STOCK TITAN

Tartisan Nickel Corp. Prepares for Phase 1 Drill Program at the Kenbridge Nickel-Copper-Cobalt Project

Rhea-AI Impact
(High)
Rhea-AI Sentiment
(Neutral)

Tartisan Nickel (OTCQB:TTSRF) is preparing a Phase 1 diamond drill program of ~3,600 metres at its 100%‑owned Kenbridge Nickel‑Copper‑Cobalt Project in the Kenora Mining District, northwestern Ontario (announced November 12, 2025).

The program aims to convert inferred resources to Measured and Indicated, test down‑plunge and along‑strike extensions of high‑grade Ni‑Cu mineralization below the existing 623‑metre shaft, improve geological and metallurgical understanding to support a potential pre‑feasibility study, and collect data for future mine design.

Tartisan also continues evaluating additional targets across the 4,273‑hectare project area with road access from Sioux Narrows and Kenora.

Loading...
Loading translation...

Positive

  • Planned 3,600 m NQ diamond drilling in Phase 1
  • Objective to convert inferred resources into Measured and Indicated
  • Focus on testing extensions below the existing 623 m shaft
  • Project covers 4,273 ha with road infrastructure access

Negative

  • Kenbridge deposit resources are currently classified as inferred

Toronto, Ontario--(Newsfile Corp. - November 12, 2025) - Tartisan Nickel Corp. (CSE: TN) (OTCQB: TTSRF) (FSE: 8TA) ("Tartisan", or the "Company") is pleased to announce that the Company is preparing to commence a Phase 1 diamond drill program totaling approximately 3600 meters at its 100% owned Kenbridge Nickel-Copper-Cobalt Project, located in the Kenora Mining District, northwestern Ontario.

The upcoming program is designed to expand and upgrade existing resources at the Kenbridge Deposit, focusing on converting inferred resources into the Measured and Indicated categories as well as test extensions of high-grade Ni-Cu mineralization below the existing 623-meter shaft.

Drill targets have been prioritized based on results from previous exploration and downhole geophysical modeling, with the aim of extending known high-grade nickel-copper mineralization both down-plunge and along strike of the Kenbridge Deposit.

Key Objectives of the Phase 1 Program:

  • Complete approximately 3600 meters of NQ diamond drilling across priority targets
  • Test extensions of high-grade Ni-Cu mineralization below the existing 623-meter shaft
  • Improve geological and metallurgical understanding to support a potential PFS
  • Collect new data to support future mine design and resource conversion

Tartisan Nickel Corp. continues to evaluate additional targets within the broader Kenbridge Nickel Project area which covers approximately 4,273 ha. of patented and staked claims with excellent infrastructure access via road from Sioux Narrows and Kenora, Ontario.

Mark Appleby, CEO of Tartisan Nickel Corp. states, "The upcoming Phase 1 drill program represents an important step in advancing the Kenbridge Project toward production readiness. Our objective is to strengthen the resource base and advance engineering studies that will form the backbone of our pre-feasibility work."

About Tartisan Nickel Corp.

Tartisan Nickel Corp. is a Canadian-based mineral exploration and development company which owns the Kenbridge Nickel Project near Sioux Narrows, Northwestern Ontario, the Night Danger Turtle Pond project near Dryden, Ontario as well as the Sill Lake Silver Property near Sault Ste. Marie, Ontario. Tartisan Nickel Corp. common shares are listed on the Canadian Securities Exchange (CSE: TN) (OTCQB: TTSRF) (FSE: 8TA). Currently, there are 130,995,782 shares outstanding (137,784,671 fully diluted).

For further information, please contact Mark Appleby, President & CEO, and a Director of the Company, at 416-804-0280 (info@tartisannickel.com). Additional information about Tartisan Nickel Corp. can be found at the Company's website at www.tartisannickel.com or on SEDAR at www.sedarplus.ca.

This news release may contain forward-looking statements including but not limited to comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential mineral recovery processes, etc. Forward-looking statements address future events and conditions and therefore involve inherent risks and uncertainties. Actual results may differ materially from those currently anticipated in such statements.

The Canadian Securities Exchange (operated by CNSX Markets Inc.) has neither approved nor disapproved of the contents of this press release.

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/274148

FAQ

What is the size and scope of Tartisan Nickel's Phase 1 drill program at Kenbridge (TTSRF)?

The Phase 1 program plans approximately 3,600 metres of NQ diamond drilling across prioritized targets.

What are the key objectives of the Kenbridge drill program announced November 12, 2025 for TTSRF?

Key objectives are to convert inferred resources to Measured and Indicated, test high‑grade Ni‑Cu extensions below the 623‑metre shaft, and collect data for a potential PFS.

How will the Kenbridge drilling target high‑grade nickel‑copper mineralization for TTSRF?

Targets were prioritized using previous exploration results and downhole geophysical modelling to extend mineralization down‑plunge and along strike.

What area does the Kenbridge Nickel Project cover for Tartisan Nickel (TTSRF)?

The Kenbridge project covers approximately 4,273 hectares of patented and staked claims.

Does the November 12, 2025 announcement state a timeline or budget for Tartisan's Kenbridge drilling?

The announcement confirms preparation to commence Phase 1 drilling but does not provide a specific start date or budget.

What infrastructure supports the Kenbridge Project for Tartisan Nickel (TTSRF)?

The project has excellent infrastructure access via road from Sioux Narrows and Kenora, Ontario.
Tartisan Nickel

OTC:TTSRF

TTSRF Rankings

TTSRF Latest News

TTSRF Stock Data

7.58M
104.15M
20.5%
Other Industrial Metals & Mining
Basic Materials
Link
Canada
Toronto