Washington, D.C. 20549
Indicate by check mark whether the registrant files or will file annual
reports under cover of Form 20-F or Form 40-F.
Pursuant to the requirements of the Securities Exchange Act of 1934,
the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Exhibit 99.1

NEWS RELEASE
Fortuna intersects 0.96 g/t gold over 350
meters at the Lindero Mine, Argentina
Vancouver, British Columbia, October 20, 2026:
Fortuna Mining Corp. (NYSE: FSM | TSX: FVI) is pleased to report results from infill drilling designed to test open mineralization
at depth and upgrade Inferred Mineral Resources below the current life-of-mine (“LOM”) pit design of the gold porphyry deposit
at the Lindero Mine in Argentina. The results confirm that gold mineralization extends significantly below the current reserve pit design.
Eric Chapman, Senior Vice President of Technical
Services, commented, “The 2026 infill drilling program returned multiple intersections with gold grades consistent with or higher
than the corresponding grades estimated in the block model.” Mr. Chapman added, “We are incorporating the drill results into
an updated block model and pit design, targeted for completion by year-end. This work will support a revised LOM plan and an updated Mineral
Reserve estimate for Lindero, incorporating both the upgraded gold mineralization and existing Indicated Mineral Resources currently located
below the pit.” Mr. Chapman concluded, “This zone remains open at depth.”
Lindero Mine Drilling highlights
| LDH-259: |
0.85 g/t Au |
over a drilled length of 236 meters from surface |
| LDH-260: |
0.98 g/t Au |
over a drilled length of 281 meters from surface |
|
LDH-261:
|
1.05 g/t Au
2.35 g/t Au
0.72 g/t Au
2.07 g/t Au
5.52 g/t Au
3.95 g/t Au |
over a drilled length of 143 meters from surface,
including
over a drilled length of 10 meters from 17 meters
over a drilled length of 149.6 meters from 149
meters, including
over a drilled length of 4 meters from 163 meters,
and
over a drilled length of 2 meters from 205 meters,
and
over a drilled length of 2 meters from 253 meters |
| LDH-262: |
0.67 g/t Au |
over a drilled length of 164 meters from 2 meters |
| LDH-265: |
0.60 g/t Au |
over a drilled length of 224 meters from surface |
| LDH-267: |
0.70 g/t Au
2.79 g/t Au |
over a drilled length of 263 meters from surface,
including
over a drilled length of 2 meters from 38 meters |
| LDH-271: |
0.94 g/t Au |
over a drilled length of 134 meters from 144 meters |
| LDH-272: |
0.96 g/t Au
2.20 g/t Au
2.45 g/t Au
2.22 g/t Au |
over a drilled length of 350 meters from surface,
including
over a drilled length of 6 meters from 10 meters,
and
over a drilled length of 4 meters from 302 meters,
and
over a drilled length of 2 meters from 316 meters |
| LDH-273: |
0.71 g/t Au
2.02 g/t Au |
over a drilled length of 203 meters from 156 meters,
including
over a drilled length of 2 meters from 184 meters |
| LDH-286: |
1.02 g/t Au
2.06 g/t Au |
over a drilled length of 134 meters from surface,
including
over a drilled length of 13 meters from 0 meters |
| LDH-288: |
0.56 g/t Au |
over a drilled length of 254 meters from surface, including |
Note: Gold mineralization at Lindero is circular
in nature and associated with a porphyry intrusive; therefore, a specific azimuth or dip cannot be defined for reporting estimated true
widths.
The 2026 drill program consisted of 31 diamond
drilling (“DD”) holes, totalling 8,534 meters, having been extended from the initially planned 6,000-meter program due to
the success from the initial holes. The program was designed with two objectives, firstly to upgrade Inferred Mineral Resources below
the current LOM pit design in the south portion of the Lindero Deposit, where higher gold grade mineralization was identified at depth.
Secondly, to obtain metallurgical samples to affirm projected recoveries in areas planned for mining in the next two years. The upgrade
drilling successfully encountered higher than expected gold mineralization in several holes, such as, LDH-259 that intersected 0.85 g/t
Au over 236 meters from surface, including 94 meters averaging 0.66 g/t Au below the current pit design (refer to Figure 1) and LDH-272
that intersected 0.96 g/t Au over 350 meters from surface, including 98 meters averaging 0.91 g/t Au below the pit design (refer to Figure
2). An updated Mineral Resource and Mineral Reserve estimate will be prepared for inclusion in the year-end consolidated report, planned
for release in the first quarter of 2027.
Gold mineralization at the Lindero Deposit forms
a circular body approximately 600 meters in diameter and extends vertically more than 300 meters below the current topographic surface.
The distribution of gold mineralization shows a strong relationship to lithology, stockwork veinlets, and alteration assemblages. Higher
gold grades of more than 1 g/t Au, characterized by native, free-milling gold, are commonly associated with sigmoidal quartz, quartz-magnetite-sulfide,
biotite-magnetite-chalcopyrite, magnetite-chalcopyrite, and quartz-limonite–hematite stockworks that are strongly associated with
K-feldspar alteration. This association is most common in the southern and eastern portions of the deposit, where the highest gold grades
occur. Where one or more stockwork types are absent or fracturing is less intense, mineralization tends to be weaker and gold grades lower
at approximately 0.4 g/t Au.

Figure 1: Lindero
Mine cross section 2623075E showing drill hole LDH-259

Figure 2: Lindero Mine cross section 7226125N
showing drill hole LDH-272


Quality Assurance & Quality Control (QA
- QC)
All drilling data completed by the Company utilized
the following procedures and methodologies. All drilling was carried out under the supervision of the Company’s personnel.
All DD holes started with HQ sized diameter, before
reducing to NQ diameter diamond drill bits on intersecting fresh rock. The core was logged, marked up for sampling using standard lengths
of two meters or to a geological boundary. Samples were then cut into equal halves using a diamond saw. One half of the core was left
in the original core box and stored in a secure location at the Company core yard at the project site. The other half was sampled, catalogued,
and placed into sealed bags and securely stored at the site until shipment.
All DD samples were transported by commercial
transport to ALS Patagonia S.A. preparation laboratory in Mendoza, Argentina. Sample pulps prepared by ALS Patagonia were then transported
via commercial courier to ALS’s facility in Lima, Peru. Routine gold analysis using a 30-gram charge and fire assay with an atomic
absorption finish was completed for all samples at ALS’s Lima laboratory plus ME-ICP61, analysis of 34 elements four acid ICP-AES.
Samples returning assays >10 ppm Au were reanalysed using a 30-gram charge and fire assay with a gravimetric finish. Quality control
procedures included the systematic insertion of blanks, duplicates and sample standards into the sample stream. In addition, ALS inserted
their own quality control samples.
Qualified Person
Eric Chapman, Senior Vice President, Technical
Services for Fortuna Mining Corp., is a Professional Geoscientist registered with Engineers and Geoscientists British Columbia (Registration
No. 36328). Mr. Chapman has reviewed and approved the scientific and technical information contained in this news release. Mr. Chapman
has verified the data disclosed, including the sampling, analytical and test data underlying the information or opinions contained herein
by reviewing geochemical and geological databases and reviewing diamond drill core. There were no limitations to the verification process.
About Fortuna Mining Corp.
Fortuna Mining Corp. is a Canadian precious metals
mining company with three operating mines in Argentina, Côte d’Ivoire, and Peru, and the feasibility-stage Diamba Sud Gold
Project in Senegal. Our exploration portfolio spans our operating jurisdictions as well as Guinea and Guyana. Sustainability is at the
core of our operations and stakeholder relationships. We produce gold and silver while creating long-term shared value through efficient
production, environmental stewardship, and social responsibility. For more information, please visit our website at www.fortunamining.com
ON BEHALF OF THE BOARD
Jorge A. Ganoza
CEO and Director
Fortuna Mining Corp.
Investor Relations:
Carlos Baca | info@fmcmail.com
| fortunamining.com | X | LinkedIn
| YouTube | Instagram | TikTok
Forward looking Statements
This news release contains forward-looking
statements which constitute “forward-looking information” within the meaning of applicable Canadian securities legislation
and “forward-looking statements” within the meaning of the “safe harbor” provisions of the Private Securities
Litigation Reform Act of 1995 (collectively, “Forward-looking Statements”). All statements included herein, other than statements
of historical fact, are Forward-looking Statements and are subject to a variety of known and unknown risks and uncertainties which could
cause actual events or results to differ materially from those reflected in the Forward-looking Statements. The Forward-looking Statements
in this news release include, without limitation, statements regarding exploration at the Lindero Mine, including the plans to incorporate
the drill results into an updated block model and pit design, targeted by the end of 2026 which are intended to support a revised life
of mine plan and an updated Mineral Reserve estimate for the Lindero Mine; statements that an updated Mineral Resource and Mineral Reserve
estimate is intended to be prepared for inclusion in the year-end consolidated report, planned for release in the first quarter of 2027;
statements that the zone drilled remains open at depth; statements about the Company’s business strategies, plans and outlook; the
Company’s plans for its mines and mineral properties; changes in general economic conditions and financial markets; the impact of
inflationary pressures on the Company’s business and operations; the future results of exploration activities; expectations with
respect to metal grade estimates and the impact of any variations relative to metals grades experienced; assumed and future metal prices;
the merit of the Company’s mines and mineral properties; and the future financial or operating performance of the Company. Often,
but not always, these Forward-looking Statements can be identified by the use of words such as “estimated”, “potential”,
“open”, “future”, “assumed”, “projected”, “proposed”, “used”,
“detailed”, “has been”, “gain”, “planned”, “reflecting”, “will”,
“anticipated”, “estimated”, “containing”, “remaining”, “to be”, or statements
that events, “could” or “should” occur or be achieved and similar expressions, including negative variations.
Forward-looking Statements involve known and
unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements of the Company to be materially
different from any results, performance or achievements expressed or implied by the Forward-looking Statements. Such uncertainties and
factors include, among others, operational risks associated with mining and mineral processing; uncertainty relating to Mineral Resource
and Mineral Reserve estimates; uncertainty relating to capital and operating costs, production schedules and economic returns; risks relating
to the Company’s ability to replace its Mineral Reserves; risks related to the conversion of Mineral Resources to Mineral Reserves;
risks associated with mineral exploration and project development; uncertainty relating to the repatriation of funds as a result of currency
controls; environmental matters including obtaining or renewing environmental permits and potential liability claims; uncertainty relating
to nature and climate conditions; laws and regulations regarding the protection of the environment (including greenhouse gas emission
reduction and other decarbonization requirements and the uncertainty surrounding the interpretation of omnibus Bill C-59 and the related
amendments to the Competition Act (Canada); risks associated with political instability and changes to the regulations governing the Company’s
business operations; changes in national and local government legislation, taxation, controls, regulations and political or economic developments
in countries in which the Company does or may carry on business; risks associated with war, hostilities or other conflicts, such as the
Ukrainian – Russian, and Israeli – Hamas and Iran – Israel and United States conflicts, and the impacts they may have
on global economic activity; risks relating to the termination of the Company’s mining concessions in certain circumstances; developing
and maintaining relationships with local communities and stakeholders; risks associated with losing control of public perception as a
result of social media and other web-based applications; potential opposition to the Company’s exploration, development and operational
activities; risks related to the Company’s ability to obtain adequate financing for planned exploration and development activities;
property title matters; risks related to the ability to retain or extend title to the Company’s mineral properties; risks relating
to the integration of businesses and assets acquired by the Company; impairments; risks associated with climate change legislation; reliance
on key personnel; adequacy of insurance coverage; operational safety and security risks; legal proceedings and potential legal proceedings;
uncertainties relating to general economic conditions; risks relating to a global pandemic, which could impact the Company’s business,
operations, financial condition and share price; competition; fluctuations in metal prices; risks associated with entering into commodity
forward and option contracts for base metals production; fluctuations in currency exchange rates and interest rates; tax audits and reassessments;
risks related to hedging; uncertainty relating to concentrate treatment charges and transportation costs; sufficiency of monies allotted
by the Company for land reclamation; risks associated with dependence upon information technology systems, which are subject to disruption,
damage, failure and risks with implementation and integration; labor relations issues; as well as those factors discussed under “Risk
Factors” in the Company's Annual Information Form. Although the Company has attempted to identify important factors that could cause
actual actions, events, or results to differ materially from those described in Forward-looking Statements, there may be other factors
that cause actions, events or results to differ from those anticipated, estimated or intended.
Forward-looking Statements contained herein
are based on the assumptions, beliefs, expectations and opinions of management, including, but not limited to, the accuracy of the Company’s
current Mineral Resource and Mineral Reserve estimates; that the Company’s activities will be conducted in accordance with the Company’s
public statements and stated goals; that there will be no material adverse change affecting the Company, its properties or its production
estimates (which assume accuracy of projected ore grade, mining rates, recovery timing, and recovery rate estimates and may be impacted
by unscheduled maintenance, labor and contractor availability and other operating or technical difficulties); the duration and effect
of global and local inflation; the duration and impacts of geo-political uncertainties on the Company’s production, workforce, business,
operations and financial condition; the expected trends in mineral prices, inflation and currency exchange rates; that all required approvals
and permits will be obtained for the Company’s business and operations on acceptable terms including
for the construction of a mine at the Diamba Sud Project, and for the expansion of the processing plant and for the use of the underground
mining method at the Séguéla Mine; that there will be no significant disruptions affecting the Company's operations
and such other assumptions as set out herein. Forward-looking Statements are made as of the date hereof and the Company disclaims any
obligation to update any Forward-looking Statements, whether as a result of new information, future events, or results or otherwise, except
as required by law. There can be no assurance that these Forward-looking Statements will prove to be accurate, as actual results and future
events could differ materially from those anticipated in such statements. Accordingly, investors should not place undue reliance on Forward-looking
Statements.
Cautionary Note to United States Investors
Concerning Mineral Resources and Reserves
Technical disclosure
regarding the Company’s properties included in this news release has been prepared in accordance with National Instrument 43-101,
Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy, and Petroleum
Definition Standards on Mineral Resources and Mineral Reserves. Canadian standards, including NI 43-101, differ from the requirements
of the Securities and Exchange Commission, and information included herein may not be comparable to similar information disclosed by U.S.
companies.
Appendix 1: Lindero Mine drill hole details
and assay results
| HoleID |
Easting
(POSGAR94_2) |
Northing
(POSGAR94_2) |
Elev. (m) |
EOH1,2
Depth (m) |
UTM
Azimuth |
Dip |
Depth2
From (m) |
Depth2
To (m) |
Drilled2
Width (m) |
Au (ppm) |
| LDH-258 |
2623035 |
7226080 |
3748 |
269 |
98.51 |
-68.98 |
0 |
186 |
186 |
0.60 |
| |
|
|
|
|
|
|
194 |
252 |
58 |
0.53 |
| |
|
|
|
|
|
Including |
198 |
202 |
4 |
2.37 |
| LDH-259 |
2623080 |
7226050 |
3747 |
281 |
180 |
-90.0 |
0.0 |
236 |
236 |
0.85 |
| LDH-260 |
2623025 |
7226090 |
3748 |
281 |
270 |
-75.0 |
0.0 |
281 |
281 |
0.98 |
| LDH-261 |
2623029 |
7226090 |
3748 |
298.6 |
90 |
-76.0 |
0.0 |
143 |
143 |
1.05 |
| |
|
|
|
|
|
Including |
17.0 |
27 |
10 |
2.35 |
| |
|
|
|
|
|
|
149.0 |
298.6 |
149.6 |
0.72 |
| |
|
|
|
|
|
Including |
163.0 |
167 |
4 |
2.07 |
| |
|
|
|
|
|
Including |
205.0 |
207 |
2 |
5.52 |
| |
|
|
|
|
|
Including |
253.0 |
255 |
2 |
3.95 |
| LDH-262 |
2623236 |
7226050 |
3748 |
230 |
0 |
-90.0 |
2.0 |
166 |
164 |
0.67 |
| |
|
|
|
|
|
|
178.0 |
192 |
14 |
0.59 |
| |
|
|
|
|
|
|
208.0 |
230 |
22 |
0.32 |
| LDH-263 |
2623101 |
7226145 |
3804 |
341 |
180 |
-77.0 |
0.0 |
102 |
102 |
0.62 |
| |
|
|
|
|
|
|
134.0 |
288 |
154 |
0.60 |
| |
|
|
|
|
|
Including |
172.0 |
174 |
2 |
4.68 |
| |
|
|
|
|
|
Including |
194.0 |
196 |
2 |
2.46 |
| |
|
|
|
|
|
Including |
204.0 |
208 |
4 |
2.69 |
| |
|
|
|
|
|
|
292.0 |
334 |
42 |
0.33 |
| LDH-264 |
2622973 |
7226050 |
3787 |
299 |
270 |
-80.0 |
0.0 |
130 |
130 |
0.47 |
| |
|
|
|
|
|
|
134.0 |
168 |
34 |
0.37 |
| |
|
|
|
|
|
|
202.0 |
210 |
8 |
0.29 |
| |
|
|
|
|
|
|
246.0 |
278 |
32 |
0.28 |
| |
|
|
|
|
|
|
286.0 |
299 |
13 |
0.24 |
| LDH-265 |
2623105 |
7226137 |
3804 |
362 |
270 |
-78.0 |
0.0 |
224 |
224 |
0.60 |
| |
|
|
|
|
|
|
262.0 |
272 |
10 |
0.31 |
| |
|
|
|
|
|
|
336.0 |
344 |
8 |
0.26 |
| LDH-266 |
2623147 |
7226116 |
3796 |
302 |
270 |
-90.0 |
22.0 |
152 |
130 |
0.68 |
| |
|
|
|
|
|
Including |
104.0 |
108 |
4 |
4.40 |
| |
|
|
|
|
|
|
182.0 |
242 |
60 |
0.36 |
| |
|
|
|
|
|
|
244.0 |
267 |
23 |
0.38 |
| |
|
|
|
|
|
|
269.0 |
281 |
12 |
0.34 |
| |
|
|
|
|
|
|
287.0 |
302 |
15 |
0.44 |
| LDH-267 |
2622943 |
7226100 |
3793 |
263 |
270 |
-80.0 |
0.0 |
263 |
263 |
0.70 |
| |
|
|
|
|
|
Including |
38.0 |
40 |
2 |
2.79 |
| LDH-268 |
2622943 |
7226175 |
3800 |
251 |
0 |
-90.0 |
92.0 |
106 |
14 |
0.28 |
| |
|
|
|
|
|
|
116.0 |
134 |
18 |
0.32 |
| |
|
|
|
|
|
|
136.0 |
250 |
114 |
0.43 |
| LDH-269 |
2622923 |
7226148 |
3798 |
380 |
90 |
-80.0 |
76.0 |
116 |
40 |
0.29 |
| |
|
|
|
|
|
|
118.0 |
156 |
38 |
0.35 |
| |
|
|
|
|
|
|
160.0 |
342 |
182 |
0.49 |
| |
|
|
|
|
|
|
344.0 |
368 |
24 |
0.27 |
| LDH-270 |
2622897 |
7226111 |
3798 |
302 |
90 |
-80.0 |
0.0 |
106 |
106 |
0.47 |
| |
|
|
|
|
|
|
108.0 |
152 |
44 |
0.31 |
| |
|
|
|
|
|
|
154.0 |
204 |
50 |
0.33 |
| |
|
|
|
|
|
|
210.0 |
232 |
22 |
0.31 |
| |
|
|
|
|
|
|
244.0 |
294 |
50 |
0.45 |
| HoleID |
Easting
(POSGAR94_2) |
Northing
(POSGAR94_2) |
Elev. (m) |
EOH1,2
Depth (m) |
UTM
Azimuth |
Dip |
Depth2
From (m) |
Depth2
To (m) |
Drilled2
Width
(m) |
Au (ppm) |
| LDH-271 |
2622980 |
7226200 |
3803 |
407 |
0 |
-90.0 |
0.0 |
54 |
54 |
0.44 |
| |
|
|
|
|
|
|
108.0 |
142 |
34 |
0.40 |
| |
|
|
|
|
|
|
144.0 |
278 |
134 |
0.94 |
| |
|
|
|
|
|
|
284.0 |
356 |
72 |
0.75 |
| LDH-272 |
2622912 |
7226124 |
3798 |
350 |
91.87 |
-74.29 |
0.0 |
350 |
350 |
0.96 |
| |
|
|
|
|
|
Including |
10.0 |
16 |
6 |
2.20 |
| |
|
|
|
|
|
and |
302.0 |
306 |
4 |
2.45 |
| |
|
|
|
|
|
and |
316.0 |
318 |
2 |
2.22 |
| LDH-273 |
2622942 |
7226224 |
3795 |
359 |
283.82 |
-88.98 |
28.0 |
38 |
10 |
0.26 |
| |
|
|
|
|
|
|
156.0 |
359 |
203 |
0.71 |
| |
|
|
|
|
|
Including |
184.0 |
186 |
2 |
2.02 |
| LDH-274 |
2622936 |
7226177 |
3799 |
380 |
351.05 |
-89.2 |
104.0 |
114 |
10 |
0.38 |
| |
|
|
|
|
|
|
122.0 |
248 |
126 |
0.40 |
| |
|
|
|
|
|
|
252.0 |
270 |
18 |
0.33 |
| |
|
|
|
|
|
|
278.0 |
290 |
12 |
0.42 |
| |
|
|
|
|
|
|
318.0 |
368 |
50 |
0.44 |
| |
|
|
|
|
|
Including |
320.0 |
322 |
2 |
1.63 |
| LDH-275 |
2623384 |
7226150 |
3796 |
257 |
270.73 |
-73.16 |
0.0 |
9 |
9 |
0.93 |
| |
|
|
|
|
|
Including |
5.0 |
7 |
2 |
2.31 |
| |
|
|
|
|
|
|
17.0 |
203 |
186 |
0.53 |
| |
|
|
|
|
|
|
205.0 |
217 |
12 |
0.50 |
| |
|
|
|
|
|
|
223.0 |
257 |
34 |
0.75 |
| LDH-276 |
2623340 |
7226235 |
3787 |
296 |
187.55 |
-79.03 |
0.0 |
19 |
19 |
0.30 |
| |
|
|
|
|
|
|
21.0 |
77 |
56 |
0.33 |
| |
|
|
|
|
|
|
83.0 |
117 |
34 |
0.29 |
| |
|
|
|
|
|
|
119.0 |
253 |
134 |
0.46 |
| |
|
|
|
|
|
|
263.0 |
296 |
33 |
0.69 |
| LDH-277 |
2623259 |
7226184 |
3788 |
320 |
132.03 |
-88.9 |
0.0 |
30 |
30 |
0.36 |
| |
|
|
|
|
|
|
40.0 |
150 |
110 |
0.74 |
| |
|
|
|
|
|
Including |
98.0 |
102 |
4 |
2.82 |
| |
|
|
|
|
|
|
158.0 |
186 |
28 |
0.32 |
| |
|
|
|
|
|
|
196.0 |
240 |
44 |
0.47 |
| |
|
|
|
|
|
Including |
208.0 |
210 |
2 |
1.28 |
| |
|
|
|
|
|
|
298.0 |
320 |
22 |
0.30 |
| LDH-278 |
2623280 |
7226222 |
3788 |
324 |
86.64 |
-79.73 |
0.0 |
53 |
53 |
0.55 |
| |
|
|
|
|
|
|
168.0 |
194 |
26 |
0.29 |
| |
|
|
|
|
|
|
196.0 |
234 |
38 |
0.43 |
| |
|
|
|
|
|
|
242.0 |
264 |
22 |
0.31 |
| |
|
|
|
|
|
|
304.0 |
324 |
20 |
0.28 |
| LDH-279 |
2623300 |
7226221 |
3788 |
299 |
181.03 |
-77.19 |
0.0 |
22 |
22 |
0.35 |
| |
|
|
|
|
|
|
44.0 |
56 |
12 |
0.22 |
| |
|
|
|
|
|
|
62.0 |
80 |
18 |
0.28 |
| |
|
|
|
|
|
|
86.0 |
112 |
26 |
0.32 |
| |
|
|
|
|
|
|
124.0 |
208 |
84 |
0.42 |
| |
|
|
|
|
|
|
210.0 |
238 |
28 |
0.43 |
| |
|
|
|
|
|
Including |
236.0 |
238 |
2 |
2.03 |
| |
|
|
|
|
|
|
244.0 |
260 |
16 |
0.33 |
| |
|
|
|
|
|
|
272.0 |
299 |
27 |
0.54 |

| HoleID |
Easting
(POSGAR94_2) |
Northing
(POSGAR94_2) |
Elev. (m) |
EOH1,2
Depth (m) |
UTM
Azimuth |
Dip |
Depth2
From (m) |
Depth2
To (m) |
Drilled2
Width (m) |
Au (ppm) |
| LDH-280 |
2623360 |
7226250 |
3787 |
113 |
247.99 |
-89.79 |
0.0 |
76 |
76 |
0.34 |
| |
|
|
|
|
|
|
82.0 |
113 |
31 |
0.28 |
| LDH-281 |
2623377 |
7226202 |
3790 |
164 |
270 |
-70.0 |
0.0 |
77 |
77 |
0.38 |
| |
|
|
|
|
|
|
83.0 |
134 |
51 |
0.41 |
| LDH-282 |
2623234 |
7226049 |
3756 |
299 |
0 |
-90.0 |
0.0 |
170 |
170 |
0.60 |
| |
|
|
|
|
|
|
178.0 |
226 |
48 |
0.41 |
| |
|
|
|
|
|
|
228.0 |
292 |
64 |
0.72 |
| |
|
|
|
|
|
Including |
236.0 |
240 |
4 |
2.26 |
| LDH-283 |
2622921 |
7226198 |
3796 |
290 |
270 |
-72.0 |
43.0 |
51 |
8 |
0.26 |
| |
|
|
|
|
|
|
55.0 |
65 |
10 |
0.42 |
| |
|
|
|
|
|
|
71.0 |
194 |
123 |
0.60 |
| |
|
|
|
|
|
Including |
156 |
194 |
38 |
0.30 |
| |
|
|
|
|
|
|
206.0 |
230 |
24 |
0.61 |
| LDH-284 |
2622889 |
7226350 |
3843 |
179 |
90 |
-70.0 |
0.0 |
179 |
179 |
0.67 |
| LDH-285 |
2622990 |
7226400 |
3799 |
140 |
0 |
-90.0 |
0.0 |
139 |
139 |
0.58 |
| LDH-286 |
2623049 |
7226389 |
3780 |
134 |
0 |
-90.0 |
0.0 |
134 |
134 |
1.02 |
| |
|
|
|
|
|
Including |
0.0 |
13 |
13 |
2.06 |
| LDH-287 |
2623161 |
7226378 |
3772 |
110 |
276.95 |
-73.19 |
10.0 |
24 |
14 |
0.34 |
| |
|
|
|
|
|
|
30.0 |
110 |
80 |
0.60 |
| |
|
|
|
|
|
Including |
52.0 |
54 |
2 |
4.68 |
| LDH-288 |
2623160 |
7226378 |
3772 |
254 |
317.52 |
-89.52 |
0.0 |
254 |
254 |
0.56 |
Notes:
1.
EOH: End of hole
2.
Depths and widths reported to nearest significant decimal place
3.
Gold mineralization at Lindero is circular in nature and associated with a porphyry intrusive; therefore, a specific azimuth or dip cannot
be defined for reporting estimated true widths