Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
8-K

Rhea-AI Filing Summary

Dakota Gold Corp. announced a pre-feasibility study for its Richmond Hill Gold Project in South Dakota, outlining a conventional open-pit mine and crushed-ore heap-leach operation. The study estimates 131.8 million tons of Proven and Probable Mineral Reserves, containing approximately 2.16 million ounces of gold and 25.4 million ounces of silver. The mine plan models approximately 45,000 tons per day and a planned nine-year mine life; scheduled gold and silver recoveries are estimated at 72.4% and 18.0%.

At base-case prices of $3,500 per ounce of gold and $50 per ounce of silver, the study estimates approximately $2.0 billion in after-tax NPV at 5%, a 70.7% after-tax IRR and a 1.4-year after-tax payback. Estimated initial capital is $538 million and sustaining capital is $133 million. The study recommends advancing to a feasibility study, with a $11.0 million work program excluding owner's costs and permitting activities. The Qualified Person identified limited metallurgical sampling coverage as a Mineral Reserve risk; receipt and timing of required permits remain subject to agency review and other processes.

1 point · 1 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 0 points

Hollow bars mark forward-looking points. How the balance works

Positive

  • Major point. Forward-looking: it has not happened yet and may not happen.The Richmond Hill PFS estimates approximately $2.0 billion in after-tax NPV at 5% at its stated base-case metal prices.

Negative

  • None.
Item 7.01 Regulation FD Disclosure Disclosure
Material non-public information disclosed under Regulation Fair Disclosure, often investor presentations or guidance.
Item 8.01 Other Events Other
Voluntary disclosure of events the company deems important to shareholders but not covered by other items.
Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, or exhibit attachments filed with this report.
Proven and Probable Mineral Reserves 131.8 million tons Richmond Hill PFS estimate
Contained gold approximately 2.16 million ounces Proven and Probable Mineral Reserves
Contained silver 25.4 million ounces Proven and Probable Mineral Reserves
Planned throughput approximately 45,000 tons per day Open-pit mine plan
After-tax NPV at 5% approximately $2.0 billion PFS base case; gold at $3,500 per ounce and silver at $50 per ounce
After-tax IRR 70.7% PFS base case
Initial capital approximately $538 million PFS estimate, including $84 million in contingency
Sustaining capital approximately $133 million PFS estimate over the life of mine
Proven and Probable Mineral Reserves technical
"131.8 million tons of Proven and Probable Mineral Reserves"
Proven and probable mineral reserves are the amounts of a mine’s minerals that engineers estimate can be economically extracted with current technology and market conditions; “proven” denotes high-confidence quantities based on detailed testing, while “probable” denotes lower-confidence but still likely quantities. For investors, these categories act like a company’s usable inventory — they underpin production forecasts, revenue estimates and lending or valuation decisions, and signal how certain future cash flows from the resource are.
heap-leach technical
"crushed-ore heap-leach operation"
Heap leach is a mining method that extracts metals (often gold, copper or silver) by stacking crushed ore on a lined pad and trickling a chemical solution through it so dissolved metals can be collected and processed—like steeping tea to pull flavor from leaves. Investors care because heap leaching typically lowers upfront costs and boosts recoverable output but also brings variable recovery rates, capital needs, and environmental or permitting risks that affect a mine’s profitability and schedule.
P80 technical
"selected ½-inch P80 crush size"
p80 denotes the value at which 80% of a measured population is below that size or level — most often used for particle-size distributions to mean the particle diameter that 80% of material passes through. Investors care because p80 is a quick indicator of product consistency, processing efficiency and potential yield or recovery: changes can signal shifts in manufacturing quality, downstream costs or regulatory compliance, much like knowing the 80th percentile height in a group helps you understand overall variation.
cyanide-soluble gold to fire-assay gold ratio (CN/FA) technical
"cyanide-soluble gold to fire-assay gold ratio (CN/FA)"
net smelter return (NSR) financial
"NSR values vary over the production schedule"
A net smelter return (NSR) is a royalty payment equal to a fixed percentage of the money received from selling mined metals after they have been processed and refined; it’s calculated on the final proceeds rather than on the raw ore. For investors, NSRs matter because they create a predictable, passive revenue stream tied to metal sales—like receiving a slice of the final sale price after a craftsman turns raw material into a finished product—affecting valuation, cash flow and risk exposure to production and metal prices.
after-tax NPV financial
"after-tax NPV 5% of approximately $2.0 billion"
After-tax NPV is the calculation that converts a series of future cash flows into a single present-day value after subtracting the taxes those cash flows will incur. It tells investors whether an investment or project is expected to add value once taxes and the time value of money are taken into account—like comparing the worth today of several future paychecks after the taxman takes his cut. This helps compare options on a common basis and decide which opportunities are likely to increase shareholder value.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much gold and silver is in DC's Richmond Hill reserve estimate?

The PFS estimates 131.8 million tons of Proven and Probable Mineral Reserves, containing approximately 2.16 million ounces of gold and 25.4 million ounces of silver.

What economics does DC's Richmond Hill pre-feasibility study estimate?

At base-case prices of $3,500 per ounce of gold and $50 per ounce of silver, it estimates approximately $2.0 billion in after-tax NPV at 5%, a 70.7% after-tax IRR and a 1.4-year after-tax payback.

How much is the Richmond Hill feasibility-study work program?

The recommended work program totals approximately $11.0 million, excluding owner's costs and permitting activities. Permitting and regulatory support is separately estimated at approximately $0.5 million to $0.75 million.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
false 0001852353 0001852353 2026-11-23 2026-11-23 iso4217:USD xbrli:shares iso4217:USD xbrli:shares

 

 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
WASHINGTON, D.C. 20549

 

 

 

FORM 8-K

 

 

 

CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

 

Date of Report (Date of earliest event reported): November 23, 2026

 

 

 

DAKOTA GOLD CORP.
(Exact name of registrant as specified in its charter)

 

 

 

Delaware 001-41349 85-3475290
(State or other jurisdiction of
incorporation)
(Commission
File Number)
(I.R.S. Employer
Identification No.)
     

106 Glendale Drive, Suite A

Lead, South Dakota, United States 57754

(Address of principal executive offices) (Zip Code)

 

(605) 906-8363

(Registrant's telephone number,
including area code)

 

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

 

¨Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

 

¨Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

 

¨Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

 

¨Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class   Trading Symbol(s)   Name of each exchange on which registered
Common Stock, par value $0.001 per share   DC   NYSE American LLC

 

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).

 

Emerging growth company                 x

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.       ¨

 

 

 

 

Item 7.01Regulation FD Disclosure.

 

On November 23, 2026, Dakota Gold Corp. (the “Company”) issued a press release announcing the results and publication of an S-K 1300 Pre-Feasibility Study and Technical Report Summary for the Company’s Richmond Hill Gold Project (the “Pre-Feasibility Study”). The Pre-Feasibility Study, dated November 23, 2026, with an effective date of November 23, 2026, was prepared in accordance with Item 1300 of Regulation S-K. A copy of the press release is furnished with this Current Report on Form 8-K as Exhibit 99.1. On November 23, 2026, the Company will host a webcast to discuss the results of the Pre-Feasibility Study. A copy of the presentation to be used during the webcast is furnished as Exhibit 99.2 to this Current Report on Form 8-K.

 

In accordance with General Instruction B.2 of Form 8-K, the information set forth in this Item 7.01 and in Exhibits 99.1 and 99.2 is deemed to be “furnished” and shall not be deemed to be “filed” for the purposes of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), and shall not be incorporated by reference into any registration statement or other document filed under the Securities Act of 1933, as amended or the Exchange Act, except as shall be expressly set forth by specific reference in such filing.

 

Item 8.01Other Events.

 

A copy of the Pre-Feasibility Study is attached as Exhibit 96.1 to this Current Report on Form 8-K, together with the consents of the qualified persons as Exhibit 23.1 through 23.6. The Pre-Feasibility Study supersedes the initial assessment technical report summaries for the Richmond Hill Gold Project with effective dates of February 3, 2025 and July 7, 2025, previously filed by the Company.

 

Item 9.01Financial Statements and Exhibits

 

(d)Exhibits

 

Exhibit No.   Description  
23.1 Consent of Qualified Person – M3 Engineering and Technology Corp.
23.2 Consent of Qualified Person – M3 Engineering and Technology Corp.
23.3 Consent of Qualified Person – Independent Mining Consultants, Inc.
23.4 Consent of Qualified Person – Forte Dynamics
23.5 Consent of Qualified Person – RESPEC Company, LLC
23.6 Consent of Qualified Person – Call & Nicholas, Inc.
96.1 S-K 1300 Pre-Feasibility Study for the Richmond Hill Gold Project
99.1 Press Release, dated November 23, 2026 
99.2 Webcast Presentation, dated November 23, 2026
104  Cover Page Interactive Data File (embedded within the Inline XBRL document) 

 

 

 

 

SIGNATURE

 

Pursuant to the requirements of the Securities Exchange Act of 1934, as amended, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

  DAKOTA GOLD CORP.
   
  /s/ Shawn Campbell
  Name: Shawn Campbell
  Title: Chief Financial Officer

 

Date: November 23, 2026

 

 

 

 

Exhibit 96.1

 

Richmond Hill Project

 

M3-PN240322

 

 

Matthew Sletten, P.E.
Benjamin Bermudez, P.E.
Michael G. Hester, FAusIMM
Barry Carlson, P.E.
Crystal Hocking, P.E. P.G.
Michael C. Conley (SME – RM)

 

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Signature Page

 

The effective date of the Mineral Resource estimate is November 23, 2026.

 

Qualified Person Report Section(s) of Responsibility Signature
Matthew Sletten, P.E. 1, 1.14, 2, 15, 15.1-15.3, 16, 21, 22, 22.1, 22.3, 22.4, 23, 23.1, 24, 25

/s/ Matthew Sletten

Date: November 23, 2026

Benjamin Bermudez, P.E. 1.8, 1.9, 1.11-1.13, 14, 18, 18.1-18.3, 18.5-18.6, 19

/s/ Benjamin Bermudez

Date: November 23, 2026

Michael G. Hester, FAusIMM 1.1-1.3, 1.5-1.7, 3-9, 11, 12, 13, 13.1, 13.3-13.6, 18.4, 18.7, 20

/s/ Michael G. Hester

Date: November 23, 2026

Barry Carlson, P.E. 1.4, 9.2, 10, 22.2, 23.2, 23.3

/s/ Barry Carlson

Date: November 23, 2026

Crystal Hocking, P.E. P.G. 1.10, 13.7, 15.4, 17, 23.4,

/s/ Crystal Hocking

Date: November 23, 2026

Michael C. Conley (SME – RM) 1.7.1, 7.7, 13.2

/s/ Michael C. Conley

Date: November 23, 2026

 

Page 2 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

RICHMOND Hill Project

S-K 1300 Technical Report

 

Table of Contents

 

SECTION PAGE
   
SIGNATURE PAGE 2
Table of Contents 3
List of Figures and Illustrations 11
List of Tables 14
1 Executive Summary 17
  1.1 Geology and Mineralization 19
  1.2 Exploration, Development, and Operations 20
  1.3 Sample Preparation, Analysis, Security, and Data Verification 20
  1.4 Mineral Processing and Metallurgical Testing 20
  1.5 Mineral Resource Estimate 22
  1.6 Mineral Reserve Estimate 24
  1.7 Mining Methods 24
    1.7.1 Geotechnical 25
  1.8 Recovery Methods 25
  1.9 Heap Leach Facility 26
  1.10 Environmental 26
  1.11 Capital Cost Summary 26
  1.12 Operating Cost Summary 27
  1.13 Economic Analysis Summary 27
  1.14 Conclusion and Recommendations 27
2 Introduction 30
  2.1 Registrant 30
  2.2 Project Scope and Terms of Reference 30
  2.3 Qualified Persons 32
  2.4 Date 32
  2.5 Sources of Information 32
  2.6 Previous Technical Report Summaries 32
  2.7 Acronyms and Abbreviations 33
  2.8 Units of Measure and Metric Equivalents 37

 

Page 3 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

3 Property Description 38
  3.1 Project Location 38
  3.2 Ownership 38
  3.3 Mineral Tenure Holdings 38
  3.4 Richmond Hill Option Agreement 46
  3.5 Surface Rights 47
  3.6 Water Rights 47
  3.7 Royalties 47
  3.8 Permitting 59
    3.8.1 Existing Permitting 59
    3.8.2 Future Permitting 60
  3.9 Potential Significant Encumbrances 62
  3.10 Violation and Fines 63
  3.11 Significant Factors and Risks That May Affect Access, Title or Work Programs 63
4 Accessibility, Climate, Local Resources, Infrastructure and Physiography 64
  4.1 Topography, Elevation, and Vegetation 64
  4.2 Property Access 65
  4.3 Climate 65
  4.4 Local Resources and Infrastructure 65
5 History 67
  5.1 Explorations 67
  5.2 Mining 69
  5.3 Dakota Gold Corp 70
6 Geological Setting, Mineralization, and Deposit 71
  6.1 Regional Geology 71
  6.2 Local/Property Geology 73
    6.2.1 Lithology 74
    6.2.2 Structure 76
    6.2.3 Deposit Geology 77
  6.3 Deposit Types 81
  6.4 Mineralization 81
7 Exploration 82
  7.1 Airborne Geophysics 82
  7.2 Gravity Compilation and Survey 83
  7.3 Induced Polarization Survey 85
  7.4 Geological Mapping 86

 

Page 4 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  7.5 Drilling 88
    7.5.1 Summary 88
    7.5.2 Freeport (1981 – 1983) 90
    7.5.3 St. Joe, Bond Gold, and Homestake (1984 – 1994) 90
    7.5.4 Coeur (2019 – 2020) 90
    7.5.5 Dakota Gold (2022 – 2026) 91
    7.5.6 Opinion 95
  7.6 Hydrogeology 95
    7.6.1 Hydrogeologic Setting 96
    7.6.2 Baseline Water Quality Monitoring 96
    7.6.3 Baseline Water Quality 100
    7.6.4 Conceptual Hydrogeologic Model 100
    7.6.5 Groundwater Modeling 100
    7.6.6 Qualified Person’s Hydrogeology Conclusion 100
  7.7 Geotechnical 100
    7.7.1 Geology 100
    7.7.2 Geotechnical Drilling 101
    7.7.3 Historical Geotechnical Data 101
    7.7.4 Televiewer Surveying 101
    7.7.5 RQD and Joint Condition Logging 102
    7.7.6 Outcrop Mapping 102
    7.7.7 Qualified Person’s Geotechnical Conclusion 102
8 Sample Preparation, Analyses and Security 104
  8.1 Drilling Programs 104
  8.2 Procedures for Historical Drilling Programs from 1981 to 1994 104
    8.2.1 Freeport (1981-1983) 104
    8.2.2 St. Joe, Bond Gold, and Homestake (1984-1994) 104
  8.3 Procedures for Drilling Programs from 2019 to 2020 106
    8.3.1 Drilling Programs 106
    8.3.2 Sampling, Sample Preparation, Analysis, and Security 106
    8.3.3 Quality Assurance and Quality Control Procedures 107
  8.4 Procedures for Drilling Programs from 2022 to 2026 107
    8.4.1 Drilling Programs 107
    8.4.2 Sampling, Sample Preparation, Analysis, and Security 107
    8.4.3 Quality Assurance and Quality Control Procedures 108
  8.5 Summary 120
9 Data Verification 122
  9.1 Drillhole Sampling Data 122
    9.1.1 Dakota Gold Drilling 2022-2024 122
    9.1.2 Coeur Drilling 122
    9.1.3 St. Joe/Bond Gold, LAC and Homestake Drilling 122
    9.1.4 Dakota Gold Drilling 2025-2026 123
    9.1.5 Other Reviews 123
  9.2 Mineral Processing 131

 

Page 5 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10 Mineral Processing and Metallurgical Testing 132
  10.1 Historical Metallurgical Test Program 132
    10.1.1 Historical Oxide and Mixed Metallurgical Testing 132
    10.1.2 Historic Sulfide and Mixed Metallurgical Testing 137
  10.2 2026 Metallurgical Test Program 143
    10.2.1 Metallurgical Sample Selection and Representativeness 143
    10.2.2 Head Characterization 145
    10.2.3 Bottle Roll Leach Testing 148
    10.2.4 Permeability Testing 150
    10.2.5 Metallurgical Domaining 152
    10.2.6 Mineralogical Characterization 154
    10.2.7 Column Leach Testing 155
    10.2.8 Acid-Base Accounting and Spent Ore Geochemical Characterization 162
    10.2.9 Laboratory Modeled Recoveries 164
    10.2.10 Comminution and Crushing Test Work 165
    10.2.11 Metallurgical Variability and Geometallurgical Interpretation 167
    10.2.12 PFS Recovery Assignments 169
11 Mineral Resource Estimates 172
  11.1 Mineral Resource 172
  11.2 Price Sensitivity 176
  11.3 Mineral Resource Parameters 178
  11.4 Additional Information 180
  11.5 Description of the Block Model 181
    11.5.1 General 181
    11.5.2 Drilling Data 181
    11.5.3 Geologic Controls 183
    11.5.4 Cap Grades and Compositing 188
    11.5.5 Summary Statistics 189
    11.5.6 Variogram Analysis 193
    11.5.7 Block Grade Estimation 200
    11.5.8 Resource Classification 206
    11.5.9 Bulk Density 210
  11.6 Reconciliation of November 2026 and February 2025 Mineral Resources 211
    11.6.1 Leach Mineral Resource 211
    11.6.2 Mill Resource 212
    11.6.3 Reconciliation Summary 218
12 Mineral Reserve Estimates 219
  12.1 Mineral Reserve 219
  12.2 Economic and Recovery Parameters 220
13 Mining Methods 224
  13.1 Operating Parameters and Criteria 224

 

Page 6 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  13.2 Geotechnical Considerations 225
    13.2.1 Geotechnical Domains 225
    13.2.2 Rock Strength and Rock Mass Properties 225
    13.2.3 Bench-Scale Analysis and Inter-Ramp Angles 226
    13.2.4 Overall Slope Stability 227
    13.2.5 Conclusions 228
    13.2.6 Recommendations 228
    13.2.7 Future Considerations 228
  13.3 Mining Phases 235
    13.3.1 Pit Optimization 235
    13.3.2 Road and Ramp Design 235
    13.3.3 Mining Phases 235
  13.4 Production Schedule 236
  13.5 Waste Rock Storage Facilities 250
  13.6 Equipment and Personnel Requirements 252
  13.7 Hydrological Considerations 255
    13.7.1 Pit Dewatering 255
    13.7.2 Site Wide Water Balance 258
    13.7.3 Recommendations for Future Studies 259
14 Processing and Recovery Methods 260
  14.1 Mine Production Schedule 260
  14.2 Process Design 260
  14.3 Heap Leach Operation 260
    14.3.1 Heap Leach Crushing Plant 264
    14.3.2 Stacking and Heap Leaching 265
    14.3.3 Heap Leach Production Forecasting 265
  14.4 Merrill-Crowe Plant and Refinery 265
  14.5 Reagents 266
    14.5.1 Sodium Cyanide 266
    14.5.2 Lime 266
    14.5.3 Zinc 266
    14.5.4 Lead Nitrate 267
    14.5.5 Diatomaceous Earth 267
    14.5.6 Flux 267
    14.5.7 Antiscalant 267
  14.6 Water Consumption 267
  14.7 Blowers and Compressors 268
  14.8 Power Consumption 268
  14.9 Control Systems 268
  14.10 Assay and Metallurgical Laboratories 268

 

Page 7 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

15 Infrastructure 269
  15.1 Site Access Road 269
  15.2 Power Supply 269
  15.3 Project Buildings 270
    15.3.1 Security Building at Access Gate 270
    15.3.2 Heap Leach Crushing Plant 270
    15.3.3 Merrill-Crowe Plant 271
    15.3.4 Administration Building 271
    15.3.5 Truck Shop Building 271
    15.3.6 Laboratory 271
  15.4 Water Management Infrastructure 272
    15.4.1 Water Supply 272
    15.4.2 Surface Water Management 272
    15.4.3 Ground Water Management 273
    15.4.4 Water Treatment 274
  15.5 Heap Leach Facility 274
    15.5.1 Heap Leach Pad 274
    15.5.2 Heap Leach Pad Collection System 275
16 Market Studies and Contracts 276
  16.1 Product Description 276
  16.2 Metal Price Assumptions 276
  16.3 Refining and Sales Arrangements 276
  16.4 Marketability 277
  16.5 Contracts and Agreements 278
17 Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups 279
  17.1 Introduction 279
  17.2 Environmental Setting 279
  17.3 Baseline Environmental Studies 279
    17.3.1 Surface Water 281
    17.3.2 Groundwater 281
    17.3.3 Air Quality and Meteorology 282
    17.3.4 Soils, Vegetation, and Wetlands 282
    17.3.5 Wildlife 282
    17.3.6 Aquatic Resources 283
    17.3.7 Cultural Resources 283
    17.3.8 Visual Resources 283
  17.4 Project Permitting Requirements, Permit Application Status, and Requirements to Post Performance or Reclamation Bonds 284
  17.5 Requirements and Plans for Waste Storage, Site Monitoring, and Water Management During Operations and After Mine Closure 284
    17.5.1 Waste Storage 284

 

Page 8 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

    17.5.2 Site Monitoring 285
    17.5.3 Water Management and Water Treatment 285
  17.6 Environmental Geochemistry 287
    17.6.1 Mine Material Types 288
    17.6.2 Mine Material Environmental Behavior 288
  17.7 Social and Community Impacts, Relations, and Consultation 289
    17.7.1 Cultural, Social, and Economic Resources 289
    17.7.2 Community Engagement, Relations, and Employment 290
    17.7.3 Community and Tribal Consultation 290
    17.7.4 Plans, Negotiations, or Agreements with Local Individuals or Groups 290
  17.8 Mine Closure and Reclamation Plans 290
  17.9 Key Environmental and Permitting Risks 293
  17.10 Qualified Person’s Opinion on the Adequacy of Current Plans to Address Any issues Related to Environmental Compliance, Permitting, and Local Individuals or Groups 293
18 Capital and Operating Costs 294
  18.1 Process Capital 295
    18.1.1 Process Capital Cost Summary 295
    18.1.2 Heap Leach Pad Capital Cost  
  18.3 HLF and Associated Infrastructure and Closure Capital Costs 297
    18.3.1 Unit Rates 297
    18.3.2 Quantities/Material Take-Offs 297
  18.4 Mining Capital Costs 297
    18.4.1 Mining Capital – Lease Case 297
    18.4.2 Mining Capital – Purchase Case 298
  18.5 Process Operating Cost Summary 300
    18.5.1 Personnel and Staffing 300
    18.5.2 Power 300
    18.5.3 Consumable Items 301
  18.6 G&A Costs 302
  18.7 Mine Operating Costs 302
19 Economic analysis 304
  19.1 Mining Physicals 304
  19.2 Process Plant Production Statistics 304
  19.3 Smelter Return Factors 306
  19.4 Capital Expenditure 306
  19.5 Revenue 306
  19.6 Total Production Cost 306
  19.7 Depreciation 307
         

Page 9 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  19.8 Royalties 307
  19.9 Government Fees 307
  19.10 Taxation 307
  19.11 Project Financing 307
  19.12 Economic Indicators 307
  19.13 Sensitivity Analysis 308
  19.14 Detailed Financial Model 308
20 Adjacent Properties 313
  20.1 The Homestake Mine 313
  20.2 Wharf Mine 313
21 Other Relevant Data and Information 315
  21.1 Homestake Mine Facilities 315
  21.2 Sanford Underground Research Facility 315
22 Interpretation and Conclusions 316
  22.1 Mineral Reserve 316
  22.2 Mineral Resources 316
  22.3 Processing 317
  22.4 Mineral Tenure 317
  22.5 Mineral Processing and Metallurgy 317
  22.6 Geotechnical 319
  22.7 Summary Conclusion 319
23 Recommendations 320
  23.1 Pre-Feasibility Analysis 321
  23.2 Mineral Processing and Metallurgy 321
  23.3 Additional Drilling 322
  23.4 Heap Leach Facility - Risks and Optimizations 323
24 References 324
25 Reliance on Information Provided by the Registrant 330
  25.1 Legal Matters 330
  25.2 Tenure 330
  25.3 Significant Encumbrances and Permitting 330
  25.4 History 330
  25.5 Exploration 330
  25.6 Environment 330

 

Page 10 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

List of Figures and Illustrations

 

FIGURE DESCRIPTION PAGE
Figure 2-1: Property Location 31
Figure 3-1: Richmond Hill Project Location and Ownership 40
Figure 3-2: Richmond Hill Project Royalties 58
Figure 4-1: Richmond Hill Gold Property Location 64
Figure 4-2: Richmond Hill Gold Project Access 66
Figure 6-1: Generalized geology of the Black Hills, modified from Redden and DeWitt (2008), with cross-section location of Figure 6-2. 72
Figure 6-2: Northern Black Hills cross-section showing generalized geology 73
Figure 6-3: Property plan view geology map 74
Figure 6-4: Generalized Precambrian stratigraphy of the northern Black Hills 75
Figure 6-5: Paleozoic section with units present on the Richmond Hill Property 76
Figure 6-6: Deposits within and near the Richmond Hill resource area 80
Figure 7-1: Airborne Magnetics Survey Flightline Limits 82
Figure 7-2: Gravity Survey Station Locations 84
Figure 7-3: Geophysical IP – Resistivity Survey Line Locations 85
Figure 7-4: Dakota Gold Geologic Field Work 87
Figure 7-5: Richmond Hill Gold Project Drillholes by Company 89
Figure 7-6: Spring and Seep Survey 98
Figure 7-7: Geotechnical Drill Hole Location Map on IA Pit Design with Exposed Geology 103
Figure 8-1: Control Chart for CRM OXE182 Gold Assays 110
Figure 8-2: Control Chart for CRM OXD183 Gold Assays 111
Figure 8-3: Control Chart for CRM OXC185 Gold Assays 112
Figure 8-4: Control Chart for CRM OXE202 Gold Assays 113
Figure 8-5: Control Chart for CRM OXF200 114
Figure 8-6: Control Chart for CRM Si96 Gold Assays 115
Figure 8-7: Original Gold Assay versus Pulp Duplicate 117
Figure 8-8: Original Gold Assay versus Crusher Duplicate 118
Figure 8-9: Original Gold Assay versus Sample Duplicate 119
Figure 8-10: Original ALS Gold Assay versus BV Check Assay 121
Figure 10-1: Richmond Hill Historic Bottle Roll Test KPIs: Calculated Heads Au opt 132
Figure 10-2: Richmond Hill Historic Bottle Roll Test KPIs: Calculated Heads Ag opt 133
Figure 10-3: Richmond Hill Historic Bottle Roll Test KPIs: Silver to Gold ratio distribution 133
Figure 10-4: Richmond Hill Historic Bottle Roll Test KPIs: Gold Recovery Distribution 134

 

Page 11 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Figure 10-5: Richmond Hill Historic Bottle Roll Test KPIs: Silver Recovery Distribution 134
Figure 10-6: Richmond Hill Oxide Column Test KPIs: Calculated Gold Head Grades Distribution (Au opt) 135
Figure 10-7: Richmond Hill Oxide Column Test KPIs: Calculated Silver Head Grades Distribution (Ag opt) 135
Figure 10-8: Richmond Hill Oxide Column Test KPIs: Silver to Gold Ratio (Ag:Au) 136
Figure 10-9: Richmond Hill Oxide Column Test KPIs: Gold Recovery (Au%) 136
Figure 10-10: Richmond Hill Column Test KPIs: Silver Recovery (Ag%) 137
Figure 10-11: Rougher Flotation Flowsheet—BaseMet 2023, BL1244 139
Figure 10-12: Rougher Mass vs. Gold Recovery—BaseMet 2023, BL1244 140
Figure 10-13: Diagnostic Leach Test Flowsheet – BaseMet 2023, BL1244 141
Figure 10-14: Gold Rougher Concentrate Recovery vs. Mass Recovery – BaseMet 2023, BL1346 142
Figure 10-15: Drillhole Interval CN/FA Ratio vs Total S% 144
Figure 10-16: Bottle Roll Sulfur Speciation, Total Sulfur vs Sulfide Sulfur by Lithology 146
Figure 10-17: Bottle Roll Sulfide% vs Drillhole Average Total Sulfur 147
Figure 10-18: Bottle Roll Extraction % Au vs Drillhole Average CN/FA Ratio by Formation 149
Figure 10-19: Bottle Roll Gold Extraction versus Total Sulfur by Metallurgical Classification 150
Figure 10-20: Compacted Permeability Results Deadwood 151
Figure 10-21: Compacted Permeability Results Breccia, Tertiary Intrusives, and Precambrian 152
Figure 10-22: Metallurgical Classification Based on Drillhole CN/FA Ratio and Total Sulfur 153
Figure 10-23: Deadwood Column Leach Gold Extraction Curves 157
Figure 10-24: Precambrian Column Leach Gold Extraction Curve 157
Figure 10-25: Tertiary Intrusives Column Leach Gold Extraction Curves 158
Figure 10-26: Breccia Column Leach Gold Extraction Curves 158
Figure 10-27: Deadwood Column Leach Silver Extraction Curves 160
Figure 10-28: Precambrian Column Leach Silver Extraction Curves 160
Figure 10-29: Tertiary Intrusives Column Leach Silver Extraction Curves 161
Figure 10-30: Breccia Column Leach Silver Extraction Curves 161
Figure 10-31: NAG pH versus Sulfide-Sulfur-Based Net Neutralization Potential for Spent Column Leach Residues 164
Figure 11-1: Constraining Shell for Mineral Resource Estimate 175
Figure 11-2: Drillhole Locations by Company 182
Figure 11-3: Rock Types on the Resource Shell 185
Figure 11-4: Rock Types on Cross Section A-A’ 186
Figure 11-5: Rock Types on Section B-B’ 187
Figure 11-6: Probability Plot of Gold by Rock Type – 10 ft Composites (IMC, 2026) 191
Figure 11-7: Probability Plot of Silver by Rock Type – 10 ft Composites (IMC, 2026) 192

 

Page 12 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Figure 11-8: Variogram for Cambrian Deadwood – Azimuth 0° – Dip 12° 194
Figure 11-9: Variogram for Cambrian Deadwood – Azimuth 270° – Dip 0° 195
Figure 11-10: Variogram for Precambrian Yates – Azimuth 292°, Dip 67° 196
Figure 11-11: Variogram for Precambrian Yates – Azimuth 202°, Dip 0° 197
Figure 11-12: Variogram for Tertiary Breccia – Azimuth 345° - Dip 90° 198
Figure 11-13: Variogram for Tertiary Breccia – Azimuth 345° – Dip 0° 199
Figure 11-14: Gold Grade on Cross Section A-A’ (See Figure 11-2) 203
Figure 11-15: Gold Grades on Cross Section B-B’ (See Figure 11-2) 204
Figure 11-16: Silver Grades on Cross Section A-A’ (See Figure 11-2) 205
Figure 11-17: Probability Plot of Average Distance to Nearest 3 and 4 Holes – Cambrian Deadwood 207
Figure 11-18: Probability Plot of Average Distance to Nearest 3 and 4 Holes – Tertiary Breccia 208
Figure 11-19: Resource Classification on Cross Section A-A’ 209
Figure 11-20: Resource Classification on Cross Section B-B’ 209
Figure 12-1: Final Pit 223
Figure 13-1: 2026 2DLE Overall Slope Stability Analysis Section Location Map with Exposed Lithology 230
Figure 13-2: 2026 Tertiary Breccia Recommended Design Rosette 231
Figure 13-3: 2026 Tertiary Sills, Paleozoic Undifferentiated, Cambrian Deadwood Formation Recommended Design Rosette 232
Figure 13-4: 2026 Precambrian Greenstone Formation Recommended Design Rosette 233
Figure 13-5: 2026 Precambrian Flagrock and Ellison Formation Recommended Design Rosette 234
Figure 13-6: Mining Phases 236
Figure 13-7: End of Year 1 242
Figure 13-8: End of Year 2 243
Figure 13-9: End of Year 3 244
Figure 13-10: End of Year 4 245
Figure 13-11: End of Year 5 246
Figure 13-12: End of Year 6 247
Figure 13-13: End of Year 7 248
Figure 13-14: End of Year 8 (Final Pit) 249
Figure 13-15: Waste Rock Storage Facilities 251
Figure 14-1: Simplified Flow Sheet of the Richmond Hill Project Heap Leach Facility 262
Figure 14-2: General Layout of the Richmond Hill Project Process Facilities 263
Figure 15-1: End of Mine Life Surface Water Management 273
Figure 17-1: LAC’s Reclamation Liability Release Map (SDBME, 2016) 292

 

Page 13 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

List of Tables

 

TABLE DESCRIPTION PAGE
Table 1-1: PFS Assigned Gold Recovery by Lithology, Grade Class, and Oxidation Classification – 12.7 mm (1/2-inch) P80 21
Table 1-2: Mineral Resource Estimate Inclusive of Mineral Reserves 23
Table 1-3: Summary of Reconciliation Analysis for Contained Gold Ounces 24
Table 1-4: Mineral Reserve 24
Table 1-5: Capital Cost Summary 27
Table 1-6: Operating Cost Summary 27
Table 1-7: Key Economic Results 27
Table 1-8: Budget for Recommended Work 28
Table 2-1: Qualified Persons Responsibilities 32
Table 3-1: Richmond Hill Gold Property Claims 41
Table 3-2: Richmond Hill Project Parcels with Holding Costs and Royalties 49
Table 3-3: Current Exploration Permits 59
Table 3-4: Current Environmental Permits 59
Table 3-5: Potential Future Environmental Permits 60
Table 5-1: Summary of Richmond Hill’s Recent History 68
Table 7-1: Drilling by Company 88
Table 7-2: 2025 Richmond Hill Baseline Monitoring Well Drilling 97
Table 7-3: June 2026 Richmond Hill Spring and Seep Survey Results 99
Table 7-4: Modeled Geologic Units Summary 101
Table 8-1: Groups of Drilling Programs at Richmond Hill Gold Project 104
Table 9-1: Comparison of Assay Certificates with Database for Dakota Gold 2022-2024 Drilling and Coeur Drilling 124
Table 9-2: Comparison of Assay Certificates with Database for Legacy Drilling – Gold 125
Table 9-3: Comparison of Assay Certificates with Database for Legacy Drilling – Silver 127
Table 9-4: Comparison of Assay Certificates with Database for Dakota Gold 2025 - 2026 Drilling and Coeur Drilling 130
Table 10-1: Historical Metallurgical Reports 137
Table 10-2: Master Composite Head Assays – BaseMet 2023, BL1244 138
Table 10-3: Rougher Flotation Results – BaseMet 2023, BL1244 140
Table 10-4: Diagnostic Leach – BaseMet 2023, BL1244 141
Table 10-5: Rougher Flotation Grind Series MC-TT-S – BaseMet 2023, BL1346 142
Table 10-6: Oxide Ore Tonnage vs Metallurgical Tests Performed 145
Table 10-7: Summary of Bottle Roll Gold Extraction by Formation 148

 

Page 14 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 10-8: Summary of Bottle Roll Gold Extraction by Formation and Metallurgical Classification 148
Table 10-9: Compacted Permeability Summary 151
Table 10-10: Metallurgical Oxidation Classification Criteria 153
Table 10-11: Summary of XRD Mineralogical Characteristics by Formation 154
Table 10-12: Column Test Summary Table 155
Table 10-13: Column Leach Recovery Comparison by Crush Size 162
Table 10-14: 25.4 mm (1-inch) &12.7 mm (1/2-inch) Laboratory Modeled Recovery Comparison 165
Table 10-15: Comminution Results by Master Composite 166
Table 10-16: Comminution Results by Master Composite Averages by Lithology 166
Table 10-17: GeoMet Domain Matrix 169
Table 10-18: PFS Assigned Gold Recovery by Lithology, Grade Class, and Oxidation Classification – 12.7 mm (1/2-inch) P80 170
Table 10-19: PFS Assigned Silver Recovery by Lithology, Grade Class, and Oxidation Classification – 12.7 mm (1/2-inch) P80 170
Table 11-1: Mineral Resource Estimate Inclusive of Mineral Reserves 173
Table 11-2: Mineral Resource Estimate Exclusive of Mineral Reserve 174
Table 11-3: Mineral Resource at Various Prices – Leach Resources 176
Table 11-4: Mineral Resource at Various Prices – Mill Resources 177
Table 11-5: Economic Parameters for Mineral Resource Estimate 179
Table 11-6: Process Recoveries for Heap Leaching – Crush Size P80 ½ Inch 180
Table 11-7: Drilling by Company for Resource Model Update 181
Table 11-8: Model Rock Types 183
Table 11-9: Formation Code 184
Table 11-10: Model Oxidation Zones 188
Table 11-11: Cap Grades and Number of Assays Capped 188
Table 11-12: Summary Statistics of Assays 189
Table 11-13: Summary Statistics of 10 ft Composites 190
Table 11-14: Estimation Parameters 201
Table 11-15: Rock Type Populations for Estimation 202
Table 11-16: Specific Gravity Measurements 210
Table 11-17: Reconciliation of November 2026 and February 2025 Mineral Resources – Leach Resource 214
Table 11-18: Reconciliation of November 2026 and January 2025 Mineral Resources – Mill Resource 216
Table 11-19: Summary of Reconciliation Analysis for Contained Gold Ounces 218
Table 12-1: Mineral Reserve 219
Table 12-2: Economic Parameters 221

 

Page 15 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 12-3: Process Recoveries for Heap Leaching - Crush Size P80 ½ Inch 222
Table 13-1: Recommended IRAs by Domain and Wall Dip Direction 227
Table 13-2: Overall Slope Stability Results 227
Table 13-3: Mine Production Schedule 239
Table 13-4: Plant Production Schedule 241
Table 13-5: Mine Supervisory Labor Requirements 253
Table 13-6: Mine Hourly Labor Requirements 254
Table 13-7: Estimated HSUs within the Project Area 256
Table 13-8: Summary of Parameters Utilized for the Groundwater Inflow Calculation 257
Table 13-9: Estimated LOM Groundwater inflows to the Proposed Richmond Hill Open 258
Table 14-1: Heap Leach Major Design Criteria 261
Table 14-2: List of Main Mechanical Equipment for the Heap Leach Crushing Plant 264
Table 14-3: Heap Leach Gold and Silver Production Forecasts 265
Table 14-4: Main Process Reagents and Consumables 267
Table 14-5: List of Blowers and Compressors 268
Table 14-6: Summary of Connected Power for Heap Leach Operations 268
Table 16-1: Refining and Settlement Assumptions 277
Table 17-1: Baseline Studies Status 280
Table 18-1: Capital Cost Summary 294
Table 18-2: Operating & Production Cost Summary 294
Table 18-3: Initial Capital Cost Summary – Surface Facilities 295
Table 18-4: Heap Leach Pad Capital Cost Summary (US$ x1,000) 296
Table 18-5: Mining Capital Costs – Equipment Lease Case 298
Table 18-6: Mining Capital Summary – Equipment Purchase Case 298
Table 18-7: Mine Development Capital 298
Table 18-8: Equipment Purchases and Costs by Year 299
Table 18-9: Process Consumables Average Annual Consumptions 301
Table 18-10: Mine Operating Costs by Cost Center - Years 1 - 8 302
Table 18-11: Mine Operating Costs by Consumables vs Labor – Years 1 - 8 303
Table 18-12: Mine Parts and Consumables Cost - Years 1 - 8 303
Table 19-1: Yearly Mine & Process Physicals 305
Table 19-2: Life of Mine Process Statistics 306
Table 19-3: Capital Expenditure Schedule 306
Table 19-4: LOM Operating Costs 307
Table 19-5: Key Economic Results 308
Table 19-6: Sensitivity Analysis 308
Table 19-7: Detailed Financial Model 309
Table 23-1: Budget for Recommended Work 320

 

Page 16 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

1Executive Summary

 

This Pre-Feasibility Study (PFS) evaluates the development of the Richmond Hill Project (the Project), a large-scale gold and silver project controlled by Dakota Gold in the historic Homestake Mining District of South Dakota. The Project is located approximately 4.5 miles northwest of Lead and encompasses more than 3,000 acres of private surface and mineral rights, including the past-producing Richmond Hill mine, historic Carbonate District workings, and multiple areas of known gold-silver mineralization.

 

The PFS contemplates a conventional open-pit mining operation delivering crushed ore to a heap-leach processing facility. The study supports a Proven and Probable Mineral Reserve and demonstrates the potential for Richmond Hill to be developed as a significant stand-alone gold and silver operation with opportunity for resource expansion for the Feasibility Study (FS), while establishing the operating and infrastructure foundation for continued exploration and potential future development across the broader Homestake Mining District.

 

Key Highlights

 

·Mineral Reserves: 131.8 million tons of Proven and Probable Mineral Reserves grading 0.016 oz/t gold and 0.19 oz/t silver, containing approximately 2.16 million ounces of gold and 25.4 million ounces of silver.

 

·Mining: Conventional open-pit mining with a design throughput of approximately 45,000 ore tons per day (approximately 16.4 million tons of ore per year), supporting a planned 9-year mine life.

 

·Processing: Crushed-ore heap leach at a ½-inch P80 crush size, with average scheduled recoveries of 72.4% for gold and 18.0% for silver.

 

·Capital: Initial capital of approximately $538 million with an additional working capital of approximately $19 million and sustaining capital of approximately $114 million.

 

·Economics: After-tax NPV 5% of approximately $2.0 billion, after-tax IRR of 70.7%, and 1.4-year after-tax payback at base-case prices of $3,500 per ounce gold and $50 per ounce silver.

 

·Growth: Drilling and met testing campaign targeted to expand resource and reserves for inclusion in the FS.

 

·District Opportunity: Homestake District-scale upside from resource expansion at Richmond Hill, exploration at Maitland and the JB Zone, and higher-grade sulfide mineralization, none of which is included in the PFS Mineral Reserve or economic analysis.

 

Mineral Reserves

 

The Richmond Hill Mineral Reserve totals 131.8 million tons of Proven and Probable Mineral Reserves grading 0.016 oz/t gold and 0.19 oz/t silver, containing approximately 2.16 million ounces of gold and 25.4 million ounces of silver, as summarized below.

 

Category Tons (millions) Contained Gold (oz) Contained Silver (oz)
Proven 62.96 ~1,125,700 ~13.46 million
Probable 68.87 ~1,032,600 ~11.96 million
Total Proven & Probable 131.83 ~2.16 million ~25.4 million

 

The Mineral Reserve is based on an open-pit mine plan and production schedule using commodity prices of $2,600 per ounce gold and $30 per ounce silver. Measured Mineral Resources included in the production schedule were converted to Proven Mineral Reserves, and Indicated Mineral Resources to Probable Mineral Reserves. The point of reference for the Reserve is delivery of material to the process plant for crushing and stacking on the leach pad.

 

Cut-off values vary over the production schedule to balance mine and process-plant capacities, ranging from $10.00/t to $5.80/t NSR. The Reserve incorporates mining dilution and ore loss, and all mineralization within the Reserve is located on mineral titles controlled by Dakota Gold.

 

Page 17 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Mining

 

The PFS mine plan uses conventional open-pit methods with a design throughput of approximately 45,000 tons per day (approximately 16.4 million tons of ore per year) delivered to the heap-leach facility, a ~50% increase from the 30,000 tons per day throughput assumed in the Initial Assessment. A primary gyratory crusher operating at the lower end of its capacity range provides a pathway to approximately 60,000 tons per day for evaluation in the FS. Waste rock and spent leach material will be progressively placed into completed mining areas to reduce long-term surface disturbance and haul distances. The heap-leach facilities are designed to support the planned 9-year mine life, with an ultimate capacity of 170 million tons of stacked material to be assessed for the FS.

 

Metallurgy and Processing

 

Metallurgical test work supports crushed-ore heap-leach processing of the oxide material only in the development plan, a change from the Initial Assessment. Testing evaluated the principal lithologies and ore types, and recoveries are assigned block by block according to lithology, cyanide-soluble ratio, and sulfur content. Both oxide and transition material were characterized; and, limited transition ore with low risk PAG potential was selected for processing at the end of active mining in the plan in the PFS.

 

At the selected ½-inch P80 crush size, gold recoveries used in the Reserve estimate range from 65.6% to 90.3% depending on lithology and material classification. Average scheduled recoveries for the Mineral Reserve are estimated of 72.4% for gold and 18.0% for silver.

 

Capital and Operating Costs

 

The PFS estimates initial capital of approximately $538 million including $84 million in contingency. The sustaining capital over the life of mine is estimated at approximately $133 million, inclusive of $19 million of working capital in the form of pre-production ore inventory and $18 million in contingency.

 

Unit operating costs are equivalent to mining costs of $5.98 per ton of ore, processing costs of $4.41 per ton processed, G&A costs of $1.13 per ton processed, and refining costs of $0.06 per ton processed for total costs of $11.58/ton.

 

Economic Analysis

 

The PFS economic analysis demonstrates that Richmond Hill can provide a strong financial foundation for development. At base-case prices of $3,500 per ounce gold and $50 per ounce silver, the Project generates an estimated after-tax NPV 5% of approximately $2.0 billion, an after-tax IRR of 70.7%, with a 1.4-year after-tax payback period.

 

Key Risks and Uncertainties

 

The Qualified Person identifies metallurgical sampling coverage as a Reserve risk. Portions of the legacy drilling lack cyanide-soluble and sulfur assays, which could affect the interpretation of oxide versus transition material and the associated recoveries as additional drilling and sampling are completed. These material classification issues will be further analyzed and addressed in the subsequent FS technical report.

 

Opportunities

 

Richmond Hill has the potential to serve as the cornerstone operation for development of the next legacy-scale gold mining operation in the Homestake Mining District and Black Hills region. The Reserve-backed heap-leach operation provides an initial production platform from which the broader mineral potential of the district can be evaluated and advanced. Key opportunities include:

 

·Resource expansion and district exploration: Expanding the mineral resource at Richmond Hill particularly in the southern Breccia Zone and advancing exploration at Maitland and the JB Zone could grow the overall mineral inventory and potentially increase the scale and longevity of future operations beyond the current mine plan.

 

Page 18 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

·Higher-grade sulfide mineralization: The current plan is centered on heap-leachable material, leaving higher-grade sulfide-hosted gold and silver mineralization as a separate longer-term opportunity. Additional drilling, metallurgical testing, and engineering could support evaluation of this mineralization and a potential future processing pathway.

 

These opportunities are not included in the current Richmond Hill Mineral Reserve or economic analysis and represent potential growth beyond the operation evaluated in the PFS. A successful development would establish mining infrastructure, an operating presence, and a platform from which Dakota Gold can pursue a broader, long-term district development strategy.

 

1.1Geology and Mineralization

 

The Project is located in the northwest portion of the Black Hills, a north-northwest-striking elongate Laramide-age structural and topographic uplift, approximately 45 miles wide by 90 miles long in extent, in western South Dakota and northeastern Wyoming. Erosion has exposed a Precambrian metamorphic core surrounded by outward-dipping Paleozoic and Mesozoic sedimentary strata. The northern Black Hills are crossed by a west-northwest-trending belt of Tertiary alkalic intrusive centers. Precious-metal mineralization in the northern Black Hills is broadly associated with this Tertiary magmatic belt, where hydrothermal fluids followed pre-existing basement fabrics, Laramide structures, intrusive contacts, and fractured or permeable horizons. The Project is located on the northwestern portion of the Lead dome, a subsidiary dome in the north of the main Black Hills uplift. The Lead dome developed in response to a major Tertiary intrusive event that also led to development of the Tertiary-aged gold-silver deposits. These Tertiary intrusive rocks have a wide range of compositions and occur as stocks, sills, dikes, laccoliths, and breccia pipes. The Property is in an area approximately 2 miles across near the transition between exposed Precambrian rocks and the overlying Paleozoic section.

 

Two major Precambrian metamorphic suites underlie the Property. In the east, steeply dipping to isoclinally folded metasedimentary and metavolcanic rocks of the Ellison Formation and Flag Rock Group include phyllite, quartzite, and iron formation. In the west, mafic metavolcanic rocks have been metamorphosed to greenstone, mapped as the Yates Member of the Poorman Formation. The two suites are separated by a major north-south structure interpreted as a Precambrian shear zone. This structure is coincident with the major breccia bodies and the mineralization trends in the southern part of the Property, and it was reactivated during Tertiary activity and mineralization.

 

Unconformably overlying the Precambrian rocks on the north portion of the Property is a Paleozoic section consisting of the Cambrian-Ordovician Deadwood Formation, the Ordovician Winnipeg and Whitewood Formations, the Mississippian-Devonian Englewood Formation, and the Mississippian Pahasapa Limestone. These units dip gently, 10 to 20 degrees, generally to the northwest, with local variation due to structural control. The Deadwood Formation, which comprises a basal conglomerate, lower sandstone, middle interbedded clastic and carbonate units, and an upper glauconitic to quartz-rich sandstone, is the key Paleozoic host.

 

Tertiary intrusive rocks occur as stocks, sills, dikes, laccoliths, and breccia pipes within all other rock units. They are generally porphyritic and range in composition from phonolite, rhyolite, trachyte, quartz trachyte, and latite to monzonite, syenite, and lamprophyre (minette-like, biotite-bearing porphyries). Local structures include fracture zones and faults, which are numerous and varied in orientation.

 

The principal deposit type at Richmond Hill is interpreted as a Tertiary epithermal to replacement style gold-silver deposit. Gold-silver mineralization is spatially associated with Tertiary intrusive and hydrothermal activity.

 

Page 19 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Several gold–silver deposits and prospective areas exist within the Project boundary. In the southern part of the Property, mineralization is predominantly hosted in breccia bodies, fractured and altered Precambrian rocks, and Tertiary intrusives. Mineralized areas include Richmond Hill, Richmond Hill North/Ella, Twin Tunnels, Turnaround, West Thumb, Huskie West, Cleveland, Calvin P, Cole Creek Heights, and Earle.

 

In the northern part of the Property, north of the exposed unconformity between the Precambrian and Cambrian-Ordovician Deadwood Formation, mineralization occurs in favorable stratigraphic horizons within the Deadwood, along near-vertical structures and fracture zones, and within Tertiary intrusive dikes, sills, and Breccia formations. Mineralized areas include Cole Creek, MW-3 Main, MW-3 East, and Chism Gulch. Localized gold mineralization also occurs in the Paleozoic units overlying the Deadwood in the Cole Creek towards the historically mined Carbonate Camp area.

 

1.2Exploration, Development, and Operations

 

Prior to Dakota Gold’s tenure, the Property was drilled by at least 1,056 rotary, RC, and core holes testing multiple prospective areas within the claim boundary. Several of these holes are excluded from the final database due to missing collar coordinates, downhole surveys, or other issues however 1,386 holes totaling 607,225 ft have been included in the resource estimation. Since optioning the Property in 2021 to June 17, 2026, the cut-off date for drilling information for this PFS, Dakota Gold has drilled 485 drill holes representing 303,864 ft of drilling. The Dakota Gold holes are all core drilling except for 29 RC holes drilled for groundwater monitoring as part of the 2025 drilling campaign. As of the date of this Report, the Project remains open in multiple directions and Dakota Gold continues to conduct exploratory drilling of the Property, particularly in the south breccia ores to be included in the FS resource update.

 

Prior to entering into the Option agreement for the Property, Dakota Gold also flew a high-resolution helicopter-borne magnetic and gamma-ray spectrometric survey over the Homestake District. The survey covered an area of 962.4 km2 and included the Project area, with the objective of mapping Precambrian lithologies and structure as well as Tertiary intrusive rocks and associated alteration in outcrop, subsurface, and beneath cover. The results of this survey are not publicly available.

 

1.3Sample Preparation, Analysis, Security, and Data Verification

 

From 1984 to 1994, project drilling was completed by St. Joe, Bond Gold, and Homestake Mining Company (Homestake). Current industry QA/QC standards were not part of these programs. However, IMC has compared historical drilling data against more recent data using current QA/QC protocols and found that the two populations of historical and current data are similar with no evident errors or biases.

 

From 2019 to the present, current industry standards for QA/QC have been followed. It is the opinion of the QP for this section that the Richmond Hill assay database of historical and current data is satisfactory for the estimation of mineral resources and subsequent mineral reserves.

 

1.4Mineral Processing and Metallurgical Testing

 

The Richmond Hill metallurgical test program was developed to characterize metallurgical variability and establish the recovery basis for heap-leach processing of oxide and transitional mineralization. The program builds upon historical metallurgical test work and includes head characterization, bottle roll and column leach testing, compacted permeability testing, mineralogical characterization, comminution testing, laboratory recovery modeling, and geochemical characterization of spent column-leach residues. Test materials represent the principal Deadwood, Precambrian, Tertiary Intrusive, and Breccia formations and were selected to evaluate variability associated with lithology, oxidation state, gold grade, and crush size.

 

A total of 110 sub-composites were subjected to head characterization and 48-hour bottle roll leach testing. Evaluation of gold extraction, cyanide-soluble gold to fire-assay gold ratio (CN/FA), and sulfur data was used to develop a metallurgical oxidation classification comprising oxide, low-performing oxide, transitional, and sulfide material. Total sulfur exhibited a strong relationship with measured sulfide sulfur within the principal formations evaluated and, together with CN/FA ratio, provides a practical basis for extending the metallurgical classification to the broader drill-hole database and to the resource and block models.

 

Page 20 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Twenty-four master-composite column tests were completed on oxide and transitional material at nominal P80 crush sizes of 25.4 mm (1 inch) and 12.7 mm (½ inch), where sufficient sample mass was available. Gold extraction varied by both formation and oxidation classification. Breccia material exhibited the strongest overall column-leach response, while Deadwood, Precambrian, and Tertiary Intrusive material exhibited lower or more variable extraction. Across the column program, measured oxide gold extraction ranged from 57.3% to 92.0%, and transitional gold extraction ranged from 60.1% to 83.7%. Finer crushing generally improved gold extraction; however, the magnitude of the response varied among metallurgical domains.

 

Laboratory modeled gold recoveries were developed using the column leach results, bottle roll test results, and kinetic recovery response analysis. At the nominal 25.4 mm (1-inch) P80 crush size, laboratory modeled gold recoveries range from 65.2% to 91.2%, while recoveries at the nominal 12.7 mm (½-inch) P80 crush size range from 67.1% to 91.8%. The modeled results demonstrate that the response to finer crushing is domain-specific, with comparatively strong improvement observed for portions of the Tertiary Intrusive material and more limited or variable response observed for Deadwood.

 

Commercial-scale recovery factors were applied to the laboratory modeled recoveries to account for expected differences between controlled laboratory testing and full-scale heap-leach operation. The resulting PFS gold recovery assignments range from 61.2% to 87.2% at the nominal 25.4 mm (1-inch) P80 crush size and from 65.6% to 90.3% at the nominal 12.7 mm (½-inch) P80 crush size. Recovery assignments were retained by lithology, oxidation classification, grade class, and crush size to preserve the metallurgical variability identified by the test program. For the PFS, a P80 of ½” has been selected for advancement and use in metal recovery and financial analysis. Table 1-1 shows the PFS recovery assignments.

 

Table 1-1: PFS Assigned Gold Recovery by Lithology, Grade Class, and Oxidation Classification – 12.7 mm (1/2-inch) P80

 

P80 1/2"
Lithology Grade Class Oxidation PFS Au Recovery
Assignment
Precambrian HG Oxide 80.1
Precambrian LG Oxide 80.1
Precambrian HG Trans 71.5
Precambrian LG Trans 67.4
Breccia HG Oxide 90.3
Breccia LG Oxide 90.3
Breccia HG Trans 84.8
Breccia LG Trans 84.8
Tertiary Intrusive HG Oxide 82.1
Tertiary Intrusive LG Oxide 80.5
Tertiary Intrusive HG Trans 84.4
Tertiary Intrusive LG Trans 70.8
Deadwood HG Oxide 70.0
Deadwood LG Oxide 70.0
Deadwood HG Trans 65.9
Deadwood LG Trans 65.6

 

Compacted permeability testing on selected samples representing the four principal formations demonstrated favorable hydraulic behavior under simulated heap-loading conditions, with some reduction in permeability observed at higher applied loads. No permeability behavior was identified that would preclude heap-leach processing of the tested material, and the results indicate that agglomeration is not required. Mineralogical characterization identified differences in gangue mineralogy, sulfide occurrence, and gold association among the principal lithologies, while comminution testing demonstrated variability in crushing resistance, grinding resistance, and abrasiveness among and within the principal formations.

 

Page 21 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Acid-base accounting (ABA) and net acid generation (NAG) testing was completed on 24 spent ore residues from the column leach program. None of the tested spent column residues were classified as potentially acid generating (PAG) based on the combined sulfide-sulfur net neutralization potential (NNP) and NAG pH criteria; however, the majority occurred within the uncertain NNP range. Additional geochemical characterization, including kinetic testing of representative material, is recommended to resolve this uncertainty, confirm long-term acid generation and neutralization behavior and support future closure and environmental evaluations.

 

The combined metallurgical results support a geometallurgical framework based primarily on formation and oxidation classification, with grade and crush-size response providing additional resolution where supported by the available test data. Formation is an important control on heap-leach response, and materials having similar oxidation classifications do not necessarily exhibit equivalent gold recovery. CN/FA ratio and total sulfur provide useful indicators of oxidation and relative leach response but are not sufficient as independent predictors of recovery. The resulting metallurgical domains provide the basis for applying the PFS recovery assignments within the resource and mine-plan models.

 

Additional metallurgical testing is recommended as the Project advances toward Feasibility Study-level evaluation. Future work should expand variability and column leach testing within metallurgical domains important to the mine plan, confirm recovery and leach kinetics at the proposed design crush size, refine reagent-consumption and solution-chemistry criteria, further evaluate heap hydraulic behavior, and expand geochemical characterization of spent heap-leach material. The resulting data should be incorporated with the mine plan and heap-leach operating parameters to refine recovery kinetics and the Feasibility Study metal production plan.

 

1.5Mineral Resource Estimate

 

The mineral resource estimate for Richmond Hill includes mineral resources amenable to heap leaching and mineral resources amenable to milling. The mineral resource amenable to leaching consists of the oxide and transition material types, and the mineral resource amenable to milling consists of the sulfide material. Table 1-2 presents the mineral resource estimate inclusive of the mineral reserve estimate presented in Section 12 of this report. The measured and indicated mineral resource amenable to leaching amounts to 173.2 million tons at 0.015 oz/t gold and 0.18 oz/t silver for 2.54 million ounces of contained gold and 30.6 million ounces of contained silver. Inferred mineral resource amenable to leaching is an additional 98.9 million tons at 0.011 oz/t gold and 0.08 oz/t silver for 1.09 million ounces of contained gold and 8.0 million ounces of contained silver.

 

The measured and indicated mineral resource amenable to milling amounts to 230.9 million tons at 0.014 oz/t gold and 0.15 oz/t silver for 3.20 million ounces of contained gold and 35.7 million ounces of contained silver. Inferred mineral resource amenable to milling is an additional 219.3 million tons at 0.012 oz/t gold and 0.13 oz/t silver for 2.72 million ounces of contained gold and 28.1 million ounces of contained silver.

 

The measured and indicated mineral resource for leach and mill material amounts to 404.1 million tons at 0.014 oz/t gold and 0.16 oz/t silver for 5.74 million ounces of contained gold and 66.2 million ounces of contained silver. Inferred mineral resource for leach and mill material is an additional 318.2 million tons at 0.012 oz/t gold and 0.11 oz/t silver for 3.81 million ounces of contained gold and 36.1 million ounces of contained silver.

 

Page 22 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 1-2: Mineral Resource Estimate Inclusive of Mineral Reserves

 

Resource Category Ktons

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Leach Resource:
Measured Mineral Resource 72,568 34.70 0.017 0.20 1,212 14,586
Indicated Mineral Resource 100,582 27.51 0.013 0.16 1,328 15,993
Meas/Indic Mineral Resource 173,150 30.52 0.015 0.18 2,540 30,579
Inferred Mineral Resource 98,912 22.76 0.011 0.08 1,088 8,012
Mill Resource:
Measured Mineral Resource 92,794 39.69 0.016 0.16 1,457 14,661
Indicated Mineral Resource 138,117 32.46 0.013 0.15 1,740 20,994
Meas/Indic Mineral Resource 230,911 35.37 0.014 0.15 3,197 35,655
Inferred Mineral Resource 219,303 31.47 0.012 0.13 2,719 28,071
Leach and Mill Mineral Resource: 
Measured Mineral Resource 165,362 37.50 0.016 0.18 2,669 29,248
Indicated Mineral Resource 238,699 30.37 0.013 0.15 3,068 36,986
Meas/Indic Mineral Resource 404,061 33.29 0.014 0.16 5,737 66,234
Inferred Mineral Resource 318,215 28.76 0.012 0.11 3,807 36,083

 

Notes:

 

1.The Mineral Resource estimate has an effective date of November 23, 2026.

 

2.All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely.

 

3.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

 

4.Mineral Resources are based on prices of $2,900/oz gold and $35/oz silver.

 

5.Mineral Resources for leach material are based on a net smelter return (NSR) cut-off of $5.80/t and Mineral Resources for mill material are based on a NSR cut-off of $11.09/t.

 

6.For leaching NSR($/t) = $2,777 x gold (oz/t) x recovery + $33.33 x silver (oz/t) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content but average recoveries are 72.6% for gold and 18.0% for silver. For reference, the average recoveries in the blocks included in the mineral resource may not line up exactly with the blocks in the mineral reserve, resulting in slight differences in recoveries.

 

7.For milling NSR($/t) = $2,659 x gold (oz/t) x recovery + $31.53 x silver (oz/t) x recovery. Gold and silver recoveries are estimated at 85% for both metals.

 

8.The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.

 

9.Table 11-5 accompanies this Mineral Resource statement and shows all relevant parameters for mineral resources.

 

10.Includes 3.8% NSR royalty.

 

11.Mineral Resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of Mineral Resource in S-K 1300; mineralization lying outside of the pit shell is excluded from the Mineral Resource.

 

12.The Mineral Resource estimate is also constrained by the Richmond Hill Project Boundary.

 

13.The Mineral Resources reported are contained on mineral titles controlled by Dakota Gold.

 

14.The Mineral Resources are reported in-situ without any dilution or loss considerations, as a point of reference.

 

Table 1-3 presents a reconciliation of the November 2026 mineral resource estimate with the February 2025 estimate for mineral resources amenable to leaching. The mineral resource estimates were based on models developed during August 2026 and January 2025 respectively. The mineral resources in this analysis are inclusive of the mineral reserve estimate.

 

Page 23 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 1-3: Summary of Reconciliation Analysis for Contained Gold Ounces

 

Parameter Oxide/Transition (Leach) Sulfide (Mill) All Mineral Resource

Meas/Indic

Au (koz)

Inferred

Au (koz)

Meas/Indic

Au (koz)

Inferred

Au (koz)

Meas/Indic

Au (koz)

Inferred

Au (koz)

Start - February 2025 Mineral Resource 3,653 2,613 982 2,447 4,635 5,060
Due to Updated Oxide/Transition/Sulfide Domains (1,406) (905) 1,402 902 (4) (4)
Due to Updated Resource Model 414 (577) 326 (646) 740 (1,223)
Due to Updated Resource Shell 318 93 98 (17) 416 76
Due to Mining/Processing Costs (185) (276) (348) (1,300) (533) (1,576)
Due to Prices 205 294 336 1,219 541 1,513
Due to Updated Recoveries (460) (154) 401 114 (59) (40)
Cumulative Change for All Parameters (1,113) (1,525) 2,215 272 1,102 (1,253)
Final – November 2026 Mineral Resource 2,540 1,088 3,197 2,719 5,737 3,807

 

1.6Mineral Reserve Estimate

 

Table 1-4 presents the Mineral Reserve estimate for the Richmond Hill Project. The Proven and Probable Mineral Reserves amount to 131.8 million tons at 0.016 oz/t gold and 0.19 oz/t silver for 2.16 million ounces of contained gold and 25.4 million ounces of contained silver.

 

The Mineral Reserve estimate is based on an open-pit mine plan and mine production schedule developed by IMC. The Mineral Reserve estimate is based on commodity prices of $2,600/oz gold and $30/oz silver. Measured Mineral Resource in the mine production schedule was converted to Proven Mineral Reserve, and Indicated Mineral Resource in the schedule was converted to Probable Mineral Reserve. The point of reference for this Mineral Reserve estimate is where the material is delivered to the process plant for crushing and stacking on the leach pad.

 

Table 1-4: Mineral Reserve

 

  Kt

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Proven Mineral Reserve 62,958 33.18 0.018 0.21 1,125.7 13,457
Probable Mineral Reserve 68,875 28.11 0.015 0.17 1,032.6 11,964
Proven/Probable Reserve 131,833 30.53 0.016 0.19 2,158.3 25,421

 

Notes:

 

1.The Mineral Reserve estimate has an effective date of November 23, 2026.

 

2.Columns may not sum exactly due to rounding.

 

3.Mineral Reserves are based on commodity prices of $2,600/oz gold and $30/oz silver.

 

4.Mineral Reserves are based on net smelter return (NSR) cut-offs that vary by time period to balance mine and plant production capacities (see Section 13). They range from a high of $10/t to a low of $5.80/t (internal cut-off grade).

 

5.For leaching NSR($/t) = $2,489 x gold (oz/t) x recovery + $28.57 x silver (oz/t) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content but average recoveries are 72.4% for gold and 18.0% for silver. For reference, the average recoveries in the blocks included in the mineral resource may not line up exactly with the blocks in the mineral reserve, resulting in slight differences in recoveries

 

6.Table 12-2 accompanies this Mineral Reserve estimate and shows all relevant parameters. Table 12-3 shows recoveries.

 

1.7Mining Methods

 

The Richmond Hill mine will be a conventional open pit mine. Mine operations will consist of drilling holes with large diameter (9.25 in) blast holes, blasting with either explosive slurries or ANFO (ammonium nitrate/fuel oil) depending on water conditions, and loading the ore onto large off-road trucks with large hydraulic shovels and wheel loaders. Ore will be delivered to the primary crusher where it will be crushed to a nominal one-half inch size and stacked on the leach pad with mine trucks. Waste rock will be delivered to various Waste Rock Management Facilities (WRMF), many of which are backfilling of the various pits. There will also be a small low-grade stockpile facility to store marginal ore material for processing at the end of commercial pit operations and a stockpile for transition ore that will not be placed on the leach pad due to sulfur content. There will be a fleet of track dozers, rubber-tired dozers, motor graders, and water trucks to maintain the working areas in the pit, WRMF areas, stockpiles, and the roads.

 

Page 24 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The mine plan was developed to deliver ore to the primary crusher at the following rates:

 

·30,000 tons per day or 10.95 million tons during Year 1,

 

·38,000 tons per day or 13.87 million tons during Year 2, and

 

·45,000 tons per day or 16.42 million tons per year for Year 3 and after.

 

Several waste rock storage facilities (WRSF) were designed to accommodate Richmond Hill waste rock. WRSF01 and WRSF02 are north of the pit and have a combined capacity of about 37.7 million tons. Most of the preproduction and Year 1 and 2 waste will go to these facilities. The remaining waste storage areas are pit backfill areas designated as BF01 through BF08. The combined capacity of all the facilities is 162.3 million tons, slightly more than the 155.0 million waste tons in the mine production schedule. There is also a stockpile area with a capacity of about 11.8 million tons to store transition material encountered during mining. This is processed at the end of the mine life.

 

1.7.1Geotechnical

 

Call & Nicholas, Inc. (CNI) conducted a geotechnical PFS for the proposed Richmond Hill Project to evaluate overall highwall slope stability and develop bench-scale design recommendations for mine planning. The study focused on proposed open-pit designs consisting of relatively shallow pits (approximately 200–400 ft deep) and side-hill cuts. Overburden storage facilities, waste dumps, and other infrastructure were excluded from the scope at this stage.

 

The study included compiling and reviewing existing geotechnical data, including site-specific rock strength testing, strength verification testing, review hydrogeologic data used to develop phreatic surfaces, and geologic and structural models. Based on these evaluations, CNI developed slope design recommendations for various pit wall orientations to maintain adequate catch bench widths for rockfall containment while optimizing overall slope angles to reduce stripping requirements without compromising slope stability.

 

The inter-ramp angles (IRAs) were developed from a statistical kinematic bench-scale analysis using a design acceptance criterion (DAC) of an 80 percent reliability of maintaining a 23 ft minimum catch-bench width for 40 feet tall benches at a 70-degree bench-face angle. Overall slope stability was verified with two-dimensional limit-equilibrium analyses using a DAC of a minimum factor of safety (FOS) of 1.2.

 

1.8Recovery Methods

 

The proposed process facilities for the Richmond Hill Project comprise a heap leach operation to process oxide and transition ores. The heap leach operation will have a nominal capacity of 45,000 short tons per day, which matches the current mine plan for this study. Minor allocations have been made in the design for potential, future expansion up to 60,000 short tons per day.

 

The main process unit operations for Richmond Hill include three-stage crushing of the ROM ore, trucking stacking onto the heap leach pad, application of cyanide-bearing solution onto the ore on the pad, recovery of pregnant leach liquors from the heap leach pad, and soluble metal recovery via Merrill-Crowe and refinery facilities, to produce doré bullion, the final product of the facility.

 

Page 25 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

1.9Heap Leach Facility

 

The Richmond Hill Heap Leach Facility (HLF) will consist of an approximately 14.9-million-square-foot lined heap leach pad (HLP) developed in three construction phases with two double-lined solution-management pond systems. The HLP will accommodate approximately 70 million tons of permanently stacked crushed ore, followed by an additional 103 million tons on a removable (on-off) pad constructed over portions of the permanent heap. Together, these facilities will provide sufficient capacity for 170 million ton ultimate capacity. The permanent heap will be stacked in approximately 30-foot lifts to a maximum height of 250 feet, while the removable pad will operate in alternating areas (also to a maximum height of 250 feet) where ore will be leached, rinsed, treated for cyanide destruction, and excavated for backfilling into the open pit.

 

The HLF will incorporate a composite liner system, solution collection and conveyance piping, groundwater underdrains, and leak detection systems to support environmental containment and operational requirements. Two solution-management pond systems, each consisting of a Process Pond and Event Pond, will provide containment for process inventory, operational draindown, and design storm runoff. The facility is designed for a maximum solution return flow of 10,500 gallons per minute and a 100-year, 24-hour storm event of 9.5 inches, including snowmelt considerations. Development on steep, irregular terrain will require substantial grading and localized excavation to establish suitable foundation conditions and drainage. PFS-level stability analyses indicate that the proposed HLP and pond facilities satisfy the adopted static and pseudostatic stability criteria. For additional details, refer to Section 15.

 

1.10Environmental

 

In the 1980s and 1990s, considerable environmental baseline information was collected to support historical mine permitting and to support reclamation and closure activities. This information, along with new and additional or updated data collected from 2022 through 2026, will be used to support future mine development and permitting efforts.

 

Dakota Gold has retained multiple third-party specialists to conduct the necessary baseline analysis and provide reporting for SDDANR and Lawrence County reviews. Key environmental baseline disciplines required to satisfy State laws and regulations and County regulations include: geochemistry, surface water, groundwater, air quality, meteorology, soils, vegetation, wetlands, wildlife, aquatic resources, cultural, noise, visual resources, and socioeconomics. As of the effective date of this PFS, most field work has been completed, though reporting efforts are still ongoing and will be completed by mid-2027.

 

Any potentially impacted groundwater from the former process area, pit impoundment, or Spruce Gulch waste dump facility is actively managed by two on-site water management and treatment systems that have continued to operate throughout the post-closure period. Continued water treatment at these sites would be the responsibility of Dakota Gold once the Option is exercised. The associated costs are subject to post-closure bonding, the obligation for which would be assumed by Dakota Gold upon exercise of the Option.

 

Based on the current regulatory framework, the Project plans to maximize the use of existing reclamation credits associated with Homestake’s LSMP No. 445, limit new disturbance to 580 acres at any one time, and incorporate design features intended to protect environmental resources. Dakota Gold’s ongoing coordination with state and local regulatory agencies and engagement with local communities are expected to support the permitting process; however, receipt and timing of all required permits and authorizations remain subject to agency review, public processes, completion of supporting studies, and satisfaction of applicable requirements.

 

1.11Capital Cost Summary

 

Capital costs were developed for the mine by IMC, for the heap leach facility by Newfields, and for the process plant by M3. Table 1-5 shows the estimated capital costs for the project comprised of $538 million in Pre-Production including $84 million of contingency, and $133 million for sustaining capital. Total capital costs are estimated at $671 million.

 

Page 26 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 1-5: Capital Cost Summary

 

Category Units Initial Sustaining Total
Mine Capital including Pre-Production K USD $34,513 $38,762 $73,275
Process Plant including Heap Leach Pad K USD $406,269 $76,578 $482,847
Owner's Cost K USD $12,560 $0 $12,560
Contingency K USD $84,203 $18,004 $102,207
TOTAL CAPITAL COST K USD $537,544 $133,344 $670,888

 

1.12Operating Cost Summary

 

Operating costs include mine operations, process plant operations, general and administrative costs, and refining charges. Table 1-6 shows the estimated operating costs for the project. Operating costs were estimated at $1.53 billion for the LOM. This is equivalent to $11.58 per ton processed or $977 per ounce of payable gold.

 

Table 1-6: Operating Cost Summary

 

    Operating Cost
Category K USD $ / ton
Processed
$ / Au oz
Payable
Mining Costs $787,902 $5.98 $504
Process Plant $580,945 $4.41 $372
G&A $148,718 $1.13 $95
Refining $8,537 $0.06 $6
Total Operating Cost $1,526,102 $11.58 $977

 

1.13Economic Analysis Summary

 

The economic analyses for the project are summarized in Table 1-7 below. The base case metal prices are $3,500 per ounce of gold and $50 per ounce of silver.

 

Table 1-7: Key Economic Results

 

Indicators Before-Tax After-Tax
LOM Cash Flow ($000) $3,263,805 $2,557,696
NPV @ 5% ($000) $2,526,939 $2,000,014
NPV @ 10% ($000) $1,992,331 $1,588,221
IRR 77.4% 70.7%
Payback (years) 1.4 1.4

 

1.14Conclusion and Recommendations

 

Under the assumptions presented in this PFS Technical Report, and based on the available data, the Mineral Resource Estimates show reasonable prospects of economic extraction. In addition, due to the nature of the Project outline additional reserve in H1, 2027, and the ability to advance Richmond Hill towards production, the recommendation section outlines an estimate for a complete FS level work program.

 

The PFS supports advancing Richmond Hill to the Feasibility Study stage. The next phase of work should advance engineering, metallurgical testing, metallurgical and resource conversion drilling for reserve expansion, geotechnical investigations, and permitting activities, building on the completed baseline environmental and hydrogeological studies. Emphasis should be placed on improving metallurgical characterization in areas where cyanide-soluble and sulfur assay coverage is limited.

 

Page 27 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The following are recommendations for the next stages of work to advance the Project:

 

·Advance the Project to a Feasibility Study level.

 

·Additional metallurgical testwork and process design.

 

·Additional drilling to infill the current mineral resource to outline additional reserves, and test additional prospective areas. This will also improve definition of geological domains and provide material for metallurgical testing.

 

·Continue advancement of baseline environmental data collection and planned permit engineering analyses to support initiation of Project permitting.

 

Table 1-8 summarizes the budget cost for these items.

 

Table 1-8: Budget for Recommended Work

 

Work Area Objective Approx. Budget (US$M)
Drilling Programs
Metallurgical drilling Approximately 12,460 ft of drilling to provide samples for FS confirmatory metallurgical testing 1.9
Resource conversion drilling Approximately 36,115 ft of drilling to upgrade Mineral Resources and fill cyanide-soluble and sulfur assay gaps 5.4
Subtotal – Drilling Programs Approximately 48,575 ft in total ~7.3
Feasibility Engineering and Technical Work
Metallurgical testing and recovery modeling FS confirmatory and column testing; refine oxide/transition classification and recovery models 1.2
Mine design and Reserve conversion FS-level mine model, pit design and production schedule, including evaluation of higher throughput 0.3
Heap-leach facility, closure and reclamation Final FS heap-leach pad design and closure and reclamation design 0.4
Power infrastructure Detailed engineering for 69kV power line relocation and substation 0.7
FS engineering and study management Advance designs and capital and operating cost estimates to FS level; prepare for project execution 1.0
Geotechnical and miscellaneous engineering support Geotechnical analysis and engineering support. Geotechnical field drilling for the pit and heap-leach facility was completed or funded under 2026 programs. 0.1
Subtotal – Feasibility Engineering and Technical Work   ~3.7
Total Work Program Excludes owner's costs and permitting activities ~11.0
Not included in total: Permitting and regulatory support State and county permit applications, any required federal authorizations, and regulatory support. Baseline environmental and hydrogeological studies are complete, with minimal remaining cost. ~0.5–0.75

 

These items are planned to execute over the next two years. Given the robust nature of the resource identified, Dakota Gold may choose to defer some portion of additional exploration drilling.

 

Page 28 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

To progress the project to complete a feasibility-level study in 2027, the authors recommend implementing a comprehensive and strategically phased program. The recommended scope of work includes, but is not limited to, advance drilling activities as needed, environmental and regulatory permitting processes, metallurgical testing and analysis, detail engineering design, and preliminary development planning. The objective of this multi-disciplinary approach is to further delineate the resource, assess technical and economic parameters, and address and identify those critical components required to support a future project development and production decision.

 

The authors believe that this next phase of work is both justified, given the positive results of the PFS and the prospective development nature of the Richmond Hill property.

 

Page 29 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

2Introduction

 

M3 Engineering and Technology Corp. (M3) has prepared this technical report on the Richmond Hill Project (“Richmond Hill”, the “Richmond Hill Mine”, or the “Project”), located in Lawrence County, South Dakota, for Dakota Gold. The purpose of this report is to present the results of a PFS, including the Mineral Resource and Mineral Reserve estimates, proposed mining and processing methods, infrastructure requirements, capital and operating cost estimates, and economic evaluation of the Project. This report, with an effective date of November 23, 2026 (the “Effective Date”), has been prepared in accordance with the requirements of Regulation S-K Subpart 1300. The Mineral Resource estimate presented herein supersedes all prior Mineral Resource estimates for the Project.

 

2.1Registrant

 

Dakota Gold Corp. (Dakota Gold) is a Delaware-incorporated company traded on the NYSE American and with a head office in Lead, South Dakota. Dakota Gold is focused on revitalizing the Homestake District in South Dakota. Dakota Gold has multiple gold mineral projects surrounding the historical Homestake mine, including the Richmond Hill Gold Project, which is the subject of this technical report summary. The Project hosts the former Richmond Hill gold mine that operated from 1988 to 1993 as an open pit mine with heap leach facilities. The Project location is shown in Figure 2-1.

 

2.2Project Scope and Terms of Reference

 

The scope of this study encompasses a comprehensive review and evaluation of relevant technical reports and datasets supplied by Dakota Gold. These materials pertain to the general project setting, geological framework, historical context, exploration activities and their corresponding results, methodologies employed, quality assurance and quality control (QA/QC) measures, interpretive analyses, drilling programs, metallurgical testing, and estimates of mineral resources at the Richmond Hill property.

 

In conducting this assessment, the authors have relied primarily on data and information provided by Dakota Gold and, where applicable, by its predecessor. A significant portion of the information utilized in this study originates from historical records and technical work conducted directly by these entities.

 

The authors have thoroughly reviewed the available documentation and performed on-site inspections to assess the veracity and reliability of the underlying data. In cases where data were determined to be inadequate, inconsistent, or otherwise unreliable, such data were either excluded from the analysis or adjusted for through modifications in methodology to mitigate potential impacts on the conclusions drawn.

 

Where necessary and appropriate, the authors have undertaken independent verification and investigations in accordance with industry best practices and professional standards. These efforts were made to ensure the accuracy and defensibility of the interpretations, findings, and conclusions presented herein.

 

Page 30 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 2-1: Property Location

 

Page 31 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

2.3Qualified Persons

 

Table 2-1 shows the Qualified Persons (QPs) for this technical report and their respective areas of responsibility.

 

Table 2-1: Qualified Persons Responsibilities

 

Qualified Person Company Report Section(s) of Responsibility
Matthew Sletten, P.E. M3 1, 1.14, 2, 15, 15.1-15.3, 16, 21, 22, 22.1, 22.3, 22.4, 23, 23.1, 24, 25
Benjamin Bermudez, P.E. M3 1.8, 1.9, 1.11-1.13, 14, 18, 18.1-18.3, 18.5-18.6, 19
Michael G. Hester, FAusIMM IMC 1.1-1.3, 1.5-1.7, 3-9, 11, 12, 13, 13.1, 13.3-13.6, 18.4, 18.7, 20
Barry Carlson, P.E. Forte 1.4, 9.2, 10, 22.2, 23.2, 23.3
Crystal Hocking, P.E. P.G. RESPEC 1.10, 13.7, 15.4, 17, 23.4
Michael C. Conley (SME – RM) CNI 1.7.1, 7.7, 13.2

 

*Wherever there is a section listed, as well as subsections, the section number refers to the introductory content before the subsections.

 

·Matthew Sletten visited the Property on February 21, 2025 and September 23, 2025 to review site conditions.

 

·Benjamin Bermudez visited the Property on September 23, 2025 to review site conditions.

 

·Michael G. Hester visited the Property on September 23 and 24, 2025 to review site conditions and interview site personnel. This included the core logging, processing and storage facilities. He also visited the site on January 16 and 17, 2025.

 

·Barry Carlson visited the Property on February 12, 2026, and was present at met testing kickoff.

 

·Crystal Hocking visited the Property on September 11, 2024, to review site conditions.

 

·Michael C. Conley visited the Property on September 3, 2026, to review site conditions and available geotechnical data and to map rock fabric in outcrops.

 

2.4Date

 

Information in this Report is current as of November 23, 2026.

 

2.5Sources of Information

 

The main sources of information for this technical report include:

 

·The drillhole database was compiled and maintained by Dakota Gold.

 

·Various geologic and ore type solids developed by Dakota Gold and Woods personnel.

 

·The report “S-K 1300 Initial Assessment and Technical Report Summary – Richmond Hill Gold Project, South Dakota, U.S.A” dated April 30, 2024.

 

·Reports and documents cited in Sections 24 and 25 were used to support the preparation of this Report.

 

2.6Previous Technical Report Summaries

 

The Registrant filed a technical report summary on the Project, dated February 3, 2025, that included an Initial Assessment and mineral resource estimate. There was also a technical report summary dated April 30, 2024, that included a maiden mineral resource estimate for the Project. The S-K 1300 Initial Assessment with Cash Flow was published July 7, 2025.

 

Page 32 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

2.7Acronyms and Abbreviations

 

$ U.S. dollar
2DLE two-dimensional limit equilibrium
3D three-dimensional
AAS atomic absorption spectroscopy
ABI acoustic borehole imaging
Ag silver
AKF AKF Mining Services Inc.
AOI Area of Interest
ARD acid-rock drainage
ARSD Administrative Rules of South Dakota
Au gold
Aueq Gold equivalent
BC Bondar-Clegg
B.C. British Columbia
Barrick Barrick Gold Corporation
BaseMet Base Metallurgical Laboratories
BFA bench-face angle
BLK blank
BLM Bureau of Land Management
BMA bulk mineral analysis
BVMM Bureau Veritas Metals and Minerals
BWi Bond ball mill work index
CBW catch-bench width
CC Cole Creek
CDP crushed duplicate
CF Chism Flat
CG Chism Gulch
CN Cyanide
CNI Call & Nicholas, Inc.
COd Cambro-Ordovician Deadwood Formation
COdcs Deadwood Formation basal conglomerate-sandstone
COG Cut off Grade
Core Central Crystalline Core
CP Calvin Point
CRM certified reference material
Cu copper
CUP Conditional Use Permit
CV Cleveland
DAC design acceptance criterion
Dakota Gold Dakota Gold Corp.
DDR dip direction
DO dissolved oxygen
DTRC Dakota Territory Resource Corp.
DUP duplicate
ERM Environmental Resources Management

 

Page 33 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

EXNI Exploration Notice of Intent
Fe iron
Freeport Freeport Exploration Company
FOS factor of safety
GRG gravity-recoverable gold
HARD Half Absolute Relative Deviation
Homestake Homestake Mining Company of California
HRD Half Relative Deviation
ICP-ES inductively coupled plasma-emission spectroscopy
ID2 inverse distance squared
IMC Independent Mining Consultants, Inc.
IP induced polarization
IRA inter-ramp angle
IRR internal rate of return
JV joint venture
Koz 1000 troy ounces
K-Met K-Met Consultants Inc.
LAC LAC Minerals
LDL lower detection limit
Magee Magee Geophysical Surveys LLC
MC master composite
Mia coarse ore index
MRE mineral resource estimate
MTO material take-off
NaCN sodium cyanide
NPV net present value
NOI Notice of Intent
NSR net smelter return
NWS National Weather Service
OBI optical borehole imaging
OK ordinary kriging
P80 80% passing
PAX potassium amyl xanthate
pC undivided Precambrian
PDP pulp duplicate
PEA preliminary economic assessment
Pef Precambrian Ellison
Pfl Precambrian Flagrock
Pgn Precambrian Greenstone
POX pressure oxidation
Property Richmond Hill Gold Project
Q’ Q-prime (modified Q-system)
QA/QC quality assurance and quality control
Q/C quality control
QP qualified person
RC reverse circulation

RH Richmond Hill

 

Page 34 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

RHN Richmond Hill North
RO reverse osmosis
RQD rock quality designation
S sulfur
SAG semi-autogenous grinding
SCSE SAG circuit specific energy
SD standard deviation
SDBME South Dakota Board of Minerals & Environment
SDCL South Dakota Codified Law
SDDANR South Dakota Department of Agriculture & Natural Resources
SDDENR South Dakota Department of Environment & Natural Resources
SDP sample duplicate
SD SHPO South Dakota State Historic Preservation Office
SMC SAG mill comminution
SMP Scale Mine Permit
SSDS small-scale direct shear
St. Joe St. Joe Gold Corporation
SURF Sanford Underground Research Facility
SWE Southwest Exploration Services, LLC
SWD surface water discharge
SWPPP Stormwater Pollution Prevention Plan
TA Turn Around
Tbx Tertiary hydrothermal breccia
Tbx RH Richmond Hill Tertiary hydrothermal breccia
Tbx RHN-NN Richmond Hill North No Name Tertiary hydrothermal breccia
TCC total constructed cost
Tdk Tertiary dike
Ti Tertiary intrusive
Tsl Tertiary sill
TT Twin Tunnels
UCS uniaxial compressive strength
U.S. United States of America
USCS Unified Soil Classification System
USFS United States Forest Service
Viable Viable Resources Inc.
WOL whole ore leach
WPS Woods Process Services
WRSF Waste Rock Storage Facility
Units of Measure  
μm micrometer (micron)
° degrees azimuth
°F degrees Fahrenheit
% percent
$ United States dollar
cm centimeter
cy cubic yard

 

Page 35 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

ft foot
ft3/ton cubic feet per US ton
g gram
g/cm3 grams per cubic meters
g/mt grams per tonne
Ga giga-annum (billion years)
gal/min U.S. gallons per minute
h hour
in inch
kg kilogram
kg/t kilogram per tonne
km2 kilometer squared
kton 1,000 US tons
ktonne 1,000 metric tonnes
kV kilovolt
kW kilowatt
kWh/m3 kilowatt hours per cubic meter
kWh/t kilowatt hour per tonne
L liter
m3 cubic meter
m meter
Ma mega-annum (one million years)
mg milligram
mg/L milligram per liter
ml milliliter
mm millimeter
Moz million ounces
ms millisecond
Mton megaton (one million tons)
Opt ounces per short ton
oz troy ounce
oz/t ounces per short ton
oz/ton ounces per short ton
pcf pounds per cubic foot
ppm parts per million
psi pounds per square inch
psf pounds per square foot
t tonne
ton short ton
ton/ft3 tons per cubic foot
t/m3 tonnes per cubic meter
wt% weight percentage

 

Page 36 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

2.8Units of Measure and Metric Equivalents

 

Currency

 

Currency is expressed in United States dollars ($).

 

Units of Measure and Metric Equivalents

 

All units of measure used in this Report are United States (US) customary units unless otherwise noted.

 

Linear Measure

 

1 centimeter = 0.3937 inches  
1 meter = 3.2808 feet = 1.0936 yards
1 kilometer = 0.6214 miles  

 

Area Measure

 

1 hectare = 2.471 acres = 0.0039 square miles

 

Capacity Measure (liquid)

 

1 liter = 0.2642 United States (US) gallons

 

Weight

 

1 tonne = 1.1023 tons = 2,205 pounds
1 kilogram = 2.205 pounds  
1 troy ounce (oz) = 31.1034768 grams

 

Page 37 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

3Property Description

 

Dakota Gold’s Richmond Hill Gold Project comprises 3,002.07 acres, including 3,000.62 acres of private surface and mineral rights. The Project includes the past-producing Richmond Hill mine and the historical mines of the Carbonate District, as well as multiple prospective areas where gold has been drill-intersected.

 

3.1Project Location

 

The Project is in the western portion of Lawrence County, South Dakota approximately 4.5 miles northwest of Lead, South Dakota.

 

The center of the main claim block for the Project is at approximately 44° 23’ N latitude and 103° 51’ W longitude. The former Richmond Hill mine is approximately 44° 22’ 45” N latitude and 103° 51’ 30” W longitude.

 

3.2Ownership

 

St. Joe Gold Corporation (St. Joe) developed the former Richmond Hill gold mine in 1987. Bond Gold Corporation (Bond Gold) acquired the St. Joe Gold Corporation gold division in 1988. The mine was permitted, and construction of the mine facilities began in April 1988 under the ownership of Bond Gold.

 

In November 1989, LAC Minerals Ltd. Acquired Bond Gold. After the merger, the Project was held by the LAC subsidiary Richmond Hill Inc. In 1993, Richmond Hill Inc merged into LAC Minerals (USA) Inc. LAC Minerals (USA) Inc. converted to LAC Minerals (USA) LLC in 1999. Barrick Gold Corporation (Barrick) acquired LAC Minerals Ltd., the parent of LAC Minerals (USA) LLC in November 1994.

 

The Homestake Mining Company was acquired by Barrick in 2001. LAC Minerals (USA) LLC (hereafter “LAC”) and Homestake Mining Company of California (hereafter “Homestake”), a subsidiary of Homestake Mining Company, merged in October 2023, with Homestake as the surviving entity. Homestake is the current owner of the properties formerly held separately by LAC and Homestake.

 

Dakota Territory Resources Corp, now DTRC LLC, a direct subsidiary of Dakota Gold, entered into a three-year Option agreement with Homestake and LAC (for convenience referred to collectively at times as Barrick) in 2021 to acquire the Homestake/LAC interests in the Richmond Hill Project area, with the mineral tenure primarily held in the names of LAC and Homestake (see discussion in Section 3.3 and 3.4). In 2022, the Option was amended to extend the Option period until March 7, 2026. In February 2025, the Option was again amended to extend the Option until December 31, 2028.

 

In addition to the optioned Property, DTRC LLC, acquired ~324 acres of private property in the Richmond Hill Project area of which ~76 acres are of surface interest only on Property included in the Richmond Hill Option Agreement.

 

3.3Mineral Tenure Holdings

 

Within the western portion of Lawrence County, South Dakota, the Property covers portions of Sections 9 to 11, 13 to 16, 21 to 24, 26 to 28, and 33 to 35, Township 5 North, Range 2 East, Black Hills Meridian, plus portions of Sections 1, 3, 4, 12, and 13, Township 4 North, Range 2 East, Black Hills Meridian, and a portion of Section 31, Township 5 North, Range 3 East, Black Hills Meridian, plus portions of Sections 6 and 7, Township 4 North, Range 3 East, Black Hills Meridian (Dakota Gold n.d. c 2023) (Table 3-1). The Property is contiguous with Dakota Gold’s West Corridor and Blind Gold Properties and is approximately two and a half miles north of the producing Wharf Gold mine owned by Coeur Mining.

 

Page 38 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The Richmond Hill Project consists of both property subject to the Option (further discussed below) comprising of 94 Lawrence County, South Dakota, Land parcels and two unpatented mining claims as well as 3 additional Lawrence County, South Dakota, Land Parcels owned by DTRC LLC. The 94 land parcels of the Option agreement comprise 246 mineral survey patented lode claims, purchased government lots, and subdivided lots. Twenty-nine (29) parcels consist only of the mineral rights, with the surface belonging to various owners. The 3 additional land parcels comprise 16 mineral survey patented lode claims. Table 3-1 contains a claims listing.

 

In October 2023, LAC and Homestake merged, and Homestake now owns or controls the entire Option property. At the Report date, Homestake and LAC remain listed in the agreement as owning their respective claims.

 

Page 39 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Figure 3-1: Richmond Hill Project Location and Ownership

 

Page 40 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 3-1: Richmond Hill Gold Property Claims

 

Map
ID
County Tax Parcel ID Mineral Property Type Mineral
Survey #
Patented Lode or
Government Lot
Property Owner
1 16000-00502-110-10 Patented Mineral Properties   Govt. Lot 10 Homestake Mining Company of California
2 16000-00502-130-12 Patented Mineral Properties   Govt. Lot 12 Homestake Mining Company of California
3 16000-00502-140-02 Patented Mineral Properties   Govt. Lot 2 Homestake Mining Company of California
Govt. Lot 3
Govt. Lot 4
Govt. Lot 7
Govt. Lot 8
Govt. Lot 9
Govt. Lot 10
4 16000-00502-150-00 Patented Mineral Properties   Govt. Lot 3 Homestake Mining Company of California
Govt. Lot 9
Govt. Lot 10
Govt. Lot 12
Govt. Lot 13
5 16000-00502-150-10 Patented Mineral Properties   Tract 0102-A Homestake Mining Company of California
Tract 0102-B
Tract 0103-B
Tract 0103-A
6 16000-00502-220-01 Patented Mineral Properties   Govt. Lot 1 Homestake Mining Company of California
7 16000-00502-220-04 Patented Mineral Properties   Govt. Lot 2 Homestake Mining Company of California
Govt. Lot 4
8 16000-00502-220-10 Patented Mineral Properties   Govt. Lot 5 Homestake Mining Company of California
9 16000-00502-230-00 Patented Mineral Properties   Govt. Lot 9 Homestake Mining Company of California
Govt. Lot 10
10 16000-00502-230-01 Patented Mineral Properties   Govt. Lot 1 Homestake Mining Company of California
Govt. Lot 2
Govt. Lot 3
Govt. Lot 4
Govt. Lot 5
Govt. Lot 6
Govt. Lot 7
Govt. Lot 8
11 16000-00502-240-12 Patented Mineral Properties   Govt. Lot 12 Homestake Mining Company of California
Govt. Lot 13
Govt. Lot 14
12 26280-00348-000-00

Patented Mineral Properties

 

348 Old Reliable

Homestake Mining Company of California & Dakota Gold Corp. (DTRC LLC) Surface

13 26280-00407-000-00 Patented Mineral Properties 407 Enterprise Homestake Mining Company of California
14 26280-00408-000-10 Patented Mineral Properties 408 Surprise Homestake Mining Company of California
15 26280-00417-000-00 Patented Mineral Properties 417 Carbonate Homestake Mining Company of California
16 26280-00425-000-00 Patented Mineral Properties 425 Jay Gould Homestake Mining Company of California
17 26280-00426-000-00 Patented Mineral Properties 426 Garfield Homestake Mining Company of California
18 26280-00428-000-00 Patented Mineral Properties 428 Far West Homestake Mining Company of California
19 26280-00437-000-00 Patented Mineral Properties 437 Katie Homestake Mining Company of California

 

Page 41 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Tax Parcel ID Mineral Property Type Mineral
Survey #
Patented Lode or
Government Lot
Property Owner
20 26280-00438-000-00 Patented Mineral Properties 438 Arthur Homestake Mining Company of California
21 26280-00440-000-00 Patented Mineral Properties 440 Hartshorn Homestake Mining Company of California
22 26280-00441-000-00 Patented Mineral Properties 441 Minnie Homestake Mining Company of California
23 26280-00442-000-00 Patented Mineral Properties 442A Ultimo Homestake Mining Company of California
24 26280-00443-000-00 Patented Mineral Properties 443 Tidiout Homestake Mining Company of California
25 26280-00447-000-00 Patented Mineral Properties 447A Utica Homestake Mining Company of California
26 26280-00448-000-00 Patented Mineral Properties 448A Antietam Homestake Mining Company of California
27 26280-00449-000-10 Patented Mineral Properties 449 Blue Bird Homestake Mining Company of California
28 26280-00450-000-00 Patented Mineral Properties 450 Carbonate Fraction #1 Homestake Mining Company of California
29 26280-00451-000-00 Patented Mineral Properties 451 Carbonate Fraction #2 Homestake Mining Company of California
30 26280-00465-000-00 Patented Mineral Properties 465 Mutual Homestake Mining Company of California
31 26280-00466-000-00 Patented Mineral Properties 466 Washington Homestake Mining Company of California
32 26280-00473-000-00 Patented Mineral Properties 473 May Queen Homestake Mining Company of California
33 26280-00474-000-00 Patented Mineral Properties 474 Hercules Homestake Mining Company of California
34 26280-00489-000-00 Patented Mineral Properties 489 Adelphi Homestake Mining Company of California
35 26280-00675-000-00 Minerals Only 675 General Grant Homestake Mining Company of California
36 26280-00679-000-00 Patented Mineral Properties 679 Spanish Homestake Mining Company of California
37 26280-00680-000-00 Patented Mineral Properties 680 Richmond Homestake Mining Company of California
38 26340-00839-000-00 Minerals Only 839 Boss Homestake Mining Company of California
39 26340-00874-000-00 Patented Mineral Properties 874 Brooklyn Homestake Mining Company of California
40 26340-00930-000-00 Minerals Only 930 Big Sam Homestake Mining Company of California
Francis
Marseillase
Minnie
Ruby Hill
Glenwood
41 26340-00935-000-20 Minerals Only 935 South Lyon

Homestake Mining Company of California;

Parcel # 26340-00935-000-20 excludes Gov’t Lot 5.

44 26342-00935-010-00
45 26342-00935-020-00
42 26340-00977-000-00 Patented Mineral Properties 977 J.M. Homestake Mining Company of California
Todd
Earle
Minnie C
Lyda B
Sister
Arthur L
Cass
Newell
Calvin P
Emma
Virginia
Juliett
Donald W
Helen
Atwood
Little Bonanze
Ella
Ralph K

 

Page 42 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Tax Parcel ID Mineral Property Type Mineral
Survey #
Patented Lode or
Government Lot
Property Owner
43 26340-01022-000-00 Patented Mineral Properties 1022 Chloride Fr. Homestake Mining Company of California
Calkins
Logan
Anis
46 26380-01043-000-00 Patented Mineral Properties 1043 Rattler Homestake Mining Company of California
Gilroy
47 26380-01092-000-00 Minerals Only 1092 Dakota Homestake Mining Company of California & Willis Aye
Granite
Columbia
Union
48 26380-01109-000-00 Minerals Only 1109 Argenta Homestake Mining Company of California
Oro
Oro Fraction
49 26380-01109-000-05 Minerals Only 1109 Glyn Homestake Mining Company of California
50 26380-01109-000-10 Minerals Only 1109 Lemans Homestake Mining Company of California
51 26380-01114-000-00 Minerals Only 1114 West Wedge Fraction Homestake Mining Company of California
West End
Jackson
Moonlight
Sunrise
Sunset Fraction
Lizzie
52 26420-01141-000-20 Minerals Only 1141 Camden Homestake Mining Company of California
Ford
Georgia
53 26460-01168-000-00 Patented Mineral Properties 1168 Blue Homestake Mining Company of California & Dakota Gold Corp. (DTRC LLC) Surface
Rocklyn
54 26540-01247-000-00 Minerals Only 1247 White House Homestake Mining Company of California
Congress
China Fraction
Japan Fraction
55 26540-01278-000-00 Patented Mineral Properties 1278 Nanki-Poo Homestake Mining Company of California
Dalaunay
56 26540-01283-000-10 Minerals Only 1283 May Homestake Mining Company of California
57 26540-01283-000-20 Minerals Only 1283 Deadwood Homestake Mining Company of California
58 26540-01283-000-30 Minerals Only 1283 Buffalo Homestake Mining Company of California
Link Fraction
59 26540-01288-000-10 Minerals Only 1288 Longpoint Fraction Homestake Mining Company of California
60 26540-01288-000-20 Minerals Only 1288 Cardinal Homestake Mining Company of California
61 26540-01289-000-05 Minerals Only 1289 Ames Homestake Mining Company of California
Ames Fraction

 

Page 43 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Tax Parcel ID Mineral Property Type Mineral
Survey #
Patented Lode or
Government Lot
Property Owner
62 26540-01289-000-10 Minerals Only 1289 Cloud Homestake Mining Company of California
Dick
Lightning
Thunder
63 26540-01289-000-15 Minerals Only 1289 Ester Homestake Mining Company of California
64 26580-01349-000-00 Minerals Only 1349 James G. Blaine Homestake Mining Company of California
65 26580-01376-000-88 Patented Mineral Properties 1376 Tract PR2 Homestake Mining Company of California
66 26580-01376-000-90 Patented Mineral Properties 1376 Aliance Homestake Mining Company of California
Sucker
Little Ellen
Black Bird
Golden Eagle No. 2
Rubicon
Rubicon No. 2
Rubicon No. 4
Dakota
Darboy
Havana No. 1
Havana No. 3
67 26580-01382-000-00 Leased Mineral Rights 1382 Rubicon James E. Peterson Living Trust
Cleveland
Lizzie Johnson
Standard
68 26580-01382-000-10 Leased Mineral Rights 1382 Grayback James E. Peterson Living Trust
69 26580-01398-000-00 Patented Mineral Properties 1398   Independent Homestake Mining Company of California
Independent No. 1
Republik
70 26620-01406-000-00 Patented Mineral Properties 1406 Yankee Boy Homestake Mining Company of California
Yankee Boy No. 3
Yankee Boy No. 4
Alliance No. 2
Little Bonanza No. 2
Magna Charta
General Joe Hooker
71 26620-01406-000-10 Patented Mineral Properties   1406 Arthur No. 1 Homestake Mining Company of California & Dakota Gold Corp. (DTRC LLC) Surface  
Little Hill
Little Hill No. 2
72 26620-01436-000-00 Patented Mineral Properties 1436 Joplin No. 1 Homestake Mining Company of California  
Joplin No. 2
Joplin No. 3
Julia-Etta
Magnetic
73 26620-01440-000-00 Patented Mineral Properties 1440   Crest Homestake Mining Company of California  
Samoa
Co-moa
Sylvanite No. 1
Sylvanite No. 2
Grove
Volt
Seven-B
Storm King
Vigor
74 26620-01468-000-00 Minerals Only 1468 Loyd Homestake Mining Company of California
75 26620-01469-000-00 Patented Mineral Properties 1469 Cashier Homestake Mining Company of California  
LaPlata

 

Page 44 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Tax Parcel ID Mineral Property Type Mineral Survey # Patented Lode or
Government Lot
Property Owner
76 26620-01529-000-00 Patented Mineral Properties 1529 Maryland Homestake Mining Company of California  
Baltimore
Maverick
Badger
North Side Fraction
77 26680-01569-000-00 Patented Mineral Properties 1569 Lola Homestake Mining Company of California  
78 26680-01616-000-60 Minerals Only 1616 Genessee Homestake Mining Company of California
Grenada
Peerless
79 26680-01616-000-70 Minerals Only 1616 Trenton Homestake Mining Company of California
80 26680-01617-000-00 Patented Mineral Properties 1617 Los Angeles No. 1 Homestake Mining Company of California
Los Angeles No. 2
Los Angeles No. 3
81 26680-01643-000-00 Minerals Only 1643 Snorter Homestake Mining Company of California
Snorter Fraction
82 26680-01655-000-10 Patented Mineral Properties 1655 Zelpha Mable Homestake Mining Company of California  
Josephine
St. Cloud No. 1
St. Cloud No. 3
Comstock
Victor Fraction #3
Grand Deposit No. 2
Tartar
Red Cloud
Red Cloud Frac.
Valley Frac.
83 26680-01655-000-20 Patented Mineral Properties 1655 St. Cloud No. 5 Homestake Mining Company of California
84 26680-01659-000-20 Minerals Only 1659 Maid of Erin Homestake Mining Company of California
Telegram
Gannon
B&M Fraction
85 26680-01673-000-00 Patented Mineral Properties 1673 Belligerent Homestake Mining Company of California & Dakota Gold Corp. (DTRC LLC) Surface
Belligerent Fraction
Belligerent No. 3
Belligerent No. 4
Bull Hill
86 26760-01769-000-00 Patented Mineral Properties 1769 Edmonia Homestake Mining Company of California  
87 26760-01792-000-00 Minerals Only 1792 Marconi Homestake Mining Company of California
88 26760-01822-000-00 Patented Mineral Properties   1822 Bessie Homestake Mining Company of California & Dakota Gold Corp. (DTRC LLC) Surface
Hattie
    Minerals Only   1822 Dixie Homestake Mining Company of California
        Geneva  
    Cross No. 1  
    Tan

 

 

 

 

Page 45 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Tax Parcel ID Mineral Property Type Mineral Survey # Patented Lode or
Government Lot
Property Owner
89 26760-01829-000-10 Patented Mineral Properties 1829 Tract 1 Homestake Mining Company of California
90 26760-01851-000-00 Patented Mineral Properties 1851 Mars No. 1 Homestake Mining Company of California  
91 26760-01862-000-00 Patented Mineral Properties 1862 Stella No. 3 Homestake Mining Company of California
Stella No. 5
Margarite No. 6
Margarite No. 7
92 26760-01872-000-00 Patented Mineral Properties 1872 Legal Tender Homestake Mining Company of California  
Diamond Point
Joe Craig
Gremmel No. 1
Cotton Tail Frac.
93 26800-01910-000-00 Patented Mineral Properties 1910 Dante Homestake Mining Company of California  
Creston
Morning Glory
Vindicator
94 26880-02033-000-00 Patented Mineral Properties 2033 Bison Homestake Mining Company of California  
Trent
95 N/A Unpatented Mining Lodes N/A L&O No. 1 Homestake Mining Company of California (See Table 5.1)
96 N/A Unpatented Mining Lodes N/A NJB 7 Homestake Mining Company of California (See Table 5.1)
97 26620-01401-000-00 Patented Mineral Properties 1401 Mammouth Dakota Gold Corp. (DTRC LLC)
98 26680-01709-000-20   Patented Mineral Properties 1709 Dague #1 Dakota Gold Corp. (DTRC LLC)
Dague #2
99 26760-01862-000-10   Patented Mineral Properties 1862 Stella Dakota Gold Corp. (DTRC LLC)
Stella #1
Stella #2
Stella #4
Stella #6
Stella #7
Margarite
Margarite #1
Margarite #2
Margarite #3
Margarite $4
Margarite #5
Margarite #8

 

3.4Richmond Hill Option Agreement

 

On September 7, 2021, Dakota Territory Resource Corp (now DTRC, LLC) entered into an Option agreement with Barrick to acquire the Richmond Hill Gold Project jointly held in the names of Barrick’s wholly owned subsidiaries, LAC and Homestake. Under the terms of the Option agreement, DTRC LLC was provided a three-year option to acquire the surface and mineral rights with attendant facilities comprising the Richmond Hill Project.

 

On signing, Dakota Territory Resources Corp. issued 400,000 shares to Barrick and agreed to make three $100,000 payments (all paid) during the Option period. The Option could be exercised at any time before September 7, 2024, by assuming all the liabilities and bonds currently held by LAC and Homestake for the Richmond Hill Gold Project. In addition, upon exercise of the Option, Dakota Gold will issue Barrick an additional 400,000 shares and grant Barrick a 1% net smelter return (NSR) concerning any gold and other minerals of any type produced from the property.

 

Page 46 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

On September 8, 2022, Dakota Gold announced an amendment to the original Richmond Hill Option agreement whereby the Option period was extended by 18 months to March 7, 2026. In addition, more than 560 acres of 100% mineral rights owned by Homestake were added to the properties subject to the Option, and Dakota Gold issued an additional 180,000 shares to Barrick. All other terms and obligations under the original Option agreement remained unchanged. The Option was again amended on February 3, 2025, extending the Option period until December 31, 2028, in return for Dakota Gold agreeing to make three annual payments of $170,000, with the first of these due on March 1, 2026.

 

The current Richmond Hill Option agreement (as amended) is summarized as follows:

 

·Option to purchase all of the mineral rights, surface rights, attendant facilities, and patented properties owned by Homestake or Lac in the Project area.

 

·Issue an aggregate of 980,000 Dakota Gold shares to Barrick through a combination of shares issued at signing and upon exercise of the Option (580,000 shares have been issued to date).

 

·Assume all property liabilities and bonds upon exercise of Option.

 

·Issue a 1% NSR upon executing the Option to Barrick from any gold and other minerals of any type produced from the Option property.

 

·Three annual payments of $100,000 have been paid previously. Dakota Gold will make three additional annual payments $170,000 to Barrick beginning on March 1, 2026.

 

·Unless further extended, the Option period extends until December 31, 2028.

 

Dakota Gold was current with all Option agreement terms and conditions as of the Report date.

 

3.5Surface Rights

 

The Option agreement included surface rights to many of the properties included in the Project area. Table 3-2 details parcels that include mineral rights, surface rights, or both. Pursuant to SDCL 45-5-1, surface rights are subservient to the development of mineral rights.

 

3.6Water Rights

 

Dakota Gold and its subsidiaries do not own any water rights in the Project area. Water for exploration drilling programs has been sourced locally and either pumped or trucked to the drills. One of three wells that supplied water to the Richmond Hill mine is still active, and Homestake maintains the water right.

 

3.7Royalties

 

In addition to the 1% NSR on gold and other minerals of any type produced from the property that Dakota Gold must grant to Barrick, several claims have underlying royalties. Table 3-2 lists the claims and any extra royalties payable to underlying claim owners. Figure 3-2 identifies claims with underlying royalties.

 

The document numbers for deeds, warranty deeds, agreements, and others refer to documents recorded at the Lawrence County Court House in Deadwood, South Dakota. The following information regarding royalties is extracted from these public documents (Dakota Gold, pers. Comm.):

 

Page 47 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Aye/Gali Royalty

 

The original Aye/Gali royalty is defined in Warranty Deed, 82-05846, dated June 2, 1976, between Iwalana L. Gali (Grantor, formally Aye, a married woman) and Homestake Mining (Grantee). The 5% Gross Royalty on all minerals produced is calculated less sales, severance and other similar taxes, charges for transportation from mine to treatment, smelting and/or refining, as well as cost for treatment, smelting and/or refining. In the event royalties are paid, the aggregate paid to the Grantor shall not exceed the sum of $200.00 per acre times the total number of acres conveyed by the Grantor to the Grantee. Dakota Gold calculated a total 416.8 acres are under the Aye (Gali) royalty agreement in 8 land parcels. At $200.00 cap per acre, that would mean the maximum royalty would be $83,360.00 if all parcels were impacted.

 

Bohlen/Hoffman Royalty

 

The Bohlen/Hoffman royalty is defined in a Grant, Bargain and Sale Deed, 2014-01458, dated April 11, 2014, between Sharlene J. Hoffman and Earl D. and Helen L. Bohlen (Grantor) and Homestake Mining (Grantee). The 4% Net Smelter Returns Royalty on all minerals produced is calculated less refining and delivery costs and taxes but does not allow for deduction of costs related to trading activities or mining, milling, leaching, or any other on-site processing costs.

 

Fillmore Royalty

 

The Fillmore royalty is defined in a Mining Deed, 84-01176, dated May 24, 1968, between Fillmore and Company, Inc, W. O. and Lillian G. Filmore (Grantor) and Congo Uranium Company (Grantee). The Filmore Royalty is a 5% Net Smelter Returns Royalty on all minerals produced. Under earlier agreements, the royalty was initially established at 10% but was bought down to 5% in 1974.

 

Peterson Royalty

 

The Peterson royalty is defined in a First Amendment to Lease Agreement, dated November 15, 1984, between James E. and Arlene Peterson (Grantor) and St. Joe American Corporation (Grantee). The 5% Net Smelter Returns Royalty on all minerals produced is due within 30 days of each calendar quarter end, and is calculated less any weighing, sampling, penalty, processing, or other charges assessed by purchaser, selling charges, any sales, severance, gross production, privilege or similar taxes assessed or in connection with the ore measured by the value thereof, and less cost of transportation. The cost of leaching or other solution techniques shall be also deducted from the selling price.

 

Whitehouse Royalty

 

The Whitehouse royalties are defined by two agreements, Mining Deed, 76-01230, dated June 1, 1976, and Warranty Deed, 76-01231, dated June 1, 1976, between White House Congress, Inc. (Grantor) and Homestake Mining (Grantee). The 5% Gross Royalty on all minerals produced is calculated less sales, severance and other similar taxes, charges for transportation from mine to treatment, smelting and/or refining, as well as cost for treatment, smelting and/or refining. In the event royalties are paid, the aggregate paid to the Grantor shall not exceed the sum of $200 per acre times the total number of acres conveyed by the Grantor to the Grantee. The property subject to the Whitehouse Royalty currently sits outside of the resource evaluated in this PFS. The claims under the Whitehouse Royalty are scattered and mostly not contiguous. There are approximately 27 parcels for a total of 486.26 acres at $200 cap per acre, the maximum royalty would be $97,252 if all parcels were impacted.

 

Elemental Royalty

 

Upon the exercise of the Richmond Hill Option, a 1% NSR Royalty shall come into effect in favor of Bullion Monarch Mining Inc., a company existing under the laws of the State of Utah, for the lode claims in Mineral Surveys 1406 and 1822 (Chism Gulch).

 

Page 48 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 3-2: Richmond Hill Project Parcels with Holding Costs and Royalties

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
1 16000-00502-110-10 Patented Mineral Properties Lot 10 11-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $12.22   HMC 1         1  
2 16000-00502-130-12 Patented Mineral Properties Lot 12 13-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $2.26   HMC 1         1  
3 16000-00502-140-02 Patented Mineral Properties Lots 2, 3, 4, 7, 8, 9 &10 14-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $159.68   HMC 1         1  
4 16000-00502-150-00 Patented Mineral Properties Govt Lots 3, 9, 10,12 & 13 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $22.24   HMC 1         1  
5 16000-00502-150-10 Patented Mineral Properties Tracts 0102-A & 0102-B of NE1/4, Tract 0103-B of NW1/4 & Tract 103A of NW1/4 15- Homestake Mining Company of California Annual Lawrence Co. property tax $9.82   HMC 1         1  
6 16000-00502-220-01 Patented Mineral Properties Govt Lot 1 22-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $4.28   HMC 1            
7 16000-00502-220-04 Patented Mineral Properties Govt Lots 2 & 4 22-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $28.14   HMC 1         1  
8 16000-00502-220-10 Patented Mineral Properties Govt Lot 5 22-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $19.68   HMC 1         1  
9 16000-00502-230-00 Patented Mineral Properties Govt Lots 9 & 1023-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $0.48   HMC 1         1  
10 16000-00502-230-01 Patented Mineral Properties Lots 1, 2, 3, 4, 5, 6,7 & 8 23-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $147.88   HMC 1         1  
11 16000-00502-240-12 Patented Mineral Properties Lots 12, 13 & 14 24-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $22.96   HMC 1         1  
12 26280-00348-000-00 Minerals Only M.S. 348 Old Reliable Lode 14-005-02 Homestake Mining Company of California       HMC 1 Aye/Gali 5     6 Capped Royalty

 

Page 49 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
13 26280-00407-000-00 Patented Mineral Properties M.S. 407 Enterprise Lode 10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $8.10   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
14 26280-00408-000-10 Patented Mineral Properties M.S. 408 pt Surprise Lode 10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $12.52   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
15 26280-00417-000-00 Patented Mineral Properties M.S. 417 Carbonate Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $12.34   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
16 26280-00425-000-00 Patented Mineral Properties M.S. 425 Jay Gould Lode 10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $13.10   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
17 26280-00426-000-00 Patented Mineral Properties M.S. 426 Garfield Lode 10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $11.30   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
18 26280-00428-000-00 Patented Mineral Properties M.S. 428 Far West Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $9.36   HMC 1         1  
19 26280-00437-000-00 Patented Mineral Properties M.S. 437 Katie Lode10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $13.10   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
20 26280-00438-000-00 Patented Mineral Properties M.S. 438 Arthur Lode 10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $13.10   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
21 26280-00440-000-00 Patented Mineral Properties M.S. 440 Hartshorn Lode 09-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $11.30   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
22 26280-00441-000-00 Patented Mineral Properties M.S. 441 Minnie Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $9.36   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
23 26280-00442-000-00 Patented Mineral Properties M.S. 442ª Ultimo Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $13.48   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
24 26280-00443-000-00 Patented Mineral Properties M.S. 443 Tidiout Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $12.64   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
25 26280-00447-000-00 Patented Mineral Properties M.S. 447ª Utica Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $14.58   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes

 

Page 50 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
26 26280-00448-000-00 Patented Mineral Properties M.S. 448A Antietam Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $14.30   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
27 26280-00449-000-10 Patented Mineral Properties M.S. 449 Blue Bird Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $2.58   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
28 26280-00450-000-00 Patented Mineral Properties M.S. 450 Carbonate Fraction #1 Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $2.10   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
29 26280-00451-000-00 Patented Mineral Properties M.S. 451 Carbonate Fraction #2 Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $0.66   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
30 26280-00465-000-00 Patented Mineral Properties M.S. 465 Mutual Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $10.64   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
31 26280-00466-000-00 Patented Mineral Properties M.S. 466 Washington Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $9.00   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
32 26280-00473-000-00 Patented Mineral Properties M.S. 473 May Queen Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $6.60   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
33 26280-00474-000-00 Patented Mineral Properties M.S. 474 Hercules Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $4.16   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
34 26280-00489-000-00 Patented Mineral Properties M.S. 489 Adelphi Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $13.98   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
35 26280-00675-000-00 Minerals Only M.S. 675 General Grant Lode 01-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
36 26280-00679-000-00 Patented Mineral Properties M.S. 679 Spanish Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $10.92   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
37 26280-00680-000-00 Patented Mineral Properties M.S. 680 Richmond Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $11.80   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
38 26340-00839-000-00 Minerals Only M.S. 839 Boss Lode 06-004-03 Homestake Mining Company of California       HMC 1         1  

 

Page 51 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
39 26340-00874-000-00 Patented Mineral Properties M.S. 874 Brooklyn Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $11.80   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
40 26340-00930-000-00 Minerals Only M.S. 930 Big Sam Lode etc. 07-004-03 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
41 26340-00935-000-20 Minerals Only M.S. 935 Tract 1 pt of South Lyon Lode Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty; Excluding Govt Lot 5 being a part of Tract 1
42 26340-00977-000-00 Patented Mineral Properties M.S. 977 Donald W, Ella & Virginia Lodes Etal 22-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $230.40   HMC 1         1  
43 26340-01022-000-00 Patented Mineral Properties M.S. 1022 Chloride Fraction Lode Etal 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $15.30   HMC 1         1 Subject to potential reversion of property if not used for mining purposes
44 26342-00935-010-00 Minerals Only M.S. 935 Lost Irishman Lot 1 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
45 26342-00935-020-00 Minerals Only M.S. 935 Lost Irishman Lot 2 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
46 26380-01043-000-00 Patented Mineral Properties M.S. 1043 Rattler & Gilroy Lodes 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $15.74   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
47 26380-01092-000-00 Minerals Only M.S. 1092 Union Lode Etal 14-005-02 Homestake Mining Company of California       HMC 1 Aye/Gali 5     6 Capped Royalty
48 26380-01109-000-00 Minerals Only M.S. 1109 Oro, Oro Frac. & Argenta Lodes 12-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
49 26380-01109-000-05 Minerals Only M.S. 1109 Glyn Lode 12-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
50 26380-01109-000-10 Minerals Only M.S. 1109 Lemars Lode 12-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
51 26380-01114-000-00 Minerals Only M.S. 1114 Jackson Lode etc. 12-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty

 

Page 52 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
52 26420-01141-000-20 Minerals Only M.S. 1141 Camden, Ford & Georgie, etc. Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
53 26460-01168-000-00 Patented Mineral Properties M.S. 1168 Rocklyn & Blue Lodes 34-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $19.96   HMC 1 Whitehouse 5     6 Capped Royalty
54 26540-01247-000-00 Minerals Only M.S. 1247 Whitehouse & Congress Lodes Etal 14-005-02 Homestake Mining Company of California       HMC 1 Aye/Gali 5     6 Capped Royalty
55 26540-01278-000-00 Patented Mineral Properties M.S. 1278 Delaunay & Nanki- Poo Lodes 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $25.40   HMC 1         1 Subject to potential reversion of property if not used for mining purposes
56 26540-01283-000-10 Minerals Only M.S. 1283 May Lode 33-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
57 26540-01283-000-20 Minerals Only M.S. 1283 Deadwood Lode 33-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
58 26540-01283-000-30 Minerals Only M.S. 1283 Buffalo & Link Frac. Lodes 33- 005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
59 26540-01288-000-10 Minerals Only M.S. 1288 Long Point Frac Lode 35-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
60 26540-01288-000-20 Minerals Only M.S. 1288 Cardinal Lode 35-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
61 26540-01289-000-01 Minerals Only M.S. 1289 Cloud, Thunder, Lighting & Dick Lodes Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
62 26540-01289-000-05 Minerals Only M.S. 1289 Ames & Ames Frac. Lodes Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
63 26540-01289-000-15 Minerals Only M.S. 1289 Ester Lode 27-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
64 26580-01349-000-00 Minerals Only M.S. 1349 James g. Blain Lode 34-005-02 Homestake Mining Company of California       HMC 1         1  

 

Page 53 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
65 26580-01376-000-88 Patented Mineral Properties M.S. 1376 Tract PR2 of Porto Rico #2 & Porto Rico Lodes 10, 11, 14, & 15- 005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $23.10   HMC 1         1  
66 26580-01376-000-90 Patented Mineral Properties M.S. 1376 Darboy Rubicon & Dakota Lodes Etal 14-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $5,014.32   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
67 26580-01382-000-00 Leased Mineral Rights M.S. 1382 Cleveland & Rubicon Lodes Etal 23-005-02 James E. Peterson Living Trust   $1,510.36 $4,000.00 HMC 1 Peterson 5     6 Lease Term 10 years (1984) $4,000 annual extended by payment. See comments in parcel #26580-01382-000-10
68 26580-01382-000-10 Leased Mineral Rights M.S. 1382 Grayback Lode 23-005-02 James E. Peterson Living Trust   $274.72   HMC 1 Peterson 5     6 Lease Term 10 years (1984) $4,000 annual extended by payment. This annual cost is already calculated in parcel #26580-01382-000-00
69 26580-01398-000-00 Patented Mineral Properties M.S. 1398 Independent Lode Etal 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $71.30   HMC 1 Fillmore 5     6 Subject to potential reversion of property if not used for mining purposes
70 26620-01406-000-00 Patented Mineral Properties M.S. 1406 Yankee Boy, Yankee Boy #3 & #4, Manga Charta, Alliance #2, Little Bonanza #2 & General Joe Hooker Lodes 14-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $93.86   HMC 1 Aye/Gali 5 OMF Fund 1 7 Capped Royalty
71 26620-01406-000-10 Minerals Only M.S. 1406 Little Hill, Little Hill #2 & Arthur #1 Lodes 14-005-02 Homestake Mining Company of California       HMC 1 Aye/Gali 5 OMF Fund 1 7 Capped Royalty
72 26620-01436-000-00 Patented Mineral Properties M.S. 1436 Julie Ette Lode Etal 22-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $73.14   HMC 1     1 Subject to potential reversion of property if not used for mining purposes    
73 26620-01440-000-00 Patented Mineral Properties M.S. 1440 Vigor Lode Etal 21-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $132.40   HMC 1     1 Subject to potential reversion of property if not used for mining purposes    

 

Page 54 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
74 26620-01468-000-00 Minerals Only M.S. 1468 Loyd Lode 33-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5 6 Capped Royalty    
75 26620-01469-000-00 Patented Mineral Properties M.S. 1469 Cashier & La Plata Lodes 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $17.02   HMC 1     1      
76 26620-01529-000-00 Patented Mineral Properties M.S. 1529 Badger Lode Etal 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $66.26   HMC 1 Fillmore 5 6 Subject to potential reversion of property if not used for mining purposes    
77 26680-01569-000-00 Patented Mineral Properties M.S. 1569 Lola Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $24.82   HMC 1 Fillmore 5 6 Subject to potential reversion of property if not used for mining purposes    
78 26680-01616-000-60 Minerals Only M.S. 1616 Grenada, Genesee & Peerless Lodes 03-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5 6 Capped Royalty    
79 26680-01616-000-70 Minerals Only M.S. 1616 Phonolite & Trenton Lodes 03-004-02 Homestake Mining Company of California       HMC 1 Whitehouse 5 6 Capped Royalty; Excludes Phonolite lode in this parcel #.    
80 26680-01617-000-00 Patented Mineral Properties M.S. 1617 Los Angeles #1, #2 & #3 Lodes 23-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $60.60   HMC 1 Aye/Gali 5 6 Capped Royalty    
81 26680-01643-000-00 Minerals Only M.S. 1543 Snorter & Snorter Frc Lodes 33-005-02 Homestake Mining Company of California       HMC 1 Whitehouse 5 6 Capped Royalty    
82 26680-01655-000-10 Patented Mineral Properties M.S. 1655 Victor #3 Lode Etal 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $167.02   HMC 1 Fillmore 5 6 Subject to potential reversion of property if not used for mining purposes    

 

Page 55 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
83 26680-01655-000-20 Patented Mineral Properties M.S. 1655 pt St. Cloud #5 Lode 22-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $16.46   HMC 1 Fillmore 5 6 Subject to potential reversion of property if not used for mining purposes    
84 26680-01659-000-20 Minerals Only M.S. 1659 Telegram, Maid of Erin, Gannon etc. Homestake Mining Company of California       HMC 1 Whitehouse 5     6 Capped Royalty
85 26680-01673-000-00 Patented Mineral Properties M.S. 1673 Blue Hill Frac, Belligerent, etc. Homestake Mining Company of California Annual Lawrence Co. property tax $56.86   HMC 1 Whitehouse 5     6 Capped Royalty
86 26760-01769-000-00 Patented Mineral Properties M.S. 1769 Edmonia Lode 14-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $20.60   HMC 1         1  
87 26760-01792-000-00 Minerals Only M.S. 1792 Marconi #2 Lode 31-005-03 Homestake Mining Company of California       HMC 1         1  
88 26760-01822-000-00 Minerals Only M.S. 1822 Hattie Lode Etal 14-005-02 Homestake Mining Company of California       HMC 1 Aye/Gali 5 OMF Fund 1 7 Capped Royalty
89 26760-01829-000-10 Patented Mineral Properties M.S. 1829 Tract 1 27-005-02 Plat 2014-01022 Homestake Mining Company of California Annual Lawrence Co. property tax $45.44   HMC 1 Bohlen/Hoffman 4     5  
90 26760-01851-000-00 Patented Mineral Properties M.S. 1851 Mars #1 Lode 15-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $14.52   HMC 1         1 Subject to potential reversion of property if not used for mining purposes
91 26760-01862-000-00 Patented Mineral Properties M.S. 1862 Stella #3 & #5 & Margarite #6 & #7 Lodes 26-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $69.00   HMC 1            
92 26760-01872-000-00 Patented Mineral Properties M.S. 1872 Cotton Tail Fraction Lode Etal 22-05-02 Homestake Mining Company of California Annual Lawrence Co. property tax $51.16   HMC 1         1 Subject to potential reversion of property if not used for mining purposes
93 26800-01910-000-00 Patented Mineral Properties M.S. 1910 Dante, Creston, Morning Glory & Vindicator Lodes 23-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $54.20   HMC 1         1 Subject to potential reversion of property if not used for mining purposes
94 26880-02033-000-00 Patented Mineral Properties M.S. 2033 Bison & Trent Lodes 10-005-02 Homestake Mining Company of California Annual Lawrence Co. property tax $36.02   HMC 1         1 Subject to potential reversion of property if not used for mining purposes

 

Page 56 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Map
ID
County Parcel ID
Number
Mineral Property Type Legal Description Property Owner Annual Property
Maintenance
2026 Taxes
Paid
Other
Cost
Final
Royalty Owner
Royalty % Second
Royalty Owner
Royalty
%
Third
Royalty
Owner
Royalty
%
Royalty
% Total
Comments
95 N/A Unpatented Mining Lodes L&O No. 1 – BLM SN MMC74914 sec. 15 St. Joe Minerals Annual BLM maintenance fee   $200.00 HMC 1         1  
96 N/A Unpatented Mining Lodes NJB 7 – BLM SN MMC165019 sec. 15 Bond Gold Richmond Annual BLM maintenance fee   $200.00 HMC 1         1  
97 26680-01709-00-20 Patented Mineral Properties M.S. 1401 Mammouth Lode 22-005-02 Dakota Gold Corp. (DTRC LLC/Dakota Gold Holdings LLC) Annual Lawrence Co. property tax $15.24                  
98 26680-01709-000-20 Patented Mineral Properties M.S. 1709 Dague #1 & Dague #2 Lodes 22-005-02 Dakota Gold Corp (DTRC LLC) Annual Lawrence Co. property tax $22.72                  
99 26760-01862-000-10 Patented Mineral Properties M.S. 1862 Stella, Stella #1, #2, #4, #6, & #7, Margarite, Margarite #1, #2, #3, #4, #5, & #8 Lodes 26-005-02 Dakota Gold Corp (DTRC LLC) Annual Lawrence Co. property tax $229.00   HMC 2         2  

 

Page 57 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 3-2: Richmond Hill Project Royalties

 

Page 58 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

3.8Permitting

 

Dakota Gold, through its subsidiary DTRC LLC, has proposed to develop a new mining operation in the area of the previously operated Richmond Hill Mine in Lawrence County, South Dakota. Following the completion of this PFS, Dakota Gold is evaluating permitting requirements for a proposed large-scale mining operation in the area of the former Richmond Hill Mine. The final permit footprint is targeted to be located entirely on private land and avoid disturbance to U.S. Forest Service (USFS) or Bureau of Land Management (BLM) land.

 

3.8.1Existing Permitting

 

3.8.1.1Exploration Notices of Intent

 

Table 3-3 includes all currently active permits required by the South Dakota Department of Agriculture and Natural Resources (SDDANR) for conducting exploration activities at the Richmond Hill site under current approved Exploration Notice(s) of Intent(s) (EXNI) permits.

 

Table 3-3: Current Exploration Permits

 

Permit Name Authority Program
EXNI-440 Richmond Hill I SDDANR Minerals and Mining Program
EXNI-444 Richmond Hill II SDDANR Minerals and Mining Program
EXNI-446 Richmond Hill III SDDANR Minerals and Mining Program
EXNI-456 Richmond Hill IV SDDANR Minerals and Mining Program
EXNI-457 Richmond Hill V SDDANR Minerals and Mining Program
EXNI-460 Richmond Hill VI SDDANR Minerals and Mining Program
EXNI-466 Richmond Hill VII SDDANR Minerals and Mining Program
EXNI-467 Richmond Hill VIII SDDANR Minerals and Mining Program

 

DTRC LLC’s current requirements, restrictions, and obligations are set out by the SDDANR. Certain restrictions apply only to the more recent EXNI permits; individual permit restriction letters should be reviewed for permit-specific conditions. In general, obligations and restrictions applied to the exploration permits address reclamation, surface discharges, erosion control measures, drilling parameters, recommendations for working around cultural resources, and communications requirements.

 

3.8.1.2Active Permits at Richmond Hill Mine

 

Table 3-4 includes all currently active permits for the historic Richmond Hill Mine. Inactive or closed permits are not included in this list.

 

Table 3-4: Current Environmental Permits

 

Permit Authority Program
Large-Scale Mine Permit (SMP) No. 445 SDDANR Minerals and Mining
Surface Water Discharge Permit SD0026883 SDDANR Surface Water Quality
Conditional Use Permit Nos. 116, 125, and 202 Lawrence County Planning and Zoning Land Use
Water Rights Permit No. 1372-1 (supply wells 2, 8, and 15) SDDANR Water Right
Water Rights Permit No. 1422-1 (stormwater and leach pad effluent in stormwater pond) SDDANR Water Rights

 

Page 59 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

·The Richmond Hill Mine was originally permitted in 1988 under Large-Scale Mine Permit SMP No. 445.

 

·Mine construction commenced in 1988.

 

·LSMP No. 460, permitted in 1994 and associated with the limestone pit used for reclamation work, is no longer active.

 

·Permit No. 445 includes approximately 74 acres of active disturbance, primarily associated with water treatment facilities.

 

·Approximately 260 reclaimed acres satisfy post-mine land use requirements and are available for use as future surface disturbance under LSMP No. 445.

 

3.8.2Future Permitting

 

In general, permitting a potential gold mine at the Richmond Hill site may require the permits listed in Table 3-5. Final Project’s design, facility locations, and operating plans may necessitate additional permitting considerations beyond those identified in Table 3-5. Project design assumptions currently avoid disturbance of federal lands and jurisdictional wetlands; however, future modifications affecting federally regulated resources or other jurisdictional features could result in additional permitting requirements.

 

Table 3-5: Potential Future Environmental Permits

 

Permit Authority Program
Conditional Use Permit (CUP) Lawrence County Planning and Zoning Land Use
Notice of Intent and Request for Determination of Special, Exceptional, Critical or Unique Lands SDDANR Minerals and Mining
Large-Scale Mine Permit SDDANR Minerals and Mining
Air Quality Construction Permit SDDANR Air Quality
Title V Air Quality Operational Permit SDDANR Air Quality
Ground Water Discharge Permit(s) SDDANR Water Quality
Surface Water Discharge Permit(s) SDDANR Water Quality
Construction Stormwater Permit SDDANR Water Quality
Solid Rubble/Construction and Demolition Debris Disposal Waste Permit SDDANR Waste Management
Water Right Permit(s) SDDANR Water Rights
Hazardous Waste – Notification of Regulated Waste Activity Form SDDANR Waste Management

 

3.8.2.1Addressing Potential Obstacles during Permitting Process

 

SDDANR permits are subject to formal administrative, technical, and public review processes prior to approval. The Notice of Intent, Air Quality, and Large Scale Mine Permits consist of departmental completeness and technical reviews. Public notice periods provide opportunities for public comment and, where applicable, requests for contested case hearings before the South Dakota Board of Minerals and Environment. Groundwater discharge, surface water discharge, and water rights permit applications can also all be contested if public comments are received. Final hearings on these permits are held by the either the South Dakota Board of Minerals and Environment or South Dakota Water Management Board. Based on the assumed project scope and standard regulatory review timeline, approval of major state permits is estimated to require approximately eighteen months following initial permit submittals.

 

Page 60 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

South Dakota Codified Law (SDCL) 45-6B-95 limits a new mine permit to 320 acres of surface mining disturbance. The existing reclaimed acres at Richmond Hill (approximately 260 acres) are also available (see Section 17.5). Therefore, new surface mining disturbance for the Project, under a single new large-scale mine permit in association with active SMP No. 445, would be limited to approximately 580 acres of surface mining disturbance. To mine beyond the initial 580 acres, the Company has two options:

 

1)Reclaim existing disturbed acres to allow one-to-one additional disturbance (subject to SDDANR approval or reclamation); or

 

2)Obtain an additional LSMP authorization up to 320 additional acres of net disturbance.

 

Conditional Use Permits (CUP) through the Lawrence County Office of Planning and Zoning go through a review and approval process, beginning with a Planning and Zoning Department review and informal information meeting and potential site visit with the Planning and Zoning Board. Notification letters are sent, and a public hearing is held by the Planning and Zoning Board, which allows for a public comment period. The Planning and Zoning Board provides a recommendation to the Lawrence County Board of Adjustment. The public is provided an additional opportunity to comment on or to appeal the Planning and Zoning Board’s recommendation during the Board of Adjustment review process. The CUP regulatory review and approval process is anticipated to be six months following submittal of the complete CUP.

 

3.8.2.2Pre-Mining Land Use

 

The pre-mining land uses within the Richmond Hill area include mineral exploration, logging, wildlife habitat, and recreation. A portion of the proposed Richmond Hill permit boundary also contains historical mine disturbance, including reclaimed heap leach facilities, waste rocks dumps, pits, two water treatment plants, lined ponds, and remnants of other former support facilities.

 

3.8.2.3Permitting Requirements

 

In general, the SDDANR and Lawrence County permit applications require:

 

·Property Location and Description

 

·Mine Plan (construction, development, processing, and backfilling)

 

·Reclamation Plan

 

·Project Schedule

 

·Existing and proposed post mining land use and adjacent land uses

 

Baseline environmental studies have been initiated and are at various stages of completion to support future permitting activities. Baseline environmental studies to be completed for the permitting process include:

 

·Geology

 

·Geochemistry

 

·Surface Water

 

·Ground Water

 

·Meteorology

 

·Air Quality

 

·Vegetation

 

·Wetlands

 

·Soils

 

·Wildlife

 

·Aquatic Resources

 

·Cultural Resources

 

·Visual Resources

 

·Noise

 

Page 61 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Conditional Use Permit Requirements can include:

 

·Proposed land uses

 

·Setbacks

 

·Existing and proposed structures, design specifications, and location of all facilities

 

·Existing and proposed grading, drainage patterns, and landscaping

 

·Existing and proposed improvements, including sewer and water facilities, parking, and roads

 

·Existing and proposed signs with size, type, and locations

 

·Proposed timeline for completion of plans

 

·Proposed parking and loading plans

 

·Relationship of the proposed development to the surrounding area

 

·Property lines and lot dimensions

 

·Existing and proposed wells

 

·Existing and proposed septic systems and drain fields.

 

Additional information that the Planning and Zoning Administrator may request could include:

 

·A description of the activity or operation being proposed

 

·Hours of operation, number of employees, number of employees reporting to site

 

·Traffic in and out of business

 

·Number of vehicles on site

 

·Number of parking places, including handicap accessible

 

·Use of existing and proposed structures

 

·Outdoor storage needs

 

·Water, sewage disposal, and waste management service

 

·Socioeconomic Report

 

3.9Potential Significant Encumbrances

 

Three potentially significant encumbrances may affect the Project.

 

In 2017, Homestake sold several claims in M.S. 1862 (Stella, Stella No.1, Stella No.2, Stella No.4, Stella No 6, Stella No. 7, Margarite, Margarite, Margarite Nos. 1 through 5, Margarite No. 8) to Terrence T. Tyler (the Tyler Property) subject to an Area of Interest (AOI) buyback right reserved by Homestake. Under this AOI, Homestake had a right to buy back 51% of the property subject to the AOI if a resource of no less than 1 Moz Au is declared with the AOI. In May 2021, Dakota Gold purchased the Tyler Property. The AOI overlaps with the southeastern portion of the Richmond Hill Option Area, which is also owned by Homestake. This buyback right runs for a period of nine months from the declaration of a 1M+ oz resource within the AOI.

 

The Lakota Sioux assert ownership of the Black Hills of South Dakota. In United States v. Sioux Nation of Indians, 448 U.S. 371 (1980), the United States Supreme Court held that the United States government had “effected a taking of tribal property, property which had been set aside for the exclusive occupation of the Sioux by the Fort Laramie Treaty of 1868.” Although compensation was awarded for this unconstitutional taking, the Lakota have not accepted the award (reportedly in excess of $2 billion) and continue to claim rights to the Black Hills.

 

Dakota Gold has indicated that they do not believe that the former Richmond Hill Mine either helps or hinders continued exploration in any significant manner. Once the Option is exercised and the Property is purchased from Barrick, all Richmond Hill mine site water-management obligations, along with other post-closure operations, would become Dakota Gold’s responsibility.

 

Page 62 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

3.10Violation and Fines

 

Currently, there are no violations or fines.

 

3.11Significant Factors and Risks That May Affect Access, Title or Work Programs

 

To the extent known to the QP, no other known significant factors and risks may affect access, title, or the right or ability to perform work on the properties that comprise the Richmond Hill Project discussed in this Report.

 

Page 63 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

4Accessibility, Climate, Local Resources, Infrastructure and Physiography

 

4.1Topography, Elevation, and Vegetation

 

The Black Hills of southwestern South Dakota is an isolated mountain range rising from the Great Plains of North America and extending north-northwest into Wyoming (Figure 4-1). The hills are so-called because of their dark appearance from a distance, as they are covered in a pine–spruce coniferous forest. Black Elk Peak (formerly Harney Peak) rises to 7,244 ft (2,208 meters) and is the range’s highest summit and the highest mountain in the United States east of the Rocky Mountains. The Black Hills have been described as an island in the plains, since they rise 3,000 to 4,000 ft above their surroundings—the Thunder Basin National Grassland of Wyoming lies to the west and the Buffalo Gap National Grassland to the east.

 

Several small rivers cut through the range, describing a roughly radial pattern, though most drainage is to the east—most notably Spearfish Creek in the north, Rapid Creek in the central region, and the Fall River in the south. Regardless of the original drainage direction, all rivers flow into either the Belle Fourche River, which wraps around the Hills to the north, or the Cheyenne River, wrapping around to the south. The Belle Fourche connects to the Cheyenne River east of the Black Hills; the Cheyenne in turn joins the southeast-flowing Upper Missouri River in central South Dakota.

 

 

 

Source: Dakota Gold (2024).

 

Figure 4-1: Richmond Hill Gold Property Location

 

The Black Hills is home to varied landscapes, such as prairie grasslands; rolling hills; badlands; karst features such as caves and sinkholes; craggy peaks; and granite spires. The hills are also noted for several unique topographic features, including the Badlands, Devils Tower, Missouri Buttes, Bear Butte, Cathedral Spires, and Mount Rushmore.


Page 64 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

An ecological crossroad, the Black Hills contains wildlife and plant species typical of habitats of the Rocky Mountains, Great Plains, northern boreal forests, and eastern deciduous forests. The local forest is dominated by ponderosa pine, but also includes dense spruce stands and areas of aspen, birch, and oak (United States Department of Agriculture Forest Service 2023). White-tailed deer and mule deer are common, and elk are encountered less often. Mountain lion sightings are rare, but coyotes are relatively common. Goshawk and osprey nest in the forest, and bald eagles may visit in the winter. Many songbird species are present, including brilliantly colored mountain bluebirds and western tanagers.

 

The Richmond Hill gold mine sits at an altitude of 6,000 ft, and the historical leach pad area is 5,600 ft, about one mile north of the pit area.

 

4.2Property Access

 

Access to the Property is gained by traveling 1 mile southwest of Lead, South Dakota, on Highway 85/14A, to State Highway 473, then west approximately 3.2 miles to the Wharf Mine Road, continuing west approximately 1.7 miles before turning and traveling 1 mile north on the Richmond Hill Road (Figure 4-2).

 

4.3Climate

 

The Black Hills climate is one of cool-to-cold snowy winters, and warm-to-hot dry summers, with four full seasons.

 

Precipitation amounts vary due to mountain influence, and Richmond Hill is rated as subhumid, with approximately 30 inches of rain annually. Average monthly snowfall ranges from 5 inches in Rapid City to 15 inches in the Black Hills. The snow on the plains usually melts within a few days, with deeper snow in the Black Hills lasting much longer.

 

Any future mining operations are expected to be year-round. During January and February, daytime temperatures average in the 30s Fahrenheit, but Chinook winds can warm temperatures into the 50s and 60s. Occasional intrusions of Arctic air are short-lived, and temperature inversions sometimes produce warmer conditions in the Black Hills.

 

July and August are the warmest months of the year, when daytime temperatures climb into the 70s and 80s Fahrenheit—and sometimes the 90s. Breezy winds and low humidity help make the hot days comfortable.

 

4.4Local Resources and Infrastructure

 

The Project is within 5 miles of the twin towns of Lead and Deadwood. Dakota Gold has its base of operations in Lead, with separate facilities for office and core processing. Historical Richmond Hill Project documents are housed in secured storage at the Armories in Lead. Two other towns, Central City and Sturgis, are within 20 miles of the Project. The larger cities of Spearfish and Rapid City are within 40 miles of the Project, and most supplies can be obtained from one of these two centers. Personnel for exploration or development programs may be sourced from or housed in the four nearby communities.

 

Major transportation systems, including road, rail, and air, exist proximally to the northern Black Hills. Rapid City has a major rail freight station and regional airport, while an Interstate highway passes through the city and wraps around the northern end of the Black Hills.

 

Multiple facilities related to the historical Richmond Hill Mine still exist on the Property, including a water treatment plant and maintenance and storage buildings. Containment ponds are still operational, although an impermeable clay membrane has capped the open pit and leach pads.

 

Water for exploration drilling programs has been sourced locally and either pumped or trucked to the drills. One of three wells that supplied water to the Richmond Hill mine is still active.

 

Page 65 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

A 69 Kv transmission line supplies power to communities, and internal power is supplied by a 12.47 Kv line to the Project site.

 

 

 

Source: Dakota Gold (2023).

 

Figure 4-2: Richmond Hill Gold Project Access

 

Page 66 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

5History

 

Gold was first recorded in the Black Hills in 1874, although prior rumors existed of prospectors discovering placer gold. The ensuing 1875 gold rush produced limited success, except in the Whitewood and Deadwood Creeks area. Other prospectors sought the hard-rock source of the placer gold upstream of the placer workings, and in 1876, the Homestake lode was discovered; it was mined almost continuously until 2001. Numerous gold deposits were subsequently discovered in the Black Hills in different geologic environments, with several turning into significant mining camps.

 

5.1Explorations

 

The Richmond Hill mine is in the historical Carbonate Mining District approximately five miles northwest of Lead, South Dakota, in the northern Black Hills. Mining in the area started in the 1870s, during the gold-rush era. The only known production from the Property was from the Carbonate camp, which was primarily mined for lead and silver. The bulk of this production was from the Iron Hill mine. The mining was such that it supported a nearby town and smelter. Mining continued in this area until the silver price collapsed in the 1880s. About 2,500 ounces of gold were produced from the Spanish R mine on the western side of the camp in the late 1800s.

 

Prior to 1981, Viable Resources Inc. (Viable) assembled a land package that included most of the Carbonate camp. The bulk of the Richmond Hill deposit lies on Mineral Survey 977, obtained by a lease from Richard McQuire that included a 2.6% NSR royalty. LAC subsequently bought out this royalty in the early 1990s. In 1981, Freeport Exploration Company (Freeport) leased several claims from various individuals within the area now known as the Property. Also in 1981, Freeport formed both a lease agreement and joint venture (JV) agreement with Viable and drilled 52 rotary and core holes near the Richmond Hill topographical high and near the Carbonate camp several thousand feet to the north. The drilling project did not return the results Freeport needed to continue exploration, and the JV was terminated in 1983. Freeport subsequentially allowed their leases to lapse.

 

St. Joe American, owned by the Fluor Corporation, first started reviewing the Black Hills for its mineral potential in 1982 (St. Joe, 1986). They noted that total gold production in the area was over 39 Moz, with the Homestake mine accounting for 36 Moz. St. Joe determined that historical gold production came from five different geological ages and mineralizing processes. From oldest to youngest stratigraphically (mine or prospect examples) they are Precambrian (Homestake, Keystone, Bullion, Holy Terror, and Clover Leaf); Cambro-Ordovician Deadwood Formation (Cod) (Golden Reward, Bald Mountain, Maitland, and Wasp); Mississippian Pahasapa Formation (Spearfish Gold, Ragged Top, and Deadwood Standard); Tertiary porphyry related (Guilt Edge and Hoodoo-Union Hill); and Placer Deposits (Deadwood and Rockerville) (St. Joe, 1986).

 

Many of these mineralizing systems seemed to be present on the ground controlled by Viable, so in January 1984, St. Joe American entered into a JV with Viable to explore land around the Richmond Hill topographical high. They determined that this area held the greatest promise to host a minable gold deposit, and that year, they started drilling a breccia body 1,500 ft south of the hilltop; that breccia body contained the Richmond Hill gold deposit (St. Joe, 1987). The Richmond Hill mine history is summarized in Section 5.2.

 

An active exploration program continued elsewhere on the claims through the life of the Richmond Hill mine, primarily looking for gold-rich oxide rock that could supplement the feed to the Richmond Hill heap leach processing facility. In July 1987, Bond International Gold (Bond Gold) acquired St. Joe American. In 1990, Bond Gold explored thirteen prospective areas on the Property; only MW-3, Richmond Hill North, and Cole Creek returned positive results. The MW-3 Main deposit was discovered in the third hole drilled, 6,000 ft northeast of Richmond Hill, and later that year the MW3 East deposit was discovered 800 ft east-northeast of MW-3 Main, which contains higher grades. Due to the gold commodity price, at the end of 1990 several prospective areas were dropped from further exploration. These included the Earle, West Thumb, Twin Tunnels (TT), and Cleveland (CV) prospective areas. In 1991, seven additional prospective areas were explored, including Richmond Hill North (RHN), Cole Creek (CC), Eagle Bird, Helena, Huskie West, Perkins–Goodell, and Cleopatra Creek. Despite somewhat encouraging results, LAC did not develop any of these prospective areas due to low gold prices and environmental concerns. The MW-3 deposits were also excluded from further exploration due to being closed off in all directions, except those portions that trend off claims into ground held by others.

 

Page 67 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

In November 1989, LAC Minerals Ltd. Acquired Bond Gold. After the merger, the Project was held by the LAC subsidiary Richmond Hill Inc. In 1993, Richmond Hill Inc merged into LAC Minerals (USA) Inc. LAC Minerals (USA) Inc. converted to LAC Minerals (USA) LLC in 1999. Barrick Gold Corporation (Barrick) acquired LAC Minerals Ltd., the parent of LAC Minerals (USA) LLC in November 1994.

 

The Homestake Mining Company was acquired by Barrick in 2001. LAC Minerals (USA) LLC (hereafter “LAC”) and Homestake Mining Company of California (hereafter “Homestake”), a subsidiary of Homestake Mining Company merged in October 2023, with Homestake as the surviving entity. Homestake is the current owner of the properties formerly held separately by LAC and Homestake.

 

Dakota Territory Resources Company, now DTRC LLC, a subsidiary of Dakota Gold, entered into a three-year option agreement (the Option) with Barrick in 2021 to acquire the Homestake/LAC interests in the Richmond Hill Project area, with the mineral tenure primarily held in the names of LAC and Homestake (see discussion in 3.3 and 3.4). In 2022, the Option was amended to extend the Option period until March 7, 2026. In February 2025, the Option was further extended until December 31, 2028.

 

Table 5-1 provides a summary of Richmond Hill’s recent history.

 

Table 5-1: Summary of Richmond Hill’s Recent History

 

Company Year Comment
Viable Pre 1981 Assembled land package.
Freeport Exploration Company 1981 Leased several claims in Richmond Hill area.
Joint venture (JV) and lease agreement with Viable. Conducted drilling on several prospects.
1983 JV with Viable terminated and leases allowed to lapse.
St. Joe 1984 JV with Viable.
Started drilling on Richmond Hill deposit breccia body.
1985-1986 Continued drilling Richmond Hill deposit. Began property-wide drilling program. Added additional claims to the property position.
1986 Richmond Hill positive feasibility study. Continued property-wide exploration program. Identified significant gold mineralization in the Cole Creek, Twin Tunnels, and Turnaround prospective areas.
1987-1988 Richmond Hill deposit permitted for mining. Added the Turnaround deposit to the Mine Permit Application.
Bond Gold 1987 Acquired St. Joe gold division.
Developed Richmond Hill as an open-cut heap leach operation. Exploration continued with discovery of Cleveland prospective area.
1988 First gold and silver doré poured.
LAC Minerals 1989 Acquired Bond Gold.
1990–1991 Multiple prospective areas explored with some positive results, including MW-3 prospective area; but all rejected as possible feed sources for Richmond Hill.
1992 Acid mine-drainage detected; studies began for determining reclamation plan for acid-rock drainage (ARD).

 

Page 68 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Company Year Comment
  1993 Final mineralized material hauled from Richmond Hill mine pit and efforts shifted to reclamation activities. Final exploration activities by LAC Minerals at the site. Final report on prospective areas completed.
1994 Permit Amendment approved and reclamation work commenced.
LAC Minerals (USA/Barrick Gold) 1994 Barrick Acquired LAC Minerals.
1995 Reclamation of pit backfill and waste-rock dump completed. Last gold poured in June.
1996 Leach pad closure plan submitted and approved.
1997 Leach Pad closure completed, and water-treatment plant construction and operation start-up. Water treatment and monitoring are primary on-site activities.
2008 Biological selenium-treating water-treatment plant added to system.
2019 Wharf Resources options property and begins exploration program.
2021

Wharf Resources drops Option with Barrick.

 

Richmond Hill Gold Project optioned by Dakota Territory Resource Corp from Barrick including adjacent lands owned by Homestake which is also owned by Barrick.

2022 Dakota Gold formed as a merger of Dakota Territory Resource Corp and JR Resources.
Homestake 2023 LAC and Homestake merged into single company to become Homestake Mining Company of California.

 

Limited formal reporting of exploration activities on the Richmond Hill property was completed as needed for corporate reporting, so the history presented herein has been gleaned from a limited number of letter reports and memos that were written by employees of the day and saved from destruction after flooding destroyed nearly all historical documents (Dakota Gold Corp., pers. Comm.). Much of the exploration status presented in this Report is from project summary reports that the exploration staff compiled in 1993 as exploration wound down. Due to that flooding, most records of ground exploration other than drilling were destroyed.

 

Exploration activities included geologic mapping, soil sampling, rock-chip sampling, airborne and ground geophysical surveys, and drilling. Drilling was mainly by reverse-circulation (RC) methods; however, a few percussion holes were completed in the early 1980s, and core holes were drilled in the more intensively mineralized areas.

 

5.2Mining

 

The Richmond Hill deposit was discovered in 1984; and St. Joe Gold Corporation filed an application to mine in 1987, following receipt in 1986 of a positive feasibility report (St. Joe, 1987). In March 1988 a mining permit was granted. In late 1988, mining started as an open-pit heap leach operation (Duex and Anderson, 1994).

 

Richmond Hill mine facilities construction began in April 1988 under the ownership of Bond Gold. In fall 1988, production began from the Richmond Hill pit, with the first bar of gold and silver doré poured in December 1988. In November 1989, LAC acquired Bond Gold Corporation.

 

Mine production was from a single open pit with a valley-fill waste dump and three heap leach pads. Zones of mined sulfide-bearing mineralized rock placed on the waste-rock pile caused acid mine-drainage by June 1992. Thus, in July 1992, LAC was issued a Notice of Violation and Cease and Desist Order from the Department and was required to submit an application to amend its mine permit to the South Dakota Department of Environment and Natural Resources (SDDENR) and the South Dakota Board of Minerals and Environment (SDBME), outlining a new reclamation plan as the result of ARD detected at the toe of the waste-rock dump. The permit amendment was approved in February 1994, and reclamation work commenced in April 1994. The approved plan consisted of constructing a retention pond, treating the waste-dump discharge, and hauling all potentially ARD waste rock back to the pit and placing it under a multilayer capping system.

 

Page 69 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Mining continued intermittently until late 1993, and processing of heap leach pads continued until June 1995. Total production for the life of the mine was 5.24 Mton, with non-mineralized-rock production of 3.75 Mton. The final ore was hauled from the Richmond Hill pit in October 1993. In all, 172,294 ounces of gold were produced from the mine, along with 212,610 ounces of silver (Dakota Gold, pers. Comm.).

 

Barrick acquired LAC in November 1994. Reclamation of the engineered pit backfill facility and former waste-rock dump was completed in September 1995.

 

In conjunction with the permit amendment, a leach pad closure plan was submitted and approved in June 1996. Closure of the leach pads consisted of amending Leach Pad 3 with limestone to mitigate ARD and recontouring the pads and constructing a multilayer capping system similar to the capping system at the pit impoundment. Leach pad closure was completed in July 1997. The capping system was successful in significantly reducing ARD generation and water infiltration and, accordingly, the amount of leach pad effluent requiring treatment.

 

Since the leach pad effluent and the water stored in the process ponds did not meet discharge standards, primarily due to elevated levels of selenium, construction of a water-treatment plant began in 1995. The primary system consisted of a 200 gal/min selenium removal system. Due to issues with scale-up, a 200 gal/min reverse-osmosis (RO) unit operating at 50% recovery was installed at the site in 1997. The original selenium treatment circuit was used to treat the brine from the RO unit, which allowed a portion of the concentrate to be blended with the RO permeate and discharged to the environment. The water-treatment plant began operation in July 1997 and ran full-time year-round until December 1999 (Dakota Gold, pers. Comm.).

 

The original water-treatment plant then ran seasonally from 2002 until 2008 when a biological selenium-treating water-treatment plant was constructed to treat the concentrate stream. This biological water-treatment operates in conjunction with the reverse-osmosis unit to treat and discharge the effluent collected from the leach pads. Water treatment, environmental monitoring, and continued reclamation activities are ongoing at the site.

 

5.3Dakota Gold Corp

 

On September 7, 2021, Dakota Territory Resource Corp (DTRC), now DTRC LLC, signed the Option agreement with Barrick for the Property. In addition to the Richmond Hill land package, the Option includes lands adjacent to the Richmond Hill Property and owned by Homestake (also owned by Barrick). On March 30, 2022, DTRC (49%) completed a merger with JR Resources Corp (51%), resulting in Dakota Gold Corp. and its subsidiary DTRC LLC. Dakota Gold’s exploration in and around the Richmond Hill historical pit has continued to the present, primarily focusing on material amendable to conventional heap leach.

 

On February 3, 2025, the term of the Option was extended by agreement with Barrick until December 31, 2028.

 

Page 70 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

6Geological Setting, Mineralization, and Deposit

 

6.1Regional Geology

 

The Black Hills form an elongate Laramide-age structural and topographic uplift extending across western South Dakota and northeastern Wyoming, where erosion has exposed a Precambrian crystalline and metamorphic core surrounded by outward-dipping Paleozoic and Mesozoic sedimentary strata (Figure 6-1). The uplift exposes Archean basement, Early Proterozoic supracrustal metamorphic rocks, and younger Phanerozoic cover rocks, and records multiple Proterozoic deformation, metamorphic, plutonic, and later Laramide structural events (Redden and DeWitt, 2008).

 

The dome formed during the Laramide Orogeny, from 66 Ma to 56 Ma, which may have included episodic tectonic events (Lisenbee and DeWitt, 1993). The northern Black Hills are crossed by a west-northwest-trending belt of Tertiary alkalic intrusive centers, including stocks, laccoliths, sills, dikes, small pipes, and irregular bodies that were emplaced at shallow crustal levels (Lisenbee, 1981; Redden and DeWitt, 2008). Intrusive compositions in the district range from silica-saturated to silica-undersaturated rocks, including rhyolite, trachyte, latite, phonolite, monzonite, syenite, lamprophyre, and related breccias (Redden and DeWitt, 2008; Duke, 2005). Geochronologic and petrologic work on northern Black Hills intrusions indicates multiple periods of Paleocene to Eocene Tertiary magmatism, with intrusive rocks generally becoming younger, more alkalic, and more silica-undersaturated toward the west-northwest along the trend (Duke, 2005).

 

Precious-metal mineralization in the northern Black Hills is broadly associated with this Tertiary magmatic belt, where hydrothermal systems used pre-existing basement fabrics, Laramide structures, intrusive contacts, and fractured or permeable stratigraphic horizons as fluid pathways and depositional sites (Shapiro and Gries, 1970; Paterson et al., 1988).

 

Page 71 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 6-1: Generalized geology of the Black Hills, modified from Redden and DeWitt (2008), with cross-section location of Figure 6-2.

 

Page 72 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 6-2: Northern Black Hills cross-section showing generalized geology

 

6.2Local/Property Geology

 

The Property is on the northwestern portion of the Lead dome, a subsidiary dome north of the main Black Hills uplift. The Lead dome developed in response to a major Tertiary intrusive event that also led to the development of the Tertiary-aged gold deposits. Tertiary activity contributed to local structural preparation, hydrothermal alteration, and mineralization within the Project area. Local uplift and subsequent erosion have exposed a core of Precambrian igneous and metamorphic rocks, which is unconformably overlain and flanked by a Paleozoic to Mesozoic sedimentary succession that dips radially away from the uplift. The Project area is situated near the transition between exposed Precambrian core rocks and the overlying Paleozoic section, where erosion, paleotopography on the Precambrian surface, and intrusive doming influence the present distribution of host rocks.

 

Two major Precambrian metamorphic suites underlie the Property. In the eastern area, these consist of metavolcanic and metasedimentary rocks, composed of phyllite, iron formation, and quartzite of the Flag Rock and Ellison Formations. These units are steeply dipping to isoclinal and intensely folded. The western side contains primarily extrusive metavolcanic rocks of original mafic composition, which have been metamorphosed to greenstone. What is currently interpreted as a Precambrian-age shear zone separates this greenstone, potentially of the Yates Formation, from the eastern metasedimentary and metavolcanic units.

 

Unconformably overlying the Precambrian rocks on the north portion of the Property is a Paleozoic section from the Cambrian-Ordovician Deadwood Formation through the Ordovician Winnipeg, Ordovician Whitewood, Mississippian-Devonian Englewood, and Mississippian Pahasapa Limestone. These units dip gently (10-20 degrees), generally to the northwest, with local variation due to structural control.

 

Tertiary intrusive rocks occur as stocks, sills, dikes, laccoliths, and breccia pipes, and can occur within all other rock units. Tertiary intrusive compositions vary widely and are generally porphyritic, and include latite, trachyte, rhyolite, phonolite, and minette.

 

Page 73 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Surface mapping was completed by previous operators including Freeport (1981 – 1983), St. Joe/Bond Gold/LAC Minerals (1984 through closure in 1993), and Homestake Mining (1985). Dakota Gold has been conducting focused surface mapping and sampling from drill roads and peripheral areas since acquiring the project in 2021. A current geology map of the central project area is shown in Figure 6-3.

 

 

Figure 6-3: Property plan view geology map

 

6.2.1Lithology

 

Principal lithologic groups on the Property include Precambrian metamorphic rocks, Cambrian through Mississippian sedimentary rocks, Tertiary intrusive rocks and breccias, and locally preserved Tertiary to younger surficial or sedimentary deposits.

 

The Precambrian section (Figure 6-4) includes greenstone that has been mapped as the Yates Member of the Poorman Formation on the west-side of the main structural zone coincident with major breccia bodies. East of this zone, Precambrian units are the Ellison Formation and Flag Rock Group. Both can include phyllite, and graphitic phyllite. The Ellison Formation also contains distinct quartzite units, and the Flag Rock contains cherty magnetite-bearing iron formation and local greenstone.

 

The Deadwood Formation (Figure 6-5) overlies the unconformity with the Precambrian units, and is a key Paleozoic host. The lowermost conglomerate unit varies in thickness depending on paleotopography; generally, paleoenvironments on more resistant quartzite ridges resulted in little to no basal conglomerate, while conglomerate is thick in areas of paleotopographic lows. Above the conglomerate, lower quartz sandstone and calcareous sandstone grades into middle interbedded shale, siltstone, sandstone, limestone/dolostone, and flat-pebble conglomerate. This grades into an upper sandstone unit that is glauconitic to quartz-rich sandstone, including a local Scolithus-bearing sandstone interval.

 

Overlying Paleozoic units include the Ordovician Winnipeg Formation, which is comprised of the Icebox Shale and Roughlock Siltstone; Ordovician Whitewood Formation, a limestone unit; Mississippian-Devonian Englewood Formation, which is composed of shale and argillaceous limestone/dolostone; and Mississippian Pahasapa Formation, correlated with the Madison Limestone. In the northern Black Hills, the Pahasapa can be locally important to mineralization, with carbonate rocks and related solution features hosting narrow, structurally-controlled mineralization, such as the silver mineralization of the Carbonate District in the northwest part of the Project area. Paleozoic units can also host structurally-controlled gold mineralization within the Richmond Hill deposit.

 

Page 74 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Tertiary igneous rocks are typically porphyritic and local compositions include phonolite, rhyolite, trachyte, quartz trachyte, latite, monzonite, and syenite. Lamprophyre is also a local term for biotite-bearing porphyritic rocks that are compositionally similar to minette but that also include feldspar phenocrysts.

 

Breccias range from crackle to chaotic textures and may be igneous, hydrothermal, phreatomagmatic, collapse-related, or fault-related; clasts may be Precambrian, Paleozoic sedimentary, Tertiary intrusive, or mixed; and matrix or cement may include rock flour, silica, calcite, fluorite, pyrite, clay, barite, and iron oxides. Intrusive breccias grading into xenolith-dominant intrusives are also common.

 

Particularly in Tertiary intrusives and breccia, alteration commonly obscures primary mineralogy and complicates hand-sample classification; more generalized terms such as “undifferentiated intrusive” may be used where alteration is significant.

 

 

 

Figure 6-4: Generalized Precambrian stratigraphy of the northern Black Hills

 

Page 75 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Source: Dakota Gold, 2025.

 

Figure 6-5: Paleozoic section with units present on the Richmond Hill Property

 

6.2.2Structure

 

Local structures include steep fractures, faults, breccia zones, intrusive contacts, and stratigraphic contacts that served as conduits or traps for hydrothermal fluids. Locally, mineralization is focused along “verticals,” the local term for vertical to subvertical fracture zones, which are not typically offset. High-grade zones, such as those evident in the northeast portion of the Property, either show continuity for hundreds to thousands of feet, or appear as clusters where fracture zones intersect. Orientation of the fracture zones varies in the northern portion of the property, but several are roughly north-south.

 

Page 76 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Mapping done by previous operators and recent surface mapping and drilling compilations include extensive faulting within the project area. Fault offsets may be restricted to the margin of sills and not extend to the Precambrian. Fault orientation is highly varied, with dip of the unconformity expressed in slightly different orientations from northeast to dominantly northwest in different fault-bounded blocks.

 

Dikes and composite dikes are clustered in some fault areas but also occur extensively across the property and frequently along steeply-dipping Precambrian fabric. Foliation and compositional layering in the east side of the property in the Ellison Formation and Flag Rock Group is steeply dipping as it is elsewhere in the region. Fabric in the greenstone to the west is subtle due to its composition and rheology.

 

The greenstone in the west side of the Project area has been mapped as the Yates Formation (e.g., Redden et al., 2008). Map compilations and recent drilling show that not only Flag Rock, but younger Ellison Formation is juxtaposed against the greenstone along a major north-south structure. This structure is coincident with the major breccia bodies and mineralization trends in the southern portion of the property, with potential reactivation of an older Precambrian shear zone during Tertiary activity and mineralization.

 

6.2.3Deposit Geology

 

Several Tertiary-age gold-silver deposits and prospective areas exist within the Project boundary. Historical prospects and mine areas within the resource area that are predominantly in fractured Precambrian rocks, breccia, and intrusives include Richmond Hill and Richmond Hill North/Ella, Turnaround, Twin Tunnels, West Thumb, Huskie West, Cleveland, Calvin P, Cole Creek Heights, and Earle.

 

In the Paleozoic rocks, mineralization occurs in the Cambrian-Ordovician Deadwood Formation laterally in major sandstone units as well as in all horizons adjacent to structures. These units are significant in Cole Creek, MW3 Main and East, and Chism Gulch. Localized mineralization also occurs in overlying units through the Pahasapa Limestone, but is often narrow along structures, such as those present in the historical Carbonate District in the northwest Property area.

 

The Richmond Hill St. Joe/Bond Gold pit area is centered on an elongate Tertiary breccia pipe intruded into Precambrian phyllite and greenstone, with stockwork zones fracturing and mineralization surrounding the pipe.

 

The Richmond Hill breccia pipe contains angular clasts, which include Tertiary intrusive rock and Precambrian greenstone, with a matrix of rock flour, iron oxides, barite, and adularia (Paterson et al., 1988). Multiple trachyte porphyry intrusions which are stockwork fractured, and fractured, altered greenstone are also present in the Richmond Hill St. Joe/Bond Gold pit area, both also gold-bearing. Accessory minerals in the breccia include quartz, alunite, jarosite, kaolinite, fluorite, and rutile. Alteration of the breccia was described as argillic with weak silicification. Pyrite and marcasite occur in unoxidized rock. The deposit (that was mined) was primarily in the oxidized zone which extended to a depth of 250 ft. Trachyte porphyry is also present with gold-bearing quartz-barite-pyrite veinlets. Gold grain sizes were determined by scanning electron microscope studies to be less than 2 microns (µm) occurring in quartz, feldspar, kaolinite, and iron oxides (Duex et al., 1987).

 

West Thumb, directly west of the Richmond Hill St. Joe/Bond Gold pit area breccia, and Huskie West, directly southwest of the breccia, had limited historic drilling. Huskie West includes a gold soil anomaly trending 700 ft north–south and 300 ft east–west. It is underlain by altered greenstone cut by numerous Tertiary dikes (St. Joe, 1986). Some historical holes, densely drilled in West Thumb and more sparsely drilled in Huskie West, were drilled into Deadwood, Precambrian, Tertiary intrusives, and breccias, with low to moderate gold grades returned in each, and higher grades in West Thumb.

 

Page 77 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The Richmond Hill North or Ella zone is centered on another breccia body approximately 1,500 ft north-northeast of the Richmond Hill St. Joe/Bond Gold pit area. A 1990 radiometric airborne geophysical survey identified the Richmond Hill North zone as having the potential for Richmond Hill deposit-style mineralization. The area has multiple intrusive bodies and a large breccia pipe. The geology comprises Proterozoic greenstone rocks overlain by the Cambro-Ordovician Deadwood Formation and intruded by Tertiary porphyritic intrusive rocks (LAC, 1993). Rock units strike approximately north–south and dip vertically.

 

The Turnaround breccia area is approximately 1,000 ft northeast of the Richmond Hill St. Joe/Bond Gold pit area. The pipe is weakly mineralized throughout, with a higher-grade core. Alteration and clast compositions are different from the pipe at the Richmond Hill deposit, as there are abundant Cambro-Ordovician Deadwood Formation clasts that contain higher-grade mineralization. These clasts are at a lower elevation than the Precambrian unconformity adjacent to the breccia zone, which indicates collapse or mixing of clasts. Other clasts include greenstone, Precambrian metasedimentary rocks (Flag Rock and Ellison Formation), and Tertiary intrusives. Precambrian clasts vary as this breccia spans the north-south Precambrian structural zone that separates the greenstone from the metasedimentary units. Breccia style is more chaotic at the core and grades to mosaic to crackle breccias to the east and west, and there are multiple overprinted breccias comprising the breccia body, from hydrothermal breccias with mineral cement to igneous matrix breccias. Carbonates and clays are the primary hydrothermal cement. Cement or matrix is overprinted by iron oxides at shallower levels.

 

The Twin Tunnels zone is north of Turnaround and south of the MW3 Main and Cole Creek areas. It is named for a pair of historical adits in the breccia zone comprising the Southern Extension and Northern Extension zones. Gold mineralization in the south of Twin Tunnels has been described as silicified Precambrian rocks surrounding a jasperoidal core (St. Joe, 1986). Dakota Gold has conducted drilling from several platforms north-south through the Twin Tunnels area, and breccia clast composition has varied across these platforms with mainly greenstone clasts in the south and metasedimentary Ellison and Flag Rock clasts in the north, as this breccia also crosses the north-south Precambrian structural zone separating these units. Mixed clast zones include Tertiary intrusives. The breccia style in this zone varies between crackle, mosaic, and chaotic throughout the composite breccia body. Clast support dominates shallower levels, with more cement or matrix support at depth and in the core. Most of the breccia body is hydrothermal type, with carbonate and clay cement dominating, and some zones of fluorite or pyrite cement.

 

The greenstone and intrusives surrounding Richmond Hill and Richmond Hill North/Ella breccias and to the west of Twin Tunnels and Turnaround is varyingly altered. Oxidation is most intense nearest the surface. Depth of oxidation can increase depending on local area and structural control. Bleaching including alteration of mafic minerals within the greenstone intensifies in general when nearer to the breccia bodies. The relative contributions to the bleaching of potassic alteration, fenitization, silicification, and argillic alteration have not been fully established. The strongest greenstone alteration and alteration of greenstone clasts within the breccia is along the major Precambrian structure, at the cores of the Twin Tunnels and Turnaround breccias. Similarly, both clay alteration within intrusives and propylitic alteration, generally marked by the addition of chlorite and epidote, is strong along the north-south structural zone, but also in the north part of the Richmond Hill St. Joe/Bond Gold pit area breccia. Potassic alteration is also identified in various intrusives, but is in general more widespread and less identifiable along specific zones.

 

The Cleveland area is about 2,000 ft northeast of the Richmond Hill gold deposit. This area contains multiple dikes mapped striking north to north-northeast within the Precambrian Flag Rock. Depth of oxidation is relatively shallow, though mineralization continues deeper. Most gold mineralization was described as controlled by east–west fault systems (Duex, 1989).

 

Mineralization weakens to the north through the Cole Creek Heights area for less than 1,000 ft before it strengthens again in the MW3 Main area. The Calvin P area is west of the Cleveland area and has similar underlying geology and merges with the Twin Tunnels area. The Earle area is roughly 3,000 ft southeast of the Richmond Hill St. Joe/Bond Gold pit area breccia; an area approximately 2,000 ft northeast to southwest was tested with historical drilling and had similar geology to the Cleveland area but limited mineralization.

 

Page 78 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The remainder of this section discusses the north portion of the deposit, including Chism Gulch, MW3 East and Main, and Cole Creek, which is generally north of the Precambrian unconformity contact at surface. These successive deposits are located generally along a north-northeast by south-southwest trend, although mineralization in Cole Creek also continues along an northwest-southeast trend. The Cambro-Ordovician Deadwood units, as well as overlying units in northwest Cole Creek, dip 10 to 20 degrees to the northwest to north-northwest, with local variations in dip direction, especially in fault bounded blocks.

 

The Cole Creek area is 4,000-5,000 ft north of the Richmond Hill gold deposit on the north side of Cole Creek. This area contains replacement-style mineralization throughout the Deadwood Formation, as well as narrow, structurally-controlled mineralization in overlying Paleozoics including the Ordovician Winnipeg and Whitewood Formations, dipping 15 to 20 degrees to the northwest. The sedimentary rocks are intruded by Tertiary porphyritic sills and dikes, and local breccias.

 

Breccias in the west are not extensive along strike but appear in multiple places along fault dike margins and as larger bodies at the junction of multiple dikes. Breccias in the east occur along trend with the Twin Tunnels breccia. The main mineralization trend is oriented northwest but exhibits local structural control. Faults occur in varying orientations, with northeast-striking faults in the east Cole Creek area, north of Twin Tunnels. Mapped north-northwest faults dominate the west side of this area. Northwest-, north-, and northeast-striking dikes are all present in surface mapping or drilling. Intrusive composition is highly varied, though the Cole Creek area has more abundant “lamprophyres” than other areas of the Property. Lamprophyres are locally designated by being porphyritic intrusives with a significant biotite component, although feldspar phenocrysts may also be present.

 

Cole Creek mineralization trends towards the northwest in the direction of the historical Carbonate Camp, but has had limited drilling in this area. The Iron Hill area is part of this district, just north of the Cole Creek prospect, and has mine dumps containing gold mineralization believed to reflect the underlying structure. Although the previous mining area produced silver, two north-northwest to south-southeast trending mineralization zones separated by about 1,000 feet, including the Iron Hill “Vertical” or fracture zone in the south, are expressed in gold-mineralized surface sampling results. Both of these structures trend onto the Property. To the west, the south structure intersects mineralized surface sampling in a parallel trend to Cole Creek in the Spanish R area. The mines and prospects of the Carbonate District, which historically produced silver, occur from within the northwest extent of the Richmond Hill gold deposit up to approximately 3,200 feet from it. Individual deposits along the main (southern) fracture zone include Segregated Iron Hill, Seabury Calkins, Iron Hill, Combination, Abe Holmes, and Adelphia. The north fracture zone includes Darboy, Farwest, Rattler, Surprise, and Hartshorn deposits. Deposits off the main fractures are the Spanish R, Buntz, and Homerun.

 

The MW3 area is approximately 5,000 to 6,000 ft northeast of the Richmond Hill mine and comprises two zones, Main and East, which were previously reported to have bulk-mineable oxide resources, but were never mined (LAC, 1991). The zone is adjacent to the original Richmond Hill mine’s processing facility in the northern portion. Fault zones that truncate sills and which in some cases offset the Precambrian are in many places coincident with dikes. A thick north-northwest composite dike was mapped in the MW3 East area and is the general interpreted strike of the multiple dikes intersected in drilling, although dikes strike more northeast on the west side of this deposit area where it joins with the Cole Creek area. Local discontinuous breccias are present. The Precambrian unconformity dip in this area is generally to the northwest, although the area between the East and Main zones is offset by faults and has a more northward dip. The unconformity steepens significantly to the south, which may be due to an east-northeast striking fault zone, though no discrete faults have been identified. The southern boundary of this area is the Precambrian unconformity contact at surface, as most of the significant mineralization is hosted in the Deadwood Formation and Tertiary sills and dikes. There is apparent steep north-northwest structural control on higher grade mineralization, though individual higher-grade zones are not as continuous as in other areas of the Project.

 

Page 79 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The Chism Gulch area was drilled out by Dakota Gold, with no historical drilling in the database, although the area was previously known to be prospective. Geology in the south part of Chism Gulch is similar to that of the MW3 area, with the highest-grade mineralization in the lower Deadwood Formation, and the south extent of the area defined in the south by the Precambrian unconformity at surface. Many porphyritic sills and dikes of varying composition are present and varyingly mineralized in this area. High-grade gold mineralization trends are particularly continuous in Chism Gulch, with two generally north-striking zones, although there is local variation to the trend, one in the east and one the west-central area. The high grades are present in the Deadwood Formation, and deepen to the north, where there are thicker overlying, less-mineralized units present. Sills to the north are weakly mineralized but contain some more well-mineralized zones along the same structures that exhibit high-grade mineralization in the Deadwood. The east side of Chism Gulch is defined by a fault that offsets the Precambrian, which is uplifted to the east. Other discontinuous faults in varying orientations have an overall northwest trend and continue from the major fault in the east through the drilled area westward. Multiple north to north-northwest-striking faults are present in the south near the unconformity at surface, and dikes are also present along and parallel to these faults. Sill compositions vary and their edges may be defined by northeast-striking faults that have been eroded below the sill level along parallel drainages.

 

 

Figure 6-6: Deposits within and near the Richmond Hill resource area

 

Page 80 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

6.3Deposit Types

 

The principal deposit type at Richmond Hill is interpreted as a Tertiary epithermal to replacement style gold-silver deposit. Mineralization developed mainly in Precambrian metamorphic rocks, Cambrian-Ordovician Deadwood Formation and overlying Paleozoic units, Tertiary intrusive rocks, and Tertiary breccia bodies.

 

Regionally, northern Black Hills Tertiary precious-metal deposits include sediment-hosted replacement zones, intrusive-hosted disseminated and stockwork zones, and breccia-hosted mineralization, and published classifications may emphasize different levels or host environments within related hydrothermal systems (Paterson et al., 1988; Paterson, 1990). Sediment-hosted replacement mineralization can occur as structurally-controlled zones where steep fracture zones or faults intersect permeable or reactive horizons, such as sandstone or dolomitic/calcareous intervals of the Deadwood Formation (Shapiro and Gries, 1970; Paterson and Giebink, 1989). Intrusive- and breccia-hosted mineralization may occur as disseminations, stockworks, or replacements within porphyritic intrusions, hydrothermal breccias, and adjacent altered country rock (Paterson et al., 1988).

 

6.4Mineralization

 

In the northern Black Hills, mineralized trends commonly reflect the interaction of older Precambrian fabrics, Tertiary structures and intrusives, and permeable or chemically reactive Paleozoic units such as the Deadwood Formation (Shapiro and Gries, 1970; Paterson and Giebink, 1989).

 

Gold-silver mineralization at Richmond Hill is spatially associated with Tertiary intrusive and hydrothermal activity and occurs in several host lithologies, including breccia bodies; fractured and altered Precambrian rocks; and Deadwood Formation sandstone, conglomerate, and interbedded sandstone, siltstone, and shale with varying carbonate content. Locally other Paleozoic carbonate-bearing units have been mineralized, such as the silver mineralization within the Pahasapa Limestone in the Carbonate District.

 

Mineralization is commonly controlled by steep structures, breccia zones, intrusive contacts, and favorable stratigraphic horizons that permitted hydrothermal fluids to move upward and laterally into permeable or reactive host rocks (Shapiro and Gries, 1970; Paterson and Giebink, 1989). In Precambrian-hosted zones, gold mineralization is associated with hydrothermal breccias, fault zones and Tertiary intrusive dikes, and intense fracturing and alteration. Alteration may overlap and include mineralogical changes in extremely fine-grained rocks that are recognized mainly by color or textural changes. Alteration can include silicification, argillic or clay alteration, propylitic alteration, and potassic alteration.

 

Tertiary hydrothermal activity is associated with silica/quartz, clay, barite, fluorite, adularia, and carbonates. Sulfide-bearing mineralization includes pyrite and marcasite, which may be arsenical, while oxidized mineralization is characterized by iron oxides and jarosite after sulfides. Other rarely observed sulfides include galena, molybdenite, sphalerite, and chalcopyrite. These minerals are not everywhere directly associated with gold-silver grades and may represent multiple hydrothermal or post-mineral events.

 

Page 81 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

7Exploration

 

Dakota Territory Resource Corp., now DTRC LLC, entered into the Option with Barrick on September 7, 2021, and began ground exploration on the Project, including gravity, induced polarization (IP) survey and drilling. Prior to optioning the Project, an airborne geophysical survey over a wide area of the Homestake district was performed. These are summarized in the following sections from data sheets provided by Dakota Gold (Berry, 2023a and 2023b).

 

7.1Airborne Geophysics

 

From June 26 to August 1, 2020, New Sense Geophysics Ltd. conducted a high-resolution helicopter-borne magnetic and gamma-ray spectrometric survey over the Homestake District of Northern Black Hills, South Dakota. The survey consisted of 11,636-line km covering an area of 962.4 km2 and included the Property (Figure 7-1). The purpose of the survey was to map Precambrian lithologies and structure, as well as Tertiary intrusive rocks and associated alteration in outcrop, subsurface, and beneath cover. A report detailing the contractor’s work is dated August 31, 2020. Results of the survey are not publicly available.

 

 

 

Figure 7-1: Airborne Magnetics Survey Flightline Limits

 

The airborne magnetic survey was able to identify the Tertiary intrusive centers and possibly larger feeder dikes. Most of the intrusive centers had previously been identified by surface mapping either by exposed intrusive rocks or by doming of the Paleozoic and Mesozoic strata. Inversions of the magnetic data set were also useful for identifying potential alteration associated with breccias and faults in the Richmond Hill Property. The radiometric survey, especially thorium, identifies the larger Tertiary intrusive centers.

 

Page 82 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

It is the opinion of the QP for this section that the airborne geophysical survey informed the selection of the Richmond Hill Gold Project area to option and also aided interpreting the extent of the geological units under areas of cover.

 

7.2Gravity Compilation and Survey

 

In December 2021, geophysical contractor Robert B. Ellis, Allan Spector and Associates, Ltd. and Magee Geophysical Surveys LLC (Magee) completed a report titled Gravity Compilation and Processing (2021 Merge) Homestake District. Their work entailed compiling and merging historical Homestake gravity data with National Geophysical Data Center gravity data and Magee gravity data for the Black Hills region.

 

During May and June 2022, Magee collected additional gravity data to be added to the Dakota Gold data set. The survey acquired data from 550 gravity stations across the Black Hills to fill in gaps in the regional data set and to replace older readings that potentially had elevation- or terrain-correction problems. The survey area included Lawrence, Pennington, Butte, and Custer Counties of South Dakota, and Crook, Weston, and Niobrara Counties of Wyoming (Figure 7-2). Although the survey encompassed a large area, additional stations were surveyed near Richmond Hill. No report was completed summarizing this work, but maps and cross-sections were produced to assist with ongoing geologic interpretations.

 

The gravity survey was used to map out differences in density of the various rock units. The Tertiary intrusive rocks generally have lower densities than the Precambrian metamorphic host rocks. For example, there is a large intrusive body east of the Project area known as the Cutting Stock that is a distinctive gravity low. The larger metamorphosed basalt units commonly generate gravity highs. The eastern contact of the metamorphosed basalt running through the center of the Project does not generate a large density contrast. The lack of density contrast may be because of the heavy alteration of the metamorphosed basalt adjacent to the north-south trending Tertiary breccia pipes or that the lower-density breccias tend to intrude along this structure.

 

The gravity survey aided in interpreting the extent of geological units in areas of cover, and drill-hole collars were spotted using a combination of this and other airborne and ground-based surveys.

 

Page 83 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The QP responsible for this section of the Report believes that the gravity survey aided Dakota Gold in interpreting the extent of geological units in areas of cover, and spotting drill-hole collars benefited from a combination of this and other airborne and ground-based surveys.

 

 

 

Source: Robert B. Ellis, Alan Spector and Associates, Ltd. And Magee Geophysical Surveys LLC (2021)

 

Notes: Index maps showing compiled gravity stations for the Black Hills regional area (left) and a focus area (right). Black dots are National Geophysical Data Center stations. Green dots are historical Homestake (Spector) stations. Red dots are stations acquired for Dakota Gold in 2020 and 2021. Black Polygons are outlines of Dakota Gold’s 2020 airborne geophysical survey and the primary gravity focus area. Blue polygons are County Lines.

 

Figure 7-2: Gravity Survey Station Locations

 

Page 84 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

7.3Induced Polarization Survey

 

From September 15 to October 2, 2022, KLM Geoscience LLC conducted IP and resistivity geophysical surveys across four lines for 8.1 miles (13.1 km) of survey lines at the Project (Figure 7-3). The survey was a dipole–dipole-type array with a 200 m dipole size using a 5 Kw transmitter and 16 channel IP receiver. The survey generated an IP response with parameters two seconds, time domain, 12 window, 150 ms, 55 ms delay after turn-off. Pseudo-sections were generated initially, then inverted to model true sections. Using the survey results, Dakota Gold was able to plan drill holes more accurately to intersect intended zones. KLM produced the Dakota Gold Richmond Hill DCIP Survey Logistical Report on October 2, 2022.

 

 

Figure 7-3: Geophysical IP – Resistivity Survey Line Locations

 

Page 85 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The IP survey identified possible breccias and iron formation as identified by the resistivity and chargeability response. Several drill holes tested the chargeability anomaly that was interpreted to be iron formation. The holes intersected Proterozoic Flag Rock Formation magnetic and sulfide-bearing iron formation containing Tertiary gold-silver mineralization but no classic Homestake-style siderite iron formation mineralization. Resistivity highs corresponded to Proterozoic Ellison Formation quartzites and unaltered Proterozoic greenstones, and these were excluded from drill testing.

 

The QP responsible for this section of the Report believes that the IP survey aided Dakota Gold in mapping iron formation and other non-mineralized rock formations at depth and that a more detailed survey could be considered in areas lacking outcrop and needing additional subsurface information.

 

7.4Geological Mapping

 

Small-scale geological mapping was conducted over the Project starting November 1, 2021, and continuing to the end of 2024. Dakota Gold geologists mapped an area of 3.3 square miles (8.6 km2) (Figure 7-4) to help guide drill-hole targeting, with the ultimate goal of integrating surface geology with drill-hole lithography to produce a three-dimensional (3D) geological model. Much of the work has consisted of field-checking St. Joe Minerals, Bond Gold, and LAC mapping and sample programs from the 1980s and 1990s. The recent mapping has yet to be compiled and is still in field note form. Dakota Gold has stated that the mapping confirms earlier work by others (James Berry, pers. Comm.) and that the map provided as Figure 7-4 is the most accurate as of the Report date.

 

The opinion of the QP for this section of the Report is that the map provided in Figure 7-4 is of sufficient detail to allow targeted drilling.

 

Page 86 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 7-4: Dakota Gold Geologic Field Work

 

Page 87 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

7.5Drilling

 

7.5.1Summary

 

Prior to Dakota Golds’ tenure, the Property was drilled by at least 1,056 rotary, RC, and core holes testing multiple prospective areas within the claim boundary. Several of these holes are excluded from the final database due to missing collar coordinates, downhole surveys, or other reasons. From optioning the Property in 2021 to June 17, 2026, the cut-off date for drilling information for this PFS, Dakota Gold has drilled an additional 485 drill holes representing 303,864 ft of drilling. The Dakota Gold holes are all core drilling except for 29 RC holes drilled for groundwater monitoring as part of the 2025 drilling campaign.

 

The drilling database provided to IMC consisted of 1,386 drillholes and 607,225 ft of drilling. Table 7-1 shows drilling by company. Figure 7-5 shows the distribution of drill holes by the company.

 

Table 7-1: Drilling by Company

 

Company Total Holes Final Database
No. of Holes Feet
Freeport 30 0 0
Legacy Drilling 951 828 275,191
St. Joe / Bond Gold 903 780 268,477
Homestake 48 48 6,714
Coeur 75 73 28,170
Pre-Dakota Gold Drilling 1,056 901 303,361
Dakota 507* 485 303,864
2022 13 13 27,954
2023 61 61 98,610
2024 78 78 36,911
2025 242 241 96,423
2026 114* 92 43,966
Total 1,563 1,386 607,225
*114 holes were drilled for 2026, but only 92 were available by the July 2026 cut-off date.

 

Page 88 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

*114 holes were drilled for 2026, but only 92 were available by the July 2026 cut-off date.

 

Figure 7-5: Richmond Hill Gold Project Drillholes by Company

 

Page 89 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

7.5.2Freeport (1981 – 1983)

 

Freeport completed 30 conventional rotary drill holes. These holes were excluded from the final database as the collar locations are not known and contamination between samples was likely.

 

7.5.3St. Joe, Bond Gold, and Homestake (1984 – 1994)

 

St. Joe, Bond Gold (while independently operated), and Bond Gold (while owned by LAC), and Homestake completed multiple RC and core-drilling programs on various prospects across the Project area. Separate drill-hole numbering series were used for each prospect area and were sequentially carried on between program operators. There are no core or pulp samples available from these drilling programs. The April 2024 Technical Report states that 951 drill holes were completed, however only 874 drill holes were acceptable for geological and resource modeling as 77 were excluded due to incomplete collar and/or downhole surveys or large discrepancies between data sources. The database provided to IMC for the current study included 828 of these holes. There were 836 holes in the database used for the July 2025 Technical Report. One of the eight removed holes was RH-87-125C, which was a duplicate of RH-86-125C. Five holes, BZ-91-10, RH-85-73, RH-85-74, RH-86-96, SR-91-7 were removed due to collar location issues. The collar elevation for some of them was below the topography surface. For two holes, HW-86-2 and TT-85-5, the logged geology was not consistent with surrounding holes, so they were assumed to be mislocated also.

 

Drill hole collar locations were surveyed at the time of drilling into the Richmond Hill mine grid, which is a property specific grid. The original surveyed collar and control point coordinates were obtained from scanned paper sheets with tabulated digital and handwritten survey coordinates under Scott Engineering Letterhead, or directly from drill log headers. The Scott Engineering survey tickets are typical of survey instrument printouts from that time period, although no instruments were specified in any of the historical documentation. Documentation comprising drill hole collar coordinate listings from later in the programs indicates that Geodimeter Surveying Software was being used to manage surveying data.

 

The Richmond Hill mine grid was originally established using a 1’ x 1’ true north grid with the US Locating Monument #41 assigned coordinates of X = 100,000 ft and Y = 100,000 ft. Key control points for this grid were relocated by Dakota Gold personnel and Ponderosa Land Surveys, re-surveyed in US State Plane Coordinates System, and a custom projection created for transferring between the Richmond Hill mine, US State Plane, UTM NAD 83, and Homestake mine coordinate systems (Ponderosa, 2024).

 

Drill hole dips were obtained directly from drill log headers and applied only to the drill hole collar as most drill holes were relatively short. No instruments were specified for any of the downhole surveys.

 

Drill logs comprise mostly handwritten sheets with a header section for hole details and a description section for from-to intervals and geological descriptions plus varying amounts of supporting information. A small number of drill logs from later holes comprise spreadsheets. Information from handwritten logs was transferred to standardized digital drill logs containing hole number, collar coordinates, azimuth, dip, dates started and completed, from-to depth intervals, sample numbers, gold values in oz/ton, silver values in ppm and codes for lithology, oxide or sulphide mineralization, and alteration.

 

7.5.4Coeur (2019 – 2020)

 

Coeur (Wharf Division) completed two drilling campaigns comprising 75 RC holes (R19R-4674 to 4683 and R20R-4684 to -4747 & 4690A). There are no core or pulp samples available from these drilling programs. The database for the July 2025 Technical Report included 74 of the Coeur drill holes as one hole was excluded due to a missing downhole survey. The database for the current study includes 73 of the Coeur holes. Hole R20R-4731 was removed because the collar elevation is below the topography surface, so it is assumed to be mislocated.

 

Page 90 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The Coeur drilling was concentrated in the north of the deposit area in the Chism Flat, MW3 East, and Cole Creek areas.

 

Drill hole collar locations were surveyed at the time of drilling into the UTM NAD 83 coordinate system. These were then converted to Richmond Hill mine grid coordinate system by Dakota Gold using the procedures described by Ponderosa Land Surveys (Ponderosa, 2024).

 

Drill hole dips were obtained by surveys completed every 50 ft downhole starting at the collar and also at the end of each hole. A Surface Recording Gyro (SRG) instrument was used for the downhole surveys, but the actual instrument brand name was not specified. All data was exported to a spreadsheet provided by Coeur to Dakota Gold.

 

Drill logs comprise colored acQuire strip logs based on geological data stored in acQuire database software and exported to spreadsheets comprising hole numbers, collar coordinates, azimuths, dips, dates started and completed, from-to depth intervals, sample numbers, gold and silver values, ABA, alteration, lithology, mineralogy, oxidation, rock type, sulphide, and texture.

 

7.5.5Dakota Gold (2022 – 2026)

 

7.5.5.12022 Drilling

 

Dakota Gold began core drilling with one drill rig on March 28, 2022. A second drill was added to the drilling project on November 9, 2022. Two drills operated for most of the campaign, except for June 15 to September 30, 2022, when only one drill was in use. Thirteen holes were completed in 2022, totaling 27,954.1 ft. The deepest hole was RH22C-001, which was drilled to 4,509 ft. The average hole depth was 2,150 ft.

 

The first two holes of the 2022 program tested the stratigraphy of the northern portion of the Project area, looking for Homestake Formation in the core of the Bald Mountain Anticline. Instead, only Ellison Formation was encountered below the Cambrian unconformity, indicating that the plunge of the Bald Mountain Anticline was steeper than expected.

 

Drill holes RH22C-003 through RH22C-007 were drilled in the Twin Tunnels area to test for high-grade gold mineralization in possible iron formation near the contact with a large greenstone unit. These holes did not encounter any Precambrian iron formation-hosting gold mineralization, but did encounter broad zones of Tertiary alteration in the greenstone and adjacent phyllites.

 

Drill holes RH22C-008 and RH22C-010 were drilled west of Twin Tunnels to test for replacement-style mineralization in the Paleozoic section and to test a geophysical target. Both holes yielded disappointing results. Drill holes RH22C-009 and RH22C-011 were drilled to test the area north of RH22C-005 at Twin Tunnels and had good results; RH22C-012 and RH22C-013 were drilled to confirm the high-grade mineralization encountered in historical hole TT-86-26. RH22C-013 confirmed the high-grade gold mineralization.

 

7.5.5.22023 Drilling

 

Sixty-one holes totaling 98,610 ft were completed at Richmond Hill during 2023. Hole depths varied from 429.5 to 6,046 ft. The average hole depth was 1,617 ft.

 

Drill holes RH23C-014 and RH23C-017 were drilled at Twin Tunnels. RH23C-015 and RH23C-016 were drilled to test for deeper mineralization below the MW3 Main zone. Both holes encountered gold mineralization in Precambrian phyllite and Tertiary iron formation-hosting breccias and fracture zones.

 

Drill holes RH23C-019, RH23C-021, RH23C-022, RH23C-023, RH23C-024, RH23C-025, RH23C-026, and RH23C-027 were drilled at the Turnaround breccia pipe. It was determined from these holes that the breccia zone was extensive and went to depth, although not all portions of the breccia were well mineralized.

 

Page 91 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Drill holes RH23C-028 through RH23C-056 were drilled as dual-purpose holes to confirm historical drilling results and obtain metallurgical test samples. The following holes were drilled at Turnaround: RH23C-028, RH23C-029, RH23C-031, RH23C-035, RH23C-046, and RH23C-047.

 

Drill holes RH23C-028 and RH23C-046 were drilled at the north end of the Turnaround breccia. Both holes encountered mineralization 800 ft below the surface. Both holes encountered gold mineralization.

 

Drill holes RH23C-029, RH23C-031, and RH23C-035 were drilled in the central portion of the Turnaround breccia. RH23C-031 and RH23C-035 encountered gold mineralization.

 

Drill hole RH23C-047 was drilled at the south end of the Turnaround breccia. This hole intersected gold mineralization in the breccia pipe and the adjacent Precambrian phyllite country rock.

 

Eight confirmation-metallurgical holes were drilled at the Twin Tunnels breccia area: RH23C-030, RH23C-032, RH23C-033, RH23C-034, RH23C-036, RH23C-039, RH23C-041, and RH23C-048. Most of the holes at Twin Tunnels breccia were drilled from the western portion of the breccia pipe over to the eastern side and fanned from north to south. RH23C-048 was drilled from the southeastern side of the breccia to the west. RH23C-030 was lost during drilling and was offset with RH23C-032.

 

Four holes were drilled at the Richmond Hill breccia and historical pit area: RH23C-044, RH23C 050, RH23C-054, and RH23C-056.

 

Drill hole RH23C-044 was 1,030 ft east of the Richmond Hill breccia pipe. It intersected gold mineralization in Deadwood Formation, Tertiary breccia, and Tertiary-altered Flag Rock Formation.

 

Drill holes RH23C-050, RH23C-054, and RH23C-056 were drilled from the east side of the Richmond Hill mine historical pit and angled under the pit to confirm the mineralization that was left below the pit. Elevated gold grades were encountered.

 

Drill holes RH23C-040, RH23C-042, and RH23C-043 were all drilled at the Cole Creek area, targeting Tertiary gold mineralization within the Deadwood Formation. RH23C-040 also encountered Tertiary epithermal mineralization below the unconformity, hosted within Precambrian greenstone. All of the drill holes encountered gold mineralization.

 

The following holes were drilled at the MW3 Main prospective area: RH23C-049 and RH23C-051. RH23C-049 intersected gold mineralization. These intercepts were in Tertiary-mineralized Precambrian phyllites and iron formation. RH23C-051 intersected gold mineralization in oxidized, lower Deadwood Formation, in Tertiary trachyte, and also in Tertiary-mineralized Precambrian phyllite.

 

The following holes were drilled at the MW3 East prospective area: RH23C-052, RH23C-053, and RH23C 055. RH23C-052 intersected gold mineralization in oxidized Deadwood Formation and in Tertiary-mineralized Precambrian phyllite. RH23C-053 intersected gold mineralization in oxidized Deadwood Formation. RH23C-055 intersected gold mineralization in oxidized Deadwood Formation, and in Precambrian-hosted Tertiary breccia.

 

7.5.5.32024 Drilling

 

The 2024 drilling consisted of 78 holes and 36,911 ft of drilling. The drilling available for the July 2025 Technical Report was 74 holes and 30,940 ft of drilling. The cut-off date for the drilling information for that study was December 2024 and the last four holes were not completed.

 

Three holes, RH24C-075, RH24C-076 and RH24C-077 were in the Cole Creek area of the deposit.

 

Twelve holes, RH24C-078 to RH24C-082, RHC24C-086 to RH24C-088 and -088A, RH24C-099, RH24C-101 and RH24C-102 were in the Richmond Hill North area.

 

Page 92 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Two holes, RH24C-083 and RH24C-084 were in the Cleveland area and one hole, RH24C-085 was in the Twin Tunnels area. The Cole Creek, Richmond Hill North, Cleveland, and Twin Tunnels drilling were to fill in gaps in the drill coverage.

 

The remaining 56 holes, RH24C-089 to RH24C-098, RHC24-100, and RH24C-103 to RH24C-147 were in the Chism Gulch area and were for the purpose of adding near surface, oxide, mineral resource to the Project. This was a successful project, with most of the holes encountering mineralized material. Most of the mineralization was in the Deadwood Formation and the drilling also encountered higher silver grades than are common in most of the deposit.

 

7.5.5.42025 Drilling

 

2025 drilling consisted of 211 core holes with 88,285 feet of drilling. An additional program of 31 reverse circulation (RC) holes with 8,580 feet was drilled in monitoring wells across the Property, including two RC exploration test holes. Of the 242 holes, 241 holes and 96,423 ft of drilling is in the resource database. Hole BG-GW-10 was excluded because it did not include sample intervals in the assay file.

 

The largest portion of the core program was drilled for the purpose of collecting metallurgical samples. Core holes were drilled, with quarter-core sampled for assay, so that half-core remained for metallurgical work of different areas and rock types.

 

Twenty-five holes, RH25C-152 through RH25C-158, RH25C-160, RH25C-162, RH25C-165, RH25C-203, RH25C-205, RH25C-208, RH25C-210, RH25C-212, RH25C-214, RH25C-216, RH25C-218, RH25C-221, RH25C-223, RH25C-225, RH25C-229, RH25C-232, RH25C-234, and RH25C-237 were drilled for metallurgical testing in the MW3 East area.

 

Nineteen holes, RH25C-159, RH25C-161, RH25C-163, RH25C-164, RH25C-166, RH25C-167, RH25C-169, RH25C-170, RH25C-171, RH25C-173, RH25C-175, RH25C-187, RH25C-189, RH25C-191, RH25C-192, RH25C-193, RH25C-199, RH25C-200, RH25C-202 were drilled for metallurgical testing in the MW3 Main area.

 

Nineteen holes, RH25C-168, RH25C-172, RH25C-174, RH25C-181, RH25C-182, RH25C-184, RH25C-186, RH25C-188, RH25C-190, RH25C-195, RH25C-196, RH25C-197, RH25C-201, RH25C-204, RH25C-206, RH25C-207, RH25C-209, RH25C-211, and RH25C-215 were drilled for metallurgical testing in the Cole Creek area.

 

Twenty-four holes, RH25C-242, RH25C-243, RH25C-245, RH25C-246, RH25C-248, RH25C-250, RH25C-251, RH25C-253, RH25C-254, RH25C-256, RH25C-257, RH25C-259, RH25C-261, RH25C-264, RH25C-266, RH25C-268, RH25C-270, RH25C-272, RH25C-276, RH25C-283, RH25C-287, RH25C-288, RH25C-291, and RH25C-294 were drilled for metallurgical testing in the Chism Gulch area.

 

Twelve holes, RH25C-222, RH25C-224, RH25C-226, RH25C-227, RH25C-228, RH25C-230, RH25C-231, RH25C-233, RH25C-235, RH25C-236, RH25C-238, and RH25C-240 were drilled for metallurgical testing in the Twin Tunnels area.

 

Seven holes, RH25C-176 through RH25C-180, RH25C-183, and RH25C-185 were drilled for condemnation and exploration underneath the historical lined leach pad. Results showed minimal mineralization in the areas tested.

 

Exploration/condemnation holes were also drilled under planned infrastructure and leach pad locations in the southeast project area. There was little evidence for mineralization at surface but the area was historically under drilled. Fourteen holes, RH25C-247, RH25C-249, RH25C-252, RH25C-255, RH25C-258, RH25C-260, RH25C-262, RH25C-265, RH25C-267, RH25C-269, RH25C-271, RH25C-274, RH25C-277, and RH25C-280 were drilled under the proposed leach pad. Eight holes, RH25C-345, RH25C-347, RH25C-349, RH25C-350, RH25C-353, RH25C-355, RH25C-358, and RH25C-361 were drilled under planned infrastructure in the southeast project area. These holes confirmed very minimal mineralization.

 

Page 93 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Another portion of the program was infill drilling in areas of inferred resource in and near the resource shell for conversion of inferred blocks to measured and indicated spacing where permitted drill sites existed. Nine holes, RH25C-217, RH25C-219, and RH25C-220 were infill holes in the MW3 Main area. RH25C-194, RH25C-198, RH25C-213, RH25C-239, RH25C-241, and RH25C-244 were infill holes in the Cole Creek area.

 

A large portion of the program was devoted to infill and expansion in the Chism Gulch area. Twelve holes, RH25C-263, RH25C-273, RH25C-281, RH25C-292, RH25C-293, RH25C-295, RH25C-297, RH25C-298 and RH25C-298A, RH25C-300, RH25C-302, and RH25C-328 were infill holes in Chism Gulch. Sixty-two holes, RH25C-275, RH25C-278, RH25C-279 and RH25C-279A, RH25C-282, RH25C-284 through RH25C-286, RH25C-289, RH25C-290, RH25C-296, RH25C-299, RH25C-301, RH25C-303 through RH25C-327, RH25C-329 through RH25C-344, RH25C-346, RH25C-348, RH25C-351, RH25C-352, RH25C-354, RH25C-356, RH25C-357, and RH25C-359 were drilled for expansion in the Chism Gulch area. Holes in this program encountered mineralization that expanded the resource, including distinct high-grade zones.

 

Some holes planned for metallurgical testing had dual purpose as infill and vice versa.

 

Thirty-one RC holes were drilled in 2025. Twenty-nine of these were for monitoring wells in and included BG-GW-01 through BG-GW-09, BG-GW-09A, BG-GW-10 through BG-GW-13, CC-GW-01 through CC-GW-03, CC-GW-05, CC-GW-07, CC-GW-08 through CC-GW-12, CC-GW-12A, CC-GW-12B, CC-GW-13, CC-GW-14, and RG-GW-01. At the end of the program, two additional holes, RH25R-001 and RH25R-002, were drilled to test the suitability of using RC for infill drilling, one within the Cole Creek area and one within Chism Gulch.

 

7.5.5.52026 Drilling

 

2026 drilling consisted of 114 holes and 53,814 ft of drilling. The 2026 drilling available as of the June 2026 cut-off date for drilling information for this study amounted to 92 holes and 43,966 ft of drilling.

 

Two holes, RH26C-362 and RH26C-364, were drilled for exploration/condemnation under planned infrastructure areas southeast of the main resource area.

 

Thirty-two holes, RH26C-407, RH26C-408, RH26C-411 through RH26C-413, RH26C-415 through RH26C-417, RH26C-419 through RH26C-439, and RH26C-441 through RH26C-443 were drilled for expansion northward from Chism Gulch and exploration under the northeastern part of the property.

 

Forty-seven holes were infill holes targeting mainly inferred and un-estimated blocks within and at the edge of the M&I shell. Twenty-two of these, RH26C-372, RH26C-374, RH26C-379, RH26C-381, RH26C-383 through RH26C-387, RH26C-392, RH26C-395, RH26C-397, RH26C-399, RH26C-401 through RH26C-406, RH26C-409, RH26C-410, and RH26C-414, were infill holes in the Cole Creek area. Eight of these, RH26C-377, RH26C-378, RH26C-380, RH26C-382, RH26C-390, RH26C-396, RH26C-398, and RH26C-400 were infill holes drilled in the Cole Creek Valley area at the southern perimeter of Cole Creek. Twelve holes, RH26C-363, RH26C-365 through RH26C-371, RH26C-373, RH26C-375, RH26C-376, and RH26C-440, were infill holes in the MW3 Main area. Five holes, RH26C-388, RH26C-389, RH26C-391, RH26C-393, and RH26C-394, were infill holes in the Twin Tunnels area.

 

Fourteen holes, RH26C-418, RH26C-444 through RH26C-453, and RH26C-473 through RH26C-475, were drilled at tighter spacing around the high-grade zones identified in Chism Gulch to confirm drillhole spacing decisions. The latter three holes were drilled after the geotechnical program to fill in remaining gaps due to field adjustments of holes, but results were not received prior to this resource update.

 

Nineteen holes, RH26C-454 through RH26C-472 were drilled for geotechnical information for slope stability analysis. These were also sampled for assay but results were not received prior to this resource update.

 

Page 94 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

7.5.5.6Procedures

 

Drill holes were lined up to the proposed hole positions using a Reflex TN14 Gyrocompass, which recorded the surface azimuth and dip of the drill hole. Drill hole collar locations were surveyed by a licensed surveyor at the time of drilling into the Homestake Mining Company (HMC) coordinate system. Starting in 2026, Dakota Gold conducted its own surveying using a Trimble rover GPS system. Historical drillhole coordinates were converted from Richmond Hill mine grid coordinate system into HMC using the procedures described by Ponderosa Land Surveys (Ponderosa, 2024).

 

For most holes, drill hole dips were obtained by surveys completed every 50 ft downhole starting at the collar and also at the end of each hole. North-Seeking Gyro (NSG) instruments comprising Reflex TN14, EZ-GYRO, Sprint_IQ, and OMNIX38, OMNIX42 tools were used. All data is uploaded by the drilling contractor, reviewed, approved or rejected, and downloaded via the IMDEX Hub-IQ online, then compiled in a database.

 

Prior to mid-2025, Dakota Gold Corp drill logs comprised mostly handwritten sheets with a header section for hole details, a description section with from-to intervals and written lithology and mineralization/alteration descriptions, and five-foot intervals with percentages of key minerals and structural orientations, along with a graphical log. Data was then entered into spreadsheets, which were compiled into a Maptek Vulcan database. In mid-2025, Datamine Fusion was implemented for logging, and included similar written descriptions and data entry using approved pick lists, along with sample creation.

 

Sample intervals were either written on sheets that were scanned, with data entry into spreadsheets, or entered directly into spreadsheets. In mid-2025, samples were created directly in Datamine Fusion. In all cases, sample intervals were simultaneously noted on sample tags, with a portion of the tag affixed to the interval in the core box, a portion sent with the sample to the assay lab, and the tag remnant retained within a tag book for reference.

 

7.5.6Opinion

 

The QP responsible for Section 7.5 has reviewed the drilling results and found that they are correctly represented as compared to the drilling results presented on geochemical laboratory certificates. In addition, the following comments can be made regarding drilling results:

 

·The procedures for the drilling programs followed standard industry procedures available at the time that the work was completed.

 

·There is no currently known relationship between recoveries and grades that could materially affect the accuracy and reliability of the results.

 

7.6Hydrogeology

 

Dakota Gold began to refine and update previous hydrogeological characterizations and studies at the Richmond Hill project site in 2024 with a baseline monitoring evaluation, evaluating historic Barrick sample locations and establishing new surface water and groundwater sites to evaluate baseline surface water and groundwater conditions in compliance with Administrative Rules of South Dakota (ARSD) 74:29 and South Dakota statutes SDCL 45-6B. Dakota Gold completed a Baseline Sampling Plan, which was submitted to and approved by SD DANR. Baseline sampling programs are described in more detail in the “Environmental Studies” Section 17.

 

Dakota Gold proposed twenty-six new baseline monitoring wells and ten new surface water stations, in addition to ten existing monitoring wells and 4 existing surface water locations. The monitoring locations, along with sampling methods and standard operating procedures, were approved by the DANR as described in the Baseline Sampling Plan. New surface water stations were established, and groundwater monitoring wells were drilled beginning in September 2025 and ending in October 2025.

 

Page 95 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Dakota Gold completed a spring and seep survey in June 2026 targeting locations obtained from: (1) historical spring and seep locations identified in the 1987 St. Joe Gold Company Richmond Hill Mine Permit and (2) the 2025 Baseline Aquatic Resources Inventory completed in 2025. The Baseline Aquatic Resources sampling program is described in more detail in the “Environmental Studies” Section 17.

 

The 2025 monitoring well drill logs, updated groundwater levels, surface water flows, spring and seep survey results, and water quality sampling will assist Dakota Gold to refine groundwater flow, water quality, groundwater recharge and discharge areas, and hydraulic gradients. Additionally, baseline water quality data will assist Dakota Gold in developing an updated conceptual site model and numerical groundwater model.

 

7.6.1Hydrogeologic Setting

 

The Richmond Hill project area sits in one of the most structurally complex parts of the Black Hills. The same geologic events that created gold deposits in the area strongly influence groundwater occurrence, storage, and flow. Regional groundwater flow directly results from tectonic uplift of multiple geologic units. Generally, groundwater flow is radially away from the uplifted areas of the Black Hills (topographic highs), including Richmond Hill within the Richmond Hill project area. In other words, groundwater generally flows from the top of Richmond Hill (i.e, in the vicinity of the proposed project) into the lower-elevation drainages down-gradient of Richmond Hill.

 

The major bedrock aquifers within the Richmond Hill project area are water-bearing zones in the Deadwood and fracture sets within the Precambrian formations. Minor groundwater quantities are present in other bedrock units, including confining units, due to fracturing and interbedded permeable layers. While groundwater flow is radial away from the uplifted areas, flow within the Precambrian formations is primarily controlled by interconnected fractures, joints, faults, and locally weathered zones. Hydraulic conductivity and groundwater yields are typically greatest where fracture sets intersect, are open, and closely spaced. Localized groundwater recharge, storage, and discharge are influenced by topography, structural features, and the degree of near-surface weathering of geologic formations.

 

7.6.2Baseline Water Quality Monitoring

 

Dakota Gold commenced monitoring well installation during September 2025, and drilling continued through October. Wells were drilled by Premier Drilling, a South Dakota licensed water-well driller (license #867). Twenty-six baseline wells were installed during this period. The baseline monitoring wells were screened across water-bearing zones. Drill cuttings were collected at 5-foot intervals. Cuttings were transported to Dakota Gold’s geology offices, where detailed formation logging was completed. Thirteen wells were completed in Burno Gulch, where total depths ranged from 20-360 feet below ground surface (bgs). Burno Gulch wells encountered water-bearing zones within the Tertiary Deadwood and Ellison and Yates formations. Twelve monitoring wells were installed in the Cleopatra Creek drainage where total depths ranged from 35 to 500 feet bgs. Cleopatra Creek wells encountered water-bearing zones within Quaternary sediments and the Tertiary, Ordovician, Flag Rock, Poorman, Ellison, and Yates formations. One well was installed within Rubicon Gulch with a total depth of 320 feet bgs in a water-bearing zone within a Devonian formation. Table 7-2 details the basic well installation information from Dakota Gold’s 2025 baseline monitoring well drilling program. Concurrent with monitoring well drilling, Dakota Gold established ten new surface water stations.

 

Page 96 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 7-2: 2025 Richmond Hill Baseline Monitoring Well Drilling

 

Well ID Formation1, 2 Drainage Total Depth3
BG-GW-01 Tertiary Bumo Gulch 30
BG-GW-02 Ellison Bumo Gulch 360
BG-GW-03 Ellison Bumo Gulch 360
BG-GW-04 Ellison Bumo Gulch 20
BG-GW-05 Ellison Bumo Gulch 130
BG-GW-06 Ellison Bumo Gulch 300
BG-GW-07 Ellison Bumo Gulch 300
BG-GW-08 Deadwood Bumo Gulch 190
BG-GW-09A Yates Bumo Gulch 120
BG-GW-10 Deadwood Bumo Gulch 240
BG-GW-11 Ellison Bumo Gulch 260
BG-GW-12 Deadwood Bumo Gulch 25
BG-GW-13 Tertiary Bumo Gulch 220
CC-GW-01 Ellison Cleopatra Creek 460
CC-GW-02 Ellison Cleopatra Creek 200
CC-GW-03 Tertiary Cleopatra Creek 460
CC-GW-05 Poorman Cleopatra Creek 220
CC-GW-07 Ellison Cleopatra Creek 80
CC-GW-08 Ellison Cleopatra Creek 165
CC-GW-09 Flagrock Cleopatra Creek 420
CC-GW-10 Quaternary Cleopatra Creek 35
CC-GW-11 Tertiary Cleopatra Creek 350
CC-GW-12B Ordovician Cleopatra Creek 460
CC-GW-13 Yates Cleopatra Creek 480
CC-GW-14 Tertiary Cleopatra Creek 500
RG-GW-01 Devonian Rubicon Gulch 320

Notes:

1= well screen interval completed in formation

2= formations based on USGS mapping

3= feet below land surface

 

Dakota Gold completed a spring and seep survey in June 2026. Survey targets were compiled from historical spring and seep locations identified in the 1987 Richmond Hill Mine Permit documents, the 2025 Baseline Aquatic Resources Inventory (ARI) completed by BKS Environmental Associates (described in Section 17), one known adit discharge and a spring that has been redirected into a culvert. Together, these sources represented 47 potential target sites. Figure 7-2 shows the 2026 Spring and Seep survey target sites; historical sites are labeled numerically, and ARI sites use BKS Environmental ARI naming conventions.

 

Page 97 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 7-6: Spring and Seep Survey

 

Page 98 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 7-3: June 2026 Richmond Hill Spring and Seep Survey Results

 

Survey
ID
Site1 Baseline
Water Quality
Sampling2
Field Parameters Lat4 Long4 Location
Description
Spring/Seep
Description

pH
(s.u)

EC
(µS/cm)

DO
(mg/L)

Temp
(°C)

ORP
(mV)

Flow
(GPM)3

W-82 CC-SRP-01 x x x x x x x 44.37404 -103.84775 South end close to property boundary, just north of East Branch Cleopatra Creek Seep
22 CC-SRP-02 x x x x x x x 44.37699 -103.84375 Downhill and southwest of Richmond Hill road close to the guard shack on Peterson James E Living Trust property Point spring discharging from marshy area upstream
W-66 CC-SRP-03 x x x x x x x 44.38665 -103.84738 East of muddy corner road, northeast of Cole Creek, well within property boundary Diffuse spring
W-60 CC-SRP-04 x x x x x x x 44.38942 -103.85892 Steep/challenging entrance starting at CC-GW-13, close to historical cabin, midpoint well within property boundary Small marshy feature <5 ft from Cole Creek
-- CC-SRP-05 x x x x x x x 44.39441 -103.86135 Near CC-GW-10/11, northwest end of the property, water leaving drainage adit Not on original survey list. Discharge from adit
-- CC-SRP-06 -- x x x x x x 44.38494 -103.87048 South end of the property ~ 1 GPM coming out of geologic outcrop Not on original survey list. Not enough water for sampling
W-39 BG-SRP-01 x x x x x x x 44.39375 -103.83760 Flat grassy/marshy area located in central Chism Gulch Diffuse spring
W-38 BG-SRP-02 x x x x x x x 44.39378 -103.83782 Flat grassy/marshy area located in central Chism Gulch Diffuse spring
W-14 BG-SRP-03 x x x x x x x 44.38275 -103.83572 Southeast side of the property just off of Columbia Dam Road Point spring in drainage bottom
W-54 BG-SRP-04 x x x x x x x 44.38036 -103.83058 Southeast end of property between BG-SW-2 and 3 Diffuse spring next to flowing drainage, drains marshy bench approximately 7 feet above stream about 30 feet wide
W-58 BG-SRP-05 x x x x x x x 44.37661 -103.83506 Southeast end of the property up the road next to BG-SW-3 Point spring discharging from geological feature in drainage
W-78 BG-SRP-06 x x x x x x x 44.37988 -103.83850 Southeast end of the property near the start of Carbonate Road (coming from Richmond Hill Road by the guard shack) Point spring discharging from geological feature in drainage
-- BG-SRP-07 x x x x x x x 44.40082 -103.83816 North of the permit boundary, east of leach pads in Chism Gulch Not on original survey list. Natural spring, drill pad built in May 2026, spring redirected into culvert

Notes:

Table compiled by R. Flick (Dakota Gold) and modified by Geosyntec

1= Spring or seep site renamed using Richmond Hill baseline monitoring naming convention

2 = Most springs sampled once, CC-SPR05 and BG-SPR-07 sampled monthly

3= Flows visually estimated

4= Latitude and longitude coordinates updated during survey

-- = No data or not measured

 

Page 99 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

7.6.3Baseline Water Quality

 

Dakota Gold has not evaluated all the baseline water quality data. Water quality results are expected to be evaluated by early 2027. A primary objective of the baseline water quality evaluation is to characterize existing conditions and understand potential impacts from historical mining and other land uses at the Site and Site vicinity.

 

7.6.4Conceptual Hydrogeologic Model

 

Dakota Gold is in the process of completing a Richmond Hill project conceptual hydrogeologic model report. A draft report is anticipated in December 2026. The conceptual model report is needed to establish an understanding of hydrogeologic conditions to evaluate potential Project impacts. Reporting elements are based on existing, known information and will include (to the extent possible) descriptions of the hydrogeologic units and properties, groundwater recharge and discharge rates and locations, groundwater flow directions, and potential implications on pit inflow rates. Findings will inform the Groundwater Modeling Work Plan and groundwater model development.

 

7.6.5Groundwater Modeling

 

Dakota Gold will finalize a Groundwater Modeling Work Plan in Q4 2026, as part of the conceptual model report, and if SD DANR requires a numerical groundwater model for the large-scale mining permit, Dakota will begin completing the model in 2027.

 

7.6.6Qualified Person’s Hydrogeology Conclusion

 

It is the QP’s opinion that the adequacy of the current plans and current understanding of Site hydrogeologic conditions indicate that any potential issues related to hydrogeology should not prevent the Richmond Hill Gold Project from progressing to the FS-stage and ultimately a mine, especially given the history of mining activity in the local area.

 

7.7Geotechnical

 

Call & Nicholas, Inc. (CNI) completed a geotechnical pre-feasibility study for Dakota Gold to evaluate overall slope stability and develop recommendations for bench-scale design parameters for the Richmond Hill pit design. The study focuses on highwall slope stability for the proposed open pits approximately 200 to 400 feet deep, including side-hill cuts, and excluded overburden storage facilities, waste dumps, and other infrastructure.

 

The study integrated existing information with new data collected in 2026, including laboratory rock strength testing, hydrogeologic data used to develop the groundwater surface, Dakota Gold’s lithology model, surface-mapped faults, and the observations from the Qualified Person’s, Michael Conley, site visit on September 3, 2026, which consisted of site condition observations, review of available geotechnical data, and mapping of rock fabric in outcrops. Nineteen drill holes were logged for geotechnical characteristics, and 14 were logged for structural information. The structural data indicate that the bedding orientations and cross joints are the primary controls on slope stability; accordingly, geotechnical domains were delineated by geologic formation and structural characteristics (Section 13.2.1). Hydrogeologic conditions are discussed in Section 7.6.

 

7.7.1Geology

 

Richmond Hill lies on the Lead dome, a subsidiary dome on the northern side of the Black Hills uplift. Tertiary intrusions emplaced approximately 58 Ma to 46 Ma formed the dome and introduced the gold mineralization. The underlying Precambrian metamorphic rocks, more than 1.7 billion years old, were folded and metamorphosed during multiple events and are overlain across the Precambrian unconformity by gently north-northwest-dipping Paleozoic sedimentary rocks. Dakota Gold’s geologic model comprises eight units (Table 7-4): Tertiary breccia (TBX), dykes (Tdk), and sills (Tsl); Paleozoic Undifferentiated (PZU); the Cambro-Ordovician Deadwood Formation (CDW); and the Precambrian Greenstone (PGN), Flagrock (PFF), and Ellison (PEF) units.

 

Page 100 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 7-4: Modeled Geologic Units Summary

 

Code Unit Age Description
TBX Tertiary breccia Tertiary Breccia pipes of angular rock fragments cemented in a finer matrix. Main host of replacement-style gold mineralization.
Tdk Tertiary dyke Tertiary Steeply dipping sheets of igneous rock cutting across the other units. Compositions range from rhyolite to phonolite.
Tsl Tertiary sill Tertiary Igneous sheets that follow the layering of the host rock, most commonly within the Deadwood Formation.
PZU Paleozoic Undifferentiated Paleozoic Younger Paleozoic sedimentary rocks overlying the Deadwood Formation, mainly shale, sandstone, siltstone, and limestone.
CDW Deadwood Formation Cambro-Ordovician Basal sandstone, conglomerate, and shale sequence resting on the Precambrian unconformity. A principal host of mineralization.
PGN Precambrian Greenstone Precambrian Greenschist-facies metamorphic rocks derived from volcanic and sedimentary protoliths.
PFF

Precambrian

Flagrock Formation

Early Proterozoic Interbedded schist, graphitic phyllite, and iron formation. The magnetite- and sulfide-bearing iron formation hosts Tertiary gold–silver mineralization.
PFE

Precambrian

Ellison Formation

Early Proterozoic Banded to massive sericite–biotite phyllite and schist with interbedded impure quartzite and minor amphibolite.

 

7.7.2Geotechnical Drilling

 

The 2026 geotechnical program consisted of 19 diamond core drill holes (RH26C-454 through RH26C-472) located relative to the Initial Assessment pit design and the principal geologic units (Figure 7-7). CNI personnel logged all 19 holes on site to characterize rock quality designation (RQD) and Q-prime parameters. Core samples were submitted for intact rock strength, fracture shear strength, and soil classification testing to the CNI laboratory in Tucson, Arizona. One exploration hole (RH26C-429) was also sampled for laboratory testing.

 

7.7.3Historical Geotechnical Data

 

Data from four drill holes in the 1986 CNI study, Preliminary Slope Design for the Proposed Richmond Hill Open Pit Mine, were digitized and incorporated. They include RQD logging, unconfined compressive strength testing, and sawcut-sample direct shear testing. Dakota Gold also provided RQD data from 387 drill holes completed from 2022 through March 2026 which was also incorporated into the analysis.

 

7.7.4Televiewer Surveying

 

Fourteen of the 19 holes, totaling approximately 6,215 feet, were surveyed with optical and acoustic borehole televiewers by Southwest Exploration Services, LLC. Optical imaging was used above the fluid level and acoustic imaging below it. CNI logged discontinuities by reconciling the processed images with the recovered core, recording depth, orientation, type, filling, aperture, confidence, and joint expression. This integrated approach helps exclude nonrepresentative features, such as healed fractures. Discontinuity orientations were corrected from apparent to true orientation and plotted on equal-area stereonets for structural analysis.

 

Page 101 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

7.7.5RQD and Joint Condition Logging

 

RQD was calculated following Deere (1963) methodology as the percentage of each core run comprising intact core pieces at least 10 cm (4 in) in length, excluding mechanical breaks from natural discontinuities. The 1986 and Dakota Gold RQD datasets were collected using the same method and therefore were combined for analysis. Joint set number (Jn), roughness (Jr), and alteration (Ja) were logged and combined with RQD to calculate Q-prime for each formation.

 

7.7.6Outcrop Mapping

 

During the September 3, 2026 site visit, the QP took the opportunity to map accessible outcrops. Talus covered limited exposure and prevented point-cloud mapping; bedding orientation and structure lengths were measured where rock was exposed. The mapped structures were consistent with the televiewer data in the Tertiary intrusive, Deadwood, and Greenstone domains.

 

7.7.7Qualified Person’s Geotechnical Conclusion

 

Preliminary observations during the QP’s site visit indicate that achievable slope angles will be controlled primarily by bench-scale rockfall criteria. The rock mass exhibits good intact strength, and few unfavorable joint sets or faults have been identified to date. Where bench-scale criteria govern, effective wall control through controlled blasting will be essential to achieving the steepest practical bench-face angles.

 

CNI recommends that Dakota Gold obtain mapping data from exposed bedrock at drill pads and road cuts to document rock fabric, including joint set orientations, discontinuity lengths, and spacing. Although available exposures are limited because pads and roads are continually reclaimed, this mapping provides valuable geotechnical data and helps develop the experience needed to characterize pit exposures before mining begins. Post mining initiation, CNI also recommends that additional geotechnical bench mapping be performed when available to update the rock fabric characteristics for implementation into ongoing pit designs.

 

Review of satellite imagery and observable pit wall performance from public access roads at nearby mines further supports the expectation that bench-scale criteria will govern slope design. Accordingly, CNI recommends that Dakota Gold evaluate 40-ft mining lifts, incorporate controlled blasting into the mine plan and drill-and-blast contracts from the outset, and continue systematic mapping of available rock exposures.

 

Page 102 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 7-7: Geotechnical Drill Hole Location Map on IA Pit Design with Exposed Geology

 

Page 103 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

8Sample Preparation, Analyses and Security

 

8.1Drilling Programs

 

Table 8-1 summarizes the historical and current Project drilling programs in four chronological groups by which the sample preparation, analyses, and security procedures described in this chapter are organized.

 

Table 8-1: Groups of Drilling Programs at Richmond Hill Gold Project

 

Company Year Comment
Viable Resources Pre 1981 Assembled land package.
Freeport Exploration Company 1981–1983 Joint venture (JV) and lease agreement with Viable Resources
St. Joe 1984 JV with Viable.
Conducted drilling program on Richmond Hill deposit breccia body.
1985–1986 Conducted drilling programs on Richmond Hill deposit and property.
1987–1988 Richmond Hill and Turnaround deposits permitted for mining.
Bond Gold 1988 Acquired St. Joe gold division.

Developed Richmond Hill as an open-cut heap leach operation.

Conducted drilling with discovery at Cleveland.

LAC Minerals 1989 Acquired Bond Gold and continued work through Bond.
1990–1991 Conducted drilling programs on multiple prospects with positive results at MW3.
1993 Final exploration activities at the site.
Homestake 1994 Chism Gulch Drilling
Barrick Gold 1994 Acquired LAC Minerals.
Coeur Mining Inc. 2019–2020 Optioned property from Barrick Gold and conducted drilling program.
2021 Terminated property option.
Dakota Territory Resources 2021 Dakota Territory Resources optioned Property.
Dakota Gold 2022–2026 Dakota Gold formed from merger of Dakota Territory and JR Resources.

 

8.2Procedures for Historical Drilling Programs from 1981 to 1994

 

8.2.1Freeport (1981-1983)

 

Freeport completed 30 conventional rotary drill holes and submitted samples of varying lengths to an unknown laboratory for gold and silver analyses. As there are no supporting laboratory certificates, these samples were excluded from the database for the Project.

 

8.2.2St. Joe, Bond Gold, and Homestake (1984-1994)

 

8.2.2.1Drilling Program

 

St. Joe, Bond Gold (while independently operated), Bond Gold (while owned by LAC), and Homestake completed multiple RC and core-drilling programs on various prospective areas across the Project area. Separate drill-hole numbering series were used for each prospect area and were sequentially carried on between program operators. There are no core or pulp samples available from these drilling programs. In all, 951 drill holes were completed for which information is available. The number of these holes in the final database is 828.

 

8.2.2.2Sampling, Sample Preparation, Analysis, and Security

 

The first four core holes drilled in 1984 at Richmond Hill were shipped in their entirety to a metallurgical laboratory in Viburnum, Missouri, for testwork. The core was crushed to 0.75 inches, split to obtain representative samples, prepared, then analyzed. Core from later holes was cut lengthwise, one-half was kept for reference at St. Joe’s field office, and the other half sampled in 5 ft intervals, and shipped for preparation and analyses.

 

Page 104 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Dry RC drilling chips were sampled in 5 ft intervals and split on site under supervision of company geologists to create two samples of equal weight. One of these samples was shipped for preparation and analyses, and the other sample stored for reference at the company’s field office. When water was encountered, it was used during drilling, which necessitated using a wet splitter to split samples down to a manageable size. Samples were then dried and split into two samples, and one was sent for preparation and analysis.

 

Most of the samples were shipped to Bondar-Clegg laboratory in Lakewood, Colorado, and assayed there or at the Bondar-Clegg laboratory in North Vancouver, B.C. The security procedures used for the shipments are not known. Bondar-Clegg was independent of St. Joe and Bond Gold, and was acquired by ALS Limited in 2002. It is not known if Bondar-Clegg had any accreditations at the time the analytical work was completed between 1984 and 1993. A small number of samples were sent to Nevada GSI laboratory in Sparks, Nevada. The history of this laboratory is not known with regards to independence and accreditations.

 

Sample preparation procedures followed a standard industry process of taking submitted samples through successive stages of reducing particle sizes and weights to obtain representative subsamples for assaying. Procedures comprised drying, crushing (jaw or rolls), splitting (riffle), pulverizing (spindle, plate, bowl), splitting (scoops), and analyses. Based on IMC file data, the standard Bondar-Clegg sample preparation consisted of drying the sample, crushing to ¾ inch with a jaw crusher and crush to 75% passing -10 mesh with a cone crusher. A 250 g split was pulverized for analysis. No details are available regarding sample preparation procedures used by Nevada GSI.

 

Gold assays were conducted by Bondar-Clegg and Nevada GSI using 1-assay-ton samples; fusing using a standard lead collector fire assay; cupelling of the lead button to obtain a gold–silver bead; removing silver by a mixture of nitric and hydrochloric acids; weighing of the final gold-only bead by a gravimetric balance; and reporting results in ounces per ton, with lower detection limits (LDL) of 0.001, 0.002. or 0.0025. There were no over-limit analyses for gold.

 

Silver analyses conducted by Bondar-Clegg and Nevada GSI were determined using 10-gram samples, dissolving samples with a mixture of hot nitric and hydrochloric acids (aqua regia), instrument reading using atomic absorption spectroscopy (AAS), and reporting of results in parts per million with LDLs of 0.1 or 0.2 ppm. Samples with results over 30 ppm Ag were re-assayed, and results were reported in ounces per ton for Bondar-Clegg or parts per million for Nevada GSI.

 

Most of the assay certificates are available and were used to check against the existing database.

 

There is no information available for Homestake sampling or analytical procedures. However, the area drilled by Homestake was also extensively drilled by Dakota Gold during their 2024 campaign.

 

8.2.2.3Quality Assurance and Quality Control Procedures

 

Current industry standard QA/QC programs were not part of any of the drilling completed by St. Joe, Bond Gold, and Homestake from 1984 to 1994, which is not unusual for that era of exploration work.

 

However, St. Joe and Bond Gold did employ three types of check assays with their drilling programs: first on 10% of the original samples using the same pulps at Bondar-Clegg; second were third splits the company took every 50 ft of drilling in the field and submitted to Bondar-Clegg; third were random checks done at Skyline Labs (Skyline), Tucson, Arizona (St. Joe, 1986). In addition, the first 20 holes included splits taken by the company and submitted to Bondar-Clegg and Cone Geochemical Lab in Denver, Colorado (Cone).

 

Page 105 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Skyline was independent of St. Joe, Bond Gold, and Lac Minerals. It is not known if Skyline had any accreditations at the time the analytical work was completed; however, it is currently accredited under ISO 17025:2017. Cone was a highly regarded testing facility and was independent of St. Joe, Bond Gold, and Lac Minerals. It is not known if there were any applicable accreditations.

 

Pulp samples submitted to Skyline and Cone for checking gold assays used the following procedure: 1-assay-ton samples; fusing using a standard lead collector fire assay; cupelling of the lead button to obtain a gold–silver bead; removing silver by a mixture of nitric and hydrochloric acids; instrument reading using an AAS; and reporting of results in parts per million.

 

A check was conducted by IMC by pairing up 10 ft composites from the St. Joe/Bond Gold, and Homestake drilling with the Dakota Gold drilling. At a maximum separation distance of 30 ft there were 484 composite pairs. The mean gold grade of the St. Joe/Bond Gold/Homestake data was 0.025 oz/t versus 0.021 oz/t for the Dakota Gold drilling. Examining a binomial statistic, the St. Joe/Bond/Homestake drilling was higher than the Dakota Gold drilling for 251 of the composite pairs and the Dakota Gold composite was higher for 233 of the pairs. This difference of 19 pairs passes a hypothesis test at the 95% level of confidence; the critical value for the statistic is 44 pairs. This indicates the two populations are similar with no evident biases.

 

8.3Procedures for Drilling Programs from 2019 to 2020

 

8.3.1Drilling Programs

 

Coeur (Wharf Division) completed two drilling campaigns comprising 75 RC holes (R19R-4674 to 4683 and R20R-4684 to -4747). Seventy-three of the holes are included in the final database for the Project. There are no core or pulp samples available from these drilling programs. The Coeur drilling was concentrated in the north of the deposit area in the Chism Flat, MW3 East, and Cole Creek areas.

 

8.3.2Sampling, Sample Preparation, Analysis, and Security

 

RC drilling chips were sampled in 10 ft intervals, and a total of 2,721 samples were collected. Samples were initially shipped to Bureau Veritas Metals and Minerals in Vancouver; later the shipping was switched to Sparks, Nevada. The security procedures used for the shipments are not known. Bureau Veritas is independent of Coeur and Dakota Gold and is accredited under ISO/IEC 17025:2017.

 

Sample preparation procedures followed a standard industry process of taking submitted samples through successive stages of reducing particle sizes and weights to obtain representative subsamples for assaying. Procedures comprised drying if required, crushing to 70% passing (P70) 2 mm (jaw), splitting of 1 kg (riffle), pulverizing to P85 200 mesh (bowl), splitting 30 g (scoops), and analysis.

 

Gold assays (code FA430) were conducted using 30 g samples; fusing using a standard lead collector fire assay; cupelling of the lead button to obtain a gold-silver bead; removing silver by a mixture of nitric and hydrochloric acids; instrument reading using an AAS; and reporting results in ounces per ton with an LDL of 0.0001. There were no over-limit analyses for gold.

 

Silver analyses (code AQ300) were determined as part of a multielement suite using 0.5 g samples; dissolving samples with a mixture of hot nitric and hydrochloric acids (aqua regia); instrument reading using an inductively couple plasma–emission spectroscopy (ICP–ES); and reporting results in ounces per ton with an LDL of 0.009. Samples with results over 30 ppm Ag were re-assayed, and results were reported in ounces per ton.

 

Page 106 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Gold and silver analyses (code CN401) were also conducted by cyanide leach using 15 g samples; dissolving samples with 30 ml of reagent; instrument reading using an AAS; and reporting results in ounces per ton with an LDL of 0.001. As of the Report date, the Coeur gold and silver cyanide soluble assays are not in the official database.

 

8.3.3Quality Assurance and Quality Control Procedures

 

Current industry standard QA/QC programs were not part of the drilling completed by Coeur from 2019 to 2020.

 

Approximately 10% of samples were sent for checking to McClelland Laboratories, Inc., in Reno, Nevada. McClelland is independent of Coeur and is accredited under ISO/IEC 17025:2017. Pulp samples submitted to McClelland for checking gold assays used the following procedure: 1-assay-ton samples; fusing using a standard lead collector fire assay; cupelling of the lead button to obtain a gold–silver bead; removing silver by a mixture of nitric and hydrochloric acids; instrument reading using an AAS; and reporting results in ounces per ton with an LDL of 0.001. There were no over-limit analyses for gold.

 

There is not much spatial overlap between the Coeur drilling and the other drilling campaigns. A check was conducted by pairing up 10 ft composites from the St. Joe/Bond Gold drilling with the Coeur drilling. At a separation distance of 30 ft there were only 58 composite pairs. The mean gold grade of the Coeur drilling is 0.012 oz/t versus 0.008 oz/t for the St. Joe/Bond Gold data. Examining a binomial statistic, the St. Joe/Bond drilling is higher than the Coeur drilling for 21 of the composite pairs and the Dakota Gold composite is higher for 33 of the pairs, and they are the same value for 4 pairs. This difference of 12 pairs passes a hypothesis test at the 95% level of confidence; the critical value for the statistic is 16 pairs.

 

Comparing the Coeur drilling with the Dakota Gold drilling resulted in 27 composite pairs at a 30 ft separation distance. The mean gold grade of the Coeur drilling was 0.005 oz/t versus 0.009 oz/t for the Dakota Gold drilling. The Coeur composite is higher for 10 of the pairs and the Dakota Gold composite is higher for 17 of the pairs. This difference of 7 pairs passes a hypothesis test at the 95% level of confidence; the critical value for the statistic is 11 pairs.

 

Though the available data is sparse, the Coeur is comparable with the other drilling campaigns. There is no evidence of a bias between the various drilling programs.

 

8.4Procedures for Drilling Programs from 2022 to 2026

 

8.4.1Drilling Programs

 

Dakota Gold drilling in the final database amounts to 485 holes and 303,864 ft of drilling completed from 2022 to mid-2026.

 

8.4.2Sampling, Sample Preparation, Analysis, and Security

 

Core was cut in half lengthwise along one side of the logging orientation line, and halves were stacked vertically for adequate drainage prior to sampling. Sample lengths varied based on geological criteria and averaged roughly 5 ft. One-half of the core from each sample interval was kept for reference, and the other half was placed in a smaller prenumbered polyweave sample bag. Multiple smaller bags were placed together in larger polyweave sample bags that were sealed using numbered ziplock tags, and the larger polyweave bags were placed into numbered shipping bins. Each bin was accompanied by a sample shipment form and sent for preparation and analysis. Initially a secure company truck shipped samples to ALS in Twin Falls, Idaho; later tracked shipments used FedEx secure transportation to ALS in Winnipeg, Manitoba.

 

ALS is independent of Dakota Gold and is accredited under ISO/IEC 17025:2017 for selected analytical techniques. Sample preparation procedures followed a standard industry process of taking submitted samples through successive stages of reducing particle sizes and weights to obtain representative subsamples for assaying. Procedures comprised drying, crushing to P70 −2 mm (jaw), splitting of 250 g (riffle), pulverizing to P85 −75 μm (bowl), splitting (scoops), and analyses.

 

Page 107 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Gold assays (code Au-AA23) were conducted using 30 g samples; fusing using a standard lead collector fire assay; cupelling of the lead button to obtain a gold-silver bead; digesting the gold-silver bead with a mixture of nitric and hydrochloric acids and preparing for analysis using an AAS; and reporting results in parts per million with an LDL of 0.005. Assays over 10 ppm were re-run as a fire assay with gravimetric finish (Au-GRA21)..

 

Silver analyses (code ME-MS61) were determined as part of a multielement suite using 1 g samples; dissolving samples with a four-acid digestion; instrument reading using an inductively coupled plasma-emission spectroscopy (ICP-ES), and reporting results in ppm with a LDL of 0.01 ppm. Samples with results greater than 100 ppm were reanalyzed, and results were reported in parts per million with an LDL of 1 ppm (Ag-OG62).

 

Gold analyses (code Au-AA13) were also conducted by cyanide leach using 30 g samples; dissolving samples with 30 ml of reagent; instrument reading using an AAS; and reporting results in parts per million with an LDL of 0.03.

 

8.4.3Quality Assurance and Quality Control Procedures

 

8.4.3.1Sample Preparation

 

Dakota inserted certified reference materials (CRM), blanks (BLK), and duplicates (DUP) into the batches of samples to be submitted for analyses using the following procedures.

 

CRMs were purchased commercially in bulk from Klen International Pty Ltd, and from Rocklabs (a division of Scott Automation). Twenty-nine separate CRMs have been used for the Project, with grades ranging from 0.453 to 14.6 ppm, and those up to 2.715 ppm were most used. CRMs were chosen based on the character of mineralization (oxide or sulfide) and lithology. Approximately 200 g were manually transferred to tin-top-sealed kraft bags, then placed in plastic ziplock bags for protection.

 

The BLKs comprised two different material types, a marble and a rhyolite rock type. The BLKs contain some gold at a nominal value of 0.005 ppm. Approximately 1 to 2 kg or coarsely crushed material was manually transferred to polyweave sample bags similar to those used for routine core samples.

 

DUPs comprised field material, crushed material, and pulverized material. Sample duplicates (SDP) were obtained from quarter-core splits of the parent core sample; crushed duplicates (CDP) from a 50% split of the crushed parent sample; and pulp duplicates (PDP) from a 50% split of the pulverized parent sample.

 

CRMs and BLKs were inserted after roughly every 11th routine sample, alternating between the two, although this sometimes varied depending on mineralization. A sequence of DUPs comprising one SDP, one CDP, and one PDP, was inserted after roughly every 36th routine sample.

 

The same consecutive numbering sequence was used for the core and quality control (QC) samples. CRMs and BLKs were inserted at an overall rate of approximately 5% for each sample type; SDPs, CDPs, and PDPs were inserted at roughly 3% for each sample type.

 

The analysis described in this section for the BLKs and CRMs is specific to the 2025 and 2026 Dakota Gold drilling. Results for the 2022 to 2024 drilling was presented in the February 3, 2025 and July 7, 2025 Technical Reports. The analysis for the DUP samples includes 2024 drilling.

 

Page 108 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

8.4.3.2Blanks

 

The QA/QC database included 1455 BLKs for 2025 and 2026 drilling. This amounts to about 5.3% of the Dakota Gold sample intervals during this same time. There were 547 rhyolite BLKs. Most of the gold assays were at, or near, the detection limit of 0.005 ppm. Only seven of the samples were greater than to 0.01 ppm (0.0003 oz/t). The highest gold assay was 0.092 ppm (0.0027 oz/t). These are excellent results, indicating minimal contamination from higher grade samples during sample preparation. The rhyolite BLK contains anomalous levels of silver and should not be considered a BLK for silver.

 

There were 908 marble BLKs. Most of the gold assays were near the detection limit of 0.005 ppm. Seventeen of the samples exceeded 0.01 ppm (0.003 oz/t) and the highest assay was 0.081 ppm (0.0024 oz/t).

 

The results for silver were also good for the marble BLK. Only 15 of the samples were greater than or equal to 0.2 ppm (0.006 oz/t) and the highest assay was 0.49 ppm (0.014 oz/t).

 

8.4.3.3Certified Reference Materials (Standards)

 

The QA/QC database included 1490 CRM samples for 2025 and 2026 drilling. This amounts to about 5.4% of the Dakota Gold sample intervals during this time. Sixteen of the 29 CRMs purchased for the Project were used for the 2025-2026 drilling. The top 6 most utilized CRMs amounted to 60% of the data.

 

Figure 8-1 shows the control chart for gold for OXE182. The certified mean and standard deviation gold values are 0.663 ppm and 0.012 ppm respectively. The control line for the mean (red), +2 standard deviations (green), and +3 standard deviations (magenta) are shown on the chart. Dakota Gold also uses a CRM tolerance limit +8% of the certificate mean value to assess laboratory performance. These limits are also shown on the chart in brown.

 

There are 139 samples for this CRM of which 12 (8.6%) are outside the 2 standard deviation limits, three (2.2%) are outside of the 3 standard deviation limits, and one is outside the +8% limits.

 

Figure 8-2 shows the control chart for gold for OXD183. The certified mean and standard deviation gold values are 0.453 ppm and 0.008 ppm respectively. There are 174 samples for this CRM of which 22 (12.6%) are outside the 2 standard deviation limits, ten (5.7%) are outside of the 3 standard deviation limits, amd two of the samples are outside the +8% limits.

 

Figure 8-3 shows the control chart for gold for OXC185. The certified mean and standard deviation gold values are 0.218 ppm and 0.006 ppm respectively. There are 180 samples for this CRM of which seven (3.9%) are outside the 2 standard deviation limits and two (1.1%) are outside of the 3 standard deviation limits and the +8% limits. One of the outliers had an assay of 0.448 ppm and is not shown on the chart. It is likely that this was CRM OXD183.

 

Figure 8-4 shows the control chart for gold for OXE202. The certified mean and standard deviation gold values are 0.65 ppm and 0.017 ppm respectively. There are 85 samples for this CRM of which seven (8.2%) are outside the 2 standard deviation limits and one (1.2%) is outside of the 3 standard deviation limits and the +8% limit. This outlier had an assay 0.479 ppm, again similar to the CRM OXD183.

 

Figure 8-5 shows the control chart for gold for OXF200. The certified mean and standard deviation gold values are 0.838 ppm and 0.025 ppm respectively. There are 189 samples for this CRM of which eight (4.2%) are outside the 2 standard deviation limits and one (0.52%) is outside of the 3 standard deviation limits and the +8% limit.

 

Figure 8-6 shows the control chart for gold for Si96. The certified mean and standard deviation gold values are 1.801 ppm and 0.031 ppm respectively. There are 146 samples for this CRM of which six (4.1%) are outside the 2 standard deviation limits and two (1.4%) are outside of the 3 standard deviation limits. There are no samples outside the +8% limit.

 

The results of the assays for CRMs are good. The number of samples outside of the +3 standard deviation control limits are typical for gold assays on CRMs. Also, there are relatively few samples outside of the +8% of the mean control limits.

 

Page 109 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-1: Control Chart for CRM OXE182 Gold Assays

 

Page 110 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-2: Control Chart for CRM OXD183 Gold Assays

 

Page 111 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-3: Control Chart for CRM OXC185 Gold Assays

 

Page 112 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-4: Control Chart for CRM OXE202 Gold Assays

 

Page 113 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-5: Control Chart for CRM OXF200

 

Page 114 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-6: Control Chart for CRM Si96 Gold Assays

 

Page 115 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

8.4.3.4Check Assays

 

As discussed in Section 8.4.3.1, Dakota Gold conducted three types of duplicate samples for their drilling program:

 

·Pulp duplicate: a check assay using the same pulp as the original sample.
·Crusher duplicate: an additional pulp is developed from the course crushed material.
·Sample duplicate: a quarter of the original drill core is submitted as a check sample.

 

Figure 8-7 presents results for the pulp duplicates versus the original assays. The top graph is an xy plot of the data. All the samples cluster relatively closely to the 1:1 line plotted on the graph. They are also relatively evenly distributed above and below the line indicating there is no apparent bias in the results.

 

The middle graph is a %HRD (Half Relative Deviation) plot of the data. Each point of the x-axis is the average of the original and pulp duplicate for each sample pair. The y-axis represents half of the difference in the assay pairs as a percentage of the mean value of the pair. It is a positive value when the check assay is higher than the original assay. For %HRD plots there are typically high relative errors at low values, particularly near detection limits. The table at the bottom shows that for all data there are 38 sample pairs with a mean gold grade of 0.474 ppm for the original assay and 0.470 ppm for the check assay. The average %HRD value for the sample pairs in 0.16% and is an estimate of bias. There is negligible bias between the original samples and the pulp checks. The table at the bottom shows results for assay pairs greater than 0.1 ppm to filter the lowest sample pairs. It also shows results for assay pairs above and below 0.5 ppm.

 

%HARD (Half Absolute Relative Deviation) is derived from taking the absolute value of the %HRD values and averaging them. This is a measure of assay precision. For all data this is interpreted that any one assay is estimated to be +4.87% of the true value. Precision is better (lower %HARD value) for assays above 0.5 ppm.

 

These are good results, showing it is relatively easy to replicate assays. This implies fine-grained gold particles that are easy to sample.

 

Figure 8-8 presents results for the crusher duplicate versus the original assays. The xy plot shows good results with the assays clustered relatively closely to the 1:1 line and relatively evenly distributed above and below the line.

 

The %HRD graph and the table show that for the 38 sample pairs the %HRD (bias) is 0.32% and the %HARD (precision) is 4.69%, i.e. any one assay can be expected to be within 4.7% of the true value. This is similar to the precision for the pulp data. Normally it would be expected that the pulp check assays would have better precision than the crusher checks. However, the difference is the results is not material.

 

Figure 8-9 presents results for the sample duplicate versus the original assays. The xy plot results are good, though there is more scatter in the data. This is expected since the duplicate sample is based on a quarter split of the original core. The %HARD estimate for all data is 7.52% meaning any one assay can be expected to be within 7.5% of the true value.

 

This is a very good result for a sample duplicate, especially in the case where the duplicate was a quarter core instead of the half core sample the original sample was based on. The reduction in the sample size is expected to add variability to the assay result. The samples used for this analysis are for drilling from 2024 to 2026.

 

The relatively small number of check assays implies that the insertion rate of these samples is considerably less than the 3% target rate specified. It appears the number of check assays declined significantly after the 2023 drilling campaign.

 

Page 116 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-7: Original Gold Assay versus Pulp Duplicate

 

Page 117 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-8: Original Gold Assay versus Crusher Duplicate

 

Page 118 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 8-9: Original Gold Assay versus Sample Duplicate

 

Page 119 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

8.4.3.5Bureau Veritas Check Assays

 

Additional QA/QC analysis was conducted by sending assay pulps prepared by ALS to Bureau Veritas (BV) for check assays. This amounted to 2385 samples for drilling from 2023 to 2026.

 

Figure 8-10 presents results for the BV check assays versus the original assays. The xy plot results are good with only a few larger differences in the assays. The %HARD estimate for all data is 4.79% meaning any one assay can be expected to be within 4.79% of the true value. The %HARD value is significantly lower for assays over 0.1 ppm and 0.3 ppm at 2.67% and 2.35% respectively. As shown on the graph, most of the scatter is at very low grades, near detection limit. This is a typical result.

 

This is a very good results for the BV check assays.

 

8.5Summary

 

The QP for this section is of the opinion that the procedures for sampling, sample shipping, sample preparation, and for analyzing gold and silver for the 1984 to 2020 drilling programs followed acceptable standard analytical laboratory procedures available at the time the work was completed. Although current industry standard QA/QC monitoring programs were not part of these drilling programs, the historical drilling data are acceptable for geological and resource modeling. A comparison of the St. Joe/Bond Gold data with Dakota Gold data for 10 ft composites within 30 ft of each other indicates the St. Joe/Bond Gold drilling data are sufficiently similar to current Dakota Gold drilling data. There is not much overlap between the Coeur drilling and the other drilling campaigns, but comparisons of composite pairs that are relatively close indicate the Coeur drilling data is similar to the St. Joe/Bond Gold data and also the Dakota Gold data.

 

The QP Is of the opinion that for the 2022 to 2026 Dakota Gold drilling programs, the procedures used for sampling, sample shipping, sample security, sample preparation, analyzing gold and silver, and QA/QC monitoring are appropriate for obtaining reliable data that is acceptable for geological and resource modeling.

 

Page 120 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 8-10: Original ALS Gold Assay versus BV Check Assay

 

Page 121 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

9Data Verification

 

9.1Drillhole Sampling Data

 

The sampling data was verified by comparing the database entries with assay certificates or other available data listings for a representative portion of the data. The drilling data is presented as the following groups:

 

·Dakota Gold drilling for 2022 to 2024.
·Coeur drilling for 2019 to 2020.
·St. Joe, Bond Gold, LAC, and Homestake drilling, 1984 to 1994.
·Dakota Gold drilling for 2025 to 2026.

 

9.1.1Dakota Gold Drilling 2022-2024

 

The Dakota Gold holes in the database were compared with assay certificates for 19 holes, as shown in the upper portion of Table 9-1. This represents about 13% of the Dakota Gold holes. Certificates were available for all the requested holes. There were no errors for gold or silver assays versus the certificates for the holes reviewed.

 

9.1.2Coeur Drilling

 

The Coeur holes in the database were compared with assay certificates for six holes, as shown in the lower portion of Table 9-1. This represents about 8% of the 74 Coeur holes. Certificates were available for all the requested holes. There were no errors for gold or silver assays versus the certificates for the holes reviewed. The Coeur drilling was reverse circulation (RC) drilling and the sample length was 10 ft, so there tends to be fewer samples per hole than the Dakota Gold and St. Joe/Bond Gold drilling.

 

9.1.3St. Joe/Bond Gold, LAC and Homestake Drilling

 

Assay certificates were requested for 57 of the holes. This represents about 7% of the 836 legacy holes drilled between 1984 to 1994. Table 9-2 summarizes the results of the comparisons for gold. The following is noted:

 

·Complete assay certificates were available for 35 of the holes. Most of the assays were done by Bondar-Clegg, though two of the holes were assayed by Nevada GSI, Inc.
·There were 16 holes without certificates but did have data printouts that showed the database as of 1990. These show that there has been no tampering with the database since the time of the printouts. Some of these holes were assayed at an internal Bond Gold laboratory on the Property.
·There were four holes, CV-90-43, RH-86-92, RCM-19, and RCM-5 with no available certificate data.
·There were two holes, RH-85-52 and TT-90-51 with only partial certificate data available.

 

There were three large errors in the data that were due to missing decimal points in the data entry. These were corrected. Other than these, there were no other assays in the data that were over 1 oz/t gold. There were also nine smaller discrepancies encountered. These are mostly due to re-assays inserted into the database to replace original values. For RH-84-3 there are certificates for check assays performed by Cone Geochemical and some Bondar-Clegg repeat assays.

 

Table 9-3 summarizes the results for silver. The silver assays generally compared well with the assay certificates, or the 1990 printouts for holes without certificates. However, there were also some significant (order of magnitude errors). The most significant errors, in holes CC-87-55 and CV-90-39, were due to missing decimal places in the data entry and resulted in erroneous values exceeding 1,000 ppm.

 

Page 122 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

As a result of the errors encountered, all the remaining assays in the St. Joe/Bond Gold data greater than 1,000 ppm were verified with certificates. This was six additional assays, of which five were incorrect. There is only one legitimate silver assay above 1,000 ppm in the data, an assay of 1,139 ppm in hole MW3-90-152.

 

Silver assays were not done for about eight of the holes that were reviewed.

 

9.1.4Dakota Gold Drilling 2025-2026

 

The 2025-2026 Dakota Gold drilling was compared with assay certificates for 17 holes. This represents 8% of the new holes. The comparison included gold, silver, sulfur, and cyanide soluble gold assays. Table 9-4 shows the results. There were no errors for any of the holes.

 

9.1.5Other Reviews

 

As discussed in Section 8.2.2.3 and 8.3.3, 10 ft drillhole composites from the various drilling campaigns were compared at separation distances up to a maximum of 30 ft. The comparisons indicated a good comparison of Dakota Gold drilling data with St. Joe/Bond Gold data. Comparison of Coeur drilling with Dakota Gold and St. Joe/Bond Gold drilling also indicated reasonable results, though there is not a lot of spatial overlap of the Coeur drilling with the other campaigns. The drilling data was reviewed in detail on cross sections.

 

Drillhole collars were also checked against topography. With the significant topographic relief at the Richmond Hill site, mis-located drill holes should stand out on the sections. No significant issues were noted.

 

It is the opinion of the QP for this section that the Richmond Hill assay database is adequate for the estimation of mineral resources and mineral reserves.

 

Page 123 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 9-1: Comparison of Assay Certificates with Database for Dakota Gold 2022-2024 Drilling and Coeur Drilling

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Assay Discrepancies Comments
Begin End Major Minor
Dakota Drilling:                
RH22C-004 578 E591334 E591970 ALS Y     No errors for Dakota gold or silver assays versus certificates for any of the holes reviewed.
RH22C-005 590 E585001 E585648 ALS Y    
RH22C-006 787 E585650 E586525 ALS Y      
RH23C-014 483 H590118 H590705 ALS Y      
RH23C-016 227 C818002 C818267 ALS Y      
RH23C-017 348 H590706 H591118 ALS Y      
RH23C-021 498 C818270 H591541 ALS Y      
RH23C-031 415 C822295 K050254 ALS Y      
RH23C-034 409 K052001 K052455 ALS Y      
RH23C-039 378 K055651 K056070 ALS Y      
RH23C-063 278 K053680 H780398 ALS Y      
RH24C-083 93 H765147 H765255 ALS Y      
RH24C-091 33 H788549 H788584 ALS Y      
RH24C-101 86 H788851 H788947 ALS Y      
RH24C-105 78 H766145 H766229 ALS Y      
RH24C-114 35 H789527 H789565 ALS Y      
RH24C-123 41 H774671 H774715 ALS Y      
RH24C-132 68 K591049 K591123 ALS Y      
RH24C-141 63 K591266 K591335 ALS Y      
Coeur Drilling:                
R19R-4678 42 24956 25004 Bureau Veritas Y    

No errors for Coeur gold or silver assays versus certificates for any of the holes reviewed.

R20R-4690 72 25581 25666 Bureau Veritas Y    
R20R-4702 72 26269 26354 Bureau Veritas Y      
R20R-4729 42 27287 27335 Bureau Veritas Y      
R20R-4743 70 27759 27839 Bureau Veritas Y      
R20R-4745 60 27914 27982 Bureau Veritas Y      

 

Page 124 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 9-2: Comparison of Assay Certificates with Database for Legacy Drilling – Gold

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Assay Discrepancies Comments
Begin End Major Minor
Legacy Drilling:                
BZ-92-21 200 306901 307100   No, Note 1. 1   Sample 306964, 0.004 opt entered as 4 opt.
CC-86-11 60 30081 30140 Bondar-Clegg Y      
CC-86-16 76 30491 30566 Bondar-Clegg Y      
CC-87-55 76 59601 59676 Bondar-Clegg Y      
CCH-89-8 104 76661 76764 Bondar-Clegg Y      
CP-86-2 83 40101 40183 Bondar-Clegg Y      
CV-88-4 88 62171 62258 Bondar-Clegg Y      
CV-89-19 89 74571 74659 Bondar-Clegg Y      
CV-89-23 100 78491 75080 Bondar-Clegg Y      
CV-90-39 69 78351 78419 Bondar-Clegg Y      
CV-90-43 81 86201 86281 No Data No     No certificate data provided
DB-91-6 59 302851 302909   No, Note 1.      
EB-91-4 68 306421 306488   No, Note 1.      
HE-91-2 131 303881 304011   No, Note 1. 1   Sample 303984, 0.002 opt entered as 2 opt.
HI-88-2 139 66351 66489 Bondar-Clegg Y      
HW-86-4 100 45731 45830 Bondar-Clegg Y      
LP-86-10 70 41501 41570   No, Note 1.      
MW3-88-6 90 61091 61180 Bondar-Clegg Y      
MW3-90-17 51 77891 77941 Bondar-Clegg Y      
MW3-90-33 74 80181 80254 Nevada GSI, Inc Y      
MW3-90-45 65 87321 87385   No, Note 1.      
MW3-90-115 79 98331 98409   No, Note 1.      
MW3-90-135 55 99461 99515   No, Note 1.      
MW3-90-136 70 99521 99590   No, Note 1.      
MW3-90-151 30 92271 92300 Bondar-Clegg Y      
MW3-90-152 34 92311 92344 Bondar-Clegg Y      
MW3-90-155 51 92431 92481 Bondar-Clegg Y      
MW3-90-22 56 79781 79836   No, Note 1.      
MW3-90-52 75 80671 80745   No, Note 1.      
MW3-90-93 129 91561 91689 Nevada GSI, Inc Y     No certificate data for first 13 samples.

 

Page 125 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Assay Discrepancies Comments
Begin End Major Minor
PG-88-1 112 62341 62452   No, Note 1.      
PG-91-13 91 305001 305091   No, Note 1.      
RCM-19 18 2473 2490   No     Only data provided was Excel spreadsheet.
RCM-5 30 2150 2179   No     Only data provided was Excel spreadsheet.
RH-84-3 70 20541 20610 Bondar-Clegg Y   6 Some Cone check assays and BC repeats included.
RH-84-16 70 22741 22810 Bondar-Clegg Y      
RH-84-18 70 23031 23100 Bondar-Clegg Y   3 Sample 23035, 0.222 opt on certificate, 0.201 opt in database.
                Sample 23058, 0.047 opt on certificate, 0.036 opt in database.
                Sample 23072, 0.055 opt on certificate, 0.064 opt in database.
RH-85-52 109 26701 51759 Bondar-Clegg Partial     No errors, but also no certificate data for bottom half of hole.
RH-85-66 60 28631 28690 Bondar-Clegg Y      
RH-86-75C 74 N.A. N.A.   No, Note 1. 1   From 44 to 49 ft, 0.008 opt entered as 8 opt.
RH-86-92 68 42811 42878 No Data No     No certificate data provided
RH-86-102 70 43091 43160 Bondar-Clegg Y      
RH-86-108 100 41221 49826   No, Note 1.      
RH-86-123C 372 54201 55572 Bondar-Clegg Y      
RH-87-128C 197 55791 55988 Bondar-Clegg Y      
RH-91-168 87 303541 303627   No, Note 1.      
RHN-90-7 121 85591 85711 Nevada GSI, Inc Y      
RP-85-2 68 33581 33648 Bondar-Clegg Y      
TA-85-2 80 35221 35399 Bondar-Clegg Y      
TA-86-21 88 39031 39118 Bondar-Clegg Y      
TA-86-26 52 41291 41342 Bondar-Clegg Y      
TT-85-11 60 35051 35110 Bondar-Clegg Y      
TT-85-2 70 28441 28510 Bondar-Clegg Y      
TT-86-24 64 51511 51574 Bondar-Clegg Y      
TT-90-47 100 77121 77220 Bondar-Clegg Y      
TT-90-51 95 30101 30195 Bondar-Clegg Partial     Certificate only available for 44 of the samples.
WD-87-16 96 58401 58496 Bondar-Clegg Y      
Note 1: Data compared with historical data printout from Bond Gold.

 

Page 126 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 9-3: Comparison of Assay Certificates with Database for Legacy Drilling – Silver

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Assay Discrepancies Comments
Begin End Major Minor
Legacy Drilling:                
BZ-92-21 200 306901 307100   No, Note 1.     No silver assays in database.
CC-86-11 60 30081 30140 Bondar-Clegg Y      
CC-86-16 76 30491 30566 Bondar-Clegg Y 1   Sample 30557, 6.2 ppm on certificate, 27.77 ppm in database.
CC-87-55 76 59601 59676 Bondar-Clegg Y 2   Sample 59646, 3.1 ppm on certificate, 3120 ppm in database.
                Sample 59665, 2.0 ppm on certificate, 19.89 ppm in database.
CCH-89-8 104 76661 76764 Bondar-Clegg Y      
CP-86-2 83 40101 40183 Bondar-Clegg Y      
CV-88-4 88 62171 62258 Bondar-Clegg Y      
CV-89-19 89 74571 74659 Bondar-Clegg Y      
CV-89-23 100 78491 75080 Bondar-Clegg Y      
CV-90-39 69 78351 78419 Bondar-Clegg Y 2   Sample 78365, 2.8 ppm on certificate, 2811 ppm in database.
                Sample 78404, 1.8 ppm on certificate, 18.18 ppm in database.
CV-90-43 81 86201 86281 No Data No     No certificate data provided
DB-91-6 59 302851 302909   No, Note 1.     No silver assays in database.
EB-91-4 68 306421 306488   No, Note 1.     No silver assays in database.
HE-91-2 131 303881 304011   No, Note 1.     No silver assays in database.
HI-88-2 139 66351 66489 Bondar-Clegg Y      
HW-86-4 100 45731 45830 Bondar-Clegg Y      
LP-86-10 70 41501 41570   No, Note 1.      
MW3-88-6 90 61091 61180 Bondar-Clegg Y     No certificate data for first 9 samples.
MW3-90-17 51 77891 77941 Bondar-Clegg Y 1   Database has 50 ppm (upper limit), 3.53 opt re-assay (121 ppm).
MW3-90-33 74 80181 80254 Nevada GSI, Inc Y      
MW3-90-45 65 87321 87385   No, Note 1.      
MW3-90-115 79 98331 98409   No, Note 1.      
MW3-90-135 55 99461 99515   No, Note 1.      

 

Page 127 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Assay Discrepancies Comments
Begin End Major Minor
MW3-90-136 70 99521 99590   No, Note 1.      
MW3-90-151 30 92271 92300 Bondar-Clegg Y      
MW3-90-152 34 92311 92344 Bondar-Clegg Y      
MW3-90-155 51 92431 92481 Bondar-Clegg Y      
MW3-90-22 56 79781 79836   No, Note 1.      
MW3-90-52 75 80671 80745   No, Note 1.     No silver assays in upper half of hole.
MW3-90-93 129 91561 91689 Nevada GSI, Inc Y 1   Sample 91677, 2.0 ppm on certificate, 23.04 ppm in database.
                No certificate data for first 13 samples.
PG-88-1 112 62341 62452   No, Note 1.      
PG-91-13 91 305001 305091   No, Note 1.     No silver assays in database.
RCM-19 18 2473 2490   No     No silver assays in database.
RCM-5 30 2150 2179   No     No silver assays in database.
RH-84-3 70 20541 20610 Bondar-Clegg Y      
RH-84-16 70 22741 22810 Bondar-Clegg Y   1 Sample 22801, 7.8 ppm on certificate, 7.47 ppm in database.
RH-84-18 70 23031 23100 Bondar-Clegg Y   3 Sample 23035, 24 ppm on certificate, 23 ppm in database.
                Sample 23039, 4.1 ppm on certificate, 5.31 ppm in database.
                Sample 23062, 6.5 ppm on certificate, 5.93 ppm in database.
RH-85-52 109 26701 51759 Bondar-Clegg Partial   1 Sample 26750, 28 ppm on certificate, 22 ppm in database.
                No certificate data for bottom half of hole.
RH-85-66 60 28631 28690 Bondar-Clegg Y   1 Sample 28650, 1.63 opt (55.9 ppm) on certificate, 53.8 ppm in data.
RH-86-75C 74 N.A. N.A.   No, Note 1.   1 244 to 249 ft. printout was 0.07 opt (2.4 ppm), database is 1.37 ppm.
RH-86-92 68 42811 42878 No Data No     No certificate data provided
RH-86-102 70 43091 43160 Bondar-Clegg Y      
RH-86-108 100 41221 49826   No, Note 1.      
RH-86-123C 372 54201 55572 Bondar-Clegg Y      
RH-87-128C 197 55791 55988 Bondar-Clegg Y      

 

Page 128 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Assay Discrepancies Comments
Begin End Major Minor
RH-91-168 87 303541 303627   No, Note 1.     No silver assays in database.
RHN-90-7 121 85591 85711 Nevada GSI, Inc Y      
RP-85-2 68 33581 33648 Bondar-Clegg Y      
TA-85-2 80 35221 35399 Bondar-Clegg Y      
TA-86-21 88 39031 39118 Bondar-Clegg Y      
TA-86-26 52 41291 41342 Bondar-Clegg Y      
TT-85-11 60 35051 35110 Bondar-Clegg Y      
TT-85-2 70 28441 28510 Bondar-Clegg Y      
TT-86-24 64 51511 51574 Bondar-Clegg Y      
TT-90-47 100 77121 77220 Bondar-Clegg Y      
TT-90-51 95 30101 30195 Bondar-Clegg Partial     Certificate only available for 44 of the samples.
WD-87-16 96 58401 58496 Bondar-Clegg Y      
Note 1: Data compared with historical data printout from Bond Gold.

 

Page 129 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 9-4: Comparison of Assay Certificates with Database for Dakota Gold 2025 - 2026 Drilling and Coeur Drilling

 

Hole Id

No. of

Samples

Sample Number Range Assay Lab Certificate? Comments
Begin End
Dakota Drilling:            
RH25C-166 36 K592973 K593012 ALS Y No errors for gold, silver, sulfur, or cyanide soluble gold
RH25C-169 50 K608599 K608653 ALS Y for any of the holes reviewed.
RH25C-190 127 K594408 K594548 ALS Y  
RH25C-204 86 K594821 K594915 ALS Y  
RH25C-209 122 H767452 K590586 ALS Y  
RH25C-237 78 K611451 K611536 ALS Y  
RH25C-270 53 K612148 K612206 ALS Y  
RH25C-310 97 H061395 H061500 ALS Y  
RH25C-331 80 K570925 K571029 ALS Y  
RH25C-348 70 K571030 K571107 ALS Y  
RH25C-358 321 H064801 H063657 ALS Y  
RH26C-368 73 H063792 H063872 ALS Y  
RH26C-373 69 H016213 H016292 ALS Y  
RH26C-388 60 H065743 H065809 ALS Y  
RH26C-420 131 H073713 H073857 ALS Y  
RH26C-432 83 H067344 H067435 ALS Y  
RH26C-445 57 H074619 H074681 ALS Y  

 

Page 130 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

9.2Mineral Processing

 

For the purposes of this Technical Report, the Qualified Person (QP) reviewed available historical metallurgical test work to provide background information and context regarding the metallurgical characteristics of the deposit. While the historical test work was considered relevant, it was utilized primarily for reference and was not relied upon as the primary basis for the metallurgical assumptions, recovery estimates, or process design criteria developed for the PFS. Instead, the PFS evaluations and conclusions were principally supported by the more recent metallurgical testing programs completed specifically to advance the Project as described in Section 10. In the QP’s opinion, the current metallurgical test work provides a suitable basis for the PFS-level analysis and associated design assumptions. Additional metallurgical testing and evaluation are recommended to further refine these assumptions, address remaining uncertainties, and support advancement of the Project to the Feasibility Study (FS) level.

 

Page 131 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10Mineral Processing and Metallurgical Testing

 

10.1Historical Metallurgical Test Program

 

10.1.1Historical Oxide and Mixed Metallurgical Testing

 

Historical Oxide metallurgical testing was conducted primarily at St. Joe’s Technical Center and on-site at the Richmond Hill Metallurgical Testing laboratory. Additional work was conducted at Dawson Metallurgical Laboratories, Bondar Clegg, Kappes, Cassiday & Associates and Heinen Linstrom and Associates. This data was used to support the design and engineering of the production processing facility at Richmond Hill which operated from 1988 to 1993.

 

The following discussion focuses on the historical cyanidation bottle roll and column tests.

 

10.1.1.1Historical Bottle Roll Tests

 

Figure 10-1 presents the gold calculated head grades for historic Richmond Hill bottle roll tests. The historical calculated Au head grades ran between 0.0027 opt to 0.699 opt with a mean of 0.052 opt and median of 0.035 opt.

 

 

 

Figure 10-1: Richmond Hill Historic Bottle Roll Test KPIs: Calculated Heads Au opt

 

The historic bottle roll test silver head grade distribution and statistics are presented in Figure 10-2. Median and Mean silver calculated heads grades are 0.22 opt and 0.472 respectively.

 

Page 132 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 10-2: Richmond Hill Historic Bottle Roll Test KPIs: Calculated Heads Ag opt

 

Historic bottle roll test Silver to Gold ratio of the Richmond Hill had a significant variance with range of 0.21 to 803.3.

 

Median and Mean Ag:Au ratio of 6.52 and 15.99 respectively suggest that a Merrill-Crowe circuit should be used for heap leach solution processing for precious metal recovery.

 

 

 

Figure 10-3: Richmond Hill Historic Bottle Roll Test KPIs: Silver to Gold ratio distribution

 

Historic bottle roll tests for Richmond Hill had median and mean gold recoveries of 79.0% and 70.2% respectively. It should be noted that the data is skewed on the low side owing to the inclusion of non-oxide bottle roll test data in the population.

 

Where noted, non-oxide historic bottle roll tests were culled from the population for analysis.

 

Page 133 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 10-4: Richmond Hill Historic Bottle Roll Test KPIs: Gold Recovery Distribution

 

Silver recoveries for the historic bottle tests had mean value of 40.8% mean of 39.7%. As with the gold recovery, the distribution is skewed owing to the presence of non-oxide material included in the population.

 

 

 

Figure 10-5: Richmond Hill Historic Bottle Roll Test KPIs: Silver Recovery Distribution

 

10.1.1.2Historical Metallurgical Testing: Oxide & Transition Heap Leach

 

The Richmond Hill oxide material is amenable to cyanide heap processing for the recovery of precious metals. Individual Column test work data was combined into a common data set for analysis of the KPI’s. Where non-oxide column tests were identified, the corresponding data was excluded from the analysis. Consequently, non-oxide column tests that were not identified as such, tend to skew the results on the low side.

 

Figure 10-6 presents the column test gold calculated head grades for the oxide column tests. These ranged between 0.016 Au opt to 0.126 Au opt. Median and Mean gold calculated head grades were 0.044 opt and 0.0416 opt respectively.

 

Page 134 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 10-6: Richmond Hill Oxide Column Test KPIs: Calculated Gold Head Grades Distribution (Au opt)

 

The oxide column test silver calculated head grade distribution and pertinent statistics are shown in Figure 10-7. The silver grades ranged between 0.014 opt and 1.063 opt with median and mean values of 0.165 and 0.214 opt Ag respectively.

 

 

 

Figure 10-7: Richmond Hill Oxide Column Test KPIs: Calculated Silver Head Grades Distribution (Ag opt)

 

Oxide column test silver to gold ratios are presented in Figure 10-8. These range between 0.48 Ag:Au up to 14.13 Ag:Au. Median and Mean values for Ag:Au were 4.15 and 5.07 respectively. These ratios indicate that a Merrill-Crowe circuit is warranted and recommended for solution processing and Richmond Hill.

 

Page 135 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 10-8: Richmond Hill Oxide Column Test KPIs: Silver to Gold Ratio (Ag:Au)

 

Oxide column test gold recoveries, as shown in Figure 10-9, ranged between 1.79% to 95.1% with median and mean values of 84.9% and 65.5% respectively. As with the bottle roll tests, the distribution is skewed owing to the presence of high-sulfide transition and sulfide material in the sample population.

 

 

 

Figure 10-9: Richmond Hill Oxide Column Test KPIs: Gold Recovery (Au%)

 

The distribution and statistics for the oxide column tests’ Silver recoveries are shown in Figure 10-10. Recoveries ranged from 0.25% to 65.2% with a median Ag recovery of 16.7% and mean Ag recovery of 20.17%.

 

Page 136 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 10-10: Richmond Hill Column Test KPIs: Silver Recovery (Ag%)

 

10.1.2Historic Sulfide and Mixed Metallurgical Testing

 

Although the current operating plan for Richmond Hill does not include processing of the high sulfide transition and sulfide material, discussion of historic metallurgical test work focusing on these materials follows.

 

10.1.2.1Historical Metallurgical Reports: Sulfide & Mixed Flotation

 

Between 1987 and 1991, five historical metallurgical test programs were conducted on sulfide material from the Richmond Hill gold deposit. These programs, which included investigations into mineralogy, gravity separation, roasting, bioleaching, flotation, and leaching, are summarized in Table 10-1. Notably, Dawson Metallurgical Laboratories in Murray, Utah, reported results in 1988 that closely align with those obtained during the 2023 test work performed by Base Metallurgical Laboratories (BaseMet) in Kamloops, B.C.

 

Table 10-1: Historical Metallurgical Reports

 

Test Program Year Sample ID
Process Mineralogy and CN Leach Tests of Sulfide Ore Samples from Richmond Hill Project, No. 5H06 1987 RH 85-54, 83, 102, 108
Dawson Metallurgical Laboratories, Inc., Cyanide Leaching with Intensive Pre-aeration on a Sample from the Richmond Hill Project, No. P-1395 1988 Not available
Dawson Metallurgical Laboratories, Inc., Results of Preliminary Cyanide Leach Test on 8 Samples from South Dakota, No. P 1590 1988 CV4-1A to 4A, CV5-1A to 4A
Extractive Technologies Metallurgical Laboratories, Agitation Cyanidation Test work, No. 0161 1989 CV-88-6, 8, 23
LAC Minerals-Richmond Hill Inc., Report on Samples Submitted by Tod Duex for Bottle Roll Analysis 1991 BR-1H1, BR-1H2, BRB-W1, BR-SR1, BR-DB1, BR-BD2, BR-SC1, BR-SC2, BR-B1, BR-W2, BR-SR2, BR-SR3, BR-B2

 

Source: K-Met 2023.

 

The mineralogical analysis shows that that the RH sulfide material contains fine gold locked within coarse gangue, as well as significant quantities of gold associated with fine- to medium-grained iron sulfides encapsulated in gangue minerals. Consistent with the 2023 test work, historical gravity concentration tests yielded modest gold recoveries ranging from 7% to 23%, and as a result, were not pursued as a primary processing method at this stage.

 

Page 137 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Whole ore leaching (WOL) demonstrated limited effectiveness, with average gold extraction of just 46%. However, improved recoveries were achieved through pre-treatment methods such as roasting, bioleaching, and pressure oxidation (POX) of the flotation concentrate, followed by cyanide leaching. Roasting and bioleaching increased gold recovery to between 74% and 80%.

 

The application of autoclaving (POX) prior to cyanide leaching significantly enhanced metallurgical performance, resulting in gold extraction of approximately 93% and silver extraction of 74%. Cyanide consumption during leaching remained low at 1.5 kg/t, though lime consumption was relatively high, averaging 7 kg/t.

 

10.1.2.2Metallurgical Report – BL1244

 

In August 2023, Base Metallurgical Laboratories (BaseMet) completed test program BL1244 on drill-core material from the Richmond Hill zone. This preliminary metallurgical investigation focused on evaluating gold and silver extraction across three distinct mineralogical classifications: oxide, mixed, and sulfide. The head assays for the master composite (MC) samples are summarized in Table 10-2. Gold concentrations range from 0.65 to 0.82 grams per tonne (g/t), while sulfur content varies significantly across the mineralogical classifications-from 1.64% in the RH22 Ox composite to 6.21% in the RH22 Sul (sulfide) composite results and methods from this program are detailed in BaseMet’s December 4, 2023, report titled BL1244: Preliminary Metallurgical Assessment of the Richmond Hill Deposit.

 

10.1.2.2.1Head Assays

 

The head assays for the master composite (MC) samples are summarized in Table 10-2. Gold concentrations range from 0.65 to 0.82 g/t, while sulfur content varies significantly across the oxidation classifications—from 1.64% in the RH22 Ox (oxide) composite to 6.21% in the RH22 Sul (sulfide) composite.

 

Table 10-2: Master Composite Head Assays – BaseMet 2023, BL1244

 

Sample Assays
Cu (%) Fe (%) Ag (g/t) Au (g/t) S (%) C (%) TOC (%)
RH22 Sul 0.013 7.18 5.0 0.65 6.21 0.25 0.07
RH22 Mix 0.014 7.85 2.8 0.82 5.16 0.50 0.09
RH22 Ox 0.014 8.32 1.4 0.74 1.64 <0.01 <0.01
Method FAAS FAAS ICP FAAS LECO LECO LECO

 

Notes: FAAS = Flame Atomic Absorption Spectroscopy; LECO = Infrared Combustion; TOC = Total Organic Carbon.

 

10.1.2.2.2Gravity-Recoverable Gold

 

Gravity-recoverable gold (GRG) test work was conducted on the three master composites showing relatively low GRG values across all samples. The test work utilized three nominal grind sizes: 80% passing (P80) 1,700 µm, P80 212 µm, and P80 75 µm. Among the samples, the oxide MC exhibited the highest GRG at 33%, while the sulfide MC showed the lowest at 8.7%. Given the low recoveries, no additional gravity concentration testing was pursued at the time since the work was focused on a primary processing method. It should be noted that gravity gold recovery may be beneficial as part of a hybrid flowsheet.

 

Page 138 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10.1.2.2.3Flotation Test Results

 

Rougher Flotation

 

Rougher flotation tests were carried out on the master composites at a grind size of approximately P80 75 µm and under natural pH conditions ranging from 5.6 to 7.0. Potassium amyl xanthate (PAX) was used as the primary collector, and methyl isobutyl carbinol (MIBC) was added to ensure consistent froth formation throughout the process.

 

Two PAX dosage levels were evaluated: a relatively low dosage of 80 g/t and a higher dosage of 200 g/t. The higher dosage tests were conducted at a lower pulp density of 25% to 27% solids by weight, as increased viscosity was encountered during the initial flotation runs at higher densities. The overall flotation flowsheet employed for these tests is depicted in Figure 10-11.

 

 

 

Figure 10-11: Rougher Flotation Flowsheet—BaseMet 2023, BL1244

 

Gold recovery to the rougher flotation concentrates under the test conditions ranged from 62% to 69% across all three master composites, with the sulfide MC achieving the highest recovery at 69%. The increased PAX dosage, applied at a lower pulp density, resulted in a reduced mass pull for the sulfide MC and a corresponding increase in gold grade within the concentrate. For the oxide MC, however, the second rougher test (with higher PAX) showed minimal improvement.

 

Silver recovery generally mirrored gold, falling within a similar range of 66% to 69% for the mixed and sulfide MCs. In contrast, the oxide MC demonstrated significantly lower silver recovery, ranging from 39% to 44%.

 

Despite these recovery rates, the rougher flotation concentrate grades remained relatively low, between 2 and 6 g/t gold. As such, further test work is necessary to evaluate whether the concentrate can be upgraded to a saleable quality. Potential processing enhancements to increase concentrate grade or enable efficient gold extraction via leaching could include additional flotation stages, continuous gravity concentration, spiral concentration, or the use of shaking tables.

 

The detailed flotation recovery results and corresponding mass versus recovery performance curves are presented in Table 10-3 and Figure 10-12.

 

Page 139 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 10-3: Rougher Flotation Results – BaseMet 2023, BL1244

 

Test Sample

PAX

(g/t)

Weight

(%)

Assay Distribution (%)
Fe (%) Ag
(g/t)
Au
(g/t)
S (%) Fe Ag Au S
1 RH22—Sul 80 29.4 14.6 12.0 1.5 15.6 56 69 69 75
2 RH22—Mix 80 15.9 21.5 11.9 3.6 23.1 40 67 66 74
3 RN22—Ox 80 8.6 12.7 10.1 6.2 .1 12 39 67 41
7 RH22—Sul 200 17.0 27.4 19.2 2.8 35.2 62 69 68 88
8 RH22—Mix 200 11.6 26.9 13.4 5.1 31.1 38 66 62 71
9 RN22—Ox 200 8.6 12.4 11.1 6.1 7.8 13 44 68 43

 

 

 

Figure 10-12: Rougher Mass vs. Gold Recovery—BaseMet 2023, BL1244

 

10.1.2.2.4Diagnostic Leach

 

To evaluate leach performance across the master composites and to better understand how gold is associated with various mineral groups, a five-stage diagnostic leach test was performed. The test sequence began with a standard cyanide leach applied to each MC, ground to a primary grind size of P80 75 µm.

 

Subsequent stages involved treating the tailings from the previous leach step with specific reagents or acids to break down progressively more refractory mineral phases, followed by an additional cyanide leach after each treatment. This stepwise approach enabled identification of gold locked within different mineralogical contexts, such as oxides, sulfides, and silicates.

 

The full diagnostic leach procedure is illustrated in Figure 10-13, outlining the sequence of chemical treatments and corresponding cyanide leach stages used to quantify the gold deportment across mineral groups.

 

Page 140 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-13: Diagnostic Leach Test Flowsheet – BaseMet 2023, BL1244

 

At each stage of the test, various minerals and mineral groups are dissolved by the acid used. The results are listed in Table 10-4.

 

Table 10-4: Diagnostic Leach – BaseMet 2023, BL1244

 

Stage Description of Gold Au Stage Extraction (%)
RH22—Sul RH22—Mix RH22—Ox
A: High-Intensity CN Leach Cyanide amenable gold 47.4 72.9 91.0
B/C: HCl Digestion/Cyanidation Carbonate locked 18.8 4.4 2.4
D/E: HNO3 Digestion/Cyanidation Arsenical minerals (arsenopyrite) 29.4 12.5 2.0
F: Aqua Regia Digestion Pyritic sulfide locked 3.5 1.9 2.6
Tailings Silicate (gangue) encapsulated 1.0 8.3 1.9
Total   100 100 100

 

The results show that the majority of gold in the oxide material is free or exposed, making it highly responsive to whole ore leaching (WOL), with an expected gold extraction of approximately 91%. For the mixed master composite (MC), gold extraction reached 72.9%, aligning with the WOL outcomes described in Section 10.2.7. Notably, 12.5% of the gold was recovered during the D/E stage (nitric acid digestion), although bulk mineral analysis (BMA) did not reveal significant arsenopyrite content. This suggests the presence of refractory gold not associated with arsenopyrite. The mixed MC also contained the highest proportion of gold encapsulated within silicate or gangue minerals. The sulfide MC demonstrated poor gold recovery in the initial cyanide leach stage; however, significant gold dissolution occurred during both the hydrochloric and nitric acid stages. Across all three composites, only minor amounts of gold were found to be locked in pyrite.

 

10.1.2.3Metallurgical Report – BL1346

 

In September 2023, intervals from 29 drill holes across seven distinct zones were collected to support metallurgical evaluation of the Richmond Hill deposit. The zones sampled include Twin Tunnels, Turn Around, Monitoring Well 3, Richmond Hill, Cleveland, Cole Creek, and Richmond Hill North. For each zone, master composites (MCs) were developed to represent the oxide, mixed, and sulfide mineralization layers. The corresponding MCs and their head grades are detailed in Table 10-2.

 

According to the mine plan established at the time, the majority of the projected mined material is sourced from four primary zones: Twin Tunnels is expected to contribute approximately 40%, followed by Turn Around at 30%, Monitoring Well 3 at 20%, and Richmond Hill at 10%.

 

Page 141 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10.1.2.3.1Flotation Grind Series

 

Three preliminary rougher flotation tests were conducted on the sulfide master composite from the Twin Tunnels zone (MC-TT-S) to evaluate the impact of primary grind size on flotation performance. The sample was milled to target grind sizes of P80 50 µm, P80 75 µm, and P80 106 µm. Flotation was carried out at natural pH over a total duration of eight minutes. Potassium amyl xanthate (PAX), a nonselective collector for gold and sulfides, was applied at a dosage of 80 g/t based on feed mass.

 

Among the three grind sizes, the P80 75 µm condition yielded the most favorable results for both gold and silver recovery. Under these conditions, approximately 21% of the feed was recovered in the rougher concentrate.

 

The rougher concentrate test results are presented in Table 10-5, and the relationship between gold recovery and mass recovery is illustrated in Figure 10-14.

 

Table 10-5: Rougher Flotation Grind Series MC-TT-S – BaseMet 2023, BL1346

 

Test No.

Grind
Size

(P80 µm)

Weight Assay Distribution (%)
% g Au (g/t) Ag (g/t) Fe (%) S (%) Au Ag Fe S
BL1346-22 50 27.9 557.1 1.93 11.4 17.2 17.9 60.3 65.7 53.5 72.5
BL1346-23 75 21.1 419.1 2.87 15.1 22.9 25.6 65.8 68.1 55.6 78.4
BL1346-24 106 16.7 330.3 3.04 15.5 24.3 26.6 54.0 56.4 46.9 64.6

 

 

Figure 10-14: Gold Rougher Concentrate Recovery vs. Mass Recovery – BaseMet 2023, BL1346

 

Page 142 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10.1.2.3.2Preliminary Flotation Optimization

 

To further enhance flotation recovery from the MC-TT-S composite, a series of optimization tests were conducted incorporating three primary changes: an extended rougher flotation time of 10 minutes, an increased PAX dosage of 200 g/t, and a reduced pulp density ranging from 25% to 27%.

 

The results indicate these adjustments collectively influenced gold recovery to the rougher concentrate. Among the variables tested, the higher PAX dosage had the most significant effect, resulting in both the highest gold recovery and the greatest mass pull to the rougher concentrate. This suggests improved collector efficiency and increased recovery of gold/sulfides.

 

Conversely, operating at a lower pulp density appeared to reduce mass recovery, likely due to reduced particle-particle collision frequency and froth carrying capacity in the more dilute slurry.

 

10.22026 Metallurgical Test Program

 

Dakota Gold Corp. commissioned Forte Dynamics, Inc. to complete a metallurgical test program for the Richmond Hill Project. The program evaluated the metallurgical characteristics of oxide, transition, and sulfide material and provided data for the project’s pre-feasibility study. The program evaluated the suitability of oxide and transition material for heap leaching, including the effects of ore type, crush size, leach conditions, and permeability on gold and silver recovery.

 

The program supports the selection of processing conditions and the development of recovery estimates and process design criteria for Richmond Hill Project. It also addresses potential risks associated with reagent consumption, preg-robbing, deleterious elements, and the environmental characteristics of spent ore.

 

The Richmond Hill metallurgical test program was developed in stages so that early test results could guide the selection of material for column leaching. Forte Dynamics first reviewed the available drill-hole intervals and organized them by formation and gold grade. The compositing approach was refined as the program progressed, using gold grade and total sulfur to identify distinct sub-composites within the principal formations: Deadwood, Precambrian, Tertiary Intrusives, and Breccia.

 

Forte Dynamics prepared 110 sub-composites for preliminary testing, which included head characterization with gold and silver assays and carbon and sulfur speciation. The sub-composites were also evaluated by 48-hour cyanidation bottle roll tests at a target grind of 80% passing 200 mesh. Forte Dynamics compared the resulting gold extraction with the drill-hole cyanide-soluble gold to fire-assay gold ratio (CN/FA) and compared total sulfur with measured sulfide sulfur. This analysis established a classification framework for oxide, low-performing oxide, transitional, and sulfide material and informed the selection of master composites for further testing.

 

The master composite program included head characterization, comminution testing, and bottle roll testing. Oxide and transitional composites were selected for column leach testing by formation, oxidation classification, and, where appropriate, gold grade. Columns were tested at target P80 crush sizes of 1 inch and ½ inch where sufficient material was available. The program also included compacted permeability testing on selected materials to assess their response to simulated heap loading. Column solutions were monitored during leaching, and the resulting recovery and reagent-consumption data were used to evaluate metallurgical variability and the effect of crush size. Sulfide master composites underwent bottle roll testing but were not included in the column leach program completed for the PFS.

 

10.2.1Metallurgical Sample Selection and Representativeness

 

Metallurgical samples for the Richmond Hill test program were selected to examine variability in gold grade, formation, and leaching response. The initial compositing review grouped drill-hole intervals by project area and formation, with gold grade used as a secondary criterion. Related formation codes were consolidated into four groups, Deadwood, Precambrian, Tertiary Intrusive, and Breccia, to provide sufficient intervals and sample mass for testing. Where practical, intervals were kept within individual project areas; broader grouping was used where interval counts were limited.

 

Page 143 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The compositing strategy was refined as preliminary results became available. Early review of gold grade and total sulfur identified variability within the initial composites, prompting formation-based sub-compositing. Forte prepared 110 sub-composites for head characterization and bottle roll testing. The resulting extraction data were compared with drill-hole CN/FA ratios and sulfur assays to define oxide, low-performing oxide, transitional, and sulfide material. Master composites for the subsequent program were then selected by formation, oxidation classification, and, where sample mass permitted, high- and low-grade categories. This approach allowed the column tests to examine metallurgically distinct material types rather than relying on formation alone.

 

 

Figure 10-15: Drillhole Interval CN/FA Ratio vs Total S%

 

The selected master composites cover all four principal formation groups, shown in Figure 10-15, and include oxide and transitional material targeted for heap leaching. Sulfide composites were characterized and bottle roll tested but were not included in the reported column leach program or in the PFS. Sample availability also affected test coverage: most selected oxide and transitional composites were tested at both 1-inch and ½-inch target P80 crush sizes, while some combinations could support only one test condition. The test program represents the principal metallurgical domains; however, column-test coverage is not proportional to the estimated tonnage of each formation and oxidation. Deadwood represents approximately 48% of the estimated PFS ore tonnage but approximately 32% of the completed column tests. This variation should be reviewed through additional variability testing as the Project advances to Feasibility Study-level evaluation.

 

Page 144 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 10-6: Oxide Ore Tonnage vs Metallurgical Tests Performed

 

Oxide Ore MTons by Formation Number of Bottle Rolls Number of Column Tests
Deadwood 56.1 48% 58 53% 8 32%
Precambrian 25.6 21% 15 14% 6 24%
Tertiary Intrusive 18.7 15% 32 29% 7 28%
Breccia 17.3 14% 5 5% 4 16%
Other 2.8 2%        
Total 120.5   110   25  

 

10.2.2Head Characterization

 

Head characterization was completed on the metallurgical composites and sub-composites developed for the Richmond Hill test program to characterize precious-metal grade and sulfur speciation and to support interpretation of subsequent leach test results. The characterization program was conducted in conjunction with bottle roll testing, at a target P80 of 200 mesh, and included gold and silver head assays and carbon and sulfur speciation by LECO analysis. Sulfur analyses included total sulfur, sulfate sulfur, and sulfide sulfur.

 

The head characterization data were evaluated together with the corresponding drill hole assay data for the intervals comprising each sub-composite. For comparison with the laboratory head results, average values of the intervals used for sub-compositing were developed for total sulfur, CN/FA ratio, and available multi-element ICP data. This allowed the metallurgical characteristics measured on the physical composites to be compared with parameters available within the exploration database and evaluated for their potential use in metallurgical classification and correlation to the resource block model.

 

Sulfur speciation was an important component of the characterization program because the exploration database principally contains total sulfur, whereas sulfide sulfur is more directly relevant to oxidation state and potential metallurgical response. Strong relationships between total sulfur and sulfide sulfur were observed within the principal geologic groups evaluated. For the Deadwood, Precambrian, and Tertiary Intrusive datasets, the coefficient of determination (R²) between bottle roll head total sulfur and sulfide sulfur was 0.967, 0.995, and 0.877, respectively, as seen in Figure 10-16. Breccia was not included in the sulfur regression analysis due to limited sample availability. Comparison of drill hole total sulfur with sulfide sulfur measured during head characterization similarly produced R² values of 0.922, 0.981, and 0.932 for these respective groups, as seen in Figure 10-17.

 

Page 145 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-16: Bottle Roll Sulfur Speciation, Total Sulfur vs Sulfide Sulfur by Lithology

 

Page 146 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-17: Bottle Roll Sulfide% vs Drillhole Average Total Sulfur

 

These results indicate, within the materials tested, total sulfur provides a useful proxy for sulfide sulfur and therefore provides a practical link between the metallurgical test program and the larger drill hole database. The relationship was subsequently incorporated, together with CN/FA ratio and bottle roll extraction, to develop the metallurgical oxidation classification described in Section 10.2.5.

 

Gold grade was also considered during development of the test composites. Gold grades within the metallurgical interval population ranged from approximately 0.14 g/t Au to 29.2 g/t Au, with an average grade of approximately 0.85 g/t Au. Approximately 25% of the intervals contained greater than 0.93 g/t Au, while approximately 10% contained greater than 1.68 g/t Au. A minimum cut-off gold grade of 0.14 g/t Au (approximately 0.004 oz/ton) was applied during development of the metallurgical composite population. Formation was used as the primary grouping criterion for master composites, with gold grade used as a secondary consideration. CN/FA ratio and sulfur were initially excluded from the master-composite definitions so that sufficient sample mass could be retained for subsequent subdivision and testing.

 

The characterization results were subsequently evaluated with the bottle roll test results to develop the metallurgical domains described in Section 10.2.4.

 

Page 147 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10.2.3Bottle Roll Leach Testing

 

Bottle roll leach testing was completed on sub-composites developed from the Richmond Hill metallurgical sample population to evaluate gold and silver cyanide leach response and characterize metallurgical variability within the principal formations. The sub-composites represented the Deadwood, Precambrian, Tertiary Intrusive, and Breccia units and were developed to provide sufficient geological representation while allowing the effects of gold grade, CN/FA ratio, and sulfur content on leach response to be evaluated.

 

Bottle Roll Procedure

 

Testing consisted of 48-hour cyanidation bottle roll tests at a target grind of P80 200 mesh. The test program included gold and silver extraction, sodium cyanide consumption, and lime addition. Each sub-composite was also subjected to head characterization, including gold and silver fire assay and LECO sulfur speciation for total sulfur, sulfate, and sulfide sulfur. The metallurgical results were compared with the corresponding drill-hole assay characteristics of the intervals comprising each sub-composite.

 

A total of 110 bottle roll tests were evaluated across the four principal formations, comprising 58 Deadwood, 32 Tertiary Intrusive, 15 Precambrian, and five Breccia sub-composites. Bottle roll gold extraction by formation and metallurgical classification are summarized in Table 10-7 and Table 10-8.

 

Table 10-7: Summary of Bottle Roll Gold Extraction by Formation

 

Formation No. of
Tests
Average Au
Extraction (%)
Std. Dev (%) Minimum Au
Extraction (%)
Maximum Au
Extraction (%)
Breccia 5 84.5 12.9 62.7 96.4
Deadwood 58 80.9 10.1 54.3 96
Precambrian 15 78.7 10.9 58.5 95.8
Tertiary Intrusive 32 79.9 9.3 59.4 93.5
Total 110        

 

Table 10-8: Summary of Bottle Roll Gold Extraction by Formation and Metallurgical Classification

 

Formation Metallurgical
Classification
No. of Tests Average Au
Extraction (%)
Std. Dev
(%)
Minimum Au
Extraction (%)
Maximum Au
Extraction (%)
Breccia Oxide 2 91.6 7 86.8 96.4
Breccia Sulfide 1 62.7   62.7 62.7
Breccia Transitional 2 88.4 4 85.7 91.0
Deadwood Oxide 26 85.8 5 76.7 92.5
Deadwood Sulfide 19 75.3 14 54.3 96.0
Deadwood Transitional 13 79.6 7 68.3 94.2
Precambrian Oxide 3 87.2 3 83.9 90.7
Precambrian Sulfide 8 74.9 13 58.5 95.8
Precambrian Transitional 4 80.0 4 75.1 84.1
Tertiary Intrusives Oxide 14 85.9 5 77.1 93.5
Tertiary Intrusives Sulfide 6 69.6 8 59.4 84.1
Tertiary Intrusives Transitional 12 78.1 9 62.0 88.5
Total   110        

 

Bottle roll gold extraction was generally higher for oxide than transitional material within each formation. Average oxide extraction ranged from 85.9% to 91.6%, while average transitional extraction ranged from 78.1% to 88.4% for the populations summarized above. Variability was present within each classification, particularly within the Tertiary Intrusive and Deadwood transitional populations, indicating that oxidation classification alone does not fully account for the observed leach response.

 

Page 148 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-18: Bottle Roll Extraction % Au vs Drillhole Average CN/FA Ratio by Formation

 

Although higher CN/FA ratios were generally associated with higher bottle roll gold extraction, appreciable variability remained within the individual formations. The results indicate that CN/FA ratio is a useful indicator of relative leach response but is not sufficient as a stand-alone predictor of metallurgical recovery. Total sulfur and sulfur speciation were therefore evaluated in conjunction with CN/FA ratio when interpreting bottle roll response.

 

Bottle roll gold extraction was also evaluated as a function of total sulfur. Lower-sulfur material with higher CN/FA ratios generally exhibited higher gold extraction, while lower extractions became more prevalent with increasing sulfur content and decreasing CN/FA ratio. Variability and overlap remained among the resulting material classifications, indicating that neither CN/FA ratio nor total sulfur individually explains the full range of metallurgical response.

 

Page 149 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-19: Bottle Roll Gold Extraction versus Total Sulfur by Metallurgical Classification

 

Lime addition during bottle roll testing was also evaluated relative to sulfur content. Higher lime requirements were generally associated with higher-sulfur samples; however, appreciable variability was observed within the oxide and transitional populations. Lime addition was therefore not considered sufficiently consistent for use as a stand-alone metallurgical classification parameter. The observed sulfur and lime-consumption behavior contributed to the recommendation for additional acid-base accounting (ABA) and PAG/NAG characterization to further evaluate acid-generation potential and heap-leach suitability.

 

Bottle roll results were used together with head characterization data to refine the formation-based master composites and select material for subsequent column leach testing. Oxide, low-performing oxide, and transitional material were prioritized for column testing because these material types are being evaluated for heap-leach processing. Where sufficient sample mass was available, master composites were further differentiated by gold grade and evaluated at nominal P80 crush sizes of 25.4 mm (1 inch) and 12.7 mm (½ inch). Sulfide material was bottle roll tested but was not advanced to column testing during this phase of the program.

 

10.2.4Permeability Testing

 

Compacted permeability testing was performed by Forte Dynamics to evaluate the ability of the Richmond Hill material to maintain hydraulic conductivity under simulated heap loading conditions. Six samples were selected to represent the four principal formations, including two Deadwood samples, two Breccia samples, one Tertiary Intrusive sample, and one Precambrian sample.

 

Page 150 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Permeability was evaluated under staged loading conditions corresponding to approximately 50 ft, 100 ft, 200 ft, 400 ft, and 600 ft of simulated heap height. Sample deformation and hydraulic response were monitored as loading increased to evaluate the potential for compaction-related loss of permeability.

 

The tested materials maintained acceptable permeability under the simulated loading conditions, with some reduction in permeability observed at the higher applied loads. The results did not identify a material characteristic expected to preclude heap-leach processing of the tested material; however, the observed reduction in permeability at greater simulated heap heights should be considered in heap configuration, material placement, and lift-height design.

 

Table 10-9: Compacted Permeability Summary

 

Test Measurement Load 1 Load 2 Load 3 Load 4 Load 5 Load 6 Pass/Fail
Load (~ft) 0 50 100 200 400 600
Deadwood (1) Average KSat (cm/s) 0.0174 0.0173 0.0173 0.0172 0.0171 0.0171 PASS
Deadwood (2) Average KSat (cm/s) 0.0169 0.0168 0.0168 0.0168 0.0167 0.0166 PASS
Breccia (1) Average KSat (cm/s) 0.0242 0.0241 0.0236 0.0225 0.0177 0.0113 PASS
Breccia (2) Average KSat (cm/s) 0.0227 0.0214 0.0210 0.0191 0.0137 0.0048 PASS
Tertiary Int. Average KSat (cm/s) 0.0205 0.0208 0.0211 0.0211 0.0210 0.0201 PASS
Precambrian Average KSat (cm/s) 0.0220 0.0221 0.0219 0.0218 0.0216 0.0209 PASS

 

 

 

Figure 10-20: Compacted Permeability Results Deadwood

 

Page 151 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-21: Compacted Permeability Results Breccia, Tertiary Intrusives, and Precambrian

 

10.2.5Metallurgical Domaining

 

The metallurgical domaining framework integrates geologic formation with oxidation classification to define material populations having differing expected heap-leach response. The framework was developed from the head characterization and bottle roll test results described in Sections 10.2.2 and 10.2.3. Formation provides the primary geologic grouping, while CN/FA ratio and total sulfur provide the principal parameters for distinguishing oxidation and leach response within each formation. Gold grade is retained as an additional consideration where sufficient sample mass is available to evaluate grade-dependent response.

 

The principal formation groups used for metallurgical domaining are Deadwood, Precambrian, Tertiary Intrusive, and Breccia. Head characterization demonstrated a strong relationship between total sulfur and sulfide sulfur within the principal formations evaluated, supporting the use of total sulfur as a practical proxy for sulfide sulfur and providing a means of extending the metallurgical classification to the broader drill-hole database. Bottle roll testing further demonstrated that higher CN/FA ratios were generally associated with higher gold extraction, but that appreciable variability remained when CN/FA was considered independently. Accordingly, CN/FA ratio and total sulfur were evaluated together in development of the oxidation classification.

 

Statistical partition analysis of the bottle roll results was used to evaluate potential boundaries associated with changes in gold extraction. Analysis of the Tertiary Intrusive dataset identified primary splits near a CN/FA ratio of 0.83 and total sulfur content of 0.49%, which closely corresponded with thresholds identified from the Precambrian dataset. Analysis of the larger Deadwood dataset demonstrated similar behavior, although the locations of individual statistical splits varied. Based on the combined datasets, and to maintain a consistent classification framework across the principal formations, CN/FA thresholds of 0.70 and 0.82 and total sulfur thresholds of 0.5% and 1.1% were adopted for metallurgical classification.

 

Page 152 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-22: Metallurgical Classification Based on Drillhole CN/FA Ratio and Total Sulfur

 

The resulting oxidation classifications are summarized in Table 10-10.

 

Table 10-10: Metallurgical Oxidation Classification Criteria

 

Classification CN/FA Ratio Total Sulfur
Oxide ≥ 0.82 < 0.5%
Low-Performing Oxide ≥0.70 and < 0.82 < 0.5%
Transitional ≥ 0.70 0.5% to 1.1%
Sulfide   >1.1%

 

The classification distinguishes relatively low-sulfur material with higher CN/FA response from material exhibiting lower CN/FA ratios and/or elevated sulfur content. Bottle roll results generally demonstrated higher gold extraction within the oxide population, while lower extraction became more prevalent within the low-performing oxide, transitional, and sulfide populations. However, overlap in extraction was observed among the classifications, indicating that the boundaries represent a framework for grouping materials with differing metallurgical tendencies rather than discrete recovery boundaries.

 

The oxidation classification was subsequently combined with formation to establish the metallurgical domains used for evaluation of column leach response. This approach allows Deadwood oxide material to be evaluated independently from Tertiary Intrusive or Breccia oxide material rather than assuming that materials having the same oxidation classification exhibit equivalent leach behavior. Where sufficient sample mass was available, gold grade was used as an additional subdivision for master-composite testing.

 

Page 153 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The resulting metallurgical domains were used to guide selection and interpretation of master composites for column leach testing and provide the framework for evaluating recovery variability by formation, oxidation classification, grade, and crush size. Subsequent column testing was used to assess whether the metallurgical differences identified during bottle roll testing persisted under conditions more representative of heap leaching.

 

10.2.6Mineralogical Characterization

 

Mineralogical characterization was completed on selected master composites representing the principal lithologies and metallurgical classifications evaluated during the test program. X-ray diffraction (XRD) analysis was completed on selected Deadwood, Precambrian, Tertiary Intrusive, and Breccia composites to characterize bulk mineral assemblages. Supplemental scanning electron microscopy and automated mineralogical characterization using the Advanced Mineral Identification and Characterization System (AMICS) were completed on selected Precambrian, Tertiary Intrusive, and Breccia composites to further characterize modal mineralogy and gold occurrence.

 

The XRD results indicate distinct mineral assemblages among the principal lithologies. Deadwood was predominantly composed of quartz and K-feldspar, with goethite present in the tested oxide and transitional composites. Precambrian material contained quartz and K-feldspar with comparatively abundant mica/illite. Breccia material was principally composed of quartz and K-feldspar with kaolinite present in the tested composites; pyrite increased in the sulfide composite. Tertiary Intrusive material was generally dominated by K-feldspar, with quartz and lesser mica/illite, plagioclase, and iron-bearing minerals occurring in selected composites. The XRD results for the selected master composites are summarized in Table 10-11.

 

Table 10-11: Summary of XRD Mineralogical Characteristics by Formation

 

Formation Samples Evaluated Principal
Mineralogy
Notable Mineralogical Characteristics
Breccia Oxide, Transitional, Sulfide Quartz, K-feldspar Kaolinite present across tested composites; goethite present in oxide/transitional material; pyrite increases in sulfide material
Tertiary Intrusive HG/LG Oxide, HG/LG Transitional, Sulfide K-feldspar, quartz K-feldspar dominated; plagioclase present in LG transitional and sulfide material; pyrite present in sulfide material
Precambrian Oxide, HG/LG Transitional, Sulfide Quartz, K-feldspar, mica/illite Comparatively abundant mica/illite; maghemite present across tested composites; goethite present in oxide/transitional material; pyrite present in LG transitional and sulfide material
Deadwood HG/LG Oxide, HG/LG Transitional Quartz, K-feldspar Quartz-rich; goethite present across tested composites; minor mica/illite and clinopyroxene present in selected composites

 

Supplemental AMICS analysis identified gold-bearing particles in the tested Precambrian, Breccia, and Tertiary Intrusive composites. In the Precambrian samples, free gold and electrum particles were approximately 2 µm to 5 µm in size, with some association with hematite. Gold particles observed in the Breccia samples were approximately 10 µm in size and associated with iron oxides, while gold-bearing particles in the Tertiary Intrusive samples were approximately 5 µm in size and exhibited association with orthoclase and iron oxides.

 

The mineralogical results provide supporting characterization of the master composites and demonstrate differences in gangue mineralogy, sulfide occurrence, and gold association among the principal lithologies and metallurgical classifications. These results provide additional context for the variability observed during subsequent column leach testing; however, the mineralogical dataset represents selected master composites and was not used independently to define metallurgical domains or recovery assignments.

 

Page 154 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

10.2.7Column Leach Testing

 

Column leach testing was completed on selected master composites to evaluate gold and silver extraction under conditions more representative of heap leaching and to assess the effects of formation, oxidation classification, grade, and crush size on metallurgical response. Oxide and transitional composites were included in the column program, with material subsequently classified as Low-Performing Oxide having been combined with transitional material during development of the original column composites. Sulfide composites were not advanced to column testing. Where sufficient sample mass was available, paired tests were conducted at nominal P80 crush sizes of 25.4 mm (1 inch) and 12.7 mm (½ inch).

 

A total of 25 column tests were completed across the four principal formations, including eight Deadwood, six Precambrian, seven Tertiary Intrusive, and four Breccia tests. The distribution of column tests by formation relative to the estimated ore tonnage is summarized in Table 10-6. The column program provided representation of the principal oxide and transitional material types identified during the preceding head characterization and bottle roll test programs.

 

Column Test Procedure

 

Column leaching was initially planned for approximately 60 days; however, individual test durations were adjusted based on observed extraction and solution assay response. Once gold and silver concentrations in the column effluent declined below analytical detection limits, solution application was discontinued and the columns were allowed to rest for approximately two weeks. The columns were subsequently restarted to evaluate additional extraction following the rest period. Total leach duration, including the rest cycle where applicable, is summarized in Table 10-12.

 

Table 10-12: Column Test Summary Table

 

Test ID P80 Days of
Leach
Extraction, %
Au
Calc’d Head g/t
Au
Extraction, %
Ag
Calc’d Head
g/t Ag
Breccia Oxide 0.5" 43 92.0 1.114 61.1 17.5
Breccia Oxide 1" 47 90.7 1.364 46.8 14.9
Breccia Trans 1" 36 83.7 0.571 16.5 7.2
Tertiary Intrusive HG Oxide 0.5" 40 80.9 1.592 8.2 19.5
Tertiary Intrusive LG Oxide 0.5" 30 79.2 0.305 9.1 5.9
Tertiary Intrusive HG Trans 1" 43 77.0 2.079 6.3 16.1
Tertiary Intrusive HG Oxide 1" 40 71.8 1.869 7.0 16.3
Tertiary Intrusive LG Trans 0.5" 30 69.2 0.245 13.4 4.2
Tertiary Intrusive LG Oxide 1" 30 66.4 0.332 4.6 6.2
Tertiary Intrusive LG Trans 1" 37 65.6 0.334 11.7 3.3
Precambrian Oxide 0.5" 36 80.6 0.538 12.0 7.5
Precambrian Oxide 1" 39 74.4 0.568 8.2 8.7
Precambrian HG Trans 0.5" 61 66.3 3.641 13.0 46.3
Precambrian LG Trans 0.5" 40 63.5 0.681 17.6 9.0
Precambrian LG Trans 1" 38 60.8 0.520 14.3 7.9
Precambrian HG Trans 1" 63 60.1 3.959 9.5 55.7
Deadwood LG Oxide 1" 21 73.4 0.308 8.3 8.8
Deadwood LG Trans 0.5" 21 68.7 0.521 17.8 20.4
Deadwood LG Trans 1" 21 65.0 0.520 17.2 15.5
Deadwood HG Oxide 0.5" 21 65.0 1.297 16.7 22.4
Deadwood HG Trans 1" 24 64.9 1.711 12.5 20.2
Deadwood HG Trans 0.5" 24 60.5 1.849 17.8 23.1
Deadwood HG Oxide 1" 27 59.2 1.516 13.5 25.1
Deadwood LG Oxide 0.5" 21 57.3 0.458 8.9 10.3

 

Page 155 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

For each master composite represented in the column program, a portion of the material was also subjected to a 48-hour cyanidation bottle roll test following grinding to a target P80 of 200 mesh. These tests provided a higher-liberation reference response for comparison with the corresponding column tests. Bottle roll testing was also completed on sulfide master composites, although sulfide material was not advanced to column leaching.

 

Gold Extraction

 

Column leach results demonstrated meaningful variability in gold extraction among all formations and oxidation classifications. Breccia exhibited the highest average gold extractions, with oxide material averaging 91.4% and transitional material averaging 83.7%. Tertiary Intrusive oxide and transitional material averaged 74.6% and 70.6%, respectively, while Precambrian oxide and transitional material averaged 77.5% and 62.7%, respectively. Deadwood oxide and transitional material averaged 63.7% and 64.8%, respectively. Across all formations, oxide column extractions ranged from 57.3% to 92.0%, while transitional material ranged from 60.1% to 83.7%.

 

The results indicate that oxidation classification alone does not fully account for the observed variability in column extraction. In particular, oxide material did not exhibit a uniform recovery response among formations. Breccia oxide material produced substantially higher average extraction than Deadwood oxide material despite both being classified as oxide. Similarly, transitional material exhibited different recovery responses among the formations. These results support the use of formation in combination with oxidation classification when developing the metallurgical domains and recovery assumptions for the Project.

 

The comparatively small difference between average oxide and transitional extraction within Deadwood also illustrates that increasing sulfur content or changing oxidation classification does not necessarily result in a proportional reduction in column recovery for every formation. Consequently, recovery should be assigned based on the observed response of the individual metallurgical domains rather than through a single deposit-wide relationship between oxidation classification and extraction.

 

Page 156 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-23 : Deadwood Column Leach Gold Extraction Curves

 

 

Figure 10-24: Precambrian Column Leach Gold Extraction Curve

 

Page 157 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-25: Tertiary Intrusives Column Leach Gold Extraction Curves

 

 

Figure 10-26: Breccia Column Leach Gold Extraction Curves

 

Page 158 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Silver Extraction

 

Silver extraction was also monitored throughout the column leach program. Silver recovery was substantially lower and more variable than gold recovery, with differences observed among the principal formations and oxidation classifications. The results indicate that silver represents a secondary component of the overall metallurgical response and that its recovery should be evaluated separately from gold rather than assuming a common response between the two precious metals.

 

Breccia material exhibited the strongest silver recovery response within the test program. Precambrian, Tertiary Intrusive, and Deadwood material generally exhibited lower silver recovery, with variability occurring between oxide and transitional material and among individual composites.

 

As observed for gold, silver response was influenced by crush size, although the magnitude of the response varied among the tested materials. Finer crushing generally improved silver extraction, indicating that liberation contributes to silver recovery for at least a portion of the Richmond Hill material. The variable response among formations indicates that silver recovery is also dependent on mineralogical and material characteristics that are not fully represented by oxidation classification alone.

 

Overall, the column results demonstrate that silver is recoverable under the cyanide leach conditions evaluated, but at substantially lower recoveries than gold. The variability among the tested materials supports evaluating silver recovery by metallurgical domain rather than applying a single recovery assumption across the deposit. Laboratory modeled silver recoveries and the effect of crush size on longer-term silver recovery are discussed further in Section 10.2.6.

 

Page 159 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-27: Deadwood Column Leach Silver Extraction Curves

 

 

Figure 10-28: Precambrian Column Leach Silver Extraction Curves

 

Page 160 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-29: Tertiary Intrusives Column Leach Silver Extraction Curves

 

 

Figure 10-30: Breccia Column Leach Silver Extraction Curves

 

Page 161 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Effect of Crush Size

 

Paired column tests conducted at nominal P80 crush sizes of 25.4 mm (1 inch) and 12.7 mm (½ inch) were evaluated to determine the effect of finer crushing on measured gold extraction. Where paired tests were available, the ½-inch crush generally resulted in higher gold extraction than the corresponding 1-inch crush; however, the magnitude of the improvement varied among the composites tested.

 

The crush-size response was not uniform among formations or oxidation classifications. Some composites exhibited a measurable improvement in extraction at the finer crush size, while others showed comparatively little difference in rate and ultimate recovery between the two crush sizes. Table 10-13 illustrates the difference in recovery by crush size observed in the column testing and the general improvement observed at the finer crush size.

 

The observed crush-size response is also important when considered together with the comminution and permeability results. The longer-term effect of crush size on recovery is further evaluated using the laboratory modeled recoveries and PFS assignment recoveries in Section 10.2.9 and 10.2.12 respectively.

 

Table 10-13: Column Leach Recovery Comparison by Crush Size

 

Column Leach Test ID

12.7 mm Ext,

% Au

25.4 mm Ext,

% Au

12.7 mm Ext,
% Ag
25.4 mm Ext,
% Ag
Precambrian Oxide 80.6 74.4 12.0 8.2
Precambrian HG Trans 66.3 60.1 13.0 9.5
Precambrian LG Trans 63.5 60.8 17.6 14.3
Breccia Oxide 92.0 90.7 61.1 46.8
Breccia Trans - 83.7 - 16.5
Tertiary Intrusive HG Oxide 80.9 71.8 8.2 7.0
Tertiary Intrusive LG Oxide 79.2 66.4 9.1 4.6
Tertiary Intrusive HG Trans - 77.0 - 6.3
Tertiary Intrusive LG Trans 69.2 65.6 13.4 11.7
Deadwood HG Oxide 65.0 59.2 16.7 13.5
Deadwood LG Oxide 57.3 73.4 8.9 8.3
Deadwood HG Trans 60.5 64.9 17.8 12.5
Deadwood LG Trans 68.7 65.0 17.8 17.2

 

10.2.8Acid-Base Accounting and Spent Ore Geochemical Characterization

 

ABA testing was completed on 110 spent ore residues generated from bottle roll leach testing and 24 spent ore residues generated from the column leach testing. The primary goal is to accurately characterize the acid generation and neutralization potential of material post-cyanide leaching. The tested residues represent the primary geometallurgical domains, namely the Breccia, Deadwood, Precambrian, and Tertiary Intrusive formations. The spent bottle roll residues further represent the oxide, transition, and sulfide sub-composites at the P80 of 200 mesh. The spent column residues represent the oxide and transitional master composites evaluated at the nominal 25.4 mm (1 inch) and 12.7 mm (½ inch) crush sizes.

 

The ABA testing included sulfur speciation, used to calculate acid generation potential (AGP) from total sulfur and sulfide sulfur, acid neutralization potential (ANP) by the Modified Sobek titration method, saturated paste pH, and NAG pH testing. The AGP and ANP were used to calculate the net neutralization potential (NNP; ANP - AGP), and neutralization potential ratio (NPR; ANP/AGP). NNP, NPR, and NAG pH are generally accepted industry standard criteria for classifying the ARD potential of mine materials. NNP and NPR were evaluated using both total sulfur and sulfide sulfur as the basis for calculated AGP but because sulfide sulfur more directly represents the sulfur fraction capable of generating acidity, the sulfide sulfur based results were used as the principal basis for interpretation. As a ratio, NPR can magnify analytical noise when AGP and ANP are near or below the detection limit, which is the case for many samples at Richmond Hill. For this reason, NNP is considered a clearer indicator than NPR for the Project and is the focus of this discussion.

 

Page 162 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The spent column residues generally exhibited lower acid rock drainage (ARD) potential and less variability than the broader bottle roll dataset, which includes sulfide sub-composites. NAG pH values for the spent column residues were generally circumneutral to alkaline, with only two samples reporting NAG pH values below 5 standard units (s.u.): the Breccia Transitional 1-inch composite and the Tertiary Intrusive Low-Grade Transitional 1-inch composite. The remaining samples reported NAG pH values between approximately 6 and 9.5 s.u.

 

Based on combined sulfide-sulfur NNP and NAG pH thresholds, none of the tested spent column residues plotted within the potentially acid generating (PAG) classification. Five samples exhibited NNP values above +20 t CaCO₃/kt and NAG pH values above 4.5 s.u. and were classified as non-potentially acid generating (NPAG). Majority of the tested spent column residues had low levels of AGP and ANP, resulting in NNP values between -20 and +20 t CaCO₃/kt and a classification of Uncertain NAG pH testing for samples in this zone confirm that all but one sample were above the cutoff of 4.5 s.u and classified as NPAG.

 

The results indicate that the tested oxide and transition residues generally have low acid generation potential following leaching, having low levels of sulfide sulfur that limits the potential amount of acid generation that can occur. There is good agreement between NNP and NAG pH, that when NNP is greater than -20 t CaCO3/kt, there is limited ability of the samples to generate acidic NAG pH values. The spent bottle roll residues confirmed that sulfide sub-composites do have the potential to generate acidic conditions and should not be targeted for extraction/processing. The prevalence of samples within the generally low-risk, uncertain NNP range indicates that additional geochemical characterization is warranted to resolve uncertainty from the ABA tests and better confirm the long-term behavior of spent heap-leach material. Additional testing, including kinetic testing of representative material, is recommended to further evaluate long-term acid generation and neutralization behavior, identify lag to the onset of acidic conditions, if any, and support future materials management decisions and heap-leach closure planning.

 

Page 163 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 10-31: NAG pH versus Sulfide-Sulfur-Based Net Neutralization Potential for Spent Column Leach Residues

 

10.2.9Laboratory Modeled Recoveries

 

Recovery equations were developed using laboratory-scale column leach tests, bottle roll tests, and recovery modeling software to establish laboratory modeled gold recoveries for the principal metallurgical domains. The recovery models were developed to provide a consistent basis for evaluating recovery by lithology, oxidation classification, grade class, and crush size and for subsequent development of the PFS recovery assignments.

 

Column recovery-versus-time data were evaluated using kinetic recovery modeling to characterize both the relatively rapid initial recovery and slower longer-term recovery components observed during leaching. Model fits were reviewed against the measured laboratory test results to confirm that the modeled recovery behavior was consistent with the observed leach response. Bottle roll results were also considered to develop and evaluate the recovery relationships, particularly as an indicator of relative metallurgical response among the materials tested.

 

Laboratory modeled gold recoveries were developed for nominal P80 crush sizes of 25.4 mm (1 inch) and 12.7 mm (½ inch). At the 25.4 mm crush size, laboratory modeled gold recoveries range from 65.2% to 91.2%. At the 12.7 mm crush size, laboratory modeled recoveries range from 67.1% to 91.8%. Breccia exhibits the highest modeled recoveries, with oxide recoveries of 91.2% at 25.4 mm and 91.8% at 12.7 mm and transitional recoveries of 85.0% and 86.3%, respectively.

 

Tertiary Intrusive material exhibits a comparatively strong response to finer crushing. Laboratory modeled oxide recoveries range from 75.6% to 81.5% at 25.4 mm and from 82.0% to 86.1% at 12.7 mm, while transitional recoveries range from 70.5% to 81.4% at 25.4 mm and from 72.3% to 85.9% at 12.7 mm. Precambrian material exhibits a more moderate response to finer crushing, with modeled recoveries generally increasing at the 12.7 mm crush size. Deadwood exhibits comparatively limited and variable response to finer crushing, with some modeled recoveries slightly lower at 12.7 mm than at 25.4 mm.

 

Page 164 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Laboratory modeled silver recoveries were also developed for the principal metallurgical domains at both crush sizes. At the 25.4 mm (1-inch) crush size, modeled silver recoveries range from 4.6% to 46.8%, while at the 12.7 mm (½ inch) crush size modeled recoveries range from 6.9% to 61.1%. Breccia oxide exhibits the highest modeled silver recovery, with recoveries of 46.8% at 25.4 mm and 61.1% at 12.7 mm. Silver recovery for the remaining domains is generally lower, with modeled recoveries ranging from 4.6% to 17.2% at 25.4 mm and from 6.9% to 17.8% at 12.7 mm.

 

Modeled silver recovery is consistently higher at the finer crush size across the evaluated metallurgical domains, although the magnitude of the improvement varies. The largest improvement is observed for Breccia oxide, where modeled silver recovery increases from 46.8% at 25.4 mm to 61.1% at 12.7 mm. More moderate increases are observed for Precambrian, Tertiary Intrusive, and Deadwood material. The results indicate that finer crushing generally improves modeled silver recovery, while the magnitude of the response remains dependent on metallurgical domain.

 

The laboratory modeled recovery results demonstrate that metallurgical response varies by lithology, oxidation classification, grade class, and crush size. Although finer crushing generally improves modeled recovery, the magnitude of the response is domain-specific and does not support application of a uniform crush-size recovery adjustment across the deposit. The laboratory modeled recoveries were therefore developed and evaluated by metallurgical domain.

 

The recoveries represent laboratory modeled recoveries prior to application of commercial-scale factors and should not be interpreted as the final PFS recovery assignments. Commercial-scale factors are subsequently applied to account for the expected differences between controlled laboratory testing and full-scale heap-leach operation. The resulting PFS recovery assignments are discussed in Section 10.2.12. A comparison of 25.4 mm (1-inch) and 12.7 mm (½-inch) laboratory modeled recoveries are presented in Table 10-14.

 

Table 10-14: 25.4 mm (1-inch) &12.7 mm (1/2-inch) Laboratory Modeled Recovery Comparison

 

Lithology Grade Class Oxidation Ultimate Recovery 1" Ultimate Recovery 1/2"
Precambrian HG Oxide 78.5 81.6
Precambrian LG Oxide 78.5 81.6
Precambrian HG Trans 69.9 73.0
Precambrian LG Trans 67.6 68.9
Breccia HG Oxide 91.2 91.8
Breccia LG Oxide 91.2 91.8
Breccia HG Trans 85.0 86.3
Breccia LG Trans 85.0 86.3
Tertiary Intrusives HG Oxide 81.5 86.1
Tertiary Intrusives LG Oxide 75.6 82.0
Tertiary Intrusives HG Trans 81.4 85.9
Tertiary Intrusives LG Trans 70.5 72.3
Deadwood HG Oxide 74.1 71.5
Deadwood LG Oxide 74.1 71.5
Deadwood HG Trans 69.6 67.4
Deadwood LG Trans 65.2 67.1

 

10.2.10Comminution and Crushing Test Work

 

Once the master composites were assembled, rock fragments were selected from each composite for comminution testing. The comminution test program included Crusher Work Index (CWi), Bond Ball Mill Work Index (BWi), and Abrasion Index (Ai) testing. The tables and sections below provide a summary for the comminution and crushing test work.

 

Page 165 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 10-15: Comminution Results by Master Composite

 

Test ID

Crusher Work Index

(CWi, kwh/st)

Bond Work Index

(BWi, kwh/st)

Abrasion Index

(Ai)

Breccia Oxide 22.41 14.97 0.0608
Breccia Trans 22.42 * *
Breccia Sulfide 17.68 * *
Tertiary Intrusive HG Oxide 19.92 17.21 0.1326
Tertiary Intrusive LG Oxide 20.61 18.01 0.2090
Tertiary Intrusive HG Trans 16.38 * *
Tertiary Intrusive LG Trans 22.18 18.60 0.2765
Tertiary Intrusive Sulfide 18.96 * *
Precambrian Oxide 17.76 15.70 0.0958
Precambrian HG Trans 17.52 16.13 0.1487
Precambrian LG Trans 18.26 16.04 0.0881
Precambrian Sulfide 15.97 * *
Deadwood HG Oxide 16.83 14.33 0.2106
Deadwood LG Oxide 19.54 13.62 0.1542
Deadwood HG Trans 17.26 14.43 0.1907
Deadwood LG Trans 16.82 14.46 0.1591
Deadwood Sulfide 17.47 * *

 

*Insufficient material availability

 

Table 10-16: Comminution Results by Master Composite Averages by Lithology

 

Comp No

Crusher Work Index

(CWi, kwh/st)

Bond Work Index

(BWi, kwh/st)

Abrasion Index

(Ai)

Breccia 21.63 14.97 0.0608
Tertiary Intrusive 20.32 17.94 0.2060
Precambrian 16.90 15.96 0.1109
Deadwood 17.97 14.21 0.1787

 

Crusher Work Index

 

Crusher Work Index (CWi) testing was performed by Forte Dynamics on 17 master composites representing the four principal formations. CWi values ranged from 15.97 kWh/st for the Precambrian Sulfide composite to 22.42 kWh/st for the Breccia Transitional composite, indicating variability in crushing resistance among the tested materials.

 

Average CWi values by formation were 16.90 kWh/st for Precambrian, 17.97 kWh/st for Deadwood, 20.32 kWh/st for Tertiary Intrusive, and 21.63 kWh/st for Breccia material. Breccia exhibited the highest average CWi, with individual values ranging from 17.68 to 22.42 kWh/st, while Precambrian exhibited the lowest average, with values ranging from 15.97 to 18.26 kWh/st. Tertiary Intrusive material ranged from 16.38 to 22.18 kWh/st, demonstrating appreciable variability within the formation, while Deadwood values ranged from 16.82 to 19.54 kWh/st.

 

Overall, the results indicate that crushing resistance varies both among and within the principal formations, with Breccia and Tertiary Intrusive material generally exhibiting higher CWi values than Precambrian and Deadwood material. The observed within-formation variability indicates that formation alone does not fully characterize crushing behavior and should be considered when establishing crushing design criteria for the PFS.

 

Page 166 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Bond Ball Mill Work Index

 

Bond Ball Mill Work Index (BWi) testing was performed by Forte Dynamics on 11 master composites representing the four principal formations. BWi values ranged from 13.62 kWh/st for the Deadwood Low-Grade Oxide composite to 18.60 kWh/st for the Tertiary Intrusive Low-Grade Transitional composite, indicating variability in grinding resistance among the tested materials.

 

Average BWi values by formation were 14.21 kWh/st for Deadwood, 14.97 kWh/st for Breccia, 15.96 kWh/st for Precambrian, and 17.94 kWh/st for Tertiary Intrusive material. The Tertiary Intrusive composites consistently exhibited the highest BWi values, ranging from 17.21 to 18.60 kWh/st, while the Deadwood composites exhibited the lowest values, ranging from 13.62 to 14.46 kWh/st. Precambrian material exhibited intermediate values ranging from 15.70 to 16.13 kWh/st.

 

Overall, the results indicate that formation is a meaningful source of variability in grinding resistance, with Tertiary Intrusive material requiring greater grinding energy than the other tested formations. The BWi results characterize variability in grinding resistance among the principal formations and provide supporting comminution data for future process evaluation.

 

Abrasion Index

 

Abrasion Index (Ai) testing was completed on selected master composites to characterize the relative abrasiveness of the Richmond Hill material and provide data for evaluating potential wear in crushing and material-handling equipment. Eleven master composites representing oxide and transitional material from the principal formations were tested.

 

Measured Ai values ranged from 0.0608 to 0.2765. The lowest value was measured for the Breccia Oxide composite, while the highest value was measured for the Tertiary Intrusive Low-Grade Transitional composite. Average Ai values by formation were 0.0608 for Breccia, 0.1109 for Precambrian, 0.1787 for Deadwood, and 0.2060 for Tertiary Intrusive material.

 

The results indicate that abrasiveness varies by formation, with Breccia and Precambrian material exhibiting lower Ai values than Deadwood and Tertiary Intrusive material. The Tertiary Intrusive samples exhibited the greatest variability, with individual Ai values ranging from 0.1326 to 0.2765.

 

10.2.11Metallurgical Variability and Geometallurgical Interpretation

 

The Richmond Hill metallurgical test program indicates that gold recovery is influenced by a combination of lithology, oxidation state, sulfur content, and CN/FA response, rather than by any single parameter. Bottle roll testing generally demonstrated higher gold extraction with increasing CN/FA ratio; however, the observed variability within this relationship indicated that CN/FA alone was insufficient to characterize metallurgical response. Integration of CN/FA with total sulfur and sulfur speciation provided a more effective basis for distinguishing oxide, low-performing oxide, transitional, and sulfide material.

 

The metallurgical test results do not show measurable preg-robbing and is therefore not a control on gold recovery within the evaluated material. No systematic recovery behavior indicative of preg-robbing was identified among the tested metallurgical domains.

 

Page 167 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Lithology represents an additional source of metallurgical variability. Both bottle roll and column testing demonstrated differences in gold extraction among the four principal formations. Breccia generally exhibited the highest column gold extractions, while Deadwood exhibited lower and more variable column extractions despite relatively favorable bottle roll response. Precambrian and Tertiary Intrusive material exhibited intermediate and variable responses. These differences indicate that materials having similar oxidation classifications may exhibit different heap-leach behavior depending on lithology and support retaining formation as a component of the geometallurgical framework.

 

Crush-size response also varied among the tested materials. Finer crushing to a nominal P80 of 12.7 mm (½ inch) generally increased gold recovery relative to the 25.4 mm (1 inch) crush, but the magnitude of the improvement differed by lithology and oxidation classification. Tertiary Intrusive material exhibited a comparatively strong response to finer crushing, whereas the improvement for some Deadwood and Precambrian domains was less so. Although variability exists between the crush sizes, there is sufficient testing and analysis to support a finer crush size for the Richmond Hill project. A finer crush product also provides benefits for liner protection and allows for greater flexibility for direct dumping during operations with reduced risk of liner puncture.

 

The combined results support a geometallurgical framework in which formation and oxidation classification form the primary metallurgical domains, with grade and crush-size response providing additional resolution where supported by the test data. Total sulfur provides a practical proxy for sulfide sulfur within the available drill-hole database and, when evaluated together with CN/FA, provides a means of extending the metallurgical classification into the resource model. The resulting framework provides a basis for assigning recovery assumptions and evaluating metallurgical variability within the mine plan.

 

Although the current test program provides coverage of the principal lithologies and oxidation classes, the number of column leach and bottle roll tests remains limited relative to the overall deposit. Continued variability testing should therefore focus on confirming the response of the defined metallurgical domains for areas or material types that are important to the production schedule. Additional testing can be used to refine recovery assumptions and determine whether further subdivision of the current geometallurgical domains is warranted as the project advances.

 

As part of the geometallurgical analysis, a total of 110 bottle roll tests were reviewed as part of the metallurgical extraction analysis. Following an evaluation of the dataset, two tests were identified as outliers and excluded from further consideration, resulting in 108 tests retained for analysis. The remaining results were evaluated and categorized based on three geologic formations, three sulfur concentration ranges, and two gold grade classifications (High Grade and Low Grade). Sulfur concentrations were grouped into three categories: less than 0.5%, 0.5% to 1.1%, and greater than 1.1%. These groupings were established to evaluate variations in metallurgical recovery associated with geologic formation, sulfur content, and gold head grade. The accompanying table summarizes the number of samples within each classification and the corresponding gold extraction for the three sulfur concentration ranges.

 

Relative extraction relationships observed in this evaluation are:

 

·Formation: Deadwood > Tertiary > Precambrian
·Au-Grade: HG > Au LG
·S-Grade: LG-S > HG S.

 

Note that Sulfide Sulfur / Total Sulfur (SS/ST) has a strong correlation with Au extraction, so it becomes an indicator of refractory severity. SS/ST is also correlated with formation as the deeper formations are less oxidized, hence influencing the relative extraction Deadwood > Precambrian. Total Sulfur has is also correlated as shown in the table and has a significant economic influence for leach effectiveness (recovery of extractable Au) and cost.

 

Page 168 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 10-17: GeoMet Domain Matrix

 

Matrix = 3 Formation, 2- Au Range, 3- S Range; Au Leach Test Extraction, Sample Count are Displayed in the Matrix Cells Au All
Samples
Au HG Au LG
S Au
HG - All S
S Au LG -  All
S
S
VHG
S HG S LG S
VHG
S HG S LG
Formation Tertiary Breccia & Intrusive 70.8 84.6 90.1 83.8 63.7 80.2 80.7 79.3 80.5
3 1 6 10 2 6 19 27 37
Deadwood 77.2 72.3 86.6 81.7 71.8 82.3 83.8 80.3 80.9
9 2 12 23 9 7 18 34 57
Precambrian 78.3 84.1 75.1 78.8 67.2 78.8 85.9 76.8 77.5
3 1 1 5 4 1 4 9 14
All Samples 76.2 78.3 87.1 81.9 69.5 81.2 82.5 79.5 80.3
15 4 19 38 15 14 41 70 108
110 Bottle Leach Test Samples are Tested, 2 Au Grade HG - Outliers are Excluded from the Matrix, Result 108

 

10.2.12PFS Recovery Assignments

 

Gold recovery assignments for the PFS were developed from the laboratory modeled recoveries described in Section 10.2.8. Commercial-scale recovery allowances were applied to the laboratory modeled recoveries to account for expected differences between controlled laboratory testing and full-scale heap-leach operation based on the QP’s experience with other metallurgical test programs and heap leach projects. The resulting recovery assignments were retained by lithology, oxidation classification, grade class, and crush size. For the PFS, a P80 of ½” has been selected for advancement and use in metal recovery and financial analysis.

 

At the nominal P80 12.7 mm (½-inch) crush size, assigned recoveries range from 65.6% to 90.3%. Breccia exhibits the highest assigned recoveries, with oxide recovery of 90.3% at 12.7 mm and transitional recovery of and 84.8%, respectively.

 

Tertiary Intrusive assigned oxide recoveries ranging from 80.5% to 82.1% at 12.7 mm. Transitional recoveries range from 70.8% to 84.4% at 12.7 mm. Precambrian material also generally exhibits higher assigned recovery at the finer crush size. Deadwood exhibits a smaller response to finer crushing, with relatively limited differences between the evaluated crush sizes.

 

The PFS recovery assignments preserve the domain-specific metallurgical response identified by the laboratory test program while incorporating appropriate allowances for commercial-scale performance. The resulting recovery framework does not apply a uniform recovery across the deposit and maintains the observed differences among lithology, oxidation classification, grade class, and crush size.

 

The PFS gold recovery assignments are summarized in Table 10-18.

 

Page 169 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 10-18: PFS Assigned Gold Recovery by Lithology, Grade Class, and Oxidation Classification – 12.7 mm (1/2-inch) P80

 

P80 1/2"
Lithology Grade Class Oxidation PFS Au Recovery
Assignment
Precambrian HG Oxide 80.1
Precambrian LG Oxide 80.1
Precambrian HG Trans 71.5
Precambrian LG Trans 67.4
Breccia HG Oxide 90.3
Breccia LG Oxide 90.3
Breccia HG Trans 84.8
Breccia LG Trans 84.8
Tertiary Intrusives HG Oxide 82.1
Tertiary Intrusives LG Oxide 80.5
Tertiary Intrusives HG Trans 84.4
Tertiary Intrusives LG Trans 70.8
Deadwood HG Oxide 70.0
Deadwood LG Oxide 70.0
Deadwood HG Trans 65.9
Deadwood LG Trans 65.6

 

Silver recovery assignments were also developed for the PFS based on the laboratory modeled silver recoveries described in Section 10.2.9. The metallurgical test program was principally designed to characterize gold recovery, and the duration of the column leach tests was established primarily on the basis of gold leach performance. Silver typically exhibited slower leach kinetics, and the column tests were not operated for sufficient duration to fully characterize longer-term silver extraction. Accordingly, the laboratory modeled silver recoveries were adjusted to account for additional silver recovery anticipated under the longer leach cycles expected during commercial heap-leach operation.

 

At the nominal P80 12.7 mm (½-inch) crush size, assigned silver recoveries range from 8.4% to 43.3%. Breccia oxide exhibits the highest assigned silver recovery at 43.3% at 12.7 mm. Assigned silver recoveries for the remaining metallurgical domains are generally lower, although recovery is consistently higher at the finer crush size. The PFS silver recovery assignments are summarized in Table 10-19.

 

Table 10-19: PFS Assigned Silver Recovery by Lithology, Grade Class, and Oxidation Classification – 12.7 mm (1/2-inch) P80

 

P80 1/2"
Lithology Grade Class Oxidation PFS Ag Recovery
Assignments
Precambrian HG Oxide 13.2
Precambrian LG Oxide 13.2
Precambrian HG Trans 14.3
Precambrian LG Trans 19.4
Breccia HG Oxide 43.3
Breccia LG Oxide 43.3
Breccia HG Trans 23.2

 

Page 170 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

P80 1/2"
Breccia LG Trans 23.2
Tertiary Intrusives HG Oxide 9.0
Tertiary Intrusives LG Oxide 10.0
Tertiary Intrusives HG Trans 8.4
Tertiary Intrusives LG Trans 14.7
Deadwood HG Oxide 18.4
Deadwood LG Oxide 9.8
Deadwood HG Trans 19.6
Deadwood LG Trans 19.6

 

The recovery assignments are applied according to the metallurgical domains represented in the resource and mine-plan models, providing a direct link between the metallurgical test program and the production schedule. This approach allows changes in the relative proportions of lithology and oxidation classification through the mine life to be reflected in predicted gold recovery.

 

The PFS recovery assignments represent the current interpretation of the available metallurgical test work and process design assumptions. Additional variability and confirmatory testing is recommended as the Project advances toward Feasibility Study-level evaluation, particularly for metallurgical domains with limited column-test coverage, material near oxidation-classification boundaries, and domains representing significant portions of the early mine schedule. Additional testing should also further evaluate the relationship among crush size, recovery, permeability, and anticipated heap operating conditions.

 

Page 171 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11Mineral Resource Estimates

 

11.1Mineral Resource

 

The mineral resource estimate for Richmond Hill includes mineral resources amenable to heap leaching and mineral resources amenable to milling. The mineral resource amenable to leaching consists of the oxide and transition material types, and the mineral resource amenable to milling consists of the sulfide material. Table 11-1 presents the mineral resource estimate inclusive of the mineral reserve estimate presented in Section 12 of this report. The measured and indicated mineral resource amenable to leaching amounts to 173.2 million tons at 0.015 oz/t gold and 0.18 oz/t silver for 2.54 million ounces of contained gold and 30.6 million ounces of contained silver. Inferred mineral resource amenable to leaching is an additional 98.9 million tons at 0.011 oz/t gold and 0.08 oz/t silver for 1.09 million ounces of contained gold and 8.0 million ounces of contained silver.

 

The measured and indicated mineral resource amenable to milling amounts to 230.9 million tons at 0.014 oz/t gold and 0.15 oz/t silver for 3.20 million ounces of contained gold and 35.7 million ounces of contained silver. Inferred mineral resource amenable to milling is an additional 219.3 million tons at 0.012 oz/t gold and 0.13 oz/t silver for 2.72 million ounces of contained gold and 28.1 million ounces of contained silver.

 

The measured and indicated mineral resource for leach and mill material amounts to 404.1 million tons at 0.014 oz/t gold and 0.16 oz/t silver for 5.74 million ounces of contained gold and 66.2 million ounces of contained silver. Inferred mineral resource for leach and mill material is an additional 318.2 million tons at 0.012 oz/t gold and 0.11 oz/t silver for 3.81 million ounces of contained gold and 36.1 million ounces of contained silver.

 

Table 11-2 presents the mineral resource estimate exclusive of the mineral reserve estimate. The mineral resource amenable to milling is the same as the inclusive case, as are the inferred mineral resources amenable to leaching. Measured and indicated mineral resources amenable to leaching amount to 41.3 million tons at 0.009 oz/t gold and 0.12 oz/t silver for 381,000 contained gold ounces and 5.16 million contained silver ounces. The measured and indicated mineral resource for leach and mill resource amounts to 272.2 million tons at 0.013 oz/t gold and 0.15 oz/t silver for 3.58 million ounces of contained gold and 40.8 million ounces of contained silver.

 

The measured, indicated, and inferred mineral resources reported herein are contained within a conceptual constraining pit shell to demonstrate “reasonable prospects for economic extraction” to meet the definition of mineral resources in S-K 1300. Figure 11-1 shows the pit shell that is based on measured, indicated, and inferred mineral resource. The constraining pit shell is also constrained by the Richmond Hill Project Boundary.

 

Page 172 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-1: Mineral Resource Estimate Inclusive of Mineral Reserves

 

Resource Category Ktons

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Leach Resource:
Measured Mineral Resource 72,568 34.70 0.017 0.20 1,212 14,586
Indicated Mineral Resource 100,582 27.51 0.013 0.16 1,328 15,993
Meas/Indic Mineral Resource 173,150 30.52 0.015 0.18 2,540 30,579
Inferred Mineral Resource 98,912 22.76 0.011 0.08 1,088 8,012
Mill Resource:
Measured Mineral Resource 92,794 39.69 0.016 0.16 1,457 14,661
Indicated Mineral Resource 138,117 32.46 0.013 0.15 1,740 20,994
Meas/Indic Mineral Resource 230,911 35.37 0.014 0.15 3,197 35,655
Inferred Mineral Resource 219,303 31.47 0.012 0.13 2,719 28,071
Leach and Mill Mineral Resource: 
Measured Mineral Resource 165,362 37.50 0.016 0.18 2,669 29,248
Indicated Mineral Resource 238,699 30.37 0.013 0.15 3,068 36,986
Meas/Indic Mineral Resource 404,061 33.29 0.014 0.16 5,737 66,234
Inferred Mineral Resource 318,215 28.76 0.012 0.11 3,807 36,083

 

Notes:

 

1.The Mineral Resource estimate has an effective date of November 23, 2026.
2.All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely.
3.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
4.Mineral Resources are based on prices of $2,900/oz gold and $35/oz silver.
5.Mineral Resources for leach material are based on a net smelter return (NSR) cut-off of $5.80/t and Mineral Resources for mill material are based on a NSR cut-off of $11.09/t.
6.For leaching NSR($/t) = $2,777 x gold (oz/t) x recovery + $33.33 x silver (oz/t) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content but average recoveries are 72.6% for gold and 18.0% for silver. For reference, the average recoveries in the blocks included in the mineral resource may not line up exactly with the blocks in the mineral reserve, resulting in slight differences in recoveries.
7.For milling NSR($/t) = $2,659 x gold (oz/t) x recovery + $31.53 x silver (oz/t) x recovery. Gold and silver recoveries are estimated at 85% for both metals.
8.The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
9.Table 11-5 accompanies this Mineral Resource statement and shows all relevant parameters for mineral resources.
10.Includes 3.8% NSR royalty.
11.Mineral Resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of Mineral Resource in S-K 1300; mineralization lying outside of the pit shell is excluded from the Mineral Resource.
12.The Mineral Resource estimate is also constrained by the Richmond Hill Project Boundary.
13.The Mineral Resources reported are contained on mineral titles controlled by Dakota Gold.
14.The Mineral Resources are reported in-situ without any dilution or loss considerations, as a point of reference.

 

Page 173 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-2: Mineral Resource Estimate Exclusive of Mineral Reserve

 

Resource Category Ktons

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Leach Resource:
Measured Mineral Resource 9,610 19.27 0.009 0.12 86 1,129
Indicated Mineral Resource 31,707 19.08 0.009 0.13 295 4,029
Meas/Indic  Mineral Resource 41,317 19.12 0.009 0.12 381 5,158
Inferred Mineral Resource 98,912 22.76 0.011 0.08 1,088 8,012
Mill Resource (Sulfides):
Measured Mineral Resource 92,794 39.69 0.016 0.16 1,457 14,661
Indicated Mineral Resource 138,117 32.46 0.013 0.15 1,740 20,994
Meas/Indic Mineral Resource 230,911 35.37 0.014 0.15 3,197 35,655
Inferred Mineral Resource 219,303 31.47 0.012 0.13 2,719 28,071
Leach and Mill Mineral Resource:
Measured Mineral Resource 102,404 37.77 0.015 0.15 1,543 15,791
Indicated Mineral Resource 169,824 29.96 0.012 0.15 2,035 25,022
Meas/Indic Mineral Resource 272,228 32.90 0.013 0.15 3,578 40,813
Inferred Mineral Resource 318,215 28.76 0.012 0.11 3,807 36,083

 

Notes:

 

1.The Mineral Resource estimate has an effective date of November 23, 2026.
2.All figures are rounded to reflect the relative accuracy of the estimate and therefore numbers may not appear to add precisely.
3.Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
4.Mineral Resources are based on prices of $2,900/oz gold and $35/oz silver.
5.Mineral Resources for leach material are based on a net smelter return (NSR) cut-off of $5.80/t and Mineral Resources for mill material are based on a NSR cut-off of $11.09/t.
6.For leaching NSR($/t) = $2,777 x gold (oz/t) x recovery + $33.33 x silver (oz/t) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content but average recoveries are 72.6% for gold and 18.0% for silver. For reference, the average recoveries in the blocks included in the mineral resource may not line up exactly with the blocks in the mineral reserve, resulting in slight differences in recoveries
7.For milling NSR($/t) = $2,659 x gold (oz/t) x recovery + $31.53 x silver (oz/t) x recovery. Gold and silver recoveries are estimated at 85% for both metals.
8.The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
9.Table 11-5 accompanies this Mineral Resource statement and shows all relevant parameters for mineral resources.
10.Includes 3.8% NSR royalty.
11.Mineral Resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of Mineral Resource in S-K 1300; mineralization lying outside of the pit shell is excluded from the Mineral Resource.
12.The Mineral Resource estimate is also constrained by the Richmond Hill Project Boundary.
13.The Mineral Resources reported are contained on mineral titles controlled by Dakota Gold.
14.The Mineral Resources are reported in-situ without any dilution or loss considerations, as a point of reference.

 

Page 174 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-1: Constraining Shell for Mineral Resource Estimate

 

Page 175 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.2Price Sensitivity

 

A sensitivity analysis of metal prices was conducted for the mineral resource estimate at the following prices:

 

·$2,500/oz gold and $30.17/oz silver,
·$2,700/oz gold and $32.60/oz silver,
·$2,900/oz gold and $35.00/oz silver (base case),
·$3,100/oz gold and $37.41/oz silver,
·$3,300/oz gold and $39.83/oz silver, and
·$3,500/oz gold and $42.24/oz silver.

 

The ratio of the gold to silver prices was constant for the cases.

 

Restraining pit shells were developed for each case and block NSR values recalculated using the gold and silver prices for the case. Table 11-3 shows the results of the sensitivity analysis for the leach resource. The mineral resources on the table are inclusive of the mineral reserve estimate. Total kilotons for each case are also provided to gauge the increase in the size of the constraining pit shells. The leach mineral resource is insensitive to prices in large part due to the consistent and ubiquitous gold mineralization. A relatively large amount of the available mineral resource is extracted at the $2,900/oz gold price and the increase in resource at higher prices is modest, even up to the $3,500/oz price. Note that total tons increased from 1.26 billion tons to 1.48 billion tons with a small impact on the mineral resource.

 

Table 11-4 shows the results of the sensitivity analysis for mill resource. Measured and indicated mineral resources are insensitive to price. Inferred mineral resource increased from 158.8 million tons in the $2,500/oz case to 273.5 million tons for the $3,500/oz case, an increase of about 72%. Contained gold ounces increased about 46% between the $2,500/oz and $3,500/oz case for inferred mineral resources.

 

Table 11-3: Mineral Resource at Various Prices – Leach Resources

 

 Price/Resource Category

NSR COG

($/t)

Ktons

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

$2500 Gold, $30.17 Silver:                
Measured Mineral Resource   70,213 30.60 0.0171 0.205 1,200.6 14,394  
Indicated Mineral Resource   92,129 24.74 0.0138 0.160 1,271.4 14,741  
Meas/Indic Mineral Resource 5.80 162,342 27.27 0.0152 0.179 2,472.0 29,134 1,018,372
Inferred Mineral Resource   82,681 21.12 0.0119 0.081 983.9 6,697  
$2700 Gold, $32.60 Silver:                
Measured Mineral Resource   71,830 32.57 0.0169 0.203 1,213.9 14,581  
Indicated Mineral Resource   98,526 25.96 0.0134 0.161 1,320.2 15,863  
Meas/Indic Mineral Resource 5.80 170,356 28.75 0.0149 0.179 2,534.2 30,444 1,203,126
Inferred Mineral Resource   92,550 21.83 0.0114 0.081 1,055.1 7,497  
$2900 Gold, $35.00 Silver:                
Measured Mineral Resource   72,568 34.70 0.0167 0.201 1,211.9 14,586  
Indicated Mineral Resource   100,582 27.51 0.0132 0.159 1,327.7 15,993  
Meas/Indic Mineral Resource 5.80 173,150 30.52 0.0147 0.177 2,539.6 30,579 1,265,029
Inferred Mineral Resource   98,912 22.76 0.0110 0.081 1,088.0 8,012  
$3100 Gold, $37.41 Silver:                
Measured Mineral Resource   73,214 36.84 0.0166 0.200 1,215.4 14,643  
Indicated Mineral Resource   102,275 29.07 0.0130 0.157 1,329.6 16,057  
Meas/Indic Mineral Resource 5.80 175,489 32.31 0.0145 0.175 2,544.9 30,700 1,311,731
Inferred Mineral Resource   103,106 23.76 0.0108 0.080 1,113.5 8,248  

 

Page 176 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 Price/Resource Category

NSR COG

($/t)

Ktons

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

$3300 Gold, $39.83 Silver:                 
Measured Mineral Resource   73,765 38.98 0.0165 0.199 1,217.1 14,679  
Indicated Mineral Resource   104,183 30.55 0.0129 0.155 1,344.0 16,148  
Meas/Indic Mineral Resource 5.80 177,948 34.04 0.0144 0.173 2,561.1 30,828 1,378,654
Inferred Mineral Resource   109,483 24.55 0.0105 0.079 1,149.6 8,649  
$3500 Gold, $42.24 Silver:                
Measured Mineral Resource   74,450 41.06 0.0164 0.197 1,221.0 14,667  
Indicated Mineral Resource   107,197 31.86 0.0127 0.152 1,361.4 16,294  
Meas/Indic Mineral Resource 5.80 181,647 35.63 0.0142 0.170 2,582.4 30,961 1,476,314
Inferred Mineral Resource   116,217 25.25 0.0102 0.078 1,185.4 9,065  

 

Table 11-4: Mineral Resource at Various Prices – Mill Resources

 

 Price/Resource Category

NSR COG

($/t)

Ktons

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

$2500 Gold, $30.17 Silver:                
Measured Mineral Resource   87,015 35.70 0.0164 0.165 1,427.0 14,357  
Indicated Mineral Resource   120,115 29.70 0.0134 0.154 1,609.5 18,498  
Meas/Indic Mineral Resource 11.09 207,130 32.22 0.0147 0.159 3,036.6 32,855 1,018,372
Inferred Mineral Resource   158,825 29.06 0.0134 0.133 2,128.3 21,124  
$2700 Gold, $32.60 Silver:                
Measured Mineral Resource   90,102 37.69 0.0160 0.161 1,441.6 14,506  
Indicated Mineral Resource   130,802 31.12 0.0129 0.156 1,687.3 20,405  
Meas/Indic Mineral Resource 11.09 220,904 33.80 0.0142 0.158 3,129.0 34,912 1,203,126
Inferred Mineral Resource   199,931 30.23 0.0128 0.131 2,559.1 26,191  
$2900 Gold, $35.00 Silver:                
Measured Mineral Resource   92,794 39.69 0.0157 0.158 1,456.9 14,661  
Indicated Mineral Resource   138,117 32.46 0.0126 0.152 1,740.3 20,994  
Meas/Indic Mineral Resource 11.09 230,911 35.37 0.0138 0.154 3,197.1 35,655 1,265,029
Inferred Mineral Resource   219,303 31.47 0.0124 0.128 2,719.4 28,071  
$3100 Gold, $37.41 Silver:                
Measured Mineral Resource   94,891 41.76 0.0154 0.156 1,461.3 14,803  
Indicated Mineral Resource   143,309 33.94 0.0123 0.149 1,762.7 21,353  
Meas/Indic Mineral Resource 11.09 238,200 37.06 0.0135 0.152 3,224.0 36,156 1,311,731
Inferred Mineral Resource   235,125 32.82 0.0121 0.129 2,845.0 30,331  
$3300 Gold, $39.83 Silver:                
Measured Mineral Resource   96,724 43.86 0.0152 0.154 1,470.2 14,895  
Indicated Mineral Resource   148,578 35.37 0.0120 0.146 1,782.9 21,692  
Meas/Indic Mineral Resource 11.09 245,302 38.72 0.0133 0.149 3,253.1 36,588 1,378,654
Inferred Mineral Resource   252,715 34.15 0.0118 0.128 2,982.0 32,348  
$3500 Gold, $42.24 Silver:                
Measured Mineral Resource   98,437 45.93 0.0150 0.152 1,476.6 14,962  
Indicated Mineral Resource   154,033 36.87 0.0118 0.144 1,817.6 22,181  
Meas/Indic Mineral Resource 11.09 252,470 40.40 0.0130 0.147 3,294.1 37,143 1,476,314
Inferred Mineral Resource   273,509 35.40 0.0114 0.129 3,118.0 35,283  

 

Page 177 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.3Mineral Resource Parameters

 

Table 11-5 shows the metal prices and other economic parameters for the Mineral Resource estimate. Metal prices for the Mineral Resource estimate are $2,900/oz gold and $35/oz silver. These prices are reasonable based on: 1) historical 3-year trailing averages, 2) prices used by other companies for comparable projects, and 3) long range consensus price forecasts prepared by various bank analysts.

 

For leach resource, the unit costs of $3.55/t (total ton) for mining, $4.71/t for processing and $1.09/t for G&A are based on the economic model for the July 7, 2025 IA study. The gold and silver refinery payables and the gold refining cost per ounce are also based on the IA study.

 

Table 11-6 shows the gold and silver recovery estimates based on a one-half inch crush size. The recoveries are estimated for four different ore types for four different lithology groupings. The high grade (HG) versus low grade (LG) classes are based on cyanide soluble ratio. The oxide versus transition oxidation state is based on sulfur content. There are mineral resources above the top of sulfide surface but without cyanide soluble or sulfur information. An additional ore type was defined to accommodate this material. The low-grade transition recovery for each rock type was used for this additional ore type. The recoveries and a recovered grade variable (recovery x grade) were put in the resource block model on a block-by-block basis. The recovery values in Table 11-5 of 73% gold and 18% silver are the average for the material in the Mineral Resource estimate.

 

Due to the many different recovery values an NSR value was calculated for each block to tabulate proposed quantities of mineral resource. The gold and silver NSR factors are calculated as follows:

 

Gold NSR Factor = ($2,900 – $10.00) x 0.999 x 0.962 = $2,777/t

Silver NSR Factor = $35.00 x 0.99 x 0.962 = $33.33/t

 

The units are US$ per ounce. The 0.962 term represents an allowance for the 3.8% royalty.

 

The NSR for each block is calculated as:

 

NSR ($/t) = $2,777 x gold (oz/t) x au recovery + $33.33 x silver (oz/t) x ag recovery

 

Or

 

NSR ($/t) = $2,777 x recovered gold (oz/t) + $33.33 x recovered silver (oz/t)

 

Breakeven NSR cut-off is the mining + process + G&A cost of $9.35/t. Internal NSR cut-off is the process + G&A cost of $5.80/t. Internal cut-off applies to blocks that must be removed from the pit, so mining is a sunk cost.

 

The NSR values for mill resource were calculated similarly. Plant recovery estimates of 85% for gold and silver are benchmark estimates. Metallurgical studies are less advance for sulfide mineralization. The process cost estimate of $10/t is also a benchmark estimate based on an approximate 30,000 ton per day mill. Breakeven and internal NSR cut-offs for milling are estimated as $14.64/t and $11.09/t respectively.

 

Page 178 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-5: Economic Parameters for Mineral Resource Estimate

 

Material Type/Process Units

Crush
Leach

Sulfide
Mill

Waste
Commodity Prices        
Gold Price Per Ounce (US$) 2900 2900  
Silver Price Per Ounce (US$) 35.00 35.00  
Mining Cost Per Total Ton        
Mining Cost  (US$) 3.550 3.550 3.550
Process and G&A Cost Per Ton        
Processing (US$) 4.710 10.000  
  G&A (US$) 1.090 1.090  
  Total Process and G&A   (US$) 5.800 11.090  
Plant Recovery        
Gold (%) 73% 85%  
Silver (%) 18% 85%  
Treatment/Refining Payables and Costs        
Gold Payable (%) 99.9% 95.5%  
Silver Payable (%) 99.0% 95.0%  
Gold Treatment/Refining Per Ounce (US$) 10.00 6.00  
Silver Treatment/Refining Per Ounce (US$) 0.00 0.50  
Royalties        
Royalty (%) 3.8% 3.8%  
NSR Factors (Applied to Recovered Grades        
Gold NSR Factor ($/oz) 2,777 2,659  
Silver NSR Factor ($/oz) 33.33 31.53  
NSR Cutoff Grades        
Breakeven NSR Cutoff ($/t) 9.35 14.64  
Internal NSR Cutoff ($/t) 5.80 11.09  

 

Page 179 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-6: Process Recoveries for Heap Leaching – Crush Size P80 ½ Inch

 

Lithology

Grade

Class

Oxidation Ultimate Recovery
Gold Silver
Precambrian HG Oxide 80.1 13.2
Precambrian LG Oxide 80.1 13.2
Precambrian HG Trans 71.5 14.3
Precambrian LG Trans 67.4 19.4
Breccia HG Oxide 90.3 43.3
Breccia LG Oxide 90.3 43.3
Breccia HG Trans 84.8 23.2
Breccia LG Trans 84.8 23.2
Tertiary Intrusives HG Oxide 82.1 9.0
Tertiary Intrusives LG Oxide 80.5 10.0
Tertiary Intrusives HG Trans 84.4 8.4
Tertiary Intrusives LG Trans 70.8 14.7
Deadwood HG Oxide 70.0 18.4
Deadwood LG Oxide 70.0 9.8
Deadwood HG Trans 65.9 19.6
Deadwood LG Trans 65.6 19.6
 
  High-Grade Oxide  
CN/FA >0.82 Total S < 0.5%
Low-Grade Trans
CN/FA >0.70 Total S < 1.1%

 

11.4Additional Information

 

The mineral resources are classified in accordance with the requirements of S-K 1300. The mineral resource estimate reflects the reasonable expectation that all necessary permits and approvals will be obtained and maintained. It is the opinion of the QP for this section that technical and economic factors likely to influence the prospects of economic extraction can be resolved with additional work. In particular, more metallurgical testing will better define process methods, metal recoveries and costs. More drilling will better define geologic domains in some areas of the deposit.

 

There is uncertainty in the estimates of measured, indicated, and inferred mineral resources. Some of the sources of uncertainty are common to all projects and all classes of the mineral resources and include: the spatial location of the samples, sample recovery in the drilling and sampling processes, assaying methods and results, data processing and handling, assumptions of geologic interpretations and continuity of grades between samples.

 

Uncertainty in the estimation of measured mineral resources should be relatively low. The sampling density is sufficient that the potential sources of uncertainty listed above should largely by mitigated by various sampling from various time periods and companies.

 

The uncertainty related to indicated mineral resources is higher than measured mineral resources due to lower sampling density and lower confidence in geologic interpretation. However, the data density is adequate for reasonable interpretations of geologic conditions and grade quality and continuity.

 

Uncertainty in the estimation of inferred mineral resources can be high since sampling data is more limited and geologic uncertainty higher. However, given the relatively disseminated nature of the deposit, the QP for this section is confident that the inferred mineral resources meet the criteria that the majority of the inferred mineral resource can be upgraded to indicated or measured mineral resources with additional exploration.

 

Page 180 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

There is no guarantee that any of the mineral resources will be converted to mineral reserve. There is also no guarantee that any of the inferred mineral resources will be upgraded to measured or indicated mineral resources or to mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

The Project is subject to the normal risks that mining projects face including changes to metal prices, changes to government regulations, social risks, uncertainty in mineral resource and recovery estimates, permitting risks, financing risks, and costs higher than forecast.

 

There is also risk related to the definitions of oxide/transition versus sulfide Mineral Resources. For Dakota Gold drilling there are cyanide soluble gold assays and sulfur assays that are used to define oxide, transition, and sulfide material. These assays are not available for the legacy drilling prior to Dakota Gold tenure. The infill drilling recommended within this PFS addresses this risk. Definition of oxide/transition versus sulfide Mineral Resources could change with additional drilling and sampling.

 

11.5Description of the Block Model

 

11.5.1General

 

The resource model is based on 20 ft x 20 ft x 20 ft blocks. The coordinate system for the Project is a local system initiated by Homestake. This will be referenced as the August 2026 model.

 

The previous mineral resource estimate for the project is dated effective February 3, 2025, and is reported in a technical report summary dated July 7, 2025. The resource model for that report will be referenced as the January 2025 model.

 

11.5.2Drilling Data

 

The drilling database for the Mineral Resource update consists of 1386 drillholes and 607,225 ft of drilling. Drilling data by company is shown on Table 11-7.

 

Table 11-7: Drilling by Company for Resource Model Update

 

Company No. of Holes Feet
St. Joe, Bond Gold, Homestake 828 275,191
Coeur 73 28,170
Dakota Gold 485 303,864
All Drilling 1,386 607,225

 

Figure 11-2 shows drillholes by company and shows the locations for cross sections A-A’ and B-B’ that are referenced in this report section.

 

Page 181 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-2: Drillhole Locations by Company

 

Page 182 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.3Geologic Controls

 

11.5.3.1Rock Types

 

Rock type interpretations for 27 rock types have been developed as 3D solids and incorporated into the resource model. Table 11-8 shows the rock types. Note that sills and dikes are composed of several different rock types.

 

Table 11-8: Model Rock Types

 

Rock Type Code Description
Tbx 10 Tertiary Breccia
Tbxc 15 Tertiary Collapse Breccia
Tsl 20 Tertiary Sills – Undifferentiated
Tslm 22 Tertiary Sills – Lamprophyre
Tslt 23 Tertiary Sills – Latite
Tsqp 25 Tertiary Sills – Quartz Porphyry
Tsrh 26 Tertiary Sills – Rhyolite
Tdk 30 Tertiary Dikes - Undifferentiated
Tddc 31 Tertiary Dikes – Dacite
Tdlm 32 Tertiary Dikes – Lamprophyre
Tdlt 33 Tertiary Dikes – Latite
Tdph 34 Tertiary Dikes – Phonolite
Tdqp 35 Tertiary Dikes – Quartz Porphyry
Tdrh 36 Tertiary Dikes – Rhyolite
Tdtr 37 Tertiary Dikes -Trachyte
Stke 40 Tertiary Stock East
Stkw 42 Tertiary Stock West
Mp 51 Mississippian Pahasapa FM
Mde 52 Mississippian/Devonian Englewood FM
Owi 53 Ordovician Winnipeg Ice Box FM
Owr 54 Ordovician Winnipeg Roughlock FM
Owh 55 Ordovician Whitewood FM
Cdw 60 Cambrian Deadwood
Pym 70 Precambrian Yates FM
Pffw 80 Precambrian Flag Rock FM - West
Pffe 85 Precambrian Flag Rock FM – East
Pef 90 Precambrian Ellison FM

 

Page 183 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-9 shows a formation code that is incorporated in the drillhole database and model to simplify the geologic units.

 

Table 11-9: Formation Code

 

Formation Code Description
Tbx 10 Tertiary Breccia
Tsl 20 Tertiary Sills
Tdk 30 Tertiary Dikes
Stke 40 Tertiary Stocks
Pal 50 Paleozoics
Cdw 60 Cambrian Deadwood
Pym 70 Precambrian Yates FM
Pffw 80 Precambrian Flag Rock FM
Pef 90 Precambrian Ellison FM

 

Figure 11-3 shows the major rock types projected on the resource shell walls and surface topography. Figure 11-4 and Figure 11-5 show the rock types on the A-A’ and B-B’ cross sections respectively.

 

All the rock types host economic mineralization. The contacts between the Precambrian units are steep and trend north-south. The Precambrian Flag Rock is between the Precambrian Yates to the west and Precambrian Ellison to the east. The Tertiary breccia and Tertiary dikes are steep north-south trending units. The Cambrian Deadwood, the Tertiary sills, and the Paleozoic rock types are flatter lying units.

 

The 3D solids were used to assign rock codes to the model blocks and rock codes were also assigned to the assay database by back-assignment from the solids. There were rock type designations in the database, but the back-assigned values were used for the resource model so the assay assignments would be consistent with the block they were located.

 

Page 184 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-3: Rock Types on the Resource Shell

 

Page 185 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-4: Rock Types on Cross Section A-A’

 

Page 186 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-5: Rock Types on Section B-B’

 

Page 187 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.3.2Oxidation Zones

 

A geologic surface to represent top of sulfides was developed based on available assay results for sulfur and cyanide soluble gold, geologic logging, and bottle roll tests conducted for the St. Joe and Bond Gold drilling. Material above the surface was designated as undifferentiated oxide/transition material, oxide code 15. In areas where Dakota Gold drilling was available, sulfur grades and the ratio of cyanide soluble gold to gold were estimated in the resource model. The sulfur values were used to further define oxide, transition and sulfide material as shown on Table 11-10.

 

Table 11-10: Model Oxidation Zones

 

Oxidation Type Code Definition
Oxide 10 Total Sulfur < 0.5%
Ox/Tran Undifferentiated 15 Geologic Estimate of Top of Sulfide
Transition 20 0.5% < Total Sulfur < 1.1%
Sulfide 30

Below Top of Sulfide Surface

or Total Sulfur > 1.1%

 

The oxidation zones do not impact grade estimation but are important for metallurgical purposes.

 

The revised definition of sulfide is more conservative than what was used for the January 2025 model, i.e. the top of sulfide is generally higher elevations than before. This has resulted in a significant amount of former oxide and transition material to be re-classified as sulfides.

 

11.5.4Cap Grades and Compositing

 

Probability plots and sorted lists of the higher-grade assay intervals for gold and silver were examined to determine cap grades. Table 11-11 shows the cap grades and the number of assays capped by rock type. A relatively small number of assays were capped for each metal in each population. The cap grades were generally between the upper 99.8 to 99.9 percentile of the populations.

 

The assay database was composited to regular 10 ft downhole composites. It is noted this is one-half of the 20 ft bench height used for the model. The smaller composite length allows capturing some of the narrower dikes and sills and also tends to result in less grade smoothing during block grade estimation. The rock type was not respected during compositing; the composite rock type was based on the majority rock type.

 

Table 11-11: Cap Grades and Number of Assays Capped

 

Formation
Code
Lithology Au Cap
(oz/t)
Ag Cap
(ppm)
Ag Cap
(oz/t)
Number of Assays
Gold Silver
10 Tertiary Breccia 0.30 72 2.10 19 22
20 Tertiary Sills 0.125 75 2.19 19 15
30 Tertiary Dikes 0.19 95 2.77 16 13
40 Tertiary Stocks 0.175 30 0.88 3 3
50 Paleozoic 0.15 90 2.63 5 5
60 Cambrian Deadwood 0.25 180 5.25 31 34
70 Precambrian Yates 0.30 55 1.60 32 27
80 Precambrian Flag Rock 0.25 150 4.38 33 31
90 Precambrian Ellison 0.13 60 1.75 15 16

 

Page 188 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.5Summary Statistics

 

Table 11-12 shows summary statistics for gold and silver for the assay intervals. The table shows values by the major rock types. The left side of the table shows uncapped values and the right side shows capped values. For gold the Tertiary sills, the Precambrian Ellison, and the Paleozoic units are lower in grade than the other units. For silver, the Cambrian Deadwood is considerably higher than the other units. Minimum values for the samples represented on the table are 0.0001 oz/t for gold and 0.001 oz/t for silver.

 

Table 11-13 shows summary statistics for 10 ft composites. The statistics are based on composites with a minimum gold value of 0.0001 oz/t and silver value of 0.001 oz/t, but lower grade assays, including 0, are incorporated into the composites.

 

Figure 11-6 shows a probability plot of gold in the composites for the various rock types. The lower grade nature of the Tertiary sills and Precambrian Ellison are evident on the plot. Figure 11-7 shows the probability plot for silver. The higher-grade nature of the Deadwood is evident.

 

Table 11-12: Summary Statistics of Assays

 

Metal Rock Type Not Capped Capped
No. of
Samples
Mean
(oz/t)
Std Dev
(oz/t)

Max
(oz/t)

No. of
Samples
Mean
(oz/t)
Std Dev
(oz/t)
Max
(oz/t)
Gold:
All Samples 103,543 0.0126 0.0307 4.769 103,543 0.0123 0.0219 0.300
Tbx-Breccia 14,709 0.0157 0.0268 0.716 14,709 0.0155 0.0243 0.300
Tsl-Sills 9,675 0.0077 0.0137 0.381 9,675 0.0076 0.0121 0.125
Tdk-Dikes 9,250 0.0101 0.0183 0.563 9,250 0.0099 0.0162 0.190
Stk-Stocks 1,616 0.0094 0.0160 0.239 1,616 0.0093 0.0153 0.175
Pzu-Paleozoic 1,911 0.0057 0.0228 0.685 1,911 0.0052 0.0128 0.150
Cdw-Deadwood 21,816 0.0150 0.0459 4.769 21,816 0.0144 0.0219 0.250
Pym-Yates 18,992 0.0147 0.0306 0.955 18,992 0.0145 0.0271 0.300
Pff-Flag Rock 17,546 0.0133 0.0279 0.930 17,546 0.0130 0.0236 0.250
Pef-Ellison 8,028 0.0051 0.0151 0.653 8,028 0.0049 0.0112 0.130
Silver:
All Samples 97,313 0.133 0.408 44.77 97,313 0.128 0.286 5.25
Tbx-Breccia 14,454 0.123 0.210 8.00 14,454 0.121 0.170 2.10
Tsl-Sills 9,095 0.084 0.272 15.00 9,095 0.080 0.171 2.19
Tdk-Dikes 8,560 0.116 0.232 4.79 8,560 0.114 0.208 2.77
Stk-Stocks 1,416 0.085 0.112 1.31 1,416 0.084 0.107 0.88
Pzu-Paleozoic 1,503 0.091 0.443 13.48 1,503 0.079 0.208 2.62
Cdw-Deadwood 18,699 0.251 0.539 12.80 18,699 0.247 0.483 5.25
Pym-Yates 17,829 0.096 0.261 25.78 17,829 0.093 0.146 1.60
Pff-Flagrock 17,690 0.127 0.588 44.77 17,690 0.118 0.300 4.38
Pef-Ellison 8,067 0.057 0.355 24.03 8,067 0.050 0.128 1.75

 

Page 189 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-13: Summary Statistics of 10 ft Composites

 

Metal Rock Type Not Capped Capped
No. of
Samples
Mean
(oz/t)
Std Dev
(oz/t)

Max
(oz/t)

No. of
Samples
Mean
(oz/t)
Std Dev
(oz/t)
Max
(oz/t)
Gold:
All Samples 53,175 0.0121 0.0234 2.231 53,175 0.0119 0.0191 0.300
Tbx-Breccia 7,220 0.0157 0.0249 0.463 7,220 0.0155 0.0225 0.300
Tsl-Sills 5,121 0.0078 0.0124 0.231 5,121 0.0076 0.0110 0.129
Tdk-Dikes 4,809 0.0100 0.0170 0.429 4,809 0.0099 0.0146 0.192
Stk-Stocks 821 0.0091 0.0141 0.144 821 0.0091 0.0136 0.141
Pzu-Paleozoic 1,066 0.0051 0.0166 0.351 1,066 0.0047 0.0105 0.138
Cdw-Deadwood 11,674 0.0138 0.0284 2.231 11,674 0.0135 0.0183 0.250
Pym-Yates 9,469 0.0142 0.0255 0.488 9,469 0.0140 0.0236 0.300
Pff-Flagrock 8,941 0.0127 0.0240 0.898 8,941 0.0124 0.0202 0.250
Pef-Ellison 4,054 0.0052 0.0128 0.333 4,054 0.0050 0.0100 0.190
Silver:
All Samples 48,908 0.130 0.315 18.02 48,908 0.126 0.250 5.25
Tbx-Breccia 7,023 0.121 0.172 5.19 7,023 0.120 0.147 2.10
Tsl-Sills 4,656 0.083 0.229 7.53 4,656 0.080 0.163 2.19
Tdk-Dikes 4,349 0.114 0.211 3.83 4,349 0.112 0.185 2.77
Stk-Stocks 709 0.084 0.100 0.99 709 0.083 0.097 0.77
Pzu-Paleozoics 809 0.086 0.369 8.38 809 0.075 0.189 2.62
Cdw-Deadwood 10,070 0.235 0.451 9.20 10,070 0.231 0.414 5.25
Pym-Yates 8,650 0.094 0.170 8.52 8,650 0.091 0.124 1.60
Pff-Flagrock 8,728 0.124 0.400 18.02 8,728 0.116 0.246 4.38
Pef-Ellison 3,914 0.059 0.246 10.34 3,914 0.053 0.115 1.92

 

Page 190 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-6: Probability Plot of Gold by Rock Type – 10 ft Composites (IMC, 2026)

 

Page 191 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-7: Probability Plot of Silver by Rock Type – 10 ft Composites (IMC, 2026)

 

Page 192 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.6Variogram Analysis

 

A variogram analysis for gold mineralization was completed for the major rock types. First, approximately 60 directional variograms were calculated to search the entire sphere in about 22.5-degree increments for each rock type. These were examined to find longest range, highest clarity, variograms that might be considered to define the primary direction. Given a candidate, or candidates, for a primary direction, a series of eight variograms were calculated to search the plane perpendicular to the primary direction, to look for the secondary and tertiary axes directions. Usually, good candidates were evident for primary directions that seemed reasonable based on the geology. It is often difficult to define secondary and tertiary directions because variogram ranges in those directions are similar to the spacing between the available samples. The variograms were calculated on the 10 ft composites and a modified covariance method was used for the calculations.

 

Figure 11-8 and Figure 11-9 show variograms for the Cambrian Deadwood. The primary direction is at an azimuth of 0° with a downward dip of 12°. The secondary axis has an azimuth of 270° (or 90°) and no dip. The variograms are nested spherical variograms. The ranges of the first structures are 225 ft and 200 ft respectively and the ranges of the second structures are 600 ft for both variograms. It is also assumed these directions are appropriate for the Tertiary sills.

 

Figure 11-10 and Figure 11-11 show variograms for Precambrian Yates Formation. The primary direction is at an azimuth of 292° with a downward dip of 67°. The secondary axis has an azimuth of 202° and no dip. The variogram for the primary direction is fit as two structures with ranges of 250 ft and 600 ft, respectively. The range of the secondary variogram is also fit as two structures with ranges of 175 ft and 550 ft respectively.

 

Figure 11-12 and Figure 11-13 show the variograms for Tertiary breccia. The variograms represent the primary and secondary directions of mineralization. The primary direction appears to be vertical and the range of the variogram is about 275 ft. The secondary direction is interpreted to be at an azimuth of 345 degrees with a no dip and the range is also about 275 ft.

 

Variograms for silver were also examined and there did not appear to be significant differences in the orientations for silver versus gold. It is also considered that the directions are reasonable given the geology and perceived orientation of mineralization as observed on sections.

 

Page 193 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-8: Variogram for Cambrian Deadwood – Azimuth 0° – Dip 12°

 

Page 194 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-9: Variogram for Cambrian Deadwood – Azimuth 270° – Dip 0°

 

Page 195 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-10: Variogram for Precambrian Yates – Azimuth 292°, Dip 67°

 

Page 196 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-11: Variogram for Precambrian Yates – Azimuth 202°, Dip 0°

 

Page 197 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-12: Variogram for Tertiary Breccia – Azimuth 345° - Dip 90°

 

Page 198 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-13: Variogram for Tertiary Breccia – Azimuth 345° – Dip 0°

 

Page 199 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.7Block Grade Estimation

 

Block grades for gold and silver were estimated with inverse distance with a power weight of 2 (ID2). The ID2 method was chosen because it generally results in less smoothing (smearing) than ordinary kriging (OK). As previously discussed, the estimates are based on 10 ft downhole composites. All estimates were done using a maximum of 15 composites, a minimum of three composites, and a maximum of three composites per hole. A minimum of one hole was allowed to estimate grades, but blocks estimated with only one or two drillholes are classified as inferred mineral resources.

 

Table 11-14 shows the estimation parameters for gold and silver. The parameters show the orientation of the composite search ellipse and the search radii in the major, minor, and tertiary axis directions. The search orientations for the Tertiary breccia, Tertiary dikes, Precambrian Yates, and Precambrian Flag Rock are relatively steep. The orientations for the Tertiary sills, Cambrian Deadwood, Precambrian Ellison and Paleozoic units are relatively flat with a slight plunge to the north. Much of the Precambrian Ellison sampling data is adjacent to, and below, the Cambrian Deadwood. The search for the Tertiary stocks is spherical; data is limited in those units. The search orientations and search radii were the same for gold and silver.

 

Sulfur and the ratio of cyanide soluble gold to total gold were estimated using the same parameters as gold with a couple of exceptions. The search orientation in the Yates and Flag Rock formations was flattened since sulfur and cyanide soluble gold are sensitive to depth.

 

Table 11-15 shows the composite rock types that were acceptable for each rock type population. The boundaries were evaluated independently for gold and silver. The evaluation was based on pairing samples relatively short distances apart across the various boundaries and reviewing statistics of the sample pairs to determine if a hard boundary was indicated. The analysis was done with the 10 ft composites. A maximum separation distance of 30 ft was used, and composites were examined in 10 ft intervals. The indicated gold and silver populations are often different.

 

The block grade estimates for gold, silver, sulfur, and the cyanide soluble gold ratio were reviewed extensively on cross sections to verify the block grades were consistent with the composite grades used in the estimation.

 

Figure 11-14 and Figure 11-15 show gold grades on cross sections A-A’ and B-B’ respectively. In Figure 11-15 it can be seen where mining was conducted in the high-grade portion of Richmond Hill. The area was also backfilled with the waste material from the prior mining.

 

Figure 11-16 shows silver grades on cross section A-A’. Note the relatively high silver grades in the flat lying Deadwood Formation in Chism Gulch on the far right of the figure.

 

Page 200 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-14: Estimation Parameters

 

Formation

Code

Formation Rotation Angles (Note 1) Search Radii Number of Composites

ID

Power

Theta

(deg)

Phi

(deg)

Psi

(deg)

Major

(ft)

Minor

(ft)

Tertiary

(ft)

Max Min

Max/

Hole

Gold:
10 Tertiary Breccia -15 -90 -90 250 250 62.5 15 3 3 2
20 Tertiary Sills 0 -12 0 250 250 50 15 3 3 2
30 Tertiary Dikes -15 -90 -90 250 250 50 15 3 3 2
40 Tertiary Stocks 0 0 0 160 160 160 15 3 3 2
50 Paleozoic (undif) -45 -14 0 250 250 50 15 3 3 2
60 Cambrian Deadwood 0 -12 0 250 250 50 15 3 3 2
70 Precambrian Yates -68 -67 0 250 250 62.5 15 3 3 2
80 Precambrian Flag Rock 45 0 -45 250 125 125 15 3 3 2
90 Precambrian Ellison 0 -12 0 250 250 50 15 3 3 2
Silver:
10 Tertiary Breccia -15 -90 -90 250 250 62.5 15 3 3 2
20 Tertiary Sills 0 -12 0 250 250 50 15 3 3 2
30 Tertiary Dikes -15 -90 -90 250 250 50 15 3 3 2
40 Tertiary Stocks 0 0 0 160 160 160 15 3 3 2
50 Paleozoic (undif) -45 -14 0 250 250 50 15 3 3 2
60 Cambrian Deadwood 0 -12 0 250 250 50 15 3 3 2
70 Precambrian Yates -68 -67 0 250 250 62.5 15 3 3 2
80 Precambrian Flag Rock 45 0 -45 250 125 125 15 3 3 2
90 Precambrian Ellison 0 -12 0 250 250 50 15 3 3 2
Sulfur, CnAu Ratio (Same as Above Except):
70 Precambrian Yates 0 -12 0 250 250 50 15 3 3 2
80 Precambrian Flag Rock 0 -12 0 250 250 50 15 3 3 2

 

Note 1: GSLIB Convention for Angles

theta - rotation of y (north) axis clockwise to principal direction in horizontal plane.

phi - dip of principal axis, negative is down.

psi - rotation around principal axis, clockwise is negative.

 

Page 201 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-15: Rock Type Populations for Estimation

 

Rock

Code

Rock

Type

Description Acceptable Rock Types
Gold Silver
10 Tbx Tertiary Breccia 10,36,40,42,50 10,36,40,42,50
20 Tsl Tertiary Sills - Undifferentiated 20,23,30,31,32,33,35,36,37,54,70,80 20,23,30,32,35,54,80,85
22 Tslm Tertiary Sills - Lamprophyre 22,23,60 22,23,60
23 Tslt Tertiary Sills - Latite 23,20,22,30,31,32,33,35,37,52,54,55 23,20,22,33,36,37,54,55,80,85,90
25 Tsqp Tertiary Sills - Quartz Porphyry 25,30 25
26 Tsrh Tertiary Sills - Rhyolite 26 26
30 Tdk Tertiary Dikes - Undifferentiated 30,20,23,25,37 30,20,32,70,80,90
31 Tddc Tertiary Dikes - Dacite 31,20,23,60 31
32 Tdlm Tertiary Dikes - Lamprophyre 32,20,23,60,80 32,20,30,60
33 Tdlt Tertiary Dikes - Latite 33,20,23,85 33,23,80
34 Tdph Tertiary Dikes - Phonolite 34,90 34,90,60
35 Tdqp Tertiary Dikes - Quartz Porphyry 35,10,20,23,90 35,20,90
36 Tdrh Tertiary Dikes - Rhyolite 36,10,20 36,10,23,60,70,80
37 Tdtr Tertiary Dikes -Trachyte 37,20,23,30,80 37,23,60,80
40 Stke Tertiary Stock East 40,10,80,90 40,10,80,90
42 Stkw Tertiary Stock West 42,10,70,80 42,10,70,80
51 Mp Mississippian Pahasapa FM 51 51
52 Mde Mississippian/Devonian Englewood FM 52,55 52,55
53 Owi Ordovician Winnipeg Ice Box FM 53 53
54 Owr Ordovician Winnipeg Roughlock FM 54,55,20,23 54,55,20,23
55 Owh Ordovician Whitewood FM 55,52,54,23 55,52,54,23
60 Cdw Cambrian Deadwood 60,10,22,31,32 60,10,22,31,32,34,36,37
70 Pym Precambrian Yates FM 70,80,42 70,80,42,30,36
80 Pffw Precambrian Flag Rock FM - West 80,70,32,37,40,42 80,70,30,33,36,37,40,42
85 Pffe Precambrian Flag Rock FM - East 85,90,33 85,90
90 Pef Precambrian Ellison FM 90,85,34,35,40 90,85,30,34,35,40

 

Page 202 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-14: Gold Grade on Cross Section A-A’ (See Figure 11-2)

 

Page 203 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-15: Gold Grades on Cross Section B-B’ (See Figure 11-2)

 

Page 204 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-16: Silver Grades on Cross Section A-A’ (See Figure 11-2)

 

Page 205 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.8Resource Classification

 

To classify measured and indicated versus inferred mineral resources, two additional block estimates were done to measure the average distance of each block to the nearest three and four drillholes. These were based on the same search orientations and search radii as the gold grade estimates. The first estimate was based on a maximum of four composites, a minimum of four, and a maximum of one composite per hole. The second estimate was based on a maximum of three composites, a minimum of three, and a maximum of one composite per hole. These estimates provide the average distance to the nearest three and four holes to each block and the distances were stored in the block model. Note the grades from these estimates were not used.

 

Blocks with an average distance to the nearest four holes less than 125 ft were assigned as measured mineral resources. Blocks with an average distance to the nearest three holes less than 175 ft (and not measured) were assigned as indicated mineral resource. Remaining blocks with an estimated gold grade were assigned to inferred mineral resource. This includes all blocks estimated with only one or two drillholes. Generally (not specific to Richmond Hill) an average distance to the nearest four holes of 125 ft corresponds to an average drill spacing of about 150 ft, and an average distance to the nearest three holes of 175 ft corresponds to an average drill spacing of about 230 ft. These estimates are approximate. Due to many angle holes from common drilling pads, the Richmond Hill sample spacing fluctuates widely.

 

Figure 11-17 and Figure 11-18 show probability plots of the average distance to the nearest three and four holes for Cambrian Deadwood and Tertiary Breccia respectively. Figure 11-19 and Figure 11-20 show the resource classification on cross sections A-A’ and B-B’ respectively.

 

After calculating the average distances to the blocks and assigning an initial classification a filtering algorithm was applied to the classification. The purpose of the filtering was to remove small clusters of blocks surrounded by blocks of different classification and to smooth out the boundaries of the various categories. The filtering identified blocks that were contacted on three or four edges by blocks of a different resource category. Five filtering passes were done, and each pass consisted of the following steps:

 

·Measured blocks with 3 or 4 adjacent indicated blocks were set to indicated.

·Measured blocks with 3 or 4 adjacent inferred blocks were set to inferred (rare case).

·Indicated blocks with 3 or 4 adjacent measured blocks were set to measured.

·Indicated blocks with 3 or 4 adjacent inferred blocks were set to inferred.

·Inferred blocks with 3 or 4 adjacent measured blocks were set to measured (rare case).

·Inferred blocks with 3 or 4 adjacent indicated blocks were set to indicated.

·Measured blocks with 3 or 4 adjacent indicated or inferred blocks were set to indicated.

·Indicated blocks with 3 or 4 adjacent measured or inferred blocks were set to inferred.

·Inferred blocks with 3 or 4 adjacent measured or indicated blocks were set to indicated.

 

The QP for this section is of the opinion that the classifications of measured, indicated, and inferred mineral resources are adequate. When examined on cross sections, the measured mineral resources correspond to a high density of sampling information, sufficient to allow accurate geologic interpretation and confirm grade quality and continuity.

 

When examined on cross sections, the indicated mineral resources correspond to a reasonable level of data density, though less than the measured mineral resources. The data density is adequate for reasonable interpretations of geologic conditions and grade quality and continuity.

 

Inferred mineral resources are based on some, but more limited sampling data, sometimes only one drillhole. However, given the relatively disseminated distribution of grades in the deposit, the QP for this section is confident that the majority of the inferred mineral resource can be upgraded to measured or indicated mineral resource with additional exploration.

 

Page 206 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-17: Probability Plot of Average Distance to Nearest 3 and 4 Holes – Cambrian Deadwood

 

Page 207 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-18: Probability Plot of Average Distance to Nearest 3 and 4 Holes – Tertiary Breccia

 

Page 208 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 11-19: Resource Classification on Cross Section A-A’

 

 

Figure 11-20: Resource Classification on Cross Section B-B’

 

Page 209 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.5.9Bulk Density

 

The drilling database included about 30,900 specific gravity measurements for Dakota Gold drill core that were conducted by Dakota personnel. The measurements were by the water immersion method. The weights in air and in water, along with the specific gravity calculations, were provided with the drilling database.

 

These were analyzed by rock type and oxide/transition versus sulfide zone. Table 11-16 summarizes the data for the samples where a rock type and oxide zone could be assigned. The data was trimmed for the analysis; 5 samples greater than 4 g/cm3 and 15 samples less than 1.2 g/m3 were excluded. The average specific gravity was reduced by 2% (0.98 bulk factor) to allow for voids at a larger scale than the available samples and a general tendency to measure more competent samples. The tonnage factors and ktons/block values on the table reflect this reduction. Items in italics represent the values used for populations that did not have any sampling.

 

Specific gravities of 1.8 and 2.0 were assigned for the existing leach pad and waste rock area.

 

Table 11-16: Specific Gravity Measurements

 

Rock

Type

Rock

Code

All Samples Oxide/Transition Sulfide

No. of

Samples

Mean

(g/cm3)

No. of

Samples

Mean

(g/cm3)

Bulk

Factor

Ton Fact

(ft3/ton)

Ktons/

Block

No. of

Samples

Mean

(g/cm3)

Bulk

Factor

Ton Fact

(ft3/ton)

Ktons/

Block

Tbx 10 4162 2.597 887 2.396 0.980 13.65 0.586 3275 2.651 0.980 12.34 0.649
Tsl 20 1624 2.510 1346 2.500 0.980 13.08 0.612 278 2.560 0.980 12.78 0.626
Tslm 22 168 2.632 127 2.636 0.980 12.41 0.645 41 2.619 0.980 12.49 0.641
Tslt 23 1503 2.491 1231 2.487 0.980 13.15 0.608 272 2.506 0.980 13.05 0.613
Tsqp 25 52 2.526 52 2.526 0.980 12.95 0.618 0 2.526 0.980 12.95 0.618
Tsrh 26 82 2.514 82 2.514 0.980 13.01 0.615 0 2.514 0.980 13.01 0.615
Tdk 30 1162 2.565 243 2.456 0.980 13.31 0.601 919 2.593 0.980 12.61 0.634
Tddc 31 52 2.461 42 2.460 0.980 13.30 0.602 10 2.466 0.980 13.26 0.603
Tdlm 32 364 2.577 195 2.483 0.980 13.17 0.607 169 2.685 0.980 12.18 0.657
Tdlt 33 351 2.539 160 2.491 0.980 13.13 0.609 191 2.580 0.980 12.68 0.631
Tdph 34 25 2.586 19 2.568 0.980 12.73 0.628 6 2.644 0.980 12.37 0.647
Tdqp 35 147 2.503 79 2.466 0.980 13.26 0.603 68 2.547 0.980 12.84 0.623
Tdrh 36 81 2.489 58 2.442 0.980 13.39 0.597 23 2.608 0.980 12.54 0.638
Tdtr 37 88 2.466 68 2.432 0.980 13.45 0.595 20 2.582 0.980 12.67 0.632
Stke 40 160 2.492 4 2.403 0.980 13.61 0.588 156 2.494 0.980 13.11 0.610
Stkw 42 3 2.490 0 2.403 0.980 13.61 0.588 3 2.494 0.980 13.11 0.610
Mp 51 0 0.000 0 2.591 0.980 12.62 0.634 0 2.591 0.980 12.62 0.634
Mde 52 19 2.591 19 2.591 0.980 12.62 0.634 0 2.591 0.980 12.62 0.634
Owi 53 146 2.525 146 2.525 0.980 12.95 0.618 0 2.525 0.980 12.95 0.618
Owr 54 140 2.487 140 2.487 0.980 13.15 0.608 0 2.487 0.980 13.15 0.608
Owh 55 19 2.532 19 2.532 0.980 12.92 0.619 0 2.532 0.980 12.92 0.619
Cdw 60 6764 2.512 5031 2.475 0.980 13.22 0.605 1733 2.621 0.980 12.48 0.641
Pym 70 4893 2.727 494 2.526 0.980 12.95 0.618 4399 2.750 0.980 11.89 0.673
Pffw 80 3566 2.786 229 2.571 0.980 12.72 0.629 3337 2.801 0.980 11.68 0.685
Pffe 85 726 2.790 86 2.634 0.980 12.42 0.644 640 2.811 0.980 11.64 0.687
Pef 90 3613 2.731 319 2.597 0.980 12.60 0.635 3294 2.744 0.980 11.92 0.671
Total   29910 2.627 11076 2.485 0.980 13.16 0.608 18834 2.711 0.980 12.06 0.663
                           

 

Page 210 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.6Reconciliation of November 2026 and February 2025 Mineral Resources

 

11.6.1Leach Mineral Resource

 

Table 11-17 presents a reconciliation of the November 2026 mineral resource estimate with the February 2025 estimate for mineral resources amenable to leaching. The mineral resource estimates were based on models developed during August 2026 and January 2025 respectively. The mineral resources in this analysis are inclusive of the mineral reserve estimate.

 

Item 1 on the table is the February 2025 mineral resource estimate as stated in the July 2025 technical report summary. Measured and indicated mineral resource was 269.8 million tons at 0.0135 oz/t gold and 0.141 oz/t silver for 3.65 million contained gold ounces and 38.1 million contained silver ounces. Inferred mineral resource was 254.2 million tons at 0.0103 oz/t gold and 0.090 oz/t silver for 2.61 million contained gold ounces and 22.8 million contained silver ounces. Oxide and transition material are not reported separately on the table, but the gold equivalent cut-off grades for each are shown and were 0.0026 oz/t for oxide and 0.0041 oz/t for transition, due to differences in estimated gold and silver recoveries. Note that total tons in the various resource shells are also presented on the table to show changes for each case.

 

For the August 2026 resource model there was a meaningful change in the interpretation of the top of the sulfide mineralization surface compared with the January 2025 model. Part of this was due to metallurgical work that recommended a maximum sulfur content of 0.5% sulfur for oxide and 1.1% sulfur for transition material. Item 3 on the table shows the impact of incorporating the updated oxide, transition, and sulfide domains into January 2025 model and tabulating mineral resources using the same resource shell and economics as the February 2025 mineral resource. This resulted in 169.4 million tons of measured and indicated mineral resource at 0.0133 oz/t gold and 0.140 oz/t silver for 2.25 million contained gold ounces and 23.7 million contained silver ounces. Inferred mineral resource was 172.6 million tons at 0.0099 oz/t gold and 0.081 oz/t silver for 1.71 million ounces of contained gold and 14.0 million contained silver ounces. Item 2 shows that the new domains reduced measured and indicated mineral resources by 100.4 million tons and 1.41 million contained gold ounces and 14.4 million contained silver ounces. Inferred mineral resources were reduced by 81.6 million tons and 904,900 contained gold ounces and 8.8 million contained silver ounces. The reduced resources were reclassified as sulfide (mill) resources.

 

Item 5 is based on the August 2026 resource model tabulated with the 2025 economics and resource shell. This resulted in 199.0 million tons of measured and indicated mineral resource at 0.0134 oz/t gold and 0.159 oz/t silver for 2.66 million contained gold ounces and 31.6 million contained silver ounces. Inferred mineral resource was 105.7 million tons at 0.0107 oz/t gold and 0.076 oz/t silver for 1.13 million ounces of contained gold and 8.0 million contained silver ounces. Item 4 shows the difference due to the new model with same economics and resource shell. Inferred mineral resources were reduced, but some of it was converted to measured and indicated mineral resource.

 

Item 7 on shows the impact of a new resource shell based on the updated model, but with 2025 economics and recoveries. This resulted in 221.7 million tons of measured and indicated mineral resource at 0.0134 oz/t gold and 0.159 oz/t silver for 2.98 million contained gold ounces and 35.3 million contained silver ounces. Inferred mineral resource was 110.2 million tons at 0.0111 oz/t gold and 0.085 oz/t silver for 1.22 million ounces of contained gold and 9.4 million contained silver ounces. Item 6 shows the difference due to the new model with same economics and an updated resource shell. Measured and indicated mineral resources increased by 22.7 million tons and 317,800 contained gold ounces and 3.7 million contained silver ounces. Inferred mineral resources increased by 4.55 million tons and 92,800 ounces of contained gold and 1.34 million ounces contained silver.

 

Item 9 shows the impact of updated unit costs for mining and processing. The November 2026 resource is based on a mining cost of $3.55/t, versus $2.15/t for the February 2025 estimate. The process plus G&A unit cost is estimated at $5.80 for oxide and transition resources versus $4.39/t for oxide and $5.15/t for transition for the February 2025 estimate. The milling process plus G&A cost is estimated at $11.09/t versus $7.83/t for the February 2025 estimate. The milling cost estimate was escalated to be similar to the leach cost increases. This resulted in 190.6 million tons of measured and indicated mineral resource at 0.0147 oz/t gold and 0.169 oz/t silver for 2.79 million contained gold ounces and 32.3 million contained silver ounces. Inferred mineral resource was 74.0 million tons at 0.0128 oz/t gold and 0.086 oz/t silver for 947,500 ounces of contained gold and 6.37 million contained silver ounces. Item 8 shows the difference due to the updated costs. Measured and indicated mineral resources decreased by 31.1 million tons and 185,000 contained gold ounces and 2.98 million contained silver ounces. Inferred mineral resources decreased by 36.2 million tons and 276,000 ounces of contained gold and 3.0 million ounces contained silver. The resource shell was also considerably smaller due to the updated costs.

 

Page 211 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Item 11 shows the impact of an increase in metal prices. The November 2026 mineral resource is based on gold and silver prices of $2900/oz and $35/oz respectively, versus $2,000/oz gold and $25/oz silver for the February 2025 mineral resource. The price increase results in 232.1 million tons of measured and indicated mineral resource at 0.0129 oz/t gold and 0.154 oz/t silver for 3.00 million contained gold ounces and 35.7 million contained silver ounces. Inferred mineral resource was 118.3 million tons at 0.0105 oz/t gold and 0.081 oz/t silver for 1.24 million contained gold ounces and 9.58 million contained silver ounces. Item 10 shows the difference due to the updated prices. Measured and indicated mineral resources increased by 41.5 million tons and 205,300 contained gold ounces and 3.43 million contained silver ounces. Inferred mineral resources increased by 44.3 million tons and 294,400 ounces of contained gold and 3.21 million ounces contained silver. The Item 11 and 7 results are similar. The increase in prices balanced the unit cost increases.

 

Item 13 represents the updated mineral resource estimate. Versus Item 11, the updated process recovery model is incorporated into Item 13. The measured and indicated mineral resource amenable to leaching amounts to 173.2 million tons at 0.0147 oz/t gold and 0.177 oz/t silver for 2.54 million ounces of contained gold and 30.6 million ounces of contained silver. Inferred mineral resource is an additional 98.9 million tons at 0.0110 oz/t gold and 0.081 oz/t silver for 1.09 million ounces of contained gold and 8.0 million ounces of contained silver. Item 12 shows that this Is a modest decrease in the mineral resources versus Item 11. The leach recoveries, especially in the Cambrian Deadwood are reduced from the February 2025 values.

 

The sensitivity analysis shows a large difference between the January 2025 and November 2026 mineral resources for leach resource. The major reason for the difference is due to the change in the estimate of the top of the sulfide surface.

 

11.6.2Mill Resource

 

Table 11-18 presents a reconciliation of the November 2026 mineral resource estimate with the February 2025 estimate for mineral resources amenable to milling.

 

Item 1 on the table is the February 2025 mineral resource estimate as stated in the July 2025 technical report summary. Measured and indicated mineral resource was 69.6 million tons at 0.0141 oz/t gold and 0.139 oz/t silver for 982,100 contained gold ounces and 9.68 million contained silver ounces. Inferred mineral resource was 202.2 million tons at 0.0121 oz/t gold and 0.145 oz/t silver for 2.45 million contained gold ounces and 29.3 million contained silver ounces. The gold equivalent cut-off grade was 0.005 oz/t.

 

As discussed in the previous section, there was a significant change in the interpretation of the top of the sulfide surface compared with the January 2025 model. Item 3 on Table 11-18 shows the impact of incorporating the updated oxide, transition, and sulfide domains into January 2025 model and tabulating mineral resources using the same resource shell and economics as the February 2025 mineral resource. This resulted in 170.0 million tons of measured and indicated mineral resource at 0.0140 oz/t gold and 0.142 oz/t silver for 2.38 million contained gold ounces and 24.2 million contained silver ounces. Inferred mineral resource was 283.8 million tons at 0.0118 oz/t gold and 0.134 oz/t silver for 3.35 million ounces of contained gold and 38.0 million contained silver ounces. Item 2 shows that the new domains increased measured and indicated mineral resources by 100.4 million tons and 1.40 million contained gold ounces and 14.5 million contained silver ounces. Inferred mineral resources were increased by 81.6 million tons and 902,100 contained gold ounces and 8.7 million contained silver ounces. These mineral resources were previously classified as leach resources.

 

Page 212 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Item 5 is based on the August 2026 resource model tabulated with the 2025 economics and resource shell. This resulted in 190.3 million tons of measured and indicated mineral resource at 0.0142 oz/t gold and 0.158 oz/t silver for 2.71 million contained gold ounces and 30.1 million contained silver ounces. The inferred mineral resource was 225.3 million tons at 0.0120 oz/t gold and 0.128 oz/t silver for 2.70 million ounces of contained gold and 28.8 million contained silver ounces. Item 4 shows the difference due to the new model with same economics and resource shell. Inferred mineral resources were reduced, but some of it was converted to measured and indicated mineral resource.

 

Item 7 shows the impact of a new resource shell based on the updated model, but with 2025 economics and recoveries. This resulted in 193.8 million tons of measured and indicated mineral resource at 0.0145 oz/t gold and 0.162 oz/t silver for 2.81 million contained gold ounces and 31.4 million contained silver ounces. Inferred mineral resource was 214.9 million tons at 0.0125 oz/t gold and 0.133 oz/t silver for 2.69 million ounces of contained gold and 28.6 million contained silver ounces. Item 6 shows the difference due to the new model with same economics and an updated resource shell. The change was small.

 

Item 9 shows the impact of updated unit costs for mining and processing. Details of the changes are discussed in the previous section. The increased costs resulted in 149.0 million tons of measured and indicated mineral resource at 0.0165 oz/t gold and 0.179 oz/t silver for 2.46 million contained gold ounces and 26.7 million contained silver ounces. Inferred mineral resource was 90.6 million tons at 0.0153 oz/t gold and 0.149 oz/t silver for 1.39 million ounces of contained gold and 13.5 million contained silver ounces. Item 8 shows the difference due to the updated costs. Measured and indicated mineral resources decreased by 44.8 million tons and 347,700 contained gold ounces and 4.78 million contained silver ounces. Inferred mineral resources decreased by 124.3 million tons and 1.30 million ounces of contained gold and 15.1 million ounces contained silver. The resource shell was considerably smaller due to the updated costs.

 

Item 11 shows the impact of an increase in metal prices. The November 2026 mineral resource is based on gold and silver prices of $2,900/oz and $35/oz respectively, versus $2,000/oz gold and $25/oz silver for the February 2025 mineral resource. The price increase results in 194.4 million tons of measured and indicated mineral resource at 0.0144 oz/t gold and 0.162 oz/t silver for 2.80 million contained gold ounces and 31.4 million contained silver ounces. Inferred mineral resource was 208.4 million tons at 0.0125 oz/t gold and 0.130 oz/t silver for 2.61 million contained gold ounces and 27.1 million contained silver ounces. Item 10 shows the difference due to the updated prices. Measured and indicated mineral resources increased by 45.4 million tons and 336,500 contained gold ounces and 4.76 million contained silver ounces. Inferred mineral resources increased by 117.9 million tons and 1.22 million ounces of contained gold and 13.6 million ounces contained silver. The Item 11 and 7 results are similar. The increase in prices balanced the unit cost increases.

 

Item 13 represents the updated mineral resource estimate for resources amenable to milling. Versus Item 11, the updated process recovery model is incorporated into Item 13. The measured and indicated mineral resource amenable to milling amounts to 230.9 million tons at 0.0138 oz/t gold and 0.154 oz/t silver for 3.20 million ounces of contained gold and 35.7 million ounces of contained silver. Inferred mineral resource is an additional 219.3 million tons at 0.0124 oz/t gold and 0.128 oz/t silver for 2.72 million ounces of contained gold and 28.1 million ounces of contained silver.

 

This is a significant increase in mineral resources amenable to milling versus the February 2025 estimate, due to the revised estimate of the top of the sulfide surface.

 

Page 213 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-17: Reconciliation of November 2026 and February 2025 Mineral Resources – Leach Resource

 

Price/Resource Category

Cut-off

(oz/t)

Ktons

AuEq

(oz/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

1. February 3, 2025 Mineral Resource
Measured Mineral Resource Oxide 113,748 0.0164 0.0158 0.160 1,793.4 18,208  
Indicated Mineral Resource 0.0026 156,019 0.0125 0.0119 0.128 1,860.0 19,884  
Meas/Indic Mineral Resource Transition 269,768 0.0141 0.0135 0.141 3,653.3 38,092 1,367,025
Inferred Mineral Resource 0.0041 254,186 0.0106 0.0103 0.090 2,613.4 22,787  
2. Due to July 2026 Oxide/Transition/Sulfide Domain Update - Versus Case 1
Measured Mineral Resource Oxide -46,366 0.0163 0.0157 0.153 -728.7 -7,090  
Indicated Mineral Resource 0.0026 -54,047 0.0131 0.0125 0.136 -677.1 -7,342  
Meas/Indic Mineral Resource Transition -100,413 0.0145 0.0140 0.144 -1,405.8 -14,432 0
Inferred Mineral Resource 0.0041 -81,615 0.0112 0.0111 0.108 -904.9 -8,809  
3. July 2026 Oxide/Transition/Sulfide Domain Update
Measured Mineral Resource Oxide 67,382 0.0165 0.0158 0.165 1,064.6 11,118  
Indicated Mineral Resource 0.0026 101,972 0.0122 0.0116 0.123 1,182.9 12,543  
Meas/Indic Mineral Resource Transition 169,354 0.0139 0.0133 0.140 2,247.5 23,661 1,367,025
Inferred Mineral Resource 0.0041 172,571 0.0103 0.0099 0.081 1,708.5 13,978  
4. Due to August 2026 Model
Measured Mineral Resource Oxide 17,943 0.0155 0.0148 0.265 266.4 4,752  
Indicated Mineral Resource 0.0026 11,706 0.0132 0.0126 0.269 147.2 3,145  
Meas/Indic Mineral Resource Transition 29,649 0.0146 0.0139 0.266 413.6 7,897 3,353
Inferred Mineral Resource 0.0041 -66,894 0.0092 0.0086 0.089 -577.7 -5,947  
5. August 2026 Model, 2025 Resource Shell and Economics
Measured Mineral Resource Oxide 85,325 0.0163 0.0156 0.186 1,331.1 15,870  
Indicated Mineral Resource 0.0026 113,678 0.0123 0.0117 0.138 1,330.0 15,688  
Meas/Indic Mineral Resource Transition 199,003 0.0140 0.0134 0.159 2,661.1 31,558 1,370,378
Inferred Mineral Resource 0.0041 105,677 0.0110 0.0107 0.076 1,130.7 8,031  
6. Due to New Resource Shell with 2025 Economic Parameters              
Measured Mineral Resource Oxide 1,740 0.0113 0.0106 0.086 18.4 150  
Indicated Mineral Resource 0.0026 20,980 0.0149 0.0143 0.170 299.3 3,569  
Meas/Indic Mineral Resource Transition 22,720 0.0146 0.0140 0.164 317.8 3,718 -46,811
Inferred Mineral Resource 0.0041 4,551 0.0207 0.0204 0.294 92.8 1,338  

 

Page 214 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Price/Resource Category

Cut-off

(oz/t)

Ktons

AuEq

(oz/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

7. August 2026 Model, New Resource Shell - 2025 Economic Parameters
Measured Mineral Resource Oxide 87,065 0.0162 0.0155 0.184 1,349.5 16,020  
Indicated Mineral Resource 0.0026 134,658 0.0127 0.0121 0.143 1,629.4 19,256  
Meas/Indic Mineral Resource Transition 221,723 0.0141 0.0134 0.159 2,978.9 35,276 1,323,567
Inferred Mineral Resource 0.0041 110,228 0.0114 0.0111 0.085 1,223.5 9,369  
8. Due to Updated Mining/Processing Unit Costs
Measured Mineral Resource Oxide -7,096 0.0049 0.0054 0.060 -38.0 -426  
Indicated Mineral Resource 0.0034 -24,036 0.0067 0.0061 0.106 -147.0 -2,552  
Meas/Indic Mineral Resource Transition -31,132 0.0063 0.0059 0.096 -185.0 -2,978 -527,161
Inferred Mineral Resource 0.0046 -36,202 0.0077 0.0076 0.083 -276.0 -3,003  
9. 2026 Model and New Shell with Updated Mining/Processing Unit Costs
Measured Mineral Resource Oxide 79,969 0.0172 0.0164 0.195 1,311.5 15,594  
Indicated Mineral Resource 0.0034 110,622 0.0140 0.0134 0.151 1,482.3 16,704  
Meas/Indic Mineral Resource Transition 190,591 0.0153 0.0147 0.169 2,793.8 32,298 796,406
Inferred Mineral Resource 0.0046 74,026 0.0132 0.0128 0.086 947.5 6,366  
10. Due to Updated Prices
Measured Mineral Resource Oxide 10,380 0.0041 0.0042 0.056 43.7 579  
Indicated Mineral Resource 0.0023 31,095 0.0058 0.0052 0.092 161.6 2,853  
Meas/Indic Mineral Resource Transition 41,475 0.0054 0.0050 0.083 205.3 3,432 485,329
Inferred Mineral Resource 0.0032 44,252 0.0068 0.0067 0.073 294.4 3,214  
11. 2026 Model and New Shell with Updated Prices ($2900/oz Au, $35/oz Ag)
Measured Mineral Resource Oxide 90,349 0.0157 0.0150 0.179 1,355.2 16,172  
Indicated Mineral Resource 0.0023 141,717 0.0122 0.0116 0.138 1,643.9 19,557  
Meas/Indic Mineral Resource Transition 232,066 0.0136 0.0129 0.154 2,999.2 35,729 1,281,735
Inferred Mineral Resource 0.0032 118,278 0.0108 0.0105 0.081 1,241.9 9,581  
12. Due to Updated Metal Recovery Models                
Measured Mineral Resource Oxide -17,781   0.0081 0.089 -143.3 -1,586  
Indicated Mineral Resource $5.80/t NSR -41,135   0.0077 0.087 -316.2 -3,564  
Meas/Indic Mineral Resource Transition -58,916   0.0078 0.087 -459.6 -5,151 -16,706
Inferred Mineral Resource $5.80/t NSR -19,366   0.0079 0.081 -153.9 -1,569  
13. 2026 Model and New Shell with Updated Metal Recovery Model Cutoff Ktons NSR ($/t) Au (oz/t) Ag (oz/t) Au (koz) Ag (koz)  
Measured Mineral Resource Oxide 72,568 34.70 0.0167 0.201 1,211.9 14,586  
Indicated Mineral Resource $5.80/t NSR 100,582 27.51 0.0132 0.159 1,327.7 15,993  
Meas/Indic Mineral Resource Transition 173,150 30.52 0.0147 0.177 2,539.6 30,579 1,265,029
Inferred Mineral Resource $5.80/t NSR 98,912 22.76 0.0110 0.081 1,088.0 8,012  

 

Page 215 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 11-18: Reconciliation of November 2026 and January 2025 Mineral Resources – Mill Resource

 

 Price/Resource Category

Cut-off

(oz/t)

Ktons

AuEq

(oz/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

1. February 3, 2025 Mineral Resource 
Measured Mineral Resource   20,703 0.0184 0.0165 0.151 341.6 3,126  
Indicated Mineral Resource   48,893 0.0147 0.0131 0.134 640.5 6,552  
Meas/Indic Mineral Resource 0.005 69,596 0.0158 0.0141 0.139 982.1 9,678 1,367,025
Inferred Mineral Resource   202,221 0.0139 0.0121 0.145 2,446.9 29,322  
2. Due to July 2026 Oxide/Transition/Sulfide Domain Update - Versus Case 1 
Measured Mineral Resource   46,357 0.0162 0.0156 0.152 724.7 7,067  
Indicated Mineral Resource   54,037 0.0130 0.0125 0.138 677.0 7,446  
Meas/Indic Mineral Resource 0.005 100,394 0.0145 0.0140 0.145 1,401.7 14,514 0
Inferred Mineral Resource   81,591 0.0115 0.0111 0.107 902.1 8,709  
3. July 2026 Oxide/Transition/Sulfide Domain Update 
Measured Mineral Resource   67,060 0.0169 0.0159 0.152 1,066.3 10,193  
Indicated Mineral Resource   102,930 0.0138 0.0128 0.136 1,317.5 13,998  
Meas/Indic Mineral Resource 0.005 169,990 0.0150 0.0140 0.142 2,383.8 24,192 1,367,025
Inferred Mineral Resource   283,812 0.0132 0.0118 0.134 3,349.0 38,031  
4. Due to August 2026 Model 
Measured Mineral Resource   14,248 0.0249 0.0182 0.220 259.1 3,141  
Indicated Mineral Resource   6,071 0.0282 0.0110 0.459 66.8 2,788  
Meas/Indic Mineral Resource 0.005 20,319 0.0259 0.0160 0.292 325.9 5,929 3,353
Inferred Mineral Resource   -58,556 0.0117 0.0110 0.157 -645.9 -9,198  
5. August 2026 Model, 2025 Resource Shell and Economics 
Measured Mineral Resource   81,308 0.0183 0.0163 0.164 1,325.3 13,335  
Indicated Mineral Resource   109,001 0.0146 0.0127 0.154 1,384.3 16,786  
Meas/Indic Mineral Resource 0.005 190,309 0.0162 0.0142 0.158 2,709.6 30,121 1,370,378
Inferred Mineral Resource   225,256 0.0136 0.0120 0.128 2,703.1 28,833  
6. Due to New Resource Shell with 2025 Economic Parameters 
Measured Mineral Resource   65 0.1435 0.1415 0.164 9.2 11  
Indicated Mineral Resource   3,449 0.0276 0.0257 0.382 88.8 1,318  
Meas/Indic Mineral Resource 0.005 3,514 0.0298 0.0279 0.378 98.0 1,329 -46,811
Inferred Mineral Resource   -10,393 0.0033 0.0017 0.025 -17.3 -256  

 

Page 216 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Price/Resource Category

Cut-off

(oz/t)

Ktons

AuEq

(oz/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Total

Ktons

7. August 2026 Model, New Resource Shell - 2025 Economic Parameters 
Measured Mineral Resource   81,373 0.0184 0.0164 0.164 1,334.5 13,345  
Indicated Mineral Resource   112,450 0.0150 0.0131 0.161 1,473.1 18,104  
Meas/Indic Mineral Resource 0.005 193,823 0.0164 0.0145 0.162 2,807.6 31,450 1,323,567
Inferred Mineral Resource   214,863 0.0141 0.0125 0.133 2,685.8 28,577  
8. Due to Updated Mining/Processing Unit Costs 
Measured Mineral Resource   -11,650 0.0076 0.0068 0.074 -79.5 -865  
Indicated Mineral Resource   -33,179 0.0095 0.0081 0.118 -268.2 -3,915  
Meas/Indic Mineral Resource 0.007 -44,829 0.0090 0.0078 0.107 -347.7 -4,780 -527,161
Inferred Mineral Resource   -124,299 0.0119 0.0105 0.121 -1,300.2 -15,083  
9. 2026 Model and New Shell with Updated Mining/Processing Unit Costs 
Measured Mineral Resource   69,723 0.0202 0.0180 0.179 1,255.0 12,480  
Indicated Mineral Resource   79,271 0.0173 0.0152 0.179 1,204.9 14,190  
Meas/Indic Mineral Resource 0.007 148,994 0.0187 0.0165 0.179 2,459.9 26,670 796,406
Inferred Mineral Resource   90,564 0.0171 0.0153 0.149 1,385.6 13,494  
10. Due to Updated Prices 
Measured Mineral Resource   11,980 0.0072 0.0064 0.077 76.7 919  
Indicated Mineral Resource   33,399 0.0092 0.0078 0.115 259.8 3,838  
Meas/Indic Mineral Resource 0.005 45,379 0.0087 0.0074 0.105 336.5 4,757 485,329
Inferred Mineral Resource   117,860 0.0116 0.0103 0.115 1,219.7 13,601  
11. 2026 Model and New Shell with Updated Prices ($2900/oz Au, $35/oz Ag) 
Measured Mineral Resource   81,703 0.0183 0.0163 0.164 1,331.8 13,399  
Indicated Mineral Resource   112,670 0.0149 0.0130 0.160 1,464.7 18,027  
Meas/Indic Mineral Resource 0.005 194,373 0.0163 0.0144 0.162 2,796.5 31,426 1,281,735
Inferred Mineral Resource   208,424 0.0140 0.0125 0.130 2,605.3 27,095  
12. Due to Updated Metal Recovery Models 
Measured Mineral Resource   11,091   0.0113 0.114 125.1 1,262  
Indicated Mineral Resource   25,447   0.0108 0.117 275.6 2,967  
Meas/Indic Mineral Resource $11.09/t NSR 36,538   0.0110 0.116 400.7 4,229 -16,706
Inferred Mineral Resource   10,879   0.0105 0.090 114.1 976  
13. 2026 Model and New Shell with Updated Metal Recovery Model Cutoff  Ktons NSR ($/t) Au (oz/t) Ag (oz/t) Au (koz) Ag (koz)  
Measured Mineral Resource   92,794 39.69 0.0157 0.158 1,456.9 14,661  
Indicated Mineral Resource   138,117 32.46 0.0126 0.152 1,740.3 20,994  
Meas/Indic Mineral Resource $11.09/t NSR 230,911 35.37 0.0138 0.154 3,197.1 35,655 1,265,029
Inferred Mineral Resource   219,303 31.47 0.0124 0.128 2,719.4 28,071  

  

Page 217 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

11.6.3Reconciliation Summary

 

Table 11-19 summarizes the reconciliation results from the November 2026 and February 2025 resource models in terms of contained gold ounces. The items on the table show incremental changes due to various changes in modeling parameters as discussed above.

 

Table 11-19: Summary of Reconciliation Analysis for Contained Gold Ounces

 

Parameter Oxide/Transition (Leach) Sulfide (Mill) All Mineral Resource

Meas/Indic

Au (koz)

Inferred

Au (koz)

Meas/Indic

Au (koz)

Inferred

Au (koz)

Meas/Indic

Au (koz)

Inferred

Au (koz)

Start - February 2025 Mineral Resource 3,653 2,613 982 2,447 4,635 5,060
Due to Updated Oxide/Transition/Sulfide Domains (1,406) (905) 1,402 902 (4) (4)
Due to Updated Resource Model 414 (577) 326 (646) 740 (1,223)
Due to Updated Resource Shell 318 93 98 (17) 416 76
Due to Mining/Processing Costs (185) (276) (348) (1,300) (533) (1,576)
Due to Prices 205 294 336 1,219 541 1,513
Due to Updated Recoveries (460) (154) 401 114 (59) (40)
Cumulative Change for All Parameters (1,113) (1,525) 2,215 272 1,102 (1,253)
Final – November 2026 Mineral Resource 2,540 1,088 3,197 2,719 5,737 3,807

 

Page 218 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

12Mineral Reserve Estimates

 

12.1Mineral Reserve

 

Table 12-1 presents the Mineral Reserve estimate for the Richmond Hill Project. The Proven and Probable Mineral Reserves amount to 131.8 million tons at 0.016 oz/t gold 0.19 oz/t silver for 2.16 million ounces of contained gold and 25.4 million ounces of contained silver.

 

The Mineral Reserve estimate is based on an open-pit mine plan and mine production schedule developed by IMC. Figure 12-1 shows the final pit that is the basis for the Mineral Reserve estimate. The Mineral Reserve estimate is based on commodity prices of $2,600/oz gold and $30/oz silver. Measured Mineral Resource in the mine production schedule was converted to Proven Mineral Reserve, and Indicated Mineral Resource in the schedule was converted to Probable Mineral Reserve. The point of reference for this Mineral Reserve estimate is where the material is delivered to the process plant for crushing and stacking on the leach pad.

 

Table 12-1: Mineral Reserve

 

  Kt

NSR

($/t)

Gold

(oz/t)

Silver

(oz/t)

Gold

(koz)

Silver

(koz)

Proven Mineral Reserve 62,958 33.18 0.018 0.21 1,125.7 13,457
Probable Mineral Reserve 68,875 28.11 0.015 0.17 1,032.6 11,964
Proven/Probable Reserve 131,833 30.53 0.016 0.19 2,158.3 25,421

 

Notes:

 

1.The Mineral Reserve estimate has an effective date of November 23, 2026.
2.Columns may not sum exactly due to rounding.
3.Mineral Reserves are based on commodity prices of $2,600/oz gold and $30/oz silver.
4.Mineral Reserves are based on net smelter return (NSR) cut-offs that vary by time period to balance mine and plant production capacities (see Section 13). They range from a high of $10/t to a low of $5.80/t (internal cut-off grade).
5.For leaching NSR($/t) = $2,489 x gold (oz/t) x recovery + $28.57 x silver (oz/t) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content but average recoveries are 72.4% for gold and 18.0% for silver. For reference, the average recoveries in the blocks included in the mineral resource may not line up exactly with the blocks in the mineral reserve, resulting in slight differences in recoveries.
6.Table 12-2 accompanies this Mineral Reserve estimate and shows all relevant parameters. Table 12-3 shows recoveries.

 

The QP for this section does not believe that there are significant risks to the Mineral Reserve estimate based on infrastructure factors or environmental, permitting, legal, title, taxation, socio-economic, marketing, or political factors. There are risks to the Mineral Reserve estimate based on metallurgical sampling coverage. Cyanide soluble and sulfur assays were not done for the legacy drilling prior to Dakota Gold tenure. There are areas of the deposit where cyanide soluble and sulfur assays used to estimate recoveries are sparse. Definition of oxide versus sulfide resource and recoveries could change significantly with additional drilling and sampling. Other risks to the Mineral Reserve estimate are related to economic parameters such as prices lower than forecast, costs higher than the current estimates, and recoveries lower than forecast. The impact of these is modeled in the sensitivity study with the economic analysis in Section 19.

 

All the mineralization comprised in the Mineral Reserve estimate with respect to the Richmond Hill Project is contained on mineral titles controlled by Dakota Gold. The Mineral Reserve estimate has been prepared based on the Qualified Person’s reasoned judgment that there is a reasonable expectation that all the necessary permits, agreements and approvals will be obtained and maintained.

 

The Mineral Reserve includes allowances for mining dilution and ore loss. The QP for this section believes that reasonable amounts of dilution and loss were incorporated into the block model used for this Technical Report. Compositing assays into composites and estimating blocks with multiple composites introduces some smoothing of model grades that are analogous to dilution and ore loss effects.

 

Page 219 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

12.2Economic and Recovery Parameters

 

Table 12-2 shows the economic parameters used for the mine design and mine production scheduling. The base case commodity prices are $2,600/oz gold and $30.00/oz silver. The QP for this section believes these prices are reasonable based on current spot prices, prices used by other companies for comparable projects, and long-range consensus price forecasts prepared by various financial institutions.

 

The unit costs of $3.55/t (total ton) for mining, $4.71/t for processing and $1.09/t for G&A are based on the economic model for the July 7, 2025 IA study. The gold and silver refinery payables and the gold refining cost per ounce are also based on the IA study.

 

Table 12-3 shows the gold and silver recoveries used for this Mineral Reserve estimate based on a one-half inch crush size. The recoveries are estimated for four different ore types for four different lithology groupings. The high grade (HG) versus low grade (LG) classes are based on cyanide soluble ratio. The oxide versus transition oxidation state is based on sulfur content. There are mineral resources above the top of sulfide surface but without cyanide soluble or sulfur information. An additional ore type was defined to accommodate this material. The low-grade transition recovery for each rock type was used for this additional ore type. The recoveries and a recovered grade variable (recovery x grade) were put in the resource block model on a block-by-block basis. The recovery values in Table 12-2 of 72.4% gold and 18.0% silver are the average for the material in the Mineral Reserve estimate.

 

Due to the many different recovery values an NSR value was calculated for each block to tabulate proposed quantities of mineral reserve. The gold and silver NSR factors are calculated as follows:

 

Gold NSR Factor = ($2600 – $10.00) x 0.999 x 0.962 = $2,489/t

 

Silver NSR Factor = $30.00 x 0.99 x 0.962 = $28.57/t

 

The units are US$ per ounce. The 0.962 term represents an allowance for the 3.8% royalty.

 

The NSR for each block is calculated as:

 

NSR ($/t) = $2,489 x gold (oz/t) x au recovery + $28.57 x silver (oz/t) x ag recovery

 

Or

 

NSR ($/t) = $2,489 x recovered gold (oz/t) + $28.57 x recovered silver (oz/t)

 

Breakeven NSR cut-off is the mining + process + G&A cost of $9.35/t. Internal NSR cut-off is the process + G&A cost of $5.80/t. Internal cut-off applies to blocks that must be removed from the pit, so mining is a sunk cost.

 

Page 220 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 12-2: Economic Parameters

 

Parameter Units

Crush/

Leach

Waste
Commodity Prices
Gold Price Per Ounce (US$) 2600  
Silver Price Per Ounce (US$) 30.00  
Mining Cost Per Total Tonne
Mining Cost (US$) 3.550 3.550
Process and G&A Cost Per Ton
Processing (US$) 4.710  
G&A (US$) 1.090  
Total Process and G&A (US$) 5.800  
Plant Recovery (Averages Based on Production Schedule)
Gold (%) 72.4%  
Silver (%) 18.0%  
Treatment/Refining Payables and Costs
Gold Payable (%) 99.9%  
Silver Payable (%) 99.0%  
Gold Treatment/Refining Per Ounce (US$) 10.00  
Silver Treatment/Refining Per Ounce (US$) 0.00  
Royalties
Royalty (%) 3.8%  
NSR Factors (Applied to Recovered Grades)      
Gold NSR Factor ($/oz) 2,489  
Silver NSR Factor ($/oz) 28.57  
NSR Cutoff Grades      
Breakeven NSR Cutoff ($/t) 9.35  
Internal NSR Cutoff ($/t) 5.80  

 

Page 221 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 12-3: Process Recoveries for Heap Leaching - Crush Size P80 ½ Inch

 

Lithology

Grade

Class

Oxidation Ultimate Recovery
Gold Silver
Precambrian HG Oxide 80.1 13.2
Precambrian LG Oxide 80.1 13.2
Precambrian HG Trans 71.5 14.3
Precambrian LG Trans 67.4 19.4
Breccia HG Oxide 90.3 43.3
Breccia LG Oxide 90.3 43.3
Breccia HG Trans 84.8 23.2
Breccia LG Trans 84.8 23.2
Tertiary Intrusives HG Oxide 82.1 9.0
Tertiary Intrusives LG Oxide 80.5 10.0
Tertiary Intrusives HG Trans 84.4 8.4
Tertiary Intrusives LG Trans 70.8 14.7
Deadwood HG Oxide 70.0 18.4
Deadwood LG Oxide 70.0 9.8
Deadwood HG Trans 65.9 19.6
Deadwood LG Trans 65.6 19.6
 
  High-Grade Oxide  
CN/FA >0.82 Total S < 0.5%
Low-Grade Trans
CN/FA >0.70 Total S < 1.1%

 

Page 222 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 12-1: Final Pit

 

Page 223 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13Mining Methods

 

13.1Operating Parameters and Criteria

 

The Richmond Hill mine will be a conventional open pit mine. Mine operations will consist of drilling holes with large diameter (9.25 in) blast holes, blasting with either explosive slurries or ANFO (ammonium nitrate/fuel oil) depending on water conditions, and loading the ore onto large off-road trucks with large hydraulic shovels and wheel loaders. Ore will be delivered to the primary crusher where it will be crushed to a nominal one-half inch size and stacked on the leach pad with mine trucks. Waste rock will be delivered to various Waste Rock Management Facilities (WRMF), many of which are backfilling of the various pits. There will also be a small low-grade stockpile facility to store marginal ore material for processing at the end of commercial pit operations and a stockpile for transition ore that will not be placed on the leach pad due to sulfur content. There will be a fleet of track dozers, rubber-tired dozers, motor graders, and water trucks to maintain the working areas in the pit, WRMF areas, stockpiles, and the roads.

 

The mine plan was developed to deliver ore to the primary crusher at the following rates:

 

·30,000 tons per day or 10.95 million tons during Year 1,
·38,000 tons per day or 13.87 million tons during Year 2, and
·45,000 tons per day or 16.42 million tons per year for Year 3 and after.

 

The peak mining rate, ore plus waste, will be about 40 million tons per year or about 109,600 tons per day during Years 2 and after. The commercial life of the project contemplated in this PFS is about 9 years after a nine-month to one-year preproduction period with Breccia opportunity to revise resources for the FS.

 

The methodology used for mine planning to define the economics for the PFS includes:

 

·Define assumptions for the economic parameters;
·Input geometric parameters and constraints;
·Run pit optimizations to determine the ultimate pit limits and sequencing;
·Define pit design parameters and design mining phases;
·Produce mine and plant production schedules;
·Identify waste-rock storage locations;
·Define mining equipment and personnel requirements;
·Estimate mine capital and operating costs.

 

Page 224 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.2Geotechnical Considerations

 

Figure 13-1 shows the exposed lithology within the pit design used in the Initial Assessment (IA) and the locations of the cross sections analyzed for the overall slope stability analysis. The figure provides geologic and spatial context for the geotechnical domains, rock strength and rock mass properties, bench-scale analysis and recommended inter-ramp angles, and overall slope stability analysis described in the following sections.

 

13.2.1Geotechnical Domains

 

Structural domain boundaries were initially explored geospatially and by potential fault boundaries that may intersect the Richmond Hill pit surface (Figure 13-1). The data within each potential structural domain were combined and compared for several different scenarios. Although some trends could be identified, the current dataset is insufficient to definitively determine these boundaries. Grouping the discontinuity data by lithology produced notable differences, so geotechnical domains were delineated by rock type: TBX, Tsl, Tdk, PZU and CDW (combined), PGN, and PFF and PEF (combined). Individual faults and structural boundaries could not be defined with the current data. The Tdk domain has limited, narrow exposure, so separate slope angles for it cannot be implemented in a mine plan.

 

Geological sets were identified for each rock group domain. It should be noted that the limited and narrow exposure of the Tertiary Dykes Domain prevented detailed structural analysis as minor slope angle fluctuations across this thin domain cannot be implemented into a practical mine plan. However, geologic sets were still identified to assist in the overall slope stability analysis.

 

For the bench-scale analysis, Tsl was analyzed with PZU and CDW because it is interbedded within them. The structural data were sorted into 40 ft vertical composites, similar to bench heights, and the critical geologic sets for each domain were identified. The core sets predict bedding dipping into or apparently into the pit walls, with the affected walls being the northeast and east (Tsl, PZU, and CDW), the east and southwest (PGN), and the north and southeast (PFF and PEF).

 

The oriented core data predicts bedding dips either into or apparently into the design pit surfaces. The creation of these domains enables the elimination of blind zones in individual stereonets, which arise from the orientation of the drillholes relative to the wall and from structures aligned in the same direction. This approach provides a more comprehensive representation of the structural information obtained from the drillholes within the analyzed domain.

 

13.2.2Rock Strength and Rock Mass Properties

 

The CNI method is an empirical rock-mass strength estimation criterion based on quantitative input parameters (Cylwik et al., 2022). The premise of the method is to reduce the intact rock strength to account for the influence of discontinuities. The shear strength of the intact rock and natural fractures are used as direct input parameters for the method and are measured with laboratory testing. The rock-mass strength is estimated by combining the intact and fracture strength with a weighting factor, r, that is based on the degree of fracturing within the rock mass as measured by either RQD or fracture frequency. A cohesion adjustment parameter that typically varies from 0.25 to 0.5 is used to account for disturbance, scale effects, blasting, or joint continuity. All input parameters except for the cohesion adjustment are quantifiable with direct measurements, and therefore the process is repeatable between practitioners. Since the method combines the intact rock strength with the fracture strength, weighted by the degree of rock-mass fracturing, the rock-mass strength can never drop below the fracture strength nor exceed the intact strength.

 

Laboratory testing was performed at the CNI laboratory on 56 triaxial compression, 67 uniaxial compression, 78 Brazilian disk tension, and 24 small-scale direct shear tests (19 of the latter on sawcut samples from 1986), plus classification tests. Only testing completed by August 13, 2026 was included, and additional tests on 29 samples are ongoing. Intact strengths were derived with lower-bound regressions and fracture strengths from direct shear tests on natural fractures. Where testing was limited, comparable units were grouped, and TBX and CDW direct shear results were used as proxies for PFF and PEF.

 

Page 225 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.2.2.1Anisotropic Strengths utilized in Stability Analysis

 

Anisotropic rock strength properties were applied to all geotechnical formations to account for the influence of persistent geological structures on slope stability. Bedding, foliation, and other discontinuities may create preferential planes of weakness, particularly when their orientations are unfavorable relative to the IA pit wall geometry. Structural data from televiewer surveys were evaluated to identify dominant joint sets and assess their potential influence on slope stability.

 

Anisotropic shear strength is expressed as the percentage of intact rock bridges along a potential shear surface. This percentage represents the proportion of the failure surface that passes through intact rock rather than along discontinuities and is influenced by joint persistence, spacing, and orientation relative to the assumed failure plane.

 

Vector rotations are used to account for the three-dimensional orientation of joint sets by calculating their apparent dip and dip direction relative to the assumed shear surface. The resulting percentage of intact rock provides an indication of discontinuity persistence and its influence on shear resistance. Lower percentages indicate that a greater proportion of the potential failure surface is controlled by discontinuities, reducing overall shear resistance, whereas higher percentages indicate greater rock bridging and a larger contribution from intact rock strength.

 

As described by C (2021), these parameters are combined to estimate the reduction in rock mass shear strength as the orientation of a potential failure surface approaches the apparent dip of dominant discontinuity sets. The resulting anisotropic strength parameters provide a directional representation of rock mass shear resistance and account for the influence of geological fabric on potential slope failure mechanisms.

 

13.2.3Bench-Scale Analysis and Inter-Ramp Angles

 

The site visit observations and the structural data indicated that the controlling stability mechanism at Richmond Hill is at the bench scale, driven by the orientation of bedding and cross joints. CNI therefore performed kinematic bench-scale analyses to evaluate the reliability of bench-face angles (BFAs) and the probability of plane-shear and wedge failures, based on the geometry of the geologic sets relative to each wall orientation and the fracture shear strengths.

 

Backbreak analyses were run for wall orientations in 30-degree increments for each domain, targeting 80 percent reliability. Wall orientations with adequate data and reasonable rock mass and strength characteristics were analyzed directly. Orientations with sparse data were reviewed individually for the probability of occurrence, orientation, and likelihood of daylighting within the design, and the recommendations were adjusted accordingly.

 

The recommended design criteria at Richmond Hill are 40 foot tall benches, a 70-degree bench-face angle as requested by Dakota Gold, and an 80 percent reliability of maintaining the minimum catch-bench width of 23 feet, calculated as 0.2 × bench height + 15 ft (Ritchie, 1963). The maximum IRA that meets this width is 46 degrees. Discontinuity lengths were assigned from outcrop mapping (10 ft for steeper and 20 ft for shallower sets), and structural data are limited for all rock types, so the results carry uncertainty. The Tertiary sills controlled the IRA results and recommendations.

 

The recommended IRAs are in Table 13-1.

 

Page 226 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-1: Recommended IRAs by Domain and Wall Dip Direction

 

Domain Mine
Planning
(Up Dip)
Wall DDR
(Down Dip)
IRA (º) BFA (º) Catch-Bench
Width (ft)
Bench Height
(ft)
TBX 000–030° 180–210º 45 70 25.4 40
030–360° 210–180º 46 70 24.1 40
Tsl, PZU, CDW 000–030° 180–210º 43 70 28.3 40
030–120° 210–300º 44 70 26.9 40
120–270° 300–090º 46 70 24.1 40
270–360° 090–180º 45 70 25.4 40
PGN 000–060° 180–240º 46 70 24.1 40
060–120° 240–300º 44 70 26.9 40
120–180° 300–360º 46 70 24.1 40
180–300° 000–120º 44 70 26.9 40
300–360° 120–180º 46 70 24.1 40
PFF, PEF 000–030° 180–210º 44 70 26.9 40
030–120° 210–300º 46 70 24.1 40
120–180° 300–360º 44 70 26.9 40
180–330° 000–150º 45 70 25.4 40
330–360° 150–180º 44 70 26.9 40

 

Notes: 40 ft bench height, 70º bench-face angle, 80% reliability. Transitions between angles should be made within the sector having the steeper angle. Tdk is designed with the host-domain recommendations.

 

13.2.4Overall Slope Stability

 

Eleven cross sections (RH01 through RH11), selected for wall height, wall orientation, and expected geologic conditions, were analyzed with Rocscience Slide2 using two-dimensional limit-equilibrium analysis (Spencer’s method) and the anisotropic rock mass strengths (Figure 13-1). The groundwater surface, provided by Geosyntec for August 2026 conditions, ranges from approximately 5,330 to 5,800 ft and is above the pit floor by approximately 100 to 360 ft, with 3 to 9 benches (40 ft high) below it. The analyses used this surface without depressurization. The only structural information for major faults was surface-mapped traces, which could not be modeled in three dimensions, so the influence of major faults was not evaluated. The DAC for overall stability is a minimum FOS of 1.2. All sections met it at the design IRA of 45º and at the recommended IRAs (Table 13-2), so no slope laybacks or dewatering scenarios were required. The smallest margins are at RH02 and RH01.

 

Table 13-2: Overall Slope Stability Results

 

Section Wall DDR (º) Design IRA (º) Design IRA FOS Recommended IRA (º) Recommended
IRA FOS
RH01 040 45 1.59 46 1.37
RH02 255 45 1.25 44 1.27
RH03 259 45 1.46 44 1.45
RH04 160 45 2.32 45 2.32
RH05 341 45 1.64 44 1.49
RH06 313 45 4.37 44 4.50
RH07 026 45 2.79 44 3.41
RH08 127 45 1.98 46 1.87
RH09 121 45 3.94 46 3.80
RH10 003 45 1.53 44 1.58
RH11 000 45 2.17 45 2.17

 

Page 227 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.2.5Conclusions

 

CNI evaluated the Richmond Hill pit design for overall and bench-scale slope stability. The principal findings are as follows:

 

·Overall slope stability: All 11 analyzed sections met the DAC of a minimum FOS of 1.20 under the August 2026 groundwater conditions identified from analyses presented in Section 13.8. The lowest FOS values were 1.25 at the 45° design interramp slope angle (ISA) and 1.27 at the recommended ISAs, both at section RH02 (Figure 13-1). Slope laybacks and dewatering scenarios were not required to meet the criterion.

 

·Groundwater conditions: Groundwater levels are approximately 100 to 360 ft above the pit floor, placing the lower wall benches below the interpreted water table. Analyses used the interpreted groundwater surface without depressurization. The smallest stability margins above the DAC occur at sections RH02 and RH01.

 

·Bench-scale stability: Bench-scale rockfall criteria, primarily influenced by bedding and cross-joint orientations, control the achievable slope angles.

 

·Recommended slope design: For 40-ft benches with a 70° bench-face angle (BFA), the maximum ISA that satisfies the minimum catch-bench width criterion is 46°. Recommended ISAs range from 43° to 46°, depending on geotechnical domain and wall orientation (Table 13-1), with Tertiary sills (Tsl) governing the lowest recommended angles.

 

·Geotechnical data remains limited across all rock types, and uncertainty remains in the interpreted structural sets and discontinuity lengths. Accordingly, the results are considered appropriate for the pre-feasibility level of study.

 

13.2.6Recommendations

 

CNI recommends the following:

 

·Use the interramp slope angles and bench configurations in Table 13-1 and the design rosettes (Figure 13-2 through Figure 13-5) for mine planning. Make transitions between slope angles within the sector having the steeper angle.

 

·Review any new or revised pit design for compliance with the design criteria before implementation, and perform additional stability analyses where slope geometry, geology, structure, or groundwater conditions change significantly.

 

·Implement controlled wall-control blasting, such as trim, buffer, or presplit blasting where warranted, to limit backbreak and maintain the recommended catch-bench widths.

 

·Conduct periodic bench-face angle surveys and slope performance audits to confirm that the recommended bench geometries are being achieved.

 

13.2.7Future Considerations

 

The following work would improve confidence in the slope design for future studies:

 

·Lithology, structural, and hydrology models: Reconcile and update the lithology model with new drilling and mapping. Develop a three-dimensional structural model beyond the surface-mapped fault traces. Update the groundwater model with new hydrogeological data, evaluate the sensitivity of the walls to groundwater, and consider depressurization requirements.

 

·Additional geotechnical drilling: Increase coverage in areas lacking data, using oriented core and borehole imaging, and include holes at orientations that sample steeply dipping structures.

 

·Laboratory testing: Expand intact and discontinuity strength testing for TBX, Tdk, Tsl, CDW, PZU, PGN, PFF, PEF, the Precambrian unconformity, and fault zones. Remaining direct shear tests will be reported in the Feasibility-level data collection laboratory results memorandum.

 

Page 228 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

·Weathered and altered zones: Characterize their extent, thickness, and strength. Rock fabric mapping: Map the first benches to confirm fracture characteristics, replace the assigned discontinuity lengths with measured values, and determine whether the recommended angles can be steepened.

 

·Test bench: Blast and excavate a test bench approximately 40 feet high and more than 20 feet long to evaluate performance under the proposed design parameters. Assess blast energy absorption and resulting rock mass damage that could contribute to crest loss. Use the exposed bench to map rock fabric, collect laboratory samples, and evaluate the achievability of the recommended design parameters.

 

Page 229 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-1: 2026 2DLE Overall Slope Stability Analysis Section Location Map with Exposed Lithology

 

Page 230 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-2: 2026 Tertiary Breccia Recommended Design Rosette

 

Page 231 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 13-3: 2026 Tertiary Sills, Paleozoic Undifferentiated, Cambrian Deadwood Formation Recommended Design Rosette

 

Page 232 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 13-4: 2026 Precambrian Greenstone Formation Recommended Design Rosette

 

Page 233 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 13-5: 2026 Precambrian Flagrock and Ellison Formation Recommended Design Rosette

 

Page 234 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.3Mining Phases

 

13.3.1Pit Optimization

 

The mine phase designs were guided by a series of Lerchs-Grossman (LG) pit optimization runs. The LG runs were done at gold prices from $500/oz to $3500/oz in $100/oz increments. A NSR cutoff was used to classify resources into ore and waste due to variable gold and silver recoveries. Section 12.2 of this report has a detailed description of the economic parameters, metal recovery estimates, and calculation of NSR values for each block in the resource model. The base case prices used for design of the final pit were $2600/oz gold and $30/oz silver. The Hexagon LG program was used for the runs. Only measured and indicated mineral resources were considered for pit design. Inferred mineral resources were assumed to be waste.

 

13.3.2Road and Ramp Design

 

Roads in the pit were designed at a width of 100 ft and at a maximum grade of 10%. The 100 ft width is to accommodate trucks of the 150-ton class such as the Caterpillar 785 or Komatsu HD1500. The trucks have an operating width of 24.75 ft. For two-way access, the road width needs to be about 3.5 times the truck width. MSHA requirements specify that safety berms be maintained at least ½ the diameter of the tires of the largest self-propelled mobile equipment which usually travels the roadway. Half the axle height of a 995 front-end loader is approximately 6 ft.

 

Assuming the safety berms have a slope of 1.5 horizontal to 1 vertical, the berm width is about 18 ft.

 

Roads outside of the pit will require two berms and design widths and should be designed with a width of 115 to 120 ft for the 150-ton trucks. There are some short single lane haul roads at the bottom of some pits. These are about 65 ft wide, two times the operating width of the truck, plus the berm.

 

13.3.3Mining Phases

 

Fifteen mining phases were designed for the Richmond Hill project. These are shown in Figure 13-6. Mining phases 1 and 2 are in the northeast. Phases 3A and 3B, 4, 5, and 6 extend the northern mining area to the west. Phases 7A, 7B, 7C, 8, 9, 10, 11, and 12 are in the south. Phase 8 is in the area mined by the original St. Joe/Bond Gold mining.

 

Additional end of year maps in Section 13.4 shows the development of the pits through the life of mine. Many of the pits will be backfilled, as discussed in Section 13.5.

 

Page 235 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-6: Mining Phases

 

13.4Production Schedule

 

The production schedule was developed using a dynamic programming algorithm developed by IMC. Mining phase data by bench with tonnage and grade tabulations at many cut-off grades is the main data. Ore production requirements by year are provided along with the economic data. Given peak total material movements by year the program solves for cut-off grade and mining sequence. The scheduling trials are based on looking at the results at various peak mining rates. Cut-off grade varies by year to balance the mine and plant production rates.

 

Only measured and indicated mineral resources are used for this production schedule; inferred mineral resources are treated as waste.

 

Table 13-3 shows the mining schedule by years. The upper section of the table shows direct process feed by time-period. This is material that is processed the same year it is mined. This amounts to 118.8 million tons at 0.0164 oz/t gold and 0.181 oz/t silver, with an average NSR value of $30.65/t. This produces about 1.95 million ounces of contained gold and 21.4 million ounces of contained silver. The production schedule shows 3,159 ktons of direct feed mined during preproduction, 10,950 ktons of direct feed during Year 1, 13,870 ktons during Year 2, and 16,425 ktons per year for Years 3 through 7.

 

Page 236 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

A NSR cut-off was used to tabulate direct feed material by year. The NSR cut-off ranges from $10.00/t for preproduction and Year 1 to $5.80/t (internal cut-off) for Year 8. The cut-off is relatively high in early years and tends to decline during the mine life.

 

Low-grade material is between a NSR cut-off of $7.00/t and the operating cut-off grade for the year. This reflects a $1.20/t allowance for stockpile rehandle cost. This amounts to 1.35 million tons at 0.0044 oz/t gold and 0.072 oz/t silver. This equates to an NSR value of $8.44/t. This amounts to 5,900 ounces of contained gold and 98,000 ounces of contained silver.

 

The transition material mined is stockpiled during the mine life and processed at the end of mining. This is due to the slightly elevated sulfur content of the material. The transition material amounts to 11.7 million tons at 0.0176 oz/t gold and 0.330 oz/t silver. This equates to an NSR value of $31.83/t with 206,000 contained gold ounces and 3.88 million contained silver ounces.

 

The bottom of Table 13-3 shows that the total material in the pit is 286.8 million tons. The peak annual material movement for the schedule is 40 million tons per year from Year 2 to Year 6. Preproduction is 6 million tons and Year 1 is 30 million tons. Waste is 155.0 million tons with low-grade and transition counted as ore. The average waste ratio is 1.18 to 1. The vertical advance rate for the schedule was allowed to go up to about 16 benches per phase per year (20 ft benches). This is a higher vertical advance rate than desired, but it is assumed the bench height will be increased to at least 30 ft for the Feasibility Study so the vertical advance rate will be more reasonable.

 

Table 13-4 shows a proposed plant production schedule. It is similar to the mine production schedule except the low-grade stockpile is included in Year 8 production and transition material is included in Year 8 and 9 production. Total resource processed is 131.8 million tons at 0.0164 oz/t gold and 0.193 oz/t silver. This amounts to 2.16 million ounces of contained gold and 25.4 million ounces of contained silver. Recoverable metal amounts to 1.56 million ounces of gold and 4.57 million ounces of silver. Average recoveries are 72.4% gold and 18.0% silver, considering the mix of rock types and ore types. The table depicts recoverable gold and silver based on the time period it is placed on the leach pad. Table 14-3, Processing and Recovery Methods, shows the forecast for metal produced by year.

 

The mine production schedule includes allowances for mining dilution and ore loss. The QP for this section believes that reasonable amounts of dilution and loss were incorporated into the block model used for this Technical Report. Compositing assays into composites and estimating blocks with multiple composites introduces some smoothing of model grades that are analogous to dilution and ore loss effects.

 

Figure 13-7 through Figure 13-14 show the mine advance by year. Year 1 mining activity (Figure 13-7) is in mining phases 1 and 2 in the north and also phase 7A in the south. The mine will typically operate in three or four phases during each year to maintain production requirements.

 

Year 2 mining activity (Figure 13-8) continues in phases 1, 2, and 7A and commences in phase 7B. Mining phases 1 and 7A are completed during the year.

 

Year 3 mining activity (Figure 13-9) continues in phases 2 and 7B and commences in phases 3A and 4. Phases 2 and 7B are completed during the year.

 

Year 4 mining activity (Figure 13-10) continues in phases 3A and 4 and commences in phase 5. Phases 3A and 4 are completed during the year.

 

Year 5 mining activity (Figure 13-11) continues in phase 5 and commences in phases 3B, 6, and 7C.

 

Year 6 mining activity (Figure 13-12) continues in phases 3B, 5, 6, and 7C and commences in phase 8. Phase 5 and 7C are completed during the year.

 

Page 237 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Year 7 mining activity (Figure 13-13) continues in phases 3B, 6, and 8. Phases 3B and 6 are completed during the year.

 

Year 8 mining activity (Figure 13-14) completes mining in phases 8, 9, 10, 11, and 12. The final four phases are small.

 

Note that actual end of year mining configurations will generally not look like these figures due to significant concurrent backfilling of the pit.

 

Page 238 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-3: Mine Production Schedule

 

  (Units) TOTAL PP Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
DIRECT FEED:
NSR Cut-off ($/t)   10.00 10.00 6.25 7.00 6.00 6.75 6.00 9.25 5.80  
Ktons (kt) 118,756 3,159 10,950 13,870 16,425 16,425 16,425 16,425 16,425 8,652  
NSR ($/t) 30.65 36.62 35.74 38.32 29.17 22.14 24.05 32.74 39.93 19.69  
Gold (oz/t) 0.0164 0.0197 0.0182 0.0192 0.0156 0.0123 0.0128 0.0180 0.0224 0.0100  
Silver (oz/t) 0.181 0.226 0.329 0.161 0.216 0.149 0.096 0.170 0.205 0.135  
Sulfur (%) 0.101 0.094 0.119 0.097 0.146 0.135 0.134 0.065 0.034 0.076  
CNAu Ratio (ratio) 0.514 0.308 0.594 0.529 0.643 0.550 0.685 0.438 0.221 0.522  
Recovered Gold (oz/t) 0.0119 0.0142 0.0137 0.0150 0.0113 0.0086 0.0095 0.0128 0.0156 0.0076  
Recovered Silver (oz/t) 0.032 0.045 0.057 0.031 0.035 0.025 0.017 0.030 0.036 0.030  
Contained Gold (koz) 1,946.4 62.2 199.3 266.3 256.2 202.0 210.2 295.7 367.9 86.5  
Contained Silver (koz) 21,449 714 3,603 2,233 3,548 2,447 1,577 2,792 3,367 1,168  
LOW GRADE STOCKPILE:
NSR Cut-off ($/t)   7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00  
Ktons (kt) 1,349 130 664           555    
NSR ($/t) 8.44 8.86 8.57           8.18    
Gold (oz/t) 0.0044 0.0045 0.0043           0.0044    
Silver (oz/t) 0.072 0.069 0.069           0.077    
Sulfur (%) 0.032 0.010 0.033           0.037    
CNAu Ratio (ratio) 0.478 0.312 0.721           0.226    
Recovered Gold (oz/t) 0.0032 0.0034 0.0033           0.0031    
Recovered Silver (oz/t) 0.013 0.017 0.014           0.012    
Contained Gold (koz) 5.9 0.6 2.9 0.0 0.0 0.0 0.0 0.0 2.4    
Contained Silver (koz) 98 9 46 0 0 0 0 0 43    
TRANSITION RESOURCE STOCKPILE:
NSR Cut-off ($/t)   7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00 7.00  
Ktons (kt) 11,728 524 1,268 1,040 1,917 3,133 2,672 675 186 313  
NSR ($/t) 31.83 43.58 43.34 44.57 33.14 27.23 25.61 29.82 33.75 17.43  
Gold (oz/t) 0.0176 0.0238 0.0229 0.0228 0.0184 0.0155 0.0147 0.0165 0.0185 0.0099  
Silver (oz/t) 0.330 0.744 0.887 0.399 0.317 0.231 0.114 0.216 0.577 0.179  
 Sulfur (%) 0.713 0.750 0.693 0.741 0.698 0.729 0.731 0.673 0.603 0.580  

 

Page 239 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  (Units) TOTAL PP Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9
CNAu Ratio (ratio) 0.819 0.835 0.802 0.793 0.827 0.803 0.853 0.825 0.790 0.755  
Recovered Gold (oz/t) 0.0120 0.0158 0.0154 0.0170 0.0126 0.0104 0.0100 0.0115 0.0123 0.0066  
Recovered Silver (oz/t) 0.063 0.146 0.173 0.079 0.060 0.043 0.021 0.041 0.113 0.035  
Contained Gold (koz) 206.0 12.5 29.0 23.7 35.3 48.6 39.3 11.1 3.4 3.1  
Contained Silver (koz) 3,875 390 1,125 415 608 724 305 146 107 56  
TOTAL MATERIAL AND WASTE:
Total Material (kt) 286,825 6,000 30,000 40,000 39,970 40,029 39,436 40,000 26,086 25,304  
Direct Feed Resource (kt) 118,756 3,159 10,950 13,870 16,425 16,425 16,425 16,425 16,425 8,652  
Low Grade Resource (kt) 1,349 130 664 0 0 0 0 0 555 0  
Transition Resource Stockpile (kt) 11,728 524 1,268 1,040 1,917 3,133 2,672 675 186 313  
Waste (kt) 154,992 2,187 17,118 25,090 21,628 20,471 20,339 22,900 8,920 16,339  
Waste Ratio (LG, Trans as Ore) (none) 1.18 0.57 1.33 1.68 1.18 1.05 1.07 1.34 0.52 1.82  
Mine Rehandle (kt) 13,077                 7,773 5,304 

 

Note: Many blocks do not have sulfur or CNAu ratio values and these are averaged in as 0. See results by ore type below.

 

Page 240 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-4: Plant Production Schedule

 

  (Units) TOTAL PP Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10
TOTAL PLANT FEED: 
NSR Cut-off ($/t)   10.00 10.00 6.25 7.00 6.00 6.75 6.00 9.25 5.80 7.00  
Ktons (kt) 131,833 3,159 10,950 13,870 16,425 16,425 16,425 16,425 16,425 16,425 5,304  
NSR ($/t) 30.53 36.62 35.74 38.32 29.17 22.14 24.05 32.74 39.93 21.44 38.23  
Gold (oz/t) 0.0164 0.0197 0.0182 0.0192 0.0156 0.0123 0.0128 0.0180 0.0224 0.0115 0.0206  
Silver (oz/t) 0.193 0.226 0.329 0.161 0.216 0.149 0.096 0.170 0.205 0.151 0.503  
Sulfur (%) 0.155 0.094 0.119 0.097 0.146 0.135 0.134 0.065 0.034 0.322 0.714  
CNAu Ratio (ratio) 0.540 0.308 0.594 0.529 0.643 0.550 0.685 0.438 0.221 0.636 0.813  
Recovered Gold Grade (oz/t) 0.0119 0.0142 0.0137 0.0150 0.0113 0.0086 0.0095 0.0128 0.0156 0.0083 0.0142  
Recovered Silver Grade (oz/t) 0.035 0.045 0.057 0.031 0.035 0.025 0.017 0.030 0.036 0.031 0.097  
Contained Gold Metal (koz) 2,158.3 62.2 199.3 266.3 256.2 202.0 210.2 295.7 367.9 189.3 109.1  
Recoverable Gold Metal (koz) 1,563.5 44.9 150.0 208.1 185.6 141.3 156.0 210.2 256.2 135.8 75.4  
Contained Silver Metal (koz) 25,421 714 3,603 2,233 3,548 2,447 1,577 2,792 3,367 2,475 2,665  
Recoverable Silver Metal (koz) 4,566 142 624 430 575 411 279 493 591 504 517  
Gold Recovery (%) 72.4% 72.1% 75.3% 78.1% 72.4% 69.9% 74.2% 71.1% 69.6% 71.7% 69.1%  
Silver Recovery (%) 18.0% 19.9% 17.3% 19.3% 16.2% 16.8% 17.7% 17.6% 17.6% 20.4% 19.4%  

 

Note: Many blocks do not have sulfur or CNAu ratio values and these are averaged in as 0. See results by ore type.

 

Page 241 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-7: End of Year 1

 

Page 242 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-8: End of Year 2

 

Page 243 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-9: End of Year 3

 

Page 244 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-10: End of Year 4

 

Page 245 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-11: End of Year 5

 

Page 246 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-12: End of Year 6

 

Page 247 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-13: End of Year 7

 

Page 248 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-14: End of Year 8 (Final Pit)

 

Page 249 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.5Waste Rock Storage Facilities

 

Several waste rock storage facilities (WRSF) were designed to accommodate Richmond Hill waste rock. Figure 13-15 shows the facilities. WRSF01 and WRSF02 are north of the pit and have a combined capacity of about 37.7 million tons. Most of the preproduction and Year 1 and 2 waste will go to these facilities. The remaining waste storage areas are pit backfill areas designated as BF01 through BF08. The combined capacity of all the facilities is 162.3 million tons, slightly more than the 155.0 million waste tons in the mine production schedule. There is also a stockpile area with a capacity of about 11.8 million tons to store transition material encountered during mining.

 

The waste storage areas were designed to be placed in 40 ft lifts, with a dump face angle of 34° and a 60 ft wide catch bench between lifts, resulting in a final 3H:1V (18.4°) slope angle that is adequate for a final reclaimed slope angle.

 

Page 250 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 13-15: Waste Rock Storage Facilities

 

Page 251 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.6Equipment and Personnel Requirements

 

Mine major equipment requirements were sized and estimated on a first principles basis based on the mine production schedule, the mine work schedule, and estimated equipment productivity rates. The mine equipment estimate is based on owner operation and assumes a well-managed mining operation with a well-trained labor pool. The mine equipment will perform the following duties:

 

·Developing access roads from the mine to the crusher, waste storage areas, low grade and transition ore stockpile, etc.,

 

·Mining and transporting ore to the crusher or low-grade stockpiles,

 

·Mining and transporting transition ore to the transition stockpile,

 

·Mining and transporting waste to the appropriate waste storage areas,

 

·Hauling crushed ore from the crusher bin to the leach pad for stacking,

 

·Maintaining the haul roads and various storage areas.

 

The peak equipment fleet consists of:

 

·Five rotary blast hole drills capable of drilling 9.25-inch diameter holes,

 

·One hydraulic shovel with 28.8 cubic yard bucket capacity,

 

·Two-wheel loaders with 36 cubic yard bucket capacity,

 

·Twenty-three trucks of approximate 150-ton capacity.

 

·Four track dozers of the Caterpillar D10 class (603 hp),

 

·One wheel dozer of the Caterpillar 834 class (562 hp),

 

·Two motor graders, Caterpillar 18 class (304 hp),

 

·Two water trucks, 18,000 to 20,000 gallon class,

 

·One small excavator, and

 

·One small drill capable of drilling 5-inch holes.

 

The number of owner salaried staff personnel (mine supervision) are shown on Table 13-5. These include mine operation supervision and mine maintenance supervision. There will also be a mine technical service staff of mining engineers, geologists, surveyors, and technicians, etc. These positions are included in site G&A personnel.

 

Owner hourly labor requirements are shown on Table 13-6. These are shown by mine operations and maintenance personnel. Due to continuous operation, there may be a significant amount of pay at overtime rates for hourly employees.

 

Page 252 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-5: Mine Supervisory Labor Requirements

 

Job Description Year
PP 1 2 3 4 5 6 7 8 9
Mine Operations: 
Mine Manager 1 1 1 1 1 1 1 1 1 1
Mine Superintendent 1 1 1 1 1 1 1 1 1 1
Drilling/Blasting Foreman 1 1 1 1 1 1 1 1 1 0
Shift Foreman 4 4 4 4 4 4 4 4 4 4
Administrative Assistant/Clerk 1 1 1 1 1 1 1 1 1 1
Dispatcher 0 4 4 4 4 4 4 2 2 0
Equipment Trainer 1 1 1 1 1 1 1 1 1 0
Mine Operations Total 9 13 13 13 13 13 13 11 11 7
Mine Maintenance: 
Maint. Superintendent 1 1 1 1 1 1 1 1 1 1
Maint. Shift Foreman 4 4 4 4 4 4 4 4 4 4
Maint. Planner 1 2 2 2 2 2 2 1 1 1
Maint. Assistant/Clerk 1 1 1 1 1 1 1 1 1 1
Maint. Trainer 1 1 1 1 1 1 1 0 0 0
Mine Maintenance Total 8 9 9 9 9 9 9 7 7 7
TOTAL PERSONNEL 17 22 22 22 22 22 22 18 18 14

 

Note: Mine Technical Services Personnel (Mining Engineers, Geologists, Surveyors, etc.) are included in Site G&A.

 

Page 253 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-6: Mine Hourly Labor Requirements

 

Job Description Year
PP 1 2 3 4 5 6 7 8 9
Mine Operations: 
Drill Operators 4 8 12 12 12 12 12 8 8 0
Shovel/Loader Operators 4 10 12 12 12 12 12 8 12 4
Truck Operators 9 44 72 68 60 60 77 48 40 12
Support Equipment Operators 20 32 32 32 32 32 32 16 16 12
Blasting Personnel 2 4 6 6 6 6 6 4 4 0
Mine Operations Total 39 98 134 130 122 122 139 84 80 28
Mine Maintenance: 
Mechanics/Helpers/Welders 14 43 58 56 53 53 60 36 34 12
Electrician 1 2 2 2 2 2 2 1 1 1
Fuel/Lube Technician 2 8 8 8 8 8 8 4 4 2
Tire Men 2 8 8 8 8 8 8 4 4 2
Mine Maintenance Total 19.3 60.8 76.0 73.8 71.3 71.0 77.8 45.2 42.7 16.5
TOTAL PERSONNEL 58.3 158.8 210.0 203.8 193.3 193.0 216.8 129.2 122.7 44.5
Maintenance/Operations Ratio 0.50 0.62 0.57 0.57 0.58 0.58 0.56 0.54 0.53 0.59

 

Page 254 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.7Hydrological Considerations

 

13.7.1Pit Dewatering

 

Geofirma Engineering Ltd. (Geofirma) was retained to assist with hydrogeological aspects of an S-K 1300-compliant Pre-Feasibility Study (PFS) for the Richmond Hill Gold Project (the Project).

 

At this stage of the project, only meteoric water is considered in the open pit dewatering estimates. This is because groundwater inflows will be proactively managed and removed ahead of mining activities encountering the water table. Through targeted dewatering strategies including pumping from perimeter wells, groundwater will be effectively cleared from the pit zones prior to active mining.

 

The Black Hills Area is characterized by a cool continental climate, with cold winters, warm summers, and moderate precipitation that increases with elevation. Mean annual precipitation typically ranges from 20 to 30 inches, with higher values observed in the central upland areas (Driscoll et al., 2002). RESPEC completed a review of the climatic conditions of the Richmond Hill Gold Project and has estimated mean annual precipitation at 29 inches per year (RESPEC, 2025a).

 

Pit dewatering sumps are planned to be installed within the deepest portions of the pit, with mine dewatering completed in advance of the bench excavations. Outside of the pit, a series of engineered drainage channels, sumps, and perimeter ditches will control contact versus non-contact water and pump to the WTP (Water Treatment Plant) for treatment and then discharge.

 

13.7.1.1Groundwater Considerations

 

Geofirma Engineering Ltd. (Geofirma) was retained by RESPEC to assist with hydrogeological aspects of an S-K 1300 compliant Pre-Feasibility Study (PFS) for the Richmond Hill Gold Project (the Project).

 

Conceptually, the Richmond Hill site is situated near the apex of the Precambrian igneous and metamorphic rock core, where both the Madison Limestone (also referred to as Pahasapa Limestone) and Deadwood aquifers are exposed at surface. These aquifers are likely to contribute to headwater flow via natural springs which may sustain stream baseflow during dry seasons. Further east of the Project area, the Deadwood and Madison Limestone aquifers are confined at depth and provide a potable drinking water source for residents throughout western South Dakota.

 

Table 13-7 indicates a preliminary depiction of the main Hydrostratigraphic Units (HSUs) within the Project area using publicly available data. Hydrogeology information for each major formation in the Richmond Hill Area was summarized from publicly available regional groundwater studies as well as studies completed for mines located near the Project. Site specific data was not available for review but is likely to be collected during additional study phases of the Project.

 

Page 255 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-7: Estimated HSUs within the Project Area

 

Formation Description Hydrological Characteristics Notes
Hydraulic
Conductivity (ft/s)
Effective Porosity (%)
Alluvium/Colluvium Appreciable thickness of unconsolidated material within topographic depressions Unknown 0.3 (Estimate) Locally saturated and likely to be conductive. Occurrence is discontinuous throughout the Project.
Precambrian (Greenstone, Flagrock, Ellison) Basement complex metamorphosed volcanic and sedimentary units. Dependent on the encounter of structural features. 0.01
(Driscoll et al., 2002)
Likely an aquitard unit, with occasional permeability associated with structural features.
Deadwood Formation Basal sandstone, conglomerate, and shale.

·   2 x 10-5 (Montgomery, 1996)

·  3 x 10-6

(Klohn Leonoff Consulting Engineers, 1986)

0.05
(Driscoll et al., 2002)
Probable moderate to high groundwater yielding aquifer
Tertiary Volcanics (Breccia, Sills, Dykes) Intrusions through the Precambrian and Deadwood Formations Unknown Unknown Due to their limited extent and size, not likely to be a groundwater source for the Project.
Paleozoic Limestone Locally referred to as the Pahasapa Limestone, consists of limestone, sandy limestone and dolomite · 9 x 10-6 (Imam, 1991) 0.05 to 0.1 Groundwater flow in the Madison Formation near Wharf is unconfined and occurs mainly in fractures and small dissolution cavities in the upper part of the formation (RESPEC, 2022)

 

13.7.1.2Groundwater Levels

 

The proposed Richmond Hill mining area is situated on a topographic high that forms the headwater catchment for Cole Creek, Cleopatra Creek, and tributaries of False Bottom Creek to the east. Numerous groundwater monitoring wells have been installed across the project area, with water level data spanning from the 1980s and 1990s to the present. Water levels range from near surface, within monitoring wells installed with shallow alluvium soils, to water levels that are hundreds of feet deep (e.g. MW-24 at 223 ft below ground surface). The depressed water levels are likely contributed by the high relief over the project area and the limited recharge area to the permeable features within the bedrock rock mass.

 

13.7.1.3Recharge and Discharge

 

The Richmond Hill Project is located on elevated terrain, surrounded by incised stream valleys. This physiography suggests that groundwater recharge within the deposit area is primarily derived from direct meteoric infiltration, with minor contributions possible from stream-induced infiltration or leakage from shallow alluvial and colluvial deposits in nearby valleys.

 

Page 256 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Recharge estimates for the Project Area have been developed using a water balance approach. According to Cartier et al. (2002) from the Black Hills Hydrology Study, approximately 91.6% of annual precipitation is lost to evapotranspiration, 3.5% contributes to aquifer recharge, and 4.9% becomes surface runoff. Based on a mean annual precipitation of approximately 29 inches (RESPEC, 2025a), estimated recharge is estimated at about 1 inch per year.

 

13.7.1.4Groundwater Inflow Estimates

 

The proposed Richmond Hill mining area is a single open pit, irregular in shape variable in depth. Analytical solutions to estimate groundwater inflows are largely idealized, assuming a circular open pit with simple arrangement of saturated thickness, hydraulic conductivity, and radius of influence. This limitation is recognized and is reflective of the preliminary nature of the current study. The area of the Richmond Hill Pit was conceptualized into an equivalent-sized circular open pit, with similar pit wall slope ranges, average pit depths, and average saturated thickness. The Marinelli equation (Marinelli and Niccoli, 2000) was utilized for this study to estimate the groundwater inflow to the proposed Richmond Hill Open Pit. The Marinelli equation is a radial inflow approach which assumes that groundwater flows radially towards the walls of the pit (Zone 1) and vertically upward through the base of the pit (Zone 2).

 

The hydraulic parameters utilized to represent the pit walls (Zone 1) and pit floor (Zone 2) for the proposed open pits are summarized in Table 13-8. Given the unknown nature of the hydraulic conductivity of lithologies within the open pit area, three cases were completed (low, base and high) to estimate the range of potential groundwater pit inflows. The range of hydraulic conductivity values utilized in the calculations span an order of magnitude. The pit floor hydraulic conductivity value was set at a constant value that is generally lower than the pit side walls.

 

Table 13-8: Summary of Parameters Utilized for the Groundwater Inflow Calculation

 

 Pit Name

Recharge to [2]
Water Table

(inch/yr)

Hydraulic Conductivity (K) [3]
Zone 1 (Pit Side Walls)

Hydraulic
Conductivity (K) [3]
Zone 2 (Pit Floor)

(ft/s)

Low

(ft/s)

Base

(ft/s)

High

(ft/s)

Richmond Hill Gold Pit 1.0 3E-08 1E-07 3E-07 7E-08

 

Notes:

1. Ultimate pit configuration provided by RESPEC (2025b).

2. Annual groundwater recharge estimated at 3.5% of annual precipitation. source: USGS black hills hydrology study (Cartier et al., 2002). Mean annual precipitation estimated at 29 inches (RESPEC, 2025a).

3. Hydraulic conductivity values represent an equivalent porous media (EPA) average of the Precambrian/Paleozoic/Volcanic lithologies.

 

13.7.1.5Groundwater Inflow Results

 

The estimated steady-state groundwater inflows to the proposed Richmond Hill Open Pit under end-of-mine (EOM) conditions are summarized in Table 13-9. Inflows are estimated to range from 190 to 300 gallons per minute (gpm). While these values may appear low for a pit of this size, they are considered reasonable given the relatively limited saturated thickness in the deposit area, the absence of a large water body (lake) to sustain recharge into the open pit, and the likely impermeable nature of the precambrian bedrock which accounts for the majority of the pit lithology.

 

Daily or transient inflows may exceed these values, especially if a permeable feature is encountered during the development of the pit, however it is expected that the higher inflows will subside over a period of time (i.e. days to weeks) as the permeable feature is drained (via effective porosity).

 

Page 257 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 13-9: Estimated LOM Groundwater inflows to the Proposed Richmond Hill Open

 

Pit Reference Pit Depth
 (ft)
Estimated
Saturated
Thickness (ft)
Groundwater Inflow (Ultimate Pit) [1]
from Pit Sidewalls & Pit Base
 

Low

(gpm)

Base

(gpm)

High

(gpm)

 
Richmond Hill Pit (EOM) 300 - 500 <250 190 250 300  

 

Notes:

1. Groundwater inflows are steady-state for the ultimate pit configuration. Inflows estimated using the Marinelli and Niccoli (2000) methodology.

 

13.7.1.6Preliminary Dewatering Design

 

Pit dewatering of the Richmond Hill Open Pit can likely be achieved through a combination of vertical and horizontal dewatering wells depending on the geotechnical requirements and the proximity to recharge sources (i.e., faults or alluvial channels). At a minimum, pit dewatering sumps are proposed to be installed within the deepest portions of the pit, with mine dewatering completed in advance of the bench excavations.

 

13.7.2Site Wide Water Balance

 

A site-wide water balance model is currently being developed to support the design of the proposed Richmond Hill Mine. The water balance will be used to estimate life of mine project water requirements, evaluate potential water supply sources, predict water oversupply (discharge) conditions, and support the preliminary design of water management infrastructure. The water balance is being developed in a GoldSim model and will account for the major inputs to and withdrawals from the Project water management system during construction, operations, and continued through post-closure.

 

The objectives of the water balance are to:

 

·Characterize major water inflows and outflows associated with the project;

 

·Assess operational water requirements;

 

·Evaluate potential sources of makeup water;

 

·Support preliminary sizing of process and stormwater management facilities; and

 

·Establish the basis for future feasibility-level water management planning.

 

The water balance will ultimately incorporate all major project facilities, including the open pit, heap leach facility, process solution ponds, Merrill-Crowe Plant, waste rock storage facilities, surface water diversion systems, and contact water management infrastructure.

 

13.7.2.1Current Status of Investigations

 

At the time of preparation of this study, development of the site-wide water balance remains ongoing. Supporting investigations include hydrogeological characterization, ongoing environmental baseline studies, meteorological data collection, metallurgical testing, mine planning, and process design activities. Results from these programs will be incorporated into future updates of the water balance model as they become available.

 

The project benefits from the presence of historical mining infrastructure at the former Richmond Hill Mine, including existing water management facilities and a water treatment system that remain in operation as part of ongoing site reclamation activities. Available historical information is being reviewed and incorporated where appropriate to support development of the project's water management strategy.

 

Page 258 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

13.7.2.2Preliminary Water Management Concept

 

Current project planning assumes that ore will be processed using a conventional cyanide heap leach operation, with process solutions recirculated within a closed-loop leaching system. Crushed oxide ore will be stacked on the heap leach pad and irrigated with barren cyanide solution. Pregnant leach solution (PLS) collected from the base of the heap will be conveyed to the Merrill-Crowe Plant for gold and silver recovery through clarification, deaeration, and zinc precipitation, after which the barren solution will be returned to the heap leach circuit for reuse.

 

Conceptual water management facilities that are currently in consideration for development of the site-wide water management strategy include:

 

·Open pit mine;

 

·Heap leach facility;

 

·Pregnant and barren solution ponds;

 

·Merrill-Crowe plant;

 

·Overburden storage areas and backfilled pits;

 

·Stormwater diversion systems; and

 

·Contact water management facilities.

 

Potential water supply sources and operational contingencies will be assessed as part of ongoing engineering studies. Design criteria for these facilities will be refined as the water balance study progresses.

 

At the time of this report, detailed water balance modeling remains in progress. Preliminary design concepts contemplate the use of lined PLS and event ponds together with event storage capacity sufficient to maintain uninterrupted operation of the heap leach and Merrill-Crowe circuits during normal operating conditions and storm events.

 

Potential sources of makeup water and opportunities for maximizing solution recirculation are being evaluated as part of the ongoing engineering and hydrogeological investigations. The completed water balance will be used to establish design criteria for process ponds, water management infrastructure, and operational water supply requirements.

 

Preliminary assessments indicate that recirculation of process solutions within the heap leach circuit is expected to substantially reduce operational freshwater requirements. Detailed quantification of makeup water demand, process inventories, and facility storage requirements will be completed as part of the ongoing water balance study.

 

While the water balance remains under development, no fatal flaws related to water supply availability or water management have been identified during the current phase of engineering. This assessment will be revisited as additional hydrogeological, environmental, and engineering information becomes available.

 

13.7.3Recommendations for Future Studies

 

Given that the project is currently at a PFS level, the following are recommendations for the collection of additional data during more advanced project stages (Feasibility):

 

·Collect hydraulic data for the various lithologic units through site-specific core recovery, drilling observations (e.g., water losses), and hydraulic testing. This data collection is recommended to be coordinated with additional resource drilling as the project advances.

 

·Install hydrometric flow monitoring stations along Cole Creek, Cleopatra Creek, and other nearby streams to understand groundwater baseflow contributions downgradient of the proposed open pit.

 

·Develop a bedrock structural model to assess the potential for groundwater inflows from fault zones across the deposit area (if applicable).

 

·Install additional monitoring wells within the open pit area, as well as dedicated pit wall vibrating wire piezometers (VWPs), to improve the resolution of water level measurements and anticipated pit wall pore pressures.

 

·Equip monitoring wells with water level transducers and dataloggers to allow for more frequent data collection (e.g., every six hours).

 

Page 259 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

14Processing and Recovery Methods

 

The proposed process facilities for the Richmond Hill Project comprise a heap leach operation to process oxide and transition ores. The heap leach operation will have a nominal capacity of 45,000 short tons per day, which matches the current mine plan for this study. Minor allocations have been made in the design for potential, future expansion up to 60,000 short tons per day.

 

The main process unit operations for Richmond Hill include three-stage crushing of the ROM ore, trucking stacking onto the heap leach pad, application of cyanide-bearing solution onto the ore on the pad, recovery of pregnant leach liquors from the heap leach pad, and soluble metal recovery via Merrill-Crowe and refinery facilities, to produce doré bullion, the final product of the facility.

 

14.1Mine Production Schedule

 

The processing facilities for the Richmond Hill Project will be developed to accommodate the mining sequences of the Richmond Hill deposit. Preliminary mine schedules are included in Section 19.1. The LOM average head grades to the heap leach operations are estimated to be 0.016 oz/ton Au and 0.193 oz/ton Ag. The mine schedule indicates that the heap leach will operate throughout the mine life, receiving ore deliveries through Year 9.

 

14.2Process Design

 

The process flow diagrams developed for the Richmond Hill Project are based on the metallurgical testing and interpretation presented in Section 10. Oxide and transition ore metallurgical testing was conducted by Forte Dynamics and supervised by DGC.

 

The following subsections provide a summary of the main components of the process design criteria, a description of the PFS process flow diagrams, the major process equipment recommended for the Project, the primary buildings required to support the major process equipment, and descriptions of the primary process support infrastructure, including water systems, power, and process air systems.

 

The crushing system mass flow rates are based on 75% plant availability through ore stacking on the pad. For simplicity, the estimated availability used in sizing each process equipment is a combination of mechanical availability and equipment utilization and, therefore, reflect estimated operating times. Every operation may have its own definitions that may differ according to its needs.

 

14.3Heap Leach Operation

 

The proposed initial processing facility is designed to process the Richmond Hill oxide and transition ore using conventional heap leaching for the extraction of precious metals and solution recovery using Merrill-Crowe zinc cementation process. Table 14-1 lists the major design criteria for the heap leach process. The proposed process is depicted in the simplified flow sheet shown in Figure 14-1. The arrangement of the heap leach facilities is shown in Figure 14-2.

 

Page 260 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 14-1: Heap Leach Major Design Criteria

 

Parameter Richmond Hill
Processing Scheme Crush/Heap Leach
Crushing Circuit Configuration Three-Stage Crushing
Crush Size (passing – inch) 80% (0.5)
Heap Stacking Method  Truck Stacking
Leach Cycle, days 90-120
Lift Height, ft 30
Solution Application Rate, gpm/ft2 0.0025-0.0033
Nominal Barren Solution Flow, gpm 10,100
Solution Application Method Drip
Precious Metal Recovery Method Merrill-Crowe Zinc Precipitation
Nominal PLS Flow Rate to Plant, gpm 10,100
Au Recovery (LOM average) 72.4%
Ag Recovery (LOM average) 18.0%

 

Page 261 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 14-1: Simplified Flow Sheet of the Richmond Hill Project Heap Leach Facility

 

Page 262 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 14-2: General Layout of the Richmond Hill Project Process Facilities

 

Page 263 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

14.3.1Heap Leach Crushing Plant

 

The Richmond Hill heap leach crushing plant will comprise three stages of crushing, starting with a gyratory crusher for primary crushing, followed by two standard cone crushers for secondary crushing, and three short-head cone crushers for tertiary crushing. Spatial allocation is included in the design to accommodate a fourth tertiary crusher. The fourth tertiary crusher would be the principle addition to the entire crushing circuit to accommodate an increase in nominal throughput up to 60,000 tons per day, should there be an update to the mine plan. Table 14-2 below is a list of the major equipment in the crushing plant.

 

Table 14-2: List of Main Mechanical Equipment for the Heap Leach Crushing Plant

 

Equipment Number Description Installed kW
Primary Crusher 1

Gyratory Crusher, Superior MK-III 60” x 89” (o/e);

CSS* = 143 mm (~5-5/8”)

746
Secondary Crusher 2 Standard Head Cone Crusher; Metso MP1000 (o/e)*; CSS* = 32 mm (~1-9/16”) 746 (each)
Tertiary Crusher 3

Short Head Cone Crusher; Metso MP1000 (o/e);

CSS = 19 mm (~¾")

746 (each)
Secondary Screen 1

Inclined, Vibrating, Double Deck; 1,250 dSTPH;

12 ft x 24 ft (est); Apertures: ¾"

112
Tertiary Screens 3

Inclined, Vibrating, Single Deck; 1330 dSTPH;

12 ft x 24 ft (est); Apertures: ¾"

112 (each)
Primary Crusher Discharge Conveyor 1 2,500 dSTPH; 130 ft L, 17 ft Lift 75
Coarse Ore Stockpile Feed Conveyor 1 2,500 dSTPH; 537 ft L, 119 ft Lift 746
Reclaim Feeders 3 1,250 dSTPH; w/ VFD; Belt 37 (each)
Reclaim Conveyor 1 2500 dSTPH; 468 ft L, 59 ft Lift 373
Secondary Screen Feeders 2 1250 dSTPH; w/ VFD; Belt 37 (each)
Tertiary Screen Feeders 3 1330 dSTPH; w/ VFD; Belt 37 (each)
Transfer Conveyors 2 3,990 dSTPH; 420 ft L, 72 ft Lift; 465 ft L, 22ft L 373 & 559
Tripper Conveyor 1 3.990 dSTPH; 810 ft L, 20 ft Lift 373
Crushing Circuit Product Transfer Conveyor 1 2,500 dSTPH; 465 ft L, 22 ft Lift 373

 

Mine trucks deliver run-of-mine (ROM) material to the primary crusher feed hopper, with a ROM stockpile available for temporary storage. Material feeds directly to a primary gyratory crusher operating at a 175 mm (6-7/8”) Open-Side Setting and a 32 mm (1-1/4") stroke. A rock breaker is situated at the feed hopper to clear blockages associated with oversized rock. Crushed ore reports to the primary crusher discharge hopper and is withdrawn from the bin by an apron feeder onto the primary crusher discharge conveyor. A belt magnet removes ferrous tramp metal, and a metal detector identifies remaining metallic material. Ore transfers to the coarse ore stockpile feed conveyor, equipped with a belt scale, and feeds the coarse ore stockpile.

 

Ore is drawn from the coarse ore stockpile via reclaim feeders and conveyed to the secondary crushing feed bin. This bin supplies two parallel lines, each comprising a feeder, double-deck vibrating screen, and a secondary cone crusher. Material finer than 19 mm (3/4”) bypasses further crushing and is sent directly to the crushing circuit product transfer conveyor feeding the haul truck feed bin. Material between 19 mm (3/4”) and 51 mm (2”) bypasses the secondary crusher and reports to the transfer conveyer feeding the tertiary crushing feed bin. Secondary screen oversize is directed to the secondary cone crusher, operating at a 32 mm (1-1/4”) Closed-Side Setting (CSS). The secondary crusher product rejoins the screen undersize on the transfer conveyor.

 

A tripper conveyor distributes ore to the tertiary crushing feed bin, which supplies three parallel lines, with provision for a fourth line for potential future expansion. Each line comprises a screen feeder, a single-deck vibrating screen, and a short-head tertiary cone crusher operating at a 19 mm (3/4") CSS. Screen oversize is recirculated to the tertiary crushers, while undersize moves forward to the crushing circuit product transfer conveyor. The crushing plant product, targeting a P80 of 12.7 mm (1/2”), is conveyed to the haul truck feed bin. En route, lime is added from a lime silo for pH control. The resulting material is then transported to the heap leach stacking system.

 

Page 264 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

14.3.2Stacking and Heap Leaching

 

Details of the stacking and heap leaching plan can be found in Section 15.

 

14.3.3Heap Leach Production Forecasting

 

Gold and silver production forecasts for the heap leach pads were derived from the mine plan, which incorporates a time delay for the full recovery of recoverable ounces. The figures reflect expected recovery estimates based on scheduled ore placement and leach pad development, prior to the application of any detailed leaching program or kinetic modeling. These values represent a preliminary planning basis and incorporate assumptions typical of a pre-program delay phase, where production is estimated before formal metallurgical modeling and program-specific leach kinetics are established.

 

A summary of the gold and silver forecasts for the heap leach pads is provided in Table 14-3 for the base case. The total forecast gold production is estimated to be 1,563,000 oz, while the total forecast silver production is estimated to be 4,566,000 oz.

 

Table 14-3: Heap Leach Gold and Silver Production Forecasts

 

Year Gold [k oz] Silver [k oz]
Annual Cumulative Annual Cumulative
1 157 157 610 610
2 194 351 479 1,089
3 191 542 539 1,627
4 152 694 452 2,079
5 152 847 312 2,391
6 197 1,043 439 2,831
7 245 1,288 567 3,397
8 166 1,454 526 3,923
9 90 1,545 514 4,437
10 19 1,563 129 4,566
Total 1,563 - 4,566 -

 

14.4Merrill-Crowe Plant and Refinery

 

The pregnant leach solution (PLS) reporting to the pregnant solution tank will be pumped to the clarifier filter feed tank at the Merrill-Crowe plant. Solution clarification will be performed by three clarifying filters arranged in parallel, with two operating and one on standby. The filters will be precoated with diatomaceous earth (DE) to aid in solids removal. Additional DE may be added, as body feed, to maintain filtration performance. The clarified solution then flows to the deaeration tower, where it enters a chamber operated under vacuum to remove the majority of the dissolved oxygen.

 

Following deaeration, powdered zinc, cyanide, and lead nitrate are added to initiate a redox exchange reaction, in which zinc metal is oxidized and gold and silver are reduced to their metallic states. The resulting solution, with precipitated solids, is pumped to three recessed plate-and-frame filters, operated with two online and one on standby. Precipitation continues as the solution travels through the filters and completes within them. The metallic gold and silver precipitates are retained in the filter presses and are discharged when the filters are full or on a weekly basis. The resulting barren solution is collected and pumped to the barren solution tank.

 

Page 265 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Make-up cyanide solution will be added to the barren solution prior to its return to the heap leach circuit for reuse.

 

The gold and silver precipitates collected in the filter presses will be dried in a retort oven to remove moisture and mercury. The dried material is then mixed with fluxes and smelted in an induction furnace. Molten metal is poured into molds to produce doré bars, which constitute the final plant product and prepared for shipment offsite.

 

The slag, poured first into a slag pot, is weighed, sampled, and stored for potential reprocessing, or alternately transferred to the heap.

 

Off-gases from the retort furnace are treated to condense and remove mercury. Off-gases from the induction furnace are filtered, scrubbed with water sprays, and then passed through a sulfur-impregnated carbon bed for final polishing.

 

14.5Reagents

 

The primary reagents used in the heap leach process are sodium cyanide and lime. Additional reagents are used in the Merrill-Crowe and refining circuits. Table 14-4 summarizes the projected reagent usage for the Richmond Hill Project, including estimated consumption rates and points of addition.

 

14.5.1Sodium Cyanide

 

Sodium cyanide (NaCN) will be used as the primary lixiviant in the heap leach circuit. It may be delivered as a 30% by weight liquid solution (specific gravity 1.15) in tanker trucks or in briquette form in iso-container and blended to 30% by weight strength with barren solution. The cyanide solution will be stored in a steel tank within secondary containment at the Merrill-Crowe plant. Distribution to the leach circuit will be via metering pumps.

 

All cyanide pipelines will use double-containment systems, either “pipe-within-pipe” or “pipe-over-liner,” to mitigate environmental risk. Cyanide consumption is estimated at 0.88 lb per short ton (ST) of ore.

 

14.5.2Lime

 

Pebble quicklime (CaO) will be used to maintain an alkaline pH in the leach solution. Lime will be delivered in bulk by 20-ton pneumatic trucks and stored in a dedicated silo. A variable-speed feeder will meter lime onto the product transfer conveyor in the crushing circuit.

 

Lime consumption is estimated at 3.98 lb/ST of ore.

 

14.5.3Zinc

 

Zinc powder will be used in the Merrill-Crowe process as a reducing agent to precipitate dissolved gold and silver from the clarified pregnant leach solution. Zinc is added after deaeration, where oxygen is removed to improve precipitation efficiency. The zinc reacts with the metal cyanide complexes to promote formation of solid gold and silver precipitates, which are then collected through filtration. Zinc will be stored in a secure, dry area and metered into the process via dedicated feeders. Actual consumption will vary depending on metal tenor in solution, process efficiencies, and operations-specified ratio of zinc to metal over stoichiometric requirements. At this study level, zinc consumption is estimated to be equivalent to 0.057 lb/ST of ore.

 

Page 266 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

14.5.4Lead Nitrate

 

Lead nitrate (PbNO3) will be used in the Merrill-Crowe plant to improve the efficiency of precious metal precipitation. Lead nitrate will be added as a dilute solution directly to the pregnant solution prior to the addition of zinc.

 

At this study level, lead nitrate consumption is estimated to be equivalent to 0.011 lb/ST of ore.

 

14.5.5Diatomaceous Earth

 

Diatomaceous earth (DE) will be used as a filter aid in the Merrill-Crowe plant to remove fine solids from the solution before dearation in the clarifier filters and before collection of precipitates in the precipitation filters. DE enhances the formation of a pre-coat and improves cake permeability, helping to retain suspended solids or precipitated gold and silver particles while minimizing blinding of the filter media.

 

DE will be added as a slurry in the filter feed pipelines. At this study level, DE consumption is estimated to be equivalent to 0.06 lb/ST of ore.

 

14.5.6Flux

 

Fluxes will be added during doré smelting to facilitate the removal of base metal impurities in the form of slag. Typical flux components include silica sand, borax, and sodium carbonate (soda ash). Additional additives such as fluorspar or potassium nitrate (niter) may be used as required. Fluxes will be delivered in 50 lb bags.

 

At this study level, flux consumption is estimated to be equivalent to 0.02 lb/ST of ore.

 

14.5.7Antiscalant

 

Antiscalant will be added to leach and strip solutions to prevent scaling in process pipelines and heap irrigation systems. The reagent will be delivered in 1 m3 tote bins and applied directly using variable-speed chemical metering pumps. Antiscalant will be added directly from the supplier tote bins into the pregnant and barren pumping systems using variable speed, chemical-metering pumps.

 

At this study level, antiscalant consumption is estimated to be equivalent to 0.02 lb/ST of ore.

 

Table 14-4: Main Process Reagents and Consumables

 

Reagent Main Points of Addition Dosage Dosage unit
Sodium Cyanide Barren Solution Tank 0.88 lb/ST
Lime Conveyor Belt reporting to Truck Stacking 3.98 lb/ST
Zinc Zinc Cone 0.057 lb/ST
Lead Nitrate Zinc Cone 0.011 lb/ST
Diatomaceous Earth (DE) Clarifier Filtration and Precipitate Filtration 0.06 lb/ST
Melting Flux Refining 0.02 lb/ST
Antiscalant Barren/Pregnant Solution Pumps 0.02 lb/ST

 

14.6Water Consumption

 

As with most mining operations, the project is designed to maximize water recycling wherever possible. Water is recovered from heap leach operations and other process circuits, with raw water used to offset losses due to evaporation, ore retention, and dust suppression. Additional raw water is also used for wet scrubbers and other utility services.

 

Page 267 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The Richmond Hill project is projected to require a total average of 801 gal/min of raw water makeup to sustain the operation. The actual requirements will fluctuate according to the weather and season.

 

14.7Blowers and Compressors

 

The design of the leach pad and process facilities includes compressors to provide plant and instrument air. A blower is also included for the pneumatic unloading of lime. A list of pneumatic equipment is given in Table 14-5 below.

 

Table 14-5: List of Blowers and Compressors

 

Equipment Tag Service Area Power, kW
100-CM-001 Primary Crusher Area Supply 56
200-BL-001 Lime Truck Offloading Blower 11
200-CM-001 Reclaim Area Supply & Dust Collectors 56
200-CM-002 Fine Crushing Area Supply & Dust Collectors 56
900-CM-001 Merrill-Crowe Area Supply & Dust Collectors 56

 

14.8Power Consumption

 

The total demand power load is estimated to be 10 mega-watts (MW) at full operation. The connected power, power demand, and annual consumption for a typical full year of operation in each process area is given in Table 14-6.

 

Table 14-6: Summary of Connected Power for Heap Leach Operations

 

Area Description Connected Load, kW Demand, kW Annual Consumption, kWh
100 Primary Crushing 1,745 1,020 8,931,020
200 Fine Crushing 7,887 4,145 36,310,335
350 Heap Leach Pad & Ponds 2,483 1,355 11,871,540
 400 Merrill-Crowe 4,849 2,131 18,669,522
500 Refinery 336 157 1,372,513
650 Water Systems 2,002 1,168 10,227,348
 800 Reagents 26 19 169,673
900 Ancillary Facilities 141 98 855,641
Total 19,469 10,092 88,407,593

 

14.9Control Systems

 

A control room is included at the primary crusher area and will be utilized primarily for monitoring truck dumping and operation of the rock breaker when required.

 

A central control room (CCR) will be inside the Merrill-Crowe Plant building. From the CCR control consoles, crushing, screening, material handling systems, reagents, pumping systems, aeration system, Merrill-Crowe plant, and utility systems will be monitored or controlled.

 

A computer room adjacent to the CCR will contain engineering workstations (EWS), a supervisory computer, historical trend system, management information systems (MIS) server, programming terminal, network and communications equipment, and documentation printers. This is primarily used for distributed control system (DCS) development and support activities by plant and control systems engineers.

 

Although the facilities are normally controlled from the CCRs, local video display terminals are selectively provided on the plant floor for occasional monitoring and control of certain process areas. Any local control panels that are supplied by equipment vendors will be interfaced with the DCS for remote monitoring or control.

 

14.10Assay and Metallurgical Laboratories

 

A laboratory building has been included with the capital cost estimate. Provision has been made for facilities that include sample receiving, sample drying, sample preparation, metallurgical laboratory, wet laboratory, and fire assay for mine and process plant samples. The assay lab will operate 24/7 to process production mine samples and heap leach solution assays for operational QA/QC.

 

Page 268 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

15Infrastructure

 

The infrastructure proposed for the Richmond Hill Project is designed to support mining and heap leach operations. Key components include improvements to the existing site access road and a connection to the regional electrical grid to meet the power requirements of the planned facilities.

 

The site layout incorporates heap leach pads, a process plant, and supporting infrastructure arranged to meet operational requirements and applicable environmental and safety standards. The heap leach facility and process plant are described in detail in other sections within this report. Ancillary facilities include administrative offices, maintenance facilities, and warehouse facilities to support daily operations.

 

The infrastructure design integrates access, utilities, and ancillary facilities with the planned mining and processing facilities to support safe, reliable, and efficient operations throughout the project life.

 

15.1Site Access Road

 

The primary access to the Richmond Hill Project site will be established via existing public roadways originating from Lead, South Dakota. This access route has been selected to leverage current infrastructure while minimizing environmental and logistical impacts.

 

From the city of Lead, the designated route will proceed southwest along U.S. Route 85—also known as the CanAm Highway—for approximately one mile, reaching the intersection with Nevada Gulch Road. From this point, the route will continue westward on Nevada Gulch Road for an estimated three miles until it intersects with Richmond Hill Road. The final leg of the route will follow Richmond Hill Road northward for approximately 3.5 miles, passing the existing Wharf Mine, and arriving at the Richmond Hill Project's security office.

 

All vehicular traffic, including personal vehicles, delivery trucks, and contractor transport, will be required to report to the security office for check-in prior to being granted access to the site. This measure is intended to maintain site security, monitor personnel movement, and ensure regulatory compliance.

 

The entire transportation of personnel, operational equipment, consumable materials, and construction-related machinery will be conducted via this primary access corridor. By utilizing a single, controlled entry route, the project will enhance site management efficiency, promote traffic safety, and support streamlined logistical operations throughout all phases of development and operation.

 

15.2Power Supply

 

Electrical utility service is currently available at the Richmond Hill Project site, providing a foundational element for supporting future mining and processing operations. Electrical power for the site will be supplied by Black Hills Energy, a regional utility provider, through enhancements to the existing transmission infrastructure. These upgrades will ensure a reliable power supply capable of delivering electrical capacity sufficient to meet the demands of mining, processing, and support facilities during both construction and full-scale operations.

 

The planned improvements will involve construction of a new substation, as well as enhancements along the current transmission line corridor that extends from the substation to the Richmond Hill site. These upgrades will strengthen the system’s capacity and reliability, supporting continuous and stable power delivery. As part of the electrical infrastructure planning, provisions have also been made for the installation or enhancement of voltage regulators along the transmission line to maintain voltage stability across varying load conditions.

 

Page 269 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

In addition, the project design includes the re-routing of certain sections of overhead power lines that currently intersect proposed pit areas and process facilities. This reconfiguration is essential to prevent operational conflicts and ensure safety and accessibility throughout the site.

 

All anticipated costs associated with these electrical infrastructure improvements have been incorporated into the Project’s Capital and Operating Cost Estimates. These proactive planning measures reflect the Project’s commitment to maintaining a robust and efficient energy supply while aligning with regulatory requirements and operational needs.

 

15.3Project Buildings

 

A dedicated truck shop is planned for operations to the west of the heap leach facility and to the south of the open pits. This strategic location has been selected to optimize logistical efficiency and to ensure seamless connectivity between key operational zones. Next to the proposed truck shop, a fuel island will be constructed to facilitate convenient refueling of heavy equipment and haul trucks, minimizing downtime and enhancing operational productivity.

 

Integrated within the truck shop complex will be offices for mine services personnel, ensuring close coordination between equipment maintenance, operational support, and field activities. Also near the truck shop, a laydown yard is proposed, which will serve as a staging and storage area for equipment, spare parts, and construction materials, further supporting maintenance and operational functions.

 

The administrative building will house designated safety and training areas, providing a centralized location for workforce orientation, ongoing training programs, and compliance with occupational health and safety standards.

 

All pit areas will be connected to their respective waste rock dumps and maintenance facilities through a network of well-designed haul roads. These roads will be engineered to accommodate the movement of mining equipment, ensuring safe and efficient transportation of material across the site.

 

This planned infrastructure reflects a comprehensive approach to supporting the full scope of mining operations, with an emphasis on safety, efficiency, and long-term functionality.

 

15.3.1Security Building at Access Gate

 

The site’s Security Building will be strategically located along the main access road at the southern property boundary. Positioned on elevated terrain, the building provides optimal visibility of incoming and outgoing traffic. This facility will serve as the primary control point for all site ingress and egress. A secure, monitored access gate will be integrated into the building's design to regulate and document all personnel and vehicle movement. Beyond this entry point, a continuous security perimeter fence will enclose all active operational areas to ensure site safety, protect personnel, and safeguard critical infrastructure.

 

15.3.2Heap Leach Crushing Plant

 

The crushing circuit infrastructure will consist of two dedicated buildings: the Primary Crushing Building and the Fine Crushing Building. These structures will be engineered steel buildings, purpose-built to shelter the crushing and screening equipment from adverse weather conditions while ensuring operational reliability. Although uninsulated, each building will be fully enclosed on all four sides, with strategically positioned access points for maintenance personnel. These buildings will be designed to balance protection from environmental exposure with the necessary accessibility for equipment servicing and routine inspections.

 

Page 270 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

15.3.3Merrill-Crowe Plant

 

Located directly east of the Phase 1 Heap Leach Pad, the Merrill-Crowe Plant will be a critical component of the gold and silver recovery process. Pregnant leach solution (PLS) from the heap leach pad will be pumped to the plant for treatment. The recovery process will involve clarification and deaeration of the PLS, followed by zinc dust cementation—commonly known as the Merrill-Crowe process—to precipitate precious metals.

 

The facility will be housed within a fully insulated, engineered steel building designed to support year-round operation. The structure will incorporate all necessary process and refinery circuits, as well as auxiliary amenities including office space, a break/lunch room, and gender-separated locker and restroom facilities. For operational flexibility, the building will be equipped with two roll-up doors to allow access for forklifts and maintenance vehicles, along with multiple man doors for personnel entry. A secure, restricted-access man door and armored vehicle roll-up door will be provided for the refinery area to ensure controlled movement of valuable materials. The plant will also be equipped with required safety infrastructure, including eyewash stations, emergency showers, and comprehensive fire protection systems.

 

15.3.4Administration Building

 

The Administration Building will be situated just beyond the Security Building along the main site access road. This modular complex will be constructed from nineteen (19) 12’ x 60’ mobile units, professionally assembled into a cohesive, functional facility. The layout will be divided to accommodate a wide variety of uses, including administrative offices, project coordination spaces, and general management operations. Dedicated areas will be included for a large conference room and a fully equipped training room, allowing for on-site meetings, workforce development sessions, and regulatory training.

 

15.3.5Truck Shop Building

 

Continuing northwest along the main access road, the Truck Shop will be located just beyond the Truck Wash and the Fueling Station. This state-of-the-art maintenance facility will measure 370 ft by 100 ft and will include four (4) service bays, two of which will be specially equipped with embedded rails to accommodate tracked vehicles and loaders with tire chains.

 

The facility will also house the Mine Warehouse, which will be situated at the ground floor opposite the service bay area. This warehouse will serve as a centralized storage hub for parts, tools, and consumables required for equipment maintenance. Adjacent to the warehouse, the Mine Services Office and a dedicated light vehicle maintenance bay will be constructed to streamline operations and facilitate the upkeep of support vehicles used across the site.

 

15.3.6Laboratory

 

The Laboratory will be housed in a purpose-built, stand-alone building located in close proximity to the Merrill-Crowe Plant to allow for efficient sample analysis and process support. The facility will be equipped with specialized systems including fume scrubbers, acid containment structures, and dust collection units to ensure safe and compliant handling of chemical reagents and analytical samples. The lab will also be outfitted with state-of-the-art equipment necessary for assay testing and metallurgical analysis.

 

In addition to its technical functions, the laboratory building will include office space, restrooms, and change facilities, providing a safe and comfortable working environment for laboratory personnel.

 

Page 271 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

15.4Water Management Infrastructure

 

15.4.1Water Supply

 

Initial water supply for the project will be sourced from an existing groundwater monitoring well. As the project advances, water sourced from the pit dewatering will provide necessary water supply to the project in an effort to reduce the overall water volume delivered to the water treatment plant (WTP).

 

15.4.2Surface Water Management

 

The proposed mine is located on Richmond Hill, generally along a north – south watershed divide. The area naturally drains to both the west and east. The west side of the site drains into Cole Creek and Cleopatra Creek, which flow into Spearfish Creek. The east side of the site drains via several unnamed streams that flow into False Bottom Creek.

 

As the pit and other mine infrastructure is located at the top of Richmond Hill, surface water management for the mine is relatively simple. The surface water management system will segregate contact and non-contact water. Due to the nature of the mine location minimal surface water inflows are present, requiring minimal non-contact water diversion needs. The system will be designed to contain and process all contact water, provide consistent water supply for ore processing, and accommodate storm events.

 

The water management system will include the following components:

 

·Non-contact water diversion ditches

 

·Contact water collection ditches

 

·Culverts

 

·Pumps / Lined Storage Ponds

 

Figure 15-1 presents the proposed water management features at the end of mine life. Note that the pump locations within the pit are approximate and will be determined based on pit phasing and mining activity.

 

Page 272 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

Figure 15-1: End of Mine Life Surface Water Management

 

Further analysis and design should include the following:

 

·Sizing of ditches, pumps and culverts.

 

·Varied layouts for each pit phase.

 

·Pipeline routing and sizing from pumps to the (WTP).

 

·Minor modifications to pit design to eliminate the need for the various short collection ditches.

 

·The runoff analysis should be revised to vary based on pit phasing.

 

15.4.3Ground Water Management

 

Hydrogeological conditions within the open pit are described in Section 14. The contact water captured within the pit sumps will be pumped to the surface water management system and piped to the WTP for treatment and discharge.

 

Page 273 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

15.4.4Water Treatment

 

The Richmond Hill water treatment plant will replace the existing facility constructed in the 1990s. The proposed plant has a design treatment capacity of 100 gpm and will remove selenium and other metals from site water. RESPEC developed the pre-feasibility-level design basis and evaluated treatment alternatives proposed by Veolia, Envirogen, and WesTech based on life-cycle cost, environmental impact, operability, and maintainability.

 

Envirogen’s Advanced Metals Removal System (AMRS) was selected as the preferred alternative for further development. The process uses zero-valent iron to remove selenium through chemical reduction, adsorption, and formation of stable iron–selenium solids, with the potential to treat the broader suite of metals present in site water. The system offers a compact, comparatively simple treatment train and the lowest estimated annual operating cost among the alternatives evaluated. The AACE Class 4 capital cost estimate is approximately US$8.9 million.

 

Final process selection and design remain subject to bench-scale treatability testing using representative site water. Testing will confirm achievable effluent quality, media consumption, reagent and utility requirements, residuals characteristics, process stability, and equipment sizing, and will support development of performance guarantees. A parallel pilot evaluation of Veolia’s Tracer Se process is recommended to provide a performance benchmark and backup treatment alternative.

 

15.5Heap Leach Facility

 

The Richmond Hill Heap Leach Facility (HLF) will include an approximately 14.9-million-square-foot lined heap leach pad (HLP), measured at the inside toe of the perimeter berm, and two solution-management pond systems. Each pond system will include a double-lined Process Pond and Event Pond with leak detection and recovery systems for containment of process solution and stormwater.

 

15.5.1Heap Leach Pad

 

The permanent HLP will be developed in three construction phases. Phase 1 will include approximately 7.7 million square feet of pad and Pond System 1; Phase 2 will add approximately 5.5 million square feet and Pond System 2; and Phase 3 will provide a pad-only expansion of approximately 1.7 million square feet. Pond System 1 will serve Phase 1 and the southeastern portion of Phase 2, while Pond System 2 will serve the northern portion of Phase 2. Solution collected in Pond System 2 will be transferred to the Phase 1 process facilities via a connected pump and piping system.

 

The HLF is located on steep, irregular terrain consisting of hills and natural drainages, with existing ground slopes generally ranging from 10 to 60 percent. Substantial clearing, mass grading, and drill-and-blast excavation may be required to establish positive drainage, construct controlled-gradient buttress zones and satisfy liner deployment and slope-stability requirements.

 

The permanent pad will receive crushed ore stacked by haul truck in approximately 30-foot lifts to a maximum vertical stack height of 250 feet, with 3H:1V overall side slopes. The prepared subgrade will be overlain by a composite liner consisting of either a 12-inch low-permeability soil layer or geosynthetic clay liner beneath an 80-mil double-sided textured linear low-density polyethylene (LLDPE) geomembrane. Overliner will provide liner protection and drainage in controlled buttress areas and around collection headers.

 

After permanent-pad stacking is complete, selected crest areas will be graded and covered by an interlift lining system comprised of an 80-mil textured LLDPE liner, collection piping, and overliner to create an on-off or removable pad. Removable-pad ore will then be stacked in two sequential operating areas to a maximum vertical height of approximately 250 feet with overall slopes of 2.5H:1V. Following leaching, each area will be rinsed and treated for cyanide destruction, excavated, and backfilled into the open pit, allowing the operating areas to alternate between stacking, leaching, rinsing, and removal.

 

Page 274 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

At an assumed bulk ore density of 111 pounds per cubic foot, the permanent HLP is estimated to accommodate approximately 70 million tons (all 3 phases total), and the removable pad will hold approximately 103 million tons (single use), providing sufficient combined capacity to exceed the 133-million-ton, 9-year mine plan target.

 

15.5.2Heap Leach Pad Collection System

 

After stacking each lift, pipe headers and drip irrigation lines will be added to the heap surface. Sodium cyanide solution will be applied at a nominal flow rate of 10,100 gpm to the heap surface via the header/drip system at a proposed application rate of 0.0025 gpm/ft2 and a maximum solution application rate of 0.0033 gpm/ft2. The pregnant leach solution (PLS) will flow by gravity to the collection point of the leach pad and to the pregnant solution pond via a network of perforated collection laterals, subheaders, and headers. From the pregnant ponds, the PLS will be pumped to the clarifier filter feed tank in the Merrill-Crowe plant. The heap-leach solution application rate may be adjusted during the leach cycle depending on the available area for irrigation. A 90-120 day leach cycle is assumed for the PFS design with actual leach cycles determined by metallurgical testing varying between 25 and 40 days.

 

Seeps and shallow groundwater occur within the HLP footprint. Underdrains will be installed along valley floors prior to mass grading for pad construction to convey groundwater beneath and downgradient of the facility. Additionally, leak-detection piping will be provided beneath the composite liner in controlled buttress zones.

 

The pond systems are sized to contain 8 hours of process operating inventory, 8 hours of draindown during a power outage, and runoff from the 100-year, 24-hour storm event including snowmelt, plus contingency and required freeboard. Off-pad diversion channels will route upgradient runoff around the HLF, while excess on-pad flow will be collected within the lined pad and pond system. The adopted PFS design storm depth is 9.5 inches.

 

PFS-level stability analyses indicate that the proposed HLP and ponds satisfy the adopted minimum static and pseudostatic factors of safety.

 

Page 275 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

16Market Studies and Contracts

 

16.1Product Description

 

The Project is designed to recover gold and silver as doré bars produced at the processing facility. These bars would be shipped under secure custody to an independent precious metals refiner for final processing, assay, and settlement.

 

Project revenue would consist solely of the payable gold and silver contained in the electrum product. Metallurgical testing completed to date has not identified any other metal expected to generate meaningful payable value. The resulting bars are anticipated to have high precious metal content and only immaterial levels of deleterious constituents.

 

Gold and silver trade in deep international markets and are priced by reference to widely accepted benchmarks, including the London Bullion Market Association ("LBMA") Gold Price and Silver Price. The Project's anticipated output should therefore be readily saleable without the need for a dedicated or specialized marketing program.

 

16.2Metal Price Assumptions

 

The economic analysis in this Preliminary Feasibility Study uses long-term metal price assumptions of US$3,500 per ounce gold and US$50.00 per ounce silver.

 

In establishing these assumptions, consideration was given to prevailing spot prices, long-term historical trends, price decks adopted in recent studies for comparable precious metals projects, published analyst and consensus outlooks, and the Qualified Person's view of conditions over the expected operating horizon. The chosen prices sit below recent spot levels and some published long-range forecasts, while exceeding the assumptions used in many earlier reserve and feasibility evaluations. In the Qualified Person's opinion, they provide a reasonable and suitable basis for assessing Project economics at the Preliminary Feasibility Study stage.

 

LBMA benchmark prices observed recently have been substantially higher than the long-term assumptions applied in this Study. As of October 2026, recent benchmark indications exceeded US$4,300 per ounce for gold and US$68 per ounce for silver. The strength in precious metals pricing has reflected factors that include central bank purchases, geopolitical uncertainty, inflation concerns, and investment demand for monetary metals.

 

Price assumptions disclosed in recent North American precious metals studies and reserve statements span a wide range. Certain development-stage studies published in 2026, for example, have applied base-case gold prices of approximately US$3,175 to US$3,600 per ounce. By contrast, more recent market and investment-bank outlooks have moved materially higher, with some long-term gold forecasts near or above US$4,500 per ounce.

 

Taken together, the Qualified Person regards the adopted price deck as a balanced and supportable planning basis for this Preliminary Feasibility Study. It is not presented as a prediction of near-term market prices; rather, it is intended to support evaluation of the Project over its mine life. The sensitivity analysis elsewhere in this Report illustrates the effect of alternative gold and silver prices on Project value.

 

16.3Refining and Sales Arrangements

 

The Company expects to contract with an established LBMA-accredited precious metals refiner. Preliminary discussions have included Asahi Refining; however, multiple qualified refiners are capable of accepting electrum products of the type anticipated from the Project. Given the expected composition and quality of the bars, the Company anticipates that competitive commercial terms should be available.

 

Page 276 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

For purposes of the economic analysis, the assumed commercial framework provides for strong gold and silver payabilities, modest refining charges relative to the value of the contained metals, customary assay and settlement protocols, and secure arrangements for transportation and custody.

 

Table 16-1 summarizes the refining and settlement assumptions used in the economic analysis.

 

Table 16-1: Refining and Settlement Assumptions

 

Parameter Unit Selected
Gold Payability % of contained Au 99.90%
Silver Payability % of contained Ag 99.00%
Gold Refining Charge US$/payable oz Au $4.00
Silver Refining Charge US$/payable oz Ag $0.50
Assay Charge US$/shipment Included
Treatment Charge US$/dry tonne None
Penalties for Deleterious Elements US$ None
Transportation and Insurance US$/shipment Included in transportation costs
Settlement Timing Business days after receipt 10 days
Settlement Basis — LBMA Gold and Silver Prices
Refiner — Asahi Refining or equivalent

 

Source: Management estimates, discussions with precious metals refiners, industry benchmarking, and Qualified Person review.

 

The assumptions reflected in the economic model were developed with reference to commercial terms generally available to North American producers shipping clean electrum to major LBMA-accredited refiners. They are broadly representative of the middle of observed market ranges and, in the Qualified Person's judgment, are appropriate for this level of study.

 

The model includes no deductions for deleterious elements. Available metallurgical results and the expected product specification indicate that the electrum should be a clean precious metals product containing payable gold and silver, with negligible constituents that could impair recovery, payability, or refining economics. On that basis, final negotiated terms could prove more favorable than the midpoint assumptions adopted for this Study.

 

The Project's location in the continental United States also offers access to domestic refining capacity and comparatively short shipping routes. This may result in lower transportation, security, and insurance costs than those faced by remote operations or producers relying on overseas delivery. Accordingly, the Study assumptions are considered prudent and do not depend on preferential refining or logistics arrangements.

 

16.4Marketability

 

Gold and silver are traded in highly liquid global markets, with a broad network of refiners, bullion banks, and precious metals dealers that routinely purchase and process electrum and doré. Expected Project output would represent only a marginal share of worldwide supply and is therefore unlikely to create a material sales or placement constraint.

 

In the Qualified Person's view, marketing risk is low because the product consists of established monetary metals, benchmark pricing is transparent, several accredited refiners can process the anticipated bars, expected output is small relative to the global market, and no material deleterious constituents are anticipated.

 

The Qualified Person therefore expects the Project's production to remain saleable on commercially reasonable terms throughout the mine life, with no material barrier to market access.

 

Page 277 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

16.5Contracts and Agreements

 

No binding refining agreement had been executed as of the effective date of this Report. The economic analysis instead applies terms that management considers attainable in the current market, informed by discussions with recognized precious metals refiners and customary industry practice.

 

The Company plans to put definitive refining arrangements in place before commercial production begins. Considering available refining capacity, the anticipated quality of the doré, and the commercial terms generally offered by major refiners, the Qualified Person does not regard the present absence of a final agreement as a material Project risk.

 

Page 278 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

17Environmental Studies, Permitting, and Plans, Negotiations, or Agreements with Local Individuals or Groups

 

17.1Introduction

 

This section describes the environmental setting (Section 17.2); baseline environmental studies required for the Project (Section 17.3); permitting (Sections 17.4 and 3.8); key considerations for waste storage, site monitoring, and water management (Section 17.5); environmental geochemistry (Section 17.6); social and community matters (Section 17.7), closure and reclamation plans (Section 17.8); and key environmental and permitting risks (Section 17.9). The information presented in this section is based on the conceptual Project design presented in this PFS and current regulatory requirements. The conceptual closure and reclamation and the associated estimated costs reflect the anticipated Project development. This information will require review and reassessment if changes to the Project area, scope, or designs occur as the Project planning advances.

 

17.2Environmental Setting

 

The Richmond Hill Project is located in the north-central Black Hills of western South Dakota, approximately 4.5 miles northwest of Lead and 5.6 miles south of Spearfish. The Project area is characterized by mountainous terrain typical of the northern Black Hills uplift, with elevations ranging from approximately 4,800 feet along Cole Creek to 6,040 feet at Richmond Hill Peak. The landscape consists of forested ridges, steep hillsides, and narrow drainages dissected by a network of ephemeral draws and tributary streams that ultimately drain to the Belle Fourche River watershed. Surface water drainages include portions of the Cleopatra Creek, Cole Creek, Rubicon Gulch, Chism Gulch, and False Bottom Creek systems.

 

The Richmond Hill Project area experiences a continental mountain climate characterized by cold winters, warm summers, and moderate precipitation. Average annual temperature is approximately 44°F, with average annual precipitation of 26.9 inches. Average annual snowfall exceeds 100 inches, and winds are generally light, averaging approximately 5.5 miles per hour, with prevailing winds from the northwest.

 

Vegetation is typical of the northern Black Hills and consists primarily of ponderosa pine, paper birch, white spruce, and quaking aspen forest communities, with localized riparian habitats along drainages and reclaimed grassland areas associated with historical mining activities. Wildlife species and habitats are characteristic of the region, and no federally listed plant or wildlife species have been identified within the Project area during recent baseline studies.

 

The Project area has been influenced by more than a century of mining, exploration, timber harvest, and reclamation activities, including operation of the former Richmond Hill Mine between 1988 and 1993. Existing disturbances include reclaimed mine lands, roads, exploration features, water management infrastructure, and maintenance facilities.

 

17.3Baseline Environmental Studies

 

The proposed Richmond Hill Project is located on private lands controlled by Dakota Gold. Accordingly, Project approval requires permits from the State of South Dakota and Lawrence County. To support Project planning and permitting, Dakota Gold is implementing a detailed baseline sampling plan to characterize natural, cultural, and socioeconomic resources within the Project area. Meetings were held with SDDANR and South Dakota Game, Fish and Parks (SDGFP) in 2025 and 2026 to review the Project and the baseline sampling plan.

 

Historical mining and related land-disturbing activities have affected natural resources within the Project area. As a result, although the term baseline is used throughout this section, some data are more appropriately considered pre-Project characterization because pre-disturbance environmental conditions cannot be directly assessed in all areas.

 

Page 279 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Baseline environmental studies necessary to satisfy State laws and regulations and County regulations for the SDDANR Large Scale Mine Permit Application and Lawrence County Conditional Use Permit (CUP) Application are listed in Table 17-1. These studies will begin to provide data that will inform several future permit applications, operating plans, and the reclamation plan.

 

Dakota Gold has retained multiple third-party specialists to conduct the necessary baseline analysis and provide reporting for SDDANR and Lawrence County reviews. As of the effective date of this PFS, most field work has been completed, though reporting efforts are still ongoing and will be completed by the end of 2026. With the exception of kinetic geochemical testing and the socioeconomic assessment, all other baseline studies are complete, facilitating the preparation of the Notice of Intent and Request for Determination of Special, Exceptional, Critical or Unique Lands for submittal to the SDDANR in the fourth quarter of 2026 or early 2027. After that time, the remaining environmental studies and operational/reclamation plans will be completed, and Dakota Gold will initiate state and county permitting for the Project.

 

Additional studies, such as geotechnical stability, blasting vibration, and water treatment, may also be required under the discretion of the SDDANR. The Lawrence County CUP application requires operational information and a socioeconomic impact assessment. Other non-environmental permit requirements are listed in Section 3.

 

Dakota Gold also collects environmental information required to support planned exploration permitting and assist with reclamation of disturbed sites. Key environmental studies that have been completed by Dakota Gold to support exploration drilling permits include cultural resources, wildlife (specifically raptor nests and bat habitat), and special plant species. These studies are limited in extent to proposed exploration disturbance footprints.

 

Table 17-1: Baseline Studies Status

 

Discipline Years Status Key Findings
Geological Resources 2022-2026 Ongoing Mineralization occurs within the lower Deadwood Formation and Precambrian rocks associated with Tertiary gold bearing fluids; geology is well understood based on historical and ongoing exploration programs.
Geochemistry 2025-2027 Ongoing Static and kinetic testing programs are ongoing to support mine design, water management, closure planning, and assessment of acid generation and metals leaching potential.
Surface Water 2025-2026 Ongoing No major constraints. Baseline surface water monitoring is ongoing.
Groundwater 2025-2026 Ongoing Baseline groundwater monitoring studies are ongoing. Preliminary results indicate groundwater conditions are generally consistent with historical Richmond Hill monitoring data.
Air Quality 2025-2027 Ongoing No major constraints. Baseline air quality monitoring and modeling are ongoing.
Meteorology 2025-2027 Ongoing No major constraints. Data are continuing to be collected at the on-site meteorological station.
Soils 2025-2026 Complete No major constraints. Soils are typical of the northern Black Hills and generally suitable for reclamation.
Vegetation 2025-2026 Complete Four South Dakota rare plant species were identified; no federally listed plant species were observed. Mitigation measures or seeding plans may need to be developed in consultation with SDDANR and SDGFP.
Wetlands 2025-2026 Ongoing Baseline wetlands surveys are ongoing. Jurisdictional determination is pending. The PFS assumes wetlands and water resources within the Project are not waters of the US.
Wildlife 2025-2026 Ongoing No federally listed wildlife species were documented. Several state-sensitive species, including bats, raptors, and Black Hills red squirrel, were identified. Wildlife mitigation measures may need to be developed in consultation with SDDANR and SDGFP.

 

Page 280 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Discipline Years Status Key Findings
Aquatic Resources 2025 Complete No major constraints. Fish, macroinvertebrate, and periphyton communities indicate healthy aquatic systems. Historical and recent monitoring results show no evidence of significant impacts from previous mining.
Cultural Resources 2025-2026 Complete Cultural resource investigations identified previously recorded and newly documented sites. Avoidance or mitigation is recommended for three sites, including two National Register of Historic Places (NRHP)-eligible resources, and State Historic Preservation Office (SHPO) will need to be consulted.
Noise 2026-2027 Ongoing No major constraints. Baseline sound monitoring completed but modeling is ongoing. Ambient noise levels are typical of rural settings and are primarily influenced by traffic, recreation, wind, and wildlife.
Visual/Scenic Resources 2026-2027 Ongoing No major constraints. Visibility effects are expected to be localized and evaluated through detailed visual simulations during permitting.
Socioeconomics 2027 Ongoing No major constraints. Detailed socioeconomic assessment will be completed as part of permitting.
Transportation 2027 Ongoing No major constraints. Existing regional road network and mine access routes are expected to support Project development.

 

In the 1980s and 1990s, considerable environmental baseline information was collected to support historical mine permitting, reclamation, and closure activities. This information, together with new or updated data collected from 2022 through 2026, will be used to support future mine development and permitting.

 

17.3.1Surface Water

 

Surface water quality monitoring has been conducted at Richmond Hill since historical mining operations and provides a long-term dataset for evaluating baseline conditions and potential mining-related influences. To support development of the Richmond Hill Project, Dakota Gold implemented a comprehensive baseline surface water monitoring program in accordance with South Dakota large-scale mine permitting requirements. The program includes 15 monitoring stations, consisting of historical Richmond Hill monitoring locations and new stations established within the Cleopatra Creek, Rubicon Gulch, Burno Gulch, and Chism Gulch drainages. Monthly sampling began in September 2025 and is scheduled to continue through late 2026 when it is anticipated to transition to quarterly sampling. Analytical parameters include major ions, metals, and other constituents of potential concern.

 

In addition to routine stream monitoring, a spring and seep inventory was completed in 2026. Thirteen springs and seeps were identified, ten were incorporated into the monitoring network, and six locations with sufficient discharge were sampled for water quality characterization. Surface water baseline studies are intended to establish existing water quality conditions, seasonal variability, and hydrologic characteristics to support water management planning and permitting.

 

17.3.2Groundwater

 

Groundwater monitoring has been conducted at Richmond Hill since at least 1988 and continued through mine closure and reclamation activities. Historical monitoring data provides a valuable record of hydrogeologic conditions in the vicinity of the former mining area, waste rock facilities, and processing areas. To support the proposed Project, Dakota Gold significantly expanded the groundwater characterization program through installation of 26 new monitoring wells during 2025 and incorporation of 11 existing Richmond Hill monitoring wells into the baseline network. The resulting monitoring system consists of 37 wells completed in alluvial, Deadwood Formation, Precambrian, volcanic, and Madison Limestone. Monthly groundwater quality and water-level monitoring commenced in September 2025 and continued through 2026. Groundwater sampling frequency is also anticipated to transition to quarterly in late 2026.

 

Page 281 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Baseline investigations indicate groundwater occurrence is controlled by a complex geologic framework that includes stratigraphic contacts, intrusive bodies, faults, fracture zones, and localized perched groundwater systems. Groundwater generally flows away from topographic highs toward adjacent drainages, with natural recharge occurring in upland areas and into perennial streams. Baseline water quality and hydrogeologic data are being used to develop a hydrogeologic model and support future groundwater flow and transport modeling required for groundwater discharge and mine permitting.

 

17.3.3Air Quality and Meteorology

 

Air quality and meteorological baseline studies were initiated in 2025 to characterize environmental conditions within the Richmond Hill Project area and provide data for future air quality and mine permitting. A site-specific meteorological station was installed in May 2025 and continuously records wind speed, wind direction, temperature, relative humidity, barometric pressure, precipitation, and solar radiation. Concurrent ambient air quality monitoring was established to measure particulate matter concentrations, including PM10 and PM2.5. The baseline air quality and meteorology monitoring program will provide the foundation for evaluating impacts of potential emissions associated with future mining operations and for developing appropriate mitigation measures where necessary. Air quality and meteorology data and baseline reports will be incorporated into future permit applications.

 

17.3.4Soils, Vegetation, and Wetlands

 

Baseline vegetation surveys were completed during 2025 and characterized vegetation communities, species composition, vegetation cover, tree and shrub density, special-status plants, and noxious weeds. Six major vegetation communities were mapped across the Project area, including paper birch, ponderosa pine, quaking aspen, white spruce, riparian, and reclaimed communities. Vegetation cover generally ranges from approximately 50% to 80%, and tree canopy cover generally ranges from 20% to 40%. No federally listed plant species were identified during baseline surveys. Four rare plant species tracked by South Dakota were documented within the Project area: white-veined wintergreen, mountain huckleberry, western mountain ash, and northern holly-fern. The presence of these species may require consultation with SDDANR and SDGFP to develop mitigation measures or changes to revegetation plans.

 

Wetland delineations completed in 2025 identified approximately 6.9 acres of wetlands and 9.8 acres of other aquatic resources within the study area. Supplemental wetland surveys were completed during 2026 to support wetlands mapping in the western side of the baseline study area. In addition, a jurisdictional determination request was submitted to the U.S. Army Corps of Engineers for features associated with False Bottom Creek.

 

Baseline soils studies in 2025-2026 included soil mapping, topsoil characterization, and laboratory analyses. Soils are typical of those found throughout the Black Hills and are dominated by loamy materials developed on colluvium, residuum, and alluvium. The average recommended top-soil salvage depth is approximately 4.5 inches. The vegetation, wetlands, and soils baseline reports are being finalized and will be incorporated into future permit applications.

 

17.3.5Wildlife

 

Historically, various wildlife inventories, including game bird, raptor, and breeding bird nest surveys, have been performed on Richmond Hill Mine property and adjacent lands (typically within a 0.5-mile buffer around the property boundary), including standard surveys and incidental sightings. Except for small-scale wildlife surveys (totaling approximately 596 acres) for exploration drilling projects in 2022, 2023, 2024, 2025, and 2026 few wildlife surveys had been conducted for the mine since the mid 90s with the cessation of mining and completion of reclamation activities.

 

Page 282 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Updated wildlife baseline studies were conducted between March 2025 and January 2026 and included habitat assessments, breeding bird surveys, raptor nest surveys, game bird surveys, bat investigations, small mammal trapping, amphibian and reptile surveys, and incidental wildlife observations.

 

Wildlife communities documented during the surveys are typical of the northern Black Hills and include a variety of mammal, bird, bat, amphibian, and reptile species associated with mixed conifer forest, ponderosa pine woodland, riparian areas, and reclaimed land habitats. No federally listed threatened or endangered wildlife species were documented. Fourteen state-sensitive species were identified, including seven bat species, six bird species, and the Black Hills red squirrel. Surveys did not identify active raptor nests, crucial big-game winter range, migration corridors, or other unique wildlife concentration areas within the Project area. Supplemental bat investigations were completed in 2026 to further evaluate potential hibernacula associated with historic mine workings, which also found no federally listed species.

 

17.3.6Aquatic Resources

 

Aquatic resource monitoring in the Richmond Hill area represents one of the longest-running environmental datasets associated with the Project. Baseline aquatic biological studies were initially conducted in 1985 and 1986, with additional monitoring performed from 2006 through 2017, in 2022, and in 2025. Aquatic resource monitoring includes habitat assessments, fisheries surveys, benthic macroinvertebrate evaluations, and periphyton monitoring within Cleopatra Creek, Rubicon Gulch, Labrador Gulch, Cole Creek, Chism Gulch, Burno Gulch, and an unnamed tributary to False Bottom Creek.

 

Results collected through 2025 indicate healthy aquatic communities that are representative of northern Black Hills streams. Brook trout were the only fish species observed, with all age classes present in the principal monitored reaches and evidence of successful reproduction occurring within the watershed. Benthic macroinvertebrate communities are diverse and include numerous sensitive taxa, while periphyton communities are generally stable and comparable to other regional streams. Comparisons of post-mining monitoring data to pre-mining baseline conditions indicate that aquatic biological communities in monitored streams have remained stable over time and do not exhibit evidence of long-term impairment from historical mining activities.

 

17.3.7Cultural Resources

 

A Level I cultural resources records review and subsequent Level III field inventory were completed to support project permitting. The records search identified 52 previous cultural resource investigations overlapping portions of the Project area. Following evaluation of previous survey coverage, approximately 1,225 acres were inventoried through pedestrian surveys and targeted subsurface investigations during 2025. The investigations documented a total of 47 previously recorded cultural resources within the one-mile study area and identified 11 newly recorded sites.

 

Two previously recorded sites, Carbonate Camp (39LA0289) and the Iron Hill Mining District (39LA0430), are considered eligible for listing on the National Register of Historic Places. One newly documented site (39LA1827) remains unevaluated and is being treated as avoidance-worthy. Current planning incorporates avoidance measures for Carbonate Camp and site 39LA1827 resources. A combination of avoidance of contributing features and mitigation measures such as archaeological monitoring during ground-disturbing activities would occur at the Iron Hill Mining District site. A determination of no adverse effect has been recommended for the Project.

 

17.3.8Visual Resources

 

A visual resource assessment was initiated in 2026 to evaluate existing visual conditions and potential effects associated with future mining activities. The assessment includes baseline photography, drone imagery, scenic quality evaluations, viewshed analysis, and visual simulations from key observation points representing recreational, residential, and transportation viewpoints surrounding the Project. Key viewpoints include Richmond Hill Road, Terry Peak, Bridal Veil Falls, Devil's Bathtub, and several nearby residential locations.

 

Page 283 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Preliminary evaluations indicate that visibility of future mine facilities will be strongly influenced by the area's rugged topography and extensive forest cover. Many recreational viewpoints, including Devil's Bathtub and Bridal Veil Falls, are expected to have limited or no visibility of proposed Richmond Hill Project facilities. Additional visual simulations will be completed as engineering designs progress and will be used to evaluate operational and post-reclamation visual conditions.

 

17.4Project Permitting Requirements, Permit Application Status, and Requirements to Post Performance or Reclamation Bonds

 

Richmond Hill Project permit requirements and status are summarized in Section 3.8.

 

Homestake Mining Company of California (Homestake) has posted the Post-Performance and Reclamation bonds required by the SDDANR for SMP No. 445, and the SDDANR has received updated bonds as required. South Dakota Board of Minerals & Environment (SDBME) required the face value of the surety bond for 2026 that serves as the post-closure financial assurance to be $42,939,910. Maintenance of the bonds would be the responsibility of Dakota Gold once the Option is exercised. Dakota Gold has posted the necessary state-wide reclamation bond of $100,000 for all Exploration Notices of Intent (EXNI) permits issued by the SDDANR.

 

17.5Requirements and Plans for Waste Storage, Site Monitoring, and Water Management During Operations and After Mine Closure

 

Plans for the new proposed Richmond Hill Project, including general mine plans, overburden and spent ore disposal, monitoring, and water management during and after closure are continuing to be developed and will be updated for inclusion in future permit applications.

 

17.5.1Waste Storage

 

As part of Homestake’s closure program at Richmond Hill Mine, all material classified as acid-generating was removed from the Spruce Gulch waste dump and placed in truck-compacted lifts back into the historical Richmond Hill mining area. In addition, the most reactive spent ore from Leach Pad 3 was also removed and placed in the former mining area. Following placement, the material was capped with a multilayered capping system to minimize oxygen and water infiltration into the compacted potentially acid-generating material and to protect the capping system from erosion, bioturbation, and frost heaving. Homestake used a similar capping system to remediate the spent ore material on the heap leach pads. Homestake also added and mixed limestone into most of the Pad 3 material to mitigate potential Acid Rock Drainage (ARD) in that material. The leach pad and backfilled historical Richmond Hill mining area impoundment covers have met or exceeded original design specifications for limiting infiltration.

 

Under Dakota Gold’s operational plan, overburden and waste rock would be temporarily stored in an overburden storage area and eventually used to backfill the mine pits. Spent ore on the heap leach pad would be reclaimed in place using a capping system to reduce oxygen and water infiltration. Plans for the new Project, including general mine plans, overburden and spent ore disposal, and material management during and after closure are continuing to be developed and will be included in future permit applications.

 

All solid waste that may be generated at the site will be transported off-site and disposed of at permitted facilities in accordance with all local, state, and federal regulations. This includes trash, debris, and building-demolition waste and rubble.

 

Page 284 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

17.5.2Site Monitoring

 

Current monitoring activities by Homestake at the Richmond Hill site include monthly site inspections of the reclaimed acreage, as well as the water treatment operations and support facilities. Annual visual inspections of the leach pad and backfilled historical Richmond Hill mining area impoundment covers are carried out to monitor for stability, erosion control, and prevention of deep-rooting vegetation through the clay caps. Visual inspections also include observations of potential surface cracking, subsidence, stressed vegetation, and erosion rills or slumping of the impoundment covers.

 

Fencing and signage along the remaining highwalls and mine access roads are routinely monitored and maintained, as needed, to restrict access and protect public safety. Homestake implements an annual noxious-weed treatment program at the site. Stormwater-management structures are monitored and repaired as needed to prevent excessive erosion and sediment loading in surrounding drainages. Homestake maintains a Stormwater Pollution Prevention Plan (SWPPP) under the site’s surface-water discharge (SWD) permit. The SWPPP provides for road grading and maintenance of sediment-control structures. Buildings are maintained as needed, and access is restricted to Homestake employees and contractors and, upon request, SDDANR personnel. Dakota Gold would assume responsibility for site maintenance upon exercise of the Option.

 

Under Dakota Gold, site monitoring would be expanded to include monitoring of new mining areas, facilities, and expanded environmental monitoring. Surface water in affected drainages would be monitored under the LSMP and/or surface water discharge permits. Groundwater monitoring during and after mining and processing operations are regulated by state statutes that control the impacts to groundwater; a groundwater monitoring program will be developed associated with any potential groundwater discharge permits and the LSMP. Additional operational monitoring would be conducted to ensure soil stockpiles are maintained for stability and erosion control. Regular aquatic resources monitoring, wildlife monitoring, and noxious weed treatment plans will be developed. An air quality monitoring program will be developed to meet air permit requirements.

 

After mining is completed and reclamation is in the final stages of establishing vegetation, Dakota Gold will inspect and maintain activities to ensure permit compliance and potential environmental impacts are reduced. Post-closure monitoring plans are continuing to be developed and will be included in future permit applications and submitted to the SDDANR before closure.

 

17.5.3Water Management and Water Treatment

 

17.5.3.1Existing Water Management

 

The existing water management program at the Richmond Hill Mine consists of potentially impacted water from the former process area, mining area impoundment, or Spruce Gulch waste rock facility that is actively managed by two on-site water management and treatment systems that have continued to operate throughout the post-closure period. The Spruce Gulch water management facility manages water from the former Spruce Gulch waste rock facility and South Gulch. The treated water is released into Spruce Gulch at the permitted SWD compliance point. The process-area water management facility manages water from the reclaimed leach pads and stormwater pond. This water is treated in one of three ways before being released to the permitted SWD compliance point. The first treatment option is reverse osmosis (RO) with additional biological treatment. The second option is biological treatment without RO. The third treatment option is biological treatment and chemical precipitation. Continued water treatment at these sites would be the responsibility of Dakota Gold upon exercise of the Option.

 

Homestake currently performs surface water and groundwater quality monitoring and aquatic biological monitoring consistent with the Hydrologic Monitoring Plan. The Hydrologic Monitoring Plan includes monitoring of 13 groundwater wells and 10 surface-water locations to assess water quality and trends in pH, sulfate, and metal concentrations. “Sentinel” monitoring locations are positioned at surface-water and groundwater flow locations downgradient of the historic operations areas (i.e., backfilled mining area, Spruce Gulch, and leach pads) and are representative of the water quality in those locations. A post-closure Groundwater Quality Contingency Plan has been implemented that identifies site-specific performance criteria that Homestake uses for triggering additional actions if water quality at defined sentinel monitoring locations indicates a potential change in groundwater conditions that could cause an exceedance of surface-water quality standards at permitted SWD compliance points. Aquatic biological monitoring continues to be conducted in Cleopatra Creek, Labrador Gulch, and Rubicon Gulch in accordance with the SWD permit. The Aquatic Biological Monitoring Plan stipulates that Homestake performs this monitoring every five years until 2032, at which time aquatic biological monitoring will be discontinued. All site monitoring would be the responsibility of Dakota Gold upon exercise of the Option.

 

Page 285 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

17.5.3.2Conceptual Project Plan for Water Management

 

Dakota Gold will assume operation and maintenance of the Richmond Hill site, including water treatment and permit-compliance activities, upon exercise of the Option. Water management for the proposed Project will be conducted in accordance with state regulations administered by SDDANR.

 

At the Richmond Hill site, the Project will need to accommodate existing water collection, treatment, and permitted discharge requirements concurrently with site development, including development of new mining areas, heap leach facilities, and overburden storage areas. Continued use of the existing water management infrastructure is assumed during the transition from existing site water management requirements to Richmond Hill Project construction, operations, closure, and post-closure. For the PFS, the existing water treatment plant is assumed to continue treating the same sources and flows as under current operations until it is replaced by a new plant. The new heap leach system will operate as a closed circuit, and drainage from inert oxide over liner material will report to the stormwater pond without treatment. Water from the new mining and overburden storage areas is not assumed to report to the existing water treatment plant or require treatment; these assumptions will be confirmed through the site-wide water balance and geochemical and hydrogeological evaluations before FS design is finalized.

 

It is assumed for the PFS that water treatment system upgrades will be installed and begin operating at the beginning of the Project. The upgrades will focus on the existing water treatment plant and will be sized for the current treatment sources and flows. The scoping-level assessment identified Envirogen’s Advanced Metal Removal System (AMRS) as best technology (see Section 17.5.3.3).

 

Potential contact water and stormwater will be segregated, collected, monitored, managed, and where required, treated and discharged in compliance with future existing or additional required discharge permits. For the PFS, runoff and seepage from the new mining and overburden storage areas are not assumed to require treatment or to report to the existing water treatment plant. This routing and treatment assumption will be confirmed before FS design using the site-wide water balance and the results of geochemical and hydrogeological characterization. A comprehensive Stormwater Pollution Prevention Plan (SWPPP) is being developed and will be included in future permit applications for the Richmond Hill Project.

 

The Project water balance is being developed in a GoldSim model to evaluate water management requirements throughout construction, operations, closure, and post-closure activities, including pit backfilling. The water balance incorporates the principal sources, storage components, and water demands associated with the Project and has been used to assess water availability and operational water management strategies. While modeling is still ongoing, the water balance indicates that Project water demands can be met throughout the mine life through a combination of treated stormwater, contact water, and an existing industrial water well. Overall, the water balance demonstrates that the Project is expected to maintain an adequate water supply while supporting efficient water reuse and management practices.

 

Page 286 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

17.5.3.3Water Treatment for Historical Heap Leach Facilities

 

A PFS-level evaluation was completed to identify a new treatment approach for water currently managed at the water treatment plant. The assessment reviewed the performance and condition of the existing reverse-osmosis, biological, and chemical-precipitation systems and compared vendor-supported alternatives against the preliminary design basis. The evaluation considered the ability to treat the anticipated range of flows and water quality, with particular emphasis on selenium and other potential constituents of concern, including arsenic, cadmium, copper, mercury, nickel, and chromium. Other considerations included process complexity, operability, influent flexibility, modularity, residuals generation and management, equipment footprint, technology maturity, capital and operating costs, and the ability to meet applicable discharge criteria.

 

Based on the evaluation, Envirogen Technologies’ Advanced Metals Removal System (AMRS) was selected as the preferred treatment technology for advancement into the Feasibility Study. The AMRS is a single-vessel, upflow process that uses a tailored zero-valent iron medium to remove selenium through reduction and adsorption while also removing a range of dissolved metals. The system can be configured for the current 100-gpm design flow, provides broad turndown and modular expansion capability, and offers a comparatively compact and simplified treatment train. Advancement of the AMRS into the Feasibility Study will include bench-scale testing using representative site water, confirmation of constituent-specific removal performance and media life, definition of any required pretreatment or effluent polishing, and refinement of residuals handling, process guarantees, capital costs, and operating costs. These activities will confirm the final process configuration and reduce technical and cost uncertainty before detailed design.

 

17.6Environmental Geochemistry

 

This section briefly summarizes the existing environmental geochemistry information available for the Richmond Hill Project and summarizes the current project understanding of the potential for future mined materials to generate acid rock drainage (ARD) or contribute to metals leaching (ML). Dakota Gold initiated geochemical characterization studies of mine materials in 2024, and the studies are currently ongoing. The purpose of mine material characterization is to advance the site environmental conceptual model and to understand both long-term material environmental behavior and environmental risks associated with ore, overburden, and rinsed spent ore. More specific objectives include identifying material types (or classes) to be managed, providing clear segregation criteria for these material types to Dakota Gold, and initiating the processes of developing long-term water quality predictions for various future mine facilities and helping Dakota Gold develop life of mine water and material management strategies.

 

Mineralization at Richmond Hill is associated with disseminated gold hosted within hydrothermally altered sedimentary and intrusive rock units. Historical and recent exploration drilling has identified a range of lithologies, alteration types, oxidation zones and sulfur content across the deposit. To assess the potential for ARD or metal leaching, drill core samples of overburden and ore have been selected to represent the project spatial extent, lithologic variability, alteration characteristics, and anticipated mined material types across the deposit. In addition, rinsed spent ore samples produced during geometallurgical testing were selected to be representative of processed mine materials produced by leaching crushed ore placed in the HLF. Sample numbers for materials selected for characterization were proportional to anticipated excavated mass and projected waste and ore tonnages, based on Project mine planning and geometallurgical planning by the Project Team.

 

The geochemical characterization studies were developed using industry-standard site characterization methods for permitting purposes and to support project feasibility, design and future operational and post-closure needs. The ore and overburden characterization program follows the standard tiered testing approach, with Tier 1a static test methods including acid-base accounting (ABA), paste pH, net acid generation (NAG) testing, and total elemental analysis conducted on the entire subset, Tier 1b static testing including the short-term synthetic precipitation leaching procedure (SPLP) test and mineralogy by x-ray diffraction (XRD) with Rietveld refinement conducted on a subset of the Tier 1a materials, and Tier 2 longer-term humidity cell tests (HCT) conducted on an even smaller subset selected to best represent the range of materials and environmental characteristics observed in Tier 1a and 1b test results. In all, the ore and overburden test program is robust, currently with over 287 drill core samples characterized according to Tier 1a. A subset of 89 samples was selected for Tier 1b testing and a further subset of 28 has been selected for HCTs (which have been initiated).

 

Page 287 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The spent ore characterization program is also underway, including ABA, paste pH, NAG testing, total elemental analysis, SPLP testing, mineralogy by XRD, standard HCTs, and modified 5-kg HCTs. At the time of this PFS, 134 bench-scale samples of spent ore have been or are currently being tested by the methods listed above.

 

17.6.1Mine Material Types

 

Anticipated mine material types can be developed into three broad Project classes, as follows:

 

·Overburden- includes material that must be mined to access the targeted mineralized area. The mine-access material will be stored on the surface in one of two overburden storage facilities or backfilled into the pits. This includes all material from the pits that does not meet geometallurgical definitions of ore. Overburden has been extensively sampled and characterized by Tier 1a and Tier 1b. Tier 2 laboratory tests are currently underway. Additional samples are anticipated for all characterization tiers in the remainder of 2026 and 2027, both for gap-filling purposes and to further support detailed design and evaluation of future mine water and material management alternatives.

 

·Ore- includes mineralized bedrock that will be excavated predominantly as ore for processing. Ore has been sampled and characterized by Tier 1a and Tier 1b. Tier 2 laboratory tests are currently underway. Additional samples are anticipated for all characterization tiers in the remainder of 2026 and 2027, both for gap-filling purposes and to further support detailed design and evaluation of future mine water and material management alternatives.

 

·Spent Ore- include bench-scale samples of rinsed heap leach spent ore have been characterized for Tier 1a, Tier 1b, and Tier 2 tests. Additional spent column leach samples generated via the 2026 geometallurgical test program have been tested for Tier 1a, and Tier 1b and Tier 2 testing will be started in 2026 and be completed by mid-2027.

 

Results of the ongoing testing may warrant defining additional subclasses if specific material types exhibit environmental behavior (i.e., acid generation risk, metals leaching risk, inertness etc.) that require segregation and separate management.

 

17.6.2Mine Material Environmental Behavior

 

The geochemical characterization studies are ongoing, with modeling and reporting to be completed in 2027, and results will be included in the FS and permit applications.

 

Static geochemical characterization tests were completed to evaluate the acid rock drainage (ARD) and metal leaching potential of representative overburden, ore, and spent ore materials. Results indicate that the many of materials associated with the Project exhibit low sulfide sulfur concentrations and correspondingly low acid generation potential (AGP). Transition and sulfide oxidation zone materials at the base of or below the current pit configuration do have increasing sulfide sulfur concentration and potential to generate acidic conditions but are not planned to be excavated. Acid neutralization potential (ANP) is generally low (less than +30 t CaCO₃/kt), with high concentrations observed in the Intermediate Deadwood Formation and Tertiary Latite. Based on two commonly accepted, industry-standard criteria for measuring ARD potential (NNP and NAG pH), more than 87% of oxide overburden, ore, and spent ore samples are highly likely to be non-acid generating. Kinetic testing (currently ongoing) is aimed at resolving any remaining uncertainty and is likely to further increase this percentage.

 

Overall, the geochemical dataset indicates that mine materials are expected to present a low risk for ARD development under anticipated operating and closure conditions. While most materials demonstrate favorable geochemical characteristics, some samples yielded acid-base accounting results within uncertainty ranges, reflecting the low sulfur and low neutralization conditions typical of the Project. Additional kinetic testing and long-term geochemical monitoring are recommended to confirm field-scale behavior, evaluate long-term acid generation and neutralization processes, and support materials management and closure planning.

 

Page 288 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Based on the geochemistry information currently available, no geochemical conditions have been identified that would preclude development of the Project. The Project will focus on mining oxide ore, though special material handling plans may need to be developed to include transitional material with blending procedures. Characterization work will continue to be incorporated into project design and material handling plans as additional data become available.

 

17.7Social and Community Impacts, Relations, and Consultation

 

17.7.1Cultural, Social, and Economic Resources

 

The Project is located in Lawrence County, South Dakota, approximately 4.5 miles northwest of Lead, SD. The economy of the northern Black Hills has been shaped by natural resource-based industries, including mining and forestry, as well as recreation tourism.

 

The area has a long history of mineral exploration and development, dating back to the late 1800s. More recently, the Richmond Hill Mine utilized open pit mining and cyanide heap leach extraction to recover gold, with production beginning in 1988 and continuing until 1993. Currently, the Richmond Hill Mine is in post-closure and maintenance phase, which primarily involves water management.

 

Considerable cultural resources research was conducted in the vicinity of the Richmond Hill Mine in association with historic mining and exploration activities since the 1970s. More recently, Vantage Point conducted cultural resource surveys within the Project area to support Dakota Gold’s exploration and mine permit application. Most historical resources identified near the Project are associated with historical mining activities and community development. Vantage Point recommended avoidance of three sites, including two sites eligible for listing on the National Register of Historic Places (NRHP) and one unevaluated site. Overall, a determination of no historic properties affected was recommended for the Project.

 

Dakota Gold has obtained a third-party consultant, Dakota Institute, to complete a socioeconomic study, and they have been approved by the Board of Minerals and Environment. At the time of this PFS, the socioeconomic study is ongoing, but the study will evaluate the potential impacts of the proposed Project within the following areas: population base, employment and income, tax base, housing, community services, traffic, recreational opportunities, or other beneficial uses of land within and adjacent to the permit area.

 

It is anticipated that most Project employees would reside in the local communities in the northern Black Hills, including Lead, Deadwood, Spearfish, and Sturgis. Construction workers with specialized skills may be hired from outside the local labor market to support construction and commissioning. Dakota Gold is committed to hiring and procurement from the local community, prioritizing the city, region, and state, followed by out-of-state and out-of-country. Therefore, the Project would have a positive impact on the local communities by providing direct employment in the mining industry, secondary employment in the local community (e.g., income generated from wages and by secondary job employers), and local and state taxes. Negative impacts related to the Project may be experienced due to increased traffic on rural roads and increased demand for housing and community services; these negative impacts are not expected to be significant.

 

Page 289 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

17.7.2Community Engagement, Relations, and Employment

 

Dakota Gold believes responsible resource development should be executed with respect for local values. Community engagement and relationship development activities include:

 

·Engaging with residents, community organizations, educational institutions, and other stakeholders to provide information and receive feedback on project activities.

 

·Hosting meetings where community members, state and local government officials and other stakeholders can meet with Dakota Gold staff, learn more about our projects, ask questions, share perspectives, and raise concerns.

 

·Hiring local contractors, engaging local service providers, and purchasing goods locally when possible.

 

·Maintaining active membership in the South Dakota Mineral Industries Association and participating in local business and community organizations.

 

·Providing financial, volunteer, and in-kind support for local organizations, events, and community initiatives.

 

Dakota Gold currently employs approximately 40 people in full-time roles to support exploration, permitting, and project development activities. A majority of these employees live in the area. Where possible, Dakota Gold prioritizes local hiring and the use of local businesses and service providers.

 

17.7.3Community and Tribal Consultation

 

A federal environmental review under NEPA is not currently anticipated. South Dakota does not require a formal Tribal consultation process or a dedicated state-Tribal scoping process for the Project. The applicable state permitting processes include the following public notification, scoping, comment, and intervention opportunities:

 

·Individuals and groups on the SDDANR’s “interested persons” mailing list and the local county commission are notified within 10 days of receiving a LSMP application.

 

·Following a completeness determination by SDDANR, Dakota Gold will mail a “Notice of Filing” to all surface owners and lessees within the Project area. The Notice will also be published in a local newspaper once a week for two consecutive weeks.

 

·The public may comment or petition to intervene in the application proceeding. It is assumed there will be one ore more interveners and a contested case hearing will be scheduled with the Board of Minerals and Environment.

 

17.7.4Plans, Negotiations, or Agreements with Local Individuals or Groups

 

Other than coordination with surface rights owners, and general plans regarding permitting strategy or land position, Dakota Gold does not have any current plans, negotiations, or agreements with local individuals or groups. Depending on how the mine plan develops, waivers may be required from adjacent landowners to waive the 500-ft surface disturbance buffer required by Lawrence County.

 

17.8Mine Closure and Reclamation Plans

 

The Richmond Hill Gold Mine is currently inactive and mostly reclaimed, except for water treatment facilities, as shown in Figure 17-1. Water treatment continues to be conducted at the former Spruce Gulch waste rock disposal site to treat water emanating from Spruce Gulch and South Gulch, and at the former process area to treat seepage from the closed leach pads. Homestake received a replacement RO unit for the water treatment plant in September 2023 which was operational in 2024. The new RO unit is smaller, more efficient, and can treat water at cooler temperatures. Water treatment will be required at these sites until water quality effluent limits and water quality standards are met pursuant to the Richmond Hill permits and South Dakota laws and regulations. If Dakota Gold exercises the option to purchase the property, continued water treatment at the Spruce Gulch waste rock disposal site would be their responsibility.

 

Page 290 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

A conceptual reclamation and closure strategy has been developed based on current project design information. Detailed closure planning will continue as engineering advances and additional baseline environmental and geochemical characterization studies are completed. Closure cost estimates and reclamation bonding requirements will be refined during the Feasibility Study phase.

 

The Richmond Hill reclamation and closure plan would include:

 

·Concurrent backfilling and grading of primary mining areas.

 

·Decommissioning, drain down, and regrading of the heap leach.

 

·Decommissioning of surface infrastructure and roadways.

 

·Dismantling of all facilities, with sales/recycling of assets and disposal of waste.

 

·Final scarification, grading, and revegetation of all disturbance areas.

 

·Post-closure groundwater monitoring.

 

This approach with concurrent reclamation would result in minimal post-reclamation landform impacts and is anticipated to be completed within five years of ceasing operation. Post-reclamation monitoring, including groundwater quality, storm water management, and revegetation success, would be designed to meet State requirements and would be continued for up to ten years following reclamation.

 

Current mining regulations require that financial guarantees cover all reclamation costs, including dismantling of facilities, abandonment of roadways, regrading and revegetating disturbed areas, and water monitoring. The amount of the guarantee, which is in the form of a surety bond, corresponds to the total estimated costs for the reclamation of the entire mine site. The RCE would be developed using average costs based on the Nevada Standardized Reclamation Cost Estimator (SRCE Version 2.0) and includes direct and indirect costs, contingency, and post-reclamation monitoring assuming third-party costs.

 

Page 291 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

 

 

Figure 17-1: LAC’s Reclamation Liability Release Map (SDBME, 2016)

 

Page 292 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

17.9Key Environmental and Permitting Risks

 

For a mineral resource to have “reasonable expectations for economic recovery,” the legal and regulatory permission to mine must be present or there must be reasonable expectation that such permission is possible. There is a legal framework in place at both the county and state levels and precedent for permitting the Project.

 

The Project is subject to county and state permitting requirements, and there is precedent for permitting mining projects within the applicable legal and regulatory framework. Receipt of the required authorizations is not assured. The permitting process may result in additional studies, design modifications, mitigation measures, permit conditions, or schedule changes.

 

Based on the current regulatory framework, the Project plans to maximize the use of existing reclamation credits associated with Homestake’s LSMP No. 445, limit new disturbance to 580 acres at any one time, and incorporate design features intended to protect environmental resources. Dakota Gold’s ongoing coordination with state and local regulatory agencies and engagement with local communities are expected to support the permitting process; however, receipt and timing of all required permits and authorizations remain subject to agency review, public processes, completion of supporting studies, and satisfaction of applicable requirements.

 

17.10Qualified Person’s Opinion on the Adequacy of Current Plans to Address Any issues Related to Environmental Compliance, Permitting, and Local Individuals or Groups

 

The QP is of the opinion that the environmental studies, permitting, and social aspects of the project are being appropriately managed and planned to support the proposed mine and mineral processing operation on Dakota Gold’s claims. Outstanding baseline studies, geochemical characterization, engineering evaluations, permit applications, mitigation plans, closure planning, and stakeholder engagement will need to be completed or refined as the Project advances.

 

Dakota Gold will continue to work with state and local agencies to ensure that all permitting will be sufficient to ensure that future mining and processing will be conducted in accordance with all applicable regulations. Additionally, Dakota Gold will develop community engagement plans to identify and ensure an understanding of the needs of the surrounding communities and to determine appropriate programs for addressing those needs.

 

The QP is of the opinion that the environmental and permitting matters identified in this section do not currently preclude advancement of the Richmond Hill Gold Project. This opinion considers the established regional mining context, including more than 40 years of continuous operation at the adjacent Wharf Mine owned by Coeur Mining, and the history of mining activity in the Homestake District. The Project’s ability to advance remains subject to completion of the studies, designs, consultations, and permitting activities described in this section.

 

Page 293 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18Capital and Operating Costs

 

 

 

Capital and operating costs were estimated for the PFS by IMC (mine development), M3 (process plant, site development, power systems, and ancillaries), Newfields (heap leach facilities), and RESPEC (water treatment plant). Table 18-1 shows the estimated capital costs for the project.

 

Table 18-1: Capital Cost Summary

 

Category Units Initial Sustaining Total
Site General K USD $30,026 $0 $30,026
Ore Preparation K USD $97,147 $0 $97,147
Merrill-Crowe & Refinery K USD $37,656 $0 $37,656
Solution Systems K USD $20,636 $0 $20,636
Power Systems K USD $5,717 $0 $5,717
Ancillaries (Truck Shop, Lab, Warehouse, Admin) K USD $32,313 $0 $32,313
Freight (Process Plant) K USD $12,530 $0 $12,530
Sub-Total Direct Cost (Process Plant & Support) K USD $236,025 $0 $236,025
Contractor Indirect Costs (incl. Mobilization) K USD $29,749 $0 $29,749
Vendor Support, Commissioning & Spare Parts K USD $9,064 $0 $9,064
Contingency (Process Plant) K USD $63,738 $0 $63,738
Owner's Costs K USD $13,410 $0 $13,410
Sub-Total Indirect Cost (Process Plant & Support) K USD $159,814 $0 $159,814
Water Treatment Plant K USD $8,855 $0 $8,855
Heap Leach Pad & Ponds K USD $97,419 $85,742 $183,161
HLP Pump System K USD $0 $7,050 $7,050
Sub-Total HLP and WTP Cost K USD $106,274 $92,792 $199,066
Mine Pre-Strip K USD $11,078 $0 $11,078
Working Capital (Ore Inventory) K USD $0 $19,315 $19,315
Mining Equipment K USD $24,353 $21,238 $45,591
Sub-Total Mine Cost K USD $35,431 $40,552 $75,984
Total Capital Cost K USD $537,544 $133,344 $670,888

  

Table 18-2 shows the estimated operating and production costs for the LOM of the project. Operating costs were estimated at $1.53 billion for the LOM. This is equivalent to $11.58 per ton processed or $977 per ounce of payable gold. Production costs are estimated at $1.76 billion per ton processed or $1,126 per ounce of payable gold.

 

Table 18-2: Operating & Production Cost Summary

 

Category Operating/Production Cost
Cost (K USD) $ / ton $ / Au oz
Mining $787,902 $5.98 $504
Process Plant $580,945 $4.41 $372
G&A $148,718 $1.13 $95
Refining $8,537 $0.06 $6
Total Operating Cost $1,526,102 $11.58 $977
Royalty $169,387 $1.28 $108
Salvage Value $0 $0.00 $0
Reclamation/Closure $62,476 $0.47 $40
Total Production Cost $1,757,965 $13.33 $1,126

 

Page 294 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18.1Process Capital

 

18.1.1Process Capital Cost Summary

 

The process plant costs are comprised of costs for the process facilities, infrastructure, power systems and ancillaries. The direct costs are developed from labor, materials, plant equipment, sub-contracts, construction equipment, and freight. Indirect costs are applied to the direct costs to account for items such as: construction support; engineering, procurement, and construction management (EPCM); vendor support during construction and commissioning; spare parts; contingency; and owner’s costs. Together, the direct and indirect costs form the capital costs.

 

The process plant includes the crushing and Merrill-Crowe plants, as well as the refinery and reagents. The ancillaries include components such as the truck shop and warehouse, truck wash, laboratory, mine dry, and the fuel station.

 

Indirect costs were then calculated following industry accepted methodologies, including application of contingency based on the completed level of design on a scope or individual work type basis. The agglomerate contingency for the process plant is estimated at 20% of total contracted cost. Total contracted costs include all process plant direct costs, plus construction support costs, EPCM costs, vendor support costs, and spare parts costs. First fills were calculated by M3. Owner’s Costs were developed in collaboration with Dakota Gold.

 

Process plant capital costs were independently developed, and all capital cost estimates are based on the purchase of new equipment. The total evaluated project cost is projected to be in the accuracy range of -15%/+20%.

 

Table 18-3: Initial Capital Cost Summary – Surface Facilities

 

Category (all costs are in USD x1,000) Plant Equip. Material Labor Sub Contract Const. Equip. Total
General Site $0 $14,180 $7,117 $0 $8,729 $30,026
Primary Crushing $8,455 $9,631 $7,040 $0 $1,009 $26,134
Fine Crushing $36,153 $18,666 $14,350 $0 $1,845 $71,013
Solution Transfer $2,170 $2,118 $1,693 $0 $116 $6,097
Merrill-Crowe $12,280 $7,985 $4,540 $0 $1,012 $25,817
Refinery $3,073 $2,782 $1,835 $0 $250 $7,939
Water Systems $3,150 $5,191 $5,700 $0 $497 $14,539
Power Systems $4,200 $1,100 $394 $0 $23 $5,717
Reagents $416 $1,926 $1,346 $0 $211 $3,899
Ancillaries $5,474 $17,675 $7,827 $0 $1,337 $32,313
Freight $6,030 $6,500 $0 $0 $0 $12,530
Sub-Total Direct Cost (Process Plant) $81,400 $87,754 $51,842 $0 $15,029 $236,025
Construction Support (inc. Mobilization) - - - - - $29,749
Engineering, Procurement, & Const. Mgmt. - - - - - $43,853
Vendor Support & Commissioning - - - - - $4,919
Spare Parts (Capital, Commissioning) - - - - - $4,145
First Fills - - - - - $850
Contingency - - - - - $63,738
Owner's Cost - - - - - $12,560
Sub-Total Indirect Cost (Process Plant) - - - - - $159,814
Total Capital Cost (Process Plant) - - - - - $395,839
Heap Leach Pad & Ponds - - - - - $97,419
Water Treatment Plant - - - - - $8,855
Total Surface Facilities Cost - - - - - $502,113

 

Page 295 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18.1.2Heap Leach Pad Capital Cost

 

The Phase 1 capital cost of $97.419 million is included in the total surface facilities costs under Heap Leach Pad & Ponds in Table 18-3. Table 18-4 presents the capital cost breakdown for Phases 1 through 3 and the removable heap leach pad.

 

Table 18-4: Heap Leach Pad Capital Cost Summary (US$ x1,000)

 

Item Phase 1 Phase 2 Phase 3 Removable HLP Total
Site Preparation  $ 5,207  $2,307  $554 $111 $8,179
Earthworks  $49,371  $20,242  $4,596 $8,361  $82,570
Geosynthetics  $17,225  $10,991  $3,444 $8,537  $40,197
Piping  $1,685  $2,271  $918 $2,449 $7,323
Miscellaneous  $75  $75 - -  $150
Direct Construction Cost $73,563 $35,886 $9,512 $19,459 $138,420
Contingency $18,391 $8,972 $2,378 $4,865 $34,605
Indirects $5,465 $2,564 $648 $1,459 $10,136
Total Heap Leach Pad Capital Cost $97,419 $47,422 $12,537 $25,783 $183,161

 

18.1.3Freight

 

Estimates for equipment and material freight costs are based on bulk freight loads and have been estimated at 8% of the equipment cost and 8% of the material cost.

 

18.1.4Construction Support

 

Contractor labor indirect costs are included 18.5% of the total direct labor hours times the average rate. Contractor non-labor indirect costs are included at 21% of total labor costs. Contractor indirect costs for office facilities during construction are included at 7.5% of the total direct labor costs. Services required through construction execution are included at 7.5% of the total direct labor costs.

 

18.1.5EPCM

 

Engineering, procurement, and construction management is included at 16.5% of total constructed cost (TCC) for the process plant scope. This includes project management and administration, project services, project controls, and EPCM fee.

 

18.1.6Vendor Support

 

Vendor supervision of specialty construction is included at 1.5% of plant equipment supply costs. Vendor pre-commissioning is included at 0.75% of plant equipment supply costs. Vendor commissioning is included at 0.75% of plant equipment supply costs.

 

Commissioning is included at 1% of the Total Constructed Cost.

 

18.1.7Spare Parts

 

Capital spare parts are included at 5% of plant equipment supply costs. Commissioning spare parts are included at 0.5% of plant equipment supply costs. Two-year operating spare parts are excluded.

 

Page 296 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18.2Owner’s Costs

 

Owner’s Costs were developed in collaboration with Dakota Gold. The Owner’s Costs include items such as salaries and wages for the project personnel, housing, and accommodations for owner’s team during project development, transportation for owner’s team during project development, owner’s team vehicles, office services, and travel during project development. There is also an allowance for external services, such as geotechnical investigation and permit support.

 

18.3HLF and Associated Infrastructure and Closure Capital Costs

 

18.3.1Unit Rates

 

Unit rates were estimated using a combination of the following:

 

·Supply vendor quotes for specific materials such as piping and geosynthetics.

 

·Contractor labor rates built up using South Dakota Prevailing Wages, with additional factors to account for per diem rates (given the remote project site), estimated contractor markup, a small hand tool allowance, and a separate tax for the contractor’s labor.

 

·Production rates for each unit rate were calculated based on similar project experience and estimates of contractors’ unit rates. The Caterpillar Performance Handbook Edition 49 was refenced for equipment specifications and capabilities.

 

·Miscellaneous closure activity costs were assigned preliminary lump sum allowances informed by previous project experience and limited information at this design stage.

 

18.3.2Quantities/Material Take-Offs

 

The CAPEX is quantity-based using engineering-derived material take-off (MTO) quantities from the PFS-level designs. The MTO was generated from AutoCAD Civil 3D design surfaces, as well as typical layouts, sections, and details developed for this project.

 

This estimate includes site preparation, earthworks, geosynthetics, piping, and associated surface water management infrastructure such as diversions and applicable erosion protection measures. Additional allowances have been made for indirect costs such as engineering, quality control, and surveying, as well as contractor costs to mobilize, demobilize, and provide temporary stormwater controls during construction.

 

The closure MTO quantities are based on preliminary estimates of the work required to achieve the anticipated final site topography, capping system, and other miscellaneous closure activities. The level of the closure/reclamation estimate is at approximately a scoping level and an accuracy of plus or minus 50 percent.

 

18.4Mining Capital Costs

 

18.4.1Mining Capital – Lease Case

 

Table 18-5 presents the mine capital costs assuming leasing of the mining equipment. The mining equipment is acquired during preproduction and Years 1 and 2. Down payments for the equipment are 20% of the purchase prices. The lease payments are based on a 60-month term at 6.5% interest on 80% of the purchase price. The initial lease payments and lease payments during preproduction are assumed to be capital costs. The lease payments for Years 1 through 6 are shown on the bottom of the table. These are assumed to be mine operating costs, in addition to the mining costs presented in Section 18.7.

 

Page 297 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The mine equipment purchases included an $8.07 million allowance for additional support equipment. This estimate assumes 50% of this is leased and the other 50% ($4.03 million) will be purchased by the owner. The capital estimate also includes $30.4 million in mine development capital that will be discussed in the next section.

 

Table 18-5: Mining Capital Costs – Equipment Lease Case

 

  Units PP Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Total
Mine Capital Costs (Lease Case):
Initial Down Payments ($x1000) 9,982 12,757 6,691 0 0 0 0 29,430
Equipment Leases ($x1000) 9,418 0 0 0 0 0 0 9,418
Owner Purchases ($x1000) 4,034 0 0 0 0 0 0 4,034
Contingency (Equipment Only) ($x1000) 919 1,174 616 0 0 0 0 2,709
Sub-total Equipment Capital ($x1000) 24,353 13,931 7,306 0 0 0 0 45,591
Mine Development ($x1000) 30,393             30,393
Mine Infrastructure ($x1000)               0
Total Mine Capital Cost ($X1000) 54,746 13,931 7,306 0 0 0 0 75,984
Lease Payments Treated As Operating Costs: 
Equipment Lease Payments  ($x1000)   21,399 27,683 27,683 27,683 18,265 6,284 128,996

 

18.4.2Mining Capital – Purchase Case

 

Table 18-6 summarizes the mine capital costs by category for initial and sustaining capital assuming owner purchase of the mining equipment. Initial capital is the capital required for the preproduction period.

 

Table 18-6: Mining Capital Summary – Equipment Purchase Case

 

Category Initial Capital Sustaining Capital Total Capital
Major Equipment 46,107 97,238 143,344
Support Equipment @ 17.50% 8,069 0 8,069
Equipment Subtotal 54,175 97,238 151,413
Equipment Contingency @ 5.0% 2,709 0 2,709
Mine Development 30,393 0 30,393
Total Mine Capital 87,277 97,238 184,514
Exclusions: Mine shop and warehouse, fuel and lubricant storage, and offices.

 

The mine shop and warehouse, fuel and lubricant storage facilities, and offices are included in the general infrastructure capital cost estimate, so are not included in this mine capital cost estimate.

 

18.4.2.1Mine Development

 

Mine development capital is estimated at US$30.4 million. This is the estimated cost to mine 6.0 million tons of preproduction material plus a contingency as follows:

 

Table 18-7: Mine Development Capital

 

Description PP
Estimated Owner Operating Cost ($x1,000) 24,193
Percent Contingency 25.63%
Contingency ($x1,000) 6,200
Mine Development ($x1,000) 30,393

 

Page 298 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

The mine development contingency provides an allowance for additional site preparation activity and/or subcontracting some portions of the mining, etc.

 

18.4.2.2Mine Major Equipment

 

The initial cost of mine major equipment is estimated at US$46.1 million. Table 18-8 shows the equipment purchase schedule and cost by year. The sustaining capital cost for major equipment is estimated at $97.2 million. Total capital for mine major equipment is estimated at $143.1 million over the mine life. All the major equipment is purchased for preproduction and Years 1 and 2.

 

The equipment prices are based on quotations from Caterpillar and Komatsu obtained during September 2026.

 

18.4.2.3Support Equipment

 

Support equipment and initial spare parts are estimated at 17.5% of major equipment during the preproduction period. The cost of support equipment is US$8.07 million. Support equipment includes fuel and lubricant trucks, mechanic and welding trucks, tire handlers, low boys and tractors to transport track equipment, cranes, surveying and engineering equipment, etc. This list is not exhaustive.

 

18.4.2.4Contingency

 

The estimate also includes a 5% contingency for the initial capital equipment purchases. This amounts to $2.71 million during the initial capital period.

 

Table 18-8: Equipment Purchases and Costs by Year

 

 

Unit Price

($x1000)

Units PP Year 1 Year 2 Year 3 Year 4 Total
Major Equipment Purchase Schedule:
Caterpillar MD6310 Drill   (none) 2 1 2 0 0 5
Caterpillar 6040FS Hyd Shovel   (none) 0 1 0 0 0 1
Caterpillar 995 Wheel Loader   (none) 1 1 0 0 0 2
Komatsu HD1500 Truck   (none) 5 10 8 0 0 23
Caterpillar D10 Track Dozer   (none) 2 2 0 0 0 4
Caterpillar 834 Wheel Dozer   (none) 1 0 0 0 0 1
Caterpillar 18 Motor Grader   (none) 1 1 0 0 0 2
Water Truck - 18,000 gal   (none) 1 1 0 0 0 2
Caterpillar 374 Excavator   (none) 1 0 0 0 0 1
Sandvik DI560 DTH Drill   (none) 1 0 0 0 0 1
Total Major Equipment Purchases   (none) 15 17 10 0 0 42
Major Equipment Capital Cost:
Caterpillar MD6310 Drill 4,246.3 ($x1000) 8,493 4,246 8,493 0 0 21,232
Caterpillar 6040FS Hyd Shovel 10,340.5 ($x1000) 0 10,341 0 0 0 10,341
Caterpillar 995 Wheel Loader 9,245.3 ($x1000) 9,245 9,245 0 0 0 18,491
Komatsu HD1500 Truck 3,120.1 ($x1000) 15,600 31,201 24,961 0 0 71,762
Caterpillar D10 Track Dozer 2,590.7 ($x1000) 5,181 5,181 0 0 0 10,363
Caterpillar 834 Wheel Dozer 1,749.3 ($x1000) 1,749 0 0 0 0 1,749
Caterpillar 18 Motor Grader 1,598.7 ($x1000) 1,599 1,599 0 0 0 3,197
Water Truck - 18,000 gal 1,971.3 ($x1000) 1,971 1,971 0 0 0 3,943
Caterpillar 374 Excavator 1,093.5 ($x1000) 1,093 0 0 0 0 1,093
Sandvik DI560 DTH Drill 1,174.1 ($x1000) 1,174 0 0 0 0 1,174
Major Equipment Capital Cost   ($x1000) 46,107 63,784 33,453 0 0 143,344
Small Equipment @ 17.50%   ($x1000) 8,069 0 0 0 0 8,069
Total Equipment Cost   ($x1000) 54,175 63,784 33,453 0 0 151,413
Contingency @ 5.0%   ($x1000) 2,709 0 0 0 0 2,709
Mine Development   ($x1000) 30,393 0 0 0 0 30,393
Total Mine Capital Cost   ($x1000) 87,277 63,784 33,453 0 0 184,514

 

Page 299 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18.5Process Operating Cost Summary

 

Process operating costs have been estimated by M3 from first principles. Labor costs were estimated using project specific staffing, salary, wage, and benefit requirements, in collaboration with Dakota Gold. Unit consumptions of materials, supplies, power, and delivered supply costs were also estimated. LOM overall average processing costs are estimated at an average cost of $4.41 per ton of ore.

 

Operating costs were estimated based on 4th quarter 2026 US dollars and are presented with no added contingency based upon the design and operating criteria present in this Technical Report. Operating costs are considered to have an accuracy of +/- 20%.

 

The process operating costs presented are based upon the ownership of all process production equipment and site facilities. The owner will employ and direct all operating maintenance and support personnel for all site activities.

 

Operating costs estimates have been based upon information obtained from the following sources:

 

·Project metallurgical test work and process engineering
·Development of a detailed equipment list and demand calculations
·M3 In-house data for reagent pricing
·Experience with other similar operations

 

Where specific data does not exist, cost allowances have been based upon consumption and operating requirements from other similar properties for which reliable data exist.

 

18.5.1Personnel and Staffing

 

Staffing requirements for process personnel have been estimated by M3, and corroborated by Dakota Gold, based on experience with similar-sized domestic operations. Total process personnel requirements are estimated at 82 persons for the crushing operation. Personnel requirements and costs are estimated at $11.7 million per year for the crushing operation.

 

18.5.2Power

 

Power usage for the process and process-facilities was derived from estimated connected loads assigned to powered equipment from the mechanical equipment list. Equipment power demands under normal operation were assigned and coupled with estimated on-stream times to determine the average energy usage and cost. Power is available via a transmission line connected to the South Dakota Power grid. Based on input from Black Hills Energy, the energy costs could vary between $0.105 and $0.145 per kWh. An estimated power cost of $0.125/kWh, is utilized in the financial analysis.

 

Page 300 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18.5.3Consumable Items

 

Operating supplies have been estimated based upon unit costs and consumption rates projected by metallurgical tests. Freight costs are included in all operating supply and reagent estimates. Reagent consumptions have been derived from test work and from design criteria considerations. Other consumable items have been estimated by M3 based on experience with other similar operations. Table 18-9 presents average consumptions for major consumables.

 

Table 18-9: Process Consumables Average Annual Consumptions

 

Item Form lb/ST ST/y
Sodium Cyanide Liquid at 30% NaCN by Weight 0.880 7,227
Lime Bulk Delivery (20 tons) 3.980 32,686
DE Dry Solid Bags 0.060 493
Lead Nitrate Liquid Tote (IBC) 0.011 94
Zinc 1,000 lb Supersacks 0.057 471
Antiscalant Liquid Tote (IBC) 0.020 164
Refinery Fluxes Dry Solid Bags 0.020 164

 

*Reagent Consumptions are expressed as 100% active reagent, excluding water in delivered solutions.

 

Operating costs for consumable items have been distributed based on tonnage and gold production or smelting batches, as appropriate.

 

18.5.4Maintenance

 

Annual maintenance costs have been included for the process facilities. The maintenance costs are estimated from the capital cost of the plant equipment at an allowance of 5% for parts repair or replacement. Maintenance labor is also included. The maintenance labor includes one maintenance supervisor, six mechanics, and six electricians. These personnel are included as part of the overall process personnel quantity. An allowance for outside repairs is also included at 10% of the maintenance parts allowance. The total annual maintenance is estimated at $6.09 million.

 

18.5.5Supplies and Services

 

Estimates for supplies and services have been included for items such as lubricants, third-party services for the process plant, safety items, and minor supplies and tools outside of maintenance. The total annual supplies and services is estimated at $2.18 million.

 

18.5.6Process Operating Cost Exclusions

 

The following operating costs are excluded from the process plant operating cost estimate:

 

·G&A costs (see section below)
·Access road and internal roads maintenance
·Operating cost contingency
·Escalation costs
·Currency exchange fluctuations

 

Page 301 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

18.6G&A Costs

 

G&A costs were included based on benchmarks for similar-sized facilities in the surrounding region.

 

G&A costs are included at $15.7 million per year for each year of operation through year 9, and $6.7 million in year 10. This includes an estimate of 50 people, as well as an allowance for non-labor related expenses. Technical services, including those for mining support, are included as part of the G&A labor.

 

18.7Mine Operating Costs

 

Table 18-10 summarizes the mine operating costs by cost center. These costs are for commercial production Years 1 through 9, and do not include the preproduction period. The operating costs during preproduction are reported as mine development capital in the mine capital costs. Along with the total cost, the average unit costs are shown per ton of total material and tons of leach material. During commercial production the unit costs for mining are $2.242 per total ton and $5.121 per leach ton.

 

Table 18-10: Mine Operating Costs by Cost Center - Years 1 - 8

 

Cost Center

Total Cost

(US$ x 1000)

Cost Per

Total Ton

(US$/t)

Cost Per

Leach Ton

(US$/t)

% of

Total

Drilling 55,153 0.188 0.429 8.4%
Blasting 80,037 0.272 0.622 12.1%
Loading 78,847 0.268 0.613 12.0%
Hauling 270,292 0.920 2.101 41.0%
Roads and Dumps 92,302 0.314 0.717 14.0%
Mine Services 40,375 0.137 0.314 6.1%
Mine Administration 41,901 0.143 0.326 6.4%
Total Cost 658,906 2.242 5.121 100.0%
Total and Leach Tons   293,902 128,674  

 

The costs are in 4th quarter 2026 US dollars. The cost estimate was developed on a first-principles bases, based on the mine production schedule, estimated mine equipment requirements, labor requirements, and various consumables. The estimate is based on assumed prices for commodities such as fuel, explosives, parts, tires, etc. that are subject to wide variations depending on market conditions. The estimate is based on the following prices for key commodities:

 

·Diesel fuel delivered to the site for $US 3.25/gallon,
·Blasting agents delivered or produced on site by the vendor for US$ 0.392/lb.

 

The costs do not include mine technical services positions such as mining engineers, geologists, technicians, and surveyors, etc. These personnel are included in the site G&A costs.

 

Mine operating costs are broadly separated into parts and consumables costs and labor costs. Table 18-11 shows consumables versus labor for the commercial production years. Consumables amount to 64.3% of the operating cost versus 35.7% for labor costs.

 

Page 302 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 18-11: Mine Operating Costs by Consumables vs Labor – Years 1 - 8

 

Category

Total Cost

(US$ x 1000)

Cost Per

Total Ton

(US$/t)

Cost Per

Leach Ton

(US$/t)

% of

Total

Parts and Consumables 423,973 1.443 3.295 64.3%
Mine Administration Salaries 27,934 0.095 0.217 4.2%
Operating Labor 128,668 0.438 1.000 19.5%
Maintenance Labor 78,331 0.267 0.609 11.9%
Total Cost 658,906 2.242 5.121 100.0%
Total and Leach Tons   293,902 128,674  

 

Table 18-12 summarizes the mine parts and consumables operating costs by commodity (fuel, tires, parts, lubricants, explosives, etc.) for the commercial production period. Life of mine, parts and consumables account for $1.443 per total ton and $3.295 per leach ton.

 

Table 18-12: Mine Parts and Consumables Cost - Years 1 - 8

 

Category 

Total Cost

(US$ x 1000)

Cost Per

Total Ton

(US$/t)

Cost Per

Leach Ton

(US$/t)

% of

Total

Fuel 122,469 0.417 0.952 28.9%
Diesel Exhaust Fluid 4,385 0.015 0.034 1.0%
Tires 60,944 0.207 0.474 14.4%
Replacement Parts 80,164 0.273 0.623 18.9%
Lubricants and Filters 51,356 0.175 0.399 12.1%
Ground Engaging Wear Parts 16,630 0.057 0.129 3.9%
Blasting 74,056 0.252 0.576 17.5%
Mine Administration 13,967 0.048 0.109 3.3%
Total Cost 423,973 1.443 3.295 100.0%
Total and Leach Tons   293,902 128,674  

 

Mine labor requirements were presented in Section 13.6 in the Mining Methods section of the report.

 

Page 303 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

19Economic analysis

 

The economic analysis in this study includes a PFS compliant modeling of the annual cash flows based on projected production volume, sales revenue, initial capital, operating cost, and sustaining capital with resulting evaluation of key economic indicators such as internal rate of return (IRR), net present value (NPV), and payback period (time in years to recapture the initial capital investment) for the Project. The sales revenue is based on the production of gold in doré bullion. The estimates of the capital expenditures and site production costs have been developed specifically for this project and have been presented in Section 18 of this Technical Report.

 

19.1Mining Physicals

 

The cash-flow model uses the mining and production schedules as discussed in Section 13 and summarized in Table 19-1. Results from the heap leach metal production model are included with this table to facilitate direct comparison between placed ounces, recoverable ounces, and recovered ounces. Placed ounces are per the mine plan and stacking plan. Recoverable ounces are placed ounces that are amenable to a positive response to leaching after cyanide-bearing solution has started being applied. Recovered ounces incorporate time-based constraints for the time it takes leached ounces to reach the pad liner and report to the metal recovery plant. Ore is placed on the pad during an nine-year period over the life of the mine plan. Solution application continues for an additional 1 year to allow recovery of the solubilized ounces.

 

19.2Process Plant Production Statistics

 

Ore will be processed by 3-stage crushing, truck stacking, and cyanide heap leaching. Metal values (gold and silver) will be recovered via a Merrill-Crowe facility as described in Section 14 of this Technical Report. Overall production over the life-of-mine is summarized in Table 19-1.

 

Page 304 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 19-1: Yearly Mine & Process Physicals

 

Material Mined  Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Total
Oxide Ore - Direct Feed K Tons 3,159 10,950 13,870 16,425 16,425 16,425 16,425 16,425 8,652 - - 118,756
Au oz/t 0.020 0.018 0.019 0.016 0.012 0.013 0.018 0.022 0.010 - - 0.016
Ag oz/t 0.675 0.624 0.658 0.535 0.422 0.439 0.617 0.768 0.343 - - 0.562
Oxide Ore - Low Grade to Stockpile K Tons 130 664 - - - - - 555 - - - 1,349
Au oz/t 0.005 0.004 - - - - - 0.004 - - - 0.004
Ag oz/t 0.154 0.147 - - - - - 0.151 - - - 0.149
Transition Ore to Stockpile K Tons 524 1,268 1,040 1,917 3,133 2,672 675 186 313 - - 11,728
Au oz/t 0.024 0.023 0.023 0.018 0.016 0.015 0.017 0.019 0.010 - - 0.018
Ag oz/t 0.816 0.785 0.782 0.631 0.531 0.504 0.566 0.634 0.339 - - 0.602
Waste K Tons 2,187 17,118 25,090 21,628 20,471 20,339 22,900 8,920 16,339 - - 154,992
Total Mined  K Tons 6,000 30,000 40,000 39,970 40,029 39,436 40,000 26,086 25,304 - - 286,825
Strip Ratio  W : O 0.57 1.33 1.68 1.18 1.05 1.07 1.34 0.52 1.82 - - 1.18
Total Ore Processed Units Pre-Prod Yr 1 Yr 2 Yr 3 Yr 4 Yr 5 Yr 6 Yr 7 Yr 8 Yr 9 Yr 10 Total
Ore Processed  K Tons 3,159 10,950 13,870 16,425 16,425 16,425 16,425 16,425 16,425 5,304 - 131,833
Au oz/t 0.020 0.018 0.019 0.016 0.012 0.013 0.018 0.022 0.012 0.021 - 0.016
Ag oz/t 0.675 0.624 0.658 0.535 0.422 0.439 0.617 0.768 0.395 0.705 - 0.561
Gold Placed  K oz Au 62 199 266 256 202 210 296 368 189 109 - 2,158
Gold Recoverable  K oz Au 45 150 208 186 141 156 210 256 136 75 - 1,563
Gold Recovered  K oz Au - 157 194 191 152 152 197 245 166 90 19 1,563
Silver Placed  K oz Ag 714 3,603 2,233 3,548 2,447 1,577 2,792 3,367 2,475 2,665 - 25,421
Silver Recoverable  K oz Ag 142 624 430 575 411 279 493 591 504 517 - 4,566
Silver Recovered  K oz Ag - 610 479 539 452 312 439 567 526 514 129 4,566

 

Page 305 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 19-2: Life of Mine Process Statistics

 

Parameter Units LOM
Total Ore K Tons 131,833
Gold Grade oz/t 0.016
Contained Gold K ozs 2,158
Gold Recovery % 72.4
Recovered Gold K ozs 1,563
Payable Gold K ozs 1,562

 

19.3Smelter Return Factors

 

No contractual payable metal rates have yet been negotiated with smelters. M3 used typical rates based on industry experience or published guidelines. Payable rates for metals used were 99.90% for gold and 99.00% for silver. Bullion refining, transportation and insurance charges of $4 per troy ounce of gold and $0.50 per troy ounce of silver were applied.

 

19.4Capital Expenditure

 

The capital expenditure schedule for the life-of-mine is shown in Table 19-3.

 

Table 19-3: Capital Expenditure Schedule

 

Capital Expenditure
$000
PreProd Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Total
Mine Pre-Strip 11,078 19,315 - - - - - - - - - 30,393
Mining Equipment 23,435 12,757 6,691 - - - - - - - - 42,882
Process  406,269 - 43,530 - 22,588 10,459 - - - - - 482,847
Owner’s Cost 12,560 - - - - - - - - - - 12,560
Contingency 84,203 1,174 9,587 - 4,810 2,432 - - - - - 102,207
Total 537,544 33,246 59,808 - 27,399 12,891 - - - - - 670,888

 

19.5Revenue

 

Annual revenue is determined by applying metal prices to the annual payable metal estimated for each operating year. Sales prices have been applied to all life-of-mine production without escalation or hedging. Gold and silver bullion revenue is based on the gross value of the payable metals sold before refining and transportation charges. Gold and silver metal pricing is based on the long-term consensus price estimates of several metals price analysts; the base case metal prices utilized in the economic assessment are:

 

Gold           $3,500 per troy ounce

Silver         $50 per troy ounce

 

19.6Total Production Cost

 

The total production cost includes mine operations, process plant operations, general administration, reclamation and closure, and government fees. Table 19-4 shows the estimated operating costs by area based on payable metals for the life of mine.

 

Page 306 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 19-4: LOM Operating Costs

 

LOM Operating Cost $000
Mining $787,902
Process Plant $580,945
G&A $148,718
Refining $8,537
Total Operating Cost $1,526,102
Royalty $169,387
Salvage Value $0
Reclamation/Closure $62,476
Total Production Cost $1,757,965

 

19.7Depreciation

 

The depreciation cost was calculated using a 7-year modified accelerated cost recovery system (MACRS) depreciation method for project initial and sustaining capital and for development costs, which consist primarily of the heap leach expansion costs.

 

19.8Royalties

 

Certain existing royalties are in place. The royalties are equivalent to 2.98% of the gross revenue minus treatment and refining charges.

 

19.9Government Fees

 

No government fees have been applied to the financial model.

 

19.10Taxation

 

South Dakota Severance Tax is applied based on the gold and gold equivalent ounces. An annual exemption of 20 ounces is deducted from the annual gold and gold equivalent ounces. Considering the price of gold is over $800 per ounce, a gross production tax of $4 per ounce is applied for taxation purposes.

 

Net revenue is calculated as the gross revenue, minus the exemption on the first 20 ounces per year, minus operating costs and depreciation costs per year. Net profit taxes of 10% against net revenue are applied.

 

Federal corporate tax of 21% is applied to taxable corporation income after adjustments for state severance tax minus loss carry-forward. Dakota Gold has informed M3 of an initial tax carry-forward equivalent to $100 million.

 

19.11Project Financing

 

It is assumed that the project will be all equity financed.

 

19.12Economic Indicators

 

The economic analyses for the project are summarized in Table 19-5. The NPV calculations have been conducted per the Mid-Year discounting method.

 

Page 307 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 19-5: Key Economic Results

 

Indicators Before-Tax After-Tax
LOM Cash Flow ($000) $3,263,805 $2,557,696
NPV @ 5% ($000) $2,526,939 $2,000,014
NPV @ 10% ($000) $1,992,331 $1,588,221
IRR 77.4% 70.7%
Payback (years) 1.4 1.4

 

19.13Sensitivity Analysis

 

Table 19-6 shows the sensitivity analysis of the key economic indicators (cash flow, NPV, IRR, and payback) to changes in gold and silver prices for the Project.

 

Table 19-6: Sensitivity Analysis

 

Financial Indicators BC +
$1250
BC +
$1000
BC +
$750
BC +
$500
BC +
$250
Base
Case
BC -
$250
BC -
$500
BC -
$750
Gold Price (per troy oz) $4,750 $4,500 $4,250 $4,000 $3,750 $3,500 $3,250 $3,000 $2,750
Pre-tax Cash Flow, $M $5,236 $4,842 $4,447 $4,053 $3,658 $3,264 $2,869 $2,475 $2,080
Pre-tax Net Present Value (5%) in $M $4,125 $3,805 $3,486 $3,166 $2,847 $2,527 $2,207 $1,888 $1,568
Pre-tax Internal Rate of Return (IRR) 120.3% 111.8% 103.2% 94.6% 86.0% 77.4% 68.8% 60.2% 51.4%
Pre-tax Payback (Years) 0.9 1.0 1.1 1.2 1.3 1.4 1.6 1.8 2.0
After-tax Cash Flow, $M $4,066 $3,764 $3,462 $3,161 $2,859 $2,558 $2,256 $1,951 $1,645
After-tax Net Present Value (5%) in $M $3,239 $2,991 $2,744 $2,496 $2,248 $2,000 $1,752 $1,501 $1,249
After-tax Internal Rate of Return (IRR) 110.4% 102.4% 94.4% 86.5% 78.6% 70.7% 62.9% 54.9% 47.0%
After-tax Payback (Years) 0.9 1.0 1.1 1.2 1.3 1.4 1.6 1.8 2.1

 

19.14Detailed Financial Model

 

The detailed financial model, as shown in Table 19-7, was developed in compliance with the PFS requirement. This model captures all the parameters of the mine production volume, annual sales revenue, and all the associated costs. The model was used to calculate the economics of the project, as well as the sensitivity analysis.

 

Page 308 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Table 19-7: Detailed Financial Model

 

  LOM Pre-Prod Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Mine
Oxide Ore - Direct Feed (tons) 118,756,000 3,159,000 10,950,000 13,870,000 16,425,000 16,425,000 16,425,000 16,425,000 16,425,000 8,652,000 - - -
Oxide Ore - Direct Feed (tonnes) 107,734,736 2,865,826 9,933,775 12,582,781 14,900,662 14,900,662 14,900,662 14,900,662 14,900,662 7,849,043 - - -
Gold Grade (oz/t) 0.016 0.020 0.018 0.019 0.016 0.012 0.013 0.018 0.022 0.010 - - -
Gold Grade (gpt) 0.562 0.675 0.624 0.658 0.535 0.422 0.439 0.617 0.768 0.343 - - -
Silver Grade (oz/t) 0.181 0.226 0.329 0.161 0.216 0.149 0.096 0.170 0.205 0.135 - - -
Silver Grade (gpt) 6.192 7.748 11.280 5.520 7.406 5.109 3.291 5.829 7.029 4.629 - - -
Contained Gold (kozs) 1,946 62 199 266 256 202 210 296 368 87 - - -
Contained Silver (kozs) 21,449 714 3,603 2,233 3,548 2,447 1,577 2,792 3,367 1,168 - - -
Oxide Ore - Low Grade to Stkpl. (tons) 1,349,000 130,000 664,000 - - - - - 555,000 - - - -
Oxide Ore - Low Grade to Stkpl. (tonnes) 1,223,805 117,935 602,377 - - - - - 503,493 - - - -
Gold Grade (oz/t) 0.004 0.005 0.004 - - - - - 0.004 - - - -
Gold Grade (gpt) 0.149 0.154 0.147 - - - - - 0.151 - - - -
Silver Grade (oz/t) 0.072 0.069 0.069 - - - - - 0.077 - - - -
Silver Grade (gpt) 2.479 2.366 2.366 - - - - - 2.640 - - - -
Contained Gold (kozs) 6 1 3 - - - - - 2 - - - -
Contained Silver (kozs) 98 9 46 - - - - - 43 - - - -
Transition Ore to Stockpile (tons) 11,728,000 524,000 1,268,000 1,040,000 1,917,000 3,133,000 2,672,000 675,000 186,000 313,000 - - -
Transition Ore to Stockpile (tonnes) 10,639,572 475,370 1,150,322 943,482 1,739,091 2,842,239 2,424,022 612,356 168,738 283,952 - - -
Gold Grade (oz/t) 0.018 0.024 0.023 0.023 0.018 0.016 0.015 0.017 0.019 0.010 - - -
Gold Grade (gpt) 0.602 0.816 0.785 0.782 0.631 0.531 0.504 0.566 0.634 0.339 - - -
Silver Grade (oz/t) 0.330 0.744 0.887 0.399 0.317 0.231 0.114 0.216 0.577 0.179 - - -
Silver Grade (gpt) 11.327 25.508 30.411 13.680 10.868 7.920 3.909 7.406 19.783 6.137 - - -
Contained Gold (kozs) 206 12 29 24 35 49 39 11 3 3 - - -
Contained Silver (kozs) 3,875 390 1,125 415 608 724 305 146 107 56 - - -
Waste (tons) 154,992,000 2,187,000 17,118,000 25,090,000 21,628,000 20,471,000 20,339,000 22,900,000 8,920,000 16,339,000 - - -
Waste (tonnes) 140,607,820 1,984,033 15,529,348 22,761,499 19,620,793 18,571,169 18,451,420 20,774,744 8,092,171 14,822,644 - - -
Total Material Mined (tons) 286,825,000 6,000,000 30,000,000 40,000,000 39,970,000 40,029,000 39,436,000 40,000,000 26,086,000 25,304,000 - - -
Total Material Mined (tonnes) 260,205,933 5,443,164 27,215,821 36,287,762 36,260,546 36,314,071 35,776,105 36,287,762 23,665,064 22,955,638 - - -
Process Plant
Total Ore (tons) 131,833,000 3,159,000 10,950,000 13,870,000 16,425,000 16,425,000 16,425,000 16,425,000 16,425,000 16,424,832 5,304,168 - -
Total Ore (tonnes) 119,598,113 2,865,826 9,933,775 12,582,781 14,900,662 14,900,662 14,900,662 14,900,662 14,900,662 14,900,510 4,811,909 - -
Gold Grade (oz/t) 0.016 0.020 0.018 0.019 0.016 0.012 0.013 0.018 0.022 0.012 0.021 - -
Gold Grade (gpt) 0.561 0.675 0.624 0.658 0.535 0.422 0.439 0.617 0.768 0.395 0.705 - -
Silver Grade (oz/t) 0.193 0.226 0.329 0.161 0.216 0.149 0.096 0.170 0.205 0.151 0.503 - -
Silver Grade (gpt) 6.611 7.748         11.280 5.520 7.406 5.109 3.291 5.829 7.029 5.166 17.229 - -
Contained Gold (kozs) 2,158 62 199 266 256 202 210 296 368 189 109 - -
Contained Silver (kozs) 25,421 714 3,603 2,233 3,548 2,447 1,577 2,792 3,367 2,475 2,665 - -
Gold Recovery % 72.4% 72.1% 75.3% 78.1% 72.4% 69.9% 74.2% 71.1% 69.6% 71.7% 69.1%    
Silver Recovery % 18.0% 19.9% 17.3% 19.3% 16.2% 16.8% 17.7% 17.6% 17.6% 20.4% 19.4%    
Recoverable Gold (kozs) 1,563 45 150 208 186 141 156 210 256 136 75 - -
Recoverable Silver (kozs) 4,566 142 624 430 575 411 279 493 591 504 517 - -
Produced Gold (kozs) 1,563 - 157 194 191 152 152 197 245 166 90 19 -
Produced Silver (kozs) 4,566 - 610 479 539 452 312 439 567 526 514 129 -

 

Page 309 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  LOM Pre-Prod Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Payable Metals
Gold (kozs) 1,562   157 193 191 152 152 196 244 166 90 19 -
Silver (kozs) 4,521   604 474 533 447 309 435 561 521 509 128 -
Silver as Gold Equivalent (kozs) 65   9 7 8 6 4 6 8 7 7 2 -
Total Metal as Gold Equivalent (kozs) 1,626   166 200 199 159 157 203 253 173 98 21 -
Metal Prices
Gold ($/oz) $3,500.00   $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $3,500.00 $0.00
Silver ($/oz) $50.00   $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $50.00 $0.00
Revenues ($000)
Gold $5,466,626   $550,241 $676,717 $668,581 $532,663 $532,663 $687,724 $855,707 $579,976 $316,431 $65,922 $0
Silver $226,032   $30,208 $23,686 $26,663 $22,359 $15,448 $21,749 $28,050 $26,041 $25,432 $6,397 $0
Total Revenues $5,692,658   $580,449 $700,403 $695,244 $555,022 $548,111 $709,473 $883,757 $606,017 $341,863 $72,318 $0
Operating Cost ($000)
Mining $787,902   $92,067 $122,602 $119,462 $115,581 $105,644 $103,923 $61,104 $57,829 $9,690 $0 $0
Process Plant $580,945   $62,920 $62,198 $69,920 $69,920 $69,920 $69,920 $69,920 $69,920 $36,306 $0 $0
G&A $148,718   $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $6,770 $0
Refining $8,537   $935 $1,013 $1,034 $835 $765 $1,006 $1,262 $927 $619 $140 $0
Total Operating Cost $1,526,102   $171,694 $201,585 $206,189 $202,109 $192,102 $190,622 $148,059 $144,448 $62,386 $6,910 $0
Royalty $169,387   $17,270 $20,842 $20,687 $16,515 $16,311 $21,112 $26,298 $18,032 $10,169 $2,151 $0
Salvage Value $0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Reclamation/Closure $62,476   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $62,476
Total Production Cost $1,757,965   $188,963 $222,426 $226,877 $218,623 $208,413 $211,734 $174,357 $162,479 $72,555 $9,061 $62,476
Operating Income $3,934,693   $391,486 $477,977 $468,368 $336,399 $339,698 $497,739 $709,399 $443,537 $269,308 $63,258 -$62,476
Depreciation ($000)
Total Capital $670,888   $107,509 $114,158 $120,869 $120,869 $123,609 $17,390 $10,740 $9,279 $9,279 $9,279 $9,279
Total Depreciation $670,888   $107,509 $114,158 $120,869 $120,869 $123,609 $17,390 $10,740 $9,279 $9,279 $9,279 $9,279
Net Income after Depreciation $3,263,805   $283,977 $363,819 $347,498 $215,529 $216,089 $480,350 $698,659 $434,258 $260,029 $53,978 -$71,755
Taxes ($000)
US State Severance Tax $348,359   $29,717 $37,976 $36,332 $22,814 $22,855 $49,649 $71,879 $44,804 $26,777 $5,556 $0
US State Corporate Income Tax $0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Federal Corporate Tax $357,750   $7,870 $38,390 $35,815 $18,196 $18,514 $57,672 $88,691 $53,287 $32,591 $6,724 $0
Total Taxes $706,108   $37,587 $76,365 $72,147 $41,010 $41,369 $107,322 $160,570 $98,091 $59,368 $12,280 $0
Net Income after Taxes ($000) $2,557,696   $246,390 $287,454 $275,351 $174,519 $174,720 $373,028 $538,089 $336,167 $200,661 $41,698 -$71,755
Cash Flow ($000)
Net Income before Taxes $3,263,805 $0 $283,977 $363,819 $347,498 $215,529 $216,089 $480,350 $698,659 $434,258 $260,029 $53,978 -$71,755
Add back Depreciation $670,888 $0 $107,509 $114,158 $120,869 $120,869 $123,609 $17,390 $10,740 $9,279 $9,279 $9,279 $9,279
Operating Cash Flow $3,934,693 $0 $391,486 $477,977 $468,368 $336,399 $339,698 $497,739 $709,399 $443,537 $269,308 $63,258 -$62,476
Working Capital ($000)
Accounts Receivable $0 $0 -$15,903 -$3,286 $141 $3,842 $189 -$4,421 -$4,775 $7,609 $7,237 $7,385 $1,981
Accounts Payable $0 $66,273 -$41,006 $6,960 -$6,806 $2,875 -$3,022 -$1,772 -$5,247 -$445 -$10,117 -$6,840 -$852
Total Working Capital $0 $66,273 -$56,909 $3,674 -$6,665 $6,717 -$2,833 -$6,193 -$10,022 $7,164 -$2,880 $545 $1,129
Working Capital (Ore Inventory) ($000)
Inventory (ore to stockpile) -$47,634 $0 -$23,866 -$2,468 -$4,402 -$6,880 -$5,920 -$1,648 -$1,736 -$715 $0 $0 $0
Inventory (ore from stockpile) $47,634 $0 $16,002 $0 $0 $0 $0 $0 $0 $18,802 $12,830 $0 $0
Total Working Capital (Ore Inventory) $0 $0 -$7,864 -$2,468 -$4,402 -$6,880 -$5,920 -$1,648 -$1,736 $18,087 $12,830 $0 $0

 

Page 310 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  LOM Pre-Prod Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
Initial Capital Expenditures ($000)
Pre-stripping $11,078 $11,078 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Mining $24,353 $24,353 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Process $489,553 $489,553 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Owner's Cost $12,560 $12,560 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Expansion Capital Expenditures ($000)
Mining $0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Process $0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Owner's Cost $0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Sustaining Capital Expenditures ($000)
Ore Inventory $19,315   $19,315 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Mining $21,238   $13,931 $7,306 $0 $0 $0 $0 $0 $0 $0 $0 $0
Process $92,792   $0 $52,502 $0 $27,399 $12,891 $0 $0 $0 $0 $0 $0
Owner's Cost $0   $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Total Capital $670,888 $537,544 $33,246 $59,808 $0 $27,399 $12,891 $0 $0 $0 $0 $0 $0
Cash Flow before Taxes ($000) $3,263,805 -$471,272 $301,331 $421,842 $461,703 $315,717 $323,974 $491,547 $699,377 $450,701 $266,428 $63,803 -$61,347
Cumulative Cash Flow before Taxes ($000)   -$471,272 -$169,940 $251,902 $713,605 $1,029,321 $1,353,296 $1,844,842 $2,544,219 $2,994,921 $3,261,348 $3,325,151 $3,263,805
Cash Taxes Payable $706,108 $0 $0 $37,587 $76,365 $72,147 $41,010 $41,369 $107,322 $160,570 $98,091 $59,368 $12,280
Cash Flow after Taxes ($000) $2,557,696 -$471,272 $301,331 $384,255 $385,338 $243,570 $282,964 $450,178 $592,055 $290,132 $168,337 $4,435 -$73,626
Cumulative Cash Flow after Taxes ($000)   -$471,272 -$169,940 $214,315 $599,653 $843,222 $1,126,186 $1,576,364 $2,168,419 $2,458,551 $2,626,888 $2,631,323 $2,557,696
Discounted Cash Flow Parameters
Year (Mid-Year Discounting)   0 0.5 1.5 2.5 3.5 4.5 5.5 6.5 7.5 8.5 9.5 10.5
Factor @ 0% 0.0% 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000 1.000
Factor @ 5% 5.0% 1.000 0.976 0.929 0.885 0.843 0.803 0.765 0.728 0.694 0.661 0.629 0.599
Factor @ 10% 10.0% 1.000 0.953 0.867 0.788 0.716 0.651 0.592 0.538 0.489 0.445 0.404 0.368
Discounted Cash Flow before Taxes ($000)
DCF @ 0% $3,263,805 -$471,272 -$169,940 $251,902 $713,605 $1,029,321 $1,353,296 $1,844,842 $2,544,219 $2,994,921 $3,261,348 $3,325,151 $3,263,805
DCF @ 5% $2,526,939 -$471,272 -$177,202 $214,870 $623,556 $889,711 $1,149,821 $1,525,679 $2,034,988 $2,347,574 $2,523,556 $2,563,693 $2,526,939
DCF @ 10% $1,992,331 -$471,272 -$183,964 $181,683 $545,498 $771,662 $982,643 $1,273,651 $1,650,059 $1,870,577 $1,989,083 $2,014,882 $1,992,331
Discounted Cash Flow after Taxes ($000)
DCF @ 0% $2,557,696 -$471,272 -$169,940 $214,315 $599,653 $843,222 $1,126,186 $1,576,364 $2,168,419 $2,458,551 $2,626,888 $2,631,323 $2,557,696
DCF @ 5% $2,000,014 -$471,272 -$177,202 $179,935 $521,025 $726,359 $953,544 $1,297,769 $1,728,922 $1,930,144 $2,041,336 $2,044,125 $2,000,014
DCF @ 10% $1,588,221 -$471,272 -$183,964 $149,103 $452,743 $627,225 $811,499 $1,078,015 $1,396,662 $1,538,617 $1,613,493 $1,615,286 $1,588,221
Financial Indicators before Taxes ($000)
NPV @ 0% $3,263,805                        
NPV @ 5% $2,526,939                        
NPV @ 10% $1,992,331                        
IRR 77.4%                        
Payback (years) 1.4   1.0 0.4 - - - - - - - - -
Financial Indicators after Taxes ($000)
NPV @ 0% $2,557,696                        
NPV @ 5% $2,000,014                        
NPV @ 10% $1,588,221                        

 

Page 311 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

  LOM Pre-Prod Year 1 Year 2 Year 3 Year 4 Year 5 Year 6 Year 7 Year 8 Year 9 Year 10 Year 11
IRR 70.7%                        
Payback (years) 1.4   1.0 0.4 - - - - - - - - -
Payable Au (kozs) 1,562 - 157 193 191 152 152 196 244 166 90 19 -
Silver as Gold Equivalent (kozs) 65   9 7 8 6 4 6 8 7 7 2 -
Total Metal as Gold Equivalent (kozs) 1,626   166 200 199 159 157 203 253 173 98 21 -
Mining $787,902 $0 $92,067 $122,602 $119,462 $115,581 $105,644 $103,923 $61,104 $57,829 $9,690 $0 $0
Process Plant $580,945 $0 $62,920 $62,198 $69,920 $69,920 $69,920 $69,920 $69,920 $69,920 $36,306 $0 $0
G&A $148,718 $0 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $15,772 $6,770 $0
Refining $8,537 $0 $935 $1,013 $1,034 $835 $765 $1,006 $1,262 $927 $619 $140 $0
Royalty $169,387 $0 $17,270 $20,842 $20,687 $16,515 $16,311 $21,112 $26,298 $18,032 $10,169 $2,151 $0
Stockpiles / Product Inventory $0 $0 -$7,864 -$2,468 -$4,402 -$6,880 -$5,920 -$1,648 -$1,736 $18,087 $12,830 $0 $0
Cash Cost before By-Product Credit $1,695,489 $0 $181,099 $219,959 $222,475 $211,744 $202,492 $210,086 $172,622 $180,566 $85,385 $9,061 $0
$/Au oz $1,086 $0 $1,152 $1,138 $1,165 $1,391 $1,331 $1,069 $706 $1,090 $944 $481 $0
Silver Credit $226,032 $0 $30,208 $23,686 $26,663 $22,359 $15,448 $21,749 $28,050 $26,041 $25,432 $6,397 $0
Cash Cost after By-Product Credit $1,469,457 $0 $150,891 $196,272 $195,812 $189,385 $187,045 $188,337 $144,572 $154,525 $59,954 $2,664 $0
$/Au oz $941 $0 $960 $1,015 $1,025 $1,244 $1,229 $958 $591 $933 $663 $141 $0
Sustaining Capital Expenditures                          
Mining $40,552 $0 $33,246 $7,306 $0 $0 $0 $0 $0 $0 $0 $0 $0
Process $92,792 $0 $0 $52,502 $0 $27,399 $12,891 $0 $0 $0 $0 $0 $0
Owner's Cost $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Salvage Value $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0
Reclamation/Closure $62,476 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $0 $62,476
US State Severance Tax $348,359 $0 $29,717 $37,976 $36,332 $22,814 $22,855 $49,649 $71,879 $44,804 $26,777 $5,556 $0
AISC (before By-Product Credit) $2,239,668 $0 $244,062 $317,743 $258,807 $261,957 $238,238 $259,736 $244,501 $225,370 $112,163 $14,617 $62,476
AISC (after By-Product Credit) $2,013,636 $0 $213,854 $294,056 $232,143 $239,598 $222,791 $237,987 $216,451 $199,329 $86,731 $8,220 $62,476
$/Au oz (before BPC) $1,434 $0 $1,552 $1,643 $1,355 $1,721 $1,565 $1,322 $1,000 $1,360 $1,241 $776 $0
$/Au oz (after BPC) $1,289 $0 $1,360 $1,521 $1,215 $1,574 $1,464 $1,211 $885 $1,203 $959 $436 $0
Total Capital Expenditures ($000)
Pre-stripping $30,393                        
Mining $45,591                        
Process $582,345                        
Owner's Cost $12,560                        
Total $670,888                        
Pre-Strip & Mining $75,984                        
Process & Owner's Cost $594,905                        

 

Page 312 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

20Adjacent Properties

 

20.1The Homestake Mine

 

The Homestake Mine was discovered in 1876 and operated until December 2001 (Mitchell, 2009). The mine produced over 40 million ounces of gold and 9 million ounces of silver from 11 ore ledges, or mineralized plunging fold structures. Recovered gold grades averaged 8.16 grams/tonne over the mine life. Mining occurred from the surface to a depth of 2,440 meters. The deposit is over 5.7 km long and 1.6 km wide. The mine is divided into two general areas: eastern ore ledges and western ore ledges. The eastern ore ledges trend N35°W and have an average plunge of 40° SE. The western ore ledges have an average trend of N80°E with plunges ranging from 40° SE to 60° NE (Caddey et. al, 1991).

 

The gold mineralization is hosted within quartz veined, sulfide rich portions of an Early Proterozoic, carbonate-facies iron formation within a sequence of calcareous, pelitic, and quartz rich sediments. Rhenium-osmium geochronology of arsenopyrite yields a mineralization age of 1,736+8 Ma (Morelli et. al, 2010). Gold mineralization occurs almost entirely within the Homestake Formation. The ore bodies consist of tabular to pipe-like segregations of quartz, siderite, ankerite, chlorite, pyrrhotite, arsenopyrite, pyrite, and native gold.

 

20.2Wharf Mine

 

The Wharf mine is a wholly owned subsidiary of Coeur Mining Inc. and is an active producing gold/silver heap leach operation located approximately 2 miles south of the Richmond Hill Project (the centroid for the Wharf Project is 44°20’03”N Latitude, 103°50’06”W Longitude and the centroid for the Richmond Hill Project is 44°52’28”N Latitude, 103°23’35”W Longitude).

 

The Wharf mine property consists of 558 patented lode claims, government lots, etc. and 93 unpatented Federal mining claims for a total of 5,266 surface acres and 8,995 mineral acres. The mineral acres are a complex mix of rights to extract minerals in all rock types and severed minerals where mineralization in the Precambrian basement rocks is excluded. Royalties, NSR's and advanced royalty payments encumber most of the mineral estate on both reserves in and outside the current life of mine plans (Coeur Mining Inc., 2026).

 

Gold mineralization was discovered in the Wharf area in 1877 with underground production commencing in 1901. Modern exploration in the area was initiated in the 1970's with commercial production starting at what is considered the Wharf mine in late 1983. Coeur acquired the Wharf mine from GoldCorp in 2015. As of the end of 2023, Wharf is estimated to have produced 3,114,375 million ounces of gold at a recovered grade of 0.0298 oz/ton and a strip ratio of 2.177 (Dakota Gold Corp, 2025).

 

In July of 2023, Wharf was granted approval for the Boston Expansion, a continuation of the open pit, truck and front-end loader operations existing at the mine. The total production from this expansion is estimated to be an additional 6,694,000 tons of ore and an estimated 7-year mine life with operations ending in 2030 (Wharf Resources Inc., 2023).

 

As of December 31, 2025, Coeur Mining Inc. reported the following mineral reserve and mineral resource numbers for the Wharf mine Property (Coeur, 2026):

 

Total Proven/Probably reserves = 60,694,000 tons @ 0.021 oz/ton containing 1,250,000 oz

Total Measured and Indicated resources = 68,119,000 tons @ 0.017 oz/ton containing 1,185,000 oz

Total Inferred resources = 80,338,000 tons @ 0.019 oz/ton containing 1,487,000 oz

 

The QP for this report section has been unable to verify the mineral reserves and mineral resources and they are not necessarily indicative of the mineralization on the property that is the subject of this technical report summary.

 

Page 313 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Wharf is described as a Tertiary age, epithermal gold deposit with structurally controlled and disseminated gold mineralization hosted in Tertiary age sills and dikes, overlying Paleozoic sedimentary rock units, and rarely metamorphosed pre-Cambrian basement rocks. There are many geologic and mineralogic similarities between parts of Richmond Hill and the Wharf mine, particularly in structural controls and host rocks in the northern portion of the Richmond Hill Property.

 

Page 314 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

21Other Relevant Data and Information

 

Information provided in this chapter does not pertain directly to the Richmond Hill Gold Project; rather, the items discussed may add benefit to the Project should positive exploration results lead to a potential mining scenario.

 

21.1Homestake Mine Facilities

 

In addition to the Option for Richmond Hill, Dakota Gold also holds a separate option with Barrick that includes exclusive access to 145 years of Homestake exploration records throughout South Dakota, Homestake mine data, and surface rights to 4,261 acres and contained facilities from the historical Homestake mine site.

 

As the Homestake property was previously disturbed by mining, Dakota Gold believes that a potential exists for Dakota Gold to repurpose this remaining infrastructure for future operations, potentially including the Richmond Hill Project.

 

21.2Sanford Underground Research Facility

 

At the 4850 level of the former Homestake mine, the Sanford Underground Research Facility (SURF) houses world-leading physics experiments with an aim of achieving a better understanding of the universe. SURF provides sufficient depth and rock stability for experiments that need to escape the constant bombardment of cosmic radiation, which can interfere with the detection of rare physics events. The facility also hosts experiments in biology, geology, and engineering.

 

SURF maintains underground dewatering to the 4850 level of the mine. Should future underground gold mining be contemplated proximal to SURF Project, certain synergies exist that may provide benefit to both Dakota Gold and SURF with regard to water treatment and the reuse of water pumped from the SURF underground facilities.

 

Page 315 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

22Interpretation and Conclusions

 

This PFS builds upon the Initial Assessment published in July 2025 and further evaluates development of the Richmond Hill Project through heap leaching of oxide and transition materials. The PFS incorporates updated geological interpretations, metallurgical evaluations, engineering designs, and economic analyses to establish the proposed development approach. The oxide mineralization provides an opportunity for development using conventional heap leach processing, with potential for relatively low initial capital investment. Opportunities for future growth include expansion of the heap leachable mineral resource, particularly in the higher recovery in the Breccia zone, and potential future development of the areas of the sulfide mineralization.

 

22.1Mineral Reserve

 

This study has defined an initial proven and probable mineral reserve of 131.8 million tons oxide and transition ore at 0.016 oz/t gold and 0.19 oz/t silver for 2.16 million ounces of contained gold and 25.4 million ounces of contained silver. The mineral reserve is amenable to conventional open pit mining and processing by crushing and heap leaching. With a peak processing rate of 45,000 tons/day, or 16,425 ktons per year, this results in a 9-year project life.

 

It is also noted that inferred mineral resources inside the current final pit design amounts to 27.1 million tons at 0.013 oz/t gold and 0.09 oz/t silver for 349,000 contained gold ounces and 2.49 million contained silver ounces. It is anticipated that additional exploration work may convert at least 50% of this inferred mineral resource to measured or indicated mineral resources and proven and probable mineral reserves.

 

22.2Mineral Resources

 

This study has defined a measured and indicated mineral resource of 173.2 million tons at 0.015 oz/t gold and 0.18 oz/t silver that is amenable to crushing and heap leaching containing 2.54 million ounces of gold and 30.6 million ounces of silver. Inferred mineral resources amenable to heap leaching are an additional 98.9 million tons at 0.011 oz/t gold and 0.08 oz/t silver for 1.09 million ounces of contained gold and 8.0 million ounces of contained silver. This estimate is inclusive of the mineral reserve estimate.

 

In addition, a measured and indicated mineral resource of 230.9 million tons at 0.014 oz/t gold and 0.15 oz/t silver that is sulfide material amenable to milling has been identified. This amounts to 3.20 million ounces of contained gold and 35.7 million ounces of contained silver. Inferred mineral resources amenable to milling are an additional 219.3 million tons at 0.012 oz/t gold and 0.13 oz/t silver amounting to 2.72 million ounces of contained gold and 28.1 million ounces of contained silver. Compared to the February 2025 mineral resource estimate, about 1.4 million contained gold ounces of measured/indicated mineral resource and 900,000 contained gold ounces of inferred mineral resource was reclassified as potential mill resource (sulfide) instead of the original leach resource (oxide and transition). This was mostly due to the reinterpretation of the top of sulfide surface to generally higher elevations. Part of this was due to metallurgical work that recommended a maximum sulfur content of 0.5% sulfur for oxide and 0.5 - 1.1% sulfur for transition material, more restrictive than previous assumptions.

 

The main risks to the mineral resource estimate are the normal risks that all mining projects face including changes to metal prices, changes to government regulations, social risks, uncertainty in mineral resource and recovery estimates, permitting risks, financing risks, and costs higher than forecast. There is no guarantee that any of the mineral resources will be converted to mineral reserve. There is also no guarantee that any of the inferred mineral resources will be upgraded to measured or indicated mineral resources or to mineral reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability.

 

There is also additional risk related to the definitions of oxide/transition versus sulfide mineral resources. For Dakota Gold cyanide soluble gold assays and sulfur assays are used to define oxide, transition, and sulfide material. These assays are not available for the legacy drilling prior to Dakota Gold tenure. Definition of oxide/transition versus sulfide mineral resources could change with additional drilling and sampling.

 

Page 316 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

22.3Processing

 

Metallurgical test work has shown that the Richmond Hill oxide material is amenable to cyanidation heap leach processing. Owing to the relatively high silver to gold ratio of the deposit, Merrill-Crowe processing of the precious metal process solution is recommended for evaluation.

 

Low sulfide transition material is likely amenable to heap leach processing, but at lower recoveries and higher reagent consumptions. Additional testing of the transition material is required to determine the cut-over grade between heap leach and flotation processing and develop an ore control method to use during production. There may also be environmental concerns that should be taken into consideration. Further geochemical analysis and testing is required to further refine the boundary between oxide ore and transition material.

 

Metallurgical testing of the sulfide material at Richmond Hill shows that it is amenable to froth flotation using bulk sulfide flotation methods resulting in a precious metal rich sulfide concentrate suitable for sale or off-site processing. Additional test work is recommended on the flotation process. Cyanide leach testing of the flotation tailings would improve overall recovery for the sulfide material and may be an option for high sulfide content transition material. Also, bio-oxidation, alkaline oxidation, or the Albion™ process applied to the flotation concentrates may be beneficial as all processing would be on-site and result in producing a doré product for direct sale.

 

22.4Mineral Tenure

 

Dakota Gold’s property tenure is based on the Option agreement to acquire the Homestake/LAC interests in the Richmond Hill Project area, with the mineral tenure primarily held in the names of LAC and Homestake (see discussion in 3.3 and 3.4). Unless further extended, Dakota Gold has until December 31, 2028 to exercise the Option. By assuming all property liabilities and bonds upon exercise of the Option, Dakota Gold will acquire the responsibility and liability to maintain the Richmond Hill mine post-closure requirements.

 

22.5Mineral Processing and Metallurgy

 

The metallurgical test work completed for the Richmond Hill Project supports the application of heap-leach processing of the oxide classified portion of the mineralization evaluated in the PFS and provides an appropriate basis for the PFS metallurgical domains and recovery assignments. Metallurgical response varies by lithology, oxidation classification, grade class, and crush size, and these relationships have been incorporated into the PFS recovery framework. The principal metallurgical risks and opportunities identified from the available test work are summarized below.

 

Metallurgical Representativeness. The distribution of completed column leach tests among the principal lithologies is not proportional to their relative contribution to the current mine plan. In particular, Deadwood represents a larger proportion of the planned ore feed than of the existing column-test database. Because metallurgical response varies by lithology, the imbalance in test coverage introduces uncertainty regarding whether the existing column program fully characterizes the recovery variability of the material expected to be processed.

 

Reducing this uncertainty is planned with the subsequent Feasibility Study metallurgical program. Additional column composites will be selected so that cumulative column-test coverage by lithology more closely reflects the relative proportions of those materials in the mine plan. Increasing test coverage for underrepresented lithologies, particularly Deadwood, will provide improved characterization of recovery variability and allow the PFS metallurgical domains and recovery assignments to be confirmed or refined for the Feasibility Study.

 

Page 317 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Recovery and Crush-Size Response. The existing test work demonstrates that gold recovery varies among metallurgical domains and that the response to finer crushing is not uniform across the deposit. Laboratory modeled recoveries and PFS recovery assignments therefore retain domain-specific differences rather than applying a single recovery assumption. The limited number of column tests within some individual lithology, oxidation, grade, and crush-size combinations introduces uncertainty in the magnitude of these relationships.

 

Additional variability and confirmatory column testing at the proposed Feasibility Study design crush size provides an opportunity to improve confidence in the recovery relationships, confirm leach kinetics and reagent requirements, and refine the recovery assumptions used in the mine plan. Integration of these results with the evolving mine schedule also provides an opportunity to improve the prediction of recovery through time rather than relying solely on static domain recovery assignments.

 

Silver Recovery. The metallurgical test program was principally designed to characterize gold recovery, and column-test duration was established primarily on the basis of gold leach performance. Silver exhibited slower leach kinetics, and the available column tests were not operated for sufficient duration to fully characterize longer-term silver extraction. Consequently, uncertainty exists in the PFS silver recovery assignments than in the gold recovery assignments.

 

The planned Feasibility Study test program provides an opportunity to obtain additional silver leach data and better characterize silver recovery kinetics under the proposed heap-leach conditions. These results can be used to confirm or refine the silver recovery assumptions and associated silver contribution to the Project metal production plan.

 

Heap Hydraulic Performance. Compacted permeability testing completed to date indicates generally favorable hydraulic characteristics for the tested materials, and no permeability behavior was identified that would preclude conventional heap-leach processing. Some reduction in permeability was observed at higher applied loads, and the existing permeability database represents a limited subset of the materials expected to be processed.

 

Additional testing of representative column residues provides an opportunity to confirm hydraulic performance at the proposed design crush size and anticipated heap-loading conditions. Integration of permeability results with fines generation, crush size, and heap configuration will improve confidence in the Feasibility Study heap design and operating criteria.

 

Spent Ore Geochemical Behavior. Static geochemical characterization of spent column-leach residues indicates generally low to uncertain ARD potential. None of the tested residues were classified as potentially acid generating based on the combined net neutralization potential and NAG pH classification criteria; however, the majority fall within the uncertain net neutralization potential range. Static testing alone does not fully characterize long-term geochemical behavior, resulting in uncertainty relevant to closure and environmental evaluation.

 

Additional geochemical characterization of representative spent material, including kinetic testing where warranted, will provide an opportunity to resolve residual uncertainty post-static testing, better define long-term material environmental behavior and support development of appropriate materials management, environmental, permitting, and closure planning. This test work has the potential to reclassify additional transition material as oxide and may have a significant positive impact to LOM ounce production.

 

Overall, the identified metallurgical risks are considered manageable at the current stage of Project development and do not indicate a material impediment to the heap-leach process concept evaluated in the PFS. As such, the current classification method of oxide versus transition material types are sufficiently conservative for project development. Dakota Gold Corporation does not anticipate including any significant transition material in the PFS production plan due to higher sulfide levels and potential higher risk to generate acid. The planned Feasibility Study metallurgical program provides an opportunity to reduce the principal remaining uncertainties by improving representation of the planned ore feed, increasing variability test coverage, confirming gold and silver recovery assumptions, and further defining heap hydraulic and spent-ore geochemical behavior.

 

Page 318 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

22.6Geotechnical

 

The geotechnical analyses indicate that the Initial Assessment (IA) pit slopes are stable at the overall scale, with bench-scale stability controlling achievable slope angles (IRAs). All eleven analyzed cross sections met the DAC of a minimum FOS of 1.2 under the August 2026 groundwater conditions, with a minimum FOS of 1.25 utilizing the Initial Assessment (IA) 45-degree design IRA and 1.27 utilizing recent bench scale analysis for the recommended IRAs. The critical overall slope stability section is in the northwestern area of the pit. Bench scale analysis for this area resulted in recommended interramp slope angle of 44 degrees, yielding FOS of 1.27 under evaluated groundwater conditions.

 

Dewatering and slope laybacks were not required to meet the DAC, although groundwater is above the pit floor. Bench-scale analyses based on 40-foot benches, 70-degree bench-face angles, and an 80 percent catch-bench reliability produced recommended IRAs of 43 to 46 degrees, depending on rock type and wall orientation, with the Tertiary sills controlling the lowest angles. Given the limited geotechnical data available across all rock types, the results are considered appropriate for a pre-feasibility level of study.

 

22.7Summary Conclusion

 

The next step is to complete a feasibility study, which the authors of this technical report expect will illustrate that the Project is economically sound and that the Project can be advanced to a construction decision and ultimately production.

 

Page 319 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

23Recommendations

 

The following are recommendations for the next stages of work to advance the Project:

 

·Advance the Project to a Feasibility Study that includes an economic analysis.
·Additional metallurgical testwork and process design.
·Additional drilling to infill the current mineral resource and test additional prospective areas. This will also improve definition of geological domains and provide material for metallurgical testing.

 

The Feasibility Study is targeted for completion in Q3 2027. The recommended work program to support the FS is summarized below and totals approximately $11.0 million, comprising approximately $7.3 million for metallurgical and resource conversion drilling and approximately $3.7 million for feasibility engineering and technical work, excluding owner's costs and permitting activities.

 

Table 23-1: Budget for Recommended Work

 

Work Area Objective Approx. Budget
(US$M)
Drilling Programs
Metallurgical drilling Approximately 12,460 ft of drilling to provide samples for FS confirmatory metallurgical testing 1.9
Resource conversion drilling Approximately 36,115 ft of drilling to upgrade Mineral Resources and fill cyanide-soluble and sulfur assay gaps 5.4
Subtotal – Drilling Programs Approximately 48,575 ft in total ~7.3
Feasibility Engineering and Technical Work
Metallurgical testing and recovery modeling FS confirmatory and column testing; refine oxide/transition classification and recovery models 1.2
Mine design and Reserve conversion FS-level mine model, pit design and production schedule, including evaluation of higher throughput 0.3
Heap-leach facility, closure and reclamation Final FS heap-leach pad design and closure and reclamation design 0.4
Power infrastructure Detailed engineering for 69kV power line relocation and substation 0.7
FS engineering and study management Advance designs and capital and operating cost estimates to FS level; prepare for project execution 1.0
Geotechnical and miscellaneous engineering support Geotechnical analysis and engineering support. Geotechnical field drilling for the pit and heap-leach facility was completed or funded under 2026 programs. 0.1
Subtotal – Feasibility Engineering and Technical Work   ~3.7
Total Work Program Excludes owner's costs and permitting activities ~11.0
Not included in total: Permitting and regulatory support State and county permit applications, any required federal authorizations, and regulatory support. Baseline environmental and hydrogeological studies are complete, with minimal remaining cost. ~0.5–0.75

 

Page 320 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

23.1Pre-feasibility Analysis

 

Based on the current oxide resource and potential for heap leach processing of a portion of the transition material, it is recommended the company engage appropriate contractors to undertake the necessary metallurgical test work, engineering, drilling, and metallurgical studies to complete a Feasibility Study.

 

23.2Mineral Processing and Metallurgy

 

The metallurgical test program completed to date provides an appropriate basis for the PFS recovery framework and process design assumptions. Additional metallurgical testing is recommended as the Richmond Hill Project advances to Feasibility Study-level evaluation to improve characterization of metallurgical variability, confirm recovery and process design assumptions, and provide additional data for heap-leach design and economic evaluation.

 

Feasibility Study Metallurgical Testing Program

 

Estimated Cost: $1.2M

 

A Feasibility Study metallurgical testing program is recommended to address the principal uncertainties identified by the PFS test work and provide additional data required for process design. The proposed program includes the following:

 

·Expand metallurgical variability and column leach testing. Additional column leach testing should be completed across the principal lithologic and oxidation domains, with test allocation reflecting the relative tonnage and metallurgical importance of the material represented in the mine plan. Particular emphasis should be placed on Deadwood material, which represents a significant proportion of the currently planned ore feed and has exhibited variable metallurgical response in the PFS test program. Additional bottle roll testing should supplement the column program to further characterize recovery variability.

 

·Confirm recovery, leach kinetics, and reagent requirements. Additional column testing should be used to confirm gold and silver recovery, leach kinetics, and cyanide and lime consumption for the metallurgical domains represented in the mine plan. The resulting data should be used to refine the recovery curves and recovery assumptions developed for the PFS and provide inputs for Feasibility Study process design and economic evaluation.

 

·Confirm performance at the proposed design crush size. The additional column program should evaluate metallurgical performance at the proposed Feasibility Study crush size and confirm the relationships among particle size, recovery, leach kinetics, and reagent consumption. The selected design crush size should ultimately consider both metallurgical performance and the associated crushing and heap-leach operating requirements.

 

·Expand ore and process characterization. Additional head and residue characterization should be completed to improve understanding of sulfur and carbon speciation, cyanide-soluble gold and silver, mineralogy, preg-robbing potential, deleterious elements, and other characteristics that may affect heap-leach performance. Particular attention should be given to characteristics that may explain metallurgical variability within and among the principal lithologic and oxidation domains.

 

·Confirm HLF hydraulic and geotechnical behavior. Additional compacted permeability testing should be completed on representative column-leach residues together with appropriate geotechnical characterization to confirm hydraulic and physical behavior under anticipated heap-loading conditions. The results should be incorporated with the selected crush size and heap design criteria.

 

·Evaluate solution treatment performance. Metallurgical testing should provide additional characterization of pregnant leach solution chemistry and evaluate gold and silver recovery through the proposed Merrill-Crowe process. Solution characterization should also identify constituents that may affect solution treatment, detoxification requirements, or process operation.

 

Page 321 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Spent Ore Geochemical Characterization

 

Estimated Cost: $120K

 

Additional acid-base accounting and related geochemical testing should be completed on spent column-leach residues to further characterize the long-term environmental behavior of material remaining in the heap. Additional testing should be coordinated with the Project environmental and permitting programs, with kinetic testing considered where warranted by the static geochemical results.

 

Heap-Leach Recovery Model and Metal Plan

 

Estimated Cost: $200K

 

A Feasibility Study heap-leach recovery model and metal production plan should be developed using the results of the expanded metallurgical test program and the updated mine plan. Recovery modeling should integrate metallurgical domain, recovery kinetics, planned stacking sequence, leach cycle, solution application rate, heap geometry, and other relevant operating parameters to predict gold and silver recovery through time.

 

The model should be used to refine the recovery curves developed for the PFS, evaluate the interaction between the mine and stacking schedules and heap-leach performance, and develop the Feasibility Study metal production plan for economic evaluation. The model should also provide a framework for evaluating changes in operating assumptions and optimizing stacking and leaching strategies as the Project design advances.

 

The estimated cost to develop the Feasibility Study heap-leach recovery model and metal production plan is $200,000.

 

Estimated Cost of Recommendations

 

The currently estimated cost of the recommended Mineral Processing and Metallurgy work is approximately $1.52 million, plus the cost of additional spent ore geochemical characterization to be developed by Life Cycle Geo.

 

The results of these programs should be used to update the metallurgical domain interpretations, gold and silver recovery assignments, recovery kinetics, reagent-consumption estimates, process design criteria, heap-leach operating assumptions, and metal production schedule used for the Feasibility Study.

 

23.3Additional Drilling

 

Drilling to date has not defined the limits of mineralization and is required to improve the geology model and improve understanding of the sites geochemistry. Additional metallurgical drilling is recommended to continue to improve the geologic model and heap leach recoveries through metallurgical variability testwork. Condemnation drilling is recommended to further define limits of the resource and confirm facility locations. Additional infill drilling as well as step out drilling to test prospective areas for potential mineralization is recommended. If successful, this drilling program will expand the extent of known mineralization and identify areas that warrant additional exploration, including additional breccia bodies and Tertiary replacement mineralization that remain undiscovered beneath the Paleozoic and Tertiary cover in the Carbonate Camp and Chism Gulch area of the Property.

 

Metallurgical Drilling: Intent to gather samples for metallurgical test work (primarily column test) to improve understanding of heap leach recovery. There are five initial target areas for metallurgical drilling in 2025 and 2026, these include: MW3 East, MW3 Main, Cole Creek, Chism Gulch, and Twin Tunnels. Metallurgical drilling in Q3 and Q4 of 2025 is projected at approximately 6,500 ft at a direct drill cost of $0.86M and in 2026 proposed drilling is at 4,000 ft and a direct drill cost of $0.53M.

 

Infill Drilling: Intent is to target the inferred portion of the resource where additional drilling is likely to convert the resource to measured or indicated. Infill drilling will also help to refine the geology model as well as the metallurgical model.

 

Geotechnical Drilling: CNI recommends additional geotechnical drilling with oriented core and borehole imaging to better characterize structural conditions, including holes that sample steeply dipping structures; expanded laboratory strength testing of the exposed pit-wall lithologies; fracture and rock fabric mapping of initial pit benches to replace assumed discontinuity lengths; additional hydrogeological investigation to evaluate groundwater sensitivity and potential dewatering if further analyses results in higher than utilized pore pressures from this study, and characterization of weathered and altered zones.

 

Page 322 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

23.4Heap Leach Facility - Risks and Optimizations

 

The Pre-Feasibility Study HLP location is generally suitable for the facility, with some notable risks and opportunities for optimization as follows:

 

·The HLP footprint valleys have seeps and shallow groundwater that require additional studies to properly size the underdrain piping system.

 

·The Pond System 2 fill slope is within 100 feet of the pit boundary due to difficult topography. For future phases of the project, the event pond layout may need to be adjusted, and additional slope stability analyses and geotechnical investigations will be required.

 

·Additional geotechnical investigations and laboratory testing are required for future phases of the project to properly characterize the site subsurface.

 

·Some high plasticity clays have been identified within the HLP footprint and additional laboratory testing will be required to properly characterize the material properties and extent of the clay. The material may need to be removed and replaced during construction. As the extent of the clay material is better defined, there may be an opportunity to further optimize current material handling projections.

 

·Due to the significant design storm event, additional work will be required to properly manage the site stormwater. Once site stormwater designs have been completed there may be an opportunity to reduce the magnitude of diversion channels around the HLF as currently designed.

 

·A borrow investigation may be required to identify construction materials such as overliner, liner bedding, and riprap.

 

·The removable HLP assumes a rinsing cycle of two years and an offloading rate of 45,000 tons per day. These values need to be verified for future phases of the project and a detailed stacking plan is required to increase confidence of the current sequencing assumptions.

 

·Additional testing is required prior to construction of the facilities for the LPS/LLDPE and GCL/LLDPE interface. Optimization to the buttress zones and grading may be required once the material properties are refined.

 

Page 323 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

24References

 

AKF Mining Services, April 30, 2024. S-K 1300 Initial Assessment and Technical Report Summary – Richmond Hill Gold Project, South Dakota, U.S.A.

 

Ballert, T. 2024. Methodology used to create custom projections for Homestake and Richmond Hill Grids (E.S.R.I. format). Memorandum from Ponderosa Land Surveys, LLC.

 

Berry, J. 2023a. Section 7 Dakota Gold Corp. Exploration and Drilling at Richmond Hill. Dakota Gold employee email correspondence November 20, 2023.

 

Berry, J. 2023b. Section 7 Dakota Gold Corp Exploration and Drilling at Richmond Hill. Dakota Gold employee email correspondence, December 19, 2023.

 

Call, R. D., Ericksen S. D. 1986 Preliminary Slope Design for the Proposed Richmond Hill Open Pit Mine.

 

Call & Nicholas, Inc. 2026. Richmond Hill Geotechnical Prefeasibility Study. Prepared for Dakota Gold Corp.     Unpublished.

 

Caddey, S.W., Bachman, R.L., Campbell, T.J., Reid, R.R., and Otto, R.P., 1991. The Homestake Gold Mine, An Early Proterozoic Iron-Formation-Hosted Gold Deposit, Lawrence County, South Dakota. In Geology and Resources of Gold in the United States, edited by Daniel R. Shawe, Roger P. Ash-ley, and Lorna M.H. Carter, J1–J67. Geological Survey Bulletin 1857. Denver, CO: United States Geological Survey. Available at https://doi.org/10.3133/b1857.

 

Carter, J.M., Daniel G. Driscoll, and Joyce E. Williamson. 2002. The Black Hills Hydrology Study. USGS Fact Sheet FS-046-02. Reston, VA: U.S. Geological Survey. Available at https://pubs.usgs.gov/fs/fs04602/pdf/fs04602.pdf.

 

Chasten, L. E., 2009, Electron microprobe (ultrachron) geochronology of monazite from the Homestake Iron Formation, Lead, the Black Hills, South Dakota, U.S.A, South Dakota School of Mines and Technology, M. S. thesis.

 

Coeur Mining Inc., 2021. Wharf Operations, South Dakota, Technical Report Summary. December 31, 2021.

 

Coeur Mining Inc. 2022, February 16. Wharf Operations, South Dakota, Technical Report Summary. Form 10-K Mineral Property Disclosure Exhibit Current to December 31, 2021.

 

Coeur Mining Inc., 2024, Annual Report: Form 10-K Annual Report. December 31, 2024.

 

Coeur Mining Inc., 2025, Annual Report 2024, Form 10-K, February 19, 2025.

 

Coeur Mining Inc,. 2026, Wharf Operations, South Dakota, S-K 1300 Technical Report Summary, February 18, 2026.

 

Connolly, J.P., 1927, The Tertiary mineralization of the northern Black Hills: South Dakota School of Mines Bull. 15, 130 p.

 

Cylwik, S.D. 2021. Three-dimensional anisotropic shear strength of jointed rockmasses. ARMA 21-1799, 55th U.S. Rock Mechanics/Geomechanics Symposium.

 

Cylwik, S.D., Killian, J.R., and Cicchini, P.F. 2022. A practical strength criterion for rock masses based on quantitative input parameters.

 

Page 324 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Dahl, P.S., Holm, D.K., Gardner, E.T., Hubacher, F.A., and Foland, K.A., 1999, New constraints on the timing of early Proterozoic tectonism in the Black Hills (South Dakota), with implications for docking of the Wyoming Province with Laurentia: GSA Bulletin, vol. 111, p. 1335-1349.

 

Dahl, P.S., Terry, M.P., Jercinovic, M.J., Williams, M.L., Hamilton, M.A., Foland, K.A., Clement, S.M., and Friberg, L.M., 2005b, Electron probe (Ultrachron) microchronometry of metamorphic monazite: unraveling the timing of polyphase thermotectonism in the easternmost Wyoming Craton (Black Hills, South Dakota): American Mineralogist, 90, p. 1712-1728.

 

Dahl, P.S., Hamilton, M.A., Jercinovic, M.J., Terry, M.P., Williams, M.L., and Frei, R., 2005a, Comparative isotopic and chemical geochronometry of monazite, with implications for U-Th-Pb dating by electron microprobe: An example from metamorphic rocks of the eastern Wyoming Craton (U.S.A.): American Mineralogist, vol. 90, p. 619-638.

 

Dakota Gold Corp, 2023a. Core Logging Manual, Internal company document, November 29, 2023.

 

Dakota Gold Corp, 2023b. Blind Gold Project. Available at https://dakotagoldcorp.com/portfolio/explore-our-gold-properties/blind-gold-property/. Accessed December 13, 2023.

 

Dakota Gold Corp, 2023c. Maitland Gold Project. Available at https://dakotagoldcorp.com/portfolio/explore-our-gold-properties/maitland-property/. Accessed December 13, 2023.

 

Dakota Gold Corp, 2023d. Richmond Hill Gold Project. Available at https://dakotagoldcorp.com/portfolio/explore-our-gold-properties/richmond-hill/. Accessed November 18, 2023.

 

Dakota Gold Corp, 2023e. West Corridor Gold Project. Available at https://dakotagoldcorp.com/portfolio/explore-our-gold-properties/west-corridor-property/. Ac-cessed December 13, 2023.

 

Dakota Gold Corp, 2025. Wharf Production Records, Internal Dakota Gold Corp Compilation from Public Records, February 18, 2025.

 

Dakota Territory Resource Corp, 2022a. Notice of Intent to Conduct Mineral Exploration Operation (EXNI 440), notice received by South Dakota Department of Environment & Natural Resources from DTRC on January 13, 2022.

 

Dakota Territory Resource Corp, 2022b. Notice of Intent to Conduct Mineral Exploration Operation (EXNI 444), notice received by South Dakota Department of Environment & Natural Resources from DTRC on December 5, 2022.

 

Dakota Territory Resource Corp, 2023. Notice of Intent to Conduct Mineral Exploration Operation (EXNI 446), notice received by South Dakota Department of Environment & Natural Resources from DTRC on January 27, 2023.

 

Additional DTRC notices for 2024 (see below) are available but they are not listed here at this time.

 

Deere, D.U. 1963. Technical description of rock cores for engineering purposes. Rock Mechanics and Engineering Geology, v. 1, no. 1, pp. 16–22.

 

Driscoll, D.G., Carter, J.M., Williamson, J.E., and Putnam, L.D., 2002. Hydrology of the Black Hills area, South Dakota: U.S. Geological Survey Water-Resources Investigations Report 02-4094, 150 p.

 

Page 325 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Duex, T.A., Smith, T.J., McConnell, P.A., Osmudnson, T.M., Petersen, and Stanley, T.M., 1987, Geology of the Richmond Hill deposit, in Han, K., and Kliche, C., eds., Proceedings Third AIME Western Regional Conference on Precious Metals, Coal, and Environment, Rapid City, p. 67-71.

 

Duex, T., 1989. November 16. St. Joe Minerals Corporation Internal Memo. Unpublished internal memorandum.

 

Duex, T., 1990. 1990 Exploration Update. Unpublished Bond Gold Internal Memo to Mike Schwabe.

 

Duex, T. A., and M. R. Andersen, 1994. Reclamation at the Richmond Hill Mine Lawrence County, South Dakota, LAC Minerals (USA), Inc. Internal report.

 

Duke, G. I., 2005, Geochemistry and geochronology of Paleocene-Eocene alkalic igneous rocks, northern Black Hills, South Dakota and Wyoming, Doctoral Dissertation, South Dakota School of Mines and Technology, Rapid City, 292 p.

 

Environmental Resources Management, 2015a. Postclosure Plan and Financial Assurance. Environmental Resources Management report presented to LAC Minerals (USA), LLC, on May 28, 2015.

 

Environmental Resources Management, 2015b. Updated Reclamation Plan and Financial Assurance. Environmental Resources Management report presented to LAC Minerals (USA), LLC, on May 28, 2015.

 

Environmental Resources Management, 2015c. Petition for Release of Reclamation Obligations. Environ-mental Resources Management report presented to LAC Minerals (USA), LLC, on May 28, 2015.

 

Frei, R., Dahl, P. S., Frandsson, M. M., Jensen, L. A., Hansen, T. R., Terry, M. P., & Frei, K. M., (2009). Lead-isotope and trace-element geochemistry of Paleoproterozoic metasedimentary rocks in the Lead and Rochford basins (Black Hills, South Dakota, USA): implications for genetic models, mineralization ages, and sources of ore leads for the Homestake gold deposit. Precambrian Research, 172(1-2), 1-24.

 

Geology of Wyoming, n.d. Devils Tower and Black Hills Regional Geology, Devils Tower & Northern Black Hills Eocene Alkaline Magmatic Province. Available at https://www.geowyo.com/devils-tower--black-hills.html. Accessed February 28, 2024.

 

Horton, J., 1989. Status Report on the Cleveland Project Area, Bond Gold internal memorandum from Jack Horton to Todd Duex, November 16, 1989.

 

Imam, Mozaffer, 1991. Factors affecting the yield of Madison wells in the Black Hills: Rapid City, South Dakota School of Mines and Technology, unpublished M.S. thesis, 96 p.

 

Irving, J.D., 1904, Economic resources of the Northern Black Hills: with contributions by Emmons, S.F., and Jagger, T.A., Jr.: U. S. Geological Survey Paper 26, 222p.

 

Klohn Leonoff Consulting Engineers, 1986. Hydrogeology of Ross Valley, prepared by Klohn Leonoff Consulting Engineers, Vancouver, Canada, for Wharf Resources, Lead, SD, United States.

 

LAC Minerals Limited, 1991. Summary Report—MW-3 Target Area—Lawrence County, South Dakota. Internal report.

 

LAC Minerals Limited, 1993. Cole Creek Target Area Summary Report. Internal report.

 

LAC Minerals Limited, 2023, August 22. Richmond Hill Mine Annual Report to the Lawrence County Com-mission Conditional Use Permit Nos. 116, 125, and 202.

 

Page 326 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Lisenbee, A.L., 1981, Studies of the Tertiary intrusions of the northern Black Hills Uplift, South Dakota and Wyoming, a historical review: Geol. Soc. America, Rocky Mountain Section, 1981, Ann. Mtg, Rapid City, Geology of the Black Hills, South Dakota and Wyoming, Guidebook, American Geol. Inst., p. 106-125.

 

Lisenbee, A.L., and DeWitt, E., 1993, Laramide evolution of the Black Hills uplift, in Snoke, A.W., Steidtmann, J.R., and Roberts, S.M., editors, Geology of Wyoming: Geological Survey of Wyoming Memoir No. 5, p. 374-412.

 

Lisenbee, A., Redden J.A., and Fahrenbach, M., 2020. Geologic Map of the Spearfish Quadrangle, South Dakota, 1:24,000 scale, South Dakota Department of Environment and Natural Resources Geologic Survey.

 

Lufkin, J.L., Redden, J.A., Lisenbee, A.L., and Loomis, T.A., 2009. Guidebook to Geology of the Black Hills, South Dakota, Golden Publishers, Golden, CO.

 

National Weather Service, 2023. Black Hills Climate Overview. National Oceanic and Atmospheric Administration, United States Department of Commerce. Available at https://www.weather.gov/unr/bhco. Accessed November 18, 2023.

 

Nations Online Project, 2023. South Dakota Map. Available at https://www.nationsonline.org/maps/USA/South_Dakota_map.jpg. Accessed January 23, 2024.

 

Marinelli, F., and W.L. Niccoli, 2000. Simple Analytical Equations for Estimating Ground Water Inflow to a Mine Pit. Ground Water. Vol, 38, No.2. pp 311-314.

 

Mitchell, S. T., 2009, Nuggets To Neutrinos: The Homestake Story, Xlibris Corporation, p. 558.

 

Montgomery Consulting Engineers Inc., 1996. Groundwater Characterization Study of the Clinton Extension Project Area, prepared by J. M. Montgomery Consulting Engineers, Inc., Boise, ID, for Wharf Resources, Lead, SD.

 

Morelli, R.M., Bell, C.C., Creaser, R.A., and Simonetti, A., 2010, Constraints on the genesis of gold mineralization at the Homestake Gold Deposit, Black Hills, South Dakota from rhenium-osmium sulfide geochronology, Mineralium Deposita, June, 2010, vol 45 p.461-480.

 

Paterson, C.J., Shapiro, L.H., and Gries, J.P., 1970: Ore Deposits in Rocks of Paleozoic and Tertiary Age of the Northern Black Hills, South Dakota: U.S. Geological Survey Open-File Report 70-300, 235 p.

 

Paterson, C. J. 1988. WGA Field Guide Notes for Wyoming Geological Association 1988 Field Conference. Department of Geology and Geological Engineering. Rapid City, SD: South Dakota School of Mines and Technology.

 

Paterson, C. J., A. L. Lisenbee, and J. A. Redden. 1988. Gold deposits in the Black Hills, South Dakota. In 39th Field Conference Guidebook, Eastern Powder River Basin—Black Hills, edited by Robin P. Die-trich, Mary Ann K. Dyka, and W. Roger Miller, 295–304. Casper, WY: Wyoming Geological Association.

 

Paterson, C.J., and Giebink, B.G., 1989: Controls on Epithermal Sediment-Hosted (Carlin-type) Au-Ag Mineralization, Annie Creek Mine, Northern Black Hills, South Dakota: internal company report, Wharf Resources, 23 p.

 

Paterson, C.J., 1990, Magmatic-hydrothermal model for epithermal-mesothermal Au- Ag deposits in the northern Black Hills, Proceedings, Fourth Western Regional Conference on Precious Metals and the Environment, Black Hills section, SME, Sep. 19-23, Lead, South Dakota, p. 89-102.

 

Paterson, C.J., and Lisenbee, A.L., 1990, Metallogeny of Gold in the Black Hills, South Dakota, Society of Economic Geologists Field Conference, Sept. 5-9, Guidebook Series Volume 7.

 

Page 327 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

Nabelek, P.I., Labotka, T.C., Helms, T., and Wilke, M., 2006. Fluid mediated polymetamorphism related to Proterozoic collision of Archean Wyoming and Superior provinces in the Black Hills, South Dakota, American Mineralogist, v. 91, p. 1473-1487.

 

Redden, J.A., and DeWitt, E., 2008. Maps showing geology, structure, and geophysics of the Central Black Hills, South Dakota, United States Geological Survey Scientific Investigations Map 2777, scale 1:100,000.

 

Redden, J.A., Peterman, Z.E., Zartman, R.E., and DeWitt, E.R., 1990. U-Th-Pb geochronology and preliminary interpretation of Precambrian events in the Black Hills, South Dakota, in Lewry, J.F. and Stauffer, M.R., eds., The Early Proterozoic Trans-Hudson Orogen of North America, Geological Association of Canada Special Paper 37, Ottawa, p. 229-251.

 

RESPEC, 2022. Groundwater Characterization Study of the Wharf Boston Expansion Project, revision 3 topical report rsi-3137.

 

RESPEC, 2025a. Excel Files sent by Aiden Schmitt titled, 20250618_Richmond Hill Hydrology Results.xlsx. June 20.

 

RESPEC, 2025b. AutoCAD File sent by Tom Dyer titled, Richmond_Hill_2025_05_14.dxf. Sent May 29.

 

Ritchie, A.M. 1963. Evaluation of rockfall and its control. Highway Research Record 17, pp. 13–28.

 

Sanford Underground Research Facility, 2020. Our History. Available at https://sanfordlab.org/feature/our-history.

 

SANtosito, 2021. Relief Location Map of South Dakota, USA, Wikimedia Commons. Available at https://upload.wikimedia.org/wikipedia/commons/thumb/7/73/USA_South_Dakota_relief_location_map.svg/1200px-USA_South_Dakota_relief_location_map.svg.png. Accessed February 23, 2021.

 

Shapiro, L.H., and Gries, J.P., 1970. Ore deposits in rocks of Paleozoic and Tertiary age of the northern Black Hills, South Dakota, United States Geological Survey Open-File Report 70-300, Reston, VA. Available at https://doi.org/10.3133/ofr70300.

 

St. Joe Gold Corporation. 1986. Feasibility Report, Volume II. St. Joe American. Unpublished In-House Re-port by St. Joe Gold Corporation 1986.

 

South Dakota Board of Minerals & Environment, 2016. Partial Release of Reclamation Liability & Release of Surety, South Dakota Department of Environment & Natural Resources Board of Minerals & Environment Notice to Todd Duex of LAC Minerals (USA), LLC on January 22, 2016.

 

South Dakota Board of Minerals & Environment, 2023. Minutes of the Board of Minerals and Environment, South Dakota Board of Minerals and Environment, notes for meeting on January 29, 2023.

 

South Dakota Department of Agriculture & Natural Resources, 2022a. EXNI 444 Restriction Letter to DTRC, notice from South Dakota Department of Agriculture & Natural Resources’ Roberta Hudson to Timm Comer of DTRC, dated January 18, 2022.

 

South Dakota Department of Agriculture & Natural Resources, 2022b. EXNI 440 Restriction Letter to DTRC, notice from South Dakota Department of Agriculture & Natural Resources’ Roberta Hudson to Gerald Aberle of DTRC, dated February 14, 2022.

 

South Dakota Department of Agriculture & Natural Resources, 2022c. LAC Minerals 2022 Annual Environ-mental Audit Report, South Dakota Department of Agriculture & Natural Resources report dated June 21 and 22, 2022.

 

Page 328 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

South Dakota Department of Agriculture & Natural Resources, 2022–2023. EXNI 440 Inspections, field inspection reports from South Dakota Department of Agriculture & Natural Resources, September 26, 2022–January 11, 2023.

 

South Dakota Department of Agriculture & Natural Resources, 2023a. Richmond Hill Gold Mine Compliance Update, Letter from South Dakota Department of Environment & Natural Resources’ Roberta Hudson to Michelle Ozarowski (consultant), dated November 20, 2023.

 

South Dakota Department of Agriculture & Natural Resources, 2023b. EXNI 446 Restriction Letter to DTRC, Notice from South Dakota Department of Agriculture & Natural Resources’ Roberta Hudson to Timm Comer of DTRC, dated February 28, 2023.

 

South Dakota Department of Agriculture & Natural Resources, 2023c. EXNI 444 Inspections, field inspection reports from South Dakota Department of Agriculture & Natural Resources, February 10, 2023–March 3, 2023.

 

South Dakota Department of Agriculture & Natural Resources, 2024. EXNI 456 Restriction Letter to DTRC, notice from South Dakota Department of Agriculture & Natural Resources’ Roberta Hudson to Timm Comer of DTRC, dated July 31, 2024.

 

South Dakota Department of Agriculture & Natural Resources, 2024a. EXNI 457 Restriction Letter to DTRC, notice from South Dakota Department of Agriculture & Natural Resources’ Roberta Hudson to Timm Comer of DTRC, dated August 7, 2024.

 

South Dakota Department of Agriculture & Natural Resources, 2024b. EXNI 460 Restriction Letter to DTRC, notice from South Dakota Department of Agriculture & Natural Resources’ Roberta Hudson to Timm Comer of DTRC, dated November 21, 2024.

 

Terry, M.P. and Friberg, L.M., 1990. Pressure-temperature-time path related to the thermotectonic evolution of an Early Proterozoic metamorphic terrane, Black Hills, South Dakota: Geology, v. 18, p. 786–789.

 

Terry, M. P., 2010. Geological Field Trips in the Black Hills Region, South Dakota. Field Trip Guide Book 2010. South Dakota School of Mines Technical Bulletin No. 21. Rapid City, SD: South Dakota Mines Department of Geology and Geological Engineering.

 

United States Department of Agriculture Forest Service, 2023. Wildlife, Fish, & Rare Plants. Available at https://www.fs.usda.gov/detailfull/blackhills/landmanagement/?cid=STELPRDB5114233&width=full.

 

Watson, J., 1990. Twin Tunnels Area. Internal Memo from Jim Watson to Pat Downey. Bond Gold, February 19, 1990.

 

Wharf Resources Inc., 2023. Summary Document: Large Scale Mine Permit Application, Wharf Boston Expansion Project. March 10, 2023.

 

Zimmer, A, 2022. Summary of Work Completed on the Richmond Hill Project. April 29, 2022.

 

Page 329 of 330

Richmond Hill ProjectM3-PN240322
S-K 1300 Pre-Feasibility StudyRev. 0

 

 

25Reliance on Information Provided by the Registrant

 

The QPs have relied upon the Registrant for information for which the QPs were not experts, or where the QPs were unable to independently secure documents describing the Project as noted in the following subsections.

 

25.1Legal Matters

 

The legal staff at Dakota Gold prepared a summary of the Dakota Gold–Barrick Option Agreement. The QPs did not have access to the complete agreement and are not experts in this discipline; therefore, they have relied wholly upon the Registrant to provide an accurate document summary as described in Sections 3.4 through 3.7 and Table 3-1 and Table 3-2. A comparison with the information provided on the Dakota Gold website agreed with the summary provided.

 

25.2Tenure

 

The QPs have relied upon the Registrant to provide a complete and accurate list of claims comprising the Property, along with the holding costs and royalties associated with certain claims as set out in Section 3.3 and Table 3-1 and Table 3-2. The QPs have not independently verified the claim listing, royalties, and holding costs, but have no reason to doubt the information Dakota Gold’s legal department provided.

 

25.3Significant Encumbrances and Permitting

 

The QPs are relying on information provided by the Registrant for this summary of current active permits associated with the potential gold deposit at the Property as discussed in Section 3.8. The required permits seem consistent with those required in other jurisdictions; thus, the QPs have no reason to doubt that these are correct and complete.

 

25.4History

 

The QPs have relied on the Registrant for the description of the history of the Project area.

 

25.5Exploration

 

The QPs have relied upon the Registrant for summaries of non-drilling exploration programs carried out on the Property. The Registrant has not made public any results from exploration programs other than drilling; however, the Registrant has stated that while these other exploration results helped target drill-collar locations, they neither contributed nor detracted from the resource estimate reported in this Report.

 

25.6Environment

 

The QPs are relying on information provided by the Registrant for this summary of all environmental information, private and public, associated with the potential gold deposit at the Property. The QPs have no reason to doubt that the required environmental information is correct and complete.

 

Page 330 of 330

 

Exhibit 99.1

 

 

November 23, 2026 News Release 26-16

 

Pre-Feasibility Study for Richmond Hill delivers strong economics with US$2 billion after-tax NPV5% and 71% IRR

 

LEAD, SOUTH DAKOTA – Dakota Gold Corp. (NYSE American: DC) (“Dakota Gold” or the “Company”) is pleased to report the results of its S-K 1300 Pre-Feasibility Study (“Report” or “PFS”) for the Richmond Hill Oxide Heap Leach Gold Project (“Richmond Hill” or “Project”) in South Dakota. The PFS was prepared in conjunction with a maiden mineral reserve and an updated mineral resource estimate (“mineral estimate”). The PFS highlights the potential for a profitable, open pit, gold heap leach operation at Richmond Hill.

 

PFS Highlights

 

·Strong Economics: At a base case gold price of $3,500 per ounce, the Project has an after-tax net present value (“NPV5%”) of $2.0 billion and an internal rate of return (“IRR”) of 71%. At a gold price of $4,250 per ounce, the NPV5% increases to $2.7 billion, and the IRR increases to 94%.

 

·Heap leachable Mineral Reserves and Resources (Table 4): An updated mineral estimate for Richmond Hill following a successful definition and expansion drill program includes Proven and Probable heap leachable mineral reserves grading 0.56 grams per tonne (“g/t”) gold (“Au”) and 6.61 g/t silver (“Ag”), containing approximately 2.16 million ounces (“Moz”) of Au and 25.4 Moz of Ag. The Measured and Indicated category of the mineral resource exclusive of reserves includes 0.4 Moz Au and 5.2 Moz of Ag grading 0.32 g/t Au and 4.28 g/t Ag. The Inferred category contains 1.1 Moz of Au and 8.0 Moz of Ag grading 0.38 g/t Au and 2.74 g/t Ag.

 

·Millable Resources Provide Long-Term Optionality for the Project (Table 5): The Measured and Indicated category of the millable mineral resource includes 3.2 Moz Au grading 0.48 g/t Au, and the Inferred category contains 2.7 Moz of Au grading 0.43 g/t Au.

 

·Gold Production at Low-Cost: Life of mine production totals 1.6 million ounces of gold over nine years, with an average annual production of 171,000 ounces of gold, at a nominal design stacking rate of 41,000 tonnes per day. Initial Capital is $538 million, including $84 million contingency, with life of mine All-in Sustaining Costs (“AISC”) of $1,066 per ounce of gold before State Severance Tax and $1,289 per ounce of gold including the State Severance Tax. AISC is a non-GAAP measure; see "Non-GAAP Measures" below.

 

·Feasibility and Permitting Underway: Work has commenced on the Feasibility Study (“FS”) planned for mid-2027 with production targeted for 2029. Permitting is through the county and state of South Dakota where the Project could generate over $348 million in State Severance taxes over the life of the project along with hundreds of high paying jobs and other economic benefits.

 

·Targeting a Minimum 10% Increase in Reserves for the FS: Approximately 3,800 m of metallurgical drilling throughout the Project and 11,000 m of definition drilling in the central area to inform the FS is underway with two drills in operation. The definition drilling is targeting Inferred material conversion in the high-recovery breccia zone not included in the PFS economics, mine sequence and mineral estimate - representing further upside. (see details and disclosure for the 2026-2027 Definition Drill Program)

 

 1

 

 

Jack Henris, CEO, President and Director of Dakota Gold, said, “We are pleased to share results that demonstrate Richmond Hill’s potential to be a significant economic driver for South Dakota. As a South Dakotan, I am proud to see that we have an opportunity to advance a project at home that could generate more than $348 million in projected State Severance Taxes over the life of mine, while supporting hundreds of high-paying jobs.”

 

Shawn Campbell, Chief Financial and Development Officer of Dakota Gold, commented, “Richmond Hill combines strong project economics, competitive operating costs and relatively low initial capital intensity in a well-established U.S. mining jurisdiction. These attributes provide a strong foundation as we advance feasibility work, evaluate future construction financing opportunities, continue investing in local communities, and advance our broader portfolio of projects across the Homestake District.”

 

Table 1: PFS key parameters

 

Pre-Feasibility Key Parameters (All Currencies in US$)
Key Assumptions
Base Case Gold Price $3,500/oz
Base Case Silver Price $50.00/oz
Production Profile
Total Tonnes Processed (Mt) 120
Strip Ratio 1.18
Heap Leach Gold Feed Grade (oz/ton) 0.016
Heap Leach Gold Feed Grade (g/t) 0.561
Mine Life (years) 9
Nominal Stacking Rate (KTPD) 41
LOM Gold Recovery (%) 72.4%
LOM Gold Payable (koz) 1,562
LOM Average Annual Gold Payable (koz) 171
Unit Operating Costs ($/payable oz Au)
Operating Costs $977
AISC $1,289
Capital Costs
Initial Capital Cost $538 M
Sustaining Capital Cost $133 M
Closure Capital Cost $62 M

 

Abbreviations in the table include ounces (“oz”); million tonnes (“Mt”); ounces per ton (“oz/ton”); grams per tonne (“g/t”); thousand tonnes per day (“KTPD”); thousand ounces (“koz”); life of mine (“LOM”); all-in sustaining costs (“AISC”).

 

 2

 

 

Table 2: PFS sensitivity to gold price, costs and recovery

 

Sensitivity to Gold Price (US$ where applicable)

 

Gold Price
(US$/oz)
$2,750 $3,000 $3,250 $3,500
(Base
Case)
$3,750 $4,000 $4,250 $4,500 $4,750
After-Tax NPV(5%) (US$) $1,249 M $1,501 M $1,752 M $2,000 M $2,248 M $2,496 M $2,744 M $2,991 M $3,239 M
After-Tax IRR 47% 55% 63% 71% 79% 87% 94% 102% 110%
After-Tax Payback 2.1 years 1.8 years 1.6 years 1.4 years 1.3 years 1.2 years 1.1 years 1.0 years 0.9 years

 

Abbreviations in the table include net present value (“NPV”); internal rate of return (“IRR”).

 

Sensitivity to Operating Costs and Capital Costs (After-Tax NPV5% US$M)

 

Sensitivity
Parameters
Base
Case
-21% -14% -7% 0%
(Base Case)
+7% +14% +21%
Operating Costs $12.76/t $2,199 M $2,132 M $2,066 M $2,000 M $1,934 M $1,868 M $1,799 M
Capital Costs $671 M $2,089 M $2,059 M $2,029 M $2,000 M $1,970 M $1,941 M $1,911 M

 

Sensitivity to Recovery* (After-Tax NPV5% US$M)

 

Sensitivity Parameters Base
Case
66% 68% 70% 72.4%
(Base Case)
Gold Recovery 72.4% $1,692 M $1,788 M $1,883 M $2,000 M

 

* Recoveries above base case (72.4%) have not been calculated.

 

Table 3: PFS after-tax free cash flow profile - For years 1 through 8 the average after-tax free cash flow per year is ~$366 M at a gold price of $3,500/oz and $474 M at a gold price of $4,250/oz

 

 

 

 3

 

 

Cumulative After-Tax Free Cash Flow Profile (US$M)

 

  PRE-PROD YR 1 YR 2 YR 3 YR 4 YR 5 YR 6 YR 7 YR 8 YR 9 YR 10 YR 11 LOM
 (US$3,500/oz Au) -$471 -$170 $214 $600 $843 $1,126 $1,576 $2,168 $2,458 $2,627 $2,631 $2,558 $2,558
 (US$4,250/oz Au) -$471 -$53 $448 $944 $1,269 $1,639 $2,209 $2,949 $3,323 $3,535 $3,539 $3,462 $3,462

 

Abbreviations in the table include pre-production (“Pre-Prod”); year (“YR”).

 

Overview

 

The PFS outlines a strong foundation for future growth and mine-sequence optimization at Richmond Hill. The study is informed by a large, near-surface heap-leachable resource which has been updated concurrently with the PFS.

 

Table 4: Richmond Hill heap leachable reserves and resources as of November 2026

 

Richmond Hill heap leachable reserves
Category NSR ($/tonne) Ktonnes Gold (g/t) Silver(g/t) Gold (koz) Silver (koz)
Proven 36.57 57,115 0.613 7.33 1,126 13,457
Probable 30.99 62,482 0.514 5.96 1,033 11,964
Reserves Total 33.65 119,597 0.561 6.61 2,158 25,421

 

Richmond Hill heap leachable resources
Category NSR ($/tonne) Ktonnes Gold (g/t) Silver(g/t) Gold (koz) Silver (koz)
Measured 21.24 8,718 0.307 4.03 86 1,129
Indicated 21.03 28,764 0.319 4.36 295 4,029
M&I Resources Total 21.08 37,482 0.316 4.28 381 5,158
Inferred 25.09 89,731 0.377 2.74 1,088 8,012

 

Notes:

 

·Mineral resources reported are exclusive of reserves.
·Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology.
·A gold price of $2,900 per ounce and a silver price of $35 per ounce was used for the mineral resources.
·The mineral resources are based on a net smelter return (NSR) cut-off of $6.39/tonne for heap leachable material.
·A gold price of $2,600 per ounce and a silver price of $30 per ounce was used for the mineral reserves.
·Mineral reserves are based on net smelter return (NSR) cut-offs that vary by time period to balance mine and plant production capacities. They range from a high of $11.00/tonne to a low of $6.39/tonne (internal cut-off grade).
·Heap-leachable resources NSR ($/tonne) = $81.00 x gold (g/tonne) x recovery + $0.97 x silver (g/tonne) x recovery. Heap-leachable reserves NSR ($/tonne) = $72.60 x gold (g/tonne) x recovery + $0.83 x silver (g/tonne) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content.
·The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
·The heap-leachable mineral resource consists of the oxide and transition mineralization in the mineral deposit.
·Includes a preliminary estimated royalty rate of 3.8% averaged across the project.
·The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resources.
·The mineral reserve estimate and mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

 

The additional milled material provides long-term optionality for the Project (see Table 5). The reserves and resources are informed by a historical database containing 56,280 gold assays from 901 drill holes totaling 92,464 meters of drilling, and an additional 62,366 gold assays from 485 drill holes totaling 92,617 meters of drilling by Dakota Gold since 2022 to expand the resource.

 

The Richmond Hill property remains subject to an option agreement between Dakota Gold and Homestake Mining Company of California a Barrick company.

 

 4

 

 

The PFS was led by M3 Engineering and Technology Corporation (M3), SLR (formerly Forte Dynamics), NewFields, and IMC, independent engineering firms capable of delivering through Feasibility and into production as soon as 2029. Concurrently, the Company is undertaking baseline environmental studies that will inform future permitting requirements.

 

The S-K 1300 technical report summary for the PFS (the “Report”) has been published on the Company’s website and filed by the Company with the Securities and Exchange Commission on EDGAR as an exhibit to its Current Report on Form 8-K dated Monday, November 23, 2026. The Report was prepared by an independent group of Qualified Persons with M3 as the Study Manager.

 

Details of the PFS will be presented in a webcast conference call on Monday, November 23, 2026 at 4:45 PM Eastern Time Zone.

 

Webcast Conference Call Information

 

Date: Monday, November 23, 2026

Time: 4:45 PM Eastern Time Zone

Webcast and replay: Click Here

USA/Canada Toll Free: +1-833-752-4751

International Toll: +1-647-849-3335

 

About Dakota Gold Corp.

 

Dakota Gold is a responsible exploration and development company advancing the Richmond Hill Gold Project toward production as soon as 2029, while continuing to define and expand the high-grade underground gold resource potential at the Maitland Gold Project. Both projects are located on private land within the historic Homestake District of South Dakota, one of the most prolific gold mining regions in the United States.

 

Subscribe to Dakota Gold’s e-mail list at www.dakotagoldcorp.com to receive the latest news and other Company updates.

 

Shareholder and Investor Inquiries

 

For more information, please contact:

 

Jack Henris

CEO, President and Director

Tel: +1 605-717-2540

 

Shawn Campbell

Chief Financial and Development Officer

Tel: +1 778-655-9638

 

Carling Gaze

Director of Investor Relations

Tel: +1 605-679-7429

Email: info@dakotagoldcorp.com

 

 5

 

 

Qualified Persons

 

The Report was prepared by an independent group of Qualified Persons with M3 Engineering and Technology Corporation as the Study Manager. M3 has reviewed and approved the contents of this news release.

 

Forward-Looking Statements

 

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. When used in this communication, the words “plan,” “target,” “anticipate,” “believe,” “estimate,” “intend,” “potential,” “will” and “expect” and similar expressions are intended to identify such forward-looking statements. Any express or implied statements contained in this communication that are not statements of historical fact may be deemed to be forward-looking statements, including, without limitation: the results of the PFS, including estimated mineral reserves and resources, mine plan and life, production, recoveries, capital and operating costs, AISC, severance taxes and economic results; our expectations regarding additional drilling, metallurgy and modeling; our expectations for the improvement and growth of the mineral resources and potential for conversion of mineral resources into reserves; our expectations regarding the economics of the project; completion of a feasibility study, and/or permitting; and our overall expectation for the possibility of near-term production at the Richmond Hill project. These forward-looking statements are based on assumptions and expectations that may not be realized and are inherently subject to numerous risks and uncertainties, which could cause actual results to differ materially from these statements. These risks and uncertainties include, among others: gold and silver prices; the preliminary nature of the PFS and the risk that a feasibility study does not confirm its results or support a production decision; uncertainty in mineral reserve, mineral resource and recovery estimates, including limited cyanide-soluble and sulfur assay data; increases in capital and operating costs; delays in or failure to obtain permits; environmental, reclamation and closure liabilities; the risk that the Richmond Hill option is not exercised; the availability of financing; construction and operating risks; changes in laws, royalties and taxes; the execution and timing of our planned exploration activities; our use and evaluation of historic data; our ability to achieve our strategic goals; the state of the economy and financial markets generally and the effect on our industry; and the market for our common stock. The foregoing list is not exhaustive. For additional information regarding factors that may cause actual results to differ materially from those indicated in our forward-looking statements, we refer you to the risk factors included in Item 1A of the Company’s Annual Report on Form 10-K for the fiscal year ended December 31, 2025, as updated by annual, quarterly and current reports that we file with the SEC, which are available at www.sec.gov. We caution investors not to place undue reliance on the forward-looking statements contained in this communication. These statements speak only as of the date of this communication, and we undertake no obligation to update or revise these statements, whether as a result of new information, future events or otherwise, except as may be required by law. We do not give any assurance that we will achieve our expectations.

 

All references to “$” in this communication are to U.S. dollars unless otherwise stated.

 

Cautionary Note Regarding Mineral Reserves and Mineral Resources

 

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources have a great amount of uncertainty as to their existence and as to their economic and legal feasibility, are not included in the PFS mine plan or economic analysis, and investors should not assume that any part or all of an Inferred mineral resource exists or is economically or legally mineable.

 

 6

 

 

Non-GAAP Measures

 

Total cash costs, AISC, NPV, IRR and payback are project-level, forward-looking estimates that are not prepared in accordance with U.S. GAAP and may not be comparable to similarly titled measures of other companies. AISC is calculated as AISC is calculated as Total Cash Costs, plus sustaining capital expenditures, sustaining lease payments, applicable corporate and site-level general and administrative expenses, and estimated sustaining reclamation, rehabilitation and closure costs, less applicable by-product credits. Royalties and State Severance Taxes are included in the calculation to the extent attributable to the Project's production and not otherwise reflected in Total Cash Costs. Initial development capital expenditures, expansion capital expenditures and other non-sustaining capital expenditures are excluded from AISC. The calculation of AISC reflects management's methodology and assumptions and may differ from the methodology used by other companies.

 

2026-2027 Definition Drill Program Details and Disclosure

 

The 2026-2027 Definition Drill Program includes approximately 11,000 meters in 123 holes
and is designed to test the potential to convert Inferred Mineral Resources within and adjacent to the PFS pit to Measured and Indicated (M&I”). The Definition Drill Program is targeting a minimum 10% increase in reserves for the Feasibility Study. Management’s internal objective is to evaluate whether this work, together with pit optimization, could support an increase in Mineral Reserves in the Feasibility Study. This objective is not an estimate of Mineral Reserves, has not been verified by a Qualified Person as a reserve estimate, and there is no certainty that any Inferred Mineral Resources will be upgraded or converted to Mineral Reserves, or that Mineral Reserves will increase.

 

Appendix

 

Table 5: Richmond Hill millable resources as of November 2026

 

Resource Category NSR ($/tonne) Ktonnes Gold (g/t) Silver (g/t) Gold (koz) Silver (koz)
Measured Total 43.75 84,181 0.538 5.42 1,457 14,661
Indicated Total 35.78 125,298 0.432 5.21 1,740 20,994
M&I Total 38.99 209,479 0.475 5.29 3,197 35,655
Inferred Total 34.69 198,948 0.425 4.39 2,719 28,071

 

Mineral resources are based on a constrained block model using drill results up to June 17, 2026 using an inverse distance squared methodology and the following assumptions:

 

·A gold price of $2900 per ounce and a silver price of $35 per ounce was used for the mineral resource.
·Mineral resources are based on a net smelter return (NSR) cut-off of $12.22/tonne for mill material.
·Millable resources NSR ($/tonne) = $77.55 x gold (g/tonne) x recovery + $0.92 x silver (g/tonne) x recovery. Gold and silver recoveries are estimated at 85% for both metals.
·The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
·The millable mineral resource consist of the sulfide portion of the mineral deposit.
·Includes a preliminary estimated royalty rate of 3.8% averaged across the project.
·The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resources.
·The mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

 

Table 6: Richmond Hill combined heap leachable and millable resources inclusive of reserves as of November 2026

 

Resource Category NSR ($/tonne) Ktonnes Gold (g/t) Silver (g/t) Gold (koz) Silver (koz)
Measured Total 41.34 150,014 0.549 6.17 2,669 29,248
Indicated Total 33.48 216,544 0.446 5.14 3,068 36,986
M&I Total 36.70 366,558 0.480 5.49 5,737 66,234
Inferred Total 31.70 288,680 0.411 3.77 3,807 36,083

 

Mineral resources are based on a constrained block model using drill results up to June 17, 2026 using an inverse distance squared methodology and the following assumptions:

 

·A gold price of $2900 per ounce and a silver price of $35 per ounce was used for the mineral resource.
·The mineral resources are based on a net smelter return (NSR) cut-off of $6.39/tonne for heap leachable material and a NSR cut-off of $12.22/tonne for mill material.
·Heap-leachable resources NSR ($/tonne) = $81.00 x gold (g/tonne) x recovery + $0.97 x silver (g/tonne) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content for heap-leachable mineral resources.
·Millable resources NSR ($/tonne) = $77.55 x gold (g/tonne) x recovery + $0.92 x silver (g/tonne) x recovery. Gold and silver recoveries are estimated at 85% for both metals for millable mineral resources.
·The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages.
·Includes a preliminary estimated royalty rate of 3.8% averaged across the project.
·The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resource.
·The mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

 

 7

 

Exhibit 99.2

GRAPHIC

Richmond Hill Gold Project Pre-Feasibility Study Webcast Presentation | November 23, 2026 dakotagoldcorp.com NYSE American: DC

GRAPHIC

COMPANY OVERVIEW PFS HIGHLIGHTS dakotagoldcorp.com | NYSE-A: DC 2 JACK HENRIS CEO, PRESIDENT & DIRECTOR

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 3 Cautionary Note Regarding Forward-Looking Statements This presentation and the accompanying webcast contain “forward-looking statements” within the meaning of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934, which are intended to be covered by the safe harbor of the Private Securities Litigation Reform Act of 1995. Any statement that is not a statement of historical fact, including any statement using words such as “estimate,” “expect,” “plan,” “potential,” “target,” “upside” or similar expressions, is forward-looking. These include statements regarding the results of the Richmond Hill Pre-Feasibility Study (the “PFS”), including Mineral Reserve and Mineral Resource estimates, mine plan and life, production, recoveries, capital and operating costs, AISC and economic results; planned drilling and the timing of a Feasibility Study; resource conversion, reserve growth and mine-life extension; permitting; a production decision, construction and first gold production in 2029; exercise of the Richmond Hill option by December 31, 2028; financing; the Maitland Project; and comparisons to other companies. These statements are based on management’s current assumptions, including those underlying the PFS, and are subject to significant uncertainties, many beyond our control. Actual results could differ materially due to, among other things: gold and silver prices; the preliminary nature of the PFS and the risk that a Feasibility Study does not confirm it; uncertainty in reserve, resource and recovery estimates, including limited cyanide-soluble and sulfur assay data; cost increases; permitting delays; environmental, reclamation and closure liabilities; the risk that the Richmond Hill option is not exercised; financing availability; construction and operating risks; stakeholder relations; changes in law and taxes; and the risks described in the PFS and under “Risk Factors” in our Form 10-K for 2025, as updated by our Forms 10-Q and other SEC filings. Forward-looking statements speak only as of the date of this presentation, and we undertake no obligation to update them except as required by law. Cautionary Note Regarding Mineral Reserves and Mineral Resources (S-K 1300) The scientific and technical information in this presentation has been prepared in accordance with Subpart 1300 of Regulation S-K (“S-K 1300”). It is supported by the technical report summary titled “Richmond Hill Project – S-K 1300 Pre-Feasibility Study,” with an effective date of November 23, 2026, prepared by M3 Engineering & Technology Corp., Independent Mining Consultants, Inc., NewFields, Forte Dynamics, RESPEC Company, LLC and Call & Nicholas, Inc. That report is filed as Exhibit 96.1 to our Current Report on Form 8-K filed on November 23, 2026. This presentation is qualified in its entirety by that report. Matthew Sletten, P.E, a “qualified person” under S-K 1300, has approved the scientific and technical information in this presentation. Mineral Reserves are reported as of November 23, 2026, based on gold and silver prices of $2,600/oz and $30/oz. Mineral Resources are reported exclusive of Mineral Reserves unless otherwise indicated, based on gold and silver prices of $2,900/oz and $35/oz. The economic analysis uses base-case prices of $3,500/oz gold and $50/oz silver. Figures are metric unless noted (the report uses imperial units) and may not sum due to rounding. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Inferred Mineral Resources are too speculative geologically to have economic considerations applied to them, are not included in the PFS mine plan or economics, and may not exist or be economically or legally mineable. Resource Conversion and Reserve Growth. References to “upside,” “growth,” “conversion” or increases in reserves, mine life or production describe exploration and study objectives, not Mineral Reserve or Mineral Resource estimates. There is no certainty that any resources will be upgraded or converted to reserves, that reserves will increase, or that the Feasibility Study will be consistent with the PFS. Economic Analysis and Non-GAAP Measures. PFS economics are pre-feasibility estimates that may not be realized. Cash costs, AISC, NPV, IRR and payback are non-GAAP, project-level estimates that may not be comparable to measures reported by other companies. AISC is calculated as AISC is calculated as Total Cash Costs, plus sustaining capital expenditures, sustaining lease payments, applicable corporate and site-level general and administrative expenses, and estimated sustaining reclamation, rehabilitation and closure costs, less applicable by-product credits. Royalties and State Severance Taxes are included in the calculation to the extent attributable to the Project's production and not otherwise reflected in Total Cash Costs. Initial development capital expenditures, expansion capital expenditures and other non-sustaining capital expenditures are excluded from AISC. The calculation of AISC reflects management's methodology and assumptions and may differ from the methodology used by other companies. Valuation and Peer Comparisons. Peer data is derived from third-party sources, including the CIBC Weekly Mining Comps Report dated November 2, 2026, and has not been independently verified. Peers differ materially from Dakota Gold, a development-stage company with no production or revenue. Peer comparisons are illustrative only and are not a projection or indication of Dakota Gold’s future enterprise value, share price or production, which will depend on many factors beyond our control. All references to “$” are to U.S. dollars unless otherwise stated. Disclaimer​

GRAPHIC

4 Richmond Hill – PFS supports simple, open pit, heap leach project​ dakotagoldcorp.com | NYSE-A: DC AFTER-TAX NPV 5% US$2.0 B US$2.7 B AFTER-TAX IRR 71% 94% AFTER-TAX PAYBACK 1.4 YEARS 1.1 YEARS LOM AISC US$1,289/oz Au US$1,357/oz Au US$538 M INITIAL CAPITAL (41KTPD stacking rate) 1.6 Moz GOLD LOM PRODUCTION (9-year mine life) 171 Koz/yr GOLD AVERAGE PRODUCTION (Peak gold production 245koz) UPSIDE DEFINITION DRILLING (Reserve growth targeted for Feasibility) 1 Richmond Hill Pre-Feasibility Study outlines an efficient, three stage crush and truck stack operation to provide strong economics and leverage to the gold price US$3,500/oz US$4,250/oz GOLD PRICE 1. See page 11 for additional details and disclosure

GRAPHIC

5 UPSIDE POTENTIAL 90mt of Leachable Inferred Material Across the Project 2026-2027 DEFINITION DRILL PROGRAM UNDERWAY Targeting Increase in Reserve For Feasibility Study Inferred Material Conversion in High-Recovery Breccia Zone Not Included in the Pre-Feasibility Study Economics, Mine Sequence and Resource Estimate - Representing Further Upside1 OPTIMIZING FOR TRANSITION MATERIAL With Pit Design and Processing Plan Pre-Feasibility Study Outlines Strong Foundation for Future Growth and Mine Sequence Optimization PFS INFRASTRUCTURE HAS EXPANDABILITY For Increased Crushing and Placement Rates Richmond Hill – Growth potential​ dakotagoldcorp.com | NYSE-A: DC 1. See page 11 for additional details and disclosure

GRAPHIC

RICHMOND HILL recap of HEAP LEACH RESOURCE and EXPLORATION POTENTIAL dakotagoldcorp.com | NYSE-A: DC 6 LINDSAY CHASTEN SENIOR EXPLORATION MANAGER

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 7 Richmond Hill – Reserve and Resource review dakotagoldcorp.com | NYSE-A: DC PFS Mineral Reserve and Resource - November 2026 • Heap Leachable Mineral Reserve: • 2.2 M oz of P&P Gold • 25.4 M oz of P&P Silver • Milled Mineral Resource: • The additional Milled material provides long-term optionality for the Project. • The resource is informed by a historical database containing 56,280 gold assays from 901 drill holes totaling 92,464 meters of drilling, and an additional 62,366 gold assays from 485 drill holes totaling 92,617 meters of drilling by Dakota Gold since 2022 to expand the Resource. • Heap Leachable Mineral Resource:(Exclusive of Reserves) • 0.4 M oz of M&I Gold • 1.1 M oz of Inferred Gold • 5.2 M oz of M&I Silver • 8.0 M oz of Inferred Silver • 3.2 M oz of M&I Gold • 2.7 M oz of Inferred Gold • 35.7 M oz of M&I Silver • 28.1 M oz of Inferred Silver Richmond Hill Location - Private Land 2026 Richmond Hill M&I Resource Cone 2025 Richmond Hill M&I Resource Cone • Combined Heap Leachable and Millable Resource:(Inclusive of Reserves) • 5.7 M oz of M&I Gold • 3.8 M oz of Inferred Gold • 66.2 M oz of M&I Silver • 36.1 M oz of Inferred Silver

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 8 Richmond Hill – Heap leachable reserves and resources Richmond Hill Heap Leachable Reserves Category NSR ($/tonne) Ktonnes Gold (g/tonne) Silver (g/tonne) Gold (koz) Silver (koz) Proven 36.57 57,115 0.613 7.33 1,126 13,457 Probable 30.99 62,482 0.514 5.96 1,033 11,964 Reserves Total 33.65 119,597 0.561 6.61 2,158 25,421 Richmond Hill Heap Leachable Resources Category NSR ($/tonne) Ktonnes Gold (g/tonne) Silver (g/tonne) Gold (koz) Silver (koz) Measured 21.24 8,718 0.307 4.03 86 1,129 Indicated 21.03 28,764 0.319 4.36 295 4,029 M&I Resources Total 21.08 37,482 0.316 4.28 381 5,158 Inferred 25.09 89,731 0.377 2.74 1,088 8,012 Notes: • Mineral resources reported are exclusive of reserves. • Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology. • A gold price of $2,900 per ounce and a silver price of $35 per ounce was used for the mineral resources. • The mineral resources are based on a net smelter return (NSR) cut-off of $6.39/tonne for heap leachable material. • A gold price of $2,600 per ounce and a silver price of $30 per ounce was used for the mineral reserves. • Mineral reserves are based on net smelter return (NSR) cut-offs that vary by time period to balance mine and plant production capacities. They range from a high of $11.00/tonne to a low of $6.39/tonne (internal cut-off grade). • Heap-leachable resources NSR ($/tonne) = $81.00 x gold (g/tonne) x recovery + $0.97 x silver (g/tonne) x recovery. Heap-leachable reserves NSR ($/tonne) = $72.60 x gold (g/tonne) x recovery + $0.83 x silver (g/tonne) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content. • The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages. • The heap-leachable mineral resource consists of the oxide and transition mineralization in the mineral deposit. • Includes a preliminary estimated royalty rate of 3.8% averaged across the project. • The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resources. • The mineral reserve estimate and mineral resource estimate is also constrained by the Richmond Hill Project Boundary.

GRAPHIC

Drilling filled M&I gaps between the IA and PFS Section 3760 m / 12332 ft North IA model • February 2025 PFS model • November 2026 M&I blocks • 10 m slices • 100 m grid 100 m grid • Showing PFS M&I and MI&I shells N Section location W E W E dakotagoldcorp.com | NYSE-A: DC 9

GRAPHIC

Drilling filled M&I gaps between the IA and PFS Section 5000 m / 13448 ft North IA model • February 2025 PFS model • November 2026 M&I blocks • 10 m slices • 100 m grid 100 m grid • Showing PFS M&I and MI&I shells N Section location W E W E dakotagoldcorp.com | NYSE-A: DC 10

GRAPHIC

Opportunities for resource growth dakotagoldcorp.com | NYSE-A: DC 11 SW NE 500 m N 500 m N Section Showing M&I Blocks Only • 50 meter thick slice • 100 m vertical grid • The 2026-2027 Definition Drill Program includes approximately 11,000 meters in 123 holes and is designed to test the potential to convert Inferred Mineral Resources within and adjacent to the PFS pit to Measured and Indicated (M&I) • The Definition Drill Program is targeting a minimum 10% increase in reserves for the Feasibility Study1 1. Management’s internal objective is to evaluate whether this work, together with pit optimization, could support an increase in Mineral Reserves in the Feasibility Study. This objective is not an estimate of Mineral Reserves, has not been verified by a Qualified Person as a reserve estimate, and there is no certainty that any Inferred Mineral Resources will be upgraded or converted to Mineral Reserves, or that Mineral Reserves will increase.

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 12 MIKE EISELEIN VICE PRESIDENT PROJECT DEVELOPMENT RICHMOND HILL PFS SUPPORTS EFFICIENT, OPEN PIT HEAP LEACH OPERATION

GRAPHIC

13 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – PFS led by M3 Environmental sub-contractors supporting permit engineering Lead Study Manager Environmental & Water Treatment Heap Leach Design, Closure & Reclamation Metallurgy • LifeCycleGeo • Geosyntec • Air Sciences • HDR • BKS Environmental Assoc. • GEI Consultants • Stantec • Wave Engineering • Vantage Point • ICF • Dakota Institute • Premier Resource and Mining Plan

GRAPHIC

dakotagoldcorp.com | NYSE dakotagoldcorp.com | NYSE-A: DC 14 Pre-Feasibility Key Parameters (All Currencies in US$) Key Assumptions Base Case Gold Price $3,500/oz Base Case Silver Price $50.00/oz Production Profile Total Tonnes Processed (Mt) 120 Strip Ratio 1.18 Heap Leach Gold Feed Grade (oz/ton) 0.016 Heap Leach Gold Feed Grade (g/t) 0.561 Mine Life (years) 9 Nominal Stacking Rate (KTPD) 41 LOM Gold Recovery (%) 72.4% LOM Gold Payable (kozs) 1,562 LOM Average Annual Gold Payable (koz) 171 Unit Operating Costs ($/payable oz Au) Operating Costs $977 All-in Sustaining Cost $1,289 Capital Costs Initial Capital Cost $538 M Sustaining Capital Cost $133.4 M Closure Capital Cost $62 M Technically straightforward, open pit and heap leach operation • Processing 120 Mt LOM, three-stage crush • Peak mining rates approximately 36mt per year starting in year 2 • Low LOM strip ratio of 1.18, minimal pre-stripping required Strong project economics at a gold price of US$3,500/oz • After-tax NPV5% of US$2.0 billion, after-tax IRR of 70.7% • Initial capital costs estimated at US$538 million with a short after-tax payback period of 1.4 years Gold production profile provides a foundation for future growth • ~171,000 oz average annual gold production at a LOM average head grade of 0.561 g/t • Peak gold production of 244,733 ounces in year seven • 1.6 million ounces gold recovered over a nine-year mine life Longer-term resource growth potential • Target increase in reserve for Feasibility Study1 • Definition drilling underway in presumed high-recovery breccia material • Upside potential with 90mt of leachable inferred material across the project • Stockpiling of transition material for end-of-life processing 1. See page 11 for additional details and disclosure Richmond Hill – PFS overview

GRAPHIC

15 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – PFS plan production & cost profile​ 0.62 0.66 0.54 0.42 0.44 0.62 0.77 0.40 0.71 - 50 100 150 200 250 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 Gold Production (1,000’s oz) Gold Equiv Prod (kozs) Gold Prod (kozs) Gold Grade (g/t) 171,000 oz/yr AVG GOLD PRODUCTION 1.6 Moz GOLD LOM PRODUCTION (9-year mine life) FS Targeting TO RAISE EARLY PRODUCTION AND EXTEND LOM PFS

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 16 • Eight-year mining, focusing on grade and recoveries to bring value forward • Years 1 – 2: Sub-phasing high grade smaller pits • Years 3 – 5: Higher value ultimate pits • Years 6 – 8: Final pits and mining • Conventional truck & shovel open pit operation • Loading units: 1 hydraulic shovel, 2 front-end loaders • 23 haul trucks – 150-ton class • 6-meter benches, 12-meter double bench to a pit depth of up to 120 meters at a 45-degree slope angle • Low strip ratio: 1.18 – Low mine development cost to achieve production Richmond Hill - Mine schedule profile​

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 17 Richmond Hill - Mine production schedule PP YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 Waste (ktonnes) 1,984 15,529 22,761 19,621 18,571 18,451 20,775 8,092 14,823 Transition Resource Stockpile (ktonnes) 475 1,150 943 1,739 2,842 2,424 612 169 284 Oxide Ore (ktonnes) 2,984 10,536 12,583 14,901 14,901 14,901 14,901 15,404 7,849 Total Material (ktonnes) 5,443 27,216 36,288 36,261 36,314 35,776 36,288 23,665 22,956 5,443 27,216 36,288 36,261 36,314 35,776 36,288 23,665 22,956 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 • Peak Mining rates approximate 36mt per year starting in year 2 • Transition material (10.6mt) stockpiled and processed in year 9 Material and Waste (thousand tonnes)

GRAPHIC

Richmond Hill - Heap leach pad production profile​ • Quick recovery – 30-to-45-day average leach cycle to achieve a projected LOM pad recovery of 72.4% • Heap leach pad with Merrill Crowe processing designed for with a capacity of 41ktpd but with potential future expansion to 54ktpd • Residual production until year 10 of the mine life dakotagoldcorp.com | NYSE-A: DC 18 74% 76% 75% 74% 74% 74% 73% 73% 73% 72% 70% 71% 72% 73% 74% 75% 76% 77% 0 50 100 150 200 250 300 350 400 PP YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 Au ounces (koz) Placed Au ounces (koz) Recovered Au ounces (koz) Operational Pad Au Recovery %

GRAPHIC

dakotagoldcorp.com | NYSE dakotagoldcorp.com | NYSE-A: DC 19 Richmond Hill – PFS capital cost details Capital cost estimate based on open pit mining utilizing a single heap leach pad, truck and shovel operation with Merrill Crowe processing with a capacity of 41ktpd Initial Capital Costs • 18-month construction timeline • Mineralization at or near surface, minimal pre-strip • Project benefits from existing access road and power line as well as proximity to large skilled labor force • Infrastructure costs include ore preparation, crushing circuit and refinery costs • Heap leach pad has capacity for 154mt based on design Sustaining Capital Costs • Heap leach pad lined area expansion, ponds and pump system as well as mining equipment and pre-strip Capital Cost Items (US$M) Initial Sustaining LOM Ore Preparation (Earthworks and Crushing circuit) $127.2 $0.0 $127.2 Heap Leach Pad, Ponds and Pump System $87.9 $76.6 $164.5 Merrill Crowe & Refinery $33.8 $0.0 $33.8 Process Support Systems (Solutions and Power) $25.2 $0.0 $25.2 Reagents $3.9 $0.0 $3.9 Ancillaries $32.3 $0.0 $32.3 Contractor Indirect Costs $29.7 $0.0 $29.7 EPCM (Process Plant, Vendor Support, Commissioning & Spare Parts) $52.9 $0.0 $52.9 Owner's Costs, Including First Fills $13.4 $0.0 $13.4 Total Capital Costs (Process Plant) $406.4 $76.6 $483.0 Freight $12.5 $0.0 $12.5 Ore Inventory $0.0 $19.3 $19.3 Total Capital Costs (Mining Equipment & Pre-Strip) $34.5 $19.4 $53.9 Total Capital Costs (Project, net of Contingency) $453.3 $115.3 $568.7 Contingency $84.2 $18.0 $102.2 Total Capital Costs (Project) $537.5 $133.3 $670.9

GRAPHIC

Richmond Hill – PFS proposed infrastructure 20 • 725 acres of disturbance is anticipated with the initial permit • Large single heap leach with capacity for 154mt, with strong natural buttressing and built for the final 40mt to be “on -off” and reusable • Small overall crushing plant footprint consistent with simple three stage crush dakotagoldcorp.com | NYSE -A: DC

GRAPHIC

21 dakotagoldcorp.com | NYSE-A: DC Three stage, crush, shovel and truck operation processing ~41kTPD Richmond Hill - Processing flow sheet dakotagoldcorp.com | NYSE-A: DC 21

GRAPHIC

dakotagoldcorp.com | NYSE dakotagoldcorp.com | NYSE-A: DC 22 Richmond Hill – PFS operating cost details Operating Cost Items LOM (US$M) US$/tonne leached US$/oz Au Mining $787.9 $6.59 $505 Processing $581.0 $4.86 $372 Mine Site G&A $148.7 $1.24 $95 Refining $8.5 $0.07 $6 Total Operating Costs $1,526.1 12.76 $977 Royalties $169.4 $1.42 $108 Total Cash Costs $1,695.5 $14.18 $1,086 Silver Credit ($226.0) ($1.89) ($145) Sustaining Capital $133.4 $1.11 $85 Reclamation & Closure $62.4 $0.52 $40 AISC (before State Severance Tax) $1,665.3 $13.92 $1,066 SD State Severance Tax $348.3 $2.91 $223 AISC (after By-Product Credit) $2,013.6 $16.83 $1,289 Costs based on a detailed annual mining and processing schedule, including variations in haulage profiles Mining Costs • Open pit truck and shovel mining operation using internal employee base vs contractors Processing Costs • Based on design process flowsheet that includes operating consumables, power, plant maintenance, process labor and pad maintenance Mine Site G&A Costs • Includes mine site personnel, mining expenses, mineral tenure fees, environmental costs Royalties • Various historical royalties that complete at various stages of production that total to an effective 2.98% NSR LOW AISC • AISC before State Severance Tax - $1,066/oz

GRAPHIC

Richmond Hill - Metallurgy Positive Metallurgical Results • 24 master-composite column tests and 110 bottle-roll tests confirmed that Richmond Hill is amenable to heap leaching, with positive gold recoveries supporting the Pre-Feasibility Study CN/FA & Sulfur content drive material classification • Leachability & acid generating potential were quantified across met domains • More than 87% of tested materials (ore & waste) are highly likely to be NON-acid generating Ore classification by both CN/FA and Sulfur Content • A robust classification criteria ensures that material is appropriately classified and routed accurately based on both CN/FA ratio and Sulfur content Positive material characteristics • Testing to date has shown no discernible issues with permeability, clay material, preg-robbing concerns, mercury content, or any other characteristics that would impede expected operational or metallurgical performance dakotagoldcorp.com | NYSE-A: DC 23 PFS Assigned Gold Recovery by Lithology – Oxide, 12.7 mm (1/2-inch) P80 Lithology Au Recovery (%) Precambrian 80.1% Breccia 90.3% Tertiary Intrusives (High Grade /Low Grade) 82.1 % / 80.5% Deadwood 70.0% Classification CN/FA Ratio Total Sulfur Oxide ≥0.82 <0.5% Low-Performing Oxide ≥0.70 and <0.82 <0.5% Transitional ≥0.70 0.5% to 1.1% Sulfide >1.1% PFS Metallurgical Oxidation Classification Criteria

GRAPHIC

24 dakotagoldcorp.com | NYSE-A: DC Richmond Hill - Location and infrastructure Location: • Project 15-minute drive from headquarters in Lead, SD Labor: • South Dakota provides access to labor for exploration through to production • Population catchment of 200,000 within a one-hour drive of the project Infrastructure: • Project has an existing power line and road connected to grid • Necessary services are available nearby with no need for camp facilities Wharf Mine Dakota Gold Core Processing Facility Richmond Hill City of Lead Homestake Open Cut City of Deadwood Dakota Gold Headquarters Powerline Access Road Maitland City of Lead Homestake Open Cut Coeur Wharf Mine Richmond Hill Legend Richmond Hill – Private Land ​Richmond Hill M&I resource cone Maitland - Private Land Coeur - Wharf Land Package

GRAPHIC

RICHMOND HILL PFS OUTLINES PROFITABLE OPERATION dakotagoldcorp.com | NYSE-A: DC 25 SHAWN CAMPBELL CHIEF FINANCIAL AND DEVELOPMENT OFFICER

GRAPHIC

26 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – PFS strong economics​ • The PFS has robust project economics, including a $2.0 billion NPV(5%), 71% IRR and a payback of only 1.4 years at a base case gold price of $3,500/oz. The financial metrics remain robust in a lower gold price environment, and at a gold price of $4,250/oz the IRR increases to 94.4% and payback in just over one year. Gold Price (US$/oz) $2,750 $3,000 $3,250 $3,500 (Base Case) $3,750 $4,000 $4,250 $4,500 $4,750 After-Tax NPV(5%) (US$) $1,249 M $1,501 M $1,752 M $2,000 M $2,248 M $2,496 M $2,744 M $2,991 M $3,239 M After-Tax IRR 47% 55% 63% 71% 79% 87% 94% 102% 110% After-Tax Payback 2.1 years 1.8 years 1.6 years 1.4 years 1.3 years 1.2 years 1.1 years 1.0 years 0.9 years Sensitivity Parameters Base Case -21% -14% -7% 0% (Base Case) +7% +14% +21% Operating Costs $12.76/t $2,199 M $2,132 M $2,066 M $2,000 M $1,934 M $1,868 M $1,799 M Capital Costs $671 M $2,089 M $2,059 M $2,029 M $2,000 M $1,970 M $1,941 M $1,911 M Sensitivity to Operating Costs and Capital Costs (US$ where applicable) (After-Tax NPV5% US$M) Sensitivity Parameters Base Case 66% 68% 70% 72.4% (Base Case) Gold Recovery 72.4% $1,692 M $1,788 M $1,883 M $2,000 M Sensitivity to Recovery* (After-Tax NPV5% US$M) * Recoveries above base case (72.4%) have not been calculated

GRAPHIC

27 dakotagoldcorp.com | NYSE-A: DC ($471) ($170) $214 $600 $843 $1,126 $1,576 $2,168 $2,458 $2,627 $2,631 $2,558 $2,558 -471 ($53) $448 $944 $1,269 $1,639 $2,209 $2,949 $3,323 $3,535 $3,539 $3,462 $3,462 ($500) $0 $500 $1,000 $1,500 $2,000 $2,500 $3,000 $3,500 $4,000 PRE-PROD YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 YEAR 11 LOM Cumulative After-Tax Free Cash Flow (US$M) (US$3,500/oz Au) Cumulative After-Tax Free Cash Flow (US$M) (US$4,250/oz Au) Richmond Hill – PFS after-tax free cash flow profile • For years 1 through 8 the average after-tax free cash flow per year is ~$366 M at a gold price of $3,500/oz and $474 M at a gold price of $4,250/oz Cumulative After-Tax Free Cash Flow (US$M) PRE-PROD YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 YEAR 6 YEAR 7 YEAR 8 YEAR 9 YEAR 10 YEAR 11 LOM (US$3,500/oz Au) -$471 -$170 $214 $600 $843 $1,126 $1,576 $2,168 $2,458 $2,627 $2,631 $2,558 $2,558 (US$4,250/oz Au) -$471 -$53 $448 $944 $1,269 $1,639 $2,209 $2,949 $3,323 $3,535 $3,539 $3,462 $3,462

GRAPHIC

28 dakotagoldcorp.com | NYSE-A: DC Richmond Hill – Strong project financial metrics $3,500/oz Au (Base Case) $4,250/oz Au Net Present Value discounted at 5% to Initial Capital Cost Ratio NPV5% @ $3,500/ oz Gold Price $2,000 M $2,744 M Initial Capital Cost $538 M $538 M Ratio of NPV5%: CAPEX 3.7 X 5.1 X Number of Times Initial CAPEX is repaid over the life of mine after-tax free cash flow Cumulative LOM After-Tax Free Cash Flow $2,558 M $3,462 M Initial Capital Cost $538 M $538 M Ratio 4.7 X 6.4 X Initial Capital Cost to Market Capitalization Initial Capital Cost $538 M Market Capitalization (As of November 10, 2026) $813 M Ratio 0.66 X dakotagoldcorp.com | NYSE-A: DC 28

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 29 Opportunity for increased valuation • Opportunity for $EV/oz of Resources and Reserves valuation to increase as Richmond Hill advances through Feasibility Study and into Production. Source: CIBC Weekly Mining Comps as at Nov 2, 2026 Developer US$EV/ RESOURCE oz Developer US$EV/ RESERVE oz

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 30 Illustrative peer production multiples Source: CIBC Weekly Mining Comps Report as of Nov 2, 2026 1.TEV = market cap + net debt + non-controlling interest + preferred shares 2.Analyst consensus estimates. COMPANY TEV (US$M)1 2026E Prod'n (AuEq koz)2 170 KOZPA as % of PRODUCTION EV (US$M) per 170 KOZPA Alamos Gold $11,209 527 32% $3,616 B2Gold $6,389 864 20% $1,257 Coeur $13,345 1,101 15% $2,061 Equinox Gold $11,879 881 19% $2,292 Evolution Mining $16,592 727 23% $3,880 Hecla $8,633 378 45% $3,883 Oceana Gold $4,865 561 30% $1,474 SSR $5,388 421 40% $2,176 Average $9,788 683 28% $2,580 The peer information on this slide is provided for illustrative purposes only and is derived from third-party sources (CIBC Weekly Mining Comps Report as of November 2, 2026, and analyst consensus estimates), which Dakota Gold has not independently verified and does not adopt. The peer companies are producing issuers that differ materially from Dakota Gold in stage of development, jurisdiction, asset base, scale, cost structure, capital structure and other respects. Dakota Gold is a development-stage company with no current production or revenue. Nothing on this slide is, or should be construed as, a projection, estimate or indication of Dakota Gold’s future enterprise value, market capitalization or share price, or a statement that Dakota Gold will achieve any particular level of production. See “Cautionary Note Regarding Forward-Looking Statements.”

GRAPHIC

VALUE CREATION OPPORTUNITY dakotagoldcorp.com | NYSE-A: DC 31 JACK HENRIS CEO, PRESIDENT & DIRECTOR

GRAPHIC

32 dakotagoldcorp.com | NYSE-A: DC 1. See news release Feb 6, 2025 re Barrick Gold has extended the option period for the Richmond Hill option agreement until December 31, 2028 with Dakota Gold. 2026 2027 2028 2029 2030 - Targeting first gold production in 2029 through a disciplined, phased responsible development approach 1. See news release Feb 6, 2025 re Barrick Gold has extended the option period for the Richmond Hill option agreement until December 31, 2028 with Dakota Gold. Pre-Construction - Major Procurement Packages - Fleet and Facilities Equipment ​ - Begin Site Prep and Construction De-risking Building the foundation Permitting Securing approvals Engineering Design and procurement Construction Build the project Production Creating long-term value Baseline Data Collection Permitting Engineering & EPCM - 2027 Initiate & Advance Final Detailed Engineering - 2027-2028 Purchase Additional Long Lead Time Item Construction Production 1 - County Conditional Use Permit - SD DANR Large Scale Mine Permit Pre-Feasibility Study Feasibility Study Notice of Intent Pre-Construction - Major Procurement Packages - Fleet & Facilities Equipment ​ - Begin Site Prep and Construction Richmond Hill - Timeline to production

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 33 HOMESTAKE DISTRICT ~50K MINERAL ACRES One concentrated land position 2 core project areas + district-wide upside One location. Multiple opportunities. Dakota Gold’s land package creates a diversified project-development portfolio in one of America’s most prolific gold districts. DEVELOPMENT PROJECT RICHMOND HILL Production pathway and upside Pre-Feasibility Transition optimization / sulfide at depth Expansion MAITLAND Two distinct exploration opportunities Unionville Zone JB Gold Zone DISTRICT UPSIDE Opportunity paths across the broader 50K-acre land package Feasibility with inferred conversion breccia material Permitting, construction & production EXPLORATION PROJECT

GRAPHIC

dakotagoldcorp.com NYSE American: DC Richmond Hill Gold Project Pre-Feasibility Study QUESTIONS and ANSWERS

GRAPHIC

MEDIA AND INVESTOR RELATIONS Jack Henris Chief Executive Officer, President and Director O +1 605 717 2540 Shawn Campbell Chief Financial and Development Officer O +1 778 655 9638 Carling Gaze Director of Investor Relations O +1 605 679 7429 E info@dakotagoldcorp.com LEAD MAIN OFFICE 106 Glendale Drive, Suite A, Lead, South Dakota, 57754, USA VANCOUVER OFFICE 1588 609 Granville Street, Vancouver, British Columbia, V7Y 1G5, Canada info@dakotagoldcorp.com @dakotagoldcorp linkedin.com/company/dakotagold/ dakotagoldcorp.com NYSE American: DC +1 778 655 9638

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 36 APPENDIX

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 37 Richmond Hill – Millable Resources Notes: • Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology. • A gold price of $2,900 per ounce and a silver price of $35 per ounce was used for the mineral resource. • The mineral resources are based on a net smelter return (NSR) cut-off of $12.22/tonne for mill material. • Millable resources NSR ($/tonne) = $77.55 x gold (g/tonne) x recovery + $0.92 x silver (g/tonne) x recovery. Gold and silver recoveries are estimated at 85% for both metals. • The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages. • The millable mineral resources consist of the sulfide portion of the mineral deposit. • Includes a preliminary estimated royalty rate of 3.8% averaged across the project. • The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a Mineral Resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resources. • The mineral resource estimate is also constrained by the Richmond Hill Project Boundary. Category NSR ($/tonne) Ktonnes Gold (g/tonne) Silver (g/tonne) Gold (koz) Silver (koz) Measured Total 43.75 84,181 0.538 5.42 1,457 14,661 Indicated Total 35.78 125,298 0.432 5.21 1,740 20,994 M&I Total 38.99 209,479 0.475 5.29 3,197 35,655 Inferred Total 34.69 198,948 0.425 4.39 2,719 28,071

GRAPHIC

dakotagoldcorp.com | NYSE-A: DC 38 Richmond Hill – Combined Heap Leachable and Millable Resources Inclusive of Reserves Notes: • Based on a constrained block model using drill results up to June 17, 2026, with estimation using inverse distance squared methodology. • A gold price of $2900 per ounce and a silver price of $35 per ounce was used for the mineral resource. • The mineral resources are based on a net smelter return (NSR) cut-off of $6.39/tonne for heap leachable material and a NSR cut-off of $12.22/tonne for mill material. • Heap-leachable resources NSR ($/tonne) = $81.00 x gold (g/tonne) x recovery + $0.97 x silver (g/tonne) x recovery. Gold and silver recoveries vary by rock type, cyanide soluble amount, and sulfur content for heap-leachable mineral resources. • Millable resources NSR ($/tonne) = $77.55 x gold (g/tonne) x recovery + $0.92 x silver (g/tonne) x recovery. Gold and silver recoveries are estimated at 85% for both metals for millable mineral resources. • The NSR values account for metal recoveries, treatment charges, refining costs, and refinery payable percentages. • Includes a preliminary estimated royalty rate of 3.8% averaged across the project. • The mineral resources are reported in relation to a conceptual constraining pit shell to demonstrate reasonable prospects for economic extraction, as required by the definition of a mineral resource in SK-1300; mineralization lying outside of the pit shell is excluded from the mineral resource. • The mineral resource estimate is also constrained by the Richmond Hill Project Boundary. Category NSR ($/tonne) Ktonnes Gold (g/tonne) Silver (g/tonne) Gold (koz) Silver (koz) Measured Total 41.34 150,014 0.549 6.17 2,669 29,248 Indicated Total 33.48 216,544 0.446 5.14 3,068 36,986 M&I Total 36.70 366,558 0.480 5.49 5,737 66,234 Inferred Total 31.70 288,680 0.411 3.77 3,807 36,083