STOCK TITAN

TRILLION ENERGY PROVIDES OPERATIONAL UPDATE

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags
Rhea-AI Summary
Trillion Energy International Inc. (TCF) provides an operational update for the SASB gas field, including plans to boost production from existing wells and implement artificial lift solutions to curtail water loading issues. The company is holding a workshop in Ankara, Turkey to discuss the 2024 work program, with the goal of bringing on production from 5 additional wells next year.
Positive
  • None.
Negative
  • None.

Vancouver, B.C., Nov. 27, 2023 (GLOBE NEWSWIRE) -- Trillion Energy International Inc. (“Trillion” or the “Company”) (CSE: TCF) (OTCQB: TRLEF) (Frankfurt: Z62) is pleased to provide an operational update for the SASB gas field. The Company is holding a workshop in Ankara, Turkey between December 4 and 8th the subject being boosting production from its existing six wells as well as the 2024 work program planning.

The Company has received a report from Frontier Project Solutions, a Calgary based engineering company founded in 1977, to assist in facilitating artificial lift solutions to curtail water loading issues. Frontier has over 50 years of hands-on experience with well pumps, how to install them and where to procure these items in a fast and timely manner. Initially 2 to 3 different artificial lift solutions will be implemented starting with the Akcakoca platform.

2024 Work Program Updates

The next phase of SASB development includes bringing on production from 5 additional wells next year bringing the total producing wells to 11, targeting gas reserves in existing wells on the three tripods. Preliminary indications suggest that at least two of the future sidetrack wells would benefit from artificial lift and may not have to be re-drilled. Artificial lift would result in an 85% cost savings over redrilling representing a savings net to Company of about US$4 million per well. The other proposed sidetracks are also being evaluated for cost savings.

In addition to SASB, the Company receives about US $300,000 per month from the Cendere oil field.

About the Company

Trillion Energy International Inc is focused on oil and natural gas production for Europe and Türkiye with natural gas assets in Türkiye. The Company is 49% owner of the SASB natural gas field, one of the Black Sea’s first and largest-scale natural gas development projects and a 19.6% (except three wells with 9.8%) interest in the Cendere oil field. The Company has a 50% interest in 3 high impact oil exploration blocks in S.E. Turkiye. More information may be found on www.sedar.com, and our website.

Contact
Arthur Halleran
1-778-819-1585
e-mail: info@trillionenergy.com; ahalleran@trillionenergy.com
Website: www.trillionenergy.com

Cautionary Statement Regarding Forward-Looking Statements

This news release may contain certain forward-looking information and statements, including without limitation, statements pertaining to the Company's ability to obtain regulatory approval of the executive officer and director appointments. All statements included herein, other than statements of historical fact, are forward-looking information and such information involves various risks and uncertainties. Trillion does not undertake to update any forward-looking information except in accordance with applicable securities laws.

These statements are no guarantee of future performance and are subject to certain risks, uncertainties, change of strategy, and assumptions that are difficult to predict and which may change over time. Accordingly, actual results and strategies could differ materially and adversely from those expressed in any forward-looking statements as a result of various factors. These factors include unforeseen securities regulatory challenges, COVID, oil and gas price fluctuations, operational and geological risks, changes in capital raising strategies, the ability of the Company to raise necessary funds for development; the outcome of commercial negotiations; changes in technical or operating conditions; the cost of extracting gas and oil may increase and be too costly so that it is uneconomic and not profitable to do so and other factors discussed from time to time in the Company’s filings on www.sedar.com, including the most recently filed Annual Report on Form 20-F and subsequent filings. For a full summary of our oil and gas reserves information for Turkey, please refer to our Forms F-1,2,3 51-101 filed on www.sedar.com, and or request a copy of our reserves report effective December 31, 2022 and updated January 31 2023.


FAQ

What is the company name and ticker symbol mentioned in the press release?

The company mentioned in the press release is Trillion Energy International Inc. and its ticker symbol is TCF.

Where is the workshop being held to discuss the operational update for the SASB gas field?

The workshop is being held in Ankara, Turkey.

What is the goal of the 2024 work program mentioned in the press release?

The goal of the 2024 work program is to bring on production from 5 additional wells next year.

What is the potential cost savings from implementing artificial lift solutions mentioned in the press release?

The potential cost savings from implementing artificial lift solutions is 85% over redrilling, representing a savings net to the company.

TRILLION ENERGY INTL INC

OTC:TRLEF

TRLEF Rankings

TRLEF Latest News

TRLEF Stock Data

13.83M
107.27M
3.11%
2.83%
Crude Petroleum and Natural Gas Extraction
Mining, Quarrying, and Oil and Gas Extraction
Link
United States of America
180 Y Daire 54 Kat 16 Oran Cankaya

About TRLEF

park place energy corp (pkpl) is an oil and energy company located in 4005 ave sw, calgary, alberta, canada.