STOCK TITAN

Red Metal Site Visit Confirms Development Progress at Carrizal IOCG Project

(Positive)
Tags

Red Metal (OTCPINK:RMESF) reported progress at the Carrizal Copper-Gold-Cobalt Property in Chile, where lease operator KMT is advancing small-scale mining on the Farellon 1/8 concession. Red Metal receives a 10% sales royalty on ore sold to ENAMI.

Level 7 de-watering at the North Mine is about 90% complete, and the South Mine decline has advanced 10 metres toward a mineralized vein. KMT indicates development is ahead of schedule, with production at Level 7 targeted by end of summer.

Loading...
Loading translation...

AI-generated analysis. How Rhea-AI works. Not financial advice.

Positive

  • Level 7 de-watering in North Mine approximately 90% complete
  • KMT reports path to full production is ahead of schedule
  • Red Metal to collect 10% royalty on ore sold to ENAMI
  • Historic Level 7 output of 5,080 t at 1.97% Cu

Negative

  • Production has not yet commenced; operations remain in development stage
  • Drill intercepts are not true widths, estimated at 70–90% of drilled
See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

VANCOUVER, BC, July 7, 2026 /PRNewswire/ - RED METAL RESOURCES LTD. ("Red Metal" or the "Company") (CSE: RMES) (OTCPINK: RMESF) (FSE: I660) is pleased to provide an operational update on the small-scale mining activities at its Farellon 1/8 mineral concession, part of the Company's Carrizal Copper-Gold-Cobalt Property ("Carrizal" or the "Property") in Chile's Atacama Region.

The update follows recent site visits by Red Metal's in-country staff, who will be visiting the operation twice monthly to monitor progress by lease operator Minera KMT SpA ("KMT"). KMT signed a mining agreement with Red Metal (see news release May 14, 2026) leasing the Farellon 1/8 mineral concession for small-scale mining. Red Metal will collect a 10% sales royalty from KMT on all ore sold to Empresa Nacional de Mineria ("ENAMI"). 

Highlights

  • Red Metal's in-country staff completed site visits June 18th and July 1st, 2026, confirming that mine development by KMT is actively underway at Farellon 1/8, and will continue to visit twice monthly.
  • De-watering of the historic Level 7 workings at the North Mine is approximately 90% complete, restoring access to known high-grade underground copper mineralization.
  • The South Mine portal has been advanced 10 metres in the direction of a mineralized vein intersected by previous drilling
  • KMT advises that the path to full production operations is ahead of schedule

Site Visit and Operational Update

During recent site visits, Red Metal's in-country staff met with KMT's mine shift supervisor to review operational activities and report on progress. As part of the Company's ongoing oversight of the lease, Red Metal staff will conduct site visits twice monthly to evaluate progress, take samples and ensure KMT is adhering to all terms of the contract. KMT is currently working on road construction, building camp infrastructure, and advancing underground development in both the North and South Mine areas.

Figure 1 – scooptram on Southern decline  Figure 2 – miners camp Figure 3 – Northern portal with dewatering lines

Underground Development

In the north workings, de-watering of the historic Level 7 workings is approximately 90% complete, with water being pumped to surface and discharged. Restoring access to Level 7 is a key step in re-establishing production, as a total of 5,080 tonnes of ore were previously extracted from Level 7 between 2016 and 2017, grading 1.97% copper, 9.62 g/t silver and 0.14 g/t gold. Copper and gold grades within the sulphide mineralization have been shown to increase and become more consistent with depth in the historic workings.

In the south sector, a crew of two drillers and a scoop tram operator continue to advance the decline toward a previously drilled vein with intercepts in the area. Intercepts listed below are historic drill intercepts in the area being targeted by the Southern decline.

Table 1 – historic drill intercepts targeted by the Southern Decline

Hole ID

Depth From m

Depth To m

Length m

Au g/t

Cu %

FAR-11-006

80

112

32

0.99

1.35

FAR-96-022

29

39

10

1.31

1.53

FAR-96-022

100

108

8

2.49

3.72

FAR-09-B

75

86

11

0.67

1.35

FAR-09-C

77

86

9

2.44

1.60

FAR-09-D

95

103

8

0.33

2.02

Drill intercepts are not true widths; true widths are estimated at between 70-90% of drilled widths

Figure 4 – Farellon site with surface sampling results and North and South mine portal locations

Red Metal Resources President and CEO, Caitlin Jeffs, stated, "The reports from our in-country team are encouraging, confirming active development and steady progress on many fronts with an experienced local crew. With de-watering of Level 7 well advanced and the south tunnel approaching the target vein, KMT is on track to begin production before the original seven month target. Having our staff on-site twice a month gives us close oversight of the operation as it advances, while continuing to support local Chilean miners and providing a reliable revenue stream from our Chilean operations."

Next Steps

  • KMT will continue to de-water Level 7 in the northern mine sector in preparation for the commencement of production by end of summer
  • the southern mine sector will be further extended until the target mineralized vein is reached.
  • IP results expected in July to aide in drill targeting

Cautionary Statement

Mining at the Farellon 1/8 concession is being carried out by the lessee, Minera KMT [SpA], under a lease and royalty arrangement. Red Metal is the lessor and royalty holder and is not the operator of the mining activities. The mining is not based on a feasibility study, preliminary feasibility study or other technical study demonstrating economic or technical viability, and no current mineral resource or mineral reserve estimate has been prepared for the Property under National Instrument 43-101.

Qualified Person

The technical content of this news release has been reviewed and approved by Caitlin Jeffs, P. Geo, who is a Qualified Person ("QP") as defined in National Instrument 43-101, Standards of Disclosure for Mineral Projects.

About Red Metal Resources Ltd.

Red Metal Resources is a mineral exploration company focused on growth through acquiring, exploring and developing clean energy and strategic minerals projects. The Company's current portfolio includes the Company's Chilean projects, located in the prolific Candelaria Iron Oxide Copper-Gold (IOCG) belt of Chile's coastal Cordillera, as well as claims in Quebec and Ontario, Canada.

Red Metal is quoted on the Canadian Securities Exchange under the symbol RMES, on the OTC Link alternative trading system on the OTC Pink marketplace under the symbol RMESF, and on the Frankfurt Stock Exchange under the symbol I660.

For more information, please visit www.redmetalresources.com.

Forward-Looking Statements - All statements in this press release, other than statements of historical fact, are "forward-looking information" within the meaning of applicable securities laws. Red Metal provides forward-looking statements for the purpose of conveying information about current expectations and plans relating to the future and readers are cautioned that such statements may not be appropriate for other purposes. By its nature, this information is subject to inherent risks and uncertainties that may be general or specific, and which give rise to the possibility that expectations, forecasts, predictions, projections or conclusions will not prove to be accurate, that assumptions may not be correct and that objectives, strategic goals and priorities will not be achieved. These risks and uncertainties include but are not limited to the ability to raise adequate financing, receipt of required approvals, as well as those risks and uncertainties identified and reported in Red Metal's public filings under its SEDAR+ profile at www.sedarplus.ca. Although Red Metal has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate as actual results and future events could differ materially from those anticipated in such statements. Red Metal disclaims any intention or obligation to update or revise any forward-looking information, whether as a result of new information, future events or otherwise unless required by law.

Neither the Canadian Securities Exchange nor the Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Red Metal Resources Ltd. Logo

Cision View original content to download multimedia:https://www.prnewswire.com/news-releases/red-metal-site-visit-confirms-development-progress-at-carrizal-iocg-project-302819723.html

SOURCE Red Metal Resources Ltd

FAQ

What did Red Metal (RMESF) announce about development at the Carrizal IOCG project?

Red Metal announced active mine development at the Farellon 1/8 concession within the Carrizal project. According to Red Metal, KMT is advancing underground work in both North and South Mine areas, with regular twice-monthly oversight visits by in-country staff to monitor progress and sampling.

How advanced is Level 7 de-watering at Red Metal’s Farellon 1/8 concession (RMESF)?

Level 7 de-watering at the North Mine is about 90% complete. According to Red Metal, restoring access is key, as 5,080 tonnes grading 1.97% copper, 9.62 g/t silver and 0.14 g/t gold were previously extracted from this level between 2016 and 2017.

When does Red Metal (RMESF) expect production to start at Level 7 of Carrizal?

Production at Level 7 is targeted by the end of summer. According to Red Metal, KMT will continue de-watering the northern mine sector in preparation for production, while maintaining development in the southern decline toward the target mineralized vein at the Carrizal property.

What royalty will Red Metal (RMESF) receive from KMT’s Carrizal mining operations?

Red Metal will receive a 10% sales royalty on ore sold to ENAMI. According to Red Metal, this royalty comes from the small-scale mining agreement leasing the Farellon 1/8 concession to Minera KMT SpA, providing a recurring revenue stream from Chilean operations.

What are the key historic drill intercepts guiding the South Mine decline at Carrizal (RMESF)?

Historic drilling includes intercepts such as 32 m at 0.99 g/t gold and 1.35% copper in hole FAR-11-006. According to Red Metal, these and other listed intercepts guide the southern decline, though true widths are estimated at 70–90% of drilled widths.

How is Red Metal (RMESF) overseeing KMT’s small-scale mining at the Carrizal project?

Red Metal’s in-country staff visit the site twice monthly to oversee operations. According to Red Metal, these visits review development progress, collect samples, and ensure KMT complies with contract terms, providing close operational oversight while supporting local Chilean miners.

What upcoming milestones did Red Metal (RMESF) highlight for the Carrizal IOCG project?

Planned milestones include completing Level 7 de-watering and extending the southern decline to the target vein. According to Red Metal, induced polarization (IP) geophysical results are also expected in July to aid drill targeting and support further exploration planning at Carrizal.