Fusion Fuel Green PLC reported that its wholly owned subsidiary, Bright Hydrogen Solutions Limited, has achieved key execution milestones on two previously announced green hydrogen projects in southern Europe. BrightHy completed the Front-End Engineering Design (FEED) package for the Hydrogen Production Unit at a 15 MW industrial green hydrogen production facility expected to supply hydrogen for blending into the natural gas network. BrightHy also completed Factory Acceptance Tests (FAT) for major equipment for a hydrogen refueling station project, working with equipment suppliers Sungrow Hydrogen and Houpu Global Clean Energy. The tested equipment has been shipped and is in transit to the project site, where installation is expected as the project advances toward commissioning. The company highlights these as important execution milestones supporting its engineering and project-delivery strategy and cites extensive forward-looking risk factors, including project execution, permitting, financing, and its ability to continue as a going concern.

Positive

  • None.

Negative

  • None.
Industrial green hydrogen facility size 15 MW Capacity of the industrial green hydrogen production facility in southern Europe
Number of green hydrogen projects 2 projects Two previously announced green hydrogen projects in southern Europe with reported milestones
Subsidiary ownership 100% Bright Hydrogen Solutions Limited is a wholly owned subsidiary of Fusion Fuel Green PLC
Front-End Engineering Design (FEED) technical
"BrightHy Solutions completed the Front-End Engineering Design ("FEED") package"
Front-end engineering design (FEED) is the detailed planning stage that produces the technical blueprints, cost estimates and scope description for a large industrial project before full construction begins. Like drawing a high-quality house plan and budget before hiring builders, FEED narrows uncertainty, identifies major risks and sets the baseline for final costs and schedules—information investors use to judge project viability, funding needs and potential returns.
Factory Acceptance Tests (FAT) technical
"completed Factory Acceptance Tests ("FAT") for major equipment packages"
green hydrogen technical
"expected to produce green hydrogen for blending into the natural gas network"
Green hydrogen is hydrogen made by splitting water with electricity that comes from renewable sources, producing little or no carbon emissions. Investors watch it because it can act like a rechargeable, low‑carbon fuel or energy carrier for industries and transport that are hard to electrify, creating long‑term demand for production plants, storage and transport infrastructure and making returns sensitive to technology costs, energy prices and policy support.
hydrogen refueling station technical
"a previously announced hydrogen refueling station project, also in southern Europe"
going concern financial
"the Company’s ability to continue as a going concern and to generate sufficient revenues"
Going concern is the accounting assumption that a company will keep operating and meeting its obligations for the foreseeable future. The phrase matters most when a company or its auditors disclose substantial doubt about it, a formal warning that the business may not have enough resources to continue without raising money, restructuring, or selling assets. That language in a filing or press release signals elevated financial risk.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

FAQ

What project milestones did Fusion Fuel (HTOO) announce for BrightHy Solutions in this 6-K?

Fusion Fuel announced that BrightHy Solutions completed the FEED package for a 15 MW green hydrogen production facility and finished Factory Acceptance Tests on major equipment for a hydrogen refueling station project in southern Europe, with equipment now shipped to the project site.

What is the scale and purpose of the 15 MW green hydrogen facility mentioned by Fusion Fuel (HTOO)?

The industrial green hydrogen facility has a planned capacity of 15 MW and is expected to produce green hydrogen for blending into the natural gas network, which Fusion Fuel believes can support the region’s transition toward cleaner energy systems in southern Europe.

What progress was reported on the hydrogen refueling station project by Fusion Fuel (HTOO)?

BrightHy Solutions completed Factory Acceptance Tests for major equipment for the hydrogen refueling station, working with suppliers Sungrow Hydrogen and Houpu Global Clean Energy. Following FAT, the company received confirmation the equipment has been shipped and is in transit to the project facility for installation.

What risks and uncertainties does Fusion Fuel (HTOO) highlight regarding these hydrogen projects?

Fusion Fuel cites risks around installing, integrating, and commissioning equipment, meeting project timelines and budgets, obtaining regulatory and permit approvals, achieving projected hydrogen output, reliance on third-party suppliers, securing additional financing, and its ability to continue as a going concern.

How does BrightHy Solutions fit into Fusion Fuel (HTOO)’s overall business strategy?

BrightHy Solutions is a wholly owned subsidiary focused on hydrogen through electrolysis, providing integrated engineering, plant design, equipment sourcing, implementation oversight, and long-term operations support. Fusion Fuel views BrightHy as its hydrogen solutions platform enabling decarbonization for hard-to-abate industries.

Which other businesses and assets does Fusion Fuel (HTOO) own besides BrightHy Solutions?

Fusion Fuel operates a diversified energy platform including Al Shola Al Modea Gas Distribution LLC for LPG solutions, BioSteam Energy for biomass-powered steam, and holds uranium and natural gas royalty and other interests in Canada, Colombia, and Argentina through Royal Uranium Inc.

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of: August, 2026.

 

Commission File Number: 001-39789

 

Fusion Fuel Green PLC

(Translation of registrant’s name into English)

 

9 Pembroke Street Upper

Dublin D02 KR83

Ireland

(Address of principal executive office)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

 

Form 20-F ☒ Form 40-F ☐

 

 

 

 

 

 

On August 12, 2026, Fusion Fuel Green PLC, an Irish public limited company (the “Company” or “Fusion Fuel”), issued a press release announcing the achievement of certain milestones with respect to certain green hydrogen projects in southern Europe by Bright Hydrogen Solutions Limited (“BrightHy Solutions”), a wholly-owned subsidiary of the Company. A copy of the press release is furnished as Exhibit 99.1 to this Report on Form 6-K.

 

Forward-Looking Statements

 

The press release attached as Exhibit 99.1 hereto and the statements contained therein include within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, and Section 21E of the U.S. Securities Exchange Act of 1934, as amended, which statements involve substantial risks and uncertainties. Forward-looking statements generally relate to future events or the Company’s future financial or operating performance. In some cases, you can identify these statements because they contain words such as “may,” “will,” “believes,” “expects,” “anticipates,” “estimates,” “projects,” “intends,” “should,” “seeks,” “future,” “continue,” “plan,” “target,” “predict,” “potential,” or the negative of such terms, or other comparable terminology that concern the Company’s expectations, strategy, plans, or intentions. Such forward-looking statements include, but are not limited to, statements regarding the expected production of green hydrogen for blending into the natural gas network; the anticipated contribution of these projects to the region’s energy transition; anticipated long-term value creation from these projects for BrightHy Solutions and Fusion Fuel; the completion of delivery of all required equipment to the hydrogen refueling station project; BrightHy Solutions’ strategy to position itself as an integrated hydrogen engineering, execution, and asset management platform; and characterizations of the Company’s market position, competitive strengths, or track record of execution. Forward-looking statements relating to expectations about future results or events are based upon information available to the Company as of today’s date and are not guarantees of the future performance of the Company, and actual results may vary materially from the results and expectations discussed. For the avoidance of doubt, statements of opinion, belief, expectation, or intention, including those attributed to the Company’s officers, directors, and management, are not statements of fact and should not be relied upon as such. The Company’s expectations and beliefs regarding these matters may not materialize, and actual results in future periods are subject to risks and uncertainties that could cause actual results to differ materially from those projected, including, without limitation, the ability of BrightHy Solutions and its affiliates to successfully install, integrate, and commission the hydrogen refueling station equipment and to complete site acceptance testing within projected timelines; the ability of the hydrogen production facility to produce green hydrogen at projected volumes and specifications suitable for blending into the natural gas network; the ability of the parties to the project agreements to obtain all necessary regulatory and other consents and approvals, including construction and activity permits, required for the installation and operation of the facilities; the ability of BrightHy Solutions and its affiliates to deliver these projects on time and within budget, including risks associated with equipment supply, transportation, engineering, and construction timelines; the risk that milestones described herein, including the completion of engineering deliverables and equipment testing, may not have been completed to the standards or specifications required by the applicable project agreements; the availability of additional financing necessary to support BrightHy Solutions’ broader growth initiatives; risks associated with operating internationally, including in southern Europe and other foreign jurisdictions; risks associated with reliance on third-party equipment suppliers and testing facilities; the Company’s ability to continue as a going concern and to generate sufficient revenues; the Company’s goals and strategies; the Company’s future business development, financial condition and results of operations; the Company’s projected revenues, profits, earnings and other estimated financial information; the Company’s ability to secure additional funding necessary for the expansion of the Company’s business; the growth of and competition trends in the Company’s industry; fluctuations in general economic and business conditions in the markets in which we operate; relevant government policies and regulations relating to the Company’s industry; and the risks and uncertainties described in Exhibit 99.2 to the Report on Form 6-K/A (the “Report”) furnished by the Company with the U.S. Securities and Exchange Commission (the “SEC”) on July 29, 2026, the Company’s Annual Report on Form 20-F filed with the SEC on May 7, 2026 (the “Annual Report” and together with the Report, the “Reports”), and other filings with the SEC. Should any of these risks or uncertainties materialize, or should the underlying assumptions about the Company’s business and the commercial markets in which the Company operates prove incorrect, actual results may vary materially from those described as anticipated, estimated or expected in the Reports. All subsequent written and oral forward-looking statements concerning the Company or other matters and attributable to the Company or any person acting on its behalf are expressly qualified in their entirety by the cautionary statements above. The Company does not undertake any obligation to publicly update any of these forward-looking statements to reflect events or circumstances that may arise after the date hereof, except as required by law.

 

Exhibit No.   Description
99.1   Press release dated August 12, 2026

 

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  Fusion Fuel Green PLC
  (Registrant)
   
Date: August 12, 2026 /s/ Frederico Figueira de Chaves
  Frederico Figueira de Chaves
  Chief Executive Officer and Interim Chief Financial Officer

 

 

 

 

Exhibit 99.1

 

Fusion Fuel Announces BrightHy Solutions Achieved Key Execution Milestones on Two Green Hydrogen Projects in Southern Europe

 

DUBLIN, Ireland, August 12, 2026 (GLOBE NEWSWIRE) – Fusion Fuel Green PLC (Nasdaq: HTOO) (“Fusion Fuel” or the “Company”), a leading provider of full-service energy engineering, advisory, and utility solutions, today announced that its wholly-owned subsidiary, Bright Hydrogen Solutions Limited (“BrightHy Solutions”), has achieved execution milestones on two previously announced green hydrogen projects in southern Europe.

 

BrightHy Solutions completed the Front-End Engineering Design (“FEED”) package for the Hydrogen Production Unit at a previously announced 15 MW industrial green hydrogen production facility in southern Europe. Once operational, the facility is expected to produce green hydrogen for blending into the natural gas network, which the Company believes will support the region’s transition toward cleaner energy systems. The Company believes that completion of the FEED package represents an important execution milestone for the project and provides the client with the technical framework to proceed with EPC tendering and the next phase of development.

 

In addition, BrightHy recently completed Factory Acceptance Tests (“FAT”) for major equipment packages associated with a previously announced hydrogen refueling station project, also in southern Europe. BrightHy’s engineering team traveled to China to oversee testing alongside equipment suppliers Sungrow Hydrogen and Houpu Global Clean Energy. Following the completion of the FAT process, the Company has received confirmation that the equipment has been shipped and is in transit to the project facility, where it is expected to be installed as the project advances toward commissioning.

 

Frederico Figueira de Chaves, Chief Executive Officer of Fusion Fuel and BrightHy Solutions, commented, “These milestones reflect what we believe is BrightHy’s ability to execute on complex hydrogen infrastructure projects and turn commercial opportunities into tangible project progress. The completion of FEED engineering for the green hydrogen production facility and the FAT process for the hydrogen refueling station project represent important execution milestones that we believe move both projects closer to deployment. As we continue to expand our engineering and project delivery business, we remain focused on disciplined execution, supporting our customers’ decarbonization objectives, and building long-term value through the successful delivery of hydrogen infrastructure projects.”

 

About Bright Hydrogen Solutions Limited

 

Bright Hydrogen Solutions Limited is a wholly owned subsidiary of Fusion Fuel Green PLC focused on hydrogen through electrolysis solutions. BrightHy Solutions provides integrated services across the hydrogen production value chain, including plant design, tailored engineering solutions, equipment sourcing, implementation oversight, and long-term operations support. BrightHy Solutions maintains a core focus on safety, reliability, and operational efficiency. Additional information is available at www.brighthy.com.

 

About Fusion Fuel Green PLC

 

Fusion Fuel Green PLC (NASDAQ: HTOO) is a diversified energy platform offering energy supply, distribution, and engineering and advisory solutions through its operating businesses Al Shola Al Modea Gas Distribution LLC (“Al Shola Gas”), BrightHy Solutions, and Biosteam Energy (Proprietary) Limited (“BioSteam Energy”). Al Shola Gas provides full-service industrial gas solutions, including the design, supply, and maintenance of liquefied petroleum gas (LPG) systems, as well as the transport and distribution of LPG across commercial, industrial, and residential sectors. BrightHy Solutions, the Company’s hydrogen solutions platform, delivers engineering and advisory services enabling decarbonization across hard-to-abate industries. BioSteam Energy provides biomass-powered industrial steam solutions to clients. The Company also holds a portfolio of uranium and natural gas royalty and other interests across Canada, Colombia and Argentina through its wholly-owned subsidiary Royal Uranium Inc. For more information, please visit www.fusion-fuel.eu.

 

 

 

 

Forward-Looking Statements

 

This press release and the statements contained herein include “forward-looking statements” within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, and Section 21E of the U.S. Securities Exchange Act of 1934, as amended, which statements involve substantial risks and uncertainties. Forward-looking statements generally relate to future events or the Company’s future financial or operating performance. In some cases, you can identify these statements because they contain words such as “may,” “will,” “believes,” “expects,” “anticipates,” “estimates,” “projects,” “intends,” “should,” “seeks,” “future,” “continue,” “plan,” “target,” “predict,” “potential,” or the negative of such terms, or other comparable terminology that concern the Company’s expectations, strategy, plans, or intentions. Such forward-looking statements include, but are not limited to, statements regarding the expected production of green hydrogen for blending into the natural gas network; the anticipated contribution of these projects to the region’s energy transition; anticipated long-term value creation from these projects for BrightHy Solutions and Fusion Fuel; the completion of delivery of all required equipment to the hydrogen refueling station project; BrightHy Solutions’ strategy to position itself as an integrated hydrogen engineering, execution, and asset management platform; and characterizations of the Company’s market position, competitive strengths, or track record of execution. Forward-looking statements relating to expectations about future results or events are based upon information available to the Company as of today’s date and are not guarantees of the future performance of the Company, and actual results may vary materially from the results and expectations discussed. For the avoidance of doubt, statements of opinion, belief, expectation, or intention, including those attributed to the Company’s officers, directors, and management, are not statements of fact and should not be relied upon as such. The Company’s expectations and beliefs regarding these matters may not materialize, and actual results in future periods are subject to risks and uncertainties that could cause actual results to differ materially from those projected, including, without limitation, the ability of BrightHy Solutions and its affiliates to successfully install, integrate, and commission the hydrogen refueling station equipment and to complete site acceptance testing within projected timelines; the ability of the hydrogen production facility to produce green hydrogen at projected volumes and specifications suitable for blending into the natural gas network; the ability of the parties to the project agreements to obtain all necessary regulatory and other consents and approvals, including construction and activity permits, required for the installation and operation of the facilities; the ability of BrightHy Solutions and its affiliates to deliver these projects on time and within budget, including risks associated with equipment supply, transportation, engineering, and construction timelines; the risk that milestones described herein, including the completion of engineering deliverables and equipment testing, may not have been completed to the standards or specifications required by the applicable project agreements; the availability of additional financing necessary to support BrightHy Solutions’ broader growth initiatives; risks associated with operating internationally, including in southern Europe and other foreign jurisdictions; risks associated with reliance on third-party equipment suppliers and testing facilities; the Company’s ability to continue as a going concern and to generate sufficient revenues; the Company’s goals and strategies; the Company’s future business development, financial condition and results of operations; the Company’s projected revenues, profits, earnings and other estimated financial information; the Company’s ability to secure additional funding necessary for the expansion of the Company’s business; the growth of and competition trends in the Company’s industry; fluctuations in general economic and business conditions in the markets in which we operate; relevant government policies and regulations relating to the Company’s industry; and the risks and uncertainties described in Exhibit 99.2 to the Report on Form 6-K/A (the “Report”) furnished by the Company with the U.S. Securities and Exchange Commission (the “SEC”) on July 29, 2026, the Company’s Annual Report on Form 20-F filed with the SEC on May 7, 2026 (the “Annual Report” and together with the Report, the “Reports”), and other filings with the SEC. Should any of these risks or uncertainties materialize, or should the underlying assumptions about the Company’s business and the commercial markets in which the Company operates prove incorrect, actual results may vary materially from those described as anticipated, estimated or expected in the Reports. All subsequent written and oral forward-looking statements concerning the Company or other matters and attributable to the Company or any person acting on its behalf are expressly qualified in their entirety by the cautionary statements above. The Company does not undertake any obligation to publicly update any of these forward-looking statements to reflect events or circumstances that may arise after the date hereof, except as required by law.

 

Contact:

 

Investor Relations Contact

 

ir@fusion-fuel.eu

 

www.fusion-fuel.eu

 

 

 

 

Filing Exhibits & Attachments

1 document