Cadiz Q3 2026 earnings: net loss widens to $14.3M
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Cadiz Inc. (CDZI) reported third-quarter revenue of $1.572 million versus $4.149 million and a net loss of $14.309 million versus $7.072 million. Nine-month revenue was $4.183 million versus $11.229 million, and net loss was $34.319 million versus $24.395 million. Operating cash used was $20.201 million versus $12.010 million; cash and equivalents were $5.909 million at September 30, 2026.
On July 14, 2026, BLM issued the FLPMA right-of-way grant to consolidated affiliate Fenner Gap Mutual Water Company, authorizing Northern Pipeline conversion to water conveyance through December 31, 2071. FGMWC’s construction contracts will begin only upon satisfaction of applicable financing conditions. Two lawsuits filed July 28, 2026, by the National Parks Conservation Association and the Center for Biological Diversity, among others, challenge the grant; it remains effective, and Cadiz says it cannot predict the outcome.
Cadiz had drawn $40 million of Lytton’s $51 million loan facility by September 30, 2026, and drew the remaining $11 million on November 10, 2026. Its October 30, 2026, registered direct offering of 5 million shares at $4.20 raised approximately $21 million gross and approximately $20 million net. Cadiz intends to use net proceeds for general corporate purposes, including Mojave Groundwater Bank development.
How this balance works
Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.
It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.
Rhea-AI Sentiment measures something else, the tone of the wording.
Positive
- None.
Negative
- Moderate pointNine-month revenue: $4.183 million versus $11.229 million.
- Moderate pointNine-month net loss widened to $34.319 million from $24.395 million.
- Moderate pointOperating cash used: $20.201 million versus $12.010 million.
Key Figures
Key Terms
variable interest entity financial
FLPMA ROW Grant regulatory
PIK interest financial
Level 3 financial
derivative liability financial
anti-dilution adjustments financial
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.
What were CDZI’s third-quarter 2026 revenue and net loss?
How much did CDZI raise in its October 2026 offering?
What are the main terms of CDZI’s Lytton loan?
When may construction on CDZI’s Northern Pipeline conversion start?
AI-generated analysis. How Rhea-AI works. Not financial advice.
Table of Contents
United States
Securities and Exchange Commission
Washington, D. C. 20549
FORM
(Mark One)
for the quarterly period ended
OR
for the transition period from …… to …….
Commission File Number
Cadiz Inc.
(Exact name of registrant specified in its charter)
(State or other jurisdiction of | (I.R.S. Employer |
incorporation or organization) | Identification No.) |
| |
(Address of principal executive offices) | (Zip Code) |
Registrant’s telephone number, including area code: (
Securities Registered Pursuant to Section 12(b) of the Act:
Title of each class | Trading Symbol(s) | Name of each exchange on which registered |
The | ||
|
The |
Indicate by check mark whether the registrant (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.
Indicate by check mark whether the registrant has submitted electronically every Interactive Data File required to be submitted pursuant to Rule 405 of Regulation S-T during the preceding 12 months (or for such shorter period that the registrant was required to submit such files).
Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, a non-accelerated filer, a smaller reporting company or an emerging growth company. See the definitions of "large accelerated filer," “accelerated file”, "smaller reporting company,” and “emerging growth company” in Rule 12b-2 of the Exchange Act:
☐ Large accelerated filer ☐ Accelerated filer ☑
If an emerging growth company, indicate by checkmark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
Indicate by check mark whether the Registrant is a shell company (as defined in Exchange Act Rule 12b-2). Yes
As of November 11, 2026, the Registrant had
Table of Contents
Fiscal Third Quarter 2026 Quarterly Report on Form 10-Q |
Page |
PART I – FINANCIAL INFORMATION |
|
|
|
ITEM 1. Financial Statements |
|
|
|
Cadiz Inc. Condensed Consolidated Financial Statements |
|
|
|
Unaudited Condensed Consolidated Statements of Operations and Comprehensive Loss for the three months ended September 30, 2026 and 2025 |
1 |
|
|
| Unaudited Condensed Consolidated Statements of Operations and Comprehensive Loss for the nine months ended September 30, 2026 and 2025 | 2 |
|
|
Unaudited Condensed Consolidated Balance Sheets as of September 30, 2026 and December 31, 2025 |
3 |
|
|
Unaudited Condensed Consolidated Statements of Cash Flows for the nine months ended September 30, 2026 and 2025 |
4 |
|
|
Unaudited Condensed Consolidated Statement of Stockholders’ Equity for the three and nine months ended September 30, 2026 |
5 |
|
|
Unaudited Condensed Consolidated Statement of Stockholders’ Equity for the three and nine months ended September 30, 2025 |
6 |
|
|
Unaudited Notes to the Condensed Consolidated Financial Statements |
7 |
|
|
ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations |
28 |
|
|
ITEM 3. Quantitative and Qualitative Disclosures about Market Risk |
41 |
|
|
ITEM 4. Controls and Procedures |
41 |
|
|
PART II – OTHER INFORMATION |
|
|
|
ITEM 1. Legal Proceedings |
43 |
|
|
ITEM 1A. Risk Factors |
43 |
|
|
ITEM 2. Unregistered Sales of Equity Securities and Use of Proceeds |
43 |
|
|
ITEM 3. Defaults Upon Senior Securities |
43 |
|
|
ITEM 4. Mine Safety Disclosures |
43 |
|
|
ITEM 5. Other Information |
44 |
|
|
ITEM 6. Exhibits |
45 |
Table of Contents
Cadiz Inc.
Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited)
|
|
For the Three Months |
|
|||||
|
|
Ended September 30, |
|
|||||
($ in thousands, except per share data) |
|
2026 |
|
|
2025 |
|
||
|
|
|
|
|
|
|
|
|
Revenues: |
|
|
|
|
|
|
|
|
Sales revenue |
|
$ |
|
|
$ |
|
||
Services revenue |
|
|
|
|
|
|
||
Rental income |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Total revenues |
|
$ |
|
|
$ |
|
||
|
|
|
|
|
|
|
|
|
Costs and expenses: |
|
|
|
|
|
|
|
|
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
|
|
|
|
||
Cost of sales, services revenue |
|
|
|
|
|
|
||
General and administrative |
|
|
|
|
|
|
||
Depreciation |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Total costs and expenses |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Operating loss |
|
|
( |
) |
|
|
(4,896 |
) |
|
|
|
|
|
|
|
|
|
Interest expense, net |
|
|
( |
) |
|
|
(2,173 |
) |
Loss on extinguishment of debt |
|
|
( |
) |
|
|
|
|
Gain on derivative liability |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Loss before income taxes |
|
|
( |
) |
|
|
(7,069 |
) |
Income tax expense |
|
|
( |
) |
|
|
(3 |
) |
|
|
|
|
|
|
|
|
|
Net loss and comprehensive loss |
|
$ | ( |
) |
|
$ | (7,072 |
) |
|
|
|
|
|
|
|
|
|
Less: Preferred stock dividend |
|
|
( |
) |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
Net loss and comprehensive loss applicable to common stock holders |
|
$ | ( |
) |
|
$ | ( |
) |
|
|
|
|
|
|
|
|
|
Basic and diluted net loss per common share |
|
$ | ( |
) |
|
$ | (0.10 |
) |
|
|
|
|
|
|
|
|
|
Basic and diluted weighted average shares outstanding |
|
|
|
|
|
|
||
See accompanying notes to the unaudited condensed consolidated financial statements.
1
Table of Contents
Cadiz Inc.
Condensed Consolidated Statements of Operations and Comprehensive Loss (Unaudited)
|
|
For the Nine Months |
|
|||||
|
|
Ended September 30, |
|
|||||
($ in thousands, except per share data) |
|
2026 |
|
|
2025 |
|
||
|
|
|
|
|
|
|
|
|
Revenues: |
|
|
|
|
|
|
|
|
Sales revenue |
|
$ |
|
|
$ |
|
||
Services revenue |
|
|
|
|
|
|
||
Rental income |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Total revenues |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Costs and expenses: |
|
|
|
|
|
|
|
|
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
|
|
|
|
||
Cost of sales, services revenue |
|
|
|
|
|
|
||
General and administrative |
|
|
|
|
|
|
||
Depreciation |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Total costs and expenses |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Operating loss |
|
|
( |
) |
|
|
(18,206 |
) |
|
|
|
|
|
|
|
|
|
Interest expense, net |
|
|
( |
) |
|
|
(6,181 |
) |
Loss on extinguishment of debt |
|
|
( |
) |
|
|
|
|
Gain on derivative liability |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Loss before income taxes |
|
|
( |
) |
|
|
(24,387 |
) |
Income tax expense |
|
|
( |
) |
|
|
(8 |
) |
|
|
|
|
|
|
|
|
|
Net loss and comprehensive loss |
|
$ | ( |
) |
|
$ | (24,395 |
) |
|
|
|
|
|
|
|
|
|
Less: Preferred stock dividend |
|
|
( |
) |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
Net loss and comprehensive loss applicable to common stock holders |
|
$ | ( |
) |
|
$ | ( |
) |
|
|
|
|
|
|
|
|
|
Basic and diluted net loss per common share |
|
$ | ( |
) |
|
$ | (0.35 |
) |
|
|
|
|
|
|
|
|
|
Basic and diluted weighted average shares outstanding |
|
|
|
|
|
|
||
See accompanying notes to the unaudited condensed consolidated financial statements.
2
Table of Contents
Cadiz Inc.
Condensed Consolidated Balance Sheets (Unaudited)
|
| September 30, |
|
| December 31, |
| ||
($ in thousands, except per share data) |
| 2026 |
|
| 2025 |
| ||
|
|
|
| |
|
|
| |
ASSETS |
|
|
| |
|
|
| |
Current assets: |
|
|
| |
|
|
| |
Cash and cash equivalents |
| $ |
|
| $ |
| ||
Accounts receivable, net |
|
|
|
|
|
| ||
Inventories |
|
|
|
|
|
| ||
Prepaid expenses and other current assets |
|
|
|
|
|
| ||
Total current assets |
| $ |
|
|
|
| ||
|
|
|
| |
|
|
| |
Property, plant, equipment and water programs, net |
|
|
|
|
|
| ||
Long-term deposit/prepaid expenses (includes $2,543 at September 30, 2026 of a consolidated VIE that can be used only to settle obligations of the VIE) |
|
|
|
|
|
| ||
Goodwill |
|
|
|
|
|
| ||
Right-of-use asset (includes $5,449 at September 30, 2026 of consolidated VIE that can be used only to settle obligations of the VIE) |
|
|
|
|
|
| ||
Long-term restricted cash |
|
|
|
|
|
| ||
Other assets |
|
|
|
|
|
| ||
Total assets |
| $ |
|
| $ |
| ||
|
|
|
| |
|
|
| |
LIABILITIES AND STOCKHOLDERS’ EQUITY |
|
|
| |
|
|
| |
Current liabilities: |
|
|
| |
|
|
| |
Accounts payable |
| $ |
|
| $ |
| ||
Accrued liabilities |
|
|
|
|
|
| ||
Current portion of long-term debt |
|
|
|
|
|
| ||
Derivative liabilities |
|
|
|
|
|
| ||
Dividend payable |
|
|
|
|
|
| ||
Deferred revenue |
|
|
|
|
|
| ||
Operating lease liabilities |
|
|
|
|
|
| ||
Total current liabilities |
|
|
|
|
|
| ||
|
|
|
| |
|
|
| |
Long-term debt, net |
|
|
|
|
|
| ||
Long-term debt with related party, net |
|
|
|
|
|
| ||
Long-term lease obligations with related party, net |
|
|
|
|
|
| ||
Long-term operating lease liabilities (includes $5,324 at September 30, 2026 of a consolidated VIE for which creditors do not have recourse to the general credit of the Company) |
|
|
|
|
|
| ||
Deferred revenue |
|
|
|
|
|
| ||
Other long-term liabilities |
|
|
|
|
|
| ||
Total liabilities |
|
|
|
|
|
| ||
|
|
|
| |
|
|
| |
Commitments and contingencies (Note 10) |
|
|
| |
|
|
| |
Stockholders’ equity: |
|
|
| |
|
|
| |
Preferred stock - $.01 par value; 100,000 shares authorized at September 30, 2026 and December 31, 2025; shares issued and outstanding – 329 at September 30, 2026 and December 31, 2025 |
|
|
|
|
|
| ||
8.875% Series A cumulative, perpetual preferred stock - $.01 par value; 7,500 shares authorized at September 30, 2026 and December 31, 2025; shares issued and outstanding – 2,300 at September 30, 2026 and December 31, 2025 |
|
|
|
|
|
| ||
Common stock - $.01 par value; 125,000,000 shares authorized at September 30, 2026 and 100,000,000 shares authorized at December 31, 2025; shares issued and outstanding – 84,901,718 at September 30, 2026 and 83,213,589 at December 31, 2025 |
|
|
|
|
|
| ||
Additional paid-in capital |
|
|
|
|
|
| ||
Accumulated deficit |
|
| ( | ) |
|
| ( | ) |
Total stockholders’ (deficit) equity |
|
| ( | ) |
|
|
| |
Total liabilities and stockholders’ (deficit) equity |
| $ |
|
| $ |
| ||
See accompanying notes to the unaudited condensed consolidated financial statements.
3
Table of Contents
Cadiz Inc.
Condensed Consolidated Statements of Cash Flows (Unaudited)
|
|
For the Nine Months |
|
|||||
|
|
Ended September 30, |
|
|||||
($ in thousands) |
|
2026 |
|
|
2025 |
|
||
|
|
|
|
|
|
|
|
|
Cash flows from operating activities: |
|
|
|
|
|
|
|
|
Net loss |
|
$ | ( |
) |
|
$ | ( |
) |
Adjustments to reconcile net loss to net cash used in operating activities: |
|
|
|
|
|
|
|
|
Depreciation |
|
|
|
|
|
|
||
Amortization of debt discount and issuance costs |
|
|
|
|
|
|
||
Amortization of right-of-use asset |
|
|
|
|
|
|
||
Interest expense added to loan principal |
|
|
|
|
|
|
||
Interest accretion on finance lease liabilities |
|
|
|
|
|
|
||
Compensation charge for stock and share option awards |
|
|
|
|
|
|
||
Unrealized gain on derivative liability |
|
|
( |
) |
|
|
|
|
Loss on extinguishment of debt |
|
|
|
|
|
|
||
Changes in operating assets and liabilities: |
|
|
|
|
|
|
|
|
Deposit for right-of-way performance and reclamation bond |
|
|
( |
) |
|
|
|
|
Accounts receivable |
|
|
|
|
|
|
||
Inventories |
|
|
( |
) |
|
|
|
|
Prepaid expenses and other current assets |
|
|
( |
) |
|
|
|
|
Other assets |
|
|
|
|
|
|
||
Accounts payable |
|
|
|
|
|
|
||
Lease liabilities |
|
|
( |
) |
|
|
( |
) |
Deferred revenue |
|
|
|
|
|
( |
) |
|
Other accrued liabilities |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
Net cash used in operating activities |
|
|
( |
) |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
Cash flows from investing activities: |
|
|
|
|
|
|
|
|
Additions to property, plant and equipment and water programs |
|
|
( |
) |
|
|
( |
) |
Additions to deposits for asset purchase options |
|
|
|
|
|
( |
) |
|
|
|
|
|
|
|
|
|
|
Net cash used in investing activities |
|
|
( |
) |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
Cash flows from financing activities: |
|
|
|
|
|
|
|
|
Net proceeds from issuance of stock |
|
|
|
|
|
|
||
Dividend payments |
|
|
( |
) |
|
|
( |
) |
Proceeds from the issuance of long-term debt |
|
|
|
|
|
|
||
Principal payments on long-term debt |
|
|
( |
) |
|
|
( |
) |
Payment for contingent consideration liabilities |
|
|
|
|
|
( |
) |
|
Taxes paid related to net share settlement of equity awards |
|
|
( |
) |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
Net cash provided by financing activities |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Net decrease in cash, cash equivalents and restricted cash |
|
|
( |
) |
|
|
( |
) |
|
|
|
|
|
|
|
|
|
Cash, cash equivalents and restricted cash, beginning of period |
|
|
|
|
|
|
||
|
|
|
|
|
|
|
|
|
Cash, cash equivalents and restricted cash, end of period |
|
$ |
|
|
$ |
|
||
See accompanying notes to the unaudited condensed consolidated financial statements.
4
Table of Contents
Cadiz Inc.
Condensed Consolidated Statements of Stockholders’ Equity (Deficit) (Unaudited)
For the three and nine months ended September 30, 2026 ($ in thousands, except share data)
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
| 8.875% Series A Cumulative |
|
| Additional |
|
|
|
| |
| Total |
| |||||||
|
| Common Stock |
|
| Preferred Stock |
|
| Perpetual Preferred Stock |
|
| Paid-in |
|
| Accumulated |
|
| Stockholders’ |
| ||||||||||||||||||
|
| Shares |
|
| Amount |
|
| Shares |
|
| Amount |
|
| Shares |
|
| Amount |
|
| Capital |
|
| Deficit |
|
| Equity (Deficit) |
| |||||||||
Balance as of December 31, 2025 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Stock-based compensation expense, net of taxes |
|
|
|
|
|
|
|
| - |
|
|
| - |
|
|
| - |
|
|
| - |
|
|
|
|
|
| - |
|
|
|
| ||||
Dividends declared on 8.875% series A cumulative perpetual preferred shares ($560 per share) |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| ( | ) |
|
|
|
|
| ( | ) | ||||
Issuance of shares to lenders |
|
|
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
Net loss and comprehensive loss |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Balance as of March 31, 2026 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Stock-based compensation expense, net of taxes |
|
|
|
|
|
|
|
| - |
|
|
| - |
|
|
| - |
|
|
| - |
|
|
|
|
|
| - |
|
|
|
| ||||
Dividends declared on 8.875% series A cumulative perpetual preferred shares ($550 per share) |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| ( | ) |
|
|
|
|
| ( | ) | ||||
Net loss and comprehensive loss |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Balance as of June 30, 2026 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Stock-based compensation expense, net of taxes |
|
| 490,473 |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Dividends declared on 8.875% series A cumulative perpetual preferred shares ($560 per share) |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| ( | ) |
|
|
|
|
| ( | ) | ||||
Issuance of shares to lenders |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||||
Equity Adjustments related to debt modification and extinguishment |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Net loss and comprehensive loss |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Balance as of September 30, 2026 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ | ( | ) | |||||||
See accompanying notes to the unaudited condensed consolidated financial statements.
5
Table of Contents
Cadiz Inc.
Condensed Consolidated Statements of Stockholders’ Equity (Unaudited)
For the three and nine months ended September 30, 2025 ($ in thousands, except share data)
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
| 8.875% Series A Cumulative |
|
| Additional |
|
|
|
| |
| Total |
| |||||||
|
| Common Stock |
|
| Preferred Stock |
|
| Perpetual Preferred Stock |
|
| Paid-in |
|
| Accumulated |
|
| Stockholders’ |
| ||||||||||||||||||
|
| Shares |
|
| Amount |
|
| Shares |
|
| Amount |
|
| Shares |
|
| Amount |
|
| Capital |
|
| Deficit |
|
| Equity |
| |||||||||
Balance as of December 31, 2024 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Issuance of shares pursuant to direct offering |
|
|
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
|
|
|
|
| |||||||
Stock-based compensation expense, net of taxes |
|
|
|
|
|
|
|
| - |
|
|
| - |
|
|
| - |
|
|
| - |
|
|
|
|
|
| - |
|
|
|
| ||||
Dividends declared on 8.875% series A cumulative perpetual preferred shares ($550 per share) |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
Net loss and comprehensive loss |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Balance as of March 31, 2025 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Stock-based compensation expense, net of taxes |
|
|
|
|
|
|
|
| - |
|
|
| - |
|
|
| - |
|
|
| - |
|
|
|
|
|
| - |
|
|
|
| ||||
Dividends declared on 8.875% series A cumulative perpetual preferred shares ($560 per share) |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| ( | ) |
|
|
|
|
| ( | ) | ||||
Reclassification of dividends paid on 8.875% series A cumulative perpetual preferred shares |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| ( | ) |
|
|
|
|
|
| |||||
Net loss and comprehensive loss |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Balance as of June 30, 2025 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Stock-based compensation expense, net of taxes |
|
| 129,210 |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
Dividends declared on 8.875% series A cumulative perpetual preferred shares ($550 per share) |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| ( | ) |
|
|
|
|
| ( | ) | ||||
Net loss and comprehensive loss |
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
| - |
|
|
|
|
|
|
|
|
| ( | ) |
|
| ( | ) | ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Balance as of September 30, 2025 |
|
|
|
| $ |
|
|
|
|
| $ |
|
|
|
|
| $ |
|
| $ |
|
| $ | ( | ) |
| $ |
| ||||||||
See accompanying notes to the unaudited condensed consolidated financial statements.
6
Table of Contents
Cadiz Inc.
Notes to the Condensed Consolidated Financial Statements
NOTE 1 – BASIS OF PRESENTATION
The Condensed Consolidated Financial Statements and notes have been prepared by Cadiz Inc., also referred to as “Cadiz” or “the Company”, and should be read in conjunction with the Consolidated Financial Statements and notes thereto included in the Company’s Annual Report on Form 10-K for the year ended December 31, 2025.
The foregoing Condensed Consolidated Financial Statements include the accounts of the Company and contain all adjustments, consisting only of normal recurring adjustments, which management considers necessary for a fair statement of the Company’s financial position, the results of its operations and its cash flows for the periods presented and have been prepared in accordance with generally accepted accounting principles.
The condensed balance sheet as of December 31, 2025, was derived from audited annual financial statements but does not contain all of the footnote disclosures from the annual financial statements.
Principles of Consolidation
The Condensed Consolidated Financial Statements also include the accounts of Fenner Gap Mutual Water Company (“FGMWC”), a variable interest entity (“VIE”) of which the Company is the primary beneficiary. The Company evaluates its interests in legal entities to determine whether it has a variable interest in a VIE and, if so, whether it is the primary beneficiary, which is the party that has both the power to direct the activities that most significantly affect the VIE’s economic performance and the obligation to absorb losses or the right to receive benefits that could potentially be significant to the VIE. The Company reassesses whether it is the primary beneficiary on an ongoing basis. All significant intercompany transactions and balances have been eliminated in consolidation.
The preparation of financial statements in conformity with generally accepted accounting principles requires management to make estimates and assumptions that affect the amounts reported in the financial statements and the accompanying notes. Actual results could differ from those estimates and such differences may be material to the financial statements. The results of operations for the nine months ended September 30, 2026, are not necessarily indicative of results for the entire fiscal year ending December 31, 2026.
Variable Interest Entity
FGMWC is a non-profit mutual benefit corporation under California law formed by the Company in 2010 and for which the Company manages all corporate functions. Under the Company’s water supply agreements, the Company expects to contribute its annual water supply from the Mojave Groundwater Bank to FGMWC. Participating public water agencies and other beneficiaries of water supply and storage rights will own shares in FGMWC under the class structure set forth in FGMWC’s bylaws. No participating public water agency currently owns shares in FGMWC. On July 14, 2026, the United States Bureau of Land Management (“BLM”) issued FGMWC a right-of-way grant under Title V of the Federal Land Policy and Management Act (“FLPMA ROW Grant”) authorizing the conversion of the Company’s 220-mile 30” steel pipeline (the “Northern Pipeline”) to water conveyance on BLM-administered lands (see Note 7 – “Leases & Property, Plant, Equipment and Water Programs”). On July 27, 2026, FGMWC executed construction-manager-at-risk contracts establishing guaranteed maximum prices for the principal construction components of the Northern Pipeline conversion (see Note 10 – “Commitments and Contingencies”). In April 2026, FGMWC and the County of San Bernardino formed the San Bernardino Water and Power Authority ("SBWPA"), a joint powers authority. The SBWPA may support the financing of our water and energy projects, including the Mojave Groundwater Bank ("MGB"). SBWPA has the ability to issue revenue bonds. The Company does not consolidate the authority.
7
Table of Contents
Cadiz Inc.
As of September 30, 2026, FGMWC has not issued shares or membership interests and has no equity investment at risk; its activities, including the rent, fees and performance and reclamation bond required for the FLPMA ROW Grant and the costs of its construction contracts, are funded by the Company. FGMWC is therefore a VIE. The Company is FGMWC’s primary beneficiary because it manages FGMWC and directs the activities that most significantly affect its economic performance – obtaining the authorizations for and developing the Northern Pipeline conversion and contracting for water supply – and because it funds FGMWC and absorbs its losses. The Company has not guaranteed FGMWC’s obligations under the FLPMA ROW Grant or its construction contracts. Under its water delivery agreements, however, the Company has agreed to arrange and finance the capital costs of the Northern Pipeline conveyance facilities, on its own or in coordination with FGMWC or others. During the three and nine months ended September 30, 2026, the Company funded FGMWC’s payment of $
The Company intends to continue funding FGMWC’s obligations under the FLPMA ROW Grant until FGMWC’s members assume them when water is available, and to fund FGMWC’s pre-construction costs and other obligations incurred before project financing for the Northern Pipeline conversion is obtained. Construction under FGMWC’s construction contracts will begin only upon satisfaction of the applicable financing conditions (see Note 10 – “Commitments and Contingencies”). The Company reassesses on an ongoing basis whether it is FGMWC’s primary beneficiary. Changes in FGMWC’s governing documents or equity, such as the issuance of membership interests to participating public water agencies, or in its activities, such as the contribution of the Northern Pipeline assets to Mojave Water Infrastructure Company LLC, would require the Company to reconsider whether FGMWC is a VIE. If the FLPMA ROW Grant were vacated (see Note 10 – “Commitments and Contingencies”), FGMWC would derecognize the related right-of-use asset and lease liability to the extent its rights and obligations under the grant ended.
The assets and liabilities of FGMWC included in the condensed consolidated balance sheet, after elimination of intercompany balances, were as follows:
|
| September 30, |
|
| December 31, |
| ||
($ in thousands) |
| 2026 |
|
| 2025 |
| ||
|
|
|
| |
|
|
| |
ASSETS |
|
|
| |
|
|
| |
Operating Right-of-use asset |
| $ |
|
| $ |
| ||
Long-term deposit/prepaid expenses |
|
|
|
|
|
| ||
Total assets |
| $ |
|
| $ |
| ||
|
|
|
| |
|
|
| |
LIABILITIES |
|
|
| |
|
|
| |
Operating lease liabilities (current) |
| $ |
|
| $ |
| ||
Long-term operating lease liabilities |
|
|
|
|
|
| ||
Total Liabilities |
| $ |
|
| $ |
| ||
The assets of FGMWC can be used only to settle obligations of FGMWC, and the creditors of FGMWC, including BLM under the FLPMA ROW Grant, do not have recourse to the general credit of the Company.
Liquidity
The Condensed Consolidated Financial Statements of the Company have been prepared using accounting principles applicable to a going concern, which assumes realization of assets and settlement of liabilities in the normal course of business.
8
Table of Contents
Cadiz Inc.
The Company incurred losses of $
Cash requirements during the nine months ended September 30, 2026 primarily reflect certain operating and administrative costs related to the development of our groundwater storage and supply project (the “Mojave Groundwater Bank”), our agricultural operations, and our water treatment business- as well as other development projects. The Company’s present activities are focused on the development of its assets in ways that meet an urgent need for groundwater storage capacity in Southern California and growing demand for affordable, reliable, long-term water supplies that provide water security against inevitable drought periods in the Southwestern United States.
On March 6, 2024, the Company entered into a Third Amendment to Credit Agreement and First Amendment to Security Agreement (“Third Amended Credit Agreement”) with HHC $ Fund 2012 (“Heerema”). The Third Amended Credit Agreement provides, among other things, (a) a new tranche of senior secured convertible terms loans from Heerema in an aggregate principal amount of $
On March 7, 2025, the Company completed the sale and issuance of
On October 27, 2025, the Company entered into a definitive agreement (the “Lytton Credit Agreement”) with Lytton Rancheria of California, a federally recognized Native American tribe (“Lytton”), pursuant to which Lytton will provide the first tranche of capital (the “Tribal Investment”) for construction of the Mojave Groundwater Bank. Under the Lytton Credit Agreement, the Company at its election may draw, as an unsecured term loan, up to $
On July 14, 2026, the Company received from BLM an effective FLPMA ROW Grant, made the required initial right-of-way rent payment of approximately $
9
Table of Contents
Cadiz Inc.
On October 30, 2026, the Company completed the sale and issuance of
The Company may meet its debt and operating and development costs requirements through a variety of means, including extension, refinancing, equity placements, the sale or other disposition of assets, or reductions in operating costs. The covenants in the senior secured debt do not prohibit the Company’s use of additional equity financing and allow the Company to retain 100% of the proceeds of any common equity financing. The Company does not expect the loan covenants to materially limit its ability to finance its Mojave Groundwater Bank, agricultural operations and water treatment business activities.
Management assesses whether the Company has sufficient liquidity to fund its costs for the next twelve months from each financial statement issuance date. Management evaluates the Company’s liquidity to determine if there is a substantial doubt about the Company’s ability to continue as a going concern. In the preparation of this liquidity assessment, management applies judgement to estimate the projected cash flows of the Company including the following: (i) projected cash outflows (ii) projected cash inflows, (iii) categorization of expenditures as discretionary versus non-discretionary and (iv) the ability to raise capital. The cash flow projections are based on known or planned cash requirements for operating costs as well as planned costs for project development.
Limitations on the Company’s liquidity and ability to raise capital may adversely affect it. Sufficient liquidity is critical to meet the Company’s resource development activities. Although the Company currently expects its sources of capital to be sufficient to meet its liquidity needs for at least the next twelve months from the date these financial statements are issued, there can be no assurance that its liquidity requirements will continue to be satisfied in the long-term. If the Company cannot raise needed funds, it might be forced to make substantial reductions in its operating expenses, which could adversely affect its ability to implement its current business plan and ultimately its viability as a company.
Supplemental Cash Flow Information
During the nine months ended September 30, 2026, approximately $
During the nine months ended September 30, 2026, in connection with the Fifth Amendment to the credit agreement, the Company recorded $1.7 million of non-cash additional debt discount on the Heerema loans, with a corresponding increase in additional paid-in capital. The Company also recorded the non-cash extinguishment of the Convertible Loan, which had a net carrying amount of $20.1 million, and its replacement by the amended Convertible Loan, which had a fair value of $
At September 30, 2026, accruals for cash dividends payable on the Series A Preferred Stock were $
At September 30, 2026, accruals for capitalized costs related to the Mojave Groundwater Bank included in property, plant and equipment and water programs not yet paid in cash were approximately $
10
Table of Contents
Cadiz Inc.
During the nine months ended September 30, 2026, the Company reclassified $
The balance of cash, cash equivalents, and restricted cash as shown in the condensed consolidated statements of cash flows is comprised of the following:
Cash, Cash Equivalents and Restricted Cash |
| September 30, 2026 |
|
| December 31, 2025 |
|
| September 30, 2025 |
| |||
(in thousands) |
|
|
| |
|
|
| |
|
|
| |
|
|
|
| |
|
|
| |
|
|
| |
Cash and Cash Equivalents |
| $ |
|
| $ |
|
| $ |
| |||
Restricted Cash |
|
|
|
|
|
|
|
|
| |||
Long-Term Restricted Cash |
|
|
|
|
|
|
|
|
| |||
Cash, Cash Equivalents and Restricted Cash in the Consolidated Statement of Cash Flows |
| $ |
|
| $ |
|
| $ |
| |||
The restricted cash amounts primarily represented funds deposited into a segregated account as cash collateral supporting a letter of credit issued by the Company related to a performance and reclamation bond for Northern Pipeline.
Recent Accounting Pronouncements
Accounting Guidance Not Yet Adopted
In November 2024, the FASB issued ASU No. 2024-03, Disaggregation of Income Statement Expenses (Subtopic 220-40)(“ASU 2024-03”). ASU 2024-03 which requires disaggregated disclosures of income statement expenses for public business entities. ASU 2024-03 is effective for fiscal years beginning after December 15, 2026, and for interim reporting periods that begin after December 15, 2027. The Company is currently evaluating the impact that adoption of this guidance will have on its consolidated financial statements and related disclosures.
NOTE 2 – REPORTABLE SEGMENTS
The Company currently operates in two reportable segments based upon its organizational structure and the way in which its operations are managed and evaluated. The Company’s largest segment is Land and Water Resources, which comprises all activities related to its properties in the eastern Mojave Desert, including pre-revenue development of the Mojave Groundwater Bank for the supply, storage and conveyance of water, as well as its agricultural operations (alfalfa farming). The Company’s second operating segment is Water Treatment Technology, consisting of ATEC Water Systems LLC (“ATEC”), which provides innovative water treatment solutions for impaired or contaminated groundwater sources. The Chief Operating Decision-Maker ("CODM") is the Chief Executive Officer of Cadiz Inc.
11
Table of Contents
Cadiz Inc.
The CODM primarily evaluates the performance of its Land and Water Resources segment based upon milestones related to project development, as well as segment operating income (loss). We evaluate the performance of our Water Treatment Technology segment based upon segment operating income (loss). Interest expense and income tax expense are excluded from the computation of operating (loss) for the segments. Segment net revenue, segment operating expenses and segment operating (loss)/income information consisted of the following for the three and nine months ended September 30, 2026 and 2025:
|
| Three Months Ended September 30, 2026 |
| |||||||||
|
|
|
| |
| Water |
|
|
|
| | |
|
| Land and Water |
|
| Treatment |
|
|
|
| | ||
(in thousands) |
| Resources |
|
| Technology |
|
| Total |
| |||
|
|
|
| |
|
|
| |
|
|
| |
Revenues: |
|
|
| |
|
|
| |
|
|
| |
Sales revenue |
| $ |
|
| $ |
|
| $ |
| |||
Services revenue |
|
|
|
|
|
|
|
|
| |||
Rental income |
|
|
|
|
|
|
|
|
| |||
Total revenues |
| $ |
|
| $ |
|
| $ |
| |||
|
|
|
| |
|
|
| |
|
|
| |
Costs and expenses: |
|
|
| |
|
|
| |
|
|
| |
Cost of sales (exclusive of depreciation shown separately below) |
|
|
|
|
|
|
|
|
| |||
Cost of sales, service revenue |
|
|
|
|
|
|
|
|
| |||
General and administrative |
|
|
|
|
|
|
|
|
| |||
Depreciation |
|
|
|
|
|
|
|
|
| |||
Total costs and expenses |
|
|
|
|
|
|
|
|
| |||
|
|
|
| |
|
|
| |
|
|
| |
Operating (loss) income |
| $ | ( | ) |
| $ | ( | ) |
| $ | ( | ) |
|
| Three Months Ended September 30, 2025 |
| |||||||||
|
|
|
| |
| Water |
|
|
|
| | |
|
| Land and Water |
|
| Treatment |
|
|
|
| | ||
(in thousands) |
| Resources |
|
| Technology |
|
|
| Total |
| ||
|
|
|
| |
|
|
| |
|
|
| |
Revenues: |
|
|
| |
|
|
| |
|
|
| |
Sales revenue |
| $ |
|
| $ |
|
| $ |
| |||
Services revenue |
|
|
|
|
|
|
|
|
| |||
Rental income |
|
|
|
|
|
|
|
|
| |||
Total revenues |
| $ |
|
| $ |
|
| $ |
| |||
|
|
|
| |
|
|
| |
|
|
| |
Costs and expenses: |
|
|
| |
|
|
| |
|
|
| |
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
|
|
|
|
|
|
| |||
Cost of sales, service revenue |
|
|
|
|
|
|
|
|
| |||
General and administrative |
|
|
|
|
|
|
|
|
| |||
Depreciation |
|
|
|
|
|
|
|
|
| |||
Total costs and expenses |
|
|
|
|
|
|
|
|
| |||
|
|
|
| |
|
|
| |
|
|
| |
Operating (loss) income |
| $ | ( | ) |
| $ |
|
| $ | ( | ) | |
12
Table of Contents
Cadiz Inc.
|
| Nine Months Ended September 30, 2026 |
| |||||||||
|
|
|
| |
| Water |
|
|
|
| | |
|
| Land and Water |
|
| Treatment |
|
|
|
| | ||
(in thousands) |
| Resources |
|
| Technology |
|
| Total |
| |||
|
|
|
| |
|
|
| |
|
|
| |
Revenues: |
|
|
| |
|
|
| |
|
|
| |
Sales revenue |
| $ |
|
| $ |
|
| $ |
| |||
Services revenue |
|
|
|
|
|
|
|
|
| |||
Rental income |
|
|
|
|
|
|
|
|
| |||
Total revenues |
|
|
|
|
|
|
|
|
| |||
|
|
|
| |
|
|
| |
|
|
| |
Costs and expenses: |
|
|
| |
|
|
| |
|
|
| |
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
|
|
|
|
|
|
| |||
Cost of sales, services revenue |
|
|
|
|
|
|
|
|
| |||
General and administrative |
|
|
|
|
|
|
|
|
| |||
Depreciation |
|
|
|
|
|
|
|
|
| |||
Total costs and expenses |
|
|
|
|
|
|
|
|
| |||
|
|
|
| |
|
|
| |
|
|
| |
Operating (loss) income |
| $ | ( | ) |
| $ | ( | ) |
| $ | ( | ) |
|
| Nine Months Ended September 30, 2025 |
| |||||||||
|
|
|
| |
| Water |
|
|
|
| | |
|
| Land and Water |
|
| Treatment |
|
|
|
| | ||
(in thousands) |
| Resources |
|
| Technology |
|
| Total |
| |||
|
|
|
| |
|
|
| |
|
|
| |
Revenues: |
|
|
| |
|
|
| |
|
|
| |
Sales revenue |
| $ |
|
| $ |
|
| $ |
| |||
Services revenue |
|
|
|
|
|
|
|
|
| |||
Rental income |
|
|
|
|
|
|
|
|
| |||
Total revenues |
|
|
|
|
|
|
|
|
| |||
|
|
|
| |
|
|
| |
|
|
| |
Costs and expenses: |
|
|
| |
|
|
| |
|
|
| |
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
|
|
|
|
|
|
| |||
Cost of sales, services revenue |
|
|
|
|
|
|
|
|
| |||
General and administrative |
|
|
|
|
|
|
|
|
| |||
Depreciation |
|
|
|
|
|
|
|
|
| |||
Total costs and expenses |
|
|
|
|
|
|
|
|
| |||
|
|
|
| |
|
|
| |
|
|
| |
Operating (loss) income |
| $ | ( | ) |
| $ |
|
| $ | ( | ) | |
13
Table of Contents
Cadiz Inc.
Assets by operating segment are as follows (dollars in thousands):
|
| September 30, |
|
| December 31, |
| ||
|
| 2026 |
|
| 2025 |
| ||
Operating Segment: |
|
|
| |
|
|
| |
Water and Land Resources |
| $ |
|
| $ |
| ||
Water Treatment Technology |
|
|
|
|
|
| ||
|
| $ |
|
| $ |
| ||
Goodwill by operating segment is as follows (dollars in thousands):
|
| September 30, |
|
| December 31, |
| ||
|
| 2026 |
|
| 2025 |
| ||
Operating Segment: |
|
|
| |
|
|
| |
Water and Land Resources |
| $ |
|
| $ |
| ||
Water Treatment Technology |
|
|
|
|
|
| ||
|
| $ |
|
| $ |
| ||
NOTE 3 – LONG-TERM DEBT
At September 30, 2026, the carrying value and estimated fair value of the Company’s secured non-convertible term loans under the Credit Agreement (as defined below) were $
On July 2, 2021, the Company entered into a $
On February 2, 2023, the Company entered into a First Amendment to Credit Agreement to amend certain provisions of the Credit Agreement (“First Amended Credit Agreement”). In connection with the First Amended Credit Agreement, the Company repaid $
14
Table of Contents
Cadiz Inc.
On March 6, 2024, the Company entered into the Third Amended Credit Agreement. Before entering into the Third Amended Credit Agreement, Heerema purchased the outstanding secured non-convertible term loans under the Credit Agreement (“Assignment”) at a discount on behalf of the Company. The Assignment was considered a debt extinguishment resulting in a gain of $
The Third Amended Credit Agreement provides, among other things, (a) a new tranche of senior secured convertible terms loans from Heerema in an aggregate principal amount of $
As a result of the registered direct offering completed in October 2026, the conversion price of the New Secured Convertible Debt was reduced to $5.00 per share.
On October 27, 2025, the Company entered into a Fourth Amendment to the Credit Agreement, which permitted the Company to incur up to $
On August 12, 2026, the Company entered into the Fifth Amendment, which extended the maturity date of each of these loans to June 30, 2028. No other terms of the loans were changed. For the New Secured Convertible Debt and the non-convertible term loans, both held by Heerema, the extension was accounted for as a debt modification. The combined $
15
Table of Contents
Cadiz Inc.
In connection with the debts issued to Heerema, the Company issued a warrant to purchase
Heerema, which holds the New Secured Convertible Debt, non-convertible term loans and Heerema Warrant, is also a significant shareholder of the Company’s common stock, holding
In the event of certain asset sales, the incurrence of indebtedness or a casualty or condemnation event, in each case, under certain circumstances as described in the Credit Agreement, the Company will be required to use a portion of the proceeds to prepay amounts under the secured debt. In the event of any additional issuance of depositary receipts (“Depositary Receipts”) representing interests in shares of
The Credit Agreement includes customary affirmative and negative covenants, including delivery of financial statements and other reports. The negative covenants limit the ability of the Company to, among other things, incur debt, incur liens, make investments, sell assets, pay dividends and enter into transactions with affiliates. In addition, the Credit Agreement includes customary events of default and remedies. The Company was in compliance with all covenants under the Credit Agreement as of September 30, 2026.
On October 27, 2025 (the “Effective Date”), the Company entered the Lytton Credit Agreement pursuant to which Lytton committed to provide an unsecured term loan facility with a maximum of $
16
Table of Contents
Cadiz Inc.
In connection with the Lytton Credit Agreement, the Company agreed to issue shares of its common stock to Lytton as follows:
| ● | upon execution of the Lytton Credit Agreement, a commitment fee of |
| ● | on each funding date, a funding fee of |
| ● | in the event the Tribal Investment is extended beyond the Initial Maturity Date, an extension fee of |
The Company has evaluated whether the contracts to issue the Company’s common stock to secure funding should be classified as equity or a derivative liability pursuant to ASC 815-40. The Company’s obligation to deliver variable funding fee shares depending on the amount drawn on the facility by the Company is not indexed to the Company's own stock under ASC 815-40 because the number of shares issuable varies with the amount drawn, which is not an input to the fair value of a fixed-for-fixed option or forward on the Company's common stock. Accordingly, the obligation does not qualify for equity classification and is recognized as a derivative liability of $
At any time following the funding of the full $
On November 4, 2025, the Company made an initial draw of $
NOTE 4 – STOCK-BASED COMPENSATION PLANS
The Company has issued options and has granted stock awards pursuant to its 2019 Equity Incentive Plan, as described below.
2019 Equity Incentive Plan
The 2019 Equity Incentive Plan (as amended, “2019 EIP”) was originally approved by stockholders at the July 10, 2019 Annual Meeting, with amendments to the plan approved by stockholders at the July 12, 2022 Annual Meeting, the June 11, 2024 Annual Meeting and the June 12, 2025 Annual Meeting. The plan, as amended, provides for the grant and issuance of up to
17
Table of Contents
Cadiz Inc.
Effective July 1, 2021, under the 2019 EIP, each outside director receives $
Stock Awards to Directors, Officers, and Consultants
The Company has granted stock awards pursuant to its 2019 EIP.
Of the total
In January 2024,
In April 2024, the Company granted
In September 2024, the Company granted
In January 2025,
In February 2025,
In March 2025,
18
Table of Contents
Cadiz Inc.
In September 2025,
In October 2025,
In April 2026,
In July 2026, the Company announced a chief financial officer succession plan pursuant to which Stanley E. Speer retired as the Company’s Chief Financial Officer effective as of September 1, 2026. Jacinto J. Hernandez was appointed as the Company’s Executive Vice President of Finance and became the Company’s Chief Financial Officer upon Mr. Speer’s retirement.
In conjunction with the succession plan, Mr. Hernandez was granted one-time inducement awards outside of the Company’s 2019 Equity Incentive Plan (the “Plan”) consisting of (i)
In connection with his retirement, Mr. Speer entered into a Separation Agreement which provides for, among other things, accelerated vesting of unvested service-based RSUs representing
The accompanying consolidated statements of operations and comprehensive loss include approximately $
NOTE 5 – INCOME TAXES
As of September 30, 2026 the Company had net operating loss (“NOL”) carryforwards of approximately $
19
Table of Contents
Cadiz Inc.
The Company’s tax years 2023 through 2025 remain subject to examination by the Internal Revenue Service, and tax years 2022 through 2025 remain subject to examination by California tax jurisdictions. In addition, the Company’s loss carryforward amounts are generally subject to examination and adjustment for a period of three years for federal tax purposes and four years for California purposes, beginning when such carryovers are utilized to reduce taxes in a future tax year.
Because it is more likely than not that the Company will not realize its net deferred tax assets, it has recorded a full valuation allowance against these assets. Accordingly, no deferred tax asset has been reflected in the accompanying condensed consolidated balance sheet.
NOTE 6 – NET LOSS PER COMMON SHARE
Basic net loss per common share is computed by dividing the net loss attributable to common stock holders by the weighted-average common shares outstanding. Options, restricted stock units, performance stock units, convertible debt, convertible preferred shares and warrants were not considered in the computation of net loss per share because their inclusion would have been antidilutive. Had these instruments been included, the fully diluted weighted average shares outstanding would have increased by approximately
NOTE 7 – LEASES & PROPERTY, PLANT, EQUIPMENT AND WATER PROGRAMS
Property, plant, equipment and water programs consist of the following (dollars in thousands):
|
| September 30, |
|
| December 31, |
| ||
|
| 2026 |
|
| 2025 |
| ||
|
|
|
| |
|
|
| |
Land and land improvements |
| $ |
|
| $ |
| ||
Water programs |
|
|
|
|
|
| ||
Pipeline |
|
|
|
|
|
| ||
Buildings |
|
|
|
|
|
| ||
Leasehold improvements, furniture and fixtures |
|
|
|
|
|
| ||
Machinery and equipment |
|
|
|
|
|
| ||
Construction in progress |
|
|
|
|
|
| ||
|
|
|
|
|
|
| ||
Less accumulated depreciation |
|
| ( | ) |
|
| ( | ) |
|
| $ |
|
| $ |
| ||
20
Table of Contents
Cadiz Inc.
Effective February 1, 2024, the Company entered into a
Effective January 1, 2026, BLM issued an updated per-acre rent schedule for calendar years 2026 through 2035, under which rent billed for the right-of-way increased to $
On July 14, 2026, BLM issued FGMWC, a consolidated VIE (see Note 1 – “Basis of Presentation”), a right-of-way grant under Title V of the Federal Land Policy and Management Act (the “FLPMA ROW Grant”) that authorizes the construction, operation and maintenance of a water transmission line and ancillary facilities on approximately
Rent under the FLPMA ROW Grant is set at fair market value as determined by BLM under its per-acre rent schedule for linear rights-of-way. The Company accounts for the FLPMA ROW Grant as an operating lease and recorded a right-of-use asset of $
The FLPMA ROW Grant authorizes the conversion of the Northern Pipeline segments on BLM-administered lands previously authorized under the
21
Table of Contents
Cadiz Inc.
In determining that the FLPMA ROW Grant is a lease and in measuring the lease, the Company made judgments regarding whether it obtains substantially all of the economic benefits from and directs the use of the right-of-way, whether rent increases under BLM’s published schedule are lease payments, and its incremental borrowing rate for a term of approximately
The Company has operating leases for right-of-way agreements, corporate offices, vehicles and office equipment. The Company’s leases have remaining lease terms of
As a lessor, in February 2016, the Company entered into a lease agreement with Fenner Valley Farms LLC (“FVF”) (the “lessee”), pursuant to which FVF is leasing, for a
Depreciation expense on land improvements, buildings, leasehold improvements, machinery and equipment and furniture and fixtures was $
NOTE 8 – FAIR VALUE MEASUREMENTS
Fair values determined by Level 1 inputs utilize quoted prices (unadjusted) in active markets for identical assets or liabilities. The Company considers a security that trades at least weekly to have an active market. Fair values determined by Level 2 inputs utilize data points that are observable, such as quoted prices, interest rates and yield curves. Fair values determined by Level 3 inputs are unobservable data points for the asset or liability, and include situations where there is little, if any, market activity for the asset or liability.
On October 27, 2025, the Company recorded a derivative liability in the amount of $
The number of shares expected to be issued is determined in accordance with the funding fee formula specified in the debt agreement (i.e.,
22
Table of Contents
Cadiz Inc.
|
| Level 3 |
| |
(in thousands) |
| Liabilities |
| |
|
|
|
| |
Balance at December 31, 2025 |
| $ | ( | ) |
Reclassification of derivative liabilities to additional paid-in capital |
|
|
| |
Unrealized gain on derivative liability |
|
|
| |
Balance at September 30, 2026 |
| $ | ( | ) |
|
| Liabilities at Fair Value as of September 30, 2026 |
| |||||||||||||
(in thousands) |
| Level 1 |
|
| Level 2 |
|
| Level 3 |
|
| Total |
| ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Liabilities |
|
|
| |
|
|
| |
|
|
| |
|
|
| |
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Derivative Liabilities |
| $ |
|
| $ |
|
| $ |
|
| $ |
| ||||
|
|
|
| |
|
|
| |
|
|
| |
|
|
| |
Total Liabilities |
| $ |
|
| $ |
|
| $ |
|
| $ |
| ||||
| | Liabilities at Fair Value as of December 31, 2025 | | |||||||||||||
(in thousands) | | Level 1 | | | Level 2 | | | Level 3 | | | Total | | ||||
| | | | | | | | | | | | | | | | |
Liabilities | | | | | | | | | | | | | | | | |
| | | | | | | | | | | | | | | | |
Derivative Liabilities | | $ | | | $ | | | $ | | | $ | | ||||
| | | | | | | | | | | | | | | | |
Total Liabilities | | $ | | | $ | | | $ | | | $ | | ||||
NOTE 9 – COMMON AND PREFERRED STOCK
Common Stock
The Company is authorized to issue
On March 7, 2025, the Company completed the sale and issuance of
On October 30, 2026, the Company completed the sale and issuance of
23
Table of Contents
Cadiz Inc.
Series 1 Preferred Stock
The Company has issued a total of
Series A Preferred Stock
On June 29, 2021, the Company entered into an Underwriting Agreement with B. Riley Securities, Inc., as representative of the several underwriters named there, to issue and sell an aggregate of
On July 1, 2021, the Company filed the Certificate of Designation (“Certificate of Designation”) for the Series A Preferred Stock with the Secretary of State of the State of Delaware, which became effective upon acceptance for record. The Certificate of Designation classified a total of
As set forth in the Certificate of Designation, the Series A Preferred Stock will rank, as to dividend rights and rights upon the Company’s liquidation, dissolution or winding up: (i) senior to Common Stock of the Company; (ii) junior to the Series 1 Preferred Stock with respect to the distribution of assets upon the Company’s voluntary or involuntary liquidation, dissolution or winding up; (iii) senior to the Series 1 Preferred Stock with respect to the payment of dividends and (iv) effectively junior to all the Company’s existing and future indebtedness (including indebtedness convertible into Common Stock or preferred stock) and to the indebtedness and other liabilities of (as well as any preferred equity interests held by others in) the Company’s existing or future subsidiaries.
Holders of Series A Preferred Stock, when and as authorized by the Company’s Board of Directors, are entitled to cumulative cash dividends at the rate of
Dividends on the Series A Preferred Stock underlying the depositary shares will continue to accumulate whether or not (i) any of our agreements prohibit the current payment of dividends, (ii) we have earnings or funds legally available to pay the dividends, or (iii) our Board of Directors does not declare the payment of the dividends.
24
Table of Contents
Cadiz Inc.
Holders of depositary shares representing interests in the Series A Preferred Stock generally will have no voting rights. However, if we do not pay dividends on any outstanding shares of Series A Preferred Stock for six or more quarterly dividend periods (whether or not declared or consecutive), holders of the Series A Preferred Stock (voting separately as a class with all other outstanding series of preferred stock upon which like voting rights have been conferred and are exercisable) will be entitled to elect two additional directors to the Board of Directors to serve until all unpaid dividends have been fully paid or declared and set apart for payment.
On and after July 2, 2026, the shares of Series A Preferred Stock are redeemable at the Company’s option, in whole or in part, at a redemption price equal to $
Shares of Series A Preferred Stock are convertible into shares of Common Stock if, and only if, a change of control or delisting event (each as defined in the Certificate of Designation) has occurred, and the Company has not elected to redeem the Series A Preferred Stock prior to the applicable conversion date. Upon any conversion, each share of Series A Preferred Stock will be converted into that number of shares of Common Stock equal to the lesser of (i) the quotient obtained by dividing (A) the sum of (x) the $
The Company has
NOTE 10 – COMMITMENTS AND CONTINGENCIES
In the normal course of its operations, the Company handles, stores, transports and dispenses products identified as hazardous materials. Regulatory agencies periodically conduct inspections and, currently, there are no pending claims with respect to hazardous materials.
Pursuant to cost-sharing agreements that have been entered into by participants in the Mojave Groundwater Bank, $
25
Table of Contents
Cadiz Inc.
In conjunction with the
In connection with the FLPMA ROW Grant (see Note 7 – “Leases & Property, Plant, Equipment and Water Programs”), FGMWC deposited $
On November 10, 2024, the Company entered into a Purchase Option Agreement (the "Option Agreement") with GMHR Acquisitions Co., LLC and LKM Industries, Inc. (together, the "Owners") and North West Iron & Metal LLC, as consignee ("NWIM"). The Option Agreement grants the Company an exclusive option to purchase up to
The Company is from time to time involved in various lawsuits and legal proceedings that arise in the ordinary course of business.
On July 28, 2026, two lawsuits were filed in the U.S. District Court for the Central District of California, one by the National Parks Conservation Association and others and one by the Center for Biological Diversity and others, challenging BLM’s approval of and seeking to vacate the FLPMA ROW Grant. The FLPMA ROW Grant remains in effect. Neither the Company nor FGMWC is a party to the lawsuits. The United States, represented by the Department of Justice, filed its response in the Center for Biological Diversity case on October 6, 2026, and in the National Parks Conservation Association case on October 9, 2026, denying all of the plaintiffs’ substantive claims in both cases.
26
Table of Contents
Cadiz Inc.
The cases are not consolidated. A scheduling conference with the judge is set for November 19, 2026, in the Center for Biological Diversity case. A separate scheduling conference with the judge in the National Parks Conservation Association case is set for February 1, 2027. The Company cannot predict the outcome of the lawsuits. If the FLPMA ROW Grant were vacated, the Company would derecognize the related right-of-use asset and lease liability to the extent FGMWC’s rights and obligations under the grant ended, and the Northern Pipeline conversion could be delayed.
At this time, the Company is not aware of any other pending or threatened litigation that it expects will have a material adverse effect on its business, financial condition, liquidity, or operating results. Legal claims are inherently uncertain and it is possible that the Company’s business, financial condition, project equity fundraising, liquidity and/or operating results could be adversely affected in the future by legal proceedings.
NOTE 11 – SUBSEQUENT EVENTS
On October 29, 2026, the Company entered into a placement agent agreement for the sale of
The offering price of $
On October 30, 2026, the Company elected to extend the option term under the Option Agreement through March 10, 2027, and paid a $
On November 10, 2026, the Company drew the remaining $
27
Table of Contents
Cadiz Inc.
ITEM 2. Management’s Discussion and Analysis of Financial Condition and Results of Operations
In connection with the “safe harbor” provisions of the Private Securities Litigation Reform Act of 1995, the following discussion contains trend analysis and other forward-looking statements. Forward-looking statements can be identified by the use of words such as “intends”, “anticipates”, “believes”, “estimates”, “projects”, “forecasts”, “expects”, “plans” and “proposes”. Although we believe that the expectations reflected in these forward-looking statements are based on reasonable assumptions, there are a number of risks and uncertainties that could cause actual results to differ materially from these forward-looking statements. These include, among others, our ability to maximize value from our portfolio of assets and our ability to obtain new financings as needed to meet our ongoing operating and development needs. See additional discussion under the heading “Risk Factors” in Item 1A of our Annual Report on Form 10-K for the year ended December 31, 2025. Our forward-looking statements are made only as of the date hereof. We assume no duty to update these forward-looking statements to reflect new, changed or unanticipated events or circumstances, other than as may be required by law.
We are a water solutions provider with a unique combination of land, water and infrastructure assets. We are located in Southern California between major water systems that serve population centers in the Southwestern United States. Our portfolio of assets includes 2.5 million acre-feet of permitted water supply, up to 1 million acre-feet of groundwater storage capacity, 220 miles of existing, underground pipeline infrastructure, and over 100 miles of right-of-way entitlements for pipeline construction. Through our ATEC subsidiary we also offer versatile, scalable and cost-effective water treatment technologies that remove contaminants and constituents of concern from groundwater. Our customers are public and private water systems, government agencies and commercial businesses.
Water Supply – In accordance with local, state, and federal laws, we own vested water rights authorizing the withdrawal of an average of 50,000 acre-feet per year ("AFY"), or 2.5 million acre-feet of groundwater over 50 years, from the aquifer system underlying our property in the Cadiz Valley (“Cadiz Ranch”) for beneficial uses, including agricultural development on our property and export to serve communities across the region. Because the groundwater in the aquifer system is eventually lost to evaporation, surplus water that is captured and withdrawn before it evaporates is a new water supply (i.e. “conserved” water).
Water Storage – The aquifer system at Cadiz Ranch is large enough for use as a water “banking” facility, capable of storing water “in-lieu” for supply customers and up to 1 million acre-feet of imported surplus water for return during drought periods. For comparison, Metropolitan Water District of Southern California stores approximately 1.2 million acre-feet of water in Lake Mead, the largest surface reservoir in the United States.
Water Conveyance – We own an existing 220-mile 30-inch steel pipeline (“Northern Pipeline”) that runs near water storage and conveyance facilities in Southern California, including the California Aqueduct, the Los Angeles Aqueduct, and the Mojave River Pipeline. The maximum potential capacity of the Northern Pipeline for water conveyance is anticipated to be 25,000 AFY with 21,275 AFY under contract. In July 2026, we received a 45-year right-of-way grant from the U.S. Department of the Interior and the Bureau of Land Management (“BLM”) that authorizes the conversion and operation of the Northern Pipeline for water conveyance including the construction of pump stations and related facilities on federal land. We also own a 99-year lease with the Arizona & California Railroad Company (“ARZC”) that authorizes construction of a 43-mile water conveyance pipeline (“Southern Pipeline”) within the active ARZC railroad right-of-way that extends from the Cadiz Ranch to the Colorado River Aqueduct (“CRA”). We currently expect the capacity of the Southern Pipeline to be 120,000 AFY to accommodate imported water storage and export of stored water. We hold an option to purchase up to 180 miles of existing unused 36" steel pipeline that can be used in construction of the Southern Pipeline system or to replace certain components of the Northern Pipeline. The option may be exercised in whole or in part at $155 per linear foot through March 10, 2027 and may be extended to no later than November 8, 2027 (see Note 10 – "Commitments and Contingencies").
28
Table of Contents
Cadiz Inc.
The combination of the water supply, water storage and water conveyance infrastructure described above constitutes the “Mojave Groundwater Bank” or “Project” as discussed in more detail in Item 1. – Business of our Annual Report on Form 10-K for the year ended December 31, 2025.
Water Treatment Technology – In 2022, we completed the acquisition of the assets of ATEC Water Systems, Inc. into ATEC Water Systems, LLC (“ATEC”), which provides innovative water treatment solutions for impaired or contaminated groundwater sources. ATEC’s specialized filtration media provide cost-effective, high-rate of removal for common groundwater impairments and contaminants that pose health risks in drinking water including iron, manganese, arsenic, Chromium-6, nitrates, per-and-polyfluoroalkyl substances (PFAS) and other constituents of concern.
Contracts (Commercial)
Beginning in 2024, we entered into long-term agreements with public water systems, private utilities, and a private water provider for the delivery of 21,275 AFY of water supply from the Mojave Groundwater Bank via the Northern Pipeline, representing approximately 85% of the total capacity of the Northern Pipeline and 45% of the total average long-term supply available under our current permits. Through FGMWC (see Note 1 – “Variable Interest Entity”), participating water providers have agreed to purchase, for up to a 50 year term, their contracted water supply on a “take on availability” basis for a delivered price “not to exceed” $1,450 - 1,750/AFY (in 2024 dollars) depending on terms with each participating water provider. The total cost of the water is expected to include a commodity charge, pro-rated operations and maintenance costs for conveyance, as well as a pro-rated capital charge per acre-foot for dedicated pipeline capacity. The contracts also include inflation escalators pegged to an agreed upon index such as the US Bureau of Labor Statistics Water & Sewer Index. While we believe the total cost of the water will be lower than other new water supplies being contemplated in the region, at current capital costs and interest rates, we estimate the delivered price of water may exceed the pricing specified in the original agreements. The agreements allow the agencies to accept water pricing above the “not to exceed price," and we expect them to adjust pricing after review of our capital and financing plan, as stated in the agreements. As contemplated in those agreements, we are pursuing grant funding and low-interest government loans that may reduce the delivered price, benefiting our participating water providers.
We expect the remaining water supply available under our current permit, or approximately 28,000 acre-feet per year, to be contracted for delivery via the Southern Pipeline, which is designed to interconnect with Colorado River Aqueduct. Parties that receive water from the Colorado River conveyance system directly or via exchange could contract for water from the Southern Pipeline including communities in Arizona that receive water from the Central Arizona Project or communities in California that receive water from the Colorado River Aqueduct. In 2010-2011 we entered into option agreements for water supply from the Southern Pipeline with Southern California based water providers totaling 40,000 acre-feet per year. Two options have already converted to water supply agreements for deliveries from the Northern Pipeline totaling 10,000 acre-feet per year. Approximately 25,000 acre-feet per year remain under option agreements entered into in 2010 and 2011.
In July 2026, we executed a Memorandum of Understanding (“MOU”) with Central Arizona Irrigation and Drainage District (“CAIDD”) for the purchase and sale of up to 10,000 acre-feet per year (“AFY”) from the Mojave Groundwater Bank, representing our first potential agreement for water supply with an Arizona water district. The MOU is subject to the negotiation of necessary interstate exchange agreements to enable delivery of water from the Mojave Groundwater Bank to CAIDD via the Central Arizona Project.
29
Table of Contents
Cadiz Inc.
We are in discussions with several additional parties interested in contracting for supply from the Southern Pipeline via the Colorado River Aqueduct, including municipal water providers, commercial users, agricultural users and Native American tribes in Arizona. These parties could take delivery from the Colorado River Aqueduct or the Central Arizona Project under exchange agreements.
In addition to available water supply, the Mojave Groundwater Bank offers one million acre-feet of imported storage capacity and 150,000 acre-feet for carryover storage of existing contracted supplies. We are in discussions with multiple parties with interest in contracting for storage capacity in the project.
In September 2025, we executed an MOU with the U.S. Bureau of Reclamation (“Reclamation”) to explore incorporating the Mojave Groundwater Bank, including supply and storage capacity, into long-term Colorado River system planning, as federal authorities contemplate solutions to the ongoing drought and long-term stress on the river system. In late May 2026, we entered into a funding agreement with Reclamation to support technical and regulatory review activities associated with the 2025 MOU, including Reclamation’s review of proposed water exchange agreements necessary to deliver water to Arizona parties and technical work to validate water supply and delivery capability and evaluate necessary steps to support potential federal investment in the project.
Permitting
On July 14, 2026, FGMWC received from the U.S. Department of the Interior, Bureau of Land Management (“BLM”) an effective Right-of-Way Grant (the “Grant”) issued pursuant to Title V of the Federal Land Policy and Management Act (“FLPMA”) following the BLM’s completion of an Environmental Assessment pursuant to the National Environmental Policy Act (“NEPA”) and issuance of a Decision Record and Finding of No Significant Impact (“FONSI”). In connection with its decision, the BLM also completed consultation and compliance under Section 106 of the National Historic Preservation Act (“NHPA”) and Section 7 of the Endangered Species Act (“ESA”).
The FLPMA ROW Grant authorizes the conversion of the Northern Pipeline to water conveyance including construction, operation and maintenance of facilities located on BLM-administered lands on approximately 58-miles crossed by the 220-mile pipeline. In total, we expect to convert approximately 162 miles from Cadiz to Mojave, California to make deliveries under the agreements to deliver 22,000 acre-feet per year.
We paid all required right-of-way rent and associated fees and delivered a performance and reclamation bond in the amount of approximately $2.5 million, satisfying the remaining requirements for the FLPMA ROW Grant to become effective. BLM has provided FGMWC notice to proceed with activities outlined in its Plan of Development for the Northern Pipeline conversion project necessary to prepare for and complete construction, including pipeline integrity testing and pump station location geotechnical investigations.
The US Air Force is processing an application by FGMWC for an outgrant easement for the Northern Pipeline, which crosses approximately 17 miles of Edwards Air Force Base ("EAFB"). No facilities are planned on EAFB lands and no access to EAFB lands is required for conversion of the pipeline to water conveyance. This section of the pipeline remains subject to a Mineral Leasing Act right of way for maintenance of the idle pipeline across military lands. The US Air Force easement is expected to be completed prior to completion of the Northern Pipeline conversion project (See Note 1 - “Basis of Presentation” and Note 7- “Leases and Property, Plant, Equipment, and Water Programs”).
30
Table of Contents
Cadiz Inc.
The California State Lands Commission is processing an application by FGMWC for a lease for a 1.1 mile portion of the Northern Pipeline, which crosses California State Indemnity School Lands. In addition, and in accordance with California Water Code Section 1815, FGMWC is seeking a finding from the Commission that the transportation of water from the Mojave Groundwater Bank will not “adversely affect the natural or cultural resources, including groundwater resources or habitat” of the desert lands described in the statute including project area. The application was deemed complete in April 2026. FGMWC provided cost recovery for a finding report being prepared by an environmental consultant retained by the Commission and the finding report is expected to be made available before the end of the year.
Construction
In July 2026, FGMWC executed the principal construction contracts for the Northern Pipeline conversion project using a construction manager at risk (“CMAR”) delivery model. The contracts establish guaranteed maximum prices (“GMPs”) for the pump station and pipeline replacement components of the Northern Pipeline conversion project. These GMPs, together with contractual pricing and option agreements for equipment, materials and necessary components expected to be procured by FGMWC, support an estimated capital cost of approximately $400 million to place the Northern Pipeline into service. The Northern Pipeline’s detailed engineering, procurement and construction pricing also provides a more reliable basis for estimating the cost of comparable components of the Southern Pipeline. Although the Southern Pipeline estimate remains subject to further engineering and negotiation of a GMP, we currently estimate that approximately $1.1 billion of additional capital will be required to place the Southern Pipeline into service. In total, the expected Northern Pipeline and Southern Pipeline capital costs are estimated at $1.5 billion.
Project Financing
To finance construction of all improvements and required facilities to operate the Mojave Groundwater Bank project including the Northern Pipeline, Southern Pipeline and related facilities, we established a special purpose business entity named Mojave Water Infrastructure Company LLC (“MWI”) that will fund these capital costs in partnership with public sector, tribal and other investors. MWI investors are expected to coordinate with us and project participants to seek available infrastructure grants and/or other financing alternatives such as public debt and infrastructure debt financing.
In October 2025, we entered into the Lytton Credit Agreement, pursuant to which we may require Lytton to provide up to $51 million in an unsecured loan facility, convertible into the Storage Cash Flows Right, which Lytton would then contribute to MWI, in exchange for equity interests in MWI on the same economic terms offered to other equity investors in MWI. The Lytton Credit Agreement represents the first tranche of up to approximately $451 million in total equity capital being raised by us through MWI, to construct, own and operate the Mojave Groundwater Bank (see Note 3 to the Consolidated Financial Statements – “Long-Term Debt”).
We are currently conducting due diligence with private equity investors on potential equity commitments of approximately $400 million to MWI. The goal of these discussions is to fund development of the Mojave Groundwater Bank without additional project equity contributions from us. Although there can be no assurances, we expect that any agreement would let us keep both operating control of MWI and a significant equity interest in it.
31
Table of Contents
Cadiz Inc.
If definitive agreements for the up to $400 million in equity capital investments in MWI described above are completed, we currently anticipate contributing to MWI certain of our pipeline infrastructure assets, which may include the Northern Pipeline and the Southern Pipeline right-of-way. The final terms, timing and scope of any such contribution will depend on the terms of those agreements. In addition, Lytton would contribute to MWI its Storage Cash Flows Right, so that the MWI investors would share in the cash flows generated from the constructed facilities, including from the supply agreements and the Storage Cash Flows Right. In consideration of our transfer of assets, we may receive an upfront capital reimbursement payment at closing in addition to an equity interest in MWI, entitling us to share in the long-term cash flows generated by MWI. Additionally, we would seek to retain rights to certain cash flows generated from our water-storage operations that we would not be contributing to MWI.
We will seek available infrastructure grants and/or other financing alternatives such as public debt and infrastructure debt financing. In February 2026 we received an invitation from the U.S. Environmental Protection Agency (“EPA”) to apply for up to $194 million under the Water Infrastructure Finance and Innovation Act (“WIFIA”) program to support Northern Pipeline conversion costs. This pre-application invitation reserves federal funding for the project while we advance through the underwriting process. In connection with this application, we applied for an indicative investment grade rating from a ratings agency for the proposed debt to be issued under the WIFIA program for the Northern Pipeline project. In October 2026, we received an indicative investment grade rating for the proposed debt, which allows us to continue to advance the application.
In addition to WIFIA, we are evaluating potential revenue bond issuances to fund any remaining construction costs through a financing focused Joint Powers Authority formed in April 2026 by Fenner Gap Mutual Water Company and the County of San Bernardino named San Bernardino Water & Power Authority. Inland Empire Utilities Agency ("IEUA") formally joined the Authority on September 2, 2026. The Authority held its first meeting on October 2, 2026 and elected a Board of Directors.
ATEC
ATEC and our agricultural operations provide our current principal source of revenue, although our operating costs are not fully supported by these operations at this time. We presently rely upon debt and equity financing to support our operating costs, including administrative and public company costs. During the third quarter of 2026, we initiated restructuring actions to improve the profitability of our ATEC subsidiary. We expect to begin realizing the benefits of these actions in the fourth quarter of 2026.
Results of Operations
Three Months Ended September 30, 2026, Compared to Three Months Ended September 30, 2025
We currently operate in two reportable segments. Our largest segment is Land and Water Resources, which comprises all activities regarding our properties in the eastern Mojave Desert, pre-revenue development of the Mojave Groundwater Bank (supply, storage and conveyance), and agricultural operations. Our second operating segment is Water Treatment Technology comprised of ATEC which provides innovative water treatment technology solutions for impaired or contaminated groundwater sources.
We primarily evaluate the performance of our Land and Water Resources segment based upon milestones related to project development and segment operating income (loss). We evaluate the performance of our Water Treatment Technology segment based on segment operating income (loss). Interest expense, income tax expense and gain on derivative liability are excluded from the computation of operating income (loss) for the segments. Segment net revenue, segment operating expenses and segment operating (loss)/income information consisted of the following for the three months ended September 30, 2026 and 2025:
32
Table of Contents
Cadiz Inc.
|
|
Three Months Ended September 30, 2026 |
|
|||||||||
|
|
|
|
|
|
Water |
|
|
|
|
|
|
|
|
Land and Water |
|
|
Treatment |
|
|
|
|
|
||
(in thousands) |
|
Resources |
|
|
Technology |
|
|
Total |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues: |
|
|
|
|
|
|
|
|
|
|
|
|
Sales revenue |
|
$ | 148 |
|
|
$ | 1,193 |
|
|
$ | 1,341 |
|
Services revenue |
|
|
- |
|
|
|
117 |
|
|
|
117 |
|
Rental income |
|
|
114 |
|
|
|
- |
|
|
|
114 |
|
Total revenues |
|
$ | 262 |
|
|
$ | 1,310 |
|
|
$ | 1,572 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Costs and expenses: |
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales (exclusive of depreciation shown separately below) |
|
|
461 |
|
|
|
717 |
|
|
|
1,178 |
|
Cost of sales, service revenue |
|
|
- |
|
|
|
90 |
|
|
|
90 |
|
General and administrative |
|
|
8,109 |
|
|
|
1,114 |
|
|
|
9,223 |
|
Depreciation |
|
|
357 |
|
|
|
20 |
|
|
|
377 |
|
Total costs and expenses |
|
|
8,927 |
|
|
|
1,941 |
|
|
|
10,868 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating (loss) income |
|
$ | (8,665 |
) |
|
$ | (631 |
) |
|
$ | (9,296 |
) |
|
|
Three Months Ended September 30, 2025 |
|
|||||||||
|
|
|
|
|
|
Water |
|
|
|
|
|
|
|
|
Land and Water |
|
|
Treatment |
|
|
|
|
|
||
(in thousands) |
|
Resources |
|
|
Technology |
|
|
Total |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues: |
|
|
|
|
|
|
|
|
|
|
|
|
Sales revenue |
|
$ | 3 |
|
|
$ | 3,922 |
|
|
$ | 3,925 |
|
Services revenue |
|
|
- |
|
|
|
112 |
|
|
|
112 |
|
Rental income |
|
|
112 |
|
|
|
- |
|
|
|
112 |
|
Total revenues |
|
$ | 115 |
|
|
$ | 4,034 |
|
|
$ | 4,149 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Costs and expenses: |
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
985 |
|
|
|
1,984 |
|
|
|
2,969 |
|
Cost of sales, service revenue |
|
|
- |
|
|
|
46 |
|
|
|
46 |
|
General and administrative |
|
|
4,730 |
|
|
|
996 |
|
|
|
5,726 |
|
Depreciation |
|
|
295 |
|
|
|
9 |
|
|
|
304 |
|
Total costs and expenses |
|
|
6,010 |
|
|
|
3,035 |
|
|
|
9,045 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating (loss) income |
|
$ | (5,895 |
) |
|
$ | 999 |
|
|
$ | (4,896 |
) |
We have not received significant revenues from the Mojave Groundwater Bank project to date. Our revenues have been limited primarily to ATEC sales of groundwater filtration systems, sales from our alfalfa plantings, and rental income from our agricultural leases. As a result, we have historically incurred a net loss from operations. We incurred an operating loss of $9.3 million in the three months ended September 30, 2026, compared to a $4.9 million operating loss during the three months ended September 30, 2025. The higher operating loss in 2026 was primarily due to decreased gross profits from ATEC, driven by reduced filter sales and increased legal and consulting fees incurred in advancing the development of the Mojave Groundwater Bank. Net loss for the three months ended September 30, 2026 was $14.3 million compared to a $7.1 million net loss during the three months ended September 30, 2025.
33
Table of Contents
Cadiz Inc.
Our primary expenses are our ongoing overhead costs associated with the development of our water supply, storage, and conveyance assets (i.e., general and administrative expenses, outside consultants, legal, lobbyists, engineering and other project related expenses), farming expenses at the Cadiz Ranch, manufacturing operations of ATEC and our interest expense. We will continue to incur non-cash expenses in connection with our management and director equity incentive compensation plan.
Revenues Revenue totaled $1.6 million during the three months ended September 30, 2026 primarily related to ATEC sales totaling $1.3 million, sales from the harvest from our 890 acres of commercial alfalfa crop totaling $0.2 million and rental income from agricultural leases totaling $0.1 million. Revenue totaled $4.1 million during the three months ended September 30, 2025, primarily related to ATEC sales totaling $4.0 million and rental income from agricultural leases totaling $0.1 million. The decrease in ATEC revenues primarily reflects a lower volume of filters shipped in the third quarter of 2026 compared to 2025. Filter revenues in the third quarter of 2025 benefited from an unusually large project for the Central Utah Water Conservancy District’s Vineyard Wellfield Groundwater Polishing Project.
Cost of Sales Cost of sales totaled $1.3 million during the three months ended September 30, 2026, comprised of $0.8 million related to ATEC (38.4% gross margin) and $0.5 million related to our alfalfa crop harvest. Cost of sales totaled $3.0 million during the three months ended September 30, 2025, comprised of $2.0 million related to ATEC (49.6% gross margin) and $1.0 million related to our alfalfa crop harvest. The decrease in ATEC gross margin is primarily driven by spreading the fixed costs of manufacturing filters included in cost of sales over a reduced number of filters sold.
General and Administrative Expenses General and administrative expenses during the three months ended September 30, 2026, exclusive of stock-based compensation costs, totaled $6.1 million compared to $5.2 million for the three months ended September 30, 2025. The increase in expenses was primarily due to increased legal and consulting fees incurred in advancing the development of the Mojave Groundwater Bank as well as elevated expenses related to our CFO transition, General and administrative expense for ATEC totaled $1.1 million during the three months ended September 30, 2026 compared with $1.0 million for the same period in 2025. The increase was due in part to time charges related to restructuring activities during the quarter.
Compensation costs for stock and option awards for the three months ended September 30, 2026, were $3.1 million, compared to $0.5 million for the three months ended September 30, 2025. The higher 2026 expense was primarily due to higher stock-based non-cash awards to employees and consultants in 2026 compared to 2025 (see Note 4 to the Condensed Consolidated Financial Statements – “Stock-Based Compensation Plans”).
Depreciation Depreciation expense totaled $0.4 million during the three months ended September 30, 2026 compared to $0.3 million during the three months ended September 30, 2025.
Interest Expense, net Net interest expense totaled $3.2 million during the three months ended September 30, 2026, compared to $2.2 million during the same period in 2025. The following table summarizes the components of net interest expense for the two periods (in thousands):
34
Table of Contents
Cadiz Inc.
|
|
Three Months Ended |
|
|||||
|
|
September 30, |
|
|||||
|
|
2026 |
|
|
2025 |
|
||
|
|
|
|
|
|
|
|
|
Cash interest on outstanding debt |
|
$ | 1,119 |
|
|
$ | 383 |
|
PIK interest on outstanding debt |
|
|
762 |
|
|
|
711 |
|
Interest added to lease obligation |
|
|
869 |
|
|
|
786 |
|
Amortization of debt discount |
|
|
680 |
|
|
|
391 |
|
Capitalized interest |
|
|
(211 |
) |
|
|
- |
|
Finance expense |
|
|
18 |
|
|
|
- |
|
Interest income |
|
|
(52 |
) |
|
|
(73 |
) |
Other income |
|
|
- |
|
|
|
(25 |
) |
|
|
|
|
|
|
|
|
|
|
|
$ | 3,185 |
|
|
$ | 2,173 |
|
Increased interest expense is primarily due to borrowings under the Lytton Credit Agreement. Interest income primarily relates to interest on investments in short-term deposits.
Nine Months Ended September 30, 2026, Compared to Nine Months Ended September 30, 2025
Segment net revenue, segment operating expenses and segment operating (loss)/income information consisted of the following for the nine months ended September 30, 2026 and 2025:
|
|
Nine Months Ended September 30, 2026 |
|
|||||||||
|
|
|
|
|
|
Water |
|
|
|
|
|
|
|
|
Land and Water |
|
|
Treatment |
|
|
|
|
|
||
(in thousands) |
|
Resources |
|
|
Technology |
|
|
Total |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues: |
|
|
|
|
|
|
|
|
|
|
|
|
Sales revenue |
|
$ | 506 |
|
|
$ | 2,886 |
|
|
$ | 3,392 |
|
Services revenue |
|
|
- |
|
|
|
458 |
|
|
|
458 |
|
Rental income |
|
|
333 |
|
|
|
- |
|
|
|
333 |
|
Total revenues |
|
|
839 |
|
|
|
3,344 |
|
|
|
4,183 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Costs and expenses: |
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
1,166 |
|
|
|
2,079 |
|
|
|
3,245 |
|
Cost of sales, services revenue |
|
|
- |
|
|
|
233 |
|
|
|
233 |
|
General and administrative |
|
|
21,233 |
|
|
|
3,291 |
|
|
|
24,524 |
|
Depreciation |
|
|
1,101 |
|
|
|
46 |
|
|
|
1,147 |
|
Total costs and expenses |
|
|
23,500 |
|
|
|
5,649 |
|
|
|
29,149 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating (loss) income |
|
$ | (22,661 |
) |
|
$ | (2,305 |
) |
|
$ | (24,966 |
) |
35
Table of Contents
Cadiz Inc.
|
|
Nine Months Ended September 30, 2025 |
|
|||||||||
|
|
|
|
|
|
Water |
|
|
|
|
|
|
|
|
Land and Water |
|
|
Treatment |
|
|
|
|
|
||
(in thousands) |
|
Resources |
|
|
Technology |
|
|
Total |
|
|||
|
|
|
|
|
|
|
|
|
|
|
|
|
Revenues: |
|
|
|
|
|
|
|
|
|
|
|
|
Sales revenue |
|
$ | 777 |
|
|
$ | 9,926 |
|
|
$ | 10,703 |
|
Services revenue |
|
|
- |
|
|
|
192 |
|
|
|
192 |
|
Rental income |
|
|
334 |
|
|
|
- |
|
|
|
334 |
|
Total revenues |
|
|
1,111 |
|
|
|
10,118 |
|
|
|
11,229 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Costs and expenses: |
|
|
|
|
|
|
|
|
|
|
|
|
Cost of sales, sales revenue (exclusive of depreciation shown separately below) |
|
|
2,098 |
|
|
|
5,597 |
|
|
|
7,695 |
|
Cost of sales, services revenue |
|
|
- |
|
|
|
63 |
|
|
|
63 |
|
General and administrative |
|
|
17,877 |
|
|
|
2,891 |
|
|
|
20,768 |
|
Depreciation |
|
|
884 |
|
|
|
25 |
|
|
|
909 |
|
Total costs and expenses |
|
|
20,859 |
|
|
|
8,576 |
|
|
|
29,435 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Operating (loss) income |
|
$ | (19,748 |
) |
|
$ | 1,542 |
|
|
$ | (18,206 |
) |
We incurred an operating loss of $25.0 million in the nine months ended September 30, 2026, compared to a $18.2 million operating loss during the nine months ended September 30, 2025. The higher operating loss in 2026 was primarily due to decreased gross profits from ATEC driven by reduced filter sales. Net loss for the nine months ended September 30, 2026 was $34.3 million compared to a $24.4 million net loss during the nine months ended September 30, 2025.
Revenues Revenue totaled $4.2 million during the nine months ended September 30, 2026, primarily related to ATEC sales totaling $3.3 million, sales from the harvest from our 890 acres of commercial alfalfa crop totaling $0.5 million and rental income from our agricultural leases totaling $0.3 million. Revenue totaled $11.2 million during the nine months ended September 30, 2025, primarily related to ATEC sales totaling $10.1 million, sales from the harvest from our 890 acres of commercial alfalfa crop totaling $0.8 million and rental income from our agricultural leases totaling $0.3 million. The decrease in ATEC revenues primarily reflects a lower volume of filters shipped in 2026 compared to 2025. Filter revenues in 2025 primarily related to an unusually large project for the Central Utah Water Conservancy District’s Vineyard Wellfield Groundwater Polishing Project.
Cost of Sales Cost of sales totaled $3.5 million during the nine months ended September 30, 2026, which comprised of $2.3 million related to ATEC (30.9% gross margin) and $1.2 million related to our alfalfa crop harvest. Cost of sales totaled $7.8 million during the nine months ended September 30, 2025, which comprised of $5.7 million related to ATEC (44.1% gross margin) and $2.1 million related to our alfalfa crop harvest. The decrease in ATEC gross margin is primarily driven by spreading the fixed costs of manufacturing filters included in cost of sales over a reduced number of filters sold.
36
Table of Contents
Cadiz Inc.
General and Administrative Expenses General and administrative expenses, exclusive of stock-based compensation costs, totaled $19.1 million in the nine months ended September 30, 2026, compared to $16.9 million in the nine months ended September 30, 2025. The increase in 2026 was primarily a result of increased legal and consulting fees incurred in advancing the development of the Mojave Groundwater Bank. General and administrative expense for ATEC totaled $3.3 million during the nine months ended September 30, 2026 compared with $2.9 million for the same period in 2025. The increase in ATEC costs was primarily related to increased salaries and benefits and marketing expenses.
Compensation costs for stock and option awards for the nine months ended September 30, 2026, were $5.5 million, compared to $3.8 million for the nine months ended September 30, 2025. The higher 2026 expense was primarily due to stock-based non-cash awards to employees and consultants.
Depreciation Depreciation expense totaled $1.1 million during the nine months ended September 30, 2026, compared to $0.9 million during the nine months ended September 30, 2025.
Interest Expense, net Net interest expense totaled $8.5 million during the nine months ended September 30, 2026 compared to $6.2 million during the same period in 2025. The following table summarizes the components of net interest expense for the two periods (in thousands):
|
|
Nine Months Ended |
|
|||||
|
|
September 30, |
|
|||||
|
|
2026 |
|
|
2025 |
|
||
|
|
|
|
|
|
|
|
|
Cash interest on outstanding debt |
|
$ | 2,774 |
|
|
$ | 1,143 |
|
PIK interest on outstanding debt |
|
|
2,224 |
|
|
|
2,072 |
|
Interest added to lease obligation |
|
|
2,544 |
|
|
|
2,301 |
|
Amortization of debt discount |
|
|
1,833 |
|
|
|
1,128 |
|
Capitalized Interest |
|
|
(554 |
) |
|
|
- |
|
Finance expense |
|
|
18 |
|
|
|
- |
|
Interest income |
|
|
(159 |
) |
|
|
(300 |
) |
Other income |
|
|
(133 |
) |
|
|
(163 |
) |
|
|
|
|
|
|
|
|
|
|
|
$ | 8,547 |
|
|
$ | 6,181 |
|
Increased interest expense is primarily due to borrowings under the Lytton Credit Agreement. Interest income primarily relates to interest on investments in short-term deposits.
Liquidity and Capital Resources
Current Financing Arrangements
To date, our water, agricultural, and groundwater filtration businesses have not generated enough revenue or gross profit to meet our liquidity needs or fund our operating and development expenditures. As a result, we have historically funded our operations and the development of the Mojave Groundwater Bank primarily through debt financing arrangements and sales of our equity securities. We expect to continue relying on outside financing until our operations generate sufficient cash flow, and we cannot assure you that such financing will be available when needed, on acceptable terms, or at all. For a discussion of risks related to our liquidity and capital resources, see Part I, Item 1A, “Risk Factors,” in our Annual Report on Form 10-K for the year ended December 31, 2025.
37
Table of Contents
Cadiz Inc.
Equity Offerings
On March 7, 2025, we completed the sale and issuance of 5,715,000 shares of our common stock to certain institutional investors in a registered direct offering (“March 2025 Direct Offering”). The shares of common stock were sold at a purchase price of $3.50 per share, for aggregate gross proceeds of approximately $20.0 million and aggregate net proceeds of approximately $18.3 million.
The proceeds from the March 2025 Direct Offering were used for capital and other expenses related to the development and construction of the Mojave Groundwater Bank, operating and development costs, and general corporate purposes.
On October 30, 2026, we completed the sale and issuance of 5,000,000 shares of our common stock to certain institutional investors in a registered direct offering (“October 2026 Direct Offering”). The shares of common stock were sold at a purchase price of $4.20 per share, for aggregate gross proceeds of approximately $21.0 million and aggregate net proceeds of approximately $20.0 million. The proceeds from the October 2026 Direct Offering will be used for capital and other expenses related to the development and construction of the Mojave Groundwater Bank, operating and development costs, and general corporate purposes.
Debt Offerings
In July 2021, we entered into a $50 million new credit agreement (“Credit Agreement”) (see Note 3 to the Condensed Consolidated Financial Statements – “Long-Term Debt”). The proceeds of the Credit Agreement, together with the proceeds from a depositary share offering, were used to (a) to repay all our outstanding senior secured debt obligations in the amount of approximately $77.6 million, (b) to deposit approximately $10.2 million into a segregated account, representing an amount sufficient to pre-fund eight quarterly dividend payments on the Series A Preferred Stock underlying depositary shares issued in a depositary share offering, and (c) to pay transaction related expenses. The remaining proceeds were used for operating and development costs and for general corporate purposes.
On February 2, 2023, we entered into a First Amendment to Credit Agreement to amend certain provisions of the Credit Agreement (“First Amended Credit Agreement), Under the First Amended Credit Agreement, the lenders will have a right to convert up to $15 million of outstanding principal, plus any PIK interest and any accrued and unpaid interest (the “Convertible Loan”) into shares of our common stock at a conversion price of $4.80 per share (the “Conversion Price”). In addition, prior to the maturity of the Credit Agreement, we have the right to require that the lenders convert the outstanding principal amount, plus any PIK Interest and accrued and unpaid interest, of the Convertible Loan if the following conditions are met: (i) the average VWAP of the Company’s common stock on The Nasdaq Stock Market, or such other national securities exchange on which the shares of common stock are listed for trading, over 30 consecutive trading dates exceeds 115% of the then Conversion Price and (ii) there is no event of default under certain provisions of the Credit Agreement.
Under the First Amended Credit Agreement, the maturity date of the Credit Agreement was extended from July 2, 2024 to June 30, 2026.
38
Table of Contents
Cadiz Inc.
On March 6, 2024, we entered into a Third Amendment to Credit Agreement and First Amendment to Security Agreement (“Third Amended Credit Agreement”) with HHC $ Fund 2012 (“Heerema”) (see Note 3 to the Condensed Consolidated Financial Statements – “Long-Term Debt”). Before entering into the Third Amended Credit Agreement, Heerema purchased the outstanding secured non-convertible term loans under the Credit Agreement (“Assignment”). In connection with the Assignment, the existing holders of both the Convertible Loan and non-convertible term loans consented to effectuate the Third Amended Credit Agreement in consideration of a consent fee in the aggregate amount of $479,845 payable in the form of our common stock (valued at $2.89 per share, or 166,036 shares), which was registered pursuant to an effective shelf registration statement on Form S-3 and a prospectus supplement thereunder. The Third Amended Credit Agreement provides, among other things, (a) a new tranche of senior secured convertible terms loans from Heerema in an aggregate principal amount of $20 million, having a maturity date of June 30, 2027 (“New Secured Convertible Debt”); (b) the aggregate principal amount of the secured non-convertible term loans acquired by Heerema has been increased from $20 million to $21.2 million and the applicable repayment fee in respect thereof has been eliminated; (c) the Convertible Loan existing prior to the Third Amended Credit Agreement, in an aggregate principal amount of approximately $16 million plus interest accruing thereon, has become unsecured; and (d) extension of the maturity date for the existing Convertible Loan and non-convertible loans to June 30, 2027. On August 12, 2026, the maturity date of each of these loans was extended to June 30, 2028 (see Note 3 to the Condensed Consolidated Financial Statements – “Long-Term Debt”).
The annual interest rate remains unchanged at 7.00%. Interest on $21.2 million of the remaining principal amount will be paid in cash. Interest on the aggregate $36 million principal amount of the New Secured Convertible Debt and existing Convertible Loan is paid in kind on a quarterly basis.
On October 27, 2025, we entered into the Lytton Credit Agreement, pursuant to which Lytton provided the first tranche of capital (the “Tribal Investment”) for construction of the Mojave Groundwater Bank. Under the Lytton Credit Agreement, the Company at its election may draw, as an unsecured term loan, up to $51 million in one or more installments beginning on the Effective Date and ending April 30, 2027. The unsecured term loan bears interest at a fixed rate of 8% per annum, payable quarterly in arrears on March 31, June 30, September 30, and December 31 of each year. Interest may be paid in cash or, upon mutual agreement between us and Lytton, in shares of our common stock determined in accordance with the Lytton Credit Agreement. The Tribal Investment matures on April 30, 2031 (“Initial Maturity Date”) which may be extended to April 30, 2036 if any principal amount remains outstanding as of the Initial Maturity Date.
In connection with the Lytton Credit Agreement, the Company agreed to issue shares of its common stock to Lytton as follows:
|
● |
upon execution of the Lytton Credit Agreement, a commitment fee of 600,000 shares; |
|
● |
on each funding date, a funding fee of 25,000 shares per $1 million of principal amount funded; and |
|
● |
in the event the Tribal Investment is extended beyond the Initial Maturity Date, an extension fee of 800,000 shares. |
At any time following the funding of the full $51 million Tribal Investment amount under the Lytton Credit Agreement, at Lytton’s election, any outstanding principal and accrued interest of the Tribal Investment may be converted into a contractual right to receive a share of future cash flows from our water-storage rights (the “Storage Cash Flows Right”), which will entitle Lytton to receive 51% of the cash flows generated from our water-storage operations, provided that Lytton contributes the Storage Cash Flows Right to MWI, our special purpose entity formed to construct, own and operate the Mojave Groundwater Bank, in exchange for an ownership interest in MWI alongside other expected equity investors in MWI on the same economic terms.
39
Table of Contents
Cadiz Inc.
The proceeds from the Tribal Investment will be used to fund the construction, development, ownership, operation, and other ongoing costs of the Mojave Groundwater Bank, and to reimburse our expenses related thereto. We made an initial draw of $15 million for reimbursement of Mojave Groundwater Bank project expenses and to support development activities in November 2025, a second draw of $15 million in March 2026, a third draw of $10 million in August 2026, and a fourth draw of $11 million in November 2026 (see Note 3 to the Consolidated Financial Statements – “Long-Term Debt”).
Limitations on our liquidity and ability to raise capital may adversely affect us. Sufficient liquidity is critical to meet our resource development activities. To the extent additional capital is required, we may increase liquidity through a variety of means, including equity or debt placements, through the lease, sale or other disposition of assets or reductions in operating costs. If additional capital is required, no assurances can be given as to the availability and terms of any new financing.
As we continue to actively pursue our business strategy, additional financing will continue to be required (see “Outlook”, below). The covenants in the Credit Agreement, as amended, do not prohibit our use of additional equity financing and allow us to retain 100% of the proceeds of any common equity financing. We do not expect the loan covenants to materially limit our ability to finance our water and agricultural development activities.
Cash Used in Operating Activities. Cash used in operating activities totaled $20.2 million for the nine months ended September 30, 2026 and $12.0 million for the nine months ended September 30, 2025. Cash used in 2026 included a $2.5 million refundable performance and reclamation bond deposited with BLM in connection with the FLPMA ROW Grant, as well as payments for general and administrative expenses related to our water development efforts, agricultural development efforts, and our ATEC business, including working capital needs. The increase also reflected increased cash losses from operations, primarily resulting from reduced ATEC filter sales and corresponding working capital activity.
Cash Used in Investing Activities. Cash used for investing activities for the nine months ended September 30, 2026, was $3.4 million, compared with $11.3 million for the nine months ended September 30, 2025. Cash used in 2026 was primarily related to engineering design costs for the Mojave Groundwater Bank project. Cash used in 2025 was primarily related to securing an exclusive option to purchase up to 180 miles of steel pipeline for $5.0 million, costs to convert three wells to natural gas of $3.5 million, and pipe inspection costs of $1.2 million for the Northern Pipeline.
Cash Provided by Financing Activities. Cash provided by financing activities totaled $20.9 million for the nine months ended September 30, 2026, compared with cash provided by financing activities of $13.0 million for the nine months ended September 30, 2025. Proceeds from the financing activities in the 2026 period primarily related to the second draw of $15 million and the third draw of $10 million under the Lytton Credit Agreement in March 2026 and August 2026, respectively. Proceeds from financing activities for the 2025 period primarily related to the issuance of shares under a direct offering.
Outlook
Short-Term Outlook. We believe that the approximately $20 million in net proceeds from the October 2026 Direct Offering, the $11 million drawn in November 2026 under the Lytton Credit Agreement, and cash on hand provide us with sufficient funds to meet our operating and development costs related to the Mojave Groundwater Bank and our agricultural operations for at least the next twelve months. Our ATEC operations are expected to be funded through operating income from its own operations.
40
Table of Contents
Cadiz Inc.
Long-Term Outlook. Over the longer term, we may need to raise additional capital to fund our operating and development costs and capital expenditures (see “Current Financing Arrangements,” above). The amount and timing of our operating and development costs will depend largely on the steps we take to entitle and develop our water supply, storage, and conveyance assets, and on other initiatives we may pursue, including energy projects related to the Mojave Groundwater Bank. Our capital expenditures will depend primarily on the progress of the Mojave Groundwater Bank, including the funding of MWI. Our need for additional capital will also be affected by the operating results of our agricultural operations and our ATEC subsidiary; the timing and amount of any reimbursement of development costs we have advanced for the Mojave Groundwater Bank; and the timing and amount of any funds we receive in connection with the anticipated transfer of assets to MWI.
We evaluate our cash requirements, and how best to meet them, on an ongoing basis. We may meet future cash requirements through a variety of means, including issuing equity, equity-linked or debt securities, entering into other financing arrangements, or selling or otherwise disposing of assets. We intend to limit equity issuances to the amounts we consider necessary in order to minimize dilution to our existing stockholders. No assurances can be given, however, that additional financing will be available when needed, on acceptable terms, or at all. Maintaining sufficient liquidity is critical to our ability to continue our resource development activities, and any inability to raise needed capital could require us to delay, scale back, or modify those activities, which could adversely affect our business, financial condition, and results of operations. For a discussion of risks related to our liquidity and capital resources, see Part I, Item 1A, “Risk Factors,” in our Annual Report on Form 10-K for the year ended December 31, 2025.
Recent Accounting Pronouncements
See Note 1 to the Condensed Consolidated Financial Statements – “Basis of Presentation”.
ITEM 3. Quantitative and Qualitative Disclosures about Market Risk
We are a smaller reporting company as defined by Reg. 240.12b-2 of the Securities and Exchange Act of 1934 and are not required to provide the information under this item.
ITEM 4. Controls and Procedures
Disclosure Controls and Procedures
The Company established disclosure controls and procedures to ensure that material information related to the Company, including its consolidated entities, is accumulated and communicated to senior management, including the Chief Executive Officer (the “Principal Executive Officer”) and Chief Financial Officer (the “Principal Financial Officer”) and to its Board of Directors. Based on their evaluation as of September 30, 2026, the Company's Principal Executive Officer and Principal Financial Officer have concluded that the Company's disclosure controls and procedures (as defined in Rules 13a-15(e) and 15d-15(e) under the Securities Exchange Act of 1934) are effective to ensure that the information required to be disclosed by the Company in the reports that it files or submits under the Securities Exchange Act of 1934 is recorded, processed, summarized and reported within the time periods specified in Securities and Exchange Commission rules and forms, and such information is accumulated and communicated to management, including the principal executive and principal financial officers as appropriate, to allow timely decisions regarding required disclosures.
41
Table of Contents
Cadiz Inc.
Changes in Internal Controls Over Financial Reporting
In connection with the evaluation required by paragraph (d) of Rule 13a-15 under the Exchange Act, there was no change identified in the Company's internal control over financial reporting that occurred during the last fiscal quarter that has materially affected, or is reasonably likely to materially affect, the Company's internal control over financial reporting.
Because of the inherent limitations of internal control over financial reporting, including the possibility of collusion or improper management override of controls, material misstatements due to error or fraud may not be prevented or detected on a timely basis. Also, projections of any evaluation of the effectiveness of the internal control over financial reporting to future periods are subject to the risk that the controls may become inadequate because of changes in conditions, or that the degree of compliance with the policies or procedures may deteriorate.
42
Table of Contents
Cadiz Inc.
PART II - OTHER INFORMATION
ITEM 1. Legal Proceedings
As noted under Item 1A, “Risk Factors,” in the Company’s Annual Report on Form 10-K for the year ended December 31, 2025,third parties may file litigation in state or federal court challenging the approval of an infrastructure project.
On July 28, 2026, two lawsuits were filed in the U.S. District Court for the Central District of California, one by the National Parks Conservation Association and others and one by the Center for Biological Diversity and others, challenging BLM’s approval of and seeking to vacate the FLPMA ROW Grant. The FLPMA ROW Grant remains in effect. Neither the Company nor FGMWC is a party to the lawsuits. The United States, represented by the Department of Justice, filed its response in the Center for Biological Diversity case on October 6, 2026, and in the National Parks Conservation Association case on October 9, 2026, denying all of the plaintiffs’ substantive claims in both cases.
The cases are not consolidated. A scheduling conference with the judge is set for November 19, 2026, in the Center for Biological Diversity case. A separate scheduling conference with the judge in the National Parks Conservation Association case is set for February 1, 2027. The Company cannot predict the outcome of the lawsuits. If the FLPMA ROW Grant were vacated, the Company would derecognize the related right-of-use asset and lease liability to the extent FGMWC’s rights and obligations under the grant ended, and the Northern Pipeline conversion could be delayed.
There have been no other material changes to legal proceedings described in our Annual Report on Form 10-K for the year ended December 31, 2025.
ITEM 1A. Risk Factors
There have been no material changes to the risk factors described in our Annual Report on Form 10-K for the year ended December 31, 2025.
ITEM 2. Unregistered Sales of Equity Securities and Use of Proceeds
Not applicable.
ITEM 3. Defaults Upon Senior Securities
Not applicable.
ITEM 4. Mine Safety Disclosures
Not applicable.
43
Table of Contents
Cadiz Inc.
ITEM 5. Other Information
| a. | Information required under Form 8K. |
None
| b. | Modifications to nomination process. |
None.
| c. | Insider trading arrangements. |
During the three months ended September 30, 2026, no director or officer of the Company adopted or terminated a “Rule 10b5-1 trading arrangement” or “non-Rule 10b5-1 trading arrangement,” as each term is defined in Item 408(a) of Regulation S-K.
44
Table of Contents
Cadiz Inc.
ITEM 6. Exhibits
The following exhibits are filed or incorporated by reference as part of this Quarterly Report on Form 10-Q.
|
**4.1 | Amendment No 1 to Common Stock Purchase Warrant |
|
|
|
|
**10.1 | Employment Agreement, dated as of July 27, 2026, by and between Cadiz Inc. and Jacinto J. Henandez |
|
|
|
|
**10.2 | Separation Agreement, dated as of July 27, 2026, by and between Cadiz Inc. and Stanley E. Speer |
|
|
|
|
**10.3> | Amended Construction Management At-Risk Agreement, dated July 27, 2026, by and between Fener Gap Mutual Water Company and W.M. Lyles Co. |
|
|
|
|
**10.4 | Construction Management At-Risk Agreement, dated July 27, 2026, by and between Fenner Gap Mutual Water Company and Mike Bubalo Construction Co., Inc. |
|
|
|
|
**10.5 | Fifth Amendment to the Credit Agreement, dated as of August 12, 2026, by and among Cadiz Inc. and Cadiz Real Estate LLC as borrowers, the lenders from time-to-time party thereto, and Alter Domus (US) LLC, as administrative agent |
|
|
|
|
**10.6 | Placement Agent Agreement, dated as of October 29, 2026, by and between the Company and Roth Capital Partners, LLC |
|
|
|
|
*31.1 |
Certification of Susan Kennedy, Chief Executive Officer of Cadiz Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 |
|
|
|
|
*31.2 |
Certification of Jacinto Hernandez, Chief Financial Officer and Secretary of Cadiz Inc. pursuant to Section 302 of the Sarbanes-Oxley Act of 2002 |
|
|
|
|
*32.1 |
Certification of Susan Kennedy, Chief Executive Officer of Cadiz Inc. pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 |
|
|
|
|
*32.2 |
Certification of Jacinto Hernandez, Chief Financial Officer and Secretary of Cadiz Inc. pursuant to 18 U.S.C. Section 1350, as adopted pursuant to Section 906 of the Sarbanes-Oxley Act of 2002 |
|
|
|
| * 101.INS | Inline XBRL Instance Document (the Instance Document does not appear in the Interactive Data File because its XBRL tags are embedded within the Inline XBRL document) | |
|
|
|
| * 101.SCH | Inline XBRL Taxonomy Extension Schema Document | |
|
|
|
| * 101.CAL | Inline XBRL Taxonomy Extension Calculation Linkbase Document | |
|
|
|
| * 101.DEF | Inline XBRL Extension Definition Linkbase Document | |
|
|
|
| * 101.LAB | Inline XBRL Taxonomy Extension Label Linkbase Document | |
|
|
|
| * 101.PRE | Inline XBRL Taxonomy Extension Presentation Linkbase Document | |
|
|
|
| 104 | Cover Page Interactive Data File (formatted as Inline XBRL and contained in Exhibit 101) | |
* |
Filed concurrently herewith. |
** |
Previously filed. |
45
Table of Contents
Cadiz Inc.
SIGNATURE
Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Cadiz Inc.
|
By:
|
/s/ Susan Kennedy
|
|
November 16, 2026 |
|
|
Susan Kennedy |
|
Date
|
|
|
Chief Executive Officer |
|
|
|
|
(Principal Executive Officer) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
By:
|
/s/ Jacinto Hernandez
|
|
November 16, 2026 |
|
|
Jacinto Hernandez |
|
Date
|
|
|
Chief Financial Officer and Secretary |
|
|
|
|
(Principal Financial Officer) |
|
|
|
46