Washington, D.C. 20549
Indicate by check mark whether the registrant files or will file annual
reports under cover of Form 20-F or Form 40-F.
Pursuant to the requirements of the Securities Exchange Act of 1934,
the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Exhibit 99.1

NEWS RELEASE
Fortuna intersects 1.9 g/t gold over 64 meters,
confirming broad gold mineralization at Kabewest, Bambadji Project, Senegal
Vancouver, British Columbia, November 2,
2026: Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to report encouraging first drilling results from the Kabewest prospect
at its recently acquired Bambadji Project in Senegal. Kabewest is the most advanced drill-defined prospect at Bambadji and is located
approximately 2.3 kilometers from the proposed Diamba Sud Gold Project plant site.
Paul Weedon, Senior Vice President of Exploration,
commented, “The first holes at Kabewest have returned broad mineralized intervals, including 1.9 g/t Au over an estimated true width
of 64 meters from 19 meters in drill hole FBRC0008. These results provide strong support for our geological interpretation and show clear
similarities to the breccia-hosted mineralization at Diamba Sud,” Mr. Weedon continued, “With approximately 70 percent of
assays received, the results to date continue to build confidence in the interpreted controls on mineralization and in Bambadji’s
potential to expand Diamba Sud.” Mr. Weedon concluded, “We look forward to receiving the remaining assays in the coming weeks
and incorporating the complete dataset into our work toward an initial Inferred Mineral Resource estimate, planned for publication in
the first quarter of 2027.”
Kabewest Drilling Highlights
FBDD0001: 1.2 g/t Au over an estimated true
width of 23 meters from 75 meters
FBDD0006: 1.8 g/t
Au over an estimated true width of 29.5 meters from 393 meters
FBDD0008: 3.2 g/t
Au over an estimated true width of 24 meters from surface, including
11.3 g/t Au over an estimated true width of 1.5 meters from 8 meters and 12.2 g/t Au over an estimated true width of 0.7 meters
from 30 meters
FBDD0009: 1.4 g/t
Au over an estimated true width of 22 meters from 65.5 meters, and 1.3 g/t Au over an estimated
true width of 23 meters from 107 meters
FBRC0003: 3.1 g/t Au over an estimated true
width of 24.2 meters from 4 meters, including
15.1 g/t Au over an estimated true width of 0.7 meters from 25 meters
FBRC0005: 1.4 g/t Au over an estimated true
width of 29.6 meters from surface
FBRC0008: 1.9 g/t Au over an estimated true
width of 64 meters from 19 meters, including
16.3 g/t Au over an estimated true width of 1.5 meters from 24 meters
The Bambadji Project is located immediately adjacent
to the Diamba Sud Gold Project. The initial Kabewest drilling program, comprising 45 reverse circulation (“RC”) and diamond
drill (“DD”) holes totalling 10,524 meters, has been completed. This work forms the first phase of a broader $8 million, 51,000-meter
drilling program planned across the Bambadji Project through the end of 2026. The program is focused on at least eight priority prospects
(refer to Figure 1 and Fortuna news release dated August 10, 2026, “Fortuna acquires highly prospective Bambadji Project
in Senegal from Barrick and IAMGOLD”).
Figure 1: Bambadji Project: Location of
priority exploration prospects and proximity to the Diamba Sud Gold Project proposed plant site


Broad mineralized intervals from the initial Kabewest
drilling include 1.9 g/t Au over an estimated true width of 64 meters from 19 meters in drill hole FBRC0008 (refer to Figure 2),
1.4 g/t Au over an estimated true width of 29.6 meters in drill hole FBRC0005 (refer to Figure 3) and 3.1 g/t Au over an estimated
true width of 24.2 meters from 4 meters in drill hole FBRC0003 (refer to Figure 4). These results strengthen the current geological
interpretation and demonstrate geological continuity with the breccia-hosted mineralization at the nearby Diamba Sud deposits. Mineralization
has been intersected over more than 600 meters of strike and remains open along strike and at depth, providing clear opportunities for
systematic follow-up drilling.
Approximately 70 percent of assays have been received,
with the balance expected in the coming weeks. Geological model updates are progressing and will incorporate the complete assay dataset
to support preparation of an initial Inferred Mineral Resource estimate for Kabewest. Subject to
completion and review of the remaining technical work, the Company expects to include the estimate in
its annual Mineral Reserve and Mineral Resource update planned for publication in the first quarter
of 2027.
Figure 2: Bambadji
Project: Kabewest prospect, cross-section 350NE
Figure 3: Bambadji
Project: Kabewest prospect, cross section 250NE

Figure 4: Bambadji Project: Kabewest prospect,
cross section 50NE
As observed at Diamba Sud, mineralization at Kabewest
is generally associated with hydrothermal breccia units, hematite-silica-altered limestone, and extensive pyrite development. These features
reinforce the interpreted structural controls on gold-bearing fluids within the Falémé domain, which hosts both projects.
The comparable geological features identified across the adjacent Diamba Sud and Bambadji Project support continued systematic exploration
along the Senegal-Mali Shear Zone.
Following completion of the initial phase of Kabewest
drilling, the six drill rigs have been relocated to the Wari and Latifa prospects (refer to Figure 1), where three drill rigs at
each prospect are testing areas defined by historical, widely spaced reconnaissance drilling. Work is also progressing to refine targets
for the 2027 field season using geochemical and geophysical data across more than 60 kilometers of strike within the Bambadji Project,
where three mineralized trends have been identified. Historical drilling along these trends is generally shallow and widely spaced, leaving
several multi-kilometer gaps that provide priority areas for evaluation as part of Fortuna’s 2026 and 2027 exploration programs.

Quality Assurance & Quality Control (QA
- QC)
All drilling data completed by the Company utilized
the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.
All reverse circulation (RC) drilling used a 5.25-inch
face sampling pneumatic hammer with samples collected into 60-liter plastic bags. Samples were kept dry by maintaining enough air pressure
to exclude groundwater inflow. If water ingress exceeded the air pressure, RC drilling was stopped, and drilling converted to diamond
core tails. Once collected, RC samples were riffle split through a three-tier splitter to yield a 12.5 percent representative sample for
submission to the analytical laboratory. The residual 87.5 percent samples were stored at the drill site until assay results were received
and validated. Coarse reject samples for all mineralized samples corresponding to significant intervals are retained and stored on-site
at the Company-controlled core yard.
All diamond drilling (DD) drill holes started
with HQ sized diameter, before reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for
sampling using standard lengths of one meter or to a geological boundary. Samples were then cut into equal halves using a diamond saw.
One half of the core was left in the original core box and stored in a secure location at the Company core yard at the project site. The
other half was sampled, catalogued, and placed into sealed bags and securely stored at the site until shipment.
All RC and DD samples were transported by Company
vehicle or commercial courier to ALS Global’s preparation laboratories in Kedougou, Senegal with prepared sample pulps then transported
via commercial courier to ALS Global’s analytical facility in Ouagadougou, Burkina Faso. Routine gold analysis using a 50-gram charge
and fire assay with an atomic absorption finish was completed for all samples. Samples returning assays >10 ppm Au were reanalyzed
using a 50-gram charge and fire assay with a gravimetric finish. Quality control procedures included the systematic insertion of blanks,
duplicates and sample standards into the sample stream. In addition, the ALS Global laboratory inserted its own quality control samples.
Qualified Person
Paul Weedon, Senior Vice President, Exploration
for Fortuna Mining Corp., is a Qualified Person as defined by National Instrument 43-101 and is a member of the Australian Institute of
Geoscientists (Membership No. 6001). Mr. Weedon has reviewed and approved the scientific and technical information contained in this news
release. He has verified the disclosed data, including the sampling, analytical and test data underlying the information and opinions
herein, through review of the geochemical and geological databases and diamond drill core. There were no limitations on the verification
process.
About Fortuna Mining Corp.
Fortuna Mining
Corp. is a Canadian precious metals mining company with three operating mines in Argentina, Côte d’Ivoire, and Peru, and the
feasibility-stage Diamba Sud Gold Project in Senegal. Our exploration portfolio spans our operating jurisdictions as well as Guinea and
Guyana. Sustainability is at the core of our operations and stakeholder relationships. We produce gold and silver while creating long-term
shared value through efficient production, environmental stewardship, and social responsibility. For more information, please visit our
website at www.fortunamining.com

ON BEHALF OF THE BOARD
Jorge A. Ganoza
CEO, and Director
Fortuna Mining Corp.
Investor Relations:
Carlos Baca | info@fmcmail.com
| fortunamining.com | X | LinkedIn
| YouTube | Instagram | TikTok
Forward looking Statements
This news release contains forward-looking
statements that constitute “forward-looking information” within the meaning of applicable Canadian securities legislation
and “forward-looking statements” within the meaning of the safe harbor provisions of the United States Private Securities
Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). Forward-looking Statements in this release include,
without limitation, expectations regarding the timing and receipt of outstanding assay results; completion and interpretation of geological
models; preparation, timing and potential inclusion of an initial Inferred Mineral Resource estimate for Kabewest in the Company’s
annual Mineral Reserve and Mineral Resource update; the scope, timing and targets of the 2026–2027 exploration program at Bambadji;
statements regarding Bambadji’s potential to expand Diamba Sud; statements regarding the proposed Diamba Sud plant site; the potential
for mineralization to continue along strike or at depth. Forward-looking Statements are based on management’s current expectations
and assumptions and are subject to known and unknown risks, uncertainties and other factors that may cause actual results to differ materially.
Words such as “expect,” “plan,” “target,” “intend,” “estimate,” “potential,”
“may,” “will,” “could,” “should” and similar expressions identify Forward-looking Statements,
although not all Forward-looking Statements contain these identifying words.
Forward-looking Statements involve known and
unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially
different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and
factors include, among others, operational risks associated with mining and mineral processing; uncertainty relating to Mineral Resource
and Mineral Reserve estimates; uncertainty relating to capital and operating costs, production schedules and economic returns; risks relating
to the Company’s ability to replace its Mineral Reserves; risks related to the conversion of Mineral Resources to Mineral Reserves;
risks associated with mineral exploration and project development; uncertainty relating to the repatriation of funds as a result of currency
controls; environmental matters including obtaining or renewing environmental permits and potential liability claims; uncertainty relating
to nature and climate conditions; laws and regulations regarding the protection of the environment (including greenhouse gas emission
reduction and other decarbonization requirements and the uncertainty surrounding the interpretation of omnibus Bill C-59 and the related
amendments to the Competition Act (Canada); risks associated with political instability and changes to the regulations governing the Company’s
business operations; changes in national and local government legislation, taxation, controls, regulations and political or economic developments
in countries in which the Company does or may carry on business; risks associated with war, hostilities or other conflicts, such as the
Ukrainian – Russian, and Israeli – Hamas conflicts, and the impacts they may have on global economic activity; risks relating
to the termination of the Company’s mining concessions in certain circumstances; developing and maintaining relationships with local
communities and stakeholders; risks associated with losing control of public perception as a result of social media and other web-based
applications; potential opposition to the Company’s exploration, development and operational activities; risks related to the Company’s
ability to obtain adequate financing for planned exploration and development activities; property title matters; risks related to the
ability to retain or extend title to the Company’s mineral properties; risks relating to the integration of businesses and assets
acquired by the Company; impairments; risks associated with climate change legislation; reliance on key personnel; adequacy of insurance
coverage; operational safety and security risks; legal proceedings and potential legal proceedings; uncertainties relating to general
economic conditions; risks relating to a global pandemic, which could impact the Company’s business, operations, financial condition
and share price; competition; fluctuations in metal prices; risks associated with entering into commodity forward and option contracts
for base metals production; fluctuations in currency exchange rates and interest rates; tax audits and reassessments; risks related to
hedging; uncertainty relating to concentrate treatment charges and transportation costs; sufficiency of monies allotted by the Company
for land reclamation; risks associated with dependence upon information technology systems, which are subject to disruption, damage, failure
and risks with implementation and integration; labor relations issues; as well as those factors discussed under “Risk Factors”
in the Company's Annual Information Form for the fiscal year ended December 31, 2025. Although the Company has attempted to identify important
factors that could cause actual actions, events, or results to differ materially from those described in Forward-looking Statements, there
may be other factors that cause actions, events or results to differ from those anticipated, estimated or intended.
Forward-looking Statements contained herein
are based on the assumptions, beliefs, expectations and opinions of management, including, but not limited to, the accuracy of the Company’s
current Mineral Resource and Mineral Reserve estimates; that the Company’s activities will be conducted in accordance with the Company’s
public statements and stated goals; that there will be no material adverse change affecting the Company, its properties or its production
estimates (which assume accuracy of projected ore grade, mining rates, recovery timing, and recovery rate estimates and may be impacted
by unscheduled maintenance, labor and contractor availability and other operating or technical difficulties); the duration and effect
of global and local inflation; the duration and impacts of geo-political uncertainties on the Company’s production, workforce, business,
operations and financial condition; the expected trends in mineral prices, inflation and currency exchange rates; that all required approvals
and permits will be obtained for the Company’s business and operations on acceptable terms; that there will be no significant disruptions
affecting the Company's operations and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof
and the Company disclaims any obligation to update any Forward-looking Statements, whether as a result of new information, future events,
or results or otherwise, except as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate,
as actual results and future events could differ materially from those anticipated in such statements. Accordingly, investors should not
place undue reliance on Forward-looking Statements.
Cautionary Note to United States Investors
Concerning Mineral Resources and Reserves
Technical disclosure regarding the Company’s
properties included in this news release has been prepared in accordance with National Instrument 43-101, Standards of Disclosure for
Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy, and Petroleum Definition Standards on Mineral
Resources and Mineral Reserves. Canadian standards, including NI 43-101, differ from the requirements of the Securities and Exchange Commission,
and information included herein may not be comparable to similar information disclosed by U.S. companies.

Appendix 1: Bambadji Project drill program
details of the drill holes and assay results
| HoleID |
Easting
(WGS84_29N) |
Northing (WGS84_29N) |
Elevation
(m) |
EOH Depth1 |
UTM
Azimuth |
Dip |
Depth
From (m) |
Depth To (m) |
Drilled Width (m) |
ETW4 (m) |
Au (ppm) |
Hole Type5 |
Area |
| FBDD0001 |
235001 |
1430989 |
155 |
236 |
135 |
-60 |
75 |
111 |
36 |
23.0 |
1.2 |
DD |
KBW |
| |
|
|
|
|
|
|
177 |
191 |
14 |
12.0 |
0.9 |
DD |
KBW |
| FBDD0002 |
234985 |
1431076 |
155 |
227 |
135 |
-50 |
174 |
192 |
18 |
13.0 |
0.9 |
DD |
KBW |
| FBDD0003 |
235030 |
1431102 |
158 |
236 |
135 |
-50 |
113 |
128 |
15 |
10.0 |
0.9 |
DD |
KBW |
| FBDD0004 |
234952 |
1430897 |
153 |
194 |
135 |
-50 |
67 |
76 |
9 |
7.0 |
0.6 |
DD |
KBW |
| |
|
|
|
|
|
|
86 |
93 |
7 |
5.5 |
1.0 |
DD |
KBW |
| |
|
|
|
|
|
|
108 |
114 |
6 |
4.3 |
1.5 |
DD |
KBW |
| |
|
|
|
|
|
|
128 |
137 |
9 |
6.5 |
1.2 |
DD |
KBW |
| FBDD0005 |
234866 |
1430911 |
151 |
353 |
135 |
-50 |
18 |
39 |
21 |
16.0 |
1.4 |
DD |
KBW |
| |
|
|
|
|
|
Including |
30 |
32 |
2 |
1,5 |
LOSS |
DD |
KBW |
| |
|
|
|
|
|
|
45 |
54 |
9 |
6.0 |
1.5 |
DD |
KBW |
| |
|
|
|
|
|
Including |
45 |
46 |
1 |
0.7 |
10.4 |
DD |
KBW |
| |
|
|
|
|
|
|
140 |
166 |
26 |
18.0 |
0.9 |
DD |
KBW |
| |
|
|
|
|
|
|
179 |
198 |
19 |
14.2 |
1.4 |
DD |
KBW |
| |
|
|
|
|
|
|
212 |
238 |
26 |
18.3 |
0.7 |
DD |
KBW |
| |
|
|
|
|
|
|
247 |
266 |
19 |
13.2 |
0.7 |
DD |
KBW |
| FBDD0006 |
234779 |
1431000 |
150 |
534 |
135 |
-50 |
235 |
239 |
4 |
3.0 |
1.5 |
DD |
KBW |
| |
|
|
|
|
|
|
276 |
286 |
10 |
7.3 |
1.1 |
DD |
KBW |
| |
|
|
|
|
|
|
303 |
319 |
16 |
13.0 |
0.9 |
DD |
KBW |
| |
|
|
|
|
|
|
349 |
361 |
12 |
9.0 |
0.6 |
DD |
KBW |
| |
|
|
|
|
|
|
393 |
430 |
37 |
29.5 |
1.8 |
DD |
KBW |
| |
|
|
|
|
|
|
458 |
469 |
11 |
9.0 |
0.7 |
DD |
KBW |
| FBDD0007 |
234884 |
1430965 |
152 |
320 |
135 |
-50 |
70 |
101 |
31 |
23.0 |
1.0 |
DD |
KBW |
| |
|
|
|
|
|
|
215 |
224 |
9 |
6.0 |
1.4 |
DD |
KBW |
| |
|
|
|
|
|
|
230 |
269 |
39 |
21.0 |
1.0 |
DD |
KBW |
| FBDD0008 |
234949 |
1430758 |
150 |
282 |
135 |
-50 |
0 |
40 |
40 |
24.0 |
3.2 |
DD |
KBW |
| |
|
|
|
|
|
Including |
8 |
10 |
2 |
1.5 |
11.3 |
DD |
KBW |
| |
|
|
|
|
|
And |
30 |
31 |
1 |
0.7 |
12.2 |
DD |
KBW |
| |
|
|
|
|
|
|
48 |
85 |
37 |
23.0 |
1.0 |
DD |
KBW |
| |
|
|
|
|
|
|
93 |
101 |
8 |
6.0 |
0.6 |
DD |
KBW |
| FBDD0009 |
234775 |
1430861 |
150 |
507 |
135 |
-50 |
14 |
24 |
10 |
7.3 |
1.0 |
DD |
KBW |
| |
|
|
|
|
|
|
65.5 |
100 |
34.5 |
22.0 |
1.4 |
DD |
KBW |
| |
|
|
|
|
|
|
107 |
143 |
36 |
23.0 |
1.3 |
DD |
KBW |
| |
|
|
|
|
|
|
109 |
110 |
1 |
|
LOSS |
DD |
KBW |
| HoleID |
Easting
(WGS84_29N) |
Northing (WGS84_29N) |
Elevation
(m) |
EOH Depth1 |
UTM
Azimuth |
Dip |
Depth
From (m) |
Depth To (m) |
Drilled Width (m) |
ETW4 (m) |
Au (ppm) |
Hole Type5 |
Area |
| |
|
|
|
|
|
|
222 |
244 |
22 |
14.6 |
0.9 |
DD |
KBW |
| |
|
|
|
|
|
|
251 |
265 |
14 |
8.7 |
0.6 |
DD |
KBW |
| |
|
|
|
|
|
|
341 |
343 |
2 |
1.4 |
8.2 |
DD |
KBW |
| |
|
|
|
|
|
Including |
341 |
342 |
1 |
0.7 |
13.0 |
DD |
KBW |
| |
|
|
|
|
|
|
362 |
391 |
29 |
19.3 |
1.2 |
DD |
KBW |
| |
|
|
|
|
|
|
477 |
484 |
7 |
4.6 |
1.3 |
DD |
KBW |
| FBDD0010 |
234828 |
1430808 |
149 |
|
135 |
-50 |
16 |
32 |
16 |
12.4 |
1.3 |
DD |
KBW |
| |
|
|
|
|
|
Including |
20 |
21 |
1 |
0.8 |
LOSS |
DD |
KBW |
| |
|
|
|
|
|
And |
26 |
27 |
1 |
0.8 |
LOSS |
DD |
KBW |
| |
|
|
|
|
|
And |
29 |
30 |
1 |
0.8 |
LOSS |
DD |
KBW |
| |
|
|
|
|
|
|
175 |
197 |
22 |
18.6 |
1.8 |
DD |
KBW |
| |
|
|
|
|
|
Including |
177 |
178 |
1 |
0.7 |
10.2 |
DD |
KBW |
| |
|
|
|
|
|
|
218 |
227 |
9 |
7.1 |
1.3 |
DD |
KBW |
| |
|
|
|
|
|
|
285 |
315 |
30 |
23.3 |
0.7 |
DD |
KBW |
| |
|
|
|
|
|
|
352 |
365 |
13 |
9.5 |
0.6 |
DD |
KBW |
| FBDD0011 |
234850 |
1431000 |
152 |
249 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0012 |
235054 |
1431220 |
159 |
239 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0013 |
234922 |
1430643 |
160 |
240 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0014 |
234599 |
1431039 |
151 |
246 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0015 |
234887 |
1430678 |
158 |
297 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0016 |
234704 |
1431004 |
152 |
251 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0017 |
235019 |
1431255 |
157 |
285 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0018 |
234966 |
1430954 |
153 |
224 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0019 |
234853 |
1430712 |
154 |
342 |
135 |
-60 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0020 |
234986 |
1430720 |
153 |
188 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0021 |
234931 |
1430989 |
155 |
245 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0022 |
235032 |
1431384 |
158 |
261 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0023 |
237150 |
1433950 |
150 |
231 |
90 |
-50 |
Pending assays |
|
|
|
|
DD |
Wari |
| FBDD0024 |
234913 |
1430794 |
150 |
287 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0025 |
234781 |
1430927 |
149 |
411 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0027 |
234895 |
1431025 |
153 |
296 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0028 |
235103 |
1431100 |
156 |
102 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| HoleID |
Easting
(WGS84_29N) |
Northing (WGS84_29N) |
Elevation
(m) |
EOH Depth1 |
UTM
Azimuth |
Dip |
Depth
From (m) |
Depth To (m) |
Drilled Width (m) |
ETW4 (m) |
Au (ppm) |
Hole Type5 |
Area |
| FBDD0029 |
234840 |
1430868 |
149 |
407 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBDD0031 |
234745 |
1430964 |
149 |
525 |
135 |
-50 |
Pending assays |
|
|
|
|
DD |
KBW |
| FBRC0001 |
235043 |
1431015 |
156 |
143 |
135 |
-50 |
2 |
4 |
2 |
1.6 |
5.5 |
RC |
KBW |
| |
|
|
|
|
|
|
12 |
31 |
19 |
12.0 |
1.9 |
RC |
KBW |
| |
|
|
|
|
|
|
100 |
105 |
5 |
3.8 |
1.9 |
RC |
KBW |
| |
|
|
|
|
|
|
109 |
114 |
5 |
3.3 |
1.1 |
RC |
KBW |
| FBRC0002 |
235036 |
1430948 |
154 |
180 |
135 |
-50 |
114 |
120 |
6 |
5.3 |
0.9 |
RC |
KBW |
| FBRC0003 |
234998 |
1430916 |
154 |
174 |
135 |
-50 |
4 |
38 |
34 |
24.2 |
3.1 |
RC |
KBW |
| |
|
|
|
|
|
Including |
25 |
26 |
1 |
0.7 |
15.1 |
RC |
KBW |
| FBRC0004 |
235099 |
1431033 |
156 |
66 |
135 |
-50 |
10 |
45 |
35 |
24.3 |
1.0 |
RC |
KBW |
| FBRC0005 |
235065 |
1431071 |
157 |
144 |
135 |
-50 |
0 |
46 |
46 |
29.6 |
1.4 |
RC |
KBW |
| |
|
|
|
|
|
|
55 |
56 |
1 |
0.7 |
5.4 |
RC |
KBW |
| FBRC0006 |
235036 |
1430741 |
152 |
126 |
135 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0007 |
235091 |
1431254 |
156 |
168 |
135 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0008 |
235089 |
1431185 |
160 |
120 |
135 |
-50 |
19 |
115 |
96 |
64.0 |
1.9 |
RC |
KBW |
| |
|
|
|
|
|
Including |
24 |
26 |
2 |
1.5 |
16.3 |
RC |
KBW |
| FBRC0009 |
235022 |
1430684 |
158 |
144 |
135 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0010 |
234992 |
1430643 |
158 |
132 |
135 |
-55 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0011 |
234957 |
1430607 |
161 |
108 |
135 |
-50 |
6 |
26 |
20 |
13.0 |
1.5 |
RC |
KBW |
| |
|
|
|
|
|
Including |
11 |
12 |
1 |
0.7 |
13.8 |
RC |
KBW |
| |
|
|
|
|
|
And |
13 |
17 |
4 |
|
LOSS |
RC |
KBW |
| |
|
|
|
|
|
|
54 |
61 |
7 |
6.5 |
0.9 |
RC |
KBW |
| |
|
|
|
|
|
|
79 |
102 |
23 |
16.3 |
0.4 |
RC |
KBW |
| FBRC0012 |
234730 |
1430836 |
152 |
120 |
135 |
-50 |
114 |
120 |
6 |
4.0 |
1.1 |
RC |
KBW |
| FBRC0013 |
234695 |
1430872 |
151 |
138 |
135 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0014 |
234625 |
1430943 |
152 |
162 |
135 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0015 |
235067 |
1431349 |
158 |
156 |
135 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
| FBRC0016 |
234894 |
1430600 |
162 |
120 |
135 |
-50 |
94 |
103 |
9 |
6.7 |
0.7 |
RC |
KBW |
| FBRC0017 |
237175 |
1434000 |
149 |
108 |
90 |
-50 |
NSI |
|
|
|
|
RC |
KBW |
Notes:
1.
EOH: End of hole
2.
Depths and widths reported to nearest significant decimal place
3.
NSI: No significant intercepts
4.
ETW: Estimated true width
5.
RC: reverse circulation drilling | DD: diamond drilling