STOCK TITAN

Aura Announces Full Board Approval for the Development of the Era Dorada Project, Reinforcing Its Commitment to Dialogue, Transparency, and Responsible Mining

(Moderate)
(Positive)
Tags

Aura Minerals (NASDAQ: AUGO) announced full board approval to develop the Era Dorada Project, with total capital expenditures estimated at US$382.0 million and operations expected to begin in the first half of 2028. Average annual gold production is estimated at 111,000 ounces during the first four years and the project has an estimated 17-year life of mine, based on mineral reserves reported under S-K 1300. Aura authorized budget for an advanced water treatment system to supply purified potable water to local communities, will pursue required permits, and filed the Era Dorada Feasibility Study with the SEC and CVM.

Aura emphasized conversion to underground mining after extensive community dialogue and pledged local hiring, 100% water recycling in plant processes, and collaboration on urban wastewater treatment.

Loading...
Loading translation...

Positive

  • Board approval granted for Era Dorada development
  • US$382.0 million total capital expenditure estimate
  • 111,000 oz average annual gold production (first four years)
  • 17-year estimated life of mine based on S-K 1300 reserves
  • Budget authorized for an advanced water treatment system supplying potable water

Negative

  • None.

News Market Reaction – AUGO

+4.51%
6 alerts
+4.51% Session close to close
+13.8% Peak in 25 hr 26 min
$9.16B Market Cap
0.1x Rel. Volume

In the Apr 14 session, AUGO gained 4.51%, reflecting a moderate positive market reaction. Argus tracked a peak move of +13.8% during that session. Our momentum scanner triggered 6 alerts that day, indicating moderate trading interest and price volatility.

Data tracked by StockTitan Argus on the day of publication.

Market Context

This announcement details full board approval for the Era Dorada Project, including planned capex of...
Analysis

This announcement details full board approval for the Era Dorada Project, including planned capex of US$382.0 million, targeted start-up in the first half of 2028, average early production of 111,000 ounces of gold per year, and a projected 17-year mine life. It emphasizes environmental and social commitments like 100% water reuse and potable water delivery. In context of recent reserve growth and record production, investors may watch project permitting, execution milestones, and adherence to S-K 1300 and NI 43-101 standards.

Key Figures

Era Dorada capex: US$382.0 million Operations start: First half of 2028 Avg annual production: 111,000 ounces +5 more
8 metrics
Era Dorada capex US$382.0 million Total capital expenditures for Era Dorada Project
Operations start First half of 2028 Expected commencement of Era Dorada operations
Avg annual production 111,000 ounces Average annual gold production first four years
Life of mine 17 years Estimated life of mine based on reserves
Community dialogue hours over 1,000 hours Dialogue with communities, authorities, regulators
Dialogue duration more than a year Period of engagement before project approval
Water reuse target 100% Planned recycle and reuse of water in plant processes
Technical standards S-K 1300, NI 43-101 Mineral reserves estimated under these frameworks

Historical Context

5 past events · Latest: Apr 10 (Positive)
Pattern 5 events
Date Event Sentiment 24h Move Catalyst
Apr 10 Production update Positive +3.3% Record Q1 2026 production of 82,137 GEO, 37% above Q1 2025.
Apr 01 Reserves/resources update Positive +7.1% Proven & Probable reserves increased to 7,223k GEO with strong drilling.
Mar 25 Sector-focused article Positive +7.6% Sector piece highlighting scalable gold assets and including Aura Minerals.
Mar 03 Credit rating upgrade Positive +2.4% S&P upgraded Aura’s ratings on global and Brazilian scales to stable.
Feb 26 Dividend announcement Positive -5.9% Declared US$0.66 per share dividend with 6.2% LTM yield; shares fell.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Pattern Detected

Recent company-specific news has typically seen positive price alignment, with only the strong dividend announcement showing a negative divergence.

Recent Company History

In the last few months, Aura has reported several positive milestones. A Q1 2026 production update highlighted record output and aligned with guidance. An updated mineral reserve/resource report for year-end 2025 showed significant growth driven by acquisitions and drilling, and drew a strong positive reaction. S&P’s credit rating upgrade in March 2026 also coincided with a gain. Only the US$0.66 per-share dividend tied to Q4 2025 results saw a negative 24-hour move, diverging from the otherwise positive pattern. Today’s project approval fits into this expansionary narrative.

Key Terms

s-k 1300, ni 43-101, feasibility study, potable water
4 terms
s-k 1300 regulatory
"based on mineral reserves estimated in accordance with S-K 1300."
Regulation S-K Item 1300 is a U.S. securities disclosure rule that requires public companies to report how they manage cybersecurity risks and to promptly disclose material cyber incidents. Think of it as a requirement to tell investors both the company’s “cyber health” plan and any major break-ins, similar to a homeowner explaining their alarm system and alerting neighbors after a burglary. This helps investors assess operational risk and potential financial or reputational impact.
ni 43-101 regulatory
"a “qualified person” within the meaning of S-K 1300 and NI 43-101."
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
feasibility study technical
"A copy of the Era Dorada Feasibility Study has been filed with the United States"
A feasibility study is an assessment that evaluates whether a proposed project or idea is practical and likely to succeed before investing significant time and resources. It considers factors like costs, potential benefits, and challenges, helping stakeholders decide if moving forward makes sense. Think of it as a detailed plan that gauges if a new venture is worth pursuing.
potable water technical
"This will enable the delivery of purified, potable water to the local community,"
Potable water is water that is safe for people to drink and use for cooking, meaning it meets health and safety standards to avoid illness. For investors, access to potable water affects a company’s operating costs, regulatory compliance, asset value and community reputation—similar to how a reliable power supply keeps a factory running, clean drinking water is a basic necessity that can influence profitability, risk and long‑term viability.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

ROAD TOWN, British Virgin Islands, April 13, 2026 (GLOBE NEWSWIRE) -- Aura Minerals Inc. (NASDAQ: AUGO, B3: AURA33) (“Aura” or the “Company”) is pleased to announce that its Board of Directors (the “Board”) has approved the development of the Era Dorada Project (“Era Dorada” or the “Project”), marking another significant milestone in the Project’s advancement. In addition to the core project approval, Aura has secured budget authorization for an advanced water treatment system, with plans to pursue all necessary government permits and approvals. This will enable the delivery of purified, potable water to the local community, further demonstrating Aura’s steadfast dedication to environmental stewardship, sustainable social impact, and responsible mining practices.

Total capital expenditures for the Era Dorada Project are estimated at US$382.0 million.and the project is expected to commence operations in the first half of 2028. Average annual gold production estimated at 111,000 ounces during the first four years of the Project, with an estimated life of mine of 17 years, based on mineral reserves estimated in accordance with S-K 1300. A copy of the Era Dorada Feasibility Study has been filed with the United States Securities and Exchange Commission (SEC) via EDGAR and is available at www.sec.gov and with the Brazilian Securities Commission (Comissão de Valores Mobiliários) (CVM) at www.cvm.com.br and is also available on Aura’s investor relations website.

Rodrigo Barbosa, Aura’s President and CEO commented, “After more than a year and over 1,000 hours of dialogue with local communities, authorities, and federal regulators, we converted the project to underground mining and approved additional investments. This ensures we not only do no harm but go beyond and create positive value for the communities and environment. Water quality is a key local concern, so Aura has approved a three-part plan: (i) Invest in engineering, infrastructure, and equipment to build and operate a plant that purifies local water to drinking quality, supplying it to communities through partnerships with authorities; (ii) Recycle and reuse 100% of the water in our plant processes; and (iii) Collaborate with local government and regulators to develop a plan to treat urban wastewater, helping clean the rivers. On the social front, we're committed to training and hiring locals, supporting local suppliers, and fostering entrepreneurship — all alongside our environmental standards and structured stakeholder dialogue. For instance, on top of direct and constant dialog with local community representatives, we've established permanent roundtables and Casa Era Dorada, located in the municipality of Asunción Mita, an open community space for sharing project information and addressing concerns. As we proceed, our commitment remains: to develop Era Dorada responsibly, listen actively, and demonstrate that modern mining can drive shared progress, environmental care, and mutual trust. I'm proud to say that we believe Era Dorada will set a global benchmark in social and environmental responsibility, just like Borborema and our other operating mines”

Qualified Persons

The scientific and technical information contained in this press release has been reviewed and approved by Farshid Ghazanfari, P.Geo., Geology and Mineral Resources Manager, an employee of Aura and a “qualified person” within the meaning of S-K 1300 and NI 43-101.

About Aura 360° Mining

Aura is focused on mining in complete terms – thinking holistically about how its business impacts and benefits every one of our stakeholders: our company, our shareholders, our employees, and the countries and communities we serve. We call this 360° Mining.

Aura is a company focused on the development and operation of gold and base metal projects in the Americas. The Company's six operating assets include the Minosa gold mine in Honduras; the Almas, Apoena, Borborema and MSG gold mines in Brazil; and the Aranzazu copper, gold, and silver mine in Mexico. Additionally, the Company owns Era Dorada, a gold project in Guatemala; Tolda Fria, a gold project in Colombia; and three projects in Brazil: Matupá, which is under development; São Francisco, which is in care and maintenance; and the Carajás copper project in the Carajás region, in the exploration phase.

Forward-Looking Information

This press release contains “forward-looking information” and “forward-looking statements”, as defined in applicable securities laws (collectively, “forward-looking statements”) which may include, but is not limited to, statements with respect to the activities, events or developments that the Company expects or anticipates will or may occur in the future. Often, but not always, forward-looking statements can be identified by the use of words and phrases such as “plans,” “expects,” “is expected,” “budget,” “scheduled,” “estimates,” “forecasts,” “intends,” “anticipates,” or “believes” or variations (including negative variations) of such words and phrases, or state that certain actions, events or results “may,” “could,” “would,” “might” or “will” be taken, occur or be achieved.

Known and unknown risks, uncertainties and other factors, many of which are beyond the Company’s ability to predict or control, could cause actual results to differ materially from those contained in the forward-looking statements. Specific reference is made to the most recent Annual Report on Form 20-F filed with the SEC for a discussion of some of the factors underlying forward-looking statements, which include, without limitation, volatility in the prices of gold, copper and certain other commodities, changes in debt and equity markets, the uncertainties involved in interpreting geological data, increases in costs, environmental compliance and changes in environmental legislation and regulation, interest rate and exchange rate fluctuations, general economic conditions and other risks involved in the mineral exploration and development industry. Readers are cautioned that the foregoing list of factors is not exhaustive of the factors that may affect the forward-looking statements. All forward-looking statements herein are qualified by this cautionary statement. Accordingly, readers should not place undue reliance on forward-looking statements. The press release includes forward-looking statements relating, but not limited to, the following: our plans and goals with respect to the Era Dorada project.

The Company undertakes no obligation to update publicly or otherwise revise any forward-looking statements whether as a result of new information or future events or otherwise, except as may be required by law. If the Company does update one or more forward-looking statements, no inference should be drawn that it will make additional updates with respect to those or other forward-looking statements.



For further information, please visit Aura’s website at www.auraminerals.com or contact:

Investor Relations
ri@auraminerals.com
www.auraminerals.com

FAQ

What did Aura (AUGO) announce about the Era Dorada Project on April 13, 2026?

Aura announced full board approval to develop Era Dorada with US$382.0 million CAPEX and operations targeted for H1 2028. According to Aura, the feasibility study was filed with the SEC and CVM and reserves comply with S-K 1300.

How much gold does Aura (AUGO) expect Era Dorada to produce annually?

Aura estimates average annual gold production of 111,000 ounces during the first four years. According to Aura, this projection is derived from mineral reserves prepared under S-K 1300 and disclosed in the feasibility study.

What is the expected timeline and life of mine for Aura's (AUGO) Era Dorada project?

Operations are expected to commence in the first half of 2028 with an estimated life of mine of 17 years. According to Aura, the schedule and life estimate are based on the filed feasibility study and reserve model.

What environmental measures did Aura (AUGO) approve for the Era Dorada Project?

Aura approved a three-part water plan including an advanced potable water plant and 100% water recycling in plant processes. According to Aura, it will pursue permits and partner with authorities to supply purified water to local communities.

Did Aura (AUGO) change the mining method for Era Dorada after community dialogue?

Yes, Aura converted the project to underground mining after extensive local engagement exceeding 1,000 hours. According to Aura, this decision followed dialogue with communities, authorities, and regulators to reduce surface impacts.