false
0000795800
0000795800
2026-11-19
2026-11-19
iso4217:USD
xbrli:shares
iso4217:USD
xbrli:shares
UNITED
STATES
SECURITIES
AND EXCHANGE COMMISSION
Washington,
D.C. 20549
FORM
8-K
CURRENT
REPORT
Pursuant
to Section 13 OR 15(d) of the Securities Exchange Act of 1934
Date
of Report (Date of earliest event reported): November 19, 2026
NEXMETALS
MINING CORP.
(Exact
name of registrant as specified in its charter)
British
Columbia, Canada
(State
or other jurisdiction of incorporation)
| 001-42750 |
|
N/A 00-0000000 |
(Commission
File Number) |
|
(IRS
Employer
Identification No.) |
| |
|
|
1600-1021
West Hastings Street,
Vancouver,
British Columbia, Canada |
|
V6E
0C3 |
| (Address
of principal executive offices) |
|
(Zip
Code) |
(866)
794-6396
(Registrant’s
telephone number, including area code)
N/A
(Former
name or former address, if changed since last report)
Check
the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under
any of the following provisions (see General Instruction A.2. below):
| ☐ |
Written
communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425) |
| |
|
| ☐ |
Soliciting
material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12) |
| |
|
| ☐ |
Pre-commencement
communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b)) |
| |
|
| ☐ |
Pre-commencement
communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c)) |
Securities
registered pursuant to Section 12(b) of the Act:
| Title
of each class |
|
Trading
Symbol(s) |
|
Name
of each exchange on which registered |
| Common
Shares, no par value |
|
NEXM |
|
Nasdaq
Stock Market LLC (Nasdaq Capital Market) |
Indicate
by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405
of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter).
Emerging
growth company ☐
If
an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying
with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ☐
| Item
7.01 | Regulation
FD Disclosure. |
On
November 19, 2026, NexMetals Mining Corp. (the “Company”) issued a news release reporting assay results from drill holes
SMD-26-217 and SMD-26-216-W1, part of its ongoing surface drilling program at the Selebi Main deposit in Botswana. A copy of this press
release is attached as Exhibit 99.1 hereto and is incorporated herein by reference. The Company undertakes no obligation to update, supplement
or amend the materials attached hereto as Exhibit 99.1.
Cautionary
Statements to Investors on Reserves and Resources
The
news release furnished herewith uses the terms “mineral resources”, “indicated mineral resources” and “inferred
mineral resources” as such terms are defined under Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects
(“NI 43-101”). NI 43-101 is a rule developed by the Canadian Securities Administrators, which establishes standards for all
public disclosure a Canadian issuer makes of scientific and technical information concerning mineral projects.
On
October 31, 2018, the SEC adopted new mining disclosure rules (“S-K 1300”) that are more closely aligned with current industry
and global regulatory practices and standards, including NI 43-101, with which we comply because we are also a “reporting issuer”
under Canadian securities laws. While S-K 1300 is more closely aligned with NI 43-101 than the prior mining disclosure rules of the Securities
and Exchange Commission, there are some differences. Accordingly, there is no assurance any mineral resources that the Company may report
as “indicated mineral resources” and “inferred mineral resources” under NI 43-101 will be the same as the reserve
or resource estimates prepared under S-K 1300. Investors should not assume that any part or all of indicated mineral resources or inferred
mineral resources will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described
using these terms has a greater amount of uncertainty as to their existence and feasibility than mineralization that has been characterized
as reserves. Accordingly, investors are cautioned not to assume that any “indicated mineral resources”, or “inferred
mineral resources” on the Company’s projects are or will be economically or legally mineable. Further, “inferred resources”
have a greater amount of uncertainty as to their existence and as to whether they can be mined legally or economically. Therefore, investors
are also cautioned not to assume that all or any part of the inferred resources exist. In accordance with Canadian rules, estimates of
“inferred mineral resources” cannot form the basis of feasibility or other economic studies, except in limited circumstances
where permitted under NI 43-101.
The
information in this Current Report on Form 8-K (including Exhibit 99.1 attached hereto) is being furnished and shall not be deemed to
be filed for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise
be subject to the liabilities of that section, nor shall it be deemed to be incorporated by reference in any filing under the Securities
Act of 1933, as amended, or the Exchange Act, whether made before or after the date hereof and regardless of any general incorporation
language in such filing.
| Item
9.01 | Financial
Statements and Exhibits. |
(d)
Exhibits
| Exhibit
No. |
|
Description |
| 99.1 |
|
Press Release dated November 19, 2026. |
| 104 |
|
Cover
Page Interactive Data File (embedded within Inline XBRL document). |
SIGNATURES
Pursuant
to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by
the undersigned hereunto duly authorized.
| |
NEXMETALS
MINING CORP.
(Registrant) |
| |
|
| |
By:
|
/s/
Brett MacKay |
| |
|
Brett
MacKay |
| |
|
Chief
Financial Officer |
Date:
November 19, 2026
Exhibit
99.1

NexMetals
Reports New Third Zone at Selebi Main Returning 6.30 Metres of 2.67% Cu and 1.85% Ni in SMD-26-217
Vancouver,
British Columbia, November 19, 2026 – NexMetals Mining Corp. (TSXV: NEXM) (Nasdaq: NEXM) (“NexMetals”
or the “Company”) is pleased to report assay results from drill holes SMD-26-217 and SMD-26-216-W1, part of its ongoing
surface drilling program at the Selebi Main deposit in Botswana (see Figure 1). The results indicate a newly encountered third mineralized
zone below the Lower Zone (the “Third Zone”) and extension of the interpreted high-grade trend by approximately 100
metres toward Selebi North, bringing its interpreted length to approximately 1.5 kilometres (the “High-Grade Trend”).
SMD-26-217
intersected three distinct mineralized zones. The Main Zone returned 3.15 metres grading 3.14% Cu and 0.86% Ni. The Lower Zone returned
6.60 metres grading 1.35% Cu and 1.95% Ni including 4.25 metres grading 1.33% Cu and 2.37% Ni. The newly encountered Third Zone returned
6.30 metres grading 2.67% Cu and 1.85% Ni, including 4.30 metres grading 2.98% Cu and 2.38% Ni, with higher copper grades than those
of the Lower Zone potentially indicating greater remobilization.
SMD-26-216-W1
was an in-fill hole testing a sparsely drilled area approximately 165 metres north of the High-Grade Trend. The hole intersected 1.00
metre grading 2.98% Cu and 1.07% Ni corresponding to the Main Zone and a Lower Zone interval of 3.45 metres grading 2.86% Cu and 1.52%
Ni, including 1.45 metres grading 3.61% Cu and 1.94% Ni. SMD-26-216-W1 infills a gap within the resource model on the northern side of
the mineralized trend and supports the interpreted consistency of the High-Grade Trend and lateral continuity of the mineralized zones.
Why
This Matters
| ● | New
Third Zone expands the exploration opportunity at Selebi Main. NexMetals’ first
significant intersection below the Lower Zone returned higher copper grades than the Lower
Zone in the same hole, alongside strong nickel grades, and indicates increased structural
complexity as drilling advances toward Selebi North. |
| | | |
| ● | The
High-Grade Trend has been extended toward Selebi North. SMD-26-217 extends the High-Grade
Trend to 1.5 kilometres and extended it by approximately 100 metres toward Selebi North while
SMD-26-216-W1 supports lateral continuity in the up-dip direction. |
| | | |
| ● | Lower
Zone is demonstrating increasing continuity at depth. Results from SMD-26-213 (7.45 metres
grading 2.52% Cu, 1.54% Ni, see news release dated July 22, 2026), SMD-26-219 (7.55
metres grading 2.70% Cu and 1.83% Ni, see news release dated September 23, 2026, together
with SMD-26-217 (6.60 metres grading 1.35% Cu and 1.95% Ni, current release) support the
interpretation of a laterally and vertically extensive Lower Zone. |
| | | |
| ● | The
system remains open, with further targets to test. Borehole electromagnetic surveying
(“BHEM”) indicates additional potential mineralization laterally
and down plunge. Ongoing drilling and geological modelling are intended to test the extent
of all three mineralized zones and target additional areas of thick massive sulphide mineralization. |
Sean
Whiteford, CEO and Director of the Company, commented: “Our first intersection of the Third Zone returned strong copper and
nickel grades below the Lower Zone, providing an additional target for follow-up drilling. Building on the recent 72% increase in Selebi
Main’s Inferred Mineral Resource to 32.47 million tonnes grading 1.53% copper and 0.97% nickel, these results point to further
growth potential as we continue to test the limits of the deposit. SMD-26-217 extends the interpreted High-Grade Trend toward Selebi
North, while SMD-26-216-W1 supports potential lateral continuity. We are advancing technical and trade-off studies to support the preliminary
economic assessment, while continuing exploration drilling to test the open system.”

Figure
1: Inclined long section of Selebi Main highlighting the location of drill holes SMD-26-217 and SMD-26-216-W1. The 2026 Inferred Mineral
Resource reference in Figure 1 is presented in accordance with NI 43-101, which may not be identical to Inferred Mineral Resource references
under Subpart 1300 of Regulation SK.
Table
1: 2026 Surface Drilling Results SMD-26-216-W1 and SMD-26-217
| Hole-ID |
|
From
(m) |
|
To
(m) |
|
Length
(m) |
|
Est.
True
Thickness1 |
|
Cu
(%) |
|
Ni
(%) |
|
Co
(%) |
|
Zone |
| SMD-26-216-W1 |
|
1624.10 |
|
1625.10 |
|
1.00 |
|
0.99 |
|
2.98 |
|
1.07 |
|
0.04 |
|
Main
Zone |
| SMD-26-216-W1 |
|
1683.35 |
|
1686.80 |
|
3.45 |
|
3.40 |
|
2.86 |
|
1.52 |
|
0.06 |
|
Lower
Zone |
| including |
|
1685.35 |
|
1686.80 |
|
1.45 |
|
1.43 |
|
3.61 |
|
1.94 |
|
0.08 |
|
| SMD-26-217 |
|
1931.85 |
|
1935.00 |
|
3.15 |
|
3.11 |
|
3.14 |
|
0.86 |
|
0.04 |
|
Main
Zone |
| including |
|
1931.85 |
|
1933.80 |
|
1.95 |
|
1.93 |
|
3.36 |
|
1.28 |
|
0.06 |
|
| SMD-26-217 |
|
1974.75 |
|
1981.35 |
|
6.60 |
|
6.52 |
|
1.35 |
|
1.95 |
|
0.06 |
|
Lower
Zone |
| including |
|
1974.75 |
|
1979.00 |
|
4.25 |
|
4.20 |
|
1.33 |
|
2.37 |
|
0.11 |
|
| SMD-26-217 |
|
1994.60 |
|
2000.90 |
|
6.30 |
|
6.22 |
|
2.67 |
|
1.85 |
|
0.09 |
|
Third
Zone |
| including |
|
1996.60 |
|
2000.90 |
|
4.30 |
|
4.25 |
|
2.98 |
|
2.38 |
|
0.11 |
|
1Length
refers to drillhole length and not true width. True widths are estimated where density of drilling is sufficient for an estimation.
To
view core photos from drill hole SMD-26-217, click here: Selebi Core Samples - NexMetals Mining Corp.
Table
2: Surface Drilling Collar Information
| Hole-ID |
|
UTM
East |
|
UTM
North |
|
Elevation |
|
Dip |
|
True
North
Azimuth |
|
Hole
Length
(m) |
|
Comment |
| SMD-26-216-W1 |
|
582793.8 |
|
7563698.8 |
|
902.0 |
|
-73.0 |
|
105.4 |
|
1763.6 |
|
Surveyed
collar |
| SMD-26-217 |
|
582546.8 |
|
7564008.6 |
|
906.0 |
|
-73.9 |
|
92.7 |
|
2050.9 |
|
Surveyed
collar |
Qualified
Person
All
scientific and technical information in this news release has been reviewed and approved by Sharon Taylor, V.P. Geophysics of the Company,
MSc, P.Geo, and a “qualified person” for the purposes of National Instrument 43-101 and Subpart 1300 of Regulation S-K.
Quality
Control and Data Verification
The
program is being executed using three Company-owned underground Zinex U5 drills which were converted into surface A5 drills, and two
Marcotte HTM2500 drills purchased by the Company capable of drilling to depths of 2,550 metres (NQ core).
Drill
core samples are either NQ (47.75 mm diameter) or BQ (36.40 mm diameter). All samples are ½ core samples cut by a diamond saw
on site and the remaining half of the core is retained for reference purposes. Samples are generally 1.0 to 1.5 metre intervals or less
at the discretion of the site geologists. Sample preparation and lab analysis were completed at ALS Geochemistry in Johannesburg, South
Africa. Commercially prepared blank samples and certified Cu/Ni sulphide analytical control standards with a range of grades are inserted
in every batch of 20 samples or a minimum of one set per sample batch. Analyses for Ni, Cu and Co are completed using a peroxide fusion
preparation and ICP-AES finish (ME-ICP81). Analyses for Pt, Pd, and Au are by fire assay (30 grams nominal sample weight) with an ICP-AES
finish (PGM-ICP23).
Holes
are numbered as follows: SMD (Selebi Main Deposit) + year + hole number starting at 201.
The
Qualified Person has verified the data disclosed in this news release, including the sampling, analytical and test data underlying the
information, through contribution to the core handling and sampling procedures, visits to the drill and core processing facilities, monitoring
of core logging results and sample selection, review of core assay and QA/QC results.
For
further information regarding the effective date of the 2026 Inferred Mineral Resource Estimate at Selebi Main and the key assumptions,
parameters and methods used in its estimation, please refer to the technical report comprising the estimates for the Selebi Main and
Selebi North deposits entitled “NI 43-101 Technical Report - October 2026 Mineral Resource Estimate, Selebi Mines Copper-Nickel-Cobalt
Project, Botswana”, prepared by The MSA Group (Pty) Ltd. with an effective date of October 16, 2026. The technical report has
been filed under the Company’s profile on SEDAR+ at www.sedarplus.ca, furnished under the Company’s profile on EDGAR at www.sec.gov
and is also available on the Company’s website. The Company has also filed a related Regulation S-K 1300-compliant technical report
summary as an exhibit to its Quarterly Report on Form 10-Q for the period ended September 30, 2026.
BHEM
Surveys
The
BHEM surveys at Selebi utilize the Crone PEM system operated by local Botswana staff. Survey data is collected using a 3-component fluxgate
probe collecting full waveform data. Surveys have been collected using timebases between 50 and 1000ms (0.25 Hz to 5 Hz). The data has
been processed to a calculated residual step response to better quantify the conductive sources. This added processing has proven to
be highly valuable because of the size of the highly conductive mineralized system.
About
NexMetals Mining Corp.
NexMetals
Mining Corp. is a TSX.V and NASDAQ listed mineral exploration and development company focused on redeveloping the past-producing Selebi
copper-nickel-cobalt mines in Botswana and the Selkirk copper-nickel-cobalt-platinum group element mines in Botswana. NexMetals has confirmed
the scale of mineralization is larger than historical estimates, supported by NI 43-101 and Regulation S-K 1300-compliant resource estimates,
with ongoing down-hole geophysics, drilling, and metallurgical programs aimed at expanding resources and supporting future economic studies.
The Company is led by an experienced management and technical team with a proven track record in global mineral projects, emphasizing
disciplined execution, transparent governance, and long-term stakeholder value creation.
For
further information about NexMetals Mining Corp., please contact:
Sean Whiteford
CEO
info@nexmetalsmining.com
1-866-794-NEXM (6396)
Neither
the TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) nor
the Nasdaq Stock Market LLC accepts responsibility for the adequacy or accuracy of this news release. No stock exchange, securities commission
or other regulatory authority has approved or disapproved the information contained herein.
Follow
Us
X:
https://x.com/NexMetalsCorp
LinkedIn:
https://www.linkedin.com/company/NexMetalsMiningCorp
Facebook:
https://www.facebook.com/NexMetalsMiningCorp
Cautionary
Note Regarding Forward-Looking Statements
This
news release contains “forward-looking statements” within the meaning of the United States federal securities laws and “forward-looking
information” within the meaning of applicable Canadian securities legislation (collectively, “forward-looking information”)
based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves risks, uncertainties
and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed
or implied by such forward-looking information. For the purposes of this release, forward looking information includes, but is not limited
to, the implementation of the objectives, goals and future plans of the Company; the Company’s interpretation of the Third Zone
as a new mineralized zone, its identification as an additional target for follow-up drilling and the potential for its lateral and down-plunge
expansion; the interpretation that higher copper grades in the Third Zone may indicate remobilization and increasing structural complexity
toward Selebi North; the extension, length and continuity of the High-Grade Trend and the Company’s plans to test its continued
extent; the interpreted lateral and vertical continuity of the Lower Zone; the potential mineralization indicated by BHEM surveying and
the planned use of BHEM, drilling and geological modelling to evaluate the extent of all three mineralized zones and identify further
areas of thick massive sulphide mineralization; the expansion and growth potential of the Selebi Main deposit; the Company’s technical
and trade-off studies and the preparation and timing of the preliminary economic assessment; planned exploration drilling; future resource
modelling and potential mine planning; and the Company’s plans to redevelop the Selebi and Selkirk mines and undertake future economic
studies. Forward-looking information is based on a number of material assumptions, including that the Company’s geological interpretations
are accurate; that drilling equipment, contractors and qualified personnel will be available as planned; that financing will be available
on acceptable terms; that required approvals will be obtained in a timely manner; and that commodity prices and general economic conditions
will remain consistent with current expectations. These forward-looking statements, by their nature, require the Company to make certain
assumptions and necessarily involve known and unknown risks and uncertainties that could cause actual results to differ materially from
those expressed or implied in these forward-looking statements. Factors that could cause actual results to differ materially from such
forward-looking information include, but are not limited to, capital and operating costs varying significantly from estimates; the preliminary
nature of drilling and metallurgical test results; the ability of exploration results to predict mineralization; the risk that geological
interpretations, including of the Third Zone and the High-Grade Trend, may change with further drilling; uncertainties inherent in mineral
resource estimates, including that Inferred Mineral Resources are not mineral reserves and have not demonstrated economic viability;
assay and QA/QC risks; the ability of the Company to implement its drilling, geoscience and metallurgical work on its properties and
work plans generally; the results of future preliminary economic assessments, prefeasibility or feasibility studies; delays in obtaining
or failures to obtain required governmental, environmental or other project approvals; political, permitting and title risks in Botswana;
the availability of equipment, contractors and key personnel; uncertainties relating to the availability and costs of financing needed
in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of projects; the other
risks involved in the mineral exploration and development industry; and those risks set out in the Company’s filings with the SEC
on EDGAR (www.sec.gov) and public disclosure record on SEDAR+ (www.sedarplus.ca), in each case, under NEXM’s issuer
profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news
release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release,
and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention
or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise,
other than as required by law.