Uranium Energy Corp Intersects 12.7% eU3O8 over 7.2 metres, 850 m northeast of Roughrider Deposit
Rhea-AI Summary
Uranium Energy Corp (NYSE American: UEC) reports significant drill results from its Roughrider Project in Northern Saskatchewan, Canada. The company intersected 6.96% eU3O8 over 13.5 m with a higher-grade sub-interval of 12.7% eU3O8 over 7.2 metres in drill hole RR-940, located 850 m northeast of the Roughrider Deposit. This represents the best hole to date outside the resource area.
UEC is advancing Roughrider through a three-pronged approach: expanding resources with additional drilling, completing an Initial Assessment Technical Report, and conducting Environmental Assessment baseline studies. The company is utilizing new Ambient Noise Tomography (ANT) survey technology to identify new targets along existing exploration corridors.
Positive
- Intersected high-grade uranium mineralization: 6.96% eU3O8 over 13.5 m with 12.7% eU3O8 over 7.2 metres
- Best drill hole to date outside the resource area, potentially expanding the project's resources
- Utilization of new ANT survey technology to identify new exploration targets
- Accelerated project work with three drills operating simultaneously
- Advancing Initial Assessment Technical Report, expected in the coming months
Negative
- None.
News Market Reaction – UEC
In the trading session that priced this news, UEC gained 2.87%, reflecting a moderate positive market reaction.
Data tracked by StockTitan Argus on the day of publication.
AI-generated analysis. How Rhea-AI works. Not financial advice.
NYSE American: UEC
- Exploration Drilling: UEC's ongoing drill program has intersected basement-hosted uranium mineralization in drill hole RR-940 that grades
6.96% eU3O8 over 13.5 m with a higher-grade sub-interval that grades12.7% eU3O8 over 7.2 metres. UEC will continue drilling in this area to evaluate the potential for additional resources. - Regional drilling benefits from new ANT survey technology: In April of this year, UEC conducted an Ambient Noise Tomography ("ANT") survey. This new exploration technology is being applied to Roughrider for the first time and has identified new targets along existing exploration corridors.
- Roughrider next steps: UEC has a three-prong approach to advancing Roughrider,
- continue growing the project's resources with an additional 25 holes this summer to further investigate the Roughrider north exploration corridor,
- advance the Initial Assessment ("IA") Technical Report Summary ("TRS") that is based on the existing project resources, this work is substantially complete and is anticipated in the coming months,
- EA baseline studies, along with community engagement to advance licensing and permitting.
- continue growing the project's resources with an additional 25 holes this summer to further investigate the Roughrider north exploration corridor,
Chris Hamel, Vice President Exploration,
Table 1, outlined below, details the equivalent uranium intersections (eU3O8) from select drill holes from the 2024 summer campaign. Figure 1 shows the immediate Roughrider project area in the Northern part of
From | To | Width | Avg. | Cut-off | GT | ||||
RR-909 | 244.3 | 264.8 | 20.6 | 0.07 | 0.05 | 1.4 | |||
RR-910 | 250.3 | 305.5 | 55.2 | 0.52 | 0.05 | 28.8 | |||
incl. | 250.3 | 255.4 | 5.1 | 1.63 | 0.05 | 8.3 | |||
incl. | 297.6 | 305.5 | 7.9 | 2.53 | 0.05 | 20.0 | |||
RR-913 | 262.8 | 310.3 | 47.5 | 0.47 | 0.05 | 22.1 | |||
incl. | 307.8 | 309.9 | 2.1 | 6.81 | 1.00 | 14.3 | |||
RR-919 | 304.1 | 307.1 | 3.0 | 2.23 | 0.05 | 6.7 | |||
incl. | 304.4 | 306.2 | 1.8 | 3.51 | 1.00 | 6.3 | |||
RR-925 | 239.8 | 313.0 | 73.3 | 0.11 | 0.05 | 7. 8 | |||
incl. | 244.3 | 246.1 | 1.9 | 1.83 | 1.00 | 3.5 | |||
RR-929 | 291.1 | 300.2 | 9.1 | 0.79 | 0.05 | 7.2 | |||
incl. | 291.5 | 292.3 | 0.8 | 1.38 | 1.00 | 1.1 | |||
incl. | 294.2 | 295.0 | 0.8 | 2.76 | 1.00 | 2.2 | |||
RR-930 | 282.8 | 288.4 | 5.6 | 0.18 | 0.05 | 1.0 | |||
RR-933 | 242.2 | 244.7 | 2.5 | 0.094 | 0.05 | 0.2 | |||
230.6 | 231.1 | 0.5 | 0.08 | 0.05 | 0.0 | ||||
249.9 | 264.2 | 14.3 | 3.00 | 0.05 | 42.8 | ||||
incl. | 251.9 | 262.2 | 10.3 | 4.06 | 1.00 | 41.8 | |||
incl. | 260.4 | 260.8 | 0.4 | 14.68 | 10.00 | 5.9 | |||
RR-934 | 316.2 | 318.1 | 1.9 | 0.22 | 0.05 | 0.4 | |||
327.1 | 328.4 | 1.3 | 0.07 | 0.05 | 0.1 | ||||
RR-935 | 319.1 | 320.2 | 1.1 | 0.05 | 0.05 | 0.1 | |||
324.1 | 327.9 | 3.8 | 0.10 | 0.05 | 0.4 | ||||
RR-937 | 313.8 | 315.7 | 1.9 | 0.64 | 0.05 | 1.2 | |||
incl. | 314.8 | 315.4 | 0.6 | 1.44 | 1.00 | 0.9 | |||
RR-938 | 322.4 | 323.2 | 0.8 | 0.32 | 0.05 | 0.3 | |||
RR-940 | 271.1 | 284.6 | 13.5 | 6.96 | 0.05 | 93.9 | |||
incl. | 271.2 | 283.4 | 12.2 | 7.69 | 0.10 | 93.8 | |||
incl. | 273.2 | 280.4 | 7.2 | 12.71 | 1.00 | 91.5 | |||
incl. | 281.9 | 282.5 | 0.6 | 1.99 | 1.00 | 1.2 | |||
RR-945 | 270.8 | 281.3 | 10.5 | 3.17 | 0.05 | 33.2 | |||
incl. | 271.7 | 280.8 | 9.1 | 3.61 | 1.00 | 32.9 | |||
incl. | 273.6 | 273.9 | 0.3 | 10.62 | 10.00 | 3.2 | |||
incl. | 277.6 | 278.2 | 0.6 | 15.18 | 10.00 | 9.1 | |||
RR-948 | 292.4 | 293.5 | 1.1 | 0.62 | 0.05 | 0.7 | |||
incl. | 292.9 | 293.1 | 0.2 | 1.10 | 1.00 | 0.2 | |||
RR-949-1 | 255.6 | 261.6 | 6.0 | 0.14 | 0.05 | 0.8 | |||
incl. | 255.6 | 257.3 | 1.7 | 0.14 | 0.05 | 0.2 | |||
incl. | 259.8 | 261.6 | 1.8 | 0.33 | 0.05 | 0.6 | |||
RR-950 | 266.7 | 268.1 | 1.4 | 0.27 | 0.05 | 0.4 | |||
About
The
All of
Uranium mineralization in the
The uranium concentrations in the holes presented above from the radiometric equivalent uranium grade ("REG"), denoted as eU3O8, were determined in-situ within the drill hole. For more information on REGs please see the "About Radiometric Equivalent Grades" section below.
About Radiometric Equivalent Grades
The eU3O8 grades were estimated in-situ within the drill holes using calibrated down-hole radiometric gamma probes lowered down into the hole. The probe records the amount of radioactivity present in the rock adjacent to the probe as it moves up and down the hole. The radiometric equivalent grade of uranium oxide (eU3O8) is then calculated.
The standard and shielded probes were calibrated prior to the commencement of the current drill program at the Saskatchewan Research Council's ("SRC") test pit facility in
Samples from all holes have been collected for assay analysis to confirm these equivalent grades. The samples will be analyzed at SRC's Geoanalytical Laboratory in
About the Roughrider Uranium Project
The Roughrider Project is a uranium project located in the eastern
Qualified Persons and Data Acquisition
The technical information in this news release has been reviewed and approved by Chris Hamel, P.Geo., UEC's Vice President Exploration,
About Uranium Energy Corp
Uranium Energy Corp is the fastest growing supplier of fuel for the green energy transition to a low carbon future. UEC is the largest, diversified North American focused uranium company, advancing the next generation of low-cost, environmentally friendly In-Situ Recovery ("ISR") uranium projects in
X (formerly known as Twitter): @UraniumEnergy
Stock Exchange Information:
NYSE American: UEC
WKN: AØJDRR
ISN: US916896103
Safe Harbor Statement
Except for the statements of historical fact contained herein, the information presented in this news release constitutes "forward-looking statements" as such term is used in applicable
View original content to download multimedia:https://www.prnewswire.com/news-releases/uranium-energy-corp-intersects-12-7-eu3o8-over-7-2-metres-850-m-northeast-of-roughrider-deposit-302226191.html
SOURCE Uranium Energy Corp

