STOCK TITAN

[8-K] AMERICAN BATTERY TECHNOLOGY Co Reports Material Event

Filing Impact
(Neutral)
Filing Sentiment
(Neutral)
Form Type
8-K

American Battery Technology Company reported the completion of an S‑K 1300 Technical Report and Preliminary Feasibility Study (PFS) for its Tonopah Flats Lithium Project. The PFS, effective September 4, 2025, discloses mineral reserves and mineral resources and includes an economic assessment prepared by qualified persons from Barr Engineering, Woods Process Services, and Dahrouge Geologic Consulting.

The company furnished the full PFS as Exhibit 96.1 and a related press release as Exhibit 99.1, along with qualified person consents (Exhibits 23.1–23.3).

American Battery Technology Company ha comunicato il completamento di un S‑K 1300 Technical Report e di uno Studio di Fattibilità Preliminare (PFS) per il suo progetto Tonopah Flats Lithium. Il PFS, in vigore dal 4 settembre 2025, rende note riserve minerarie e risorse minerarie e comprende una valutazione economica predisposta da persone qualificate di Barr Engineering, Woods Process Services e Dahrouge Geologic Consulting.

La società ha fornito l'intero PFS come Allegato 96.1 e un comunicato stampa correlato come Allegato 99.1, insieme ai consensi delle persone qualificate (Allegati 23.1–23.3).

American Battery Technology Company informó la culminación de un Informe Técnico S‑K 1300 y un Estudio de Factibilidad Preliminar (PFS) para su Proyecto Tonopah Flats de Litio. El PFS, vigente al 4 de septiembre de 2025, revela reservas y recursos minerales e incluye una evaluación económica elaborada por personas calificadas de Barr Engineering, Woods Process Services y Dahrouge Geologic Consulting.

La empresa proporcionó el PFS completo como Anexo 96.1 y un comunicado de prensa relacionado como Anexo 99.1, junto con los consentimientos de las personas calificadas (Anexos 23.1–23.3).

American Battery Technology Company는 Tonopah Flats 리튬 프로젝트를 위한 S‑K 1300 기술 보고서와 예비 타당성 조사(PFS)의 완료를 발표했습니다. PFS는 2025년 9월 4일 부로 발효되었으며 광물 매장량과 광물 자원을 공개하고 Barr Engineering, Woods Process Services, Dahrouge Geologic Consulting의 자격 있는 전문가들이 작성한 경제 평가를 포함합니다.

회사는 전체 PFS를 Exhibit 96.1로, 관련 보도자료를 Exhibit 99.1로 제공했으며 자격 있는 전문가의 동의서(Exhibits 23.1–23.3)도 함께 제출했습니다.

American Battery Technology Company a annoncé l’achèvement d’un Rapport Technique S‑K 1300 et d’une Étude de faisabilité préliminaire (PFS) pour son projet Tonopah Flats Lithium. Le PFS, en vigueur le 4 septembre 2025, révèle des réserves et des ressources minérales et comprend une évaluation économique préparée par des personnes qualifiées de Barr Engineering, Woods Process Services et Dahrouge Geologic Consulting.

La société a fourni le PFS complet en tant que Exhibit 96.1 et un communiqué de presse associé en tant que Exhibit 99.1, ainsi que les consentements des personnes qualifiées (Exhibits 23.1–23.3).

American Battery Technology Company berichtete den Abschluss eines S‑K 1300 Technical Report sowie einer Preliminary Feasibility Study (PFS) für ihr Tonopah Flats Lithium-Projekt. Der PFS, gültig ab dem 4. September 2025, offenbart Mineralreserven und Mineralressourcen und beinhaltet eine wirtschaftliche Bewertung, verfasst von qualifizierten Personen von Barr Engineering, Woods Process Services und Dahrouge Geologic Consulting.

Das Unternehmen hat den vollständigen PFS als Exhibit 96.1 und eine dazugehörige Pressemitteilung als Exhibit 99.1 bereitgestellt, zusammen mit den Zustimmungen der qualifizierten Personen (Exhibits 23.1–23.3).

American Battery Technology Company أعلنت عن إكمال تقرير تقني S‑K 1300 ودراسة جدوى أولية (PFS) لمشروع Tonopah Flats لليثيوم. يوضح PFS، الذي كان ساري المفعول اعتبارًا من 4 سبتمبر 2025، الاحتياطات المعدنية والموارد المعدنية ويتضمن تقييمًا اقتصاديًا أعده أشخاص مؤهلون من Barr Engineering وWoods Process Services وDahrouge Geologic Consulting.

وقد قدّمت الشركة PFS الكامل كـ Exhibit 96.1 وبيانًا صحفيًا ذي صلة كـ Exhibit 99.1، إلى جانب موافقات الأشخاص المؤهلين (Exhibits 23.1–23.3).

American Battery Technology Company 已完成 S‑K 1300 技术报告和初步可行性研究(PFS),用于其 Tonopah Flats 锂项目。该 PFS 自 2025 年 9 月 4 日生效,披露了矿产储量和矿产资源,并包括由 Barr Engineering、Woods Process Services 和 Dahrouge Geologic Consulting 的合格人员撰写的经济评估。

公司已将完整的 PFS 作为附件 96.1 提供,相关的新闻稿作为附件 99.1 提供,并附有合格人员的同意书(附件 23.1–23.3)。

Positive
  • None.
Negative
  • None.

Insights

PFS filed under S‑K 1300; formalizes reserves/resources disclosure.

ABAT announced completion of an S‑K 1300‑compliant PFS for Tonopah Flats, with an effective date of September 4, 2025. The study includes mineral reserves, mineral resources, and an economic assessment prepared by independent qualified persons.

This elevates the project’s technical disclosure to a standardized framework but does not, by itself, indicate financing or construction decisions. The exhibits list the full PFS (Exhibit 96.1) and press release (Exhibit 99.1).

Investor takeaways depend on the detailed metrics inside Exhibit 96.1; those specifics are not included in the provided excerpt.

American Battery Technology Company ha comunicato il completamento di un S‑K 1300 Technical Report e di uno Studio di Fattibilità Preliminare (PFS) per il suo progetto Tonopah Flats Lithium. Il PFS, in vigore dal 4 settembre 2025, rende note riserve minerarie e risorse minerarie e comprende una valutazione economica predisposta da persone qualificate di Barr Engineering, Woods Process Services e Dahrouge Geologic Consulting.

La società ha fornito l'intero PFS come Allegato 96.1 e un comunicato stampa correlato come Allegato 99.1, insieme ai consensi delle persone qualificate (Allegati 23.1–23.3).

American Battery Technology Company informó la culminación de un Informe Técnico S‑K 1300 y un Estudio de Factibilidad Preliminar (PFS) para su Proyecto Tonopah Flats de Litio. El PFS, vigente al 4 de septiembre de 2025, revela reservas y recursos minerales e incluye una evaluación económica elaborada por personas calificadas de Barr Engineering, Woods Process Services y Dahrouge Geologic Consulting.

La empresa proporcionó el PFS completo como Anexo 96.1 y un comunicado de prensa relacionado como Anexo 99.1, junto con los consentimientos de las personas calificadas (Anexos 23.1–23.3).

American Battery Technology Company는 Tonopah Flats 리튬 프로젝트를 위한 S‑K 1300 기술 보고서와 예비 타당성 조사(PFS)의 완료를 발표했습니다. PFS는 2025년 9월 4일 부로 발효되었으며 광물 매장량과 광물 자원을 공개하고 Barr Engineering, Woods Process Services, Dahrouge Geologic Consulting의 자격 있는 전문가들이 작성한 경제 평가를 포함합니다.

회사는 전체 PFS를 Exhibit 96.1로, 관련 보도자료를 Exhibit 99.1로 제공했으며 자격 있는 전문가의 동의서(Exhibits 23.1–23.3)도 함께 제출했습니다.

American Battery Technology Company a annoncé l’achèvement d’un Rapport Technique S‑K 1300 et d’une Étude de faisabilité préliminaire (PFS) pour son projet Tonopah Flats Lithium. Le PFS, en vigueur le 4 septembre 2025, révèle des réserves et des ressources minérales et comprend une évaluation économique préparée par des personnes qualifiées de Barr Engineering, Woods Process Services et Dahrouge Geologic Consulting.

La société a fourni le PFS complet en tant que Exhibit 96.1 et un communiqué de presse associé en tant que Exhibit 99.1, ainsi que les consentements des personnes qualifiées (Exhibits 23.1–23.3).

American Battery Technology Company berichtete den Abschluss eines S‑K 1300 Technical Report sowie einer Preliminary Feasibility Study (PFS) für ihr Tonopah Flats Lithium-Projekt. Der PFS, gültig ab dem 4. September 2025, offenbart Mineralreserven und Mineralressourcen und beinhaltet eine wirtschaftliche Bewertung, verfasst von qualifizierten Personen von Barr Engineering, Woods Process Services und Dahrouge Geologic Consulting.

Das Unternehmen hat den vollständigen PFS als Exhibit 96.1 und eine dazugehörige Pressemitteilung als Exhibit 99.1 bereitgestellt, zusammen mit den Zustimmungen der qualifizierten Personen (Exhibits 23.1–23.3).

false 0001576873 0001576873 2025-10-16 2025-10-16 iso4217:USD xbrli:shares iso4217:USD xbrli:shares

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934

 

Date of Report (Date of earliest event reported): October 16, 2025

 

AMERICAN BATTERY TECHNOLOGY COMPANY
(Exact name of registrant as specified in its charter)

 

Nevada   001-41811   33-1227980
(State or other jurisdiction of   (Commission   (IRS Employer
incorporation or organization)   File No.)   Identification Number)

 

100 Washington Street, Suite 100

Reno, NV

 

 

89503

(Address of principal executive offices)   (Zip Code)

 

(775) 473-4744

(Registrant’s telephone number including area code)

 

N/A

(Former name or former address, if changed since last report)

 

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions (see General Instruction A.2. below):

 

Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)
   
Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)
   
Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))
   
Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of Each Class   Trading Symbol(s)   Name of Each Exchange on Which Registered
Common Stock, $0.001 par value   ABAT   The Nasdaq Stock Market LLC

 

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

 

Emerging growth company

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐

 

 

 

 

 

 

Item 8.01 Other Events.

 

On October 16, 2025, the Company issued a press release announcing the completion of the S-K 1300 Technical Report and Preliminary Feasibility Study (the “PFS”) disclosing mineral reserves and mineral resources, including economic assessment, for the Tonopah Flats Lithium Project. The PFS was completed by Daniel R. Palo, qualified person on behalf of Barr Engineering Co., Jeffrey Woods, qualified person on behalf of Woods Process Services, LLC, and Jacob Anderson, qualified person on behalf of Dahrouge Geologic Consulting Ltd., in compliance with Item 1300 of Regulation S-K and with an effective date of September 4, 2025.

 

A copy of the press release is attached as Exhibit 99.1 to this Form 8-K and is incorporated herein by reference. The PFS is filed as Exhibit 96.1 and the qualified person consents are filed as Exhibits 23.1 through 23.3 to this Form 8-K, each of which are incorporated herein by reference.

 

Item 9.01. Financial Statements and Exhibits.

 

(d) Exhibits

 

Exhibit No.   Description
     
23.1   Consent of Daniel R. Palo.
23.2   Consent of Jeffrey Woods.
23.3   Consent of Jacob Anderson.
96.1   S-K 1300 Technical Report and Preliminary Feasibility Study, effective as of September 4, 2025.
99.1   Press Release, dated October 16, 2025.
104   Cover Page Interactive Data File (embedded within the Inline XBRL document)

 

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

  AMERICAN BATTERY TECHNOLOGY COMPANY
     
Date: October 16, 2025 By: /s/ Ryan Melsert
    Ryan Melsert
    Chief Executive Officer

 

 

 

FAQ

What did ABAT (ABAT) announce in this 8‑K?

The company completed an S‑K 1300 Technical Report and Preliminary Feasibility Study for the Tonopah Flats Lithium Project, disclosing mineral reserves and resources with an economic assessment.

Which project is covered by ABAT’s new PFS?

The PFS covers the Tonopah Flats Lithium Project.

Who prepared the PFS for ABAT?

Qualified persons: Daniel R. Palo (Barr Engineering Co.), Jeffrey Woods (Woods Process Services, LLC), and Jacob Anderson (Dahrouge Geologic Consulting Ltd.).

What is the effective date of ABAT’s PFS?

The effective date is September 4, 2025.

Is the PFS compliant with Regulation S‑K 1300?

Yes. It was prepared in compliance with Item 1300 of Regulation S‑K.

Where can investors find the full study and press release?

The PFS is filed as Exhibit 96.1 and the press release as Exhibit 99.1. Consents are Exhibits 23.1–23.3.
American Battery Technology Co

NASDAQ:ABAT

ABAT Rankings

ABAT Latest News

ABAT Latest SEC Filings

ABAT Stock Data

669.33M
113.33M
5.43%
19.03%
12.65%
Waste Management
Mining & Quarrying of Nonmetallic Minerals (no Fuels)
Link
United States
RENO