Indicate by check mark whether the registrant files or will file annual
reports under cover Form 20-F or Form 40-F.
Pursuant to the requirements of the Securities Exchange Act of 1934,
the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.
Exhibit 99.1

NEWS RELEASE
| TSX: ELD NYSE: EGO |
September 28,
2026 |
Eldorado Gold
Announces Completion of Skouries Mine Energization
Permanent grid
power connection supports advance towards commercial production
VANCOUVER, BC –
Eldorado Gold Corporation (TSX: ELD, NYSE: EGO) (“Eldorado” or the “Company”) today announced that the
Skouries mine in northern Greece has been successfully energized following completion of the permanent connection to the Greek national
power grid following final inspection, testing and approval by the Greek transmission authority.
“Site energization
is an important step in advancing Skouries toward ramp up to steady-state operations and reflects the dedication and commitment of our
team," said George Burns, Chief Executive Officer. "The connection to permanent grid power supports the ongoing commissioning
and ramp up of key systems across the site and provides the long-term power infrastructure required for the operation. Together with
the recent achievement of first copper-gold concentrate production, this achievement demonstrates the strong progress being made at Skouries
as we continue advancing one of Europe's largest copper-gold projects toward commercial production.”
Connection to the
national grid provides a reliable long-term power source for the operation and supports the continued advancement of processing and mining
activities as the project progresses toward commercial production expected in the fourth quarter of 2026.
Main substation
Skouries is expected
to produce on average 140,000 ounces of gold and 67 million pounds of copper annually over the life of mine.
Qualified Person
Simon Hille, FAusIMM,
Executive Vice President, Chief Operating Officer, is the Qualified Person under National Instrument 43-101 responsible for preparing
and supervising the preparation of the scientific or technical information contained in this news release and for verifying the technical
data disclosed in this document relating to Skouries.
About Eldorado
Gold
Eldorado is a gold,
copper and base metals producer with mining, development and exploration operations in Canada, Türkiye, and Greece. The Company
has a highly skilled and dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-term partnerships
with local communities. Eldorado's common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE:
EGO).
Contact
Investor Relations
Lynette Gould,
VP, Investor Relations, Communications & External Affairs
647 271 2827 or
1 888 353 8166
lynette.gould@eldoradogold.com
Media
Chad Pederson,
Director, Communications and Public Affairs
236 885 6251 or
1 888 353 8166
chad.pederson@eldoradogold.com
Cautionary Note
about Forward-looking Statements and Information
Certain of the
statements made and information provided in this news release are forward-looking statements or information within the meaning of the
United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking
statements and forward-looking information can be identified by the use of words such as “anticipate”, “believe”,
“budget”, “continue”, “commitment”, “confident”, “estimate”, “expect”,
"focus", “forecast”, “foresee”, “future”, “goal”, “guidance”, “intend”,
“opportunity”, “outlook”, “plan”, “potential”, “project”, “prospective”,
“schedule”, “strive”, “target”, “underway”, "working" or the negatives thereof
or variations of such words and phrases or similar words or statements that certain actions, events or results “can”, “could”,
"likely", "may", “might”, “will” or "would" be taken, occur or be achieved.
Forward-looking
statements or information contained in this news release include, but is not limited to, statements or information with respect to: the
transition toward ramp up to steady-state operations for the Skouries Project; expected commercial production and expected timing thereof;
expected benefits of site energization to the Skouries Project; continued commissioning and ramp up of key systems at the Skouries Project;
expected gold and copper production of the Skouries Project annually over the life of mine; our belief that strong progress is being
made at the Skouries Project; and generally our strategy, plans and goals, including our proposed development, construction, permitting,
financing and operating potential, plans and priorities and related timelines and schedules.
Forward-looking
statements and forward-looking information by their nature are based on a number of assumptions that management considers reasonable.
However, if such assumptions prove to be inaccurate, then actual results, activities, performance, or achievements may be materially
different from those described in the forward-looking statements or information. These include assumptions concerning, among other things:
timing, costs and results of our construction and development activities, improvements and exploration, including at the Skouries Project,
the McIlvenna Bay Project and our other operating mines and development projects; the current or future price of gold, copper and other
commodities; the availability of financing for our exploration, development and operating activities and our ability to access existing
project funding and remain in compliance with all covenants and contractual commitments related thereto; the geopolitical, economic,
permitting and legal climate that we operate in, including recent disruptions to shipping operations in the Strait of Hormuz and Red
Sea and any related shipping delays, shipping price increases, or impacts on the global energy market; availability of labour resources,
including for construction, development and improvement activities; our ability to integrate the assets of Foran Mining Corporation,
advance its exploration and development assets and to realize anticipated synergies and benefits therefrom; general business and economic
conditions, including interest rates, inflation, commodity and power prices, credit and financial market conditions and the impact of
foreign exchange rates and tax rates and related frameworks; anticipated values, costs, expenses and working capital requirements; production
and metallurgical recoveries; Mineral Reserves and Mineral Resources; our ability to develop, finalize and execute on our updated five-year
strategic plan through 2030; acts of governments and the outcome of any legal or regulatory proceedings or other disputes that we may
be involved in; our ability to continue to make purchases under our normal course issuer bid and to pay dividends; the impact of acquisitions,
dispositions, suspensions or delays on our business; our ability to manage and mitigate the risks associated with our use of technology
and artificial intelligence; the expected vesting and redemption outcomes under our compensation securities; our ability to address the
negative impacts of climate change and adverse weather; consistency of agglomeration and our ability to optimize it in the future; the
cost of, and extent to which we use, essential consumables; the impact and effectiveness of productivity initiatives; the time and cost
necessary for anticipated overhauls of equipment; expected by-product grades; the effectiveness of our hedging programs; and our ongoing
relations with regulators, communities, and our partners.
More
specifically, with respect to the Skouries Project and updates, we have made additional assumptions regarding: our ability to continue
executing our plans relating to the Skouries Project on the estimated existing project timeline and consistent with the current planned
project scope; labour productivity, rates, and expected hours; inflation rates; the timeliness of shipping for important or critical
items; our ability to continue accessing our project funding and remain in compliance with all covenants and contractual commitments
related thereto; our ability to obtain and maintain all required approvals and permits, both overall and in a timely manner; the absence
of further previously unidentified archaeological discoveries which would delay construction of various portions of the project; the
future price of gold, copper, and other commodities; and the broader community engagement and social climate in respect of the Skouries
Project.
In
addition, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis
as exists at the time of this news release. Even though we believe that the assumptions and expectations represented by such statements
or information are reasonable, there can be no assurance that the forward-looking statements or information will prove to be accurate.
Many assumptions may be difficult to predict and are beyond our control.
Forward-looking
statements or information contained in this news release are subject to a variety of known and unknown risks, uncertainties and other
factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements or information,
including, but not limited to: commodity price risk; construction and development risks at the Skouries Project, the McIlvenna Bay Project
and our other construction and development projects; changing political, economic and social conditions, including changes in governments
or political systems, ongoing market uncertainty and global or regional geopolitical events, conflicts or disruptions; risks relating
to our operations in foreign jurisdictions; risks related to production and processing; risks related to our improvement projects; our
ability to integrate the assets of Foran Mining Corporation, advance its exploration and development assets and to realize anticipated
synergies and benefits therefrom on the timelines expected or at all; delays and risks relating to surface construction, commissioning
activities, ramp-up, and commercial production at McIlvenna Bay; our ability to obtain reliable supplies of power and water at a reasonable
cost; prices of commodities and consumables; our reliance on significant amounts of critical equipment; our reliance on infrastructure,
commodities and consumables, including risks from volatility and inflationary pressures as a result from the ongoing international conflict
in Iran; inflation risk; risks related to fluctuations in the currency markets, including the Euro, Turkish lira, Canadian dollar and
United States dollar; community relations and social license; environmental matters; geotechnical and hydrogeological structures, conditions
or failures, including our ability to completely understand such structures and to mitigate such conditions or failures at a reasonable
cost or at all; regulatory requirements as they relate to mine plan approvals; compliance with the Extractive Sector Transparency Measures
Act (Canada); waste disposal; mineral tenure; permits, licenses and other authorizations; non-governmental organizations; reputational
issues; climate change, including risks related to forest fires and water management; water collection, treatment and disposal operations
at our mines, including the ability to manage unexpectedly large quantities of water; risk of spills or failure from our tailings operations
(including circumstances beyond our control such as extreme weather, seismic events, prolonged droughts or heavy rainfall); environmental
risks from our heap leaching operations, including hazardous materials management of our use of cyanide; change of control; actions of
activist shareholders; estimation of Mineral Reserves and Mineral Resources; risks related to replacement of Mineral Reserves; regulatory
reviews and different standards used to prepare and report Mineral Reserves and Mineral Resources; risks relating to any pandemic, epidemic,
endemic or similar public health threats; regulated substances; acquisitions, including integration risks; dispositions; co-ownership
of our properties; investment portfolio; volatility, volume fluctuations, and dilution risk in respect of our shares; competition; reliance
on a limited number of smelters and off-takers; information and operational technology systems; liquidity and financing risks; indebtedness,
including current and future operating restrictions, implications of a change of control, ability to meet debt service obligations, the
implications of defaulting on obligations and changes in credit ratings; total cash costs per ounce and all in sustaining costs, including
in relation to the market price of gold and the Company’s profitability; interest rate risk; credit risk; tax matters; financial
reporting, including relating to the carrying value of our assets and changes in reporting standards; the global economic environment;
labour risks (availability of labour resources, including for construction, development and improvements activities, and their productivity;
and risks relating to employee/union relations, employee misconduct, key personnel, skilled workforce, expatriates and contractors, reclamation
and long-term obligations); turnover and attrition rates of labour, and related impacts thereto; the unavailability of insurance; Sarbanes-Oxley
Act, applicable securities laws, and stock exchange rules; risks related to title and surface rights; risks relating to environmental,
sustainability, health and safety, and governance matters; technology and cybersecurity risks; corruption, bribery, and sanctions; litigation
and contracts; conflicts of interest; compliance with applicable laws, legislation and regulations; dividends; tariffs and other trade
barriers; and those risk factors discussed in the section titled “Risk Factors in Our Business” in the Company’s most
recent Annual Information Form and Form 40-F. The reader is directed to carefully review our most recent Annual Information
Form, Form 40-F and other regulatory filings filed on SEDAR+ and EDGAR under our Company name for a fuller understanding of the
risks and uncertainties that affect the Company’s business and operations.
With
respect to the Skouries Project, these risks, uncertainties and other factors may cause further delays in the completion of the construction
and commissioning at the Skouries Project which in turn may cause delays in the commencement of production and further increases to the
costs of the Skouries Project. The specific risks, uncertainties and other factors include, among others: our ability to efficiently
manage the transitions from construction to commissioning to operations (including EPCM performance and owner team turn over); our ability
to increase productivity by, among other things, adding or modifying labour shifts; rising labour costs or costs of key inputs such as
materials, power and fuel; risks related to any unanticipated critical equipment defects or failures during the commissioning and ramp-up
of operations; risks related to third-party contractors, including reduced control over aspects of the Company's operations, and/or the
ability of contractors to perform at required levels and according to baseline schedules, costs of any engineering rework and any commercial
disputes that may arise from a contractor’s failure to meet these requirements; the ability of key suppliers to meet key contractual
commitments in terms of schedules, amount of product delivered, cost, or quality and the impact of any vendor data errors; impacts to
overhead costs related to the schedule; our ability to construct key infrastructure within the required timelines, including the process
plant, filter plant, substation, waste management facilities, embankments, tailings conveyors, and water management infrastructure; the
timely receipt of necessary permits and authorizations and our ability to comply with the terms of existing and future permits and authorizations;
differences between projected and actual degree of pre-strip required in the open pit; variability in metallurgical recoveries and concentrate
quality due to factors such as extent and intensity of oxidation or presence of transition minerals; presence of additional structural
features impacting hydrological and geotechnical considerations; variability in minerals or presence of substances that may have an impact
on filtered tails performance and resulting bulk density of stockpiles or filtered tails; distribution of sulfides that may dilute concentrate
and change the characteristics of tailings; unexpected disruptions to operations including due to protests, non-routine regulatory inspections,
road conditions, on site or labour unrest; unexpected inclement weather and climate events, including wildfires, short and long duration
rainfall and floods and other extreme weather events and our site's ability to respond to those events; our ability to meet pre-commercial
producing mining or underground development targets; unexpected results from underground stopes; new archaeological discoveries requiring
the completion of a regulatory process; changes in support from local communities; and our ability to meet the expectations of communities,
governments, and stakeholders related to the Skouries Project. Our project capital and accelerated operational capital costs at Skouries
are incurred primarily in Euros but are reported in US dollars and are therefore sensitive to fluctuations in the EUR/USD exchange rate.
The inclusion of
forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term
prospects, and it may not be appropriate for other purposes. There can be no assurance that forward-looking statements or information
will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except
as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are
referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory
authorities in Canada and the United States. Accordingly, you should not place undue reliance on the forward-looking statements or information
contained herein.