generating strong operating cash flow and funding growth as Marmato CIP commissioning advances
Vancouver, Canada, November 4, 2026
– Aris Mining Corporation (Aris Mining or the Company) (TSX: ARIS; NYSE: ARIS) announces its financial and operating results
for the three and nine months ended September 30, 2026 (Q3 2026 and YTD 2026). All amounts are in U.S. dollars unless otherwise
indicated.
Q3 2026 & YTD 2026
Financial Performance
| ● | YTD gold production of 217.3 koz, up 16% from YTD
2025, including Q3 production of 69.3 koz. |
| ● | Q3 gold revenue of $287 million, with an average
realized gold price of $4,205/oz. |
| ● | Q3 adjusted EBITDA1 of $144 million, bringing
YTD adjusted EBITDA to $535 million, up 81% from YTD 2025. Trailing 12-month adjusted EBITDA reached $702 million. |
| ● | Q3 adjusted net earnings of $73 million or $0.35/share,
bringing YTD adjusted net earnings to $293 million, up 99% from YTD 2025. Trailing 12-month adjusted net earnings reached $387
million or $1.88 per share. |
| ● | Cash balance of $419 million as of September 30, 2026,
after investing $144 million in capital projects during Q3, including $86 million at Marmato and $41 million at Segovia. |
Neil Woodyer, Chair and CEO, commented
“Aris Mining delivered another strong quarter, with cash generated from Segovia supporting our significant capital investment
program during the most capital-intensive phase of the Marmato expansion, while maintaining a strong balance sheet.
At Marmato, construction of the new carbon-in-pulp
(CIP) plant is nearing completion and commissioning activities are underway, with the first gold pour expected in December 2026
following start-up of the processing and gold-recovery circuits. Upgrades completed at the existing flotation plant during Q3 and
the successful commissioning of the new Cascabel 3 filtered tailings facility, together with ongoing mining in the Bulk Mining
Zone and commission of the new CIP plant, are key to achieving Marmato’s planned production ramp-up in 2027.
At Segovia, our investments in underground
development and the mining fleet are building the capacity required to increase mining rates and improve haulage efficiency. The
resolution of explosives supply constraints is also expected to support increased production from our contract mining partners.
Together, the Segovia and Marmato expansions underpin our target of approximately 500,000 ounces² of annual gold production
once fully ramped up.
At Soto Norte, we continue to advance the
environmental licensing process and are encouraged by recent government actions that have improved regulatory clarity. At Toroparu,
the Prefeasibility Study (PFS) is nearing completion, with the PFS targeted for release in November 2026. We will assess a potential
construction decision in early 2027 following first gold from the Marmato CIP plant as we continue executing our well sequenced
growth strategy.”
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
Summary Financial and
Operating Results
| |
Q3 2026 |
Q2 2026 |
YTD 2026 |
YTD 2025 |
| Gold production (koz), total |
69.3 |
73.7 |
217.3 |
186.7 |
| Gold sold (koz), total |
68.4 |
72.1 |
215.3 |
188.3 |
| Segovia – AISC, Owner Mining ($/oz sold) |
$1,945 |
$1,767 |
$1,729 |
$1,482 |
| Segovia – CMP3 AISC Sales Margin |
37% |
46% |
41% |
43% |
| EBITDA (US$M) |
$131 |
$163 |
$475 |
$168 |
| Adjusted EBITDA (US$M) |
$144 |
$179 |
$535 |
$296 |
| Adjusted EBITDA, last 12 months (US$M) |
$702 |
$690 |
$702 |
$352 |
| Net earnings4 (US$M) |
$67 or $0.32/sh |
$94 or $0.46/sh |
$259 or $1.25/sh |
$27 or $0.15/sh |
| Adjusted earnings4 (US$M) |
$73 or $0.35/sh |
$96 or $0.47/sh |
$293 or $1.42/sh |
$147 or $0.80/sh |
| Adjusted earnings4, last 12 months (US$M) |
$387 or $1.88/sh |
$386 or $1.89/sh |
$387 or $1.88/sh |
$171 or $0.93/sh |
Q3 & YTD 2026 Operational
Performance
| ● | Segovia produced 63.4 koz in Q3, bringing
YTD gold production to 194.4 koz. |
| ○ | Q3 production reflected higher throughput, with 208.0 thousand tonnes (kt) processed at an average
gold grade of 9.77 g/t, compared with 202.5 kt at 10.23 g/t in Q2 2026. |
| ○ | Owner-mined tonnes increased approximately 23% from Q1 to Q3. Production from external mining partners
was affected by temporary explosives supply constraints, which impacted their tonnes and grades. This issue was resolved in September
under the new Colombian administration, positioning partner production to increase. |
| ○ | Segovia continues investing in underground development and enhancing its mining fleet to support
increasing utilization of the expanded processing capacity. Total investment, including sustaining and non-sustaining capital,
increased to $41 million in Q3 2026 from $31 million in Q2 2026. |
| ○ | Segovia generated an AISC margin of $129
million in Q3 2026, supported by higher tonnes processed and continued
strong gold prices, bringing YTD 2026 AISC margin to $485 million. |
| ○ | Owner-operated mining AISC was $1,945/oz
for Q3 2026, bringing YTD 2026 owner-operated mining AISC to $1,729/oz,
at the low-end of the full-year guidance range of $1,700 to $1,800/oz. |
| ○ | CMP-sourced gold delivered an AISC sales
margin of 37% in Q3 2026, bringing YTD 2026 CMP AISC sales margin
to 41%, above the top-end of the full-year guidance range of 35%
to 40%. |
| ○ | Combined AISC is $2,039/oz
for YTD 2026. |
| ● | Marmato produced 5.8 koz, bringing
YTD gold production to 22.9 koz. |
| ○ | Q3 production reflected the processing of 55.5 kt at an average gold grade of 3.68 g/t, compared
with 84.6 kt at 3.79 g/t in Q2 2026. |
| ○ | Marmato achieved an important expansion milestone with the successful commissioning of the new
Cascabel 3 filtered tailings facility in Q3. The planned transition from Cascabel 2 required approximately four weeks of flotation
plant downtime, which contributed to lower quarterly production but was used to complete upgrades and extensive maintenance at
the flotation plant. |
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
| ○ | The refurbishment of the primary
ball mill, together with the installation of a new regrind mill and Knelson concentrator, increased the existing flotation plant's
capacity to 1,200 tpd. |
| ○ | Construction of the new 5,000 tpd design-capacity CIP plant is in the final stages, and commissioning
is underway, with the first gold pour expected in December 2026. |
| ○ | Aris Mining plans to ramp up the new CIP plant to approximately 4,000 tpd by mid-2027 and to reach
the full 5,000 tpd design-capacity by the end of 2027, following commissioning of the paste backfill plant. |
| ○ | An updated NI 43-101 technical report for Marmato, including new mineral reserve and resource estimates,
is expected to be released in the first quarter of 2027. |
| ○ | Aris Mining is targeting the lower end of the 2026 production guidance of 300,000 to 350,000 ounces
of gold. |
| ○ | YTD 2026 production of 217.3 koz represents approximately 72% of the lower end of the full-year
guidance range. |
| ○ | At Segovia, the Company is focused on increasing mining rates and gold production during Q4 as
CMP operations improve following the resolution of explosives supply constraints, alongside continued development of the Company's
owner-operated mining capacity. |
| ○ | At Marmato, upgrades completed during Q3 are expected to support improved performance at the existing
flotation plant, while the new CIP plant continues to target first gold in December 2026. |
Project Development
Highlights
| ● | Toroparu – Advancing Toward a Potential Early 2027 Construction Decision |
| ○ | The Toroparu PFS is targeted for completion in November 2026, including Aris Mining’s first
mineral reserve estimate for Toroparu. |
| ○ | The PFS incorporates an execution strategy including experienced mining contractors, with costs
supported by competitive international quotations, and a combination of engineering and construction contracting models as well
as self-performed work, selecting the most appropriate delivery approach for each project area. This approach is designed to strengthen
cost and schedule control while managing execution risk compared with the owner-mining strategy contemplated in the 2025 PEA. |
| ○ | Early works continue, including construction of the Puruni River bridge to strengthen equipment
access and regional connectivity. |
| ○ | The Large-Scale Mining License application has been submitted, and Aris Mining is working collaboratively
with the Government of Guyana to advance the permitting process. |
| ● | Soto Norte – Permitting Milestone Advancing |
| ○ | As detailed in a new release on September 30, 2026, recent government actions have improved regulatory
clarity for Soto Norte's environmental licensing pathway. These include the revocation of the La Baja permanent reserve and the
revocation of the August 2026 extension of the Temporary Reserve Area, restoring its original March 4, 2027 expiry date. In addition,
on July 29, 2026, the National Mining Agency (ANM) approved the modification to the PTO for Soto Norte in respect of mining concession
0095-68, where the deposit is located. In approving the plan, the ANM reviewed Soto Norte’s geology, mineral resources and
reserves, mine design and production plan. |
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
| ○ | The preparation of the Environmental and Social Impact Assessment (ESIA) is complete, and the assessment
is ready for formal consultation with local communities. |
Q3 2026 Conference Call
Details
Management will host a conference call
on Wednesday, November 4, 2026 at 3:00 pm Vancouver time (5:00 pm ET / 10:00 pm GMT) to discuss the results.
Participants may gain expedited access
to the conference call by registering at Diamond Pass Registration. Once registered,
call-in details will be displayed on screen which can be used to bypass the operator and avoid the call queue. Registration will
remain open until the end of the live conference call.
Webcast
| ● | Link:
Webcast | Q3 2026 Conference Call |
Conference Call
| ● | Toll-free North America: +1-833-821-0197 |
| ● | International: +1-647-846-2328 |
Audio Recording
| ● | After the call, an audio recording will be available via telephone until end of day November 11,
2026 |
| ● | Toll-free in the US and Canada: +1-855-669-9658 |
| ● | International: +1-412-317-0088; and using the access code: 4512692 |
Aris Mining's Condensed Consolidated Interim
Financial Statements for the three and nine months ended September 30, 2026 and related MD&A are available on SEDAR+, in the
Company’s filings with the U.S. Securities and Exchange Commission (the SEC) and in the Financials section of Aris Mining's
website here. Hard copies of the financial statements are available free of charge
upon written request to info@aris-mining.com.
About Aris Mining
Aris Mining is a Canadian gold mining company
focused on South America. The Company operates the Segovia and Marmato underground gold mines in Colombia, which together produced
approximately 257,000 ounces of gold in 2025. Aris Mining is listed on the Toronto Stock Exchange and the New York Stock Exchange
under the symbol ARIS.
The Company is advancing expansion projects
at Segovia and Marmato that are expected to increase annual gold production to 500,000 ounces7, driven by the ramp-up
at Segovia following the installation of the second mill and construction of the new Marmato bulk mine and CIP plant, with first
gold expected in Q4 2026.
Aris Mining’s portfolio supports
a longer-term objective of approximately 1 million ounces7 of annual gold production. Key projects include the high-grade
Soto Norte gold project in Colombia, where preparation of the Environmental and Social Impact Assessment (ESIA) has been completed
for community engagement, and the Toroparu gold project in Guyana, where a Prefeasibility Study is in progress and a construction
decision is expected in early 2027.
Additional information on Aris Mining
can be found at www.aris-mining.com, www.sedarplus.ca,
and on www.sec.gov.
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
Aris Mining Contact
| Oliver Dachsel |
|
Lillian Chow |
| Senior Vice President, Capital Markets |
|
Director, Investor Relations & Communications |
| +1.917.847.0063 |
|
info@aris-mining.com |
Endnotes
1.
All references to adjusted earnings, EBITDA, adjusted EBITDA, growth capital investment, cash flow after sustaining capital and
income taxes, cash costs ($ per oz) and AISC ($ per oz) are non-GAAP financial measures in this document. These measures are intended
to provide additional information to investors. They do not have any standardized meanings under IFRS, and therefore may not be
comparable to other issuers and should not be considered in isolation or as a substitute for measures of performance prepared in
accordance with IFRS. Refer to the Non-GAAP Measures section in this document for a reconciliation of these measures to the most
directly comparable financial measure disclosed in the Company’s financial statements.
2. Reflects expected steady-state annual
gold production run-rates of approximately 300 koz at Segovia and 200 koz at Marmato following completion and ramp-up of the respective
expansion projects. For more information, please refer to the Company’s news releases dated June 30, 2025 regarding the Segovia
expansion and March 12, 2025 regarding the Marmato expansion
3. Aris Mining operates its own mines and
contracts with community-based mining partners, referred to as Contract Mining Partners or CMPs, to increase total gold production.
Some partners work within Aris Mining’s infrastructure, while others manage their own mining operations on Aris Mining’s
titles using their own infrastructure. In addition, Aris Mining purchases high grade mill feed from third-party contractors operating
off-title, which further optimizes production and increases operating margins.
4. Net earnings represents net earnings
attributable to owners of the company, as presented in the annual and interim financial statements for the relevant period.
5. See technical report dated October 28,
2025 and entitled “NI 43-101 Technical Report Preliminary Economic Assessment for the Toroparu Project Cuyuni-Mazaruni Region,
Guyana”. Note that this PEA is preliminary in nature. It includes inferred mineral resources that are considered too speculative
geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves,
and there is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves
do not have demonstrated economic viability.
6. See technical report dated September
3, 2025 and entitled “NI 43-101 Technical Report Prefeasibility Study for the Soto Norte Project, Santander, Colombia.”
7. Includes potential production estimates
from Toroparu, which is based on a preliminary economic assessment effective October 21, 2025, which contemplates a 7.0 Mtpa operation
over a 21.3-year mine life with average annual gold production of approximately 235 koz at a base case gold price of US$3,000/oz.
The preliminary economic assessment is preliminary in nature and includes inferred mineral resources that are considered too speculative
geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves,
and there is no certainty that the preliminary economic assessment will be realized. Mineral resources that are not mineral reserves
do not have demonstrated economic viability. There can be no assurance that the projected production will be achieved. In the case
of Soto Norte and Toroparu, such production also remains subject to obtaining all necessary permits and to formal construction
decisions by the Company.
 |
NEWS
RELEASE
TSX
& NYSE: ARIS
aris-mining.com
|
Non-GAAP
Measures
Cash
costs & all-in sustaining cost per ounce
| |
For
the three months ended, |
For
the nine months ended, |
| |
|
|
| Segovia |
Sep
30, 2026 |
Jun
30, 2026 |
Sep
30, 2026 |
Sep
30,2025 |
| Total
gold sold (ounces) |
62,748 |
62,762
|
193,219 |
166,721
|
| Cost of sales1 |
116,143 |
110,226
|
342,477 |
237,059
|
| Less: royalties1 |
(9,693) |
(10,741) |
(31,573) |
(17,590) |
| Add:
by-product revenue1 |
(8,050) |
(8,703) |
(24,202) |
(9,987) |
| Total
cash costs |
98,400 |
90,782
|
286,702 |
209,482 |
| Add: royalties1 |
9,693
|
10,741
|
31,573 |
17,590
|
| Add: social contributions1 |
7,914
|
8,661
|
28,933 |
17,025
|
| Add:
sustaining capital expenditures and lease payments |
20,377 |
14,473 |
46,767 |
28,306 |
| Total
AISC |
136,384
|
124,657
|
393,975 |
272,403 |
| AISC
per ounce sold |
$2,174
|
$1,986
|
$2,039 |
$1,634 |
| Marmato |
|
|
|
|
| Total
gold sold (ounces) |
5,611 |
9,362
|
22,107 |
21,585
|
| Cost
of sales1 |
20,851 |
26,542
|
70,489 |
53,082
|
| Less:
royalties1 |
(2,414) |
(3,938) |
(9,684) |
(6,439) |
| Add:
by-product revenue1 |
(159) |
(123) |
(588) |
(1,283) |
| Total
cash costs |
18,278 |
22,481
|
60,217 |
45,360
|
| Add:
royalties1 |
2,414 |
3,938
|
9,684 |
6,439 |
| Add:
social contributions1 |
231 |
392
|
1,563 |
1,095 |
| Add:
sustaining capital expenditures |
3,776 |
1,791
|
7,048 |
3,683 |
| Total
AISC |
24,699 |
28,602
|
78,512 |
56,577 |
| Consolidated |
|
|
|
|
| Total
gold sold (ounces) |
68,359 |
72,124
|
215,326 |
188,306
|
| Cost
of sales1 |
136,994 |
136,768
|
412,966 |
290,141
|
| Less:
royalties1 |
(12,107) |
(14,679) |
(41,257) |
(24,029) |
| Add:
by-product revenue1 |
(8,209) |
(8,826) |
(24,790) |
(11,270) |
| Total
cash costs |
116,678 |
113,263
|
346,919 |
254,842
|
| Add:
royalties1 |
12,107 |
14,679
|
41,257 |
24,029
|
| Add:
social contributions1 |
8,145 |
9,053
|
30,496 |
18,120
|
| Add:
sustaining capital expenditures and lease payments |
24,153 |
16,264
|
53,815 |
31,989 |
| Total
AISC |
161,083 |
153,259
|
472,487 |
328,980 |
1.
As presented in the financial statements and notes thereto for the respective periods
 |
NEWS
RELEASE
TSX
& NYSE: ARIS
aris-mining.com
|
All-in
sustaining cost per ounce – business units (Segovia)
| |
For
the three months ended, |
For
the nine months ended, |
| Segovia
- Owner Mining |
Sep
30, 2026 |
June
30, 2026 |
Sep
30, 2026 |
Sep
30,2025 |
| Total
gold sold (ounces) |
42,913 |
41,520
|
130,222
|
100,632 |
| Cost
of sales1 |
66,869 |
61,207
|
182,933
|
122,833 |
| Less:
royalties1 |
(6,932) |
(7,415) |
(22,152) |
(11,388) |
| Add:
by-product revenue1 |
(5,503) |
(5,771) |
(16,311) |
(6,028) |
| Total
cash costs |
54,434 |
48,021
|
144,470
|
105,416 |
| Add:
royalties1 |
6,932 |
7,415
|
22,152
|
11,388 |
| Add:
social contributions1 |
5,679 |
5,961
|
20,300
|
11,023 |
| Add:
sustaining capital and lease payments |
16,438 |
11,949 |
38,222 |
21,338 |
| Total
AISC |
83,483 |
73,346
|
225,144
|
149,165 |
| AISC
($/oz sold) |
$1,945 |
$1,767
|
$1,729
|
$1,482 |
| Segovia
- CMPs |
|
| Total
gold sold (ounces) |
19,835 |
21,242
|
62,997
|
66,089 |
| Cost
of sales1 |
49,274 |
49,019
|
159,544
|
114,226 |
| Less:
royalties1 |
(2,761) |
(3,326) |
(9,421) |
(6,202) |
| Add:
by-product revenue1 |
(2,547) |
(2,932) |
(7,891) |
(3,959) |
| Total
cash costs |
43,966 |
42,761
|
142,232
|
104,065 |
| Add:
royalties1 |
2,761 |
3,326
|
9,421
|
6,202 |
| Add:
social contributions1 |
2,235 |
2,700
|
8,633
|
6,002 |
| Add:
sustaining capital and lease payments |
3,939 |
2,524
|
8,545
|
6,969 |
| Total
AISC |
52,901 |
51,311
|
168,831
|
123,238 |
| AISC
($/oz sold) |
$2,667 |
$2,415
|
$2,680
|
$1,865 |
| Segovia
- Combined |
|
|
|
|
| Total gold produced
(ounces) |
63,445 |
64,424
|
194,436
|
164,625 |
| Total gold sold
(ounces) |
62,748 |
62,762
|
193,219 |
166,721 |
| Gold revenue
|
265,190 |
281,764
|
878,565
|
541,977 |
| Avg realized
gold price ($/oz sold) |
$4,226 |
$4,489
|
$4,547
|
$3,251 |
| Cost of sales1 |
116,143 |
110,226 |
342,477
|
237,059 |
| Less: royalties1 |
(9,693) |
(10,741) |
(31,573) |
(17,590) |
| Add:
by-product revenue1 |
(8,050) |
(8,703) |
(24,202) |
(9,987) |
| Combined cash
costs |
98,400 |
90,782
|
286,702
|
209,482 |
| Add: royalties1 |
9,693 |
10,741
|
31,573
|
17,590 |
| Add: social
contributions1 |
7,914 |
8,661
|
28,933
|
17,025 |
| Add:
sustaining capital and lease payments |
20,377 |
14,473 |
46,767 |
28,306 |
| Combined AISC |
136,384 |
124,657
|
393,975 |
272,403 |
| AISC ($/oz
sold) |
$2,174 |
$1,986
|
$2,039
|
$1,634 |
| AISC
Margin |
128,806 |
157,108 |
484,590 |
269,574 |
1.
As presented in the financial statements and notes thereto for the respective periods
 |
NEWS
RELEASE
TSX
& NYSE: ARIS
aris-mining.com
|
Operating
free cash flow and free cash flow after growth and expansion capital
| |
For
the three months ended, |
For
the nine months ended, |
| ($’000) |
Sep
30, 2026 |
Jun
30, 2026 |
Sep
30, 2026 |
Sep
30, 2025 |
| Operating
cash flows before taxes1 |
157,503 |
199,189
|
541,673 |
294,791
|
| Adjusting
Items: |
|
|
|
|
| Precious
metal stream deposit settled (received) 1 |
(41,968) |
— |
(81,984) |
—
|
| Finance
income1 |
(4,361) |
(4,166) |
(11,910) |
(8,247) |
| Impact
of FX on cash and cash equivalents1 |
(294) |
1,600
|
2,120 |
3,143
|
| Adjusted
operating cash flows before taxes |
110,880 |
196,623
|
449,899 |
289,687
|
| |
|
|
|
|
| Less:
Income taxes paid1 |
(16,900) |
(113,086) |
(156,157) |
(60,593) |
| Adjusted
net cash provided by operating activities |
93,980 |
83,537
|
293,742 |
229,094
|
| |
|
|
|
|
| Less:
Sustaining capital |
(23,337) |
(15,655) |
(51,829) |
(30,734) |
| Less:
Sustaining lease payments |
(816) |
(609) |
(1,986) |
(1,255) |
| Cash
flow from operations after sustaining capital and income taxes |
69,827 |
67,273
|
239,927 |
197,105
|
| Less:
Growth and expansion capital |
(120,578) |
(105,084) |
(286,913) |
(127,891) |
| Free
cash flow after growth and expansion capital |
(50,751) |
(37,811)
|
(46,986) |
69,214 |
1.
As presented in the financial statements and notes thereto for the respective periods.
Additions
to mineral interests, plant and equipment
| |
For
the three months ended, |
| ($’000) |
Sep
30, 2026 |
Jun
30, 2026 |
Mar
31, 2026 |
Dec
31, 2025 |
Sep
30, 2025 |
Jun
30, 2025 |
| Sustaining
capital |
|
|
|
|
|
|
| Segovia
|
19,561 |
13,864 |
11,356 |
16,197 |
10,334 |
10,861 |
| Marmato
|
3,776 |
1,791 |
1,481 |
2,192 |
1,524 |
1,426 |
| Total
Sustaining Capital |
23,337 |
15,655 |
12,837 |
18,389 |
11,858 |
12,287 |
| Non-sustaining
capital |
|
|
|
|
|
|
| Marmato
|
82,013 |
76,290 |
47,031 |
43,562 |
31,369 |
23,628 |
| Segovia
|
21,096 |
17,279 |
5,454 |
16,161 |
9,618 |
6,930 |
| Soto
Norte Project and other |
4,642 |
5,576 |
3,445 |
4,885 |
3,879 |
3,446 |
| Toroparu
Project |
12,827 |
5,939 |
5,321 |
3,127 |
3,270 |
2,741 |
| Total
(Growth Capital Investment) |
120,578 |
105,084 |
61,251 |
67,735 |
48,136 |
36,745 |
| Additions
to mining interest, plant and equipment1 |
143,915 |
120,739 |
74,088 |
86,124 |
59,994 |
49,032 |
1.
As presented in the financial statements and notes thereto for the respective periods.
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
Earnings
before interest, taxes, depreciation, and amortization (EBITDA) and adjusted EBITDA
| | |
For the three months ended, | |
| ($000s) | |
| Sep 30, 2026 | | |
| Jun 30, 2026 | | |
| Mar 31, 2026 | | |
| Dec 31, 2025 | |
| Earnings (loss) before tax1 | |
| 108,225 | | |
| 141,579 | | |
| 161,672 | | |
| 97,519 | |
| Add back: | |
| | | |
| | | |
| | | |
| | |
| Depreciation and depletion1 | |
| 20,133 | | |
| 17,322 | | |
| 16,246 | | |
| 16,809 | |
| Finance income1 | |
| (4,361 | ) | |
| (4,166 | ) | |
| (3,383 | ) | |
| (4,353 | ) |
| Interest and accretion1 | |
| 6,723 | | |
| 7,803 | | |
| 7,408 | | |
| 10,431 | |
| EBITDA | |
| 130,720 | | |
| 162,538 | | |
| 181,943 | | |
| 120,406 | |
| Add back: | |
| | | |
| | | |
| | | |
| | |
| Share-based compensation1 | |
| 6,468 | | |
| (809 | ) | |
| 7,602 | | |
| 20,663 | |
| (Income) loss from equity accounting in investee1 | |
| — | | |
| — | | |
| — | | |
| (14 | ) |
| (Gain) loss on financial instruments1 | |
| (14,226 | ) | |
| (26,548 | ) | |
| 1,762 | | |
| 3,058 | |
| Loss on settlement of deferred revenue1 | |
| — | | |
| — | | |
| — | | |
| 4,990 | |
| Other (income) expense1 | |
| 351 | | |
| 3,505 | | |
| 9,177 | | |
| 6,447 | |
| Foreign exchange (gain) loss1 | |
| 20,526 | | |
| 39,902 | | |
| 11,590 | | |
| 12,446 | |
| Adjusted EBITDA | |
| 143,839 | | |
| 178,588 | | |
| 212,074 | | |
| 167,996 | |
1.
As presented in the financial statements and notes thereto for the respective periods
| | |
| |
| ($000s) | |
| Sep 30, 2025 | | |
| Jun 30, 2025 | | |
| Mar 31, 2025 | | |
| Dec 31, 2024 | |
| Earnings (loss) before tax1 | |
| 76,094 | | |
| 12,258 | | |
| 21,220 | | |
| 37,513 | |
| Add back: | |
| | | |
| | | |
| | | |
| | |
| Depreciation and depletion1 | |
| 13,459 | | |
| 11,929 | | |
| 10,734 | | |
| 9,530 | |
| Finance income1 | |
| (2,437 | ) | |
| (3,474 | ) | |
| (2,336 | ) | |
| (1,606 | ) |
| Interest and accretion1 | |
| 9,390 | | |
| 10,833 | | |
| 10,037 | | |
| 21,165 | |
| EBITDA | |
| 96,506 | | |
| 31,546 | | |
| 39,655 | | |
| 66,602 | |
| Add back: | |
| | | |
| | | |
| | | |
| | |
| Share-based compensation1 | |
| 9,497 | | |
| 8,136 | | |
| 3,784 | | |
| (483 | ) |
| (Income) loss from equity accounting in investee1 | |
| — | | |
| — | | |
| 14 | | |
| 14 | |
| (Gain) loss on financial instruments1 | |
| 6,385 | | |
| 50,737 | | |
| 16,628 | | |
| (6,561 | ) |
| Loss of disposal of Juby Project1 | |
| 3,200 | | |
| — | | |
| — | | |
| — | |
| Other (income) expense1 | |
| 1,961 | | |
| 1,090 | | |
| 535 | | |
| 1,116 | |
| Foreign exchange (gain) loss1 | |
| 13,520 | | |
| 7,224 | | |
| 5,997 | | |
| (5,113 | ) |
| Adjusted EBITDA | |
| 131,069 | | |
| 98,733 | | |
| 66,613 | | |
| 55,575 | |
1.
As presented in the financial statements and notes thereto for the respective periods.
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
Adjusted
net earnings and adjusted net earnings per share
| | |
For the three months ended, | |
| ($000s except shares amount) | |
Sep 30, 2026 | | |
Jun 30, 2026 | | |
Mar 31, 2026 | | |
Dec 31, 2025 | |
| Basic weighted average shares outstanding1 | |
| 206,519,188 | | |
| 206,398,410 | | |
| 205,967,201 | | |
| 203,245,172 | |
| Net earnings (loss)1 | |
| 66,692 | | |
| 94,243 | | |
| 97,614 | | |
| 50,863 | |
| Add back: | |
| | | |
| | | |
| | | |
| | |
| Share-based compensation1 | |
| 6,468 | | |
| (809 | ) | |
| 7,602 | | |
| 20,663 | |
| (Income) loss from equity accounting in investee1 | |
| — | | |
| — | | |
| — | | |
| (14 | ) |
| (Gain) loss on financial instruments1 | |
| (14,226 | ) | |
| (26,548 | ) | |
| 1,762 | | |
| 3,058 | |
| Loss on settlement of deferred revenue1 | |
| — | | |
| — | | |
| — | | |
| 4,990 | |
| Other (income) expense1 | |
| 351 | | |
| 3,505 | | |
| 9,177 | | |
| 6,447 | |
| Foreign exchange (gain) loss1 | |
| 20,526 | | |
| 39,902 | | |
| 11,590 | | |
| 12,446 | |
| Income tax effect on adjustments | |
| (7,184 | ) | |
| (13,966 | ) | |
| (4,057 | ) | |
| (4,356 | ) |
| Adjusted net earnings | |
| 72,627 | | |
| 96,327 | | |
| 123,688 | | |
| 94,097 | |
| Adjusted net earnings per share – basic ($/share) | |
| 0.35 | | |
| 0.47 | | |
| 0.60 | | |
| 0.46 | |
1.
As presented in the financial statements and notes thereto for the respective periods.
| ($000s except shares amount) | |
Sep 30, 2025 | | |
Jun 30, 2025 | | |
Mar 31, 2025 | | |
Dec 31, 2024 | |
| Basic weighted average shares outstanding1 | |
| 199,171,052 | | |
| 179,836,208 | | |
| 171,622,649 | | |
| 170,900,890 | |
| Net earnings (loss) 1 | |
| 42,011 | | |
| (16,897 | ) | |
| 2,368 | | |
| 21,687 | |
| Add back: | |
| | | |
| | | |
| | | |
| | |
| Share-based compensation1 | |
| 9,497 | | |
| 8,136 | | |
| 3,784 | | |
| (483 | ) |
| (Income) loss from equity accounting in investee1 | |
| — | | |
| — | | |
| 14 | | |
| 14 | |
| (Gain) loss on financial instruments1 | |
| 6,385 | | |
| 50,737 | | |
| 16,628 | | |
| (6,561 | ) |
| Other (income) expense1 | |
| 1,961 | | |
| 1,090 | | |
| 535 | | |
| 1,116 | |
| Loss of disposal of Juby Project1 | |
| 3,200 | | |
| — | | |
| — | | |
| — | |
| Loss on extinguishment of Senior Notes1 | |
| — | | |
| — | | |
| — | | |
| 11,463 | |
| Foreign exchange (gain) loss1 | |
| 13,520 | | |
| 7,224 | | |
| 5,997 | | |
| (5,113 | ) |
| Income tax effect on adjustments | |
| (4,732 | ) | |
| (2,528 | ) | |
| (2,099 | ) | |
| 2,536 | |
| Adjusted net earnings | |
| 71,842 | | |
| 47,762 | | |
| 27,227 | | |
| 24,659 | |
| Adjusted net earnings per share – basic ($/share) | |
| 0.36 | | |
| 0.27 | | |
| 0.16 | | |
| 0.14 | |
1.
As presented in the financial statements and notes thereto for the respective periods.
Cash
Cost and All-in Sustaining Cost
Cash
costs per ounce, and all-in sustaining cost per ounce (as calculated in the tables above) are performance measures that reflect
certain costs that are required to produce and sell an ounce of gold from operations. Management believes that these two measures
are useful to market participants in assessing operating performance and the Company’s ability to generate cash flow from
current operations. These measures do not have standardized meanings under IFRS and may not be comparable to similar measures
used by other issuers.
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
Operating
Cash Flow and Free Cash Flow after Growth and Expansion Capital
Cash
flow from operations after sustaining capital and income taxes is calculated as Adjusted operating cash flows before taxes, less
sustaining capital and income taxes paid. Free cash flow after growth and expansion capital is calculated by further deducting
growth and expansion capital. Management believes these measures are useful to market participants in assessing the Company’s
ability to generate cash flow from operations after funding its capital requirements. These measures do not have standardized
meanings under IFRS and may not be comparable to similar measures used by other issuers.
Growth
and Expansion Capital
Growth
and expansion capital represents additions to depletable and non-depletable mineral interests, right of use assets, exploration
projects, and plant and equipment that are not sustaining in nature. Management believes this measure is useful to market participants
in assessing the level of capital invested to expand operations, develop projects and support future growth separately from capital
required to sustain current operations. This measure does not have a standardized meaning under IFRS and may not be comparable
to similar measures used by other issuers.
EBITDA
and Adjusted EBITDA
EBITDA
is calculated as earnings before tax, adjusted to add back depreciation and depletion, finance income, and interest and accretion.
Adjusted EBITDA is calculated by further excluding items that management does not consider to be reflective of the underlying
operating performance. Management believes these measures are useful to market participants in assessing the Company’s operating
performance and ability to generate cash flow from operations. These measures do not have standardized meanings under IFRS and
may not be comparable to similar measures used by other issuers.
Adjusted
Net Earnings and Adjusted Net Earnings Per Share
Adjusted
net earnings is calculated as net earnings attributable to owners of the Company, adjusted for items that management does not
consider to be reflective of the underlying operating performance of the Company Adjusted net earnings per share is calculated
by dividing adjusted net earnings by the basic weighted average number of shares outstanding for the applicable period. Management
believes these measures are useful to market participants in assessing the Company’s underlying financial performance and
results on a per share basis. These measures do not have standardized meanings under IFRS and may not be comparable to similar
measures used by other issuers.
Qualified
Person and Technical Information
Pamela
De Mark, P.Geo., Senior Vice President Geology and Exploration of Aris Mining, is a Qualified Person as defined by National Instrument
43-101 (NI 43-101), and has reviewed and approved the technical information contained in this news release.
Forward-Looking
Information
This
news release contains “forward-looking information” or “forward-looking statements” within the meaning
of Canadian securities legislation. All statements included herein, other than statements of historical fact, including, without
limitation, statements relating to the Company’s ability to deliver on its 2026 objectives, updates and timing for completion,
first gold pour and ramp-up at the Marmato CIP plant, the Company’s longer-term growth outlook, the timeline for submission
of the environmental license application for the Soto Norte Project, the timeline for a Prefeasibility Study and construction
decision for the Toroparu Project, the objective of reaching 1 million ounces of gold production, are forward-looking. Generally,
the forward-looking information and forward looking statements can be identified by the use of forward looking terminology such
as “plans”, “expects” or “does not expect”, “is expected”, “budget”,
“scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or
“does not anticipate”, “will continue” or “believes”, or variations of such words and phrases
or state that certain actions, events or results “may”, “could”, “would”, “might”
or “will be taken”, “occur” or “be achieved”. The material factors or assumptions used to
develop forward looking information or statements are disclosed throughout this news release.
 |
NEWS
RELEASE |
| |
| |
TSX & NYSE: ARIS |
| |
aris-mining.com |
Forward
looking information and forward looking statements, while based on management’s best estimates and assumptions, are subject
to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance
or achievements of Aris Mining to be materially different from those expressed or implied by such forward-looking information
or forward looking statements, including but not limited to those factors discussed in the section entitled “Risk Factors”
in Aris Mining’s annual information form dated March 11, 2026 which is available on SEDAR+ at www.sedarplus.ca and
included as part of the Company’s Annual report on Form 40-F, filed with the SEC at www.sec.gov.
Although
Aris Mining has attempted to identify important factors that could cause actual results to differ materially from those contained
in forward-looking information and forward-looking statements, there may be other factors that cause results not to be as anticipated,
estimated or intended. There can be no assurance that such information or statements will prove to be accurate, as actual results
and future events could differ materially from those anticipated in such information or statements. The Company discloses in its
Management’s Discussion and Analysis and other publicly filed documents, changes to material factors or assumptions underlying
the forward-looking information and forward-looking statements and to the validity of the information, in the period the changes
occur. The forward-looking statements and forward-looking information are made as of the date hereof and Aris Mining disclaims
any obligation to update any such factors or to publicly announce the result of any revisions to any of the forward-looking statements
or forward-looking information contained herein to reflect future results. Accordingly, readers should not place undue reliance
on forward-looking statements and information.