Denison Mines swings to C$81.8M Q3 2026 profit

Phoenix was approximately 24% complete at quarter-end, while Denison forecast CAD $278.6 million in 2026 project expenditures.

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Denison Mines Corp. (DNN) reported third-quarter net income of CAD $81.768 million, compared with a net loss of CAD $134.965 million a year earlier. The quarter included CAD $110.828 million in gains from fair-value changes in embedded derivatives on convertible notes. For the first nine months, Denison recorded a net loss of CAD $7.548 million versus CAD $166.001 million, while revenue was CAD $2.872 million versus CAD $3.696 million and operating cash use was CAD $87.516 million versus CAD $59.714 million.

Phoenix mine construction was approximately 24% complete at September 30, 2026. Year-to-date project expenditures were CAD $161.143 million, including CAD $104.955 million for construction and construction indirect costs and CAD $38.967 million for equipment and materials procurement; 2026 forecast expenditures were CAD $278.6 million. Cash and cash equivalents were CAD $362.749 million at September 30, 2026, compared with CAD $465.918 million at December 31, 2025.

1 point · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 2 points

How the balance works

Positive

  • Moderate pointNine-month net loss: CAD $7.548 million versus CAD $166.001 million.

Negative

  • Moderate pointNine-month revenue: CAD $2.872 million versus CAD $3.696 million.
  • Moderate pointNine-month operating cash used: CAD $87.516 million versus CAD $59.714 million.

Filing Explained

Qualifying conversions could dilute existing holders if settled in shares, but Denison may instead settle in cash or a combination.

This 6-K furnishes Denison’s interim report for the nine months ended September 30, 2026; the Wheeler River joint venture has CAD $237.732 million in capital commitments, including CAD $225.845 million attributable to Denison and expected to be incurred over the next 24 months.

The notes have a face value of US$345 million and mature on September 15, 2031; holders may convert after December 31, 2025 only under specified conditions, and Denison may settle conversions in shares, cash, or both. The stated conversion price is approximately US$2.92 per share, while the cash-settled capped calls are described as effectively increasing it up to US$4.32.

Third-quarter net income CAD $81.768 million Three months ended September 30, 2026; net loss of CAD $134.965 million in 2025
Nine-month net loss CAD $7.548 million Nine months ended September 30, 2026; CAD $166.001 million in 2025
Nine-month revenue CAD $2.872 million Nine months ended September 30, 2026; CAD $3.696 million in 2025
Operating cash used CAD $87.516 million Nine months ended September 30, 2026; CAD $59.714 million in 2025
Cash and cash equivalents CAD $362.749 million At September 30, 2026; CAD $465.918 million at December 31, 2025
Phoenix construction completion Approximately 24% At September 30, 2026
Phoenix 2026 forecast expenditures CAD $278.6 million Forecast for 2026
Uranium sold after quarter-end 150,000 pounds of U3O8 at US$84.94 per pound October 2026 sale; weighted average price
in-situ recovery technical
"Phoenix in-situ recovery uranium mine"
In-situ recovery is a mining method that extracts a valuable material by dissolving it underground and pumping the solution to the surface instead of digging or blasting rock. For investors, it matters because this approach often lowers upfront construction costs, shortens development time and reduces visible land disturbance, but it also brings regulatory, environmental and groundwater risks that can affect project timelines, operating costs and valuation.
embedded derivatives financial
"Embedded Derivatives were measured at fair value"
An embedded derivative is a hidden financial option or payout rule built into a larger contract—like a bond, loan, or supply agreement—that makes part of the deal behave like a separate financial bet whose value swings with interest rates, currencies, commodity prices, or a company’s stock. Investors care because these built‑in features can change reported assets, liabilities and profits and add unexpected risk or upside, like finding a bonus or penalty clause inside a rental lease.
deferred revenue financial
"The deferred revenue balance represents a non-cash liability"
Cash a company has already received for goods or services it has promised but not yet delivered; it's recorded as a liability because the company still owes that product, service, or future revenue recognition. For investors, deferred revenue signals upcoming work or deliveries that will convert into reported sales over time and affects short-term obligations, cash flow quality, and how quickly a firm can grow recognized revenue—think of it like prepaid subscriptions or gift cards a business must honor later.
Surface Access Borehole Resource Extraction technical
"patented Surface Access Borehole Resource Extraction (“SABRE”) mining method"
Surface access borehole resource extraction is the process of reaching underground materials—such as minerals, oil, gas, water or heat—by drilling narrow, engineered holes from the ground surface and removing or tapping the resource through those holes. Investors care because this method determines how expensive, fast and risky production will be: drilling depth, equipment, regulatory approvals and environmental controls all affect costs, timeline and the potential return, much like choosing between a roadside well or a deep, expensive mine.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much did DNN earn in Q3 2026?

DNN reported net income of CAD $81.768 million for the three months ended September 30, 2026, compared with a net loss of CAD $134.965 million in the same 2025 period. Basic and diluted earnings were CAD $0.09 per share, versus a loss of CAD $0.15 per share.

What is DNN’s updated Phoenix initial capital estimate?

The updated estimate lists CAD $600.0 million in post-FID initial capital and CAD $100.0 million in pre-FID capex, in 2026 dollars. The 2023 Phoenix Feasibility Study listed CAD $419.4 million in post-FID initial capital, in 2022 dollars.

What uranium sale did DNN complete after quarter-end?

In October 2026, Denison completed a sale of 150,000 pounds of U3O8 at a weighted average price of US$84.94 per pound. The transaction was a scheduled delivery under a sales agreement entered in 2025.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
 

 
UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
 
 
FORM 6-K
 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934
 
Date: November 5, 2026
 
Commission File Number: 001-33414
 
 
Denison Mines Corp. 
 (Name of registrant)
 
 
 
1100-40 University Avenue
Toronto Ontario
 M5J 1T1 Canada
 
 (Address of principal executive offices)
 

 Indicate by check mark whether the registrant files or will file annual reports under cover Form 20-F or Form 40-F.
 
Form 20-F  ☐            Form    40-F   ☒
 
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ☐
Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ☐
 

 
 
  
INCORPORATION BY REFERENCE
 
 
Exhibits 99.1 and 99.2 to this Form 6-K of Denison Mines Corp. are hereby incorporated by reference to its Registration Statement on Form F-10EF (File No. 333-298898), as amended or supplemented.
 
 
SIGNATURES
 
Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
 
 
 
 
 
 
 
 
 
 
 
 
 
DENISON MINES CORP.
 
 
 
 
 
 
 
/s/ Amanda Willett
Date:  November 5, 2026
 
 
 
Amanda Willett
 
 
 
 
Vice President Legal and Corporate Secretary
 
 
 
 
 
FORM 6-K EXHIBIT INDEX
 
Exhibit Number
  
Description
 
 
99.1
 
Interim Consolidated Financial Statements for the three and nine month periods ended September 30, 2026
99.2
 
Management's Discussion and Analysis for the three and nine months ended September 30, 2026
99.3
 
Form 51-102F2 Certification of Interim Filings - CEO
99.4
 
Form 51-102F2 Certification of Interim Filings - CFO
99.5
 
Press release dated November 4, 2026

 

 
 

 
 
 
 
 
 
 
 
 
 
 

  Exhibit 99.1
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF FINANCIAL POSITION
 
(Unaudited - Expressed in thousands of Canadian dollars (“CAD”) except for share amounts)
 
 
 
 
At September 30
2026
 
At December 31
2025
 
ASSETS
 
 
 
 
 
 
Current
 
 
 
 
 
 
Cash and cash equivalents (note 4)
 
 
$
362,749
$
 465,918
Trade and other receivables
 
 
 
6,485
 
 5,332
Inventories (note 5)
 
 
 
21,505
 
12,267
Investments-equity instruments (note 6)
 
 
 
11,463
 
11,961
Investments–uranium (note 6)
 
 
 
76,420
 
61,560
Prepaid expenses and other
 
 
 
4,372
 
 3,195
 
 
 
 
482,994
 
560,233
Non-Current
 
 
 
 
 
 
Inventories-ore in stockpiles (note 5)
 
 
 
2,098
 
2,098
Investments-equity instruments (note 6)
 
 
 
5,633
 
5,951
Investments-uranium (note 6)
 
 
 
44,578
 
 128,716
Investments-debt instruments (note 6)
 
 
 
11,605
 
 11,768
Capped Call derivative options (note 12)
 
 
56,375
 
47,993
Investments-joint venture (note 7)
 
 
19,488
 
19,450
Restricted cash and investments
 
 
10,746
 
11,830
Property, plant and equipment (note 8)
 
 
 
504,584
 
316,926
Other long-term assets
 
 
 
-
 
1,109
Total assets
 
 
$
1,138,101
 $
1,106,074
 
LIABILITIES
 
 
 
 
 
 
Current
 
 
 
 
 
 
Accounts payable and accrued liabilities (note 9)
 
 
$
97,250
$
41,202
Current portion of long-term liabilities:
 
 
 
 
 
 
Deferred revenue (note 10)
 
 
 
4,500
 
 4,517
Reclamation obligations (note 11)
 
 
 
1,085
 
 1,060
Other liabilities
 
 
 
552
 
 5,342
 
 
 
 
103,387
 
52,121
Non-Current
 
 
 
 
 
 
Deferred revenue (note 10)
 
 
 
35,988
 
35,628
Reclamation obligations (note 11)
 
 
 
37,921
 
 33,544
Convertible Notes (note 12)
 
 
 
583,021
 
612,164
Other liabilities
 
 
 
2,475
 
 2,658
Deferred income tax liability
 
 
 
1,562
 
 1,589
Total liabilities
 
 
 
764,354
 
737,704
 
EQUITY
 
 
 
 
 
 
Share capital (note 13)
 
 
 
1,694,111
 
 1,683,831
Contributed surplus
 
 
 
78,560
 
 76,229
Deficit
 
 
 
(1,400,836)
 
 (1,393,288)
Accumulated other comprehensive income
 
 
 
1,912
 
 1,598
Total equity
 
 
 
373,747
 
368,370
Total liabilities and equity
 
 
$
1,138,101
$
 1,106,074
Issued and outstanding common shares (note 13)
 
 
905,440,742
 
901,610,950
Commitments and contingencies (note 20)
Subsequent events (note 21)
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
  
 1
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF LOSS AND COMPREHENSIVE LOSS
 
(Unaudited - Expressed in thousands of Canadian dollars except for share and per share amounts
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
 
 
2026
 
2025
 
2026
 
2025
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
REVENUES (note 16)
$
1,046
$
1,045
$
2,872
$
3,696
 
 
 
 
 
 
 
 
 
EXPENSES
 
 
 
 
 
 
 
 
Operating expenses (note 16)
 
(1,775)
 
(1,209)
 
(4,550)
 
(3,818)
Exploration (note 16)
 
(2,896)
 
 (3,798)
 
(12,124)
 
 (14,362)
Evaluation (note 16)
 
(9,874)
 
 (14,015)
 
(25,151)
 
(34,151)
Mine development (note 16)
 
(4,497)
 
-
 
(6,485)
 
-
General and administrative (note 16)
 
(6,815)
 
 (3,664)
 
(19,220)
 
 (13,010)
Other income/(expense) (note 15)
 
4,980
 
 16,790
 
12,942
 
 22,205
 
 
(20,877)
 
(5,896)
 
(54,588)
 
 (43,136)
Income (loss) before net finance expense, equity accounting and taxes
 
(19,831)
 
 (4,851)
 
(51,716)
 
 (39,440)
 
 
 
 
 
 
 
 
 
Finance (expense)/income, net (note 15)
 
  105,068
 
 (130,168)
 
44,957
 
 (130,286)
Equity share of gain/(loss) of investment in associates (note 6)
 
(3,183)
 
 (124)
 
(4,144)
 
 (1,623)
Equity share of loss of joint venture (note 7)
 
(293)
 
 (243)
 
(1,402)
 
 (1,180)
Income (loss) before taxes
 
81,761
 
  (135,386)
 
(12,305)
 
(172,529)
Deferred Income tax recovery (note 17)
 
7
 
 421
 
4,757
 
 6,528
Net income (loss) for the period
$
81,768
$
(134,965)
$
(7,548)
$
 (166,001)
 
 
 
 
 
 
 
 
 
Other comprehensive loss:
 
 
 
 
 
 
 
 
Items that are or may be subsequently reclassified to loss:
 
 
 
 
 
 
 
 
   Foreign currency translation change
 
22
 
82
 
314
 
(108)
Comprehensive income (loss) for the period
$
81,790
$
(134,883)
$
(7,234)
$
(166,109)
 
 
 
 
 
 
 
 
 
Continuing operations net income (loss) per share:
 
 
 
 
 
 
 
 
Basic and diluted
$
0.09
$
(0.15)
$
(0.01)
$
(0.19)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Weighted-average number of shares outstanding (in thousands):
 
 
 
 
 
 
 
 
Basic
 
905,292
 
 896,574
 
904,432
 
896,226
Diluted
 
915,467
 
 896,574
 
904,432
 
896,226
 
 
 
 
 
 
 
 
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 2
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CHANGES IN EQUITY
 
(Unaudited - Expressed in thousands of Canadian dollars)
 
 
 
 
 
 
Nine Months Ended
September 30
 
 
 
 
 
 
 
2026
 
2025
 
 
 
 
 
 
 
 
 
 
 
Share capital (note 13)
 
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
$
1,683,831
$
1,665,189
 
Shares issued, net of issue costs
 
 
 
 
 
2,069
 
 (80)
 
Share options exercised-cash
 
 
 
 
 
4,263
 
 1,152
 
Share options exercised-transfer from contributed surplus
 
 
 
2,128
 
566
 
Share units exercised-transfer from contributed surplus
 
 
 
1,820
 
 1,148
 
Balance-end of period
 
 
 
 
 
1,694,111
 
1,667,975
 
 
 
 
 
 
 
 
 
 
 
Contributed surplus
 
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
 
76,229
 
 73,311
 
Share-based compensation expense (note 14)
 
 
 
 
 
6,279
 
 3,617
 
Share options exercised-transfer to share capital
 
 
 
 
 
(2,128)
 
 (566)
 
Share units exercised-transfer to share capital
 
 
 
 
 
(1,820)
 
 (1,148)
 
Balance-end of period
 
 
 
 
 
78,560
 
 75,214
 
 
 
 
 
 
 
 
 
 
 
Deficit
 
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
 
(1,393,288)
 
 (1,176,000)
 
Net loss for the period
 
 
 
 
 
(7,548)
 
 (166,001)
 
Balance-end of period
 
 
 
 
 
(1,400,836)
 
 (1,342,001)
 
 
 
 
 
 
 
 
 
 
 
Accumulated other comprehensive income
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
 
1,598
 
 1,822
 
Foreign currency translation
 
 
 
 
 
314
 
 (108)
 
Balance-end of period
 
 
 
 
 
1,912
 
 1,714
 
 
 
 
 
 
 
 
 
 
 
Total Equity
 
 
 
 
 
 
 
 
 
Balance-beginning of period
 
 
 
 
$
368,370
$
 564,322
 
Balance-end of period
 
 
 
 
$
373,747
$
 402,902
 
 
 
 
 
 
 
 
 
 
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 3
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
CONDENSED INTERIM CONSOLIDATED STATEMENTS OF CASH FLOW
 
(Unaudited - Expressed in thousands of Canadian dollars)
 
 
 
 
 
Nine Months Ended
September 30
 
 
 
 
2026
 
2025
CASH (USED IN) PROVIDED BY:
 
 
 
 
 
 
 
OPERATING ACTIVITIES
 
 
 
 
 
 
Net loss for the period
 
 
$
(7,548)
$
(166,001)
Adjustments and items not affecting cash and cash equivalents:
 
 
 
 
 
 
Depletion, depreciation, amortization and accretion
 
 
 
19,562
 
10,724
Fair value change (gains) losses:
 
 
 
 
 
 
         Investments-equity instruments (notes 6 and 15)
 
 
 
1,690
 
 (5,846)
         Investments-uranium (notes 6 and 15)
 
 
 
(22,346)
 
 (16,979)
         Investments-convertible debentures (notes 6 and 15)
 
 
 
163
 
 411
         Deferred consideration (note 15)
 
 
 
(227)
 
(134)
         Investments-Capped Call options (note 15)
 
 
 
(8,382)
 
(7,909)
         Convertible notes-Embedded Derivatives (note 12)
 
 
 
(56,856)
 
98,599
Day one loss on convertible notes
 
 
 
-
 
36,021
Investment in associate-equity pick up (note 6)
 
 
 
4,144
 
1,623
Joint venture-equity share of loss (note 7)
 
 
 
1,402
 
 1,180
Recognition of deferred revenue (note 10)
Gain on disposal of mineral properties (note 15)
 
 
 
(2,872)
(1,374)
 
 (3,696)
-
Post-employment benefit payments
 
 
 
(76)
 
 (33)
Reclamation obligation expenditures (note 11)
 
 
 
(804)
 
 (828)
Share-based compensation (note 14)
 
 
 
6,279
 
 3,617
Foreign exchange loss (note 15)
 
 
 
7,734
 
 597
Deferred income tax recovery
 
 
 
(4,757)
 
 (6,528)
Change in non-cash operating working capital items (note 15)
 
 
 
(23,248)
 
 (4,532)
Net cash used in operating activities
 
 
 
(87,516)
 
 (59,714)
 
 
 
 
 
 
 
INVESTING ACTIVITIES
 
 
 
 
 
 
(Increase)/Decrease in restricted cash and investments
 
 
 
1,082
 
 (332)
Purchase of equity investments (note 6)
 
 
 
(786)
 
(1,698)
Purchase of investments in joint venture (note 7)
 
 
 
(1,440)
 
 -
Additions of property, plant and equipment (note 8)
 
 
 
(114,574)
 
(19,092)
Proceeds on disposal of investments – Uranium (note 6)
 
 
 
91,624
 
31,166
Purchase of Capped Call derivative options
 
 
 
-
 
(48,822)
Net cash (used in) provided by investing activities
 
 
 
(24,094)
 
(38,778)
 
 
 
 
 
 
 
FINANCING ACTIVITIES 
 
 
 
 
 
 
Proceeds from convertible notes, net of issue costs (note 12)
 
 
 
-
 
458,994
Proceeds from share options exercised (note 13)
 
 
 
4,263
 
 1,152
Repayment of debt obligations
 
 
 
(319)
 
(359)
Payment of issue costs
 
 
 
(80)
 
(252)
Net cash (used) provided by financing activities
 
 
 
3,864
 
 459,535
 
 
 
 
 
 
 
Decrease in cash and cash equivalents
 
 
 
(107,746)
 
 361,043
Foreign exchange effect on cash and cash equivalents
 
 
 
4,577
 
 1,697
Cash and cash equivalents, beginning of period
 
 
 
465,918
 
 108,518
Cash and cash equivalents, end of period
 
 
$
362,749
$
 471,258
 
 
The accompanying notes are an integral part of the condensed interim consolidated financial statements
 
 
 
 4
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
NOTES TO THE CONDENSED INTERIM CONSOLIDATED FINANCIAL STATEMENTS FOR THE NINE MONTHS ENDED SEPTEMBER 30, 2026
 
(Unaudited - Expressed in Canadian dollars except for shares and per share amounts)
 
 
1.
NATURE OF OPERATIONS
 
Denison Mines Corp. (“DMC”) and its subsidiary companies and joint arrangements (collectively, “Denison” or the “Company”) are engaged in uranium mining related activities, which can include acquisition, exploration, development and mining of uranium bearing properties, as well as the processing and selling of, and investing in, uranium.
 
Denison’s property interests are focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95.0% interest in the Wheeler River Joint Venture (“WRJV”), which owns the Company’s flagship Wheeler River Uranium Project. Denison has direct ownership interests in properties covering ~459,000 hectares in the Athabasca Basin region, including a 70.55% interest in the Waterbury Lake Uranium Limited Partnership (“WLULP”), a 25.17% interest in the Midwest Joint Venture (“MWJV”) and a 22.5% interest in the McClean Lake Joint Venture (“MLJV”), which includes the McClean Lake mill and the McClean North mine. The McClean Lake mill is contracted to provide toll milling services to the Cigar Lake Joint Venture (“CLJV”) under the terms of a toll milling agreement between the parties (see note 10). The McClean North mine uses the MLJV’s patented Surface Access Borehole Resource Extraction (“SABRE”) mining method and commenced production in 2025.
 
Through its 50% ownership of JCU (Canada) Exploration Company, Limited (“JCU”), Denison holds further indirect interests in various uranium project joint ventures in Canada, including the Millennium project (JCU 30.099%), the Kiggavik project (JCU 33.8118%), and the Christie Lake project (JCU 34.4508%). See note 7 for details.
 
DMC is established under the Business Corporations Act (Ontario) and domiciled in Canada. The address of its registered head office is 40 University Avenue, Suite 1100, Toronto, Ontario, Canada, M5J 1T1.
 
 
2.
STATEMENT OF COMPLIANCE
 
These condensed interim consolidated financial statements have been prepared in accordance with International Accounting Standards (“IAS”) 34, Interim Financial Reporting. The condensed interim consolidated financial statements should be read in conjunction with the audited annual consolidated financial statements for the year ended December 31, 2025. The Company’s presentation currency is Canadian dollars (“CAD”).
 
These financial statements were approved by the board of directors for issue on November 3, 2026.
 
 
3.
MATERIAL ACCOUNTING POLICIES AND CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS
 
Material Accounting Policies
 
The material accounting policies followed in these condensed interim consolidated financial statements are consistent with those applied in the Company’s audited annual consolidated financial statements for the year ended December 31, 2025, except as noted below.
 
The Company has considered the amendments to the Classification and Measurement of Financial Instruments (Amendments to IFRS 9 and IFRS 7), which are effective for annual periods beginning on or after January 1, 2026 and has concluded that these amendments have no impact on the Company’s condensed interim consolidated financial statements.
 
New Accounting Policies
 
On February 24, 2026 the Company announced the Final Investment Decision (“FID”) for the Phoenix in-situ Recovery Mine and its plans to commence construction. The decision to commence construction of Phoenix reflects management’s assessment that the technical feasibility and commercial viability of the project has been proven. Accordingly, during construction, equipment purchases and expenditures on construction of mining and processing facilities will be capitalized and classified as assets under construction. These costs include: the purchase price of goods and materials, installation costs, site preparation costs, survey costs, freight charges, transportation insurance costs, duties, testing and preparation charges and estimated costs of dismantling and removing items and restoring the site on which it is located.
 
 
 5
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Applicable borrowing costs are capitalized to qualifying assets and are included in assets under construction. Qualifying assets are assets that take a substantial period of time to prepare for the Company’s intended use. Borrowing costs attributable to the acquisition, construction or production of qualifying assets are added to the cost of those assets until such time as the assets are substantially ready for their intended use.
 
Assets under construction are not considered to be available for use and are therefore not subject to depreciation.
When an asset becomes available for use, its costs are transferred from assets under construction into the appropriate asset classification such as mineral properties, or property, plant and equipment. Depreciation commences once the asset is complete and available for use.
 
Any costs incurred during the construction of Phoenix that are not eligible for capitalization will be expensed as Mine Development Costs including costs associated with engagement activities and payments under impact benefit agreements.
 
Critical Accounting Estimates and Judgements
 
The preparation of consolidated financial statements in accordance with IFRS requires the use of certain critical accounting estimates and judgements that affect the amounts reported. The critical accounting estimates and judgements utilized in the preparation of these condensed interim consolidated financial statements are consistent with those applied in the Company’s audited annual consolidated financial statements for the year ended December 31, 2025.
 
Changes in Accounting Standards not yet effective
 
In April 2024, the IASB issued IFRS 18 “Presentation and Disclosure in the Financial Statements” (“IFRS 18”) replacing IAS 1. IFRS 18 introduces categories and defined subtotals in the statement of profit or loss, disclosures on management-defined performance measures, and requirements to improve the aggregation and disaggregation of information in the financial statements. As a result of IFRS 18, amendments to IAS 7 were also issued to require that entities use the operating profit subtotal as the starting point for the indirect method of reporting cash flows from operating activities and also to remove presentation alternatives for interest and dividends paid and received. Similarly, amendments to IAS 33 “Earnings per Share” were issued to permit disclosure of additional earnings per share figures using any other component of the statement of profit or loss, provided the numerator is a total or subtotal defined under IFRS 18. IFRS 18 is effective for annual reporting periods beginning on or after January 1, 2027, and is to be applied retrospectively, with early adoption permitted. The Company is currently assessing the impact of the standard on its financial statements.
 
 
4.
CASH AND CASH EQUIVALENTS
 
The cash and cash equivalent balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Cash
 
 
$
97,718
$
 11,620
Cash in MLJV and MWJV
 
 
 
2,578
 
 1,970
Cash equivalents
 
 
 
262,453
 
 452,328
 
 
 
$
362,749
$
 465,918
 
 
 6
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
5.
INVENTORIES
 
The inventories balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Inventory of MLJV - McClean North
 
 
 
 
 
 
Ore stockpile
 
 
$
6,195
$
1,018
Ore in circuit
 
 
 
838
 
135
Uranium in Concentrates
 
 
 
9,199
 
6,847
Inventory of MLJV – historic Sue ore stockpile
 
 
 
2,098
 
2,098
Mine and mill supplies in MLJV
 
 
 
5,273
 
4,267
 
 
 
$
23,603
$
14,365
 
 
 
 
 
 
 
Inventories-by balance sheet presentation:
 
 
 
 
 
 
Current
 
 
$
21,505
$
12,267
Long term-ore in stockpiles
 
 
 
2,098
 
2,098
 
 
 
$
23,603
$
14,365
 
 
6.
 INVESTMENTS
 
The investments balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Investments:
 
 
 
 
 
 
    Equity instruments
 
 
 
 
 
 
       Shares
 
 
$
11,249
$
 11,949
       Warrants
 
 
 
533
 
1,131
Investment in Associates
 
 
 
5,314
 
 4,832
Debt Instruments
 
 
 
11,605
 
 11,768
Physical Uranium
 
 
 
120,998
 
 190,276
 
 
 
$
149,699
$
 219,956
 
 
 
 
 
 
 
Investments-by balance sheet presentation:
 
 
 
 
 
 
Current
 
 
$
87,883
$
 73,521
Long-term
 
 
 
61,816
 
 146,435
 
 
 
$
149,699
$
 219,956
 
Non-current instruments consist of warrants in publicly traded companies exercisable for a period more than one year after the balance sheet date, physical uranium not committed to be sold within one year after the balance sheet date, investment in associates, as well as convertible debt instruments convertible and redeemable for a period more than one year after the balance sheet date.
 
The investments continuity summary is as follows:
 
 
(in thousands)
 
Equity
Instruments
 
Investment in Associates
 
Debt
Instruments
 
Physical
Uranium
 
Total
Investments
 
 
 
 
 
 
 
 
 
 
 
Balance-December 31, 2025
$
13,080
$
4,832
$
 11,768
$
 190,276
$
219,956
Sale of investments
 
-
 
-
 
-
 
(91,624)
 
(91,624)
Acquisition of investments
 
392
 
4,626
 
-
 
-
 
5,018
Change in fair value (note 15)
 
(1,690)
 
-
 
 (163)
 
22,346
 
 20,493
Equity pick up of associates
 
-
 
(4,144)
 
-
 
-
 
(4,144)
Balance-September 30, 2026
$
11,782
$
5,314
$
 11,605
$
 120,998
$
149,699
 
 
 
 7
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Investment in equity and debt instruments
 
At September 30, 2026, the Company holds equity instruments consisting of shares and warrants in publicly traded companies as well as a strategic investment in F3 Uranium Corp. (“F3”) in the form of convertible debt instruments.
 
Investment in associates
 
As at September 30, 2026, the Company has investments in two entities which are accounted for as investments in associates using the equity method, as it has determined that it has significant influence over both companies, due to Denison’s shareholdings and board representation rights. Denison records its equity share of earnings (loss) in these entities one quarter in arrears (due to the information not yet being available), adjusted for any known material transactions that have occurred up to the period end date on which Denison is reporting.
 
Foremost Clean Energy Ltd.
 
In October 2024, Denison completed a transaction with Foremost Clean Energy Ltd (“Foremost”), whereby Denison became a significant shareholder in Foremost in exchange for granting Foremost a multi-phase option to acquire up to 70% of Denison’s interest in 10 non-core uranium exploration properties (the ‘Option Agreement’).
 
During 2025, the Company purchased 485,000 shares of Foremost for total consideration of $1,067,000.
 
In May 2026, the Company exercised its equity participation right under the amended and restated investor rights agreement and acquired an additional 137,590 shares for a total consideration of $335,720.
 
In July 2026, Foremost completed the Phase 2 earn-in requirements under the Option Agreement with the Company. Pursuant to the Option Agreement, Denison’s ownership interest in the related uranium exploration properties has been reduced to 49% (Foremost – 51%), with the exception of Hatchet Lake, where Denison’s interest has been reduced to 34.37% (Foremost - 35.78%). As part of the completion of the Phase 2 option, Foremost issued 848,610 common shares to the Company with a fair value of $2,000,000. After accounting for Denison’s share of the gain on disposal of $257,000, the net addition to the investment in associate was $1,743,000.
 
As at September 30, 2026, based on the most recent publicly available information, the Company owns 19.87% of the issued and outstanding common shares of Foremost (holding 3,448,610 Foremost common shares) and its equity loss pick up of Foremost of $2,083,000 and a dilution loss of $799,000 (June 30, 2026 – dilution gain of $443,000) for a total loss of $2,882,000 for the nine months ended September 30, 2026 (September 30, 2025 – total equity loss of $966,000).
 
Cosa Resources
 
In January 2025, Denison closed a transaction with Cosa Resources Corp (“Cosa”), whereby Denison became a significant shareholder in Cosa in exchange for Cosa’s acquisition of a 70% interest in Denison's Murphy Lake North, Darby, and Packrat properties (collectively the “Cosa Transaction”). Under the Cosa Transaction, Cosa was required to issue Denison $2,250,000 in deferred consideration shares within five years of the closing date. In 2026, Cosa paid in full the deferred consideration, with the issuance to Denison of 1,960,000 common shares in January, valued at $762,000, and a further 2,154,476 common shares in July, valued at $1,488,000.
 
In 2025, the Company participated in a Cosa private placement and acquired 4,835,358 common shares and 2,417,679 share purchase warrants for total consideration of $1,232,000.
 
In June 2026, the Company participated in a Cosa private placement pursuant to its pre-emptive and top-up rights under an investor rights agreement and acquired an additional 750,000 common shares of Cosa for total consideration of $450,000.
 
As at September 30, 2026, based on the most recent publicly available information, the Company owns 17.47% of the issued and outstanding common shares of Cosa (holding 23,895,340 Cosa common shares) and its equity loss pick up of Cosa amounted to $706,000 and a dilution loss of $556,000 (June 30, 2026 – dilution gain of $634,000) for a total loss of $1,262,000 for the nine months ended September 30, 2026 (September 30, 2025 – equity pickup loss of $588,000).
 
 
 
 8
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Investment in uranium
 
As at September 30, 2026, the Company holds a total of 950,000, pounds of physical uranium as uranium oxide concentrates (“U3O8“) at a cost of $35,124,000 (US$28,414,000 or US$29.91 per pound of U3O8) and market value of $120,998,000 (US$85,025,000 or US$89.50 per pound of U3O8). At December 31, 2025, the Company held a total of 1,700,000 pounds of physical uranium as uranium oxide concentrates (“U3O8”) at a cost of $62,487,000 (US$50,539,000 or US$29.73 per pound of U3O8) and market value of $190,276,000 (US$138,615,000 or US$81.55 per pound of U3O8).
 
As at September 30, 2026, the Company has entered into commitments to sell 600,000 pounds of U3O8 between the fourth quarter of 2026 and the second quarter of 2027. These deliveries of U3O8 are scheduled to occur in the next twelve months and the applicable portion of the investment value is classified as a current asset.
 
 
7.
INVESTMENT IN JOINT VENTURE
 
The investment in joint venture balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Investment in joint venture:
 
 
 
 
 
 
JCU
 
 
$
19,488
$
19,450
 
 
 
$
19,488
$
 19,450
 
A summary of the investment in JCU is as follows:
 
(in thousands)
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance-December 31, 2025
 
 
 
 
$
19,450
Investment at cost:
 
 
 
 
 
 
 Additional investment in JCU
 
 
 
 
 
1,440
  Equity share of loss
 
 
 
 
 
(1,402)
Balance-September 30, 2026
 
 
 
 
$
19,488
 
JCU is a private company that holds a portfolio of twelve uranium project joint venture interests in Canada, including a 10% interest in the WRJV, a 30.099% interest in the Millennium project (Cameco Corporation 69.901%), a 33.8118% interest in the Kiggavik project (Orano Canada Inc. 66.1882%), and a 34.4508% interest in the Christie Lake project (UEC 65.5492%).
 
The following tables summarize the consolidated financial information of JCU on a 100% basis, taking into account adjustments made by Denison for equity accounting purposes (including fair value adjustments and differences in accounting policies). Denison records its equity share of earnings (loss) in JCU one month in arrears (due to the information not yet being available), adjusted for any known material transactions that have occurred up to the period end date on which Denison is reporting.
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Total current assets(1)
 
 
$
910
$
 352
Total non-current assets
 
 
 
39,078
 
 39,227
Total current liabilities
 
 
 
(487)
 
 (133)
Total non-current liabilities
 
 
 
(525)
 
 (546)
Total net assets
 
 
$
38,976
$
 38,900
 
 
 
 9
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nine Months Ended
 
 
 
 
 
 
August 31
2026(2)
 
 
 
 
 
 
 
Revenue
 
 
 
 
$
-
Net loss
 
 
 
 
 
(2,804)
 
 
 
 
 
 
 
Reconciliation of JCU net assets to Denison investment carrying value:
 
 
 Adjusted net assets of JCU–at December 31, 2025
 
 
$
38,900
Net loss
 
 
 
 
 
 (2,804)
Investments from owners
 
 
 
 
 
 2,880
Net assets of JCU-at August 31, 2026
 
 
 
 
$
38,976
Denison ownership interest
 
 
 
 
 
50.00%
Investment in JCU
 
 
 
 
$
19,488
(1)
Included in current assets are $910,000 in cash and cash equivalents (December 31,2025 - $352,000)
(2)
Represents JCU net loss for the nine months ended August 31, 2026 (recorded one month in arrears), adjusted for differences in fair value allocations and accounting policies.
 
 
8.
PROPERTY, PLANT AND EQUIPMENT
 
The property, plant and equipment (“PP&E”) continuity summary is as follows:
 
 
 
Plant and Equipment
 
Mineral
 
Total
(in thousands)
 
Owned
 
Right-of-Use
 
Assets under Construction
 
Properties
 
PP&E
 
 
 
 
 
 
 
 
 
 
 
Cost:
 
 
 
 
 
 
 
 
 
 
Balance-December 31, 2025(1)
$
 136,051
$
 2,254
$
26,900
$
 201,602
$
 366,807
Additions (note 16)
 
 7,450
 
 58
 
176,339
 
815
 
184,662
Additions-capitalized borrowing costs (note 15)
 
-
 
-
 
5,707
 
-
 
5,707
Additions-reclamation asset
 
-
 
-
 
3,600
 
-
 
3,600
Disposals
 
(93)
 
-
 
-
 
(369)
 
(462)
Balance-September 30, 2026
$
143,408
$
2,312
$
212,546
$
202,048
$
560,314
 
 
 
 
,
 
 
 
 
 
 
Accumulated amortization, depreciation:
 
 
 
 
 
 
 
 
 
 
Balance-December 31, 2025
$
 (47,618)
$
(603)
$
-
$
(1,660)
$
 (49,881)
Amortization
 
 (401)
 
 -
 
-
 
-
 
 (401)
Depreciation
 
 (5,322)
 
(219)
 
-
 
-
 
 (5,541)
Disposals
 
93
 
-
 
-
 
 
 
93
Balance-September 30, 2026
$
(53,248)
$
(822)
$
-
$
(1,660)
$
(55,730)
 
 
 
 
 
 
 
 
 
 
 
Carrying value:
 
 
 
 
 
 
 
 
 
 
Balance-December 31, 2025
$
 88,433
$
 1,651
$
26,900
$
 199,942
$
 316,926
Balance-September 30, 2026
$
90,160
$
 1,490
$
212,546
$
 200,388
$
504,584
(1)
Subsequent to February 24, 2026, $26,900,000 in deposits made in prior years for Phoenix long-lead capital items that had been included in Plant and Equipment – Owned are now separated out and presented with Assets under Construction.
 
Plant and Equipment – Owned
 
The Company’s Plant and Equipment is predominantly comprised of (a) its 22.5% interest in the McClean Lake mill through its ownership interest in the MLJV (including various infrastructure, building and machinery assets), (b) exploration equipment, (c) exploration camps and (d) office-related equipment.
 
Plant and Equipment – Right-of-Use
 
The Company has included the cost of various right-of-use (“ROU”) assets within its plant and equipment ROU carrying value amount. These assets consist of building, vehicle and office equipment leases. The majority of the asset value is attributable to the building lease assets for the Company’s office in Toronto and warehousing space in Saskatoon.
 
 
 
 10
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Assets under Construction
 
On February 24, 2026, the Company announced the FID for the Phoenix in-situ recovery uranium mine and its plans to commence construction. During construction, expenditures incurred on construction of mining and processing facilities are capitalized and classified as assets under construction. These costs include: the purchase price of goods and materials, installation costs, site preparation costs, survey costs, freight charges, transportation insurance costs, duties, testing and preparation charges, capitalized borrowing costs and estimated costs of dismantling and removing items and restoring the site on which it is located.
 
Mineral Properties
 
As at September 30, 2026, the Company has various interests in development, evaluation and exploration projects located in Saskatchewan, Canada, which are either held directly, or through contractual arrangements. The properties with significant carrying values are Wheeler River, Waterbury Lake, Midwest, Mann Lake, Wolly, Johnston Lake and McClean Lake, which together represent $170,380,000, or 84.9%, of the total mineral property carrying value as at September 30, 2026.
 
On February 24, 2026, the Company announced the FID for the Phoenix in-situ Recovery Mine and site preparation and early works activities started in March 2026. The decision to commence construction of Phoenix reflected management’s assessment that the technical feasibility and commercial viability of the project had been proven. As such, the Phoenix project is no longer accounted for under IFRS 6, Exploration for and Evaluation of Mineral Resources, but rather under IAS 16, Property, Plant and Equipment. As required under IFRS 6, immediately before exiting the exploration and evaluation phase, the Company performed an impairment test to assess the recoverability of the Wheeler River mineral property asset and concluded that there was no impairment.
 
9. ACCOUNTS PAYABLE AND ACCRUED LIABILITIES
 
The accounts payable and accrued liabilities balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Trade payables
 
 
$
86,874
$
 19,968
Interest payable on Convertible Notes
 
 
 
1,034
 
7,645
Payables in MLJV and MWJV
 
 
 
9,188
 
 8,999
Other payables
 
 
 
154
 
 4,590
 
 
 
$
97,250
$
 41,202
 
 
10. DEFERRED REVENUE
 
The deferred revenue balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
CLJV Toll Milling-Ecora
 
 
$
31,138
$
 31,910
Uranium Prepayment
 
 
 
9,350
 
8,235
 
 
 
$
40,488
$
40,145
 
Deferred revenue-by balance sheet presentation:
 
 
 
 
Current
 
 
$
4,500
$
 4,517
Non-current
 
 
 
35,988
 
 35,628
 
 
 
$
40,488
$
 40,145
 
 
 11
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
The deferred revenue continuity summary is as follows:
 
 
 
 
 
CLJV
 
Uranium
(in thousands)
 
 
 
 
 
Prepayment
 
 
 
 
 
 
 
Balance-December 31, 2025
 
 
$
31,910
$
8,235
Revenue recognized during the period (note 16)
 
 
 
(2,872)
 
-
Accretion (note 15)
 
 
 
2,100
 
790
Unrealized foreign exchange loss
 
 
 
-
 
325
 
 
 
$
31,138
$
9,350
 
Arrangement with Ecora Resources PLC (“Ecora”)
 
In February 2017, Denison closed an arrangement with Ecora pursuant to which, Denison received an upfront payment of $43,500,000 in exchange for its right to receive specified future toll milling cash receipts from the MLJV earned by the Company related to the processing of specified Cigar Lake ore through the McClean Lake mill under the current toll milling agreement with the CLJV from July 1, 2016 onwards (the “Ecora Arrangement”). The up-front payment was based upon an estimate of the gross toll milling cash receipts to be received by Denison discounted at a rate of 8.50%.
 
The Ecora Arrangement represents a contractual obligation of Denison to pay onward to Ecora any cash proceeds of future toll milling revenue earned by the Company related to the processing of the specified Cigar Lake ore through the McClean Lake mill. The deferred revenue balance represents a non-cash liability, which is adjusted as any toll milling revenue received by Denison is passed through to Ecora, or any changes in Cigar Lake Phase 1 and Phase 2 tolling milling production estimates are recognized.
 
During the three and nine months ended September 30, 2026, the Company recognized $1,046,000 and $2,872,000 of toll milling revenue from the draw-down of deferred revenue, based on Cigar Lake toll milling production of 4,184,000 and 12,015,000 pounds U3O8 (100% basis). The draw-down in 2026 includes a cumulative decrease in revenue for prior periods of $132,000 resulting from changes in estimates to the toll milling rates during 2026.
 
For the comparative three and nine months ended September 30, 2025, the Company recognized $1,045,000 and $3,696,000 of toll milling revenue from the draw-down of deferred revenue, respectively based on Cigar Lake toll milling production of 4,164,000 pounds and 14,277,000 pounds U3O8 (100% basis). The draw-down in 2025 included a cumulative increase in revenue for prior periods of $113,000 resulting from changes in estimates to the toll milling rates during 2025.
 
During the three and nine months ended September 30, 2026, the Company recognized accretion expense of $682,000 and $2,100,000, including a true-up adjustment of $54,000 due to the change in the estimated timing of milling of the Cigar Lake ore (September 30, 2025, accretion expense for three and six months of $719,000 and $2,116,000 including a $41,000 true-down adjustment in the first quarter of 2025).
 
The current portion of the deferred revenue liability reflects Denison’s estimate of Cigar Lake toll milling over the next 12 months. This assumption is based on current mill packaged production expectations and is reassessed on a quarterly basis.
 
Uranium Prepayment
 
In 2025, Denison entered a uranium sales contract with a third party which included upfront cash prepayments. Under this arrangement Denison received $8,235,000 (US$6,000,000) in December 2025, with an additional US$4,000,000 due by the end of 2026. As consideration for the prepayments, the counterparty will receive a discount from the then prevailing market price on the sale of 4,500,000 pounds of U3O8, with scheduled deliveries from 2028-2033. The prepayment has been recorded as deferred revenue. The amount of the upfront payment included a significant financing component, so the Company is recognizing accretion expense on the deferred revenue.
 
 
 12
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
11. RECLAMATION OBLIGATIONS
 
The reclamation obligations balance consists of:
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Reclamation obligations-by item:
 
 
 
 
 
 
Elliot Lake
 
 
$
16,637
$
 16,662
MLJV and MWJV
 
 
 
13,911
 
 13,293
Wheeler River and other
 
 
 
8,458
 
 4,649
 
 
 
$
39,006
$
 34,604
 
 
 
 
 
 
 
Reclamation obligations-by balance sheet presentation:
 
 
 
 
Current
 
 
$
1,085
$
 1,060
Non-current
 
 
 
37,921
 
 33,544
 
 
 
$
39,006
$
 34,604
 
The reclamation obligations continuity summary is as follows:
 
 
(in thousands)
 
 
 
 
 
Reclamation
Obligations
 
 
 
 
 
 
 
Balance-December 31, 2025
 
 
 
 
$
 34,604
Liability adjustments-balance sheet
 
 
 
 
 
3,541
Accretion (note 15)
 
 
 
 
 
1,665
Expenditures incurred
 
 
 
 
 
(804)
Balance-September 30, 2026
 
 
 
 
$
39,006
 
Site Restoration: Elliot Lake
 
The Elliot Lake uranium mine was closed in 1992 and capital works to decommission this site were completed in 1997. The Company is responsible for monitoring the Tailings Management Areas at the Denison and Stanrock sites and for treatment of water discharged from these areas.
 
Spending on restoration activities at the Elliot Lake site is funded by the Elliot Lake Reclamation Trust (“Trust”). The Trust had a balance of $3,955,000 as at September 30, 2026 (December 31, 2025 - $3,858,000).
 
Site Restoration: McClean Lake Joint Venture and Midwest Joint Venture
 
Under the Saskatchewan Mineral Industry Environmental Protection Regulations (1996), the Company is required to provide its pro-rata share of financial assurances to the province of Saskatchewan relating to future decommissioning and reclamation plans that have been filed and approved by the applicable regulatory authorities. Accordingly, as at September 30, 2026, the Company has provided surety bonds under an agreement with a Canadian licensed insurance company, in favour of the Saskatchewan Ministry of Environment, totalling $22,972,000, which relate to the most recently filed reclamation plan dated November 2021.
 
Site Restoration: Wheeler River and other
 
The Company’s exploration and evaluation activities, along with the construction activities at the Phoenix site, are subject to environmental regulations as set out by the government of Saskatchewan. The estimate for the reclamation obligation for Phoenix is based on the construction activities completed to date. The Company has provided surety bonds under an agreement with a Canadian licensed insurance company totaling $13,874,000 in support of decommissioning and reclamation obligations for Wheeler River Project, including the preliminary decommissioning cost estimate for the construction scopes that are expected to be completed.
 
 
 13
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
12. CONVERTIBLE SENIOR UNSECURED NOTES AND CAPPED CALL DERIVATIVE OPTIONS
 
Convertible Senior Unsecured Notes
 
 
 
 
 
At September 30
 
At December 31
(in thousands)
 
 
 
2026
 
2025
 
 
 
 
 
 
 
Host-liability of the Notes
 
 
$
323,433
$
295,720
Embedded Derivatives
 
 
 
259,588
 
316,444
 
 
 
$
583,021
$
612,164
 
 
 
 
 
 
 
Convertible notes-by balance sheet presentation:
 
 
 
 
Current
 
 
$
-
$
 -
Non-current
 
 
 
583,021
 
 612,164
 
 
 
$
583,021
$
 612,164
 
In August 2025, the Company issued US$345,000,000 ($476,307,000) of convertible senior unsecured notes (the “Notes”). The Company received $458,994,000, after commissions, fees and transaction costs of $17,313,000. The transaction costs are included in the amortized value of the host contract and are amortized over the life of the Notes using the effective interest method. The Notes pay interest semi-annually at a rate of 4.25% per annum. The Company made the first two interest payments of US$8,553,125 ($11,902,529) on March 15, 2026, and US$7,331,250 ($10,156,714) on September 15, 2026. The Notes mature on September 15, 2031. The holders of the Notes may convert their Notes after December 31, 2025 in shares, cash or a combination thereof at the Company’s discretion, under the following circumstances: (1) the closing sale price of the Company’s shares exceeds 130% of the conversion price of US$2.92 per share for at least 20 trading days in the 30 consecutive trading days ending on the last trading day of the immediately preceding quarter, and only in the following quarter (the “Share Price Threshold”); (2) the trading price per $1,000 principal amount of the Note is equal to or less than 98% of the product of the closing sale price of the Company’s common shares and the applicable conversion rate; (3) the Notes are called for redemption by the Company; or (4) after June 15, 2031. The conversion rate is 342.9355 common shares per US$1,000 principal amount of notes which represents a conversion price of approximately US$2.92 per share. Upon conversion the Company may settle the obligation, at its sole discretion, in either common shares, in cash at an equivalent value or in a combination of both.
 
The Company may redeem for cash all or any portion of the Notes on or after September 20, 2029, but only if Denison’s share price reaches at least 130% of the conversion price for 20 out of the previous 30 consecutive trading days before the quarter ends. The redemption price represents 100% of the principal amount of the Notes, plus accrued and unpaid interest. The Notes contain a make-whole provision such that, in the event of a redemption, the conversion price is adjusted to ensure no loss to the Note holders. Upon the occurrence of specified corporate transactions, such as a change of control, major corporate transaction, or liquidation, the Company must offer to repurchase all or part of the outstanding Notes for cash.
 
The Notes mature on September 15, 2031. Any Notes not converted, repurchased or redeemed prior to the maturity date will have their principal amount repaid by Denison in cash at maturity.
 
Under IFRS 9, Financial Instruments, the early redemption feature and conversion option meet the definition of an embedded derivative (the “Embedded Derivatives”) and the Company has elected to bifurcate the host liability from the conversion and redemption options. The conversion option and redemption feature are treated as one unit on account of being closely related. The Embedded Derivatives were measured at fair value on issuance and at each subsequent reporting period, with changes in fair value recorded in net earnings. The host liability was recorded as the residual amount and subsequently measured at amortized cost.
 
On the date of issuance, the Notes were trading at a premium to their face value, resulting in a fair value on issuance of $512,328,000 (US$371,091,000), resulting in a day-one loss of $36,021,000, recorded in other income (note 15).
 
The Embedded Derivatives are classified as a Level 2 financial instrument based on the IFRS 13, Fair Value Measurement, fair value hierarchy, and are valued using a partial differential equation valuation model. The following key assumptions were used in the valuation model:
 
 
 14
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
 
 
 
 
 
Key Assumption
Key Assumption
 
 
 
 
September 30, 2026
December 31, 2025
 
 
 
 
 
 
Maturity date
 
 
 
September 15, 2031
September 15, 2031
Debt traded price
 
 
 
128.40
130.64
Volatility rate
 
 
 
62.73%
76.6%
Share price
 
 
 
US$2.59
US$2.66
Credit spread
 
 
 
6.15%
10.49%
 
The host-liability of the notes and embedded derivatives continuity summary is as follows:
 
 
(in thousands)
 
Host-liability of the Notes
 
Embedded Derivatives
 
 
 
 
 
Balance-December 31, 2025
$
295,720
$
316,444
Accretion of host liability (13.76%)
 
16,366
 
-
Foreign exchange loss on convertible debt
 
11,347
 
-
Change in fair value (gain) loss
 
-
 
(56,856)
Balance-September 30, 2026
$
323,433
$
259,588
 
For the nine months ended September 30, 2026, the Company recorded a gross interest expense of $31,600,000, including cash interest of $15,234,000 and accretion of the host liability related to the Notes, of $16,366,000 at an effective interest rate of 13.76%.
 
Following FID, the Company commenced capitalizing its borrowing costs in accordance with IAS 23, Borrowing Costs. For the three and nine months ended September 30, 2026, $3,626,000 and $5,707,000, respectively in borrowing costs were capitalized to Assets under Construction.
 
Capped Call Derivative Options
 
Concurrently with the issuance of the Notes, the Company purchased cash-settled call options (the “Capped Calls”) with a strike price equal to initial conversion price of the Notes of USD$2.92 and with a cap price of USD$4.32, and a term consistent with the term of the Notes. This transaction effectively increased the conversion price of the Notes up to USD$4.32 per share. The purchase price for the Capped Call transactions was approximately USD$35,363,000 ($48,822,000).
 
The Capped Calls are accounted for as a derivative instrument and are re-measured to fair value at each reporting date. The Capped Calls are classified as a Level 3 of the fair value hierarchy under IFRS 13, Fair Value Measurement and are valued using a Monte Carlo model. The key assumptions used in the valuation model as at September 30, 2026 and December 31, 2025, of the capped call option are:
 
 
 
 
 
Key Assumption
Key Assumption
 
 
 
 
 
September 30, 2026
December 31, 2025
 
 
 
 
 
 
 
 
Maturity date
 
 
 
September 15, 2031
September 15, 2031
Strike price
 
 
 
US$2.916
US$2.916
Cap
 
 
 
US$4.32
US$4.32
Share price
 
 
 
US$2.59 
US$2.66
Volatility rate
 
 
 
62.73%
76.6%
Risk free rate
 
 
 
4.89%
3.54%
Credit spread
 
 
 
0.60%
0.55%
 
The Capped Calls were initially valued at US$21,497,000 ($29,679,000) on August 15, 2025. The initial valuation resulted in a difference between the transaction price and the fair value on initial recognition of $19,143,000. As this valuation is based on a valuation technique where not all the inputs are observable, the day one loss was deferred, and is recorded as an asset on the statement of financial position, which is amortized on a straight-line basis into net earnings over the contractual life of the Capped Calls. Including the deferral of the loss, the total Capped Call value on August 15, 2025 was $48,822,000.
 
 
 15
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
The capped call derivative options continuity summary is as follows:
 
 
(in thousands)
 
Capped Call Derivative Options
 
 
 
Balance-December 31, 2025
$
47,993
Change in fair value gain (loss)
 
10,753
Amortization of day one loss
 
(2,371)
Balance-September 30, 2026
$
56,375
 
 
13. SHARE CAPITAL
 
Denison is authorized to issue an unlimited number of common shares without par value. A continuity summary of the issued and outstanding common shares and the associated dollar amounts is presented below:
 
 
Number of
 
 
 
Common
 
Share
(in thousands except share amounts)
Shares
 
Capital
 
 
 
 
Balance-December 31, 2025
901,610,950
$
1,683,831
Issued for cash:
 
 
 
Share option exercises
2,476,500
 
4,263 
Other share issues
531,077
 
2,149
Less: share issue costs
-
 
(80)
Share option exercises-transfer from contributed surplus
-
 
2,128 
Share unit exercises-transfer from contributed surplus
822,215 
 
1,820 
 
3,829,792
 
10,280 
Balance-September 30, 2026
905,440,742
$
 1,694,111
 
 
14. SHARE-BASED COMPENSATION
 
The Company’s share-based compensation arrangements include share options, restricted share units (“RSUs”) and performance share units (“PSUs”).
 
Share-based compensation is recorded over the vesting period, and a summary of share-based compensation expense recognized in the statement of income (loss) is as follows:
 
 
 
Three Months Ended
 September 30
 
Nine Months Ended
September 30
(in thousands)
 
2026
 
2025
 
2026
 
2025
 
 
 
 
 
 
 
 
 
Share based compensation expense for:
 
 
 
 
 
 
 
 
Share options
$
(529)
$
 (342)
$
(1,757)
$
 (1,164)
RSUs
 
(1,218)
 
 (789)
 
(3,695)
 
 (2,453)
PSUs
 
(525)
 
-
 
(827)
 
-
Share based compensation expense
$
(2,272)
$
 (1,131)
$
(6,279)
$
 (3,617)
 
An additional $13,259,000 in share-based compensation expense remains to be recognized, up until August 2031, on outstanding share options and share units at September 30, 2026.
 
 
 16
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Share Options
 
Share options granted in 2026 vest over a period of three years. A continuity summary of the share options granted under the Company’s Share Option Plan is presented below:
 
 
 
 
 
2026
 
 
 
 
 
 
 
 
Weighted
 
 
 
 
 
 
 
 
Average
 
 
 
 
 
 
 
 
Exercise
 
 
 
 
 
 
Number of
Common
 
Price per
Share
 
 
 
 
 
 
Shares
 
(CAD)
 
 
 
 
 
 
 
 
 
Share options outstanding-December 31, 2025
 
 
 
 
 
 6,356,165
$
 1.95
Grants
 
 
 
 
 
 1,509,000 
 
 5.36
Exercises(1)
 
 
 
 
 
 (2,476,500)
 
 1.72
Forfeitures
 
 
 
 
 
 (268,334)
 
 3.59 
Share options outstanding-September 30, 2026
 
 
 
 
 
 5,120,331
$
 2.98
Share options exercisable-September 30, 2026
 
 
 
 
 
2,239,987
$
1.98
(1)
The weighted average share price on the date of exercise was CAD$5.10.
 
A summary of the Company’s share options outstanding at September 30, 2026 is presented below:
 
 
 
 
 
 
Weighted
 
 
 
Weighted-
 
 
 
 
 
Average
 
 
 
Average
 
 
 
 
 
Remaining
 
 
 
Exercise
Range of Exercise
 
 
 
 
Contractual
 
Number of
 
Price per
Prices per Share
 
 
 
 
Life
 
Common
 
Share
(CAD)
 
 
 
 
(Years)
 
Shares
 
(CAD)
 
 
 
 
 
 
 
 
 
 
Share options outstanding
 
 
 
 
 
 
$ 1.00 to $ 1.50
 
 
 
 
1.45 
 
678,998
 
1.49
$ 1.51 to $ 2.00
 
 
 
 
2.71
 
1,770,335
 
1.95
$ 2.01 to $ 2.50
 
 
 
 
2.61
 
194,000
 
2.21
$ 2.51 to $ 3.00
 
 
 
 
2.46 
 
1,017,998
 
2.62
$ 3.51 to $ 4.00
 
 
 
 
4.11
 
67,000
 
3.61
$ 4.51 to $ 5.00
 
 
 
 
4.74
 
137,000
 
4.74
$ 5.01 to $ 5.42
 
 
 
 
4.45
 
1,255,000
 
5.42
Share options outstanding-September 30, 2026
 
2.99
 
5,120,331
$
2.98
 
Share options outstanding at September 30, 2026 expire between November 2026 and August 2031.
 
The fair value of each share option granted is estimated on the date of grant using the Black-Scholes option pricing model. The following table outlines the assumptions used in the model to determine the fair value of share options granted:
 
 
 
 
 
Nine Months Ended
 
 
 
 
September 30, 2026
 
 
 
 
 
Risk-free interest rate
 
 
 
3.06% - 3.23%
Expected stock price volatility
 
 
 
52.12% - 53.80%
Expected life
 
 
 
3.39 years
Expected dividend yield
 
 
 
-
Fair value per option granted
 
 
$1.88 – $2.21
 
 
 17
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Share Units
 
RSUs granted under the Share Unit Plan in 2026 vest ratably over a period of three years. PSUs granted under the Share Unit Plan in 2026 vest on satisfaction of performance criteria.
 
 
 
RSUs
 
PSUs
 
 
 
 
Weighted
 
 
 
Weighted
 
 
 
 
Average
 
 
 
Average
 
 
Number of
 
Fair Value
 
Number of
 
Fair Value
 
 
Common
 
Per RSU
 
Common
 
Per PSU
 
 
Shares
 
(CAD)
 
Shares
 
(CAD)
 
 
 
 
 
 
 
 
 
Units outstanding–December 31, 2025
 
7,821,087
$
 $1.66
 
260,000
$
0.98
Grants
 
1,421,000
 
5.21
 
1,449,000
 
      4.78
Exercises(1)
 
(762,215)
 
2.22
 
(60,000)
 
2.08
Forfeitures
 
(177,666)
 
2.95
 
(114,000)
 
      4.78
Units outstanding–September 30, 2026
 
8,302,206
$
2.19
 
1,535,000
$
4.24
Units vested–September 30, 2026
 
5,452,515
$
2.13
 
200,000
$
0.65
(1)
The weighted average share price on the date of exercise was $5.00.
 
The fair value of each RSU and PSU granted is estimated on the date of grant using the Company’s closing share price on the day before the grant date.
  
 
15. SUPPLEMENTAL FINANCIAL INFORMATION
 
The components of Other income (expense) are as follows:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2026
 
2025
 
2026
 
2025
 
 
 
 
 
 
 
 
 
(Losses) gains on:
 
 
 
 
 
 
 
 
Foreign exchange
$
(1,321) 
$
530
$
(7,734)
$
(597)
Gain on disposal of mineral properties
 
1,374
 
-
 
1,374
 
-
Fair value changes:
 
 
 
 
 
 
 
 
Investments-equity instruments (note 6)
 
(938)
 
 3,745
 
(1,690)
 
5,846
Investments-uranium (note 6)
 
6,564
 
 12,452
 
22,346
 
 16,979
Investments-debt instruments (note 6)
 
(318)
 
 97
 
(163)
 
 (411)
Gain on deferred consideration
 
139
 
(20)
 
227
 
(134)
Gain on recognition of proceeds–U.I. Repayment Agreement
 
-
 
413
 
971
 
1,259
Uranium investment carrying charges
Surety bond fees
 
(246)
(81)
 
(244)
-
 
(712)
(1,201)
 
(653)
-
Other
 
(193)
 
 (183)
 
(476)
 
 (84)
Other income – continuing operations
$
4,980
$
 16,790
$
12,942
$
22,205
 
 
 18
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
The components of Finance income (expense) are as follows:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2026
 
2025
 
2026
 
2025
 
 
 
 
 
 
 
 
 
Interest income
$
3,242
$
2,788
$
9,992
$
5,087
Convertible note interest expense
 
(5,132)
 
(2,535)
 
(15,234)
 
(2,535)
Fair value changes:
 
 
 
 
 
 
 
 
Convertible notes – Embedded Derivatives (note 12)
 
110,828
 
(98,599)
 
56,856
 
(98,599)
Investments-Capped Calls (note 12)
 
(379)
 
7,909
 
8,382
 
7,909
    Convertible notes – Day one Loss
 
-
 
(36,021)
 
-
 
(36,021)
Accretion expense
 
 
 
 
 
 
 
 
Deferred revenue (note 10)
 
(956)
 
 (719)
 
(2,890)
 
(2,116)
Reclamation obligations (note 11)
 
(594)
 
 (462)
 
(1,665)
 
(1,384)
Convertible Notes
 
(5,701)
 
(2,476)
 
(16,366)
 
(2,476)
    Less Borrowing costs capitalized
 
3,626
 
-
 
5,707
 
-
Other
 
134
 
(53)
 
175
 
 (151)
Finance income (expense)
$
105,068
$
(130,168)
$
44,957
$
(130,286)
 
The change in non-cash operating working capital items in the consolidated statements of cash flows is as follows:
 
 
 
 
 
Nine Months Ended
September 30
(in thousands)
 
 
 
 
 
2026
 
2025
 
 
 
 
 
 
 
 
 
Change in non-cash working capital items:
 
 
 
 
 
 
 
 
Trade and other receivables
 
 
 
 
$
(1,545)
$
 (4,434)
Inventories
 
 
 
 
 
(7,648)
 
 (3,264)
Prepaid expenses and other assets
 
 
 
 
 
(1,939)
 
 600
Accounts payable and accrued liabilities
 
 
 
 
 
(12,116)
 
 2,566
Change in non-cash working capital items
 
 
 
 
$
(23,248)
$
 (4,532)
 
 
 
 
 19
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
16.
SEGMENTED INFORMATION
 
Business Segments
 
The Company operates in two primary segments – the Mining segment and the Corporate and Other segment. The Mining segment includes activities related to exploration, evaluation and development, mining, milling (including toll milling) and the sale of mineral concentrates. The Corporate and Other segment includes general corporate expenses not allocated to the other segments.
 
For the nine months ended September 30, 2026, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
 2,872
 -
 2,872
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (4,550)
 -
 (4,550)
Exploration
 
 
 (12,124)
 -
 (12,124)
Evaluation
 
 
 (25,151)
 -
 (25,151)
Mine development
 
 
(6,485)
 
(6,485)
General and administrative
 
 
(26)
 (19,194)
 (19,220)
 
 
 
 (48,336)
 (19,194)
 (67,530)
Segment loss
 
$
 (45,464)
 (19,194)
 (64,658)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 10)
 
2,872
-
2,872
 
 
$
2,872
-
2,872
 
 
 
 
 
 
Capital additions:
 
 
 
 
 
 Property, plant and equipment (note 8)
$
193,870
99
193,969
 
 
 
 
 
 
Long-lived assets:
 
 
 
 
 
Plant and equipment
 
 
 
 
 
Cost
 
$
 349,950
 8,316
 358,266
Accumulated depreciation
 
 
 (53,173)
 (897)
 (54,070)
Mineral properties
 
 
 200,388
 -
 200,388
 
 
$
 497,165
7,419
 504,584
 
 
 20
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS

For the three months ended September 30, 2026, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
 1,046
 -
 1,046
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (1,775)
 -
 (1,775)
Exploration
 
 
 (2,896)
 -
 (2,896)
Evaluation
 
 
 (9,874)
 -
 (9,874)
Mine Development
 
 
(4,497)
-
(4,497)
General and administrative
 
 
 -
 (6,815)
 (6,815)
 
 
 
 (19,042)
 (6,815)
 (25,857)
Segment loss
 
$
 (17,996)
 (6,815)
 (24,811)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 10)
 
1,046
-
1,046
 
 
$
1,046
-
1,046
 
For the nine months ended September 30, 2025, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
3,696
 -
3,696
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (3,818)
 -
 (3,818)
Exploration
 
 
 (14,362)
 -
 (14,362)
Evaluation
 
 
 (34,151)
 -
 (34,151)
General and administrative
 
 
 -
 (13,010)
(13,010)
 
 
 
 (52,331)
 (13,010)
(65,341)
Segment loss
 
$
 (48,635)
 (13,010)
 (61,645)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 10)
 
3,696
-
3,696
 
 
$
3,696
-
3,696
 
 
 
 
 
 
Capital additions:
 
 
 
 
 
 Property, plant and equipment (note 8)
$
29,776
 1,204
30,980
 
 
 
 
 
 
Long-lived assets:
 
 
 
 
 
Plant and equipment
 
 
 
 
 
Cost
 
$
 137,856
8,285
146,141
Accumulated depreciation
 
 
 (46,546)
 (700)
 (47,246)
Mineral properties
 
 
 181,692
 -
 181,692
 
 
$
273,002
 7,585
 280,587
 
 
 
 21
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
For the three months ended September 30, 2025, reportable segment results were as follows:
 
 
 
(in thousands)
 
 
 
 
Mining
 
Corporate
and Other
 
 
Total
 
 
 
 
 
 
Statement of Operations:
 
 
 
 
 
Revenues
 
$
 1,045
 -
 1,045
 
 
 
 
 
 
Expenses:
 
 
 
 
 
Operating expenses
 
 
 (1,209)
 -
 (1,209)
Exploration
 
 
 (3,798)
 -
 (3,798)
Evaluation
 
 
 (14,015)
 -
 (14,015)
General and administrative
 
 
 -
 (3,664)
 (3,664)
 
 
 
 (19,022)
 (3,664)
(22,686)
Segment loss
 
$
 (17,977)
 (3,664)
 (21,641)
 
 
 
 
 
 
Revenues-supplemental:
 
 
 
 
 
Toll milling services-deferred revenue (note 9)
 
1,045
-
1,045
 
 
$
1,045
-
1,045
 
 
17.
INCOME TAXES
 
During the nine months ended September 30, 2026, the Company recognized deferred tax recoveries of $4,757,000. The deferred tax recovery includes the recognition of previously unrecognized Canadian tax assets of $4,730,000 relating to the February 2026 renunciation of the tax benefits associated with the Company’s $15,000,000 flow through share issue in December 2025.
 
 
18.
RELATED PARTY TRANSACTIONS
 
Compensation of Key Management Personnel
 
Key management personnel are those persons having authority and responsibility for planning, directing and controlling the activities of the Company, directly or indirectly. Key management personnel includes the Company’s executive officers, vice-presidents and members of its Board of Directors.
 
The following compensation was awarded to key management personnel:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2026
 
2025
 
2026
 
2025
 
 
 
 
 
 
 
 
 
Salaries and short-term employee benefits
$
(1,079)
$
 (887)
$
(4,979)
$
 (4,707)
Share-based compensation
 
(1,428)
 
 (768)
 
(4,145)
 
 (2,380)
Key management personnel compensation
$
(2,507)
$
 (1,655)
$
(9,124)
$
 (7,087)
 
19. FAIR VALUE OF INVESTMENTS AND FINANCIAL INSTRUMENTS
 
IFRS requires disclosures about the inputs to fair value measurements, including their classification within a hierarchy that prioritizes the inputs to fair value measurement. The three levels of the fair value hierarchy are:
 
●
Level 1 - Unadjusted quoted prices in active markets for identical assets or liabilities;
●
Level 2 - Inputs other than quoted prices that are observable for the asset or liability either directly or indirectly; and
●
Level 3 - Inputs that are not based on observable market data.
 
 
 22
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
The fair value of financial instruments which trade in active markets, such as share and warrant equity instruments, is based on quoted market prices at the balance sheet date. The quoted market price used to value financial assets held by the Company is the current closing price. Warrants that do not trade in active markets have been valued using the Black-Scholes pricing model. Investment in associates, have been valued based on the consideration given up and adjusted for any related equity pickup. Debt instruments have been valued using the effective interest rate for the period that the Company expects to hold the instrument and not the rate to maturity.
 
Except as otherwise disclosed, the fair values of cash and cash equivalents, trade and other receivables, accounts payable and accrued liabilities, restricted cash and cash equivalents and debt obligations approximate their carrying values as a result of the short-term nature of the instruments, the variable interest rate associated with the instruments or the fixed interest rate of the instruments being similar to market rates.
 
During 2026 and 2025, there were no transfers between levels 1, 2 and 3 and there were no changes in valuation techniques. The following table illustrates the classification of the Company’s financial assets and liabilities within the fair value hierarchy as at September 30, 2026 and December 31, 2025:
 
 
 
Financial
 
Fair
 
September 30,
 
December 31,
 
 
Instrument
 
Value
 
2026
 
2025
(in thousands)
 
Category(1)
 
Hierarchy
 
Fair Value
 
Fair Value
 
 
 
 
 
 
 
 
 
Financial Assets:
 
 
 
 
 
 
 
 
Cash and equivalents
 
Category B
 
 
$
362,749
$
 465,918
Trade and other receivables
 
Category B
 
 
 
6,485
 
 5,332
Investments
 
 
 
 
 
 
 
 
Equity instruments-shares
 
Category A
 
Level 1
 
11,249
 
 11,949
Equity instruments-warrants
 
Category A
 
Level 2
 
533
 
 1,131
Investments-uranium
 
Category A
 
Level 2
 
120,998
 
190,276
Debt instruments
 
Category A
 
Level 3
 
11,605
 
 11,768
Capped call options
 
Category A
 
Level 3
 
56,375
 
47,993
Restricted cash and equivalents
 
 
 
 
 
 
 
 
Elliot Lake reclamation trust fund
 
Category B
 
 
 
3,955
 
 3,858
Credit facility pledged assets
 
Category B
 
 
 
1,264
 
 7,972
Surety Bonds
 
Category B
 
 
 
5,527
 
-
 
 
 
 
 
$
580,740
$
 746,197
 
 
 
 
 
 
 
 
 
Financial Liabilities:
 
 
 
 
 
 
 
 
Account payable and accrued liabilities
 
Category C
 
 
 
97,250 
 
 41,202
Debt obligations
 
Category C
 
 
 
2,094
 
 2,280
Convertible Notes(2)
 
Category A/C
 
Level 2
 
630,400
 
639,526
 
 
 
 
 
$
729,744
$
 683,008
(1)
Financial instrument designations are as follows: Category A=Financial assets and liabilities at fair value through profit and loss; Category B=Financial assets at amortized cost; and Category C=Financial liabilities at amortized cost.
(2)
The Convertible Notes Embedded Derivatives are Category A and the Convertible Notes host liability is Category C.
 
Investments in uranium are categorized as Level 2. Investments in uranium are measured at fair value at each reporting period based on the month-end spot price for uranium published by UxC and converted to Canadian dollars during the period-end indicative foreign exchange rate. The Capped Call options are categorized as Level 3, as there are significant inputs that are unobservable. The Convertible note Embedded Derivatives are categorized as Level 2, due to the use of a valuation model based on market observable inputs.
 
 
20. COMMITMENTS AND CONTINGENCIES
 
Capital Commitments
 
As of September 30, 2026, the WRJV has commitments for $237,732,000 related to capital purchases and construction contracts for the Wheeler Joint Venture, with Denison’s share being $225,845,000. These commitments are expected to be incurred over the next 24 months.
 
 
 23
 
  INTERIM CONSOLIDATED FINANCIAL STATEMENTS
 
Surety Bonds
 
In April 2026, the Company entered into an agreement with a Canadian licensed insurance company to provide Surety Bonds totaling $36,846,000 in support of decommissioning and reclamation obligations for the McClean Lake Operation and Wheeler River Project (see note 11). The Company pledged $5,526,900 as restricted cash and investments pursuant to its obligations under the agreement. The Surety Bonds are subject to annual surety fees of 3.0%.
 
Letters of Credit Facility
In January 2026, the Company entered into an agreement with The Bank of Nova Scotia to amend the terms of the Company’s Fourth Amended and Restated Credit Facility Agreement (the “Credit Facility”) to extend the maturity date to January 31, 2027 (the “Credit Facility”). Under the Credit Facility, the Company has access to letters of credit of up to $28,478,000, which is partially utilized for non-financial letters of credit in support of performance obligations. The tangible net worth covenant remains unchanged by the amendment. The Company has provided $1,264,000 in cash collateral on deposit with BNS to maintain the current letters of credit issued under the Credit Facility. During the nine months ended September 30, 2026, the Company incurred letter of credit fees of $210,000 (June 30, 2025 - $322,000).
 
At September 30, 2026, the Company is in compliance with its facility covenants and has access to letters of credit of up to $28,478,000 (December 31, 2025 - $28,478,000). The facility is partially utilized to provide a $4,514,000 non-financial letter of credit issued in support of performance obligations. (see note 11).
 
Sale of Uranium
 
As at September 30, 2026, the Company has entered into uranium sales contracts to sell 600,000 pounds for deliveries between the fourth quarter of 2026 and the second quarter of 2027.
 
General Legal Matters
 
The Company is involved, from time to time, in various legal actions and claims in the ordinary course of business.
In the opinion of management, the aggregate amount of any potential liability is not expected to have a material adverse effect on the Company’s financial position or results.
 
Specific Legal Matters
 
Mongolia Mining Division Sale – Arbitration Proceedings with Uranium Industry a.s.
 
In November 2015, the Company sold all of its mining assets and operations located in Mongolia to Uranium Industry a.s (“UI”) pursuant to an amended and restated share purchase agreement (the “GSJV Agreement”). The primary assets at that time were the exploration licenses for the Hairhan, Haraat, Gurvan Saihan and Ulzit projects. As consideration for the sale per the GSJV Agreement, the Company received cash consideration of US$1,250,000 prior to closing and the rights to receive additional contingent consideration of up to US$12,000,000.
 
With respect to outstanding contingent consideration payable to Denison in relation to this transaction, in January 2022, the Company executed a Repayment Agreement with UI (the “Repayment Agreement”). Under the terms of the Repayment Agreement, UI has agreed to make scheduled payments of the Arbitration Award, plus additional interest and fees, through a series of quarterly installments and annual milestone payments until December 31, 2025.
 
On April 1, 2026, the Company received the remaining US$702,000 as full and final settlement of all amounts payable under the GSJV Agreement and the Repayment Agreement.
 
 
21.
SUBSEQUENT EVENTS
 
Sale of Uranium
 
In October 2026, the Company completed a transaction to sell 150,000 pounds of U3O8 at a weighted average price of US$84.94 per pound. The transaction represented a scheduled delivery under a sales agreement entered in 2025.
 
 
 24

 
 
 
 
 
 Exhibit 99.2

 
 
 
 
 
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
FOR THE THREE AND NINE MONTHS ENDED
SEPTEMBER 30, 2026
 
TABLE OF CONTENTS
Q3 2026 PERFORMANCE HIGHLIGHTS
ABOUT DENISON
RESULTS OF CONTINUING OPERATIONS
WHEELER RIVER URANIUM PROJECT
PIPELINE MINERAL PROPERTY EVALUATION
MINERAL PROPERTY EXPLORATION
COMMERCIAL ACTIVITIES
LIQUIDITY AND CAPITAL RESOURCES
OUTLOOK FOR 2026
ADDITIONAL INFORMATION
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
 
 
 
 
 
 
This Management’s Discussion and Analysis (‘MD&A’) of Denison Mines Corp. and its subsidiary companies and joint arrangements (collectively, ‘Denison’ or the ‘Company’) provides a detailed analysis of the Company’s business and compares its financial results with those of the previous year. This MD&A is dated as of November 4, 2026 and should be read in conjunction with the Company’s unaudited interim condensed consolidated financial statements and related notes for the three and nine months ended September 30, 2026. The unaudited interim condensed consolidated financial statements are prepared in accordance with International Financial Reporting Standards (‘IFRS’) as issued by the International Accounting Standards Board (‘IASB’), including IAS 34, Interim Financial Reporting. Readers are also encouraged to consult the audited consolidated financial statements and MD&A for the year ended December 31, 2025. All dollar amounts in this MD&A are expressed in Canadian dollars, unless otherwise noted.
 
Additional information about Denison, including the Company’s press releases, quarterly and annual reports, Annual Information Form (‘AIF’) and Annual Report on Form 40-F (‘Form 40-F’), is available through the Company’s filings with the applicable securities regulatory authorities at www.sedarplus.ca (‘SEDAR+’) and at www.sec.gov/edgar (‘EDGAR’).
 
 
 
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Q3 2026 PERFORMANCE HIGHLIGHTS
 
■
Phoenix achieves ~24% total completion after first quarter of full-scale construction
 
Building on the successful completion of site preparation and early works construction in early July, Denison made significant progress executing on key construction work scopes during its first quarter of full-scale construction on site. The project’s total percentage completion as at September 30, 2026 is estimated at approximately 24%, which includes (i) engineering, PCM, and owner’s costs at 32% completion, (ii) construction and construction indirect costs at 20% complete, and (iii) fabrication and delivery of equipment and materials at 32% complete.
 
With full-scale construction commencing during the critical summer construction season, initial construction activities have focused on schedule and seasonally sensitive work. Civil work continued with the main site access road from Highway 914 currently available for use, the substation area substantially completed and the freeze plant area and airstrip significantly advanced (with 100% of the final grade completed for the runway area). In addition, concrete work commenced in August and continues into the fourth quarter of 2026. By the end of October 2026, site civil work is estimated to be nearly 50% complete and the concrete work required to enable the commencement of construction of the process plant building over the winter has been substantially completed.
 
■
Phoenix construction and procurement strategy allows continued productivity during winter months
 
With an approximately 2-year construction timeline targeted for Phoenix, Denison developed a procurement and execution strategy whereby key project components have been procured directly by Denison, rather than through its contractors, and modularization has been utilized wherever possible. As a result, Denison is responsible for making progress payments as equipment is fabricated and the total project spend curve is thus front-loaded relative to the rate of construction progress on site. This approach decouples fabrication of key equipment from onsite construction by utilizing offsite fabrication facilities which allows for continued productivity during the winter season. Fabrication has commenced on the majority of the process plant equipment and shipment release has occurred for the site transformer, substation e-house, high-voltage substation yard equipment, switchgear, generators, freeze plants, and certain process tanks and construction bulks.
 
Year to date Phoenix project expenditures totaled $161.1 million, including $105.0 million on construction and construction indirect costs and $39.0 million on procurement of equipment and materials. Life to date expenditures on procurement of equipment and materials is approximately $56.8 million.
 
Forecasted expenditures for 2026 are now estimated to be $278.6 million, with $39.9 million in procurement payments, $68.5 million in construction and construction indirect costs, and $9.1 million in engineering, PCM, and owner’s costs estimated for the fourth quarter of 2026.
 
■
Additional mineralization discovered at Phoenix North exploration target area, located within surface footprint of the Phoenix ISR mine site
 
During the third quarter of 2026, drill hole WR-857D1 intersected 0.39% eU3O8 over 4.7 metres from 409.9 metres to 414.6 metres at the unconformity and represents the best mineralized hole drilled in this area of sparse historic drilling. WR-857D1 is located approximately 10 metres up-dip and along section of WR-857, which was completed during the second quarter and intersected mineralized intervals of 0.20% eU3O8 over 1 metre from 417.6 metres, and 0.07% eU3O8 over 0.5 metres from 415.8 metres. In October 2026, drill hole WR-868 encountered unconformity associated mineralization (0.67% eU3O8 over 2.5 metres from 413.1 metres to 415.6 metres) approximately 50 metres along strike to the northeast of WR-857, and drill hole WR-869A intersected additional mineralization (highlighted by 0.07% eU3O8 over 2.2 metres from 421.5 metres to 423.7 metres) 50 metres along strike to the southwest of WR-857. Taken together, mineralization has now been intersected over 100-metres of strike length at the Phoenix North target area, which remains open in multiple directions with the anticipated optimal target horizon yet to be tested.
 
While in the early stages of exploration discovery, the results at Phoenix North are especially encouraging as the mineralization is situated in the immediate vicinity of the Phoenix ISR mine currently under construction.
 
 
 
 2
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
ABOUT DENISON
 
Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories with its common shares listed on the Toronto Stock Exchange (the ‘TSX’) under the symbol ‘DML’ and on the NYSE American exchange under the symbol ‘DNN’.
 
Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. In mid-2023, the Phoenix Feasibility Study (‘2023 Phoenix FS’) was completed for the Phoenix ISR mining operation, and an update to the 2018 Pre-Feasibility Study (‘2018 PFS’) was completed for the Gryphon deposit as a conventional underground mining operation (the ‘Gryphon Update’). Based on the respective studies, both deposits have the potential to be competitive with the lowest cost uranium mining operations in the world.
 
Site preparation and early works construction of the Phoenix ISR mine commenced in March 2026, following shortly after federal approval of the EA and issuance of the Construction Licence in February 2026. Full-scale construction started in July 2026 and is ongoing.
 
Denison’s interests in Saskatchewan also include a 22.5% ownership interest in the McClean Lake Joint Venture (‘MLJV’), which includes unmined uranium deposits (with mining at McClean North deposit having commenced in July 2025 using the MLJV’s SABRE mining method) and the McClean Lake uranium mill (currently utilizing a portion of its licenced capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Main and Midwest A deposits held by the Midwest Joint Venture (‘MWJV’), and a 70.55% interest in the Tthe Heldeth Túé (‘THT’) and Huskie deposits on the Waterbury Lake Property (‘Waterbury’). The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, the Company has direct ownership interests in properties covering ~459,000 hectares in the Athabasca Basin region.
 
Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited (‘JCU’), Denison holds further interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).
 
SELECTED FINANCIAL INFORMATION
 
(in thousands)
 
As at
September 30,
2026
 
As at
December 31,
2025
 
 
 
 
 
Financial Position:
 
 
 
 
Cash and cash equivalents
$
362,749
$
465,918
Working capital(1)
$
384,107
$
 512,629
Investments in uranium
$
120,998
$
 190,276
Property, plant and equipment
$
504,584
$
 316,926
Total assets
$
1,138,101
$
 1,106,074
Total long-term liabilities(2)
$
660,967
$
685,583
Notes:
(1)
Working capital is a non-IFRS financial measure and is calculated as the value of current assets less the value of current liabilities, excluding non-cash current liabilities. Working capital at September 30, 2026 excludes $4,500,000 from the current portion of deferred revenue (December 31, 2025 – $4,517,000).
(2)
Predominantly comprised of the Convertible Notes (including the fair value of the Embedded Derivatives), non-current portion of deferred revenue and non-current reclamation obligations. The Convertible Notes have a face value of US$345,000,000. Had the Convertible Notes matured at September 30, 2026, the settlement amount would have been US$345,000,000 ($490,970,000).
 
 
 
 3
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
SELECTED QUARTERLY FINANCIAL INFORMATION
 
 
 
 
 
2026
 
2026
 
2026
 
2025
(in thousands, except for per share amounts)
 
Q3
 
Q2
 
Q1
 
Q4
 
 
 
 
 
 
 
 
 
 
 
Continuing Operations:
 
 
 
 
 
 
 
 
 
 
Total revenues
$
1,046
  $
720
  $
1,106
$
 1,222
Net (loss) earnings
$
81,768
  $
25,563
  $
(114,879)
$
 (51,287)
Adjusted net (loss) earnings(1)
$
(28,681)
  $
(24,447)
  $
(19,658)
$
(29,791)
Basic and diluted (loss) earnings per share
$
0.09
  $
0.03
  $
(0.13)
$
(0.06)
Adjusted basic and diluted (loss) earnings per share(1)
$
(0.03)
  $
(0.03)
  $
(0.02)
$
 (0.03)
 
 
 
 
 
 
 
 
 
 
 
 
 
2025
 
2025
 
2025
 
2024
(in thousands, except for per share amounts)
 
Q3
 
Q2
 
Q1
 
Q4
 
 
 
 
 
 
 
 
 
 
 
Continuing Operations:
 
 
 
 
 
 
 
 
Total revenues
$
1,045
  $
1,276
  $
1,375
$
1,170
Net (loss) earnings
$
 (134,965)
  $
12,498
  $
(43,534)
$
(29,502)
Adjusted net (loss) earnings(1)
$
(8,254)
  $
12,498
  $
(43,534)
$
(29,502)
Basic and diluted (loss) earnings per share
$
(0.15)
  $
0.01
  $
(0.05)
$
(0.03)
Adjusted basic and diluted (loss) earnings per share(1)
$
 (0.01)
  $
0.01
  $
(0.05)
$
(0.03)
Note:
(1)
Adjusted earnings and adjusted earnings per share exclude the fair value movements on the embedded conversion and redemption features in the Convertible Notes as well as the fair value movements on the Capped Call Options. Both the Convertible Notes and the Capped Call options were issued/acquired in the third quarter of 2025. The unrealized fair value movements on the embedded conversion and redemption features in the Convertible Notes are primarily driven by changes in the Company’s share price; however, such changes in the share price do not necessarily result in any additional cash or share consideration being owed upon settlement beyond the total of (i) the face value of the Convertible Notes and (ii) the proceeds from the exercise of the Capped Call options. Due to the addition of the Capped Calls, the effective amount owed upon settlement of the Convertible Notes will not increase until the Company’s share price exceeds US$4.32 (a 100% increase in the share price from the date of the pricing of the transaction).
 
Significant items causing variations in quarterly results
 
●
The Company’s revenues are based on a draw-down of deferred toll milling revenue, the rate of which fluctuates due to the timing of uranium processing at the McClean Lake mill, as well as changes to the estimated mineral resources of the Cigar Lake mine. See RESULTS OF CONTINUING OPERATIONS below for further details.
●
Exploration expenses are generally largest in the first and third quarters due to the timing of the winter and summer exploration seasons in northern Saskatchewan.
●
Evaluation expenses increased period over period from the second quarter of 2024 until the fourth quarter of 2025 as the Company advanced towards an FID for Phoenix. With the receipt of the Construction Licence and the declaration of FID in the first quarter of 2026, the Company achieved technical viability and commercial feasibility for Phoenix and commenced capitalizing eligible costs associated with mine construction. As a result, subsequent to February 24, 2026, any further evaluation expenses for Phoenix will be capitalized.
●
Other income and expense fluctuate due to changes in the fair value of the Company’s investments in equity instruments, convertible debentures, and physical uranium, all of which are recorded at fair value through profit or loss and are subject to fluctuations in the underlying share and commodity prices. The Company’s uranium investments, Convertible Notes and Capped Call options are also subject to fluctuations in the US dollar to Canadian dollar exchange rate.
●
Fair value adjustments of the Company’s Convertible Notes and Capped Call options issued in the third quarter of 2025 add volatility to Finance income/(expense). See FINANCE INCOME AND EXPENSE below for more details.
●
The Company’s results are also impacted, from time to time, by other non-recurring events arising from its ongoing activities, as discussed below, where applicable.
 
 
 
 4
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
RESULTS OF CONTINUING OPERATIONS
 
REVENUES
 
McClean Lake Uranium Mill
 
McClean Lake is located on the eastern edge of the Athabasca Basin in northern Saskatchewan, approximately 750 kilometres north of Saskatoon. Denison holds a 22.5% ownership interest in the MLJV and the McClean Lake uranium mill, one of the world’s largest uranium processing facilities, which is contracted to process ore from the Cigar Lake mine under a toll milling agreement. The MLJV is a joint venture between Orano Canada, with a 77.5% interest, and Denison, with a 22.5% interest.
 
In February 2017, Denison closed an arrangement with Ecora Resources PLC (‘Ecora’, then known as Anglo Pacific Group PLC) and one of its wholly owned subsidiaries (the ‘Ecora Arrangement’) under which Denison received an upfront payment of $43,500,000 in exchange for its right to receive future toll milling cash receipts from the MLJV under the then current toll milling agreement with the Cigar Lake Joint Venture (‘CLJV’) from July 1, 2016 onwards. The Ecora Arrangement consists of certain contractual obligations of Denison to forward to Ecora the cash proceeds of future toll milling revenue earned by the Company related to the processing of the specified Cigar Lake ore through the McClean Lake mill and, as such, the upfront payment was accounted for as deferred revenue.
 
During the three and nine months ended September 30, 2026, the McClean Lake mill processed 4.2 million and 12.0 million pounds U3O8, respectively for the CLJV (September 30, 2025 – 4.2 million and 14.3 million pounds U3O8) and Denison recorded toll milling revenue of $1,046,000 and $2,872,000, respectively (September 30, 2025 – $1,045,000 and $3,696,000). The decrease in toll milling revenue during the nine month period ended September 30, 2026, as compared to the prior year period, is predominantly driven by a decrease in production in the current year due to the timing of scheduled maintenance. The decrease in toll milling revenue during the nine months ended September 30, 2026 compared to the prior year period, is also due to a $132,000 negative non-cash cumulative accounting adjustment recorded in the first quarter of 2026 to reflect an update to the Cigar Lake mineral resource estimate (September 30, 2025 - $113,000 positive non-cash cumulative accounting adjustment).
 
During the three and nine months ended September 30, 2026, the Company also recorded accounting accretion expense of $682,000 and $2,100,000, respectively on the toll milling deferred revenue balance (September 30, 2025 – $719,000 and $2,116,000). Annual accretion expense will decrease over the life of the agreement, as the deferred revenue liability decreases over time, and fluctuations may occur due to the change in the timing of the estimated CLJV toll milling activities discussed above. During the nine months ended September 30, 2026, an adjustment of $54,000 was recorded to increase life-to-date accretion expense as a result of an update to the Cigar Lake mineral resource estimate (September 30, 2025 - $41,000 adjustment to decrease life-to-date accretion expense).
 
The impact of the current and prior period true-ups to revenue and accretion are non-cash.
 
OPERATING EXPENSES
 
Mining
 
Operating expenses of the mining segment include depreciation and development costs, costs relating to Denison’s legacy mine sites in Elliot Lake, as well as cost of sales related to the sale of uranium, when applicable. Operating expenses in the three and nine months ended September 30, 2026 were $1,775,000 and $4,550,000, respectively (September 30, 2025 – $1,209,000 and $3,818,000).
 
Included in operating expenses is depreciation expense relating to the McClean Lake mill of $763,000 and $2,138,000, respectively (September 30, 2025 – $646,000 and $2,239,000), as a result of processing 4.2 and 12 million pounds U3O8 for the CLJV in the applicable period (September 30, 2025 – 4.2 million and 14.3 million pounds U3O8). Also included in operating expenses are costs related to the Company’s Elliot Lake legacy mine sites of $693,000 and $1,520,000, respectively (September 30, 2025 – $267,000 and $777,000), and development costs of the MLJV and MWJV and other operating costs of $319,000 and $892,000, respectively (September 30, 2025 – $296,000 and $802,000).
 
In 2024, the MLJV began construction to prepare the McClean North deposit for SABRE mining and, in 2025, the site achieved commercial production.
 
 
 5
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
During the first half of 2026, mining activities were minimal and consisted largely of resource confirmation drilling prior to the placement of the pilot holes for 2026 mining operations. Excavation of mining cavities and active mining activities resumed at the end of May and recovered ore began to be processed through the mill in the third quarter of 2026.
 
The following tables provides a financial and operational review of the McClean Lake SABRE mining activities.
 
MLJV operational results for the nine months ended September 30, 2026
 
Units
100% Basis
Denison’s
22.5% Share
Ore Mined
Tonnes
2,403
541
Average grade
% U3O8
7.91%
7.91%
Ore Mined
lbs U3O8
419,245
94,330
Millfeed
lbs U3O8
156,822
35,285
Finished goods produced
lbs U3O8
160,345
36,078
 
MLJV inventory Physicals – Denison’s Share
 
Units
September 30
December 31
Stockpiled production
lbs U3O8
94,816
35,772
Ore-in-circuit
lbs U3O8
1,359
2,411
Finished Goods
lbs U3O8
182,004
145,926
 
MLJV inventory Value – Denison’s Share
 
 
September 30
December 31
Stockpiled production
$
6,195
1,018
Ore-in-circuit
$
838
135
Finished Goods
$
9,199
6,847
 
No uranium sales from production were made during the three or nine months ended September 30, 2026. Included in the total cost of finished goods are $1,675,000 in non-cash costs. The average cash operating cost of finished goods in inventory is approximately $41 per pound U3O8 (approximately US$29 per pound U3O8).
 
 
 6
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
WHEELER RIVER URANIUM PROJECT
 
The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. At September 30, 2026, the WRJV is owned by the Company (90%) and JCU (10%), and Denison owns 50% of the shares of JCU.
 
The location of the Wheeler River property, which includes the Phoenix and Gryphon deposits, and existing and proposed infrastructure, is shown on the map provided below.
 
 
Further details regarding Wheeler River, including the estimated mineral reserves and resources for Phoenix and Gryphon, are provided in the technical report for the Wheeler River project titled ‘NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada’ with an effective date of June 23, 2023 (‘Wheeler Technical Report’) and the update to estimated Phoenix initial capital costs disclosed in the Company’s AIF and Form 40-F dated March 30, 2026. Copies of the Wheeler Technical Report, AIF and Form 40-F are available on Denison’s website and under its profile on each of SEDAR+ and EDGAR.
 
 
 
 7
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Phoenix Mine Development
 
In October 2024, the WRJV Management Committee approved the findings and recommendations of the Phoenix FS providing the WRJV’s approval for development and construction of the project in accordance with the Phoenix FS.
 
Significant regulatory, engineering, and construction planning progress was made throughout 2025, which positioned Phoenix in a construction-ready state. Additionally, based on substantial completion of project engineering and execution of significant procurement activities since 2023, the Company provided an updated initial capital cost estimate for the Project in January 2026 (‘Updated Capex’).
 
Phoenix Initial Capital Cost Estimate Comparison (100% basis)
 
2023 Phoenix FS(1)
(2022 Dollars)
Updated Capex Estimate(2)
(2026 Dollars)
Post-FID Initial Capital
$419.4 million
$600.0 million
Pre-FID Capex
$67.4 million
$100.0 million
Base Case Uranium Price(3)
UxC Comp. Midpoint Q2 2023
(US$66.53/lb - US$70.11/lb)
UxC Comp. Midpoint Q4 2025
(US$68.89/lb - US$78.36/lb)
Post-Tax Payback Period(4)
~10 months
~12 months
Post-Tax NPV8%(5)
$1.56 billion
$1.57 billion
Post-Tax NPV8%(5) to Initial Capex Factor
3.7
2.6
Post-Tax IRR(5)
90%
73%
Notes:
(1)
Based on the 2023 Phoenix FS in the Wheeler Technical Report (defined below).
(2)
Estimated project economics reflect Updated Capex and revised base case uranium price, as described herein. All other costs and production estimates are consistent with the 2023 Phoenix FS and are shown from the point in time in which an FID is made and excludes pre-FID expenditures.
(3)
UxC forecast is based on “Composite Midpoint” constant dollar scenario from UxC's Q2 2023 and Q4 2025 Uranium Market Outlook (‘UMO’), as outlined above.
(4)
Payback period is stated as number of months to payback post-FID initial capital expenditures from the start of uranium production.
(5)
Post-tax NPV, IRR and payback period are based on the “adjusted post-tax” scenario in the 2023 Phoenix FS, which includes the benefit of certain entity level tax attributes which are expected to be available and used to reduce taxable income from the Phoenix operation.
 
Denison is not, at this time, providing any updates to the Phoenix operating cost or other estimates in the Wheeler Technical Report (defined below); however, it may do so in the future.
 
Summary of Key Phoenix Operational Parameters (100% basis)(1)
Mine life
10 years
Proven & Probable reserves(2)
56.7 million pounds U3O8 (219,000 tonnes at 11.7% U3O8)
First 5 years of reserves(3)
41.9 million pounds U3O8 (Average 8.4 million lbs U3O8 / year)
Remaining years of reserves
14.8 million pounds U3O8 (Average 3.0 million lbs U3O8 / year)
Initial capital costs(4)
$600.0 million
Average cash operating costs
$8.51 (US$6.28) per pound U3O8
All-in cost(5)
$24.92 (US$18.41) per pound U3O8
Notes
(1)
Based on the Wheeler Technical Report, as updated for the capital cost update. See Denison press release dated January 2, 2026.
(2)
See Denison press release dated June 26, 2023 for additional details regarding Proven & Probable reserves.
(3)
The first five years is determined by reference to the 60-month period that commences at the start of operations.
(4)
Initial capital costs exclude $100.0 million in estimated pre-FID expenditures expected to be incurred before the project’s FID has been made. See Denison press release dated January 2, 2026.
(5)
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8 to be produced.
 
 
 
 8
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
The following 3D model illustrates the mining and processing infrastructure planned for Phoenix.
 
 
In February 2026, following receipt of the final regulatory approvals required to commence construction of Phoenix, Denison made its FID and site preparation and early works activities started in March 2026. Full-scale construction activities commenced during July 2026.
 
Other than payments related to long-lead capital items, costs incurred prior to the Company’s determination that the project was technically viable and commercially feasible in late February 2026, were expensed as evaluation expenses. Eligible costs incurred subsequent to achieving technical viability and commercial feasibility have been capitalized as part of the Phoenix assets under construction, and costs associated with sustainability activities that are not eligible for capitalization to the Phoenix assets under construction have been expensed as mine development expenses.
 
Project Expenditures
 
A summary of the current period and life to date actual expenditures for the Project in comparison to the Updated Capex (see above, and Denison press release dated January 2, 2026), including both pre-FID and post-FID spend, is shown below:
 
(‘000)
Updated Pre- and Post-FID Capex
YTD Actual to
September 30, 2026
LTD(1) Actual to
September 30, 2026
Procurement of Equipment & Materials
(176,822)
(38,967)
(56,827)
Construction & Construction Indirects
(419,632)
(104,955)
(113,555)
EPCM & Owners’ Costs
(103,546)
(17,221)
(42,892)
Total
($700,000)
($161,143
($213,274)
Notes:
(1)
Life to Date since the completion of the Wheeler Technical Report in June 2023.
 
Current Period Activities
 
During the nine months ended September 30, 2026, the Company completed activities related to (1) detailed design engineering and procurement and construction management (“PCM”), (2) mobilization of construction personnel and equipment, site preparation and early works construction and commencement of full scale construction including the mobilization of contractors and equipment for the process plant, wellfield, airstrip and power infrastructure, and (3) procurement of equipment and materials, and construction services.
 
 
 9
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
The below table summarizes the initial construction priorities for the Phoenix site.
 
Milestone
Target timing
Site civil work for commencement of wellfield & process plant scopes
Completed
Process plant concrete works necessary for building construction
Q4 2026
Airstrip and site access roads operational
Q4 2026
Substation energized and connected to the provincial grid
Q1 2027
Freeze plant commissioned and ground freezing initiated
Q2 2027
Commencement of process plant mechanical and electrical installation
Q2 2027
 
Engineering, PCM, and Owners’ Costs
 
Total engineering for the Project is approximately 90% complete, with the detailed design engineering phase of the Project achieving approximately 80% complete at September 30, 2026.
 
With a recent focus on construction support during the commencement of construction, the remaining detailed engineering, which relates to the latter phases of project construction, is now expected to continue into 2027, with completion of “issued for construction” drawings expected to be sequenced to incorporate vendor information when received and support construction as required.
 
In February 2026, Wood Canada Limited (“Wood”) was awarded the Procurement and Construction Management (‘PCM’) Contract to oversee the construction of the Phoenix mine. The PCM Contract currently contemplates procurement and construction management scopes, whereby Wood is responsible for (i) construction management of the full processing plant scope, (ii) installation of certain site infrastructure, and (iii) integrated project controls, ongoing procurement support, on-site safety oversight, as well as maintaining reporting and performance management standards. Such services will be provided by Wood in close consultation with Denison, with members of Wood's team and Denison's team holding complementary roles in an integrated project management team. Denison retains overall responsibility for the Project as owner.
 
During the nine months ended September 30, 2026, the Company incurred engineering, PCM and owners’ costs of $17,221,000 (life to date spend of $42,892,000) and as of September 30, 2026, is estimated to have achieved approximately 32% completion for these scopes of work.
 
Mobilization, Site Preparation and Full-Scale Construction Commencement
 
Most construction activities in northern Saskatchewan are impacted by seasonal weather conditions, with rates of advancement over the summer months generally expected to be higher than during the winter. The Company's construction strategy was designed accordingly, with weather-dependent tasks scheduled to occur during the warmer months and employing modularization to utilize offsite fabrication as much as possible to reduce the impact of inclement weather and remote site operations on progress.
 
In March 2026, the Construction Management team mobilized to site and clearing and grubbing activities were initiated to allow for the establishment of critical construction facilities, including contractor management facilities, equipment laydown areas, and transportation infrastructure, including a helipad.
 
Site preparation and construction early works efforts were substantially complete by early July 2026 with the establishment of all required construction management facilities and the temporary construction camp, mobilization of the concrete batch plant, production of off-site aggregate, as well as the opening of site and airstrip access routes, which allowed for full scale construction to commence.
 
The process plant area was turned over from the civil contractor in July 2026 and concrete form work for the process plant commenced immediately thereafter. First pours of concrete occurred in August 2026 and as of the end of October, the critical concrete work necessary to enable the commencement of construction of the process plant building structure over the winter construction season is substantially completed. Based on the positive progress to date, the building installation contractor has mobilized to the Phoenix site during the fourth quarter 2026.
 
Following completion of the civil sub grade at the phase 1 area of the wellfield in July 2026, drilling crews mobilized to site and commenced activities required to establish the freeze wall for the phase 1 wellfield area, which is planned to consist of 66 freeze holes. As of the end of October 2026, the well cellar and overburden casing installation has been completed for all 66 holes, and 15 freeze holes have been completed to depth.
 
 
 10
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Freeze hole drilling progressed slower than scheduled during the summer, however, the rate of completion of freeze drilling has increased steadily during September and October and the number of drill rigs on site has increased from one rig at the start of the program to four rigs at the end of October 2026. Based on the current rate of production and optimized drilling plans. Freeze hole drilling is expected to be completed by the end of the first quarter of 2027.
 
Site civil work has continued during the third quarter and is estimated to be 47% complete by the end of October 2026.
 
The main site access road from Highway 914 and the internal road to the airstrip also advanced significantly during the quarter and are currently available for use. As at the end of October 2026, civil works at the airstrip is significantly advanced, including 100% completion of final grade for the runway area. The installation of the airstrip lighting and temporary support facilities are also in progress. Subject to weather restrictions, the airstrip is currently targeted to be operational before the end of 2026.
 
At the substation area, civil works were substantially completed during the third quarter of 2026, allowing mobilization of the contractor responsible for installation of all components needed for the interconnection to the provincial power grid. As at the end of October 2026, the substation grounding grid was completed, precast concrete foundations installed and structural steel installation in progress. The substation e-house, transformer, high-voltage substation equipment, and backup generators are either ready for shipment or already received to site, and energization of the substation is currently forecast for the first quarter of 2027.
 
Adjacent to the process plant and substation pads, the civil work for the freeze plant and freeze plant e-house area have significantly advanced and the freeze plant e-house grounding grid has been installed.
 
In addition, the civil works for the material laydown area and on-site warehouse facility are complete and construction of the warehouse building is approximately 45% complete, with the structure erected and installation work in progress.
 
Aggregate production required for site civil areas has continued throughout the third quarter at a nearby quarry and on site. Remaining site civil works largely consists of installation of site ponds/landfills and associated liners (wellfield runoff pond, domestic waste water pond, clean waste storage pond, industrial landfill, domestic landfill, industrial waste water treatment pond, process precipitate solids pond, and the process water pond), as well as finalization of civil work at the airstrip apron, substation, wellfield phases 2-4, freeze plant, and process plant.
 
During the nine months ended September 30, 2026, the Company incurred construction and construction indirect costs of $104,955,000 (life to date spend of $113,555,000, including the cost to construct the SaskPower transmission line in 2025) and as of September 30, 2026, is estimated to have achieved approximately 20% completion for construction activities.
 
Procurement: Supply Chain and Construction Contract Advancement
 
Procurement efforts related to Phoenix continue to progress with a total of 129 procurement and construction packages currently assessed as required for the project. As at September 30, 2026, 99 packages have been awarded, including 75 equipment and material supply packages and 24 construction and construction indirect services contracts. Procurement and contracting activities are in progress for the remaining packages.
 
Most long-lead packages, including electrical equipment such as the substation transformer, high voltage sub-station yard equipment, electrical switch gear, most E-house electrical buildings and diesel power generators, as well as process equipment, including tanks, control systems, drum filling station, process thickeners, sand filters and centrifuges, have been purchased. Fabrication has commenced on the majority of the process plant equipment, and release for shipment has occurred for the freeze plants, FRP process tanks, transformer, substation e-house, high-voltage substation yard equipment, switchgear, generators, airport lights, and certain construction bulks. Accordingly, the supply chain team is now focussed on expediting equipment that has been released for fabrication and arranging quality inspections and logistics for delivery to site.
 
As a strategy to reduce project risk, the procurement of key project components has been carried out either directly or on the behalf of the project owner – meaning that minimal equipment is to be supplied by contractors as part of their construction work scopes. As a result, Denison is responsible for making progress payments against equipment during the fabrication phase and the total project spend curve will be somewhat front-loaded when compared to the rate of construction progress. This approach decouples fabrication of key equipment from the construction contractors, and, along with the strategy to select modular equipment and facilities, ensures construction progress continues steadily offsite when progress could otherwise slow on site during the winter construction season. Finally, this approach gives Denison control of key process technologies and builds relationships with suppliers.
 
 
 11
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
As of September 30, 2026, $56,827,000 has been incurred towards equipment and material packages life to date, with $80,312,000 in additional progress payments / commitments expected to be incurred largely over the next 18 months. As of September 30, 2026, fabrication and delivery progress for equipment and materials is estimated to be 32% complete.
 
Overall Construction Progress
 
Significant progress has been made during the first quarter of full-scale construction with the project’s overall percentage completion, as of September 30, 2026, estimated to be approximately 24%, which incorporates the reported progress on (i) construction and construction indirects, (ii) engineering, PCM, and owner’s costs, and (iii) procurement for equipment and materials.
 
The site preparation and early works program was successful in supporting the ramp up of construction activities at Phoenix by the summer months; however, the completion of site preparation was slower than anticipated due to regional flooding and other restrictions to site access, which resulted in a delay in mobilizing civil and other required equipment to the site during the second quarter. In addition, significant rain events occurred during the third quarter of 2026 which temporarily impacted productivity during full-scale construction. The cost of these unusual events are estimated to be approximately $20,000,000 and are included in reported construction and EPCM costs.
 
Despite these challenges, significant progress has been made during the first quarter of full-scale construction with the project’s overall percentage completion, as of September 30, 2026, estimated to be approximately 24%, which incorporates the reported progress on (i) construction and construction indirects, (ii) engineering, PCM, and owner’s costs, and (iii) procurement for equipment and materials.
 
The Company was able to commence construction activities within three weeks of obtaining necessary regulatory approvals.  To achieve this, the construction plans for 2026 were developed to be flexible with a focus on (i) the completion of site preparation and early works, and (ii) the start of full-scale construction in time to benefit from the summer construction season.  Based on when the summer construction season winds down and transitions into winter conditions, and the actual results achieved during 2026, the construction schedule and cost to completion for the project will be finalized, which is expected in early 2027.
 
Gryphon Mineral Property Evaluation
 
The Gryphon Update was completed in 2023 and was largely based on the 2018 PFS, with efforts targeted at the review and update of capital and operating costs, as well as various minor scheduling and design optimizations.
 
Overall, the Gryphon Update demonstrates that the underground development of Gryphon is a positive potential future use of cash flows generated from Phoenix, as the project can leverage existing infrastructure to provide an additional source of low-cost production.
 
Summary of Gryphon Economic Results (100% Basis) – Base Case
Uranium selling price
US$75/lb U3O8(1)
(Fixed selling price)
Exchange Rate (US$:CAD$)
1.35
Discount Rate
8%
Operating profit margin(3)
83.0%
Pre-tax NPV8%(3) (Change from 2018 PFS)(4)
$1.43 billion (+148%)
Pre-tax IRR(3)
41.4%
Pre-tax payback period(5)
~20 months
Post-tax NPV8%(3)(6)
$864.2 million
Post-tax IRR(3)(6)
37.6%
Post-tax payback period(5)(6)
~22 months
Notes
(1)
Fixed selling price is based on the forecasted annual “Composite Midpoint” long-term uranium price from UxC’s Q2’2023 UMO (defined below) and is stated in constant (not-inflated) dollars. See Denison news releases dated June 26, 2023 and August 9, 2023, and the Wheeler Technical Report (defined below) for details.
(2)
Operating profit margin is calculated as aggregate uranium revenue less aggregate operating costs, divided by aggregate uranium revenue. Operating costs exclude all royalties, surcharges and income taxes.
(3)
NPV and IRR are calculated to the start of construction activities for the Gryphon operation, and excludes $56.5 million in pre-FID expenditures.
(4)
Change from 2018 PFS is computed by reference to the same scenario from the 2018 PFS, adjusted to incorporate certain pre-FID costs for consistent comparability.
(5)
Payback period is stated as number of months to payback from the start of uranium production.
(6)
There is no “adjusted” post-tax case for Gryphon, given that the entity level tax attributes of the Wheeler River Joint Venture owners are assumed to have been fully depleted by the Phoenix operation. See Denison news release dated June 26, 2023 and the Wheeler Technical Report for details.
 
 12
MANAGEMENT'S DISCUSSION & ANALYSIS 
 
 
Summary of Key Gryphon Operational Parameters (100% basis)
Mine life
6.5 years
Probable reserves(1)
49.7 million lbs U3O8 (1,257,000 tonnes at 1.8% U3O8)
Average annual production
7.6 million lbs U3O8
Initial capital costs(2)
$737.4 million
Average cash operating costs
$17.27 (US$12.75) per lb U3O8
All-in cost(3)
$34.50 (US$25.47) per lb U3O8
Notes
(1)
See Denison press release dated June 26, 2023 for additional details regarding Probable reserves.
(2)
Initial capital costs exclude $56.5 million in estimated pre-FID expenditures expected to be incurred before an FID has been made.
(3)
All-in cost is estimated on a pre-tax basis and includes all project operating costs, capital costs post-FID, and decommissioning costs divided by the estimated number of pounds U3O8 to be produced.
 
Current Period Activities
 
During the three and nine months ended September 30, 2026, Denison’s share of evaluation expenditures at Gryphon was $7,174,000 and $14,160,000, respectively (September 30, 2025 – $485,000 and $968,000). The increase in evaluation expenditures at Gryphon was due to an increase in field-based activities, including diamond drilling, geotechnical and hydrogeological evaluations.
 
A multi-purpose winter drilling program with a total of 3,757 metres drilled was carried out from January to March 2026 which included the completion of (i) one resource delineation hole, (ii) one metallurgical sample hole and (iii) two geotechnical/hydrogeological holes – one at the expected location of the main shaft and another proximal to planned underground workings to support future trade-off and mining evaluation studies.
 
In June 2026, drilling resumed with (i) two geotechnical/hydrogeological holes to support future trade-off and mining evaluation studies – one of which was at the expected location of the ventilation shaft and another proximal to planned underground workings, and (ii) a summer delineation drilling program composed of 11 holes, focused on mineral resource expansion with targets along strike and down-plunge of the Gryphon deposit. The drilling program concluded in September with a total of 13,256 metres completed. The results of the delineation program identified additional mineralization in the E series lenses with WR-849A and WR-864A intersecting 1.24% eU3O8 over 7.2m and 2.69% eU3O8 over 3.3 metres respectively, expanding the known mineralized footprint of these lenses in the down dip direction. The remaining holes drilled along strike and down plunge of the existing A Series lenses intersected significant alteration and structure, but did not intersect additional mineralization.
 
In the third quarter of 2026, metallurgical test work continued to further evaluate the Gryphon deposit from a mineral processing perspective. Work focused on ore sorting, grinding, leaching, solid/liquid separation, solvent extraction, and tailings neutralization.
 
Also in the third quarter of 2026, engineering and technical trade-off studies continued, which are evaluating and optimizing key areas of project design. The results of these studies are anticipated to inform a potential future decision to initiate a Feasibility Study.
 
 
 13
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
OTHER MINERAL PROPERTY EVALUATION
 
During the three and nine months ended September 30, 2026, Denison’s share of evaluation expenditures at its pipeline properties was $339,000 and $2,088,000, respectively (September 30, 2025 – $2,726,000 and $6,739,000).
 
The decrease in evaluation expenditures for pipeline properties in the three and nine month periods ended September 30, 2026, as compared to the prior year period, is primarily due to a reduction in field activities. Field activities were undertaken at Waterbury Lake in 2025. Activities in 2026 have focused on metallurgical testing at Waterbury and the PFS for the KLP project.
 
Evaluation activities on pipeline properties were minimal in the quarter and are summarized in the following table.
 
PROJECT EVALUATION ACTIVITIES
Property
Denison’s ownership
Evaluation activities
Waterbury Lake
70.55%(1)
 
Continuation of ISR metallurgical testing
Midwest
25.17%
Continuation of SABRE engineering studies.
Kindersley Lithium Project (‘KLP’)
30%(2)
 Progression of a PFS for the KLP project which was finalized in October 2026
   
 
 
 
Notes
(1)
Denison’s ownership position as at September 30, 2026.
(2)
Pursuant to an earn-in agreement executed in January 2024, Denison can earn up to a 75% interest in the KLP through a series of options exercisable with direct payments and work expenditures. As at September 30, 2026, Denison has not yet vested an ownership interest in the project; however, it has incurred expenditures that would entitle it to vest a 30% interest in the KLP if it elected to cease to fund further project expenditures towards the earn-in arrangement.
 
 
 14
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
MINERAL PROPERTY EXPLORATION
 
During the three and nine months ended September 30, 2026, Denison’s share of exploration expenditures was $2,896,000 and $12,124,000, respectively (September 30, 2025 – $3,799,000 and $14,362,000). The decrease in exploration expenditures in the nine month period ended September 30, 2026, as compared to the prior year period, is primarily due to a decrease in winter exploration activities at Wheeler River.
 
Exploration spending in the Athabasca Basin is generally seasonal in nature, with spending typically higher during the winter exploration season (January to mid-April) and summer exploration season (June to mid-October).
 
The following table summarizes the 2026 exploration activities to the end of September 30, 2026. For exploration expenditures reported in this MD&A, all amounts are reported for the three and nine months ended September 30, 2026.
 
EXPLORATION ACTIVITIES
Property
Denison’s ownership
Drilling in metres (m)(1)
Other activities
Bachman Lake
100.00%
-
Geophysical Survey
Brown Lake
100.00%
-
Geophysical Survey
CLK
49.00%(2)
-
Geophysical Survey
Crawford
100.00%
 
Geophysical Survey
Darby
30.00%(3)
5,693 (7 holes)
-
Ford Lake
100.00%
-
Geophysical Survey
Getty East
30.00%(4)
-
Geophysical Survey
Hatchet Lake
34.37%(2)
4,589 (22 holes)
-
Hook Carter
75.00%(5)
1,529 (3 holes)
Geophysical Survey, Geochemistry Survey
McClean Lake
22.50%
9,756 (41 holes)
Geophysics Survey
Moon Lake
100.00%
-
Geophysical Survey
Moon Lake South
75.00%(6)
-
Geophysical Survey, Re-logging Program
Murphy Lake North
30.00%(3)
8,767 (18 holes)
Geophysical Survey
RL / Russell Lake
20.00%(4)
4,288 (11 holes)
Geophysical Survey
Wheeler River
95.00%(7)
19,645 (23 holes)
Geophysical Survey
Waterfound
24.68%(8)
14,765 (25 holes)
Geophysical Survey
Wheeler North
49.00%(4)
1,915 (3 holes)
-
Wolly
27.73%(9)
7,143 (25 holes)
Geophysical Survey
     Total
 
78,090 (178 holes)
 
Notes
(1)
The Company reports total exploration metres drilled and the number of holes that were successfully completed to their target depth.
(2)
Denison’s effective ownership interest as at September 30, 2026.
(3)
Denison’s effective ownership interest as at September 30, 2026. The remaining interest was acquired by Cosa Resources Corp. in January 2025.
(4)
Denison’s effective ownership interest as at September 30, 2026. The remaining interest is owned by Skyharbour Resources Ltd.
(5)
Denison’s effective ownership interest as at September 30, 2026.The remaining interest is owned by Greenridge Exploration Inc.
(6)
Denison’s effective ownership interest as of September 30, 2026. The remaining interest is owned by CanAlaska Uranium Limited.
(7)
Denison’s effective ownership interest as at September 30, 2026, including an indirect 5.0% ownership interest held through JCU.
(8)
Denison’s effective ownership interest as at September 30, 2026, including an indirect 12.90% ownership interest held through Denison’s 50% ownership of JCU. The remaining interest is owned by Orano Canada.
(9)
Denison’s effective ownership interest as at September 30, 2026, including an indirect 6.39% ownership interest held through Denison’s 50% ownership of JCU. The remaining interest is owned by Orano Canada.
 
At September 30, 2026, the Company’s land position in the Athabasca Basin, increased to 459,196 hectares (262 claims) from 457,321 hectares (256 claims), as illustrated in the figure below. The land position reported by the Company excludes the land positions held by JCU. The land position increase reflects successful mineral claim staking by Denison, adding 1,106 hectares to the Crawford project, and successful claim staking by Cosa Resources Corp. (‘Cosa’) on the Murphy Lake North (3 claims, 344 hectares), and Darby (2 claims, 760 hectares) joint venture projects. Additionally, recorded areas of certain longstanding claims have been updated to reflect GIS-determined areas resulting in slight changes to recorded areas and associated work requirements.
 
 
 15
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Wheeler River Exploration
 
Denison’s share of exploration costs at Wheeler River during the three and nine months ended September 30, 2026, was $1,091,000 and $3,387,000, respectively (September 30, 2025 - $246,000 and $6,550,000).
 
A five-line 179.2 line-kilometre Stepwise Moving Loop Electromagnetic (‘SWML EM’) survey was completed during the first quarter of 2026. The survey used a LandTEM SQUID (Superconducting Quantum Interference Device) sensor, which generates higher quality data when compared to the historic EM surveys conducted on the Property, to fill in gaps in historical coverage including in the vicinity of the Phoenix and Gryphon deposits. Initial interpretation of survey data indicates strong continuous EM responses across all lines generating targets that are being evaluated further and anticipated to be incorporated into future drill programs.
 
A single-hole exploration diamond drilling program was completed at Gryphon during the first quarter, in conjunction with the ongoing evaluation field program discussed above. The drill hole was completed to a final depth of 1,055 metres and designed to collect preliminary geological information from the extreme down plunge extent of the deposit to inform future exploration drilling programs.
 
A large regional 5,036 line-kilometre VTEM airborne survey, flown over several properties, was completed in the second quarter of 2026, with final data received in August 2026. This survey included 397 line-kilometres flown over the Wheeler River property. The survey was designed to confirm and more accurately map the extent of conductors initially identified with airborne MegaTEM and ground TEM surveys.
 
In the second quarter of 2026, an exploration drilling program commenced at Wheeler River, focused at the Phoenix North target area, which is located approximately 600 metres N-NE of the Phoenix deposit within the surface footprint of the Phoenix ISR mine site and proximal to the future industrial landfill. The target area at Phoenix North is characterized as a series of sandstone resistivity low anomalies coincident with underlying conductive units on the interpreted footwall of the regional quartzite ridge unit. 
 
As of September 30, 2026, the Company has completed 2160 metres of exploration drilling in four drill holes at Phoenix North. The first drill hole of the program, WR-857, located approximately 160 metres north-east of historic drill hole ZR-18, intersected weak unconformity associated mineralization including 0.07% eU3O8 over 0.5 metres and 0.20% eU3O8 over 1.0 metre from 415.8 metres and 417.6 metres, respectively, utilizing a 0.05% eU3O8 cut-off.
 
 
 16
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Drill hole WR-857D1, designed to test the extent of mineralization intersected by WR-857, is approximately 10 metres, up-dip along section. This drill hole intersected multiple intervals of mineralization above a cut-off grade of 0.05% eU3O8, highlighted by 0.39% eU3O8 over 4.7 metres from 409.9 metres to 414.6 metres.
 
During October 2026, mineralization was intersected in two additional drill holes completed along strike of WR-857D1, 50 metres to the northeast and southwest respectively in drill holes WR-868 (intersected 0.67% eU3O8 over 2.5 metres from 413.1 metres to 415.6 metres) and WR-869A (intersected several intervals of mineralization above a cut-off grade of 0.05% eU3O8, highlighted by 0.07% eU3O8 over 2.2 metres from 421.5 metres to 423.7 metres).
 
The expanded program continues into the fourth quarter of 2026 with drilling expected to evaluate targets along strike and on section of WR-857D1.
 
 
 
 17
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
 
2026 Wheeler River Exploration Drill Hole Intercepts
Drill Hole
Orientation (azimuth/dip)
From
(m)
To
(m)
Length
(m)(1)
%eU3O8(2)
WR-857
300º/-70º
415.8
416.3
0.5
0.07
WR-857
300º/-70º
417.6
418.6
     1.0
0.20
WR-857D1
300º/-70º
408.6
408.8
      0.2
0.06
WR-857D1
300º/-70º
409.9
414.6
      4.7
0.39
WR-857D1
300º/-70º
415.0
415.5
      0.5
0.08
WR-857D1
300º/-70º
416.0
416.3
      0.3
0.11
WR-868
304º/-68º
413.1
415.6
2.5
0.67
WR-869A
304º/-68.5º
421.2
421.4
0.2
0.05
WR-869A
304º/-68.5º
421.5
423.7
2.2
0.07
Notes
(1)
Lengths indicated represent the down-hole length of mineralized intersections above a composited cut-off grade 0.05% eU3O8.
(2)
eU3O8 interval is radiometric equivalent uranium from a calibrated total gamma down-hole probe. All intersections have been sampled for chemical U3O8 assay. Assay samples have been sent to the SRC for processing.
 
Exploration Pipeline Properties
 
The Company continues to invest in its Athabasca Basin exploration portfolio with an objective to make meaningful new uranium discoveries.
 
During the three and nine months ended September 30, 2026, exploration field programs were carried out at 18 of Denison’s pipeline properties (three operated by Denison). Denison’s share of exploration costs for these properties was $2,317,000 and $9,820,000, respectively (September 30, 2025 – $3,702,000 and $7,254,000).
 
Geophysics
 
As discussed above, a large regional 5,036 line-kilometre VTEM airborne survey was completed in the second quarter of 2026, covering Bachman Lake (2,134 line-kilometre), Brown Lake (129 line-kilometre), Crawford Lake (302 line-kilometre), Ford Lake (1,041 line-kilometre), Moon Lake (420 line-kilometre), Moon Lake North (64 line-kilometre), and Moon Lake South (549 line-kilometre). The application of modern VTEM across a large group of Denison’s eastern Athabasca Basin exploration properties is expected to produce a high-quality conductivity map of the region, which is intended to resolve and refine the geometry of conductors in a manner that historic surveys could not. Overall, the objective of the survey is to confirm and more accurately map the extent of conductors initially identified with airborne MegaTEM and ground TEM surveys. The final survey data was received in August 2026 and is being utilized to develop follow up ground geophysics and drill targets for future exploration programs across the covered claims.
 
Darby
 
In January 2025, the Company completed a transaction with Cosa pursuant to which Cosa acquired a 70% stake in Darby, entered into a joint venture agreement with Denison, and assumed operatorship of the project, subject to the conditions for retaining Cosa’s interest as provided for in the acquisition agreement between Cosa and the Company
 
In the first quarter of 2026 Cosa completed approximately 2,952 metres of diamond drilling at Darby in three drill holes testing the high-priority targets identified by Cosa’s 2025 core relogging and reinterpretation program. The targets were in the immediate vicinities of historic drill holes that intersected zones of coincident sandstone alteration and anomalous uranium content proximal to significant graphitic basement faults. Initial results showed some elevated uranium geochemistry that requires further follow up.
 
In the third quarter of 2026, Cosa commenced a 2,500 metre drill program to follow up the results from the winter drilling on the Gamma and Bravo Trends. Targets for the Gamma Trend include follow up of the intersected broad zone of structure with significant unconformity offset, alteration, and elevated to strongly anomalous uranium geochemistry on trend with historical uranium mineralization. Drilling at Bravo is expected to follow up on historical results including favourable structure, alteration, and uranium mineralization. At the end of October, Cosa completed 2,741 meters in four holes, including two drill holes at Bravo and two drill holes at Gamma.
 
 
 18
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Getty East
 
In December 2025, the Company completed a transaction with Skyharbour Resources Ltd. (‘Skyharbour’) pursuant to which Denison acquired a 30% stake in Getty East and entered into an agreement with Skyharbour (70%), where Denison has an option to acquire up to an additional 40% interest through a two phase earn-in and can become the operator of the joint venture. Skyharbour is currently the operator of the project.
 
A 108 line-kilometre SWML EM survey commenced at Getty East and RL (see below) during the first quarter of 2026. The survey crews were demobilized in late April 2026 due to deteriorating ground conditions and remobilized in mid-May 2026 to complete the survey. In early June 2026 the survey was modified with additional lines completed as a Fixed Loop Electromagnetic (‘FLEM’) survey to allow the remaining survey to be completed in a timely manner.
 
In October 2026 a drill program commenced at Getty East which is expected to consist of approximately 3,600 metres, comprising ten to twelve drill holes. This drilling will test the Little Man Lake Uranium Zone and priority targets along the interpreted extension of the mineralized Middle Lake trend.
 
Hatchet Lake
 
Hatchet Lake is a joint venture between Denison (70.15%) and Trident Resources Corp. (29.85%). Denison has entered into an option agreement with Foremost Clean Energy Ltd (‘Foremost’) whereby Foremost can acquire up to a 51% interest in the project via a three-phased earn in option on a portfolio of properties. In July 2026 Foremost announced the completion of the second earn-in option and the vesting of a 35.78% stake in the Hatchet Lake joint venture from Denison’s share in the project. Foremost is the operator of the project during the earn-in period.
 
In the first half of 2026, Foremost completed a total of 19 diamond drill holes (3,848 metres) as part of a drill program at the Tuning Fork target area. Drilling was focused on following up drill hole TF-25-16, which intersected 6.2 metres of 0.10% U3O8, including 0.87% U3O8 over 0.45 metre, of unconformity-related uranium mineralization, above a cut-off grade of 0.05%.
 
In October, Foremost announced chemical assay results from its 2026 drilling program, which was highlighted by a high-grade intercept of 1.3% U₃O₈ over 1.0 metre, including 4.5% U3O8 over 0.25 metres within a broader interval of 0.36% U3O8 over 4.0 metres in drill hole TF-26-30. Taken together, the 2026 drill program identified uranium mineralization, above a cut-off grade of 0.05% U₃O₈, in eight drill holes across multiple drill fences spanning 200 metres of strike length. The mineralized trend is sparsely tested, with approximately 600 metres open to the south and 250 metres open to the north.
 
Hook Carter
 
The Hook Carter Project is a joint venture between Denison (75%) and Greenridge Exploration Inc. (‘Greenridge’) (25%). The project is located in the southwestern portion of the Athabasca Basin in Northern Saskatchewan, comprising 11 mineral claims for a total of 25,115 hectares, and is host to 15 kilometres of strike potential along the prolific Patterson Corridor – which is known to host significant delineated uranium deposits on other properties.
 
During the first quarter of 2026, three drill holes were completed totaling 1,529 metres testing previously identified EM targets on the Derkson and Patterson Corridors. On the Derkson Corridor, a single hole testing an EM anomaly along strike of historic off-property mineralization intersected a 75 metre wide alteration zone in the overlying sandstone directly above the unconformity at 272 metres. Given the absence of conductive basement geology, additional follow up is warranted to further assess the source of the overlying sandstone alteration and EM anomaly.
 
Two of the 2026 holes tested EM anomalies along the Patterson corridor spaced 1,200 metres apart along strike. Both drill holes intersected significant sandstone alteration and structural disruption in the lower 130 metres until the unconformity at approximately 420 metres. Trace graphite was intersected in the basement units. The interpreted results have upgraded the potential of this portion of the Patterson trend and warrant future exploration.
 
The 2026 drilling program was primarily funded by Greenridge under the terms of an agreement whereby Greenridge increased its ownership in the project from 20% to 25% by funding $3,000,000 in project expenditures.
 
During the third quarter of 2026, 28.8 kilometres of line-cutting and 19.4 line-kilometres of fixed loop electromagnetic (‘FLEM’) survey was completed over the Derkson Corridor, following up on the favourable alteration and geochemistry results of the drill hole completed on this trend during the first quarter of 2026. LiDAR was also flown over the Hook-Carter property covering an area of 4,400 hectares over the Derkson block. In addition to the FLEM, 428 soil samples were collected over the Derkson trends for soil gas hydrocarbon analysis. Results are expected in the fourth quarter of 2026.
 
 
 19
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Murphy Lake North
 
In January 2025, the Company completed a transaction with Cosa pursuant to which Cosa acquired a 70% stake in Murphy Lake North (‘MLN’), entered into a joint venture agreement with Denison, and assumed operatorship of the project, subject to the conditions for retaining Cosa’s interest as provided for in the acquisition agreement between Cosa and the Company.
 
In April 2026, Cosa completed a five-hole diamond drill program at MLN for 2,015 metres. The drilling followed up results from summer 2025 at the Cyclone trend, where broad zones of structure and alteration were intersected over a two kilometre strike length, targeting a gap in drilling at Cyclone and evaluating a potential untested trend approximately 100 metres south of Cyclone.
 
MLN26-013 was the first drill hole of the program and targeted a gap in previous drill testing along the main Cyclone trend. The drill hole intersected broad zones of moderately to strongly altered sandstone from 200 metres below surface to the unconformity at approximately 300 metres. Immediately below the unconformity a 5.0 metre wide zone of elevated radioactivity was intersected.
 
In Q2, chemical assays confirmed uranium mineralization is the source of anomalous radioactivity intersected. MLN26-013, which intersected 1.7% U₃O₈ over 0.5 metres (310.5 – 311.0 metres) within a broader interval averaging 0.55% U₃O₈ over 5.0 metres (308.5 – 313.5 metres).
 
A subsequent summer drilling program commenced in mid-June 2026, following up on mineralization intersected in MLN26-013. The program was completed in September 2026 and consisted of 13 drill holes totaling 6,752 metres. All drill holes intersected moderate to strong alteration and structure, with several drill holes intersecting intervals of elevated radioactivity over a 650 metre strike length. The trend remains prospective for future programs and targeting.
 
RL / Russell Lake
 
In December 2025, the Company completed a transaction with Skyharbour pursuant to which Denison acquired a 20% stake in Russell Lake (or “RL”) and entered into a joint venture agreement with Skyharbour (80%).
 
As disclosed above, a 108 line-kilometre SWML EM survey commenced at Getty East and RL and was completed using FLEM to enable it to be completed in a timely manner. The results of the combined SWML EM and FLEM survey were used to generate targets for diamond drill exploration program in the third quarter of 2026.
 
During the second quarter of 2026, a ground electromagnetic (EM) survey was carried out in the Kowalchuk Lake area.
 
Also in the second quarter of 2026, a drill program comprised of 11 drill holes was completed (RSL26-01 through RSL26-11) on the South Russell target area for a program total of 4,288.2 metres. The completed holes intersected the sub-Athabasca unconformity into graphitic and non-graphitic metasediments, and Archean granitic gneiss, locally with granitic pegmatite; multiple EM conductors were intersected. Notable features include multiple sandstone- and basement-hosted fault zones, local grey alteration within a wide interval of faulted graphitic metasediments overlying strongly silicified lithologies. Results are being compiled with follow-up anticipated in future drill programs.
 
McClean Lake
 
Orano initiated an exploration drilling program focused on the McClean South area in the first quarter of 2026. Historically two pods of uranium mineralization, the 8W and 8E pods, were defined along a conductor in the McClean South area with the 8C Pod discovered in 2021. The 8C pod hosts low to high-grade uranium mineralization over 150 metres of strike length between the 8W and 8E Pods.
 
The 2026 exploration program was designed to (1) further define and upgrade the understanding of potential mineral resources by completing select infill drilling within the mineralized envelope, (2) identify prospective structures or mineralization east of the 8E Pod, and (3) test large gaps in the historic drilling west of the 8W Pod for prospective structures and mineralization.
 
Forty-one holes were completed during the winter exploration drilling program for a total of 9,756 metres. Based on initial probing results, 22 drill holes intersected uranium mineralization above a cutoff grade of 0.05% eU3O8. Assay results for the 2026 winter exploration drilling program are pending.
 
 
 20
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Borehole EM was conducted on nine of the drill holes and acoustic televiewer was attempted in all holes. The final processed data from the borehole EM was received during the second quarter of 2026. A Moving Loop Transient Electromagnetic (ML-TEM) survey over the McClean West Grid area commenced in the first quarter of 2026 but was suspended due to adverse weather conditions in mid-March with 80% of the survey completed. The results from the ML-TEM survey is being evaluated and the data from the Borehole EM survey is currently being modelled.
 
Work in the third quarter of 2026 involved internal updates to resource models for the 8C and 8E pods, which are expected to be used to help inform drill targeting and planning for 2027.
 
Waterfound
 
Waterfound is a joint venture between Orano Canada (62.42%), JCU (25.8%) and Denison (11.78%) and is operated by Orano Canada.
 
The project is located along the LaRocque Lake corridor, which hosts high-grade uranium mineralization at the Hurricane deposit (IsoEnergy), as well as the western extension of Hurricane and at the LaRocque Lake zone on the Cameco-operated Dawn Lake property. Waterfound hosts two zones of high-grade uranium mineralization: the Alligator and Crocodile Zones, which are both interpreted to sit on the D-1 North trend. Since the discovery of the Crocodile Zone (4.75% eU3O8 over 13.3 metres) in the winter of 2022, all exploration activity at Waterfound has focused on drilling the D-1 North trend.
 
In the first quarter of 2026, 25 drill holes were completed for 14,765 metres. Borehole EM surveys were completed on 14 of the 20 selected holes to characterize the conductive response along the D-1 North trend to further refine and resolve the position of the D-1 North conductor. Based on initial probing results, uranium mineralization exceeding a cutoff grade of 0.05% eU3O8 was encountered in 16 drill holes with final results of the borehole EM survey and final assay results are pending.
 
In the third quarter of 2026, a structural review of the project was conducted and an ambient noise tomography geophysical survey covering an area of approximately 36 square kilometres, commenced.
 
Wheeler North
 
In December 2025, the Company completed a transaction with Skyharbour pursuant to which Denison acquired a 49% stake in Wheeler North and entered into an agreement with Skyharbour (51%), where Denison is the Operator and has an option to acquire up to an additional 21% interest through a two phase earn-in.
 
During the first quarter of 2026, a three-hole drill program was completed at the Fox Lake Trail target area totalling 1,915 metres. This program was designed to further investigate the significant alteration and elevated uranium intersected in previous years’ program on the 7S conductor and to investigate the untested 1S and 3S conductors.
 
All three drill holes intersected favourable geology, including hydrothermal hematite in the lower sandstone with quartzite basement lithologies; however, conductive basement lithologies in response to the interpreted targets, were not intersected. Geochemical results are pending and are expected to be further incorporated into the identification of future potential drill targets in this area.
 
Planning of drilling targets for a fall drilling program commenced late in the second quarter of 2026 and was completed in mid-August. The planned 5,500 metre diamond drilling program originally set to commence in the third quarter of 2026 has been deferred to 2027 with targets testing the Sphinx, Fork, and Grayling areas.
 
Wolly
 
The Wolly project is a joint venture between Orano Canada (65.88%, Operator), JCU (12.78%), and Denison (21.34%). Deposits previously discovered on the Wolly project were later partitioned into the McClean Lake property, including JEB, McClean North/South, and the Sue deposits.
 
Orano Canada is the operator of the project and carried out an exploration diamond drilling program during the first quarter of 2026. The program was designed to evaluate the Collins Creek and Emperor target areas. At Collins Creek historic drilling identified anomalous uranium along the trend, which could potentially host uranium pods similar to those found at McClean North and South. The Emperor trend represents the E-NE strike extension of the geological trend that hosts the Tamarack deposit, which is located approximately 1,200 metres to the west on the Cameco-operated Dawn Lake property.
 
 
 21
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Twenty-five holes were completed for 7,143 metres during the first quarter of 2026, with 14 holes completed at Collins Creek, and 11 holes completed at the Emperor trend with associated borehole EM. Based on initial probing results, two of the holes completed at Collins Creek intersected low-grade unconformity-associated uranium mineralization exceeding a cutoff grade of 0.05% eU3O8. All 11 holes completed at Emperor identified elevated uranium mineralization and one hole encountered low-grade mineralization above a 0.05% eU3O8 cutoff. Assay results for the program are pending. In addition to the drilling activities, an ML-TEM survey over the Pat North grid was completed during the first quarter of 2026. The final processed borehole EM data was received during the second quarter and the modelling of the ML-TEM and borehole EM surveys was finalized in June 2026.
 
In the third quarter, work was done to upgrade the core storage facility at the Moffat Lake Camp, prepare the 2025 and 2026 assessment reports, and complete preliminary drill planning and budgeting for 2027. Geophysical modeling of the ML-TEM and BHEM data was finalized in September.
 
GENERAL AND ADMINISTRATIVE EXPENSES
 
Total general and administrative expenses were $6,815,000 and $19,220,000, respectively, during the three and nine months ended September 30, 2026 (September 30, 2025 – $3,664,000 and $13,010,000). These costs are mainly comprised of head office salaries and benefits, share based compensation, audit and regulatory costs, legal fees, investor relations expenses, and all other costs related to operating a public company with listings in Canada and the United States. The increase in general and administrative expenses during the period was predominantly driven by an increase in (i) share-based compensation and (ii) head office salaries and benefits. The increases in salaries was predominantly due to increases in headcount, The increase in share-based compensation is due to both increases in headcount and the impact of share price appreciation, which occurred between the reference date used to determine equity grant quantities and the actual equity grant date, on the valuation of the current year share-based award grants (See KEY MANAGEMENT COMPENSATION below for further details)
 
FINANCE INCOME AND EXPENSE
 
During the three and nine months ended September 30, 2026, the Company recognized finance income of $105,068,000 and $44,957,000, respectively (September 30, 2025 – finance expense of $130,168,000 and $130,286,000). Finance income and expense includes interest income generated on cash and cash equivalents held by the Company, interest expense due to the Convertible Notes, fair value gains/losses on the Convertible Notes and Capped Call options, and accretion expense.
 
Fair value loss on convertible notes conversion and redemption options and Capped Call options
 
On August 15, 2025, the Company completed its ‘US-Style’ offering of convertible senior unsecured notes for an aggregate principal amount of US$345,000,000 ($476,307,000). The holders of the Convertible Notes may convert their Convertible Notes after December 31, 2025, under the following circumstances: (1) the closing sale price of the Company’s common shares exceeds 130% of the conversion price of US$2.92 per share (US$3.79) for at least 20 trading days in the 30 consecutive trading days ending on the last trading day of the immediately preceding quarter (the ‘Share Price Threshold’); (2) the trading price per US$1,000 principal amount of the Note is equal to or less than 98% of the product of the closing sale price of the Company’s common shares and the applicable conversion rate; (3) the Convertible Notes are called for redemption by the Company; or (4) after June 15, 2031. The conversion rate is 342.9355 common shares per US$1,000 principal amount of notes which represents a conversion price of approximately US$2.92 per share. Upon conversion, the Company can settle in shares, cash or a combination thereof, at its sole discretion.
 
The Company may redeem for cash all or any portion of the Convertible Notes on or after September 20, 2029, but only if Denison’s stock price reaches at least 130% of the conversion price for 20 out of the previous 30 consecutive trading days before each calendar quarter end. The redemption price represents 100% of the principal amount of the Convertible Notes, plus accrued and unpaid interest. The Convertible Notes contain a make-whole provision such that, in the event of a redemption, the conversion price is adjusted to ensure no loss to the Noteholders. Upon the occurrence of specified corporate transactions, such as a change of control, major corporate transaction, or liquidation, the Company must offer to repurchase all or part of the outstanding Convertible Notes for cash.
 
The Convertible Notes mature on September 15, 2031. Any Convertible Notes not converted, repurchased or redeemed prior to the maturity date will have their principal amount repaid by Denison in cash at maturity.
 
Under IFRS 9, Financial Instruments, the conversion and redemption features of the Convertible Notes have been bifurcated from the host debt instrument and are accounted for as an embedded derivative (the ‘Embedded Derivatives’). These Embedded Derivatives are recorded at fair value and will be re-measured at each reporting date.
 
 
 22
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
On issuance, the Convertible Notes were trading at a premium to their face value, with a fair value of $512,328,000 (US$371,091,000), resulting in a day one non-cash loss of $36,021,000. The fair value of the Embedded Derivatives on issuance was $205,086,000, resulting in a host liability being measured at $289,929,000 (the residual amount of $307,242,000 less $17,313,000 in transaction costs).
 
The following key assumptions are used in the valuation model:
 
 
 
 
 
Key Assumption
Key Assumption
Key Assumption
 
 
 
 
September 30, 2026
June 30, 2026
December 31, 2025
 
 
 
 
 
 
 
Maturity date
 
 
 
September 15, 2031
September 15, 2031
September 15, 2031
Debt traded price
 
 
 
128.40
139.92
130.64
Volatility rate
 
 
 
62.73%
72.1%
76.6%
Share price
 
 
 
US$2.59
US$3.06
US$2.63
Credit spread
 
 
 
6.15%
10.711%
10.49%
 
During the three months ended September 30, 2026, the fair value of the Embedded Derivatives liability decreased from $370,416,000 to $259,588,000, due to movements in the key assumptions used in the valuation model, and thus resulted in a fair value gain of $110,828,000 for the three months ended September 30, 2026 (three months ended September 30, 2025 – fair value loss $98,599,000).
 
During the nine months ended September 30, 2026, the fair value of the Embedded Derivatives liability decreased from $316,444,000 to $259,588,000, due to movements in the key assumptions used in the valuation model, and thus resulted in a fair value gain of $56,856,000 for the nine months ended September 30, 2026 (nine months ended September 30, 2025 – fair value loss $98,599,000).
 
The Share Price Threshold was not met during the three months ended September 30, 2026, and the Convertible Notes are not currently convertible or redeemable. Accordingly, if the Convertible Notes matured at September 30, 2026, the settlement amount would have been US$345,000,000 ($490,970,000).
 
Concurrently with the issuance of the Convertible Notes, the Company purchased a package of cash-settled call options (the ‘Capped Calls’) with a strike price equal to the initial conversion price of the Convertible Notes (US$2.92) and with a cap price of US$4.32. This transaction effectively increased the conversion price of the Convertible Notes to US$4.32 per share (i.e., if the share price on conversion or maturity is over US$2.92 but less than US$4.32, the settlement value of the Convertible Notes will be higher than the US$345,000,000 face value; however, the proceeds received by the Company from the exercise of the Capped Calls will offset the incremental liability).
 
The purchase price for the capped call transactions was US$35,363,000 ($48,822,000). The Capped Calls are accounted for as a derivative instrument and are re-measured to fair value at each reporting date. The Capped Calls were initially valued at US$21,497,000 ($29,679,000) on August 15, 2025. The initial valuation resulted in a difference between the transaction price and the fair value on initial recognition of $19,143,000. The valuation on initial recognition is based on a valuation technique where not all the inputs are market-observable, and therefore under IFRS, the day one loss is deferred, and has been recorded as an asset on the statement of financial position, which will be amortized on a straight-line basis into net earnings over the contractual life of the Capped Calls. Including the deferral of the loss, the fair value of the Capped Call on December 31, 2025 was $47,993,000.
 
The key assumptions used in the valuation model of the capped call option are:
 
 
 
 
 
Key Assumption
Key Assumption
Key Assumption
 
 
 
 
September 30, 2026
June 30, 2026
December 31, 2025
 
 
 
 
 
 
 
Maturity date
 
 
 
September 15, 2031
September 15, 2031
September 15, 2031
Strike price
 
 
 
US$2.916
US$2.916
US$2.916
Cap
 
 
 
US$4.32
US$4.32
US$4.32
Volatility rate
 
 
 
62.73%
72.1%
76.6%
Share price
 
 
 
US$2.59
US$3.06
US$2.63
Risk free rate
 
 
 
4.89%
3.95%
3.54%
Credit spread
 
 
 
0.60%
0.60%
0.55%
 
 
 23
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
During the three months ended September 30, 2026, the fair value of the Capped Calls decreased from $56,754,000 to $56,375,000, due to movements in the key assumptions, and thus resulted in a fair value loss of $379,000 for the three months ended September 30, 2026 (three months ended September 30, 2025 – fair value gain of $7,909,000).
 
During the nine months ended September 30, 2026, the fair value of the Capped Calls increased from $47,993,000 to $56,375,000 due to movements in the key assumptions, and thus resulted in a fair value gain of $8,382,000 for the nine months ended September 30, 2026 (nine months ended September 30, 2025 – fair value gain of $7,909,000).
 
Convertible Note interest expense
 
The Convertible Notes pay interest semi-annually at a rate of 4.25% per annum commencing on March 15, 2026. During the three and nine months ended September 30, 2026, the Company recognised interest expense on the convertible notes of $5,132,000 and $15,234,000, respectively (September 30, 2025- $2,535,000 and $2,535,000).
 
Accretion Expense – Convertible Notes
 
The transaction costs relating to the issue of the Convertible Notes along with the embedded derivatives are amortized over the life of the Convertible Notes using the effective interest method. During the three and nine months ended September 30, 2026, the Company recognized an accretion expense of $5,701,000 and $16,366,000, respectively (September 30, 2025 - $2,476,000 and $2,476,000).
 
Capitalization of Borrowing Costs
 
Following FID on February 24, 2026, the Company commenced capitalizing its borrowing costs in accordance with IAS 23, Borrowing Costs. For the three and nine months ended September 30, 2026, borrowing costs of $3,626,000 and $5,707,000, (September 30, 2025 - $Nil and $Nil) were capitalized to Assets under Construction.
 
OTHER INCOME AND EXPENSE
 
During the three and nine months ended September 30, 2026, the Company recognized net other income of $4,980,000 and $12,942,000, respectively (September 30, 2025 – net other income of $16,790,000 and $22,205,000).
 
Fair value gains/losses on uranium investments
 
In 2021, the Company acquired 2,500,000 pounds of U3O8 at a weighted average cost of $36.67 (US$29.66) per pound U3O8 to be held as a long-term investment to strengthen the Company’s balance sheet and potentially enhance its ability to access project financing in support of the future advancement and/or construction of Wheeler River. Given that this material was acquired to be held for long-term capital appreciation, the Company’s holdings are measured at fair value, with changes in fair value between reporting dates recorded through profit and loss. In previous years, the Company sold 800,000 pounds of U3O8 at a weighted average price of $109.69 (US$79.99) per pound U3O8. During the second quarter of 2026, the Company sold 750,000 pounds of U3O8 at a weighted average price of $122.16 (US$89.17) per pound.
 
As at September 30, 2026, the Company held uranium investments of 950,000 pounds of U3O8, excluding the Company’s share of uranium production from mining activities.
 
During the three months ended September 30, 2026, the spot price of U3O8 increased from $120.45 (US$84.85) per pound U3O8 at June 30, 2026, to $127.37 (US$89.50) per pound U3O8 at September 30, 2026, resulting in a fair value of the Company’s uranium investments of $120,998,000 and mark-to-market gain for the three months ended September 30, 2026 of $6,564,000 (three months ended September 30, 2025 – mark to market gain of $12,452,000). During the nine months ended September 30, 2026, the spot price of U3O8 increased from $111.93 (US$81.55) per pound U3O8 at December 31, 2025, to $127.37 (US$89.50) per pound U3O8 at September 30, 2026, resulting in a fair value of the Company’s uranium investments of $120,998,000 and mark-to-market gain for the nine months ended September 30, 2026 of $22,346,000 (nine months ended September 30, 2025 – mark to market gain of $16,979,000).
 
Fair value gains/losses on portfolio investments
 
During the three and nine months ended September 30, 2026, the Company recognized a loss of $938,000 and $1,690,000, respectively on portfolio investments carried at fair value (September 30, 2025 – gain of $3,745,000 and $5,846,000). Gains and losses on investments carried at fair value are determined by reference to the closing share price of the related investee at the end of the period, or, as applicable, immediately prior to disposal.
 
 
 24
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Fair value gains/losses on F3 Debentures
 
During the year ended December 31, 2023, the Company completed a $15 million strategic investment in F3 Uranium Corp. (‘F3’) in the form of unsecured convertible debentures, which carry a 9% coupon and are convertible at Denison’s option into common shares of F3 at a conversion price of $0.56 per share. During the third quarter of 2024, F3 completed an arrangement whereby F3 transferred 17 prospective uranium exploration projects to F4 Uranium Corp. (‘F4’). As a result of the spin out, for the conversion price of $0.56, Denison will now receive one share of F3 and 1/10 of a share of F4 on conversion of the debentures. F3 has the right to pay up to one third of the quarterly interest payable by issuing common shares. F3 will also have certain redemption rights on or after the third anniversary of the date of issuance of the Debentures and/or in the event of an F3 change of control. As a result of the debentures’ conversion and redemption features, the contractual cash flow characteristics of these instruments do not solely consist of the payment of principal and interest and therefore the debentures are accounted for as a financial asset at fair value through profit and loss.
 
During the three and nine months ended September 30, 2026, the Company recognized mark-to-market loss of $318,000 and $163,000, respectively (September 30, 2025 – mark-to-market gain of $97,000 and mark-to-market loss of $411,000) on its investments in the debentures. For the three months ended September 30, 2026, the loss was primarily due to a decrease in the F3 share price and an increase in the credit spread between June 30, 2026 and September 30, 2026. For the nine months ended September 30, 2026, the loss was primarily due to a decrease in the F3 share price and an increase in the credit spread between December 31, 2025 and September 30, 2026.
 
Gain on receipt of proceeds from Uranium Industry a.s.
 
In November 2015, the Company sold all of its mining assets and operations located in Mongolia to Uranium Industry a.s (‘UI’) pursuant to an amended and restated share purchase agreement (the ‘GSJV Agreement’). The primary assets at that time were the exploration licences for the Hairhan, Haraat, Gurvan Saihan and Ulzit projects. As consideration for the sale per the GSJV Agreement, the Company received cash consideration of US$1,250,000 prior to closing and the rights to receive additional contingent consideration of up to US$12,000,000.
 
With respect to outstanding contingent consideration payable to Denison in relation to this transaction, in January 2022, the Company executed a Repayment Agreement with UI (the ‘Repayment Agreement’). Under the terms of the Repayment Agreement, UI agreed to make scheduled payments plus additional interest and fees, through a series of quarterly installments and annual milestone payments until December 31, 2025. As at March 31, 2026, US$702,000 remained outstanding under the Repayment Agreement.
 
On April 1, 2026, the Company received the remaining US$702,000 as full and final settlement of all amounts payable under the GSJV Agreement and the Repayment Agreement. During the three and nine months ended September 30, 2026, as a result of the payment received, the Company recorded gains related to the Mongolia sale receivable of $Nil and $971,000, respectively (September 30, 2025 - $413,000 and $1,259,000).
 
Foreign exchange losses/gains
 
During the three and nine months ended September 30, 2026, the Company recognized a foreign exchange loss of $1,321,000 and $7,734,000, respectively (September 30, 2025 – gain of $530,000 and loss of $597,000). The foreign exchange loss is predominantly due to the impact of the changes in the US dollar to Canadian dollar exchange rate during the period on US dollar denominated monetary assets and liabilities.
 
EQUITY SHARE OF LOSS FROM INVESTMENT IN ASSOCIATES
 
During the three and nine months ended September 30, 2026, the Company recorded its equity share of loss from investments in associates (Foremost and Cosa) of $3,183,000 and $4,144,000, respectively (September 30, 2025 – $124,000 and $1,623,000). The Company records its share of income or loss from Foremost and Cosa one quarter in arrears, based on the most current available public financial information, adjusted for any subsequent material transactions that have occurred.
 
EQUITY SHARE OF LOSS FROM JOINT VENTURES
 
During the three and nine months ended September 30, 2026, the Company recorded its equity share of loss from JCU of $293,000 and $1,402,000, respectively (September 30, 2025 – loss of $243,000 and $1,180,000). The Company records its share of income or loss from JCU one month in arrears, based on the most current available financial information, adjusted for any subsequent material transactions that have occurred.
 
 
 25
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
COMMERCIAL ACTIVITIES
 
Denison is actively involved in the uranium market to (a) execute on its strategy to monetize its physical uranium holdings to fund a portion of the construction costs for Phoenix, and (b) establish long-term supply agreements to facilitate the sale of future uranium production from the Company’s uranium mining projects.
 
As at September 30, 2026, the Company held 950,000 pounds U3O8 in investments in physical uranium and 182,004 pounds U3O8 of uranium concentrates inventory from its share of McClean Lake production, for a total uranium holdings of approximately 1.1 million pounds U3O8.
 
The proceeds from the sale of the Company’s physical uranium holdings and inventory are an important part of the Company’s project financing plans for Phoenix. At the end of the third quarter of 2026, 600,000 pounds U3O8 were committed for deliveries occurring between the fourth quarter of 2026 to the second quarter of 2027. Of these committed quantities, the sales price has been fixed for 350,000 pounds U3O8 with future gross proceeds expected to be US$33.3 million (average price of US$95.17 per pound of U3O8). The remaining 250,000 pounds U3O8 of committed near-term sales are subject to market-related pricing to be fixed in reference to the time of delivery.
 
Approximately 500,000 pounds U3O8 in physical holdings and inventories remain uncommitted.
 
Including near-term commitments, the Company has contracted firm uranium sales commitments for over 8 million pounds U3O8 from its uranium holdings and expected future uranium production, and is in advanced negotiations for additional sales commitments of over 5 million pounds U3O8, resulting in total contracted and advanced negotiation sales commitments of over 13 million pounds U3O8. The large majority of contracted sales and those under advanced negotiation are contemplated to occur post-2028 during the expected mine life of Phoenix.
 
Customers include several leading north American nuclear power plant owners/operators responsible for approximately 50 nuclear reactors, as well as multiple reputable industry intermediaries, which have each demonstrated significant interest in securing supply from Denison. Pricing mechanisms include a mix of market-related with no floors and ceilings, market-related with floors and ceilings, and base-escalated pricing. The large majority of commitments are on a market-related basis.
 
LIQUIDITY AND CAPITAL RESOURCES
 
Cash and cash equivalents were $362,749,000 at September 30, 2026 (December 31, 2025 – $465,918,000).
 
The decrease in cash and cash equivalents from December 31, 2025, of $103,169,000 was due to net cash used in operations of $87,516,000 net cash used in investing activities of $24,094,000 and net cash provided by financing activities of $3,864,000, as well as a positive foreign exchange effect on cash and cash equivalents of $4,577,000.
 
Net cash used in operating activities of $87,516,000 was due to the net loss for the period adjusted for non-cash items, including fair value adjustments.
 
Net cash used in investing activities of $24,094,000 was primarily due to an increase in property, plant & equipment relating to milestone payments for long lead items for the Wheeler River project and capitalization of eligible project expenditures, a net increase in restricted cash due to the Company replacing the letters of credit with surety bonds including the reclamation bond required for the Phoenix Project , as well as the Company’s incremental investment in JCU, offset in part by the proceeds received from the sale of uranium investments during the period.
 
Net cash provided from financing activities of $3,864,000 was primarily due to proceeds received from the exercise of employee stock options.
 
Use of Proceeds
 
December 2025 Flow Through Financing
 
As at September 30, 2026, the Company has fulfilled its obligation to spend $15,000,000 on eligible Canadian exploration expenditures related to the 2025 flow through financing.
 
August 2025 Convertible Senior Unsecured Note Financing
 
The Company intends to use the net proceeds from the issuance of the Convertible Notes for expenditures to support the evaluation and development of the Company's uranium development projects, including to fund the construction of Phoenix, and for general corporate purposes.
 
 
 26
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
As at September 30, 2026, the Company’s use of proceeds from this offering was in line with this guidance.
 
Revolving Term Credit Facility
 
In January 2026, the Company entered into an agreement with The Bank of Nova Scotia to amend the terms of the Company’s Fourth Amended and Restated Credit Agreement (the ‘Credit Facility’), to extend the maturity date to January 31, 2027. Under the Credit Facility, the Company has access to letters of credit of up to $28,478,000, which is partially utilized for non-financial letters of credit in support of performance obligations. The tangible net worth covenant remains unchanged by the amendment. The Company has provided $1,264,000 in cash collateral on deposit with BNS to maintain the current letters of credit issued under the Credit Facility.
 
At September 30, 2026, the Company is in compliance with its facility covenants and has access to letters of credit of up to $28,478,000 (December 31, 2025 - $28,478,000). The facility is partially utilized to provide a $4,514,000 non-financial letter of credit issued in support of performance obligations.
 
Issue of Surety Bonds
 
In April 2026, the Company entered into an agreement with a Canadian licenced insurance company to provide Surety Bonds totaling $36,846,000 in support of decommissioning and reclamation obligations for the McClean Lake Operation and Wheeler River Project. The Company pledged $5,526,900 as restricted cash and investments pursuant to its obligations under the agreement. The Surety Bonds are subject to annual surety fees of 3.0%.
 
Following the issue of the Surety Bonds the letters of credit previously provided to the Government of Saskatchewan were returned to, and cancelled by, the Bank of Nova Scotia (‘BNS’) and $6,708,000 restricted cash and investments were released by BNS as cash and cash equivalents.
 
COMPENSATION OF KEY MANAGEMENT PERSONNEL
 
Key management personnel are those persons having authority and responsibility for planning, directing and controlling the activities of the Company, directly or indirectly. Key management personnel include the Company’s executive officers, vice-presidents, and members of its Board of Directors.
 
The following compensation was awarded to key management personnel:
 
 
 
Three Months Ended
September 30
 
Nine Months Ended
September 30
(in thousands)
 
2026
 
2025
 
2026
 
2025
 
 
 
 
 
 
 
 
 
Salaries and short-term employee benefits
$
 (1,079)
$
 (887)
$
 (4,979)
$
 (4,707)
Share-based compensation
 
 (1,428)
 
 (768)
 
 (4,145)
 
 (2,380)
 
$
 (2,507)
$
 (1,655)
$
 (9,124)
$
 (7,087)
 
The increase in key management compensation in the three and nine period is predominantly driven by an increase in the share-based compensation resulting from the accelerated vesting of share-based awards from certain employee departures. In addition, the Company recognizes the accounting value of share-based compensation over the vesting period. The number of share-based awards to be issued under the Company’s long-term incentive plan is calculated based on the fair value of the awards at December 31 of the immediately preceding year, while the accounting value assigned to the awards is based on their fair value at the date of issuance, which is typically in March of the following year. In 2026, an increase in the Company’s share price between December 31, 2025 and the issue date of the awards in March 2026 resulted in a larger increase in the share-based compensation for the three and nine months ended September 30, 2026 relating to this award than typical.
 
SUBSEQUENT EVENTS
 
Sale of Uranium
 
In October 2026, the Company completed a transaction to sell 150,000 pounds of U3O8 at a weighted average price of US$84.94 per pound. The transaction represented a scheduled delivery under a sales agreement entered in 2025.
 
 
 27
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
OFF-BALANCE SHEET ARRANGEMENTS
 
The Company does not have any off-balance sheet arrangements.
 
OUTSTANDING SHARE DATA
 
Common Shares
 
At November 4, 2026, there were 905,445,408 common shares issued and outstanding and a total of 920,333,611 common shares on a fully-diluted basis.
 
Stock Options and Share Units
 
At November 4, 2026, there were 5,095,331 stock options, and 9,792,872 share units outstanding.
 
OUTLOOK FOR 2026
 
Refer to the Company’s annual MD&A for the year ended December 31, 2025 for a detailed discussion of the previously disclosed 2026 budget and outlook.
 
The outlook for mineral sales has decreased by $29,000,000 due to timing of receipt of finished goods inventory from Orano from the McClean North SABRE mine. All uranium sales in 2026 will be fulfilled from the Company’s investments in physical uranium and are therefore excluded from the Company’s outlook, which covers operating cash flows.
 
The outlook for development and Operations expenditures has increased by $768,000 due to costs associated with the expansion of environmental monitoring and related studies for the Company’s legacy mine sites in Elliot Lake.
 
The outlook for exploration expenditures has decreased by $1,181,000 due to reduction in forecasted expenditures to maintain the Company’s remote exploration camps.
 
The outlook for evaluation expenditures has decreased by $1,625,000 predominantly due to a reduction in planned field activities at Gryphon.
 
The outlook for Phoenix program expenditures has decreased by $620,000 due to the timing of payments associated with IBA-type agreements signed in 2026.
 
The outlook for Phoenix construction expenditures has decreased by $26,559,000 primarily due to the slight deferral of certain construction work, as a result of a later than anticipated start date for site clearing activities, a slower than planned ramp up to full-scale construction due to regional flooding and site access restrictions, plus weather-related delays once in full-scale construction. In Q4’2026 expenditures are expected to include $39,908,000 in procurement of equipment and materials, $68,518,000 in construction and construction indirects, and $9,054,000 in engineering, PCM and owners’ costs.
 
 
 28
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
(in thousands)
 
PREVIOUS 2026
OUTLOOK(2)
CURRENT 2026 OUTLOOK(2)
ACTUAL to
September 30, 2026(3)
Mining Segment
 
 
 
 
Mineral Sales
 
29,000
-
-
Development & Operations
 
(20,432)
(21,200)
(12,758)
Exploration
 
(27,816)
(26,635)
(19,065)
Evaluation
 
(12,396)
(10,771)
(8,137)
Phoenix Program Expenditures
 
(17,094)
(16,474)
(11,855)
Phoenix Construction Expenditures
 
(305,181)
(278,622)
(161,143)
JCU Cash Contributions
 
(1,420)
(1,440)
(1,440)
 
 
(355,339)
(355,142)
(214,398)
Corporate and Other Segment
 
 
 
 
Corporate Administration & Other
 
(31,944)
(31,944)
(25,355)
 
 
(31,944)
(31,944)
(25,355)
Total(1)
 
$ (387,283)
$ (387,086)
$ (239,753)
Notes:
1.
Only material operations shown.
2.
As discussed in Wheeler River Uranium Project above, the outlook reflects Denison funding 100% of expenditures for the WRJV.
3.
The outlook is prepared on a cash basis. As a result, actual amounts represent a non-GAAP measure. Compared to segment loss as presented in the Company’s unaudited interim consolidated financial statements for the nine months ended September 30, 2026, actual amounts reported above includes capital additions of $173,516,000, JCU contributions of $1,440,000 and excludes $3,019,000 net impact of non-cash items and other adjustments.
 
ADDITIONAL INFORMATION
 
CONTROLS AND PROCEDURES
 
Management is responsible for the design, implementation and operating effectiveness of internal control over financial reporting. Under the supervision of the Chief Executive Officer and Chief Financial Officer, management evaluated the design of the Company’s internal control over financial reporting as of September 30, 2026. In making the assessment, management used the criteria set forth in Internal Control - Integrated Framework (2013), issued by the Committee of Sponsoring Organizations of the Treadway Commission. Based on a review of internal control procedures at the end of the period covered by this MD&A, management determined internal control over financial reporting was appropriately designed as at September 30, 2026. There have been no changes in our internal controls over financial reporting during the nine months ended September 30, 2026 that have materially affected, or are reasonably likely to materially affect, our internal control over financial reporting.
 
Management is also responsible for the design and effectiveness of disclosure controls and procedures. The Company’s Chief Executive Officer and Chief Financial Officer have each evaluated the design of the Company’s disclosure controls and procedures as at September 30, 2026 and have concluded that these disclosure controls and procedures were appropriately designed as at September 30, 2026.
 
QUALIFIED PERSON
 
The scientific and technical disclosure in this MD&A has been prepared and/or reviewed and confirmed by Ricardo Afonso, P.Eng., Denison’s Vice President Projects, or Chad Sorba, P.Geo., Denison’s Vice President Technical Services & Project Evaluation, each of whom is a ‘Qualified Person’ in accordance with NI 43-101.
 
For more information regarding Denison’s material project, the Wheeler River project, you are encouraged to refer to the ‘Technical Report for the Wheeler River project titled ‘NI 43-101 Technical Report on the Wheeler River Project, Athabasca Basin, Saskatchewan, Canada’ with an effective date of June 23, 2023 and an update to estimated Phoenix initial capital costs disclosed in Denison’s AIF and Form 40-F dated March 30, 2026. The technical report, AIF and Form 40-F are available on the Company’s website and under the Company’s profile on SEDAR+ (www.sedarplus.ca) and EDGAR (www.sec.gov/edgar.shtml). For information regarding Denison’s other project interests, more information is available on the Company’s website.
 
 
 29
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
ASSAY PROCEDURES AND DATA VERIFICATION
 
The Company reports preliminary radiometric equivalent grades (‘eU3O8’), derived from a calibrated down-hole total gamma probe, during or upon completion of its exploration programs and subsequently reports definitive U3O8 assay grades following sampling and chemical analysis of the mineralized drill core. Uranium assays are performed on split core samples by the Saskatchewan Research Council Geoanalytical Laboratories using an ISO/IEC 17025:2005 accredited method for the determination of U3O8 weight %. Sample preparation involves crushing and pulverizing core samples to 90% passing -106 microns. The resultant pulp is digested using aqua-regia and the solution analyzed for U3O8 weight % using ICP-OES. Geochemical results from composite core samples are reported as parts per million (‘ppm’) obtained from a partial HNO3:HCl digest with an ICP-MS finish. Boron values are obtained through NaO2/NaCO3 fusion followed by an ICP-OES finish. All data are subject to verification procedures by qualified persons employed by Denison prior to disclosure. For further details on Denison’s sampling, analysis, quality assurance program and quality control measures and data verification procedures, please see Denison's AIF filed under the Company's profile on SEDAR+ (www.sedarplus.ca) and in its Form 40-F available on EDGAR (www.sec.gov/edgar.shtml).
 
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
 
Certain information contained in this MD&A constitutes ‘forward-looking information’, within the meaning of the applicable United States and Canadian legislation concerning the business, operations, and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as ‘plans’, ‘expects’, ‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’, or the negatives and/or variations of such words and phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’, ‘be achieved’ or ‘has the potential to’.
 
In particular, this MD&A contains forward-looking information pertaining to the following: the results of, and estimates and assumptions within, the Phoenix FS and the Gryphon PFS Update, including the estimates of Denison's mineral reserves and mineral resources, and statements regarding anticipated budgets, fees, expenditures and timelines; the results of, and estimates and assumptions used to prepare, the capital cost update for Phoenix; the scope, results and timing of the review of the Phoenix construction progress, cost and schedule, and the expected timing of first production; Denison’s outlook, plans and objectives for 2026 and beyond; exploration, development and expansion programs, plans and objectives, including projected status of detailed design engineering, long lead procurement, field program optimization studies, and other project planning programs; statements regarding Denison’s EA and EIS approvals, expectations with respect to Denison’s Project licensing and permitting; expectations regarding Denison’s community engagement activities and related agreements with interested parties; expectations regarding uranium mining on the McClean Lake property, including anticipated timing and budgets; expectations regarding evaluation and exploration activities at Midwest; expectations regarding the toll milling of Cigar Lake ores, including projected annual production volumes; Denison’s land position; expectations regarding Denison’s joint venture ownership interests and the continuity of its agreements with its partners; expectations regarding agreements with third parties, including Foremost, Grounded Lithium, Cosa, Skyharbour, and F3; Denison’s expectations with respect the exploration and evaluation of the KLP; Denison’s plans with respect to its commercial activities, including its physical uranium holdings and other uranium sales transactions and the expected benefits thereof; and the annual operating budget and capital expenditure programs, estimated exploration, development and construction expenditures and reclamation costs and Denison's share of same. Statements relating to ‘mineral reserves’ or ‘mineral resources’ are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.
 
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, estimates of construction progress and related percentages are estimates subject to change, and may be impacted by many factors including contractor availability, labour availability, weather, and other events or circumstances.  In addition, the results of the Denison’s studies, including the Phoenix FS, and field work, may not be maintained after further testing or be representative of actual mining plans for the Phoenix deposit after further design and studies are completed. Denison could decide or otherwise be required to discontinue testing, evaluation and development work at Wheeler River or other projects, or its exploration plans if it is unable to maintain or otherwise secure the necessary resources (such as testing facilities, capital funding, regulatory approvals, etc.) or operations are otherwise affected by regulatory restrictions or requirements.
 
Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate, and results may differ materially from those anticipated in this forward-looking information. For a discussion of risks and other factors that could influence forward-looking events, please refer to the factors discussed under the heading ‘Risk Factors’ in Denison’s AIF and Form-F as may be updated or supplemented in this MD&A. These factors are not, and should not be construed as being, exhaustive.
 
Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this MD&A is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this MD&A. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this MD&A to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.
 
 30
 
 
MANAGEMENT’S DISCUSSION & ANALYSIS
 
Cautionary Note to United States Investors Concerning Estimates of Measured, Indicated and Inferred Mineral Resources and Proven and Probable Mineral Reserves: As a foreign private issuer reporting under the multijurisdictional disclosure system adopted by the United States, the Company has prepared this MD&A in accordance with Canadian securities laws and standards for reporting of mineral resource estimates, which differ in some respects from United States standards. In particular, and without limiting the generality of the foregoing, the terms “measured mineral resources,” “indicated mineral resources,” “inferred mineral resources,” and “mineral resources” used or referenced in this MD&A are Canadian mineral disclosure terms as defined in accordance with National Instrument 43-101 — Standards of Disclosure for Mineral Projects (‘NI 43-101’) under the guidelines set out in the Canadian Institute of Mining, Metallurgy and Petroleum Standards for Mineral Resources and Mineral Reserves, Definitions and Guidelines, May 2014 (the ‘CIM Standards’). These standards differ significantly from the mineral property disclosure requirements of the U.S. Securities and Exchange Commission (the ‘SEC’) in Regulation S-K Subpart 1300 (the ‘SEC Modernization Rules’) under the U.S. Securities Exchange Act of 1934, as amended (the “U.S. Exchange Act”). Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the mineral reserve or mineral resource estimates under the standards adopted under the SEC Modernization Rules. For the above reasons, information contained in the AIF and other documents incorporated by reference herein containing descriptions of mineral deposits may not be comparable to similar information made public by U.S. companies subject to the SEC Modernization Rules. Additionally, investors are cautioned that “inferred mineral resources” have a great amount of uncertainty as to their existence, and great uncertainty as to their economic feasibility. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies, except in limited circumstances. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. The term “resource” does not equate to the term “reserves”. Investors should not assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. Investors are also cautioned not to assume that all or any part of an inferred mineral resource exists or is economically mineable.
 
 
 
 
 
 31
  Exhibit 99.3
 
FORM 52-109F2
CERTIFICATION OF INTERIM FILINGS
 
I, David Cates, President and Chief Executive Officer of Denison Mines Corp., certify the following:
 
1.
Review: I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Denison Mines Corp. (the "issuer") for the interim period ended September 30, 2026.
 
2.
No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
 
3.
Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
 
4.
Responsibility: The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.
 
5.
Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings
 
(a)
designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
 
(i)
material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
 
(ii)
information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
 
(b)
designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.
 
5.1
Control framework: The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is Internal Control – Integrated Framework (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).
 
5.2
ICFR: Not applicable.
 
5.3
Limitation on scope of design: Not applicable.
 
6.
Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.
 
Date:  November 4, 2026
 
(signed) "David Cates"  
Name:          
David Cates
Title:            
President and Chief Executive Officer
 

 
 
 
 
 Exhibit 99.4
 
FORM 52-109F2
CERTIFICATION OF INTERIM FILINGS
 
I, Elizabeth Sidle, Vice President Finance and Chief Financial Officer of Denison Mines Corp., certify the following:
 
1.
Review: I have reviewed the interim financial report and interim MD&A (together, the "interim filings") of Denison Mines Corp. (the "issuer") for the interim period ended September 30, 2026.
 
2.
No misrepresentations: Based on my knowledge, having exercised reasonable diligence, the interim filings do not contain any untrue statement of a material fact or omit to state a material fact required to be stated or that is necessary to make a statement not misleading in light of the circumstances under which it was made, with respect to the period covered by the interim filings.
 
3.
Fair presentation: Based on my knowledge, having exercised reasonable diligence, the interim financial report together with the other financial information included in the interim filings fairly present in all material respects the financial condition, financial performance and cash flows of the issuer, as of the date of and for the periods presented in the interim filings.
 
4.
Responsibility: The issuer's other certifying officer(s) and I are responsible for establishing and maintaining disclosure controls and procedures (DC&P) and internal control over financial reporting (ICFR), as those terms are defined in National Instrument 52-109 Certification of Disclosure in Issuers' Annual and Interim Filings, for the issuer.
 
5.
Design: Subject to the limitations, if any, described in paragraphs 5.2 and 5.3, the issuer's other certifying officer(s) and I have, as at the end of the period covered by the interim filings
 
(a)
designed DC&P, or caused it to be designed under our supervision, to provide reasonable assurance that
 
(i)
material information relating to the issuer is made known to us by others, particularly during the period in which the interim filings are being prepared; and
 
(ii)
information required to be disclosed by the issuer in its annual filings, interim filings or other reports filed or submitted by it under securities legislation is recorded, processed, summarized and reported within the time periods specified in securities legislation; and
 
(b)
designed ICFR, or caused it to be designed under our supervision, to provide reasonable assurance regarding the reliability of financial reporting and the preparation of financial statements for external purposes in accordance with the issuer's GAAP.
 
5.1
Control framework: The control framework the issuer's other certifying officer(s) and I used to design the issuer's ICFR is Internal Control – Integrated Framework (COSO Framework) published by The Committee of Sponsoring Organizations of the Treadway Commission (COSO).
 
5.2
ICFR: Not applicable.
 
5.3
Limitation on scope of design: Not applicable.
 
6.
Reporting changes in ICFR: The issuer has disclosed in its interim MD&A any change in the issuer's ICFR that occurred during the period beginning on July 1, 2026 and ended on September 30, 2026 that has materially affected, or is reasonably likely to materially affect, the issuer's ICFR.
 
Date: November 4, 2026
 
(signed) "Elizabeth Sidle"
Name:         
Elizabeth Sidle
Title:            
Vice President Finance and Chief Financial Officer
 

 
 
 
 
 
Exhibit 99.5 


 
Denison Mines Corp.
1100 – 40 University Ave
Toronto, ON M5J 1T1
www.denisonmines.com

PRESS RELEASE 
 
 
Denison Reports Financial and Operational Results for Q3 2026,
Highlighted by 24% Total Completion after First Quarter of Full-Scale Construction at Phoenix ISR Uranium Mine
 
Toronto, ON – November 4, 2026. Denison Mines Corp. (“Denison” or the “Company”) (TSX: DML, NYSE American: DNN) today filed its Condensed Consolidated Financial Statements and Management’s Discussion & Analysis (“MD&A”) for the three and nine months ended September 30, 2026. Both documents will be available on the Company’s website (at www.denisonmines.com), SEDAR+ (at www.sedarplus.ca) and EDGAR (at www.sec.gov/edgar). The highlights provided below are derived from these documents and should be read in conjunction with them. All amounts in this release are in Canadian dollars unless otherwise stated.
David Cates, President and CEO of Denison commented, “With a relatively short timeline for construction of the Phoenix In-Situ Recovery (“ISR”) uranium mine, executing during the prime summer construction season is critical. We are very pleased with our ability to immediately mobilize to site after regulatory approvals and ramp up activity to achieve a full-scale rate of construction for the third quarter. Denison’s results showcase significant construction progress at Phoenix and the potential to add meaningful shareholder value from the discovery of new mineralization on site.
 
During the quarter, we prioritized schedule-critical and seasonally sensitive activities to capitalize on the summer construction season, and we ended our first quarter of full-scale construction with the project’s total percentage completion estimated at 24%. Based on this initial progress, we continue to target completion of construction and achievement of first production during the second half of 2028, which is approximately 2 years after the commencement of full-scale construction.
 
By the end of October 2026, nearly 50% of all site civil work was complete, including the establishment of the main access road from Highway 914, and all scopes required to advance construction of the process plant, the delivery and installation of key electrical assets, the commencement of freeze well drilling, and preparation of the airstrip for operations in Q4. In addition, the schedule-critical concrete work required to start construction of the process plant building during the winter is substantially complete. Offsite fabrication of modularized equipment is also progressing, with key electrical infrastructure, the freeze plant, and certain process tanks, amongst other equipment and materials, already received on site or released for shipment to site.
 
We are also pleased to report encouraging exploration results at the emerging Phoenix North target area, which is located within the surface footprint of the Phoenix ISR mine site. Drill hole WR-857D1 intersected 0.39% eU3O8 over 4.7 metres, and approximately 50 metres to the northeast drill hole WR-868 intersected 0.67% eU3O8 over 2.5 metres. Drilling in this area continues into the fourth quarter, as the discovery of additional resources in the immediate vicinity of Phoenix could add significant value to the project.”
 
Highlights
 
■
Phoenix achieves 24% total completion after first quarter of full-scale construction
 
Building on the successful completion of site preparation and early works construction in early July, Denison made significant progress executing on key construction work scopes during its first quarter of full-scale construction on site. The project’s total percentage completion as at September 30, 2026 is estimated at approximately 24%, which includes (i) engineering, PCM, and owner’s costs at 32% completion, (ii) construction and construction indirect costs at 20% complete, and (iii) fabrication and delivery of equipment and materials at 32% complete.
 
With full-scale construction commencing during the critical summer construction season, initial construction activities have focused on schedule and seasonally sensitive work. Civil work continued with the main site access road from Highway 914 currently available for use, the substation area substantially completed and the freeze plant area and airstrip significantly advanced (with 100% of the final grade completed for the runway area). In addition, concrete work commenced in August and continues into the fourth quarter of 2026. By the end of October 2026, site civil work is estimated to be nearly 50% complete and the concrete work required to enable the commencement of construction of the process plant building over the winter has been substantially completed.
 
 
 
 
■
Phoenix construction and procurement strategy allows continued productivity during winter months
 
With an approximately 2-year construction timeline targeted for Phoenix, Denison developed a procurement and execution strategy whereby key project components have been procured directly by Denison, rather than through its contractors, and modularization has been utilized wherever possible. As a result, Denison is responsible for making progress payments as equipment is fabricated and the total project spend curve is thus front-loaded relative to the rate of construction progress on site. This approach decouples fabrication of key equipment from onsite construction by utilizing offsite fabrication facilities which allows for continued productivity during the winter season. Fabrication has commenced on the majority of the process plant equipment and shipment release has occurred for the site transformer, substation e-house, high-voltage substation yard equipment, switchgear, generators, freeze plants, and certain process tanks and construction bulks.
 
Year to date total Phoenix project expenditures totaled $161.1 million, including $105.0 million on construction and construction indirect costs and $39.0 million on procurement of equipment and materials. Life to date expenditures on procurement of equipment and materials is approximately $56.8 million.
 
Forecasted expenditures for 2026 are now estimated to be $278.6 million, with $39.9 million in procurement payments, $68.5 million in construction and construction indirect costs, and $9.1 million in engineering, PCM, and owner’s costs estimated for the fourth quarter of 2026.
 
■
Additional mineralization discovered at Phoenix North exploration target area, located within surface footprint of the Phoenix ISR mine site
 
During the third quarter of 2026, drill hole WR-857D1 intersected 0.39% eU3O8 over 4.7 metres from 409.9 metres to 414.6 metres at the unconformity and represents the best mineralized hole drilled in this area of sparse historic drilling. WR-857D1 is located approximately 10 metres up-dip and along section of WR-857, which was completed during the second quarter and intersected mineralized intervals of 0.20% eU3O8 over 1 metre from 417.6 metres, and 0.07% eU3O8 over 0.5 metres from 415.8 metres. In October 2026, drill hole WR-868 encountered unconformity associated mineralization (0.67% eU3O8 over 2.5 metres from 413.1 metres to 415.6 metres) approximately 50 metres along strike to the northeast of WR-857, and drill hole WR-869A intersected additional mineralization (highlighted by 0.07% eU3O8 over 2.2 metres from 421.5 metres to 423.7 metres) 50 metres along strike to the southwest of WR-857. See the MD&A for further details. Taken together, mineralization has now been intersected over 100-metres of strike length at the Phoenix North target area, which remains open in multiple directions with the anticipated optimal target horizon yet to be tested.
 
While in the early stages of exploration discovery, the results at Phoenix North are especially encouraging as the mineralization is situated in the immediate vicinity of the Phoenix ISR mine currently under construction.
 
 
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
About Denison
 
Denison Mines Corp. was formed under the laws of Ontario and is a reporting issuer in all Canadian provinces and territories. Denison’s common shares are listed on the Toronto Stock Exchange (the “TSX”) under the symbol ‘DML’ and on the NYSE American exchange under the symbol ‘DNN’.
 
Denison is a uranium mining, exploration and development company with interests focused in the Athabasca Basin region of northern Saskatchewan, Canada. The Company has an effective 95% interest in its flagship Wheeler River Uranium Project, which is the largest undeveloped uranium project in the infrastructure rich eastern portion of the Athabasca Basin region of northern Saskatchewan. In mid-2023, the Phoenix FS was completed for the Phoenix ISR mining operation, and an update to the 2018 Pre-Feasibility Study (“2018 PFS”) was completed for the Gryphon deposit as a conventional underground mining operation (the “Gryphon Update”). Based on the respective studies, both deposits have the potential to be competitive with the lowest-cost uranium mining operations in the world.
 
Full-scale construction commenced at Phoenix in July 2026, which followed receipt of Federal approval of the project’s Environmental Assessment and issuance of the Construction Licence in February 2026, as well as completion of site preparation and early works programs initiated in March 2026. Construction is expected to take approximately 2 years with first production targeted for the second half of 2028.
 
Denison’s interests in Saskatchewan also include a 22.5% ownership interest in the MLJV, which restarted mining with SABRE in 2025) and the McClean Lake uranium mill (currently utilizing a portion of its licensed capacity to process the ore from the Cigar Lake mine under a toll milling agreement), plus a 25.17% interest in the Midwest Main and Midwest A deposits held by the Midwest Joint Venture (“MWJV”), and a 70.55% interest in the Tthe Heldeth Túé (“THT”) and Huskie deposits on the Waterbury Lake Property (“Waterbury”). The Midwest Main, Midwest A, THT and Huskie deposits are located within 20 kilometres of the McClean Lake mill. Taken together, the Company has direct ownership interests in properties covering ~459,000 hectares in the Athabasca Basin region.
 
Additionally, through its 50% ownership of JCU (Canada) Exploration Company, Limited (“JCU”), Denison holds further interests in various uranium project joint ventures in Canada, including the Millennium project (JCU, 30.099%), the Kiggavik project (JCU, 33.8118%) and Christie Lake (JCU, 34.4508%).
 
In 2024, Denison celebrated its 70th year in uranium mining, exploration, and development, which began in 1954 with Denison’s first acquisition of mining claims in the Elliot Lake region of northern Ontario.
 
Technical Disclosure and Qualified Person
 
The scientific and technical information contained in this press release has been reviewed and approved by Ricardo Afonso, P.Eng., Denison’s Vice President Projects, or Chad Sorba, P.Geo., Denison’s Vice President Technical Services & Project Evaluation, each of whom is a Qualified Person in accordance with NI 43-101.
 
For more information, please contact
 
David Cates                                                             (416) 979-1991 ext. 362
President and Chief Executive Officer
 
Geoff Smith                                                              (416) 979-1991 ext. 358
Vice President Corporate Development & Commercial
 
Follow Denison on Twitter @DenisonMinesCo
  
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS
 
Certain information contained in this press release constitutes ‘forward-looking information’, within the meaning of the applicable United States and Canadian legislation concerning the business, operations, and financial performance and condition of Denison. Generally, these forward-looking statements can be identified by the use of forward-looking terminology such as ‘plans’, ‘expects’, ‘budget’, ‘scheduled’, ‘estimates’, ‘forecasts’, ‘intends’, ‘anticipates’, or ‘believes’, or the negatives and/or variations of such words and phrases, or state that certain actions, events or results ‘may’, ‘could’, ‘would’, ‘might’ or ‘will be taken’, ‘occur’, ‘be achieved’ or ‘has the potential to’.
 
In particular, this press release contains forward-looking information pertaining to the following: Denison’s estimated completion status, and other outlook, plans and objectives with respect to Phoenix construction; assumptions and estimates with respect to the Company’s other exploration, development and expansion programs, plans and objectives; Denison’s land position; and expectations regarding Denison’s joint venture ownership interests and the continuity of its agreements with its partners. Statements relating to ‘mineral reserves’ or ‘mineral resources’ are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral reserves and mineral resources described can be profitably produced in the future.
 
 
 
 
Forward looking statements are based on the opinions and estimates of management as of the date such statements are made, and they are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Denison to be materially different from those expressed or implied by such forward-looking statements. For example, estimates of construction progress and related percentages are estimates subject to change, and may be impacted by many factors including contractor availability, labour availability, weather, and other events or circumstances. In addition, the results of the Denison’s studies, including the Phoenix FS, and field work, may not be maintained after further testing or be representative of actual mining plans for the Phoenix deposit after further design and studies are completed. Denison could decide or otherwise be required to discontinue testing, evaluation and development work at Wheeler River or other projects, or its exploration plans if it is unable to maintain or otherwise secure the necessary resources (such as testing facilities, capital funding, regulatory approvals, etc.) or operations are otherwise affected by regulatory restrictions or requirements.
 
Denison believes that the expectations reflected in this forward-looking information are reasonable, but no assurance can be given that these expectations will prove to be accurate, and results may differ materially from those anticipated in this forward-looking information. For a discussion in respect of risks and other factors that could influence forward-looking events, please refer to the factors discussed under the heading ‘Risk Factors’ in this MD&A. These factors are not, and should not be construed as being, exhaustive. Accordingly, readers should not place undue reliance on forward-looking statements. The forward-looking information contained in this press release is expressly qualified by this cautionary statement. Any forward-looking information and the assumptions made with respect thereto speaks only as of the date of this press release. Denison does not undertake any obligation to publicly update or revise any forward-looking information after the date of this press release to conform such information to actual results or to changes in Denison's expectations except as otherwise required by applicable legislation.
 
 
 
 


Filing Exhibits & Attachments

5 documents

Keep reading