward Looking Statements:
Certain statements in this news release are forward-looking and involve a number of risks and uncertainties. Such forward-looking statements are within the meaning of the phrase 'forward-looking information' in the Canadian Securities Administrators' National Instrument 51-102 - Continuous Disclosure Obligations. Forward-looking statements are not comprised of historical facts. Forward-looking statements include estimates and statements that describe the Company's future plans, objectives or goals, including words to the effect that the Company or management and Qualified Persons (in the case of technical and scientific information) expects a stated condition or result to occur. Forward-looking statements may be identified by such terms as "believes", "anticipates", "expects", "estimates", "may", "could", "would", "will", or "plan". Since forward-looking statements are based on assumptions and address future events and conditions, by their very nature they involve inherent risks and uncertainties. Although these statements are based on information currently available to the Company, the Company provides no assurance that actual results will meet management's expectations. Risks, uncertainties and other factors involved with forward-looking information could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Forward-looking information in this news release includes, but is not limited to: the future exploration performance at La Parrilla, the timing and extent of current and future drill programs, the potential dimensions of the Mineral Resource extension at the Rosarios Zone, and the ability to increase the Mineral Resources therein.
In making the forward-looking statements included in this news release, the Company and Qualified Persons (in the case of technical and scientific information) have applied several material assumptions, including that the Company´s financial condition and development plans do not change because of unforeseen events, that future metal prices and the demand and market outlook for metals will remain stable or improve, management's ability to execute its business strategy and no unexpected or adverse regulatory changes with respect to La Parrilla. The Company cautions that its decision to potentially restart operations at La Parrilla, and any related production decisions, are largely based on internal Company data, historical operating results, reports, and engineering assessments and are not supported by a current mineral reserve estimate prepared in accordance with NI 43-101, preliminary economic assessments, pre-feasibility studies, or feasibility studies that demonstrate economic and technical viability. As a result, there is increased uncertainty and a higher degree of economic and technical risk associated with any such production decision than would be the case if such mineral reserves estimates or studies were completed and relied upon to support a production decision. No mineral reserves have been established for La Parrilla, and mineral resources that are not reserves do not have demonstrated economic viability. The absence of mineral reserve estimates prepared in accordance with NI 43-101, preliminary economic assessments, pre-feasibility studies, or feasibility studies supporting a production decision increases the uncertainty of achieving any particular level of mineral recovery or the cost of such recovery and heightens the risks associated with developing a commercially mineable deposit. Historically, projects advanced without the support of such mineral reserves estimates and studies have experienced a significantly higher incidence of economic and technical failure. There can be no assurance that production at La Parrilla will commence as anticipated or at all, or that any anticipated production levels or operating costs will be achieved. A failure to commence production would have a material adverse effect on the Company's ability to generate revenue and cash flow to fund its operations. Similarly, a failure to achieve anticipated production costs would have a material adverse effect on the Company's cash flow and future profitability.
Forward-looking statements and information are subject to various known and unknown risks and uncertainties, many of which are beyond the ability of the Company to control or predict, that may cause the Company's actual results, performance or achievements to be materially different from those expressed or implied thereby, and are developed based on assumptions about such risks, uncertainties and other factors set out herein.
Such forward-looking information represents management's and Qualified Persons' (in the case of technical and scientific information) best judgment based on information currently available. No forward-looking statement can be guaranteed, and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information.
SOURCE: Silver Storm Mining Ltd.
View the original press release on ACCESS Newswire