Aris Mining study projects 5.6M gold ounces at Toroparu

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Aris Mining Corp. (ARIS) reported completed prefeasibility study results for its Toroparu gold project in Guyana, outlining 5.6 million ounces of planned gold production over a 29-year processing period, including 21 years of mining. Proven and Probable reserves total 5.922 million ounces, with reserve pit designs based on a $1,950/oz gold price. Production averages 258,000 ounces annually in Years 1–17 and 195,000 ounces across the processing life.

At the $3,600/oz base-case gold price, the study estimates $2.8 billion after-tax NPV at a 5% discount rate, a 31.5% after-tax IRR and a 2.2-year payback. It outlines a 32-month construction schedule; Aris targets a construction decision in early 2027, subject to receipt of the large-scale mining licence and other necessary approvals. The licence application is under regulatory review, and Aris and Wheaton are exploring amendments to an existing precious-metals stream agreement.

Filing Explained

Toroparu remains pre-construction, and the modeled one hundred thirty-eight million dollars from Wheaton is conditional and exchanged for metal-sale rights.

The study is complete, but the project has not reached a construction decision: Aris targets one for early 2027, subject to the mining licence and other approvals.

The release states an initial funding requirement of $1,005 million; separately, the study’s cash-flow table includes $1,119 million of construction capital and a $138 million credit for funding under the Wheaton agreement.

Wheaton may elect to provide that $138 million after completion of a full development plan, in exchange for rights to buy 10% of gold and 50% of silver production at fixed prices of $400 per ounce and $3.90 per ounce, respectively, with escalation beginning on the fourth anniversary of commercial production, and Aris and Wheaton are exploring amendments.

Proven and Probable gold reserves 5.922 million ounces Toroparu reserves; reserve pit designs based on a $1,950/oz gold price
Planned gold production 5.6 million ounces Over a 29-year processing period
Average annual gold production 258,000 ounces Years 1–17 of planned operations
After-tax NPV at 5% $2.8 billion Base case at $3,600/oz gold
After-tax IRR 31.5% Base case at $3,600/oz gold
Payback period 2.2 years From start of operations; base case at $3,600/oz gold
Initial funding requirement $1,005 million Toroparu project headline estimate
Average all-in sustaining cost $1,494/oz Au Total life-of-operation average in the PFS
Prefeasibility Study (PFS) technical
"completed Prefeasibility Study (PFS) for its Toroparu Gold Project"
A prefeasibility study (PFS) is a preliminary evaluation that estimates whether a proposed project is likely to be technically workable and economically viable before committing major time or money. It gives a rough blueprint of expected costs, potential returns and key risks—like a contractor’s early budget and sketch for a house—so investors can decide whether to fund further, more detailed studies or walk away.
Proven and Probable Gold Mineral Reserves technical
"5.9 Moz of Proven and Probable Gold Mineral Reserves"
After-tax NPV 5% financial
"After-tax NPV 5% ($ billion)"
IRR financial
"After-tax IRR (%)"
IRR (Internal Rate of Return) is the annualized percentage return an investment is expected to produce based on its projected series of cash outflows and inflows; mathematically, it’s the rate that makes the present value of those cash flows balance to zero. Investors use IRR to compare and rank projects or investments—similar to comparing the interest rates on savings accounts—to judge which offers the best return for the time and risk involved.
all in sustaining cost financial
"Average all in sustaining cost 2"
All-in sustaining cost (AISC) is a per-unit measure of what it really costs a mining company to produce its product over the long run, combining direct operating expenses with ongoing capital spending, maintenance, and other sustaining overheads. For investors, AISC shows the full, steady-state cost to keep operations running—similar to calculating the total cost per mile of driving a car when you include fuel, repairs and routine upkeep—so it helps judge long-term profitability and compare producers on a like-for-like basis.
precious metals stream agreement financial
"historic precious metals stream agreement with Wheaton"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What are ARIS’s projected Toroparu economics?

At the $3,600/oz base-case gold price, the PFS estimates $2.8 billion in after-tax NPV at a 5% discount rate, 31.5% after-tax IRR and a 2.2-year payback period.

How much gold is Toroparu expected to produce?

The PFS projects 5.6 million ounces over a 29-year processing period, including 21 years of mining. Average annual production is 258,000 ounces in Years 1–17 and 195,000 ounces over the full processing life.

What are the terms of the Wheaton funding and metals agreement for Toroparu?

Following completion of a full development plan, Wheaton may elect to provide $138 million in construction funding in exchange for the right to purchase 10% of Toroparu’s gold production and 50% of its silver production at fixed prices of $400/oz and $3.90/oz, respectively. Both prices are subject to escalation beginning on the fourth anniversary of commercial production.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

 

 

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549

FORM 6-K

REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16
UNDER THE SECURITIES EXCHANGE ACT OF 1934

For the month of November 2026

Commission File Number: 001-41794

Aris Mining Corporation
(Translation of registrant's name into English)

Suite 2400 - 1021 West Hastings St., Vancouver, BC, Canada V6E 0C3

(Address of principal executive offices)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.


Form 20-F ☐      Form 40-F ☒

  

 

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

  ARIS MINING CORPORATION
     
Date: November 12, 2026 By: (s) Ashley Baker
    Ashley Baker
    Chief Legal Officer

 

EXHIBIT INDEX    
     
Exhibit Number   Description
     
99.1   Press Release dated November 12, 2026

 

 

  

 

 

 

Exhibit 99.1

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

ARIS MINING ANNOUNCES POSITIVE PFS RESULTS FOR THE TOROPARU GOLD PROJECT

 

5.9 Moz of Proven and Probable Gold Mineral Reserves at $1,950/oz Gold

5.6 Moz of Planned Gold Production Over 29 Years; 258 koz Annually in Years 1–17

$2.8 Billion After-Tax NPV5% and 31.5% IRR at $3,600/oz Gold

Initial funding requirement of $1,005 million

 

Vancouver, Canada, November 12, 2026 – Aris Mining Corporation (Aris Mining or the Company) announces positive results from the completed Prefeasibility Study (PFS) for its Toroparu Gold Project (Toroparu or the Project) in Guyana. The PFS outlines a large-scale, long-life open pit development, expected to produce 5.6 million ounces (Moz) of gold over a 29-year processing period, including 21 years of mining. The project development strategy is based on contractor mining and a combination of engineering and construction contracting models as well as self-performed work. With the PFS now completed, the Company continues to target a construction decision in early 2027, subject to receipt of necessary approvals. The full Technical Report summarizing the results of the PFS is available on the Company’s website and SEDAR+ profile at www.sedarplus.ca and is filed with the U.S. Securities and Exchange Commission (SEC) at www.sec.gov. All amounts are in U.S. dollars unless otherwise indicated.

 

Neil Woodyer, Chair and CEO, commented “Toroparu is positioned to become our next major growth project. The PFS confirms a large-scale, long-life operation with compelling economics, a substantially larger mineral resource base compared to the 2025 PEA1, and a practical development plan designed to reduce execution risk. Our large-scale mining licence application, submitted in August, is progressing through the regulatory review process. We appreciate the constructive engagement with the Government of Guyana and are advancing the technical work required to support our application as we move Toroparu toward development readiness.

 

The PFS incorporates an execution strategy suited to the Project’s large scale and remote location, with a planned 32-month construction schedule. We have also replaced the owner-mining approach contemplated in the 2025 PEA with the use of experienced mining contractors, with costs supported by competitive international quotations.

 

We are sequencing Toroparu within our broader growth strategy, targeting a construction decision in early 2027, subject to the required approvals, and following first gold from the Marmato CIP plant expected in December 2026. In parallel, we are expanding our Guyana team and advancing engineering and pre-construction activities. With its scale, mine life and economics, Toroparu has the potential to become a cornerstone operation for Aris Mining for decades.”

 

Project Highlights: a Large-Scale, Long-Life Open Pit Mine

 

●Proven and probable mineral reserves of 5.1 Moz at 1.18 g/t Au (above 0.50 g/t) and 0.9 Moz at 0.40 g/t Au (below 0.50 g/t and the marginal cut-off grade) for a total mineral reserve of 5.9 Moz. See Table 3 for the detailed technical disclosure.

 

●Step-change increase in the mineral resource estimate compared to the 2025 PEA:

 

○Measured and indicated gold mineral resources increased to 9.3 Moz, up 74% from the PEA

 

○Inferred gold mineral resources increased by 1.4 Moz, up 115% from the PEA.

 

○See Table 4 for the detailed technical disclosure.

 

●Lower-grade tonnes add value and extend operating life: material previously treated as waste in the 2025 PEA is now planned to be stockpiled for processing later in the mine life, generating positive operating margin at the mineral reserve gold price of $1,950/oz or higher.

 

●32-month construction schedule for development of a conventional truck-and-shovel open pit mine with a 3.3 to 1 life-of-mine strip ratio, a 7.0 Mtpa processing plant and other mine infrastructure.

 

 - 1 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

●Conservative mine design and robust mining schedule. Mineral reserve pit designs are based on a $1,950/oz gold price, well below the $3,600/oz PFS base-case price used for the economic analysis, with the mine plan emphasizing practical operability and production reliability.

 

●Contractor mining strategy aligned with project scale and workforce development objectives. The PFS incorporates mining by experienced third-party contractors, reflecting the scale of the operation and the importance of accessing specialized mining expertise while supporting local employment, training and skills development opportunities. Mining cost estimates are informed by quotations from multiple international mining contractors. This approach replaces the owner-operated, equipment-leasing model contemplated in the 2025 PEA.

 

●Tailored construction delivery strategy reflecting the Project’s large scale and remote location. The PFS incorporates a combination of engineering, procurement and construction management (EPCM), design-and-construct (D&C), engineering, procurement and construction (EPC), and self-performed work. The delivery model for each project area has been selected based on specific scope and execution requirements, with the objectives of strengthening cost and schedule control while managing execution risk.

 

●Large-scale mining licence application submitted in August 2026. The Government of Guyana is advancing their review of the large-scale mining license application.

 

Production and Costs

 

●Production of doré and copper concentrates containing 5.6 Moz gold, 5.3 Moz silver, and 235 million pounds (Mlb) of copper over the processing life.

 

○Average annual gold production of 291 thousand ounces (koz) over the first five years.

 

○Average annual gold production of 258 koz during the main pit operations (first 17 years), followed by 103 koz during late-life mining and stockpile processing (years 18-29).

 

●Low life-of-mine cash costs2 of $1,119/oz Au and all-in-sustaining costs (AISC)2 of $1,494/oz Au, net of by-product credits from copper and silver.

 

Capital Costs and Returns

 

●Initial funding requirement of $1,005 million, comprising $1,017 million in construction capital, $102 million in contingency allowances, and $24 million in working capital during construction, offset by $138 million of funding available under the historic Toroparu precious metals purchase agreement.

 

●Compelling base case economics at metal prices of $3,600/oz gold, $50/oz silver and $5.00/lb copper, generating $19.9 billion of life-of-mine payable gold revenue and $1.3 billion in copper and silver by-product credits, with:

 

○Average annual EBITDA2 of $588 million during main-pit operations (years 1-17), followed by $176 million during late-life mining and stockpile processing (years 18-29).

 

○After-tax net present value at a 5% discount rate (NPV5%) of $2.8 billion.

 

○Internal rate of return (IRR) of 31.5%.

 

○Payback period of 2.2 years from the start of operations.

 

●Robust economics at lower gold prices, with an after-tax NPV5% $1.8 billion and IRR of 24.3% at a gold price of $3,000/oz.

 

●Significant additional value at higher gold prices, with after-tax NPV5% of $3.8 billion and IRR of 37.8% at a gold price of $4,200/oz.

 

 - 2 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Figure 1 – Toroparu annual gold production and processed gold grade

 

 

Figure 1 illustrates Toroparu’s planned gold production and processed grade profile. Higher-grade ore is prioritized in the earlier years, while lower-grade stockpiles extend processing through Year 29. Gold production averages 258 koz per year during the first 17 years of main-pit operations and 195 koz over the full 29-year processing life, with peak annual production of approximately 323 koz in Year 16.

 

The open pit optimization and mineral reserve pit designs were based on a $1,950/oz gold price. This provides a conservative mine-design basis relative to the $3,600/oz base-case gold price used in the economic analysis.

 

PFS Report Availability

 

A complete National Instrument 43-101 – Standards of Disclosure for Mineral Projects (NI 43-101) compliant Technical Report titled “NI 43-101 Technical Report Prefeasibility Study for the Toroparu Project, Cuyuni-Mazaruni Region, Guyana” dated November 12, 2026 and with an effective date of November 12, 2026 (the Technical Report) has been filed on SEDAR+ and with the SEC on EDGAR, and is also available on the Company’s website at https://www.aris-mining.com/operations-and-projects/technical-reports.

 

Positioned to be Guyana’s next major gold mine

 

With the PFS complete and the large-scale mining license application under review, Toroparu is progressing through pre-development activities. Aris Mining continues to target a construction decision in early 2027, subject to receiving the large-scale mining licence and other necessary approvals. The PFS contemplates a 32-month construction period and supports Toroparu’s potential to become a major new long-life gold mine in Guyana. The PFS also underscores Toroparu’s status as a cornerstone asset within the portfolio as Aris Mining executes its strategy to build a major gold producer in South America.

 

 - 3 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Table 1 – Toroparu PFS economic evaluation sensitivity to gold price

 

Gold price $3,000/oz $3,600/oz
Base case
$4,200/oz
Indicator 
After-tax NPV5% ($ billion) $1.8 $2.8 $3.8
After-tax IRR (%) 24.3% 31.5% 37.8%
Payback period (years)  2.7  2.2 1.9

 

The sensitivity analysis in Table 1 shows that at higher gold prices, returns increase substantially beyond the attractive levels of the base case scenario while remaining robust at lower gold prices.

 

The economic analysis also includes the historic precious metals stream agreement with Wheaton Precious Metals International Ltd. (Wheaton), originally entered into in 2013 and amended in 2015, when Toroparu was owned by Sandspring Resources Ltd., a single-asset junior developer. Under this agreement, Wheaton may elect to provide $138 million in construction funding following completion of a full development plan, in exchange for the right to purchase 10% of Toroparu’s gold production and 50% of its silver production at fixed prices of $400/oz and $3.90/oz, respectively, with both prices subject to escalation beginning on the fourth anniversary of commercial production. With the PFS now complete, Aris Mining and Wheaton are exploring opportunities for amending the terms of the agreement to align with the updated project parameters.

 

 - 4 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Table 2 – PFS Economic evaluation results

 

Key indicators Units Main Pit Operations
(Years 1-17)
Late-life Mining & Stockpile Processing (Years 18-29) Total / Life-of-operation average
Total gold produced in period Moz 4.4 1.2 5.6
Mining Years Years 1 to 17 18 to 21 21
Processing Years Years 1 to 17 18 to 28.6 28.6
Average annual gold production koz 258 103 195
Average cash cost2 $/oz Au 1,003 1,529 1,119
Average all in sustaining cost2 $/oz Au 1,395 1,841 1,494
Average annual EBITDA2 $M 588 176 423
Summary cash flow ($M) at $3,600/oz gold price        
 Revenue from payable gold sales $M 15,592 4,267 19,859
 Less: royalties $M 1,262 347 1,609
 Less: operating costs $M 5,238 2,191 7,429
 Less: sustaining capital $M 437 22 459
 Add: by-product copper and silver revenues, net of TCRCs $M (896) (363) (1,259)
 Operating margin $M 9,551 2,069 11,620
 Less: income tax $M 2,420 613 3,033
 Working capital (inflows)/outflows $M (109) 114 5
 After-tax cash flow $M 7,241 1,342 8,583
 Less: construction capital with contingency allowances $M 1,119 — 1,119
 Credit: construction funding from Toroparu PMPA $M (138) — (138)
 Less: additional project capital during operations $M 175 27 202
 Less: closure costs $M — 60 60
 Net cash flow, before costs of Toroparu PMPA financing $M 6,085 1,255 7,340
 Less: costs of Toroparu PMPA financing $M 1,477 412 1,888
Net cash flow $M 4,608 843 5,451
Pre-tax indicators at $3,600/oz gold price (base case)        
 NPV at 5% discount rate $M     4,374
 IRR %     39.4%
 Payback period (from start of operations) Years     1.8
After-tax indicators at $3,600/oz gold price (base case)        
 NPV at 5% discount rate $M     2,828
 IRR %     31.5%
 Payback period (from start of operations) Years     2.2
 After-tax indicators at $4,200/oz gold price        
 NPV at 5% discount rate $M     3,819
 IRR %     37.8%
 Payback period (from start of operations) Years     1.9

 

 - 5 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Table 3 - Toroparu mineral reserves, effective November 12, 2026

 

Gold cut-off grade Classification Tonnes
(Mt)
Grade
gold
(g/t)
Grade
silver
(g/t)
Grade
copper
(%)
Contained
gold
 (koz)
Contained
silver
(koz)
Contained
copper
(Mlb)
Total above marginal1 Proven 91.2 0.96 1.4 0.10 2,808 3,995 209
Probable 109.1 0.89 0.9 0.05 3,114 3,029 113
Proven + Probable 200.2 0.92 1.1 0.07 5,922 7,024 322
Including
above
0.50 g/t
Proven 61.4 1.23 1.5 0.12 2,423 2,937 156
Probable 72.2 1.14 0.9 0.05 2,635 2,159 80
Proven + Probable 133.6 1.18 1.2 0.08 5,058 5,096 236
Including
between
0.50 g/t and marginal
Proven 29.8 0.40 1.1 0.08 385 1,058 53
Probable 36.9 0.40 0.7 0.04 479 870 33
Proven + Probable 66.6 0.40 0.9 0.06 864 1,928 85

Notes:

1.     Mineral reserves were estimated using a gold price of $1,950 per ounce, constrained within pit designs, and are reported above diluted marginal gold cut-off grades of 0.34 g/t for saprolite and 0.32 g/t for all other ore at Toroparu, and above 0.37 g/t for saprolite and 0.38 g/t for all other ore at Sona Hill.

2.     The mineral reserve estimate was prepared under the supervision of or was reviewed by Ignacio Vélez, FAusIMM, Vice President Technical Services Colombia of Aris Mining, who is a qualified person as defined by NI 43-101.

3.     Totals may not add up due to rounding.

4.     Other than as disclosed in the Technical Report, there are no known mining, metallurgical, infrastructure, permitting, or other relevant factors or risks that could materially affect the mineral reserve estimate or the potential development of the mineral reserves.

 

Table 4 - Toroparu mineral resources, effective November 12, 2026

 

Gold cut-off grade Classification Tonnes
(Mt)
Grade
gold
(g/t)
Grade
silver
(g/t)
Grade
copper
(%)
Contained
gold
 (koz)
Contained
silver
(koz)
Contained
copper
(Mlb)
Total above marginal1 Measured 115.0 0.87 1.3 0.10 3,232 4,908 255
Indicated 246.0 0.76 0.7 0.04 6,022 5,911 228
Measured + Indicated 360.9 0.80 0.9 0.06 9,254 10,820 483
Inferred 115.4 0.68 0.2 0.02 2,535 644 62
Including
above
0.60 g/t
Measured 55.1 1.39 1.6 0.12 2,459 2,797 149
Indicated 105.5 1.24 0.8 0.05 4,216 2,881 113
Measured + Indicated 160.6 1.29 1.1 0.07 6,675 5,679 262
Inferred 43.6 1.15 0.2 0.03 1,617 247 25
Including
between
0.60 g/t and marginal
Measured 59.9 0.40 1.1 0.08 773 2,111 106
Indicated 140.5 0.40 0.7 0.04 1,806 3,030 115
Measured + Indicated 200.4 0.40 0.8 0.05 2,578 5,141 221
Inferred 71.8 0.40 0.2 0.02 918 396 37

Notes:

1.     Mineral resources were estimated using a gold price of $2,600 per ounce, constrained within optimized pit shells, and are reported above marginal gold cut-off grades of 0.26 g/t for saprolite and 0.24 g/t for all other material at Toroparu, and above 0.28 g/t for saprolite and 0.29 g/t for all other material at Sona Hill.

2.     Mineral resources are not mineral reserves and have no demonstrated economic viability.

3.     The mineral resource estimate was prepared under the supervision of or was reviewed by Pamela De Mark, P.Geo., Senior Vice President Geology and Exploration of Aris Mining, who is a qualified person as defined by NI 43-101.

4.     Totals may not add up due to rounding.

5.     Other than as disclosed in the Technical Report, there are no known legal, political, environmental, or other risks that could materially affect the potential development of the mineral resources.

 

 - 6 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Endnotes

 

1.See superseded technical report entitled “NI 43-101 Technical Report, Preliminary Economic Assessment for the Toroparu Project, Cuyuni-Mazaruni Region, Guyana” with an effective date of October 21, 2025 and a report date of October 28, 2025. This preliminary economic assessment was preliminary in nature and included inferred mineral resources that were considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves. Accordingly, there is no certainty that the preliminary economic assessment would be realized.

2.Cash costs ($ per oz sold), AISC ($ per oz sold) and EBITDA are non-GAAP financial measures without standardized meanings under IFRS and may not be comparable to similar measures used by other issuers or considered in isolation or as substitutes for IFRS measures; refer to the Non-GAAP Financial Measures section of this document for further information.

3.Cash costs per ounce and AISC per ounce are calculated on a payable gold ounce basis and include open pit mining, treatment, transport, refining, processing, logistics, surface, G&A and other costs, net of silver and copper by-product credits.

 

About Aris Mining

 

Aris Mining is a Canadian gold mining company focused on South America. The Company operates the Segovia and Marmato underground gold mines in Colombia, which together produced approximately 257,000 ounces of gold in 2025. Aris Mining is listed on the Toronto Stock Exchange and the New York Stock Exchange under the symbol ARIS.

 

The Company is advancing expansion projects at Segovia and Marmato that are expected to increase annual gold production to 500,000 ounces1, driven by the ramp-up at Segovia following the installation of the second mill and construction of the new Marmato bulk mine and CIP plant, with first gold expected in December 2026.

 

Aris Mining’s portfolio supports a longer-term objective of approximately 1 million ounces of annual gold production2. Key projects include the high-grade Soto Norte gold project in Colombia, where preparation of the Environmental and Social Impact Assessment (ESIA) has been completed for community engagement, and the Toroparu gold project in Guyana, where a construction decision is targeted for early 2027.

 

Additional information on Aris Mining can be found at www.aris-mining.com, www.sedarplus.ca, and on www.sec.gov.

 


Aris Mining Contact

 

Oliver Dachsel

Senior Vice President, Capital Markets

+1.917.847.0063

Lillian Chow

Director, Investor Relations & Communications

info@aris-mining.com

 

 

1 Reflects expected steady-state annual gold production of approximately 300 thousand ounces (koz) at Segovia and 200 koz at Marmato following completion and ramp-up of the respective expansion projects. For more information, please refer to the Company’s news releases dated June 30, 2025 regarding the Segovia expansion and March 12, 2025 regarding the Marmato expansion.

2 There can be no assurance that the projected production will be achieved. Such production also remains subject to obtaining all necessary permits and to formal construction decisions by the Company, in each case for both Soto Norte and Toroparu.

 

 - 7 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Qualified Persons and Cautionary Language

 

Qualified Persons

 

The Toroparu Gold Project Prefeasibility Study “NI 43-101 Technical Report Prefeasibility Study for the Toroparu Project, Cuyuni-Mazaruni Region, Guyana” was prepared in accordance with NI 43-101 by the following Qualified Persons, all of whom are independent of Aris Mining for the purposes of NI 43-101, with the exception of Pamela De Mark, P.Geo., Senior Vice President Geology and Exploration of Aris Mining Corporation, and Ignacio Vélez, FAusIMM, Vice President Technical Services Colombia, Aris Mining Corporation:

 

●Ignacio Vélez, FAusIMM, Vice President Technical Services Colombia, Aris Mining Corporation;

 

●Jan Eklund, P.E., Process Consultant, LogiProc Pty. Ltd.;

 

●Dawie le Roux, Pr.Eng., Partner and SMPP Engineering Manager, LogiProc Pty. Ltd.;

 

●Kevin Leahy, C.Geol., Geologist and Associate Partner, Environmental Resource Management Ltd.;

 

●Chris Fourie, Pr.Eng., Director of Tailings Engineering, Eco Elementum Engineering; and

 

●Pamela De Mark, P.Geo., Senior Vice President of Geology and Exploration, Aris Mining Corporation.

 

Pamela De Mark, P.Geo., Senior Vice President Geology and Exploration of Aris Mining, is a Qualified Person as defined by NI 43-101, and has reviewed and approved the technical information contained in this news release.

 

Non-GAAP Financial Measures

 

Cash costs ($ per oz sold), AISC ($ per oz sold) and EBITDA are non-GAAP financial measures and ratios that lack standardized meanings under IFRS or US GAAP and may not be comparable to those of other issuers or considered in isolation or as substitutes for IFRS measures. Cash costs per ounce and AISC per ounce are calculated by dividing total cash costs and AISC, respectively, by projected payable gold ounces produced, while EBITDA represents earnings before interest, income taxes, depreciation, depletion and amortization.

 

Forward-Looking Information

 

This news release contains “forward-looking information” or “forward-looking statements” within the meaning of Canadian and United States securities legislation. All statements included herein, other than statements of historical fact, including, without limitation, statements relating to the results of the PFS, including projected production of gold, silver and copper, mining and processing life, projected capital and operating costs, funding requirements and financial returns, the sensitivity of the Project’s economics to gold prices, projected metal prices and other assumptions underlying the PFS, the mineral reserve and mineral resource estimates for the Project, the expected benefits of the contractor mining and fit-for-purpose construction delivery strategies, the anticipated construction schedule, the mining licence application review process and the timing of receipt of that licence and other necessary approvals, the targeted construction decision for Toroparu, the potential for Toroparu to become a major long-life gold mine in Guyana, the availability of construction funding, , the intention of Aris Mining and Wheaton to explore opportunities for amending the Wheaton precious metals purchase agreement, the building of the Company’s Guyana team and the advancement of engineering and pre-construction activities, the timing of the first gold pour at the Marmato CIP plant, and statements included in the “About Aris Mining” section of this news release relating to the Segovia and Marmato expansions, the expected increase in annual gold production to 500,000 ounces, the objective of reaching approximately 1 million ounces of annual gold production, are forward-looking. Generally, the forward-looking information and forward looking statements can be identified by the use of forward looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, “will continue” or “believes”, or variations of such words and phrases or state that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. The material factors or assumptions used to develop forward looking information or statements are disclosed throughout this news release and include, among others, the metal price assumptions of $3,600/oz gold, $50/oz silver and $5.00/lb copper used in the PFS base case; the accuracy of the mineral reserve and mineral resource estimates and the production, cost and capital estimates in the PFS; the availability of mining and construction contractors and the resources required to implement the proposed delivery strategy on the terms assumed in the PFS; the availability of sufficient financing on acceptable terms, including receipt of the assumed construction funding from Wheaton; the ability to carry out the planned construction activities in accordance with the anticipated construction schedule; and the receipt of the large-scale mining licence and other necessary approvals on a timely basis.

 

 - 8 -

 

 

 

NEWS RELEASE

 

TSX & NYSE: ARIS

aris-mining.com

 

Forward looking information and forward looking statements, while based on management’s best estimates and assumptions, are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of Aris Mining to be materially different from those expressed or implied by such forward-looking information or forward looking statements, including but not limited to risks relating to the timing of receipt of the large-scale mining licence and other necessary approvals for the Project, variations in metal prices, capital and operating costs and other assumptions underlying the PFS, the availability and performance of mining and construction contractors and internal teams involved in the construction delivery strategy, the receipt of the Wheaton construction funding, the negotiation of any amendments to the Wheaton precious metals purchase agreement, and those factors discussed in the section entitled “Risk Factors” in Aris Mining’s annual information form dated March 11, 2026 which is available on SEDAR+ at www.sedarplus.ca and included as part of the Company’s Annual Report on Form 40-F, filed with the SEC at www.sec.gov.

 

Although Aris Mining has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information and forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information or statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information or statements. The Company has and continues to disclose in its Management’s Discussion and Analysis and other publicly filed documents, changes to material factors or assumptions underlying the forward-looking information and forward-looking statements and to the validity of the information, in the period the changes occur. The forward-looking statements and forward-looking information are made as of the date hereof and Aris Mining disclaims any obligation to update any such factors or to publicly announce the result of any revisions to any of the forward-looking statements or forward-looking information contained herein to reflect future results. Accordingly, readers should not place undue reliance on forward-looking statements and information.

 