Endeavour Silver Produces 1,943,955 Oz Silver and 10,474 Oz Gold, for a total of 3.4 Million Silver Equivalent Oz in Q2 2026
Rhea-AI Summary
Endeavour Silver (NYSE:EXK) reported Q2 2026 production of 1,943,955 oz silver, 10,474 oz gold and 3.44 million silver equivalent oz, up 31%, 35% and 36% year-over-year. Throughput rose 68%.
Growth was driven by Terronera and Kolpa, while Guanacevi grades declined. Q2 results will be discussed July 30, 2026.
Positive
- Q2 2026 silver production 1,943,955 oz, up 31% year-over-year
- Q2 2026 gold production 10,474 oz, up 35% year-over-year
- Q2 2026 silver equivalent production 3.44M oz, up 36% year-over-year
- Lead, zinc and copper production up 72–120% year-over-year in Q2
- Kolpa Q2 throughput 233,408 tonnes, silver output up 19% vs Q1 2026
- Terronera Q2 silver recovery 85.4% and gold recovery 72.6%
- Q2 silver sales 2,086,717 oz and gold sales 10,823 oz, up 43% and 40%
Negative
- Consolidated Q2 2026 silver production slightly below internal plan
- Guanacevi silver production 30% lower year-over-year on 35% lower grades
- Guanacevi gold production 21% lower year-over-year with 27% lower grades
- Kolpa Q2 2026 processed lower silver grades as mining development lags plant capacity
News Market Reaction – EXK
In the Jul 8 session, EXK declined 3.74%, reflecting a moderate negative market reaction. Argus tracked a peak move of +8.0% during that session. Argus tracked a trough of -3.5% from its starting point during tracking. Our momentum scanner triggered 13 alerts that day, indicating notable trading interest and price volatility.
Data tracked by StockTitan Argus on the day of publication.
Key Figures
Historical Context
| Date | Event | Sentiment | 24h Move | Catalyst |
|---|---|---|---|---|
| Jun 18 | Drill results update | Positive | -2.6% | High‑grade Terronera and La Luz drilling results extended mineralization. |
| Jun 02 | AGM voting results | Neutral | -6.9% | Shareholders approved all AGM matters and re‑elected the full board. |
| May 06 | Q1 2026 earnings | Positive | +9.0% | Sharp revenue and profit improvement on higher prices and new mines. |
| Apr 08 | Q1 2026 production | Positive | +2.2% | Strong Q1 production of 3.34M AgEq oz with added Kolpa and Terronera. |
| Mar 02 | Leadership changes | Neutral | -5.5% | Board addition and COO transition as projects advance toward growth phase. |
24h Move is the share-price change in the day after each event; other market factors may also have contributed.
Recent news has often seen the stock sell off on operational or corporate updates, with stronger alignment mainly around quarterly production and earnings releases.
Key Terms
silver equivalent financial
ni 43-101 regulatory
tailings storage facility technical
dry-stack tailings technical
AI-generated analysis. How Rhea-AI works. Not financial advice.
VANCOUVER, British Columbia, July 08, 2026 (GLOBE NEWSWIRE) -- Endeavour Silver Corp. (“Endeavour” or the “Company”) (NYSE: EXK; TSX: EDR) reports second quarter 2026 production of 1,943,955 silver ounces (“oz”), 10,474 gold oz, and in combination with base metals, a silver equivalent (1) production of 3.4 million oz. Year-to-date production was 3,819,329 silver oz and 22,215 gold oz for a total silver equivalent production of 6.8 million ounces. All dollar amounts are in US dollars ($).
“During the second quarter, we continued to advance our operational priorities across the portfolio, with Terronera making steady progress through plant optimization, Kolpa delivering a meaningful step-up in throughput following its plant expansion, and Pitarrilla feasibility study advancing,” commented Dan Dickson, Chief Executive Officer. “While Terronera’s production remains in line with our planned first-half ramp-up profile, the continued improvement in Terronera recoveries and the strong contribution from Kolpa position us well as we work to build momentum through the remainder of 2026.”
Q2 2026 Production Overview
- Terronera Continues Plant Optimization: Throughput was consistent with plan in Q2, while metal recoveries improved through continued process refinement.
- Kolpa Expansion Increases Throughput: A significant portion of the plant expansion was commissioned at the end of Q1 2026, resulting in throughput of 233,408 tonnes in Q2 2026, a substantial increase compared to previous quarters. Recoveries remained stable through Q2 2026, while grades experienced a slight decrease as mining development in higher-grade areas catches up with the new plant capacity. As a result, Q2 2026 silver production was
19% higher than Q1 2026 and silver equivalent production was26% higher. - Guanaceví Maintains Stable Throughput: Throughput and recoveries were slightly higher than Q2 2025, offset by lower silver and gold grades. As a result, silver production was below plan while gold production remains in line with plan.
- Metal Sales and Inventories: Sold 2,086,717 silver oz and 10,823 gold oz during the second quarter. A total of 268,522 silver oz and 900 gold oz of bullion inventory and 41,771 silver ounces and 399 gold ounces in concentrate inventory are held as at June 30, 2026.
Q2 2026 Operations
Consolidated silver production was 1,943,955 oz in Q2 2026, slightly below plan, and
Consolidated gold production was 10,474 oz in Q2 2026,
Terronera’s production in Q2 2026 was in line with plan and mining operations are scheduled to shift into higher-grade areas in Q3 2026. Terronera recoveries averaged
Guanaceví’s throughput was
Kolpa's throughput in Q2 2026 was 233,408 tonnes producing 633,288 oz of silver, compared to 171,727 tonnes producing 530,118 oz of silver in Q1 2026. A significant portion of the plant expansion to 2,500 tonnes per day (tpd) was completed in March 2026; during the commissioning and ramp-up, the plant processed a higher proportion of lower grade open pit material. The processed material in Q2 2026 averaged grades of 93.3 g/t silver,
Consolidated Production Highlights for the Three and Six Months Ended June 30, 2026
| Three Months Ended June 30 | Six Months Ended June 30 | |||||
| 2026 | 2025 | % Change | 2026 | 2025 | % Change | |
| 509,576 | 303,828 | Throughput (tonnes) | 966,232 | 513,335 | ||
| 1,943,955 | 1,483,736 | Silver ounces produced | 3,819,329 | 2,689,529 | ||
| 10,474 | 7,755 | Gold ounces produced | 22,215 | 16,093 | ||
| 6,207 | 3,503 | Lead tonnes produced | 11,146 | 3,503 | ||
| 3,989 | 2,316 | Zinc tonnes produced | 6,831 | 2,316 | ||
| 127 | 58 | Copper tonnes produced | 193 | 58 | ||
| 1,872,767 | 1,454,412 | Payable silver ounces produced | 3,687,909 | 2,647,770 | ||
| 10,143 | 7,638 | Payable gold ounces produced | 21,517 | 15,826 | ||
| 3,437,794 | 2,528,562 | Silver equivalent ounces produced1 | 6,779,737 | 4,401,401 | ||
| 2,086,717 | 1,455,680 | Silver ounces sold | 3,728,937 | 2,679,364 | ||
| 10,823 | 7,706 | Gold ounces sold | 21,766 | 16,244 | ||
1 Silver equivalent for 2026 is calculated using 90 silver oz to 1 gold oz; 45 silver oz to 1 lead tonne; 61 silver oz to 1 zinc tonne; 238 silver oz to 1 copper tonne. Silver equivalent for 2025 is calculated using 80 silver oz to 1 gold oz; 60 silver oz to 1 lead tonne; 85 silver oz to 1 zinc tonne; 300 silver oz to 1 copper tonne ratios.
Bolañitos mine was sold January 15, 2026, and is included in the consolidated results above.
Totals may not add up due to rounding
Production Tables for the Three Months Ended June 30, 2026, by mine
| Three Months Ended June 30, 2026 | Terronera | Guanaceví | Kolpa |
| Tonnes processed | 175,729 | 100,439 | 233,408 |
| Tonnes per day | 1,931 | 1,104 | 2,565 |
| Silver ounces produced | 608,347 | 702,320 | 633,288 |
| Silver grade g/t | 126 | 235 | 93 |
| Silver recovery | |||
| Gold ounces produced | 7,666 | 2,808 | - |
| Gold grade g/t | 1.87 | 0.94 | - |
| Gold recovery | - | ||
| Lead tonnes produced | - | - | 6,207 |
| Lead grade % | - | - | |
| Lead recovery % | - | - | |
| Zinc tonnes produced | - | - | 3,989 |
| Zinc grade % | - | - | |
| Zinc recovery % | - | - | |
| Copper tonnes produced | - | - | 127 |
| Copper grade % | - | - | |
| Copper recovery % | - | - | |
| Silver Equivalent ounces produced1 | 1,298,268 | 955,070 | 1,184,457 |
Totals may not add up due to rounding
Production Tables for the Six Months Ended June 30, 2026, by mine
| Six Months Ended June 30, 2026 | Terronera | Guanacevi | Kolpa |
| Tonnes processed | 351,147 | 195,963 | 405,135 |
| Tonnes per day | 1,940 | 1,083 | 2,238 |
| Silver ounces produced | 1,141,648 | 1,495,880 | 1,163,406 |
| Silver grade g/t | 119 | 259 | 98.63 |
| Silver recovery | |||
| Gold ounces produced | 16,144 | 5,577 | - |
| Gold grade g/t | 1.97 | 0.98 | - |
| Gold recovery | - | ||
| Lead tonnes produced | - | - | 11,146 |
| Lead grade % | - | - | |
| Lead recovery % | - | - | |
| Zinc tonnes produced | - | - | 6,831 |
| Zinc grade % | - | - | |
| Zinc recovery % | - | - | |
| Copper tonnes produced | - | - | 193 |
| Copper grade % | - | - | |
| Copper recovery % | - | - | |
| Silver Equivalent ounces produced | 2,594,616 | 1,998,849 | 2,124,507 |
Bolañitos mine was sold January 15, 2026, and is not included in the breakdown above.
Totals may not add up due to rounding
About Endeavour Silver
Endeavour is a mid-tier silver producer with three operating mines in Mexico and Peru and a robust pipeline of exploration projects across Mexico, Chile, and the United States. With a proven track record of discovery, development, and responsible mining, Endeavour is driving organic growth and creating lasting value on its path to becoming a leading senior silver producer.
Qualified Person
Dale Mah, P.Geo., Vice President Corporate Development, a qualified person under NI 43-101, has approved the scientific and technical information related to operations matters in this news release.
Q2 2026 Financial Results and Conference Call
Q2 2026 financial results will be released after market close on Wednesday July 29, 2026, and Management will host a conference call the next day, Thursday July 30, 2026, at 10:00 a.m. Pacific Time / 1:00 p.m. EDT to discuss the results.
| Date: | Thursday July 30, 2026 |
| Time: | 10:00am Pacific Time / 1:00pm EDT |
| Telephone: | Canada & US + 1-833-752-3348 International + 1-647-846-2804 |
| Replay: | Canada & US +1- 855-669-9658 International +1-412-317-0088 Access code is 8095012; audio replay will be available on the Company’s website |
Contact Information
Allison Pettit
Vice President, Investor Relations
Email: apettit@edrsilver.com
Website: www.edrsilver.com
Cautionary Note Regarding Forward-Looking Statements [Blakes to review]
This news release contains “forward-looking statements” within the meaning of the United States private securities Litigation Reform Act of 1995 and “forward-looking information” within the meaning of applicable Canadian securities legislation. Such forward-looking statements and information herein include, but are not limited to, statements regarding improvement initiatives; contribution from Kolpa; operations at the Company’s properties continuing to meet management targets; mining operations; improvement of recoveries; the Company’s plans to drive organic growth, create lasting value and become a leading senior silver producer; and the timing and results of various activities. The Company does not intend to and does not assume any obligation to update such forward-looking statements or information, other than as required by applicable law.
Forward-looking statements or information involve known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, production levels, performance or achievements of Endeavour and its operations to be materially different from those expressed or implied by such statements. Such factors include but are not limited to unexpected changes in production and costs guidance; the ongoing effects of inflation and supply chain issues on mine economics; changes in national and local governments’ legislation, taxation, controls, regulations and political or economic developments in Canada, Chile, the USA, Mexico and Peru; financial risks due to precious metals prices; operating or technical difficulties in mineral exploration, development and mining activities; risks and hazards of mineral exploration, development and mining (including, but not limited to environmental hazards, industrial accidents, unusual or unexpected geological conditions, pressures, cave-ins and flooding); inadequate insurance, or inability to obtain insurance; availability of and costs associated with mining inputs and labour; the speculative nature of mineral exploration and development; diminishing quantities or grades of mineral reserves as properties are mined; risks in obtaining necessary licenses and permits; fluctuations in the prices of silver and gold; fluctuations in currency markets (particularly the Mexican peso, Peruvian sol, Chilean peso, Canadian dollar and U.S. dollar); and challenges to the Company’s title to properties; as well as those factors described in the section “Risk Factors” contained in the Company’s most recent form 40F/Annual Information Form Dated March 27, 2026, filed with the S.E.C. and Canadian securities regulatory authorities.
Forward-looking statements are based on assumptions management believes to be reasonable, including but not limited to: the continued operation of the Company’s mining operations, no material adverse change in the market price of commodities, forecasted mine economics, mining operations will operate and the mining products will be completed in accordance with management’s expectations and achieve their stated production outcomes, and such other assumptions and factors as set out herein. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements or information, there may be other factors that cause results to be materially different from those anticipated, described, estimated, assessed or intended. There can be no assurance that any forward-looking statements or information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements or information. Accordingly, readers should not place undue reliance on forward-looking statements or information.