[Form 4] Huron Consulting Group Inc. Insider Trading Activity
SkyWater Technology, Inc. (SKYT) filed an 8-K disclosing three material events dated 30 June 2025:
- Completion of the Spansion Fab 25 acquisition. The company closed the purchase of all membership interests in Spansion Fab 25, LLC, which holds substantially all property, plant, equipment, employees and certain liabilities of Infineon’s 200 mm Austin, TX fabrication plant. The cash purchase price was approximately $93 million, consisting of a $73 million base price and a provisional $20 million working-capital payment.
- Amendment to the Membership Interest Purchase Agreement. Amendment No. 1 raised the cash consideration due at closing by $18 million but eliminated a previously agreed $25 million deferred payment tied to a multi-year supply agreement, reducing total consideration by $7 million and simplifying post-closing obligations.
- Amended & Restated Loan and Security Agreement. SKYT and its subsidiaries entered into a new senior secured $350 million revolving credit facility maturing 30 June 2030 with Siena Lending Group (agent) and a lender group including BSP, GRC and Ares. Proceeds refinanced Siena/GRC debt, funded the Fab 25 purchase and will support working capital and capex.
Key financing terms:
- Interest: Term-SOFR loans at 1-month SOFR (floor 2.5%) + 4.0%–5.0%; Base-rate loans at greater of prime, Fed funds + 0.5%, or 7.0% + 3.0%–4.0%.
- Borrowing base: advance rates against billed/unbilled A/R, inventory and equipment; agent may set additional reserves.
- Covenants: minimum trailing-12-month EBITDA of $10 million; liquidity requirements (≥$70 million post sale-leaseback); FCCR ≥1.0× under certain conditions; annual unfunded capex limits; restrictions on additional debt, liens, asset sales and dividend payments.
- Security: first-priority lien on substantially all borrower assets; parent guarantee.
Required historical and pro-forma financial statements for the acquired business will be filed by amendment no later than 16 September 2025.
SkyWater Technology, Inc. (SKYT) ha presentato un modulo 8-K comunicando tre eventi rilevanti in data 30 giugno 2025:
- Completamento dell'acquisizione di Spansion Fab 25. La società ha concluso l'acquisto di tutte le quote di partecipazione in Spansion Fab 25, LLC, che detiene sostanzialmente tutti i beni, gli impianti, le attrezzature, i dipendenti e alcune passività dello stabilimento di produzione da 200 mm di Infineon ad Austin, TX. Il prezzo di acquisto in contanti è stato di circa 93 milioni di dollari, composto da un prezzo base di 73 milioni di dollari e un pagamento provvisorio di 20 milioni di dollari per il capitale circolante.
- Modifica dell'Accordo di Acquisto delle Quote di Partecipazione. L'emendamento n. 1 ha aumentato di 18 milioni di dollari il corrispettivo in contanti dovuto alla chiusura, ma ha eliminato un pagamento differito precedentemente concordato di 25 milioni di dollari legato a un accordo pluriennale di fornitura, riducendo così il corrispettivo totale di 7 milioni di dollari e semplificando gli obblighi post-chiusura.
- Accordo di Prestito e Garanzia Modificato e Ristabilito. SKYT e le sue controllate hanno stipulato una nuova linea di credito senior garantita da 350 milioni di dollari a rotazione con scadenza 30 giugno 2030 con Siena Lending Group (agente) e un gruppo di finanziatori comprendente BSP, GRC e Ares. I proventi hanno rifinanziato il debito Siena/GRC, finanziato l'acquisto di Fab 25 e supporteranno il capitale circolante e gli investimenti in conto capitale.
Termini chiave del finanziamento:
- Interessi: prestiti Term-SOFR al tasso SOFR a 1 mese (floor 2,5%) + 4,0%–5,0%; prestiti a tasso base al maggiore tra prime rate, Fed funds + 0,5% o 7,0% + 3,0%–4,0%.
- Base di prestito: tassi di anticipo su crediti fatturati/non fatturati, inventario e attrezzature; l'agente può stabilire riserve aggiuntive.
- Vincoli: EBITDA minimo degli ultimi 12 mesi di 10 milioni di dollari; requisiti di liquidità (≥70 milioni di dollari dopo operazioni di sale-leaseback); FCCR ≥1,0× in determinate condizioni; limiti annuali per investimenti non finanziati; restrizioni su ulteriori debiti, gravami, vendite di asset e distribuzioni di dividendi.
- Garanzie: privilegio di primo grado su sostanzialmente tutti gli asset del mutuatario; garanzia del socio controllante.
I bilanci storici e pro-forma richiesti per l’attività acquisita saranno depositati tramite emendamento entro e non oltre il 16 settembre 2025.
SkyWater Technology, Inc. (SKYT) presentó un formulario 8-K divulgando tres eventos materiales fechados el 30 de junio de 2025:
- Finalización de la adquisición de Spansion Fab 25. La compañía cerró la compra de todas las participaciones en Spansion Fab 25, LLC, que posee sustancialmente todas las propiedades, planta, equipo, empleados y ciertas responsabilidades de la planta de fabricación de Infineon de 200 mm en Austin, TX. El precio de compra en efectivo fue aproximadamente de $93 millones, compuesto por un precio base de $73 millones y un pago provisional de capital de trabajo de $20 millones.
- Enmienda al Acuerdo de Compra de Participaciones. La Enmienda No. 1 aumentó la consideración en efectivo debida al cierre en $18 millones, pero eliminó un pago diferido previamente acordado de $25 millones vinculado a un acuerdo de suministro plurianual, reduciendo la consideración total en $7 millones y simplificando las obligaciones posteriores al cierre.
- Acuerdo de Préstamo y Garantía Modificado y Restablecido. SKYT y sus subsidiarias celebraron una nueva línea de crédito senior garantizada revolving de $350 millones con vencimiento el 30 de junio de 2030 con Siena Lending Group (agente) y un grupo de prestamistas que incluye BSP, GRC y Ares. Los ingresos refinanciaron la deuda Siena/GRC, financiaron la compra de Fab 25 y respaldarán el capital de trabajo y el gasto de capital.
Términos clave del financiamiento:
- Interés: préstamos Term-SOFR a la tasa SOFR a 1 mes (mínimo 2.5%) + 4.0%–5.0%; préstamos a tasa base al mayor entre prime, fondos federales + 0.5%, o 7.0% + 3.0%–4.0%.
- Base de préstamo: tasas de adelanto contra cuentas por cobrar facturadas/no facturadas, inventario y equipo; el agente puede establecer reservas adicionales.
- Convenios: EBITDA mínimo de los últimos 12 meses de $10 millones; requisitos de liquidez (≥$70 millones después de venta y arrendamiento); FCCR ≥1.0× bajo ciertas condiciones; límites anuales para gastos de capital no financiados; restricciones en deuda adicional, gravámenes, ventas de activos y pagos de dividendos.
- Garantía: gravamen de primera prioridad sobre sustancialmente todos los activos del prestatario; garantía del accionista matriz.
Los estados financieros históricos y pro forma requeridos para el negocio adquirido se presentarán mediante enmienda a más tardar el 16 de septiembre de 2025.
SkyWater Technology, Inc. (SKYT)는 2025년 6월 30일자로 세 가지 주요 사건을 공개하는 8-K 보고서를 제출했습니다:
- Spansion Fab 25 인수 완료. 회사는 Spansion Fab 25, LLC의 모든 지분을 인수 완료했으며, 이 회사는 Infineon의 텍사스 오스틴 200mm 제조 공장의 자산, 설비, 장비, 직원 및 일부 부채를 대부분 보유하고 있습니다. 현금 구매 가격은 약 9,300만 달러로, 기본 가격 7,300만 달러와 임시 운전자본 지급액 2,000만 달러로 구성됩니다.
- 지분 매매 계약 수정. 제1차 수정안은 클로징 시 지급할 현금 대금을 1,800만 달러 인상했으나, 다년간 공급 계약과 연계된 기존에 합의된 2,500만 달러의 연기 지급을 제거하여 총 대가를 700만 달러 줄이고 클로징 후 의무를 단순화했습니다.
- 수정 및 재작성된 대출 및 담보 계약. SKYT와 자회사는 Siena Lending Group(대리인) 및 BSP, GRC, Ares를 포함한 대출자 그룹과 함께 만기일이 2030년 6월 30일인 신규 선순위 담보 3억 5천만 달러 회전 신용 시설에 서명했습니다. 대출금은 Siena/GRC 부채를 재융자하고 Fab 25 인수를 자금 조달하며 운전자본 및 자본 지출을 지원할 예정입니다.
주요 금융 조건:
- 이자율: 1개월 SOFR(최저 2.5%) + 4.0%–5.0%의 Term-SOFR 대출; 기준금리 대출은 prime, 연방기금금리 + 0.5%, 또는 7.0% 중 높은 금리에 3.0%–4.0% 추가.
- 대출 기준: 청구 및 미청구 매출채권, 재고, 장비에 대한 선급 비율; 대리인이 추가 준비금을 설정할 수 있음.
- 약정: 최근 12개월 기준 최소 EBITDA 1,000만 달러; 유동성 요건(매각 후 ≥7,000만 달러); 특정 조건 하 FCCR ≥1.0×; 연간 미충당 자본 지출 한도; 추가 부채, 담보권, 자산 매각 및 배당 지급 제한.
- 담보: 차입자 자산 대부분에 대한 우선 담보권; 모회사 보증.
인수된 사업에 대한 과거 및 프로포르마 재무제표는 2025년 9월 16일까지 수정서로 제출될 예정입니다.
SkyWater Technology, Inc. (SKYT) a déposé un formulaire 8-K divulguant trois événements importants datés du 30 juin 2025 :
- Finalisation de l'acquisition de Spansion Fab 25. La société a finalisé l'achat de toutes les parts de Spansion Fab 25, LLC, qui détient substantiellement tous les biens, installations, équipements, employés et certaines dettes de l'usine de fabrication 200 mm d'Infineon à Austin, TX. Le prix d'achat en espèces était d'environ 93 millions de dollars, comprenant un prix de base de 73 millions de dollars et un paiement provisoire de 20 millions de dollars pour le fonds de roulement.
- Modification de l'Accord d'Achat des Parts Sociales. L'Amendement n°1 a augmenté la contrepartie en espèces due à la clôture de 18 millions de dollars, mais a supprimé un paiement différé précédemment convenu de 25 millions de dollars lié à un accord d'approvisionnement pluriannuel, réduisant la contrepartie totale de 7 millions de dollars et simplifiant les obligations post-clôture.
- Contrat de Prêt et de Garantie Modifié et Reformulé. SKYT et ses filiales ont conclu une nouvelle facilité de crédit renouvelable senior garantie de 350 millions de dollars arrivant à échéance le 30 juin 2030 avec Siena Lending Group (agent) et un groupe de prêteurs comprenant BSP, GRC et Ares. Les fonds ont refinancé la dette Siena/GRC, financé l'achat de Fab 25 et soutiendront le fonds de roulement et les dépenses d'investissement.
Principaux termes du financement :
- Intérêts : prêts Term-SOFR au taux SOFR à 1 mois (plancher 2,5 %) + 4,0 %–5,0 % ; prêts au taux de base au plus élevé entre prime, Fed funds + 0,5 % ou 7,0 % + 3,0 %–4,0 %.
- Base d'emprunt : taux d'avance sur créances facturées/non facturées, stocks et équipements ; l'agent peut fixer des réserves supplémentaires.
- Covenants : EBITDA minimum sur 12 mois glissants de 10 millions de dollars ; exigences de liquidité (≥ 70 millions de dollars après cession-bail) ; FCCR ≥ 1,0× sous certaines conditions ; limites annuelles pour les dépenses d'investissement non financées ; restrictions sur les dettes supplémentaires, les privilèges, les ventes d'actifs et les paiements de dividendes.
- Sécurité : privilège de premier rang sur pratiquement tous les actifs de l'emprunteur ; garantie parentale.
Les états financiers historiques et pro forma requis pour l'activité acquise seront déposés par amendement au plus tard le 16 septembre 2025.
SkyWater Technology, Inc. (SKYT) reichte ein 8-K ein und gab drei wesentliche Ereignisse zum 30. Juni 2025 bekannt:
- Abschluss der Übernahme von Spansion Fab 25. Das Unternehmen schloss den Kauf aller Mitgliedsanteile an Spansion Fab 25, LLC ab, die im Wesentlichen alle Vermögenswerte, Anlagen, Ausrüstungen, Mitarbeiter und bestimmte Verbindlichkeiten des 200-mm-Fertigungswerks von Infineon in Austin, TX, hält. Der Barzahlungspreis betrug ca. 93 Millionen US-Dollar, bestehend aus einem Basispreis von 73 Millionen US-Dollar und einer vorläufigen Zahlung von 20 Millionen US-Dollar für das Betriebskapital.
- Änderung des Mitgliedschaftsanteilkaufvertrags. Änderung Nr. 1 erhöhte die Barzahlung bei Abschluss um 18 Millionen US-Dollar, eliminierte jedoch eine zuvor vereinbarte aufgeschobene Zahlung von 25 Millionen US-Dollar, die an einen mehrjährigen Liefervertrag gebunden war, wodurch die Gesamtsumme um 7 Millionen US-Dollar reduziert und die Verpflichtungen nach dem Abschluss vereinfacht wurden.
- Geänderter und neu gefasster Kredit- und Sicherheitenvertrag. SKYT und seine Tochtergesellschaften schlossen eine neue senior besicherte 350 Millionen US-Dollar revolvierende Kreditfazilität mit Fälligkeit zum 30. Juni 2030 mit der Siena Lending Group (Agent) und einer Kreditgebergruppe einschließlich BSP, GRC und Ares ab. Die Erlöse refinanzierten die Siena/GRC-Schulden, finanzierten den Kauf von Fab 25 und unterstützen das Betriebskapital sowie Investitionen.
Wesentliche Finanzierungsbedingungen:
- Zinsen: Term-SOFR-Darlehen zu 1-Monats-SOFR (Mindestzins 2,5 %) + 4,0%–5,0%; Basiszinssatzdarlehen zum höheren Satz aus Prime, Fed Funds + 0,5 % oder 7,0 % + 3,0%–4,0%.
- Ausleihbasis: Vorschusssätze auf fakturierte/nicht fakturierte Forderungen, Inventar und Ausrüstung; der Agent kann zusätzliche Rücklagen festlegen.
- Auflagen: Mindest-EBITDA der letzten 12 Monate von 10 Millionen US-Dollar; Liquiditätsanforderungen (≥ 70 Millionen US-Dollar nach Sale-Leaseback); FCCR ≥ 1,0× unter bestimmten Bedingungen; jährliche unbelegte Investitionsgrenzen; Beschränkungen für zusätzliche Schulden, Belastungen, Vermögensverkäufe und Dividendenzahlungen.
- Sicherheit: vorrangige Sicherungsrechte an nahezu allen Vermögenswerten des Kreditnehmers; Konzernbürgschaft.
Erforderliche historische und pro-forma Finanzberichte für das erworbene Geschäft werden spätestens bis zum 16. September 2025 per Nachtrag eingereicht.
- Acquisition closed: SkyWater completed the $93 million purchase of Spansion Fab 25, adding a fully equipped 200 mm fab and workforce.
- Improved purchase economics: Amendment removed a $25 million deferred payment while only adding $18 million up-front, lowering total consideration by $7 million.
- Long-term liquidity: New $350 million revolving credit facility runs to 2030, providing substantial funding for integration, working capital and capex.
- Higher immediate cash outflow: Purchase-price amendment increases closing payment by $18 million.
- Expensive debt: Facility rates of SOFR +4%-5% (floor 2.5%) or base +3%-4% create sizable interest burden if fully utilized.
- Restrictive covenants: Minimum EBITDA, liquidity thresholds, FCCR tests and capex limits reduce financial flexibility.
- Comprehensive collateral pledge: All borrower assets are pledged, limiting future unsecured borrowing capacity.
Insights
TL;DR: Fab 25 deal enlarges SKYT’s 200 mm capacity; $350 m revolver secures liquidity but carries high spreads and tight covenants.
The completed acquisition provides SKYT with a fully staffed Austin fab, accelerating its push into specialty 200 mm manufacturing without green-field build risk. Paying $93 million up-front—net $7 million less than the prior structure after eliminating the $25 million earn-out—looks reasonable versus replacement cost of similar equipment. Immediate cash outflow increases but avoids contingent payments and aligns Infineon’s exit. The long-dated $350 million ABL gives flexibility through 2030, sized well beyond the deal cost to support ramp-up and future programs. However, SOFR+400-500 bp and a 2.5% floor translate to a minimum 6.5–7.5% coupon in today’s rates, materially dilutive if fully drawn. Operating covenants (≥$10 m EBITDA, liquidity triggers, FCCR tests) will force disciplined execution as the Fab 25 integration proceeds. Overall, the transaction should enhance capacity and customer diversification but heightens leverage and execution risk.
TL;DR: New ABL boosts liquidity, yet aggressive pricing, full-asset collateral and step-up covenants raise credit-profile caution.
The amended revolver materially extends maturity to 2030 and increases gross availability, a credit positive versus the prior shorter-tenor facilities. Refinancing risk is therefore deferred five years. Nonetheless, pricing is steep (SOFR floor + up to 500 bp; base rate floor 7% + up to 400 bp), indicating lenders’ perception of heightened risk. The requirement to sweep 100% of certain net cash proceeds and agent-set reserves could restrict incremental borrowing headroom, especially during cyclical downturns. Minimum liquidity of $70 million post sale-leaseback and monthly EBITDA thresholds provide early warning triggers but may also push the company toward expensive equity or asset sales if integration delays occur. From a credit standpoint, leverage is poised to rise once the facility is drawn and the fab ramps, and the all-asset lien limits unencumbered collateral. Risk is balanced by the sizable borrowing base and covenant cure rights.
SkyWater Technology, Inc. (SKYT) ha presentato un modulo 8-K comunicando tre eventi rilevanti in data 30 giugno 2025:
- Completamento dell'acquisizione di Spansion Fab 25. La società ha concluso l'acquisto di tutte le quote di partecipazione in Spansion Fab 25, LLC, che detiene sostanzialmente tutti i beni, gli impianti, le attrezzature, i dipendenti e alcune passività dello stabilimento di produzione da 200 mm di Infineon ad Austin, TX. Il prezzo di acquisto in contanti è stato di circa 93 milioni di dollari, composto da un prezzo base di 73 milioni di dollari e un pagamento provvisorio di 20 milioni di dollari per il capitale circolante.
- Modifica dell'Accordo di Acquisto delle Quote di Partecipazione. L'emendamento n. 1 ha aumentato di 18 milioni di dollari il corrispettivo in contanti dovuto alla chiusura, ma ha eliminato un pagamento differito precedentemente concordato di 25 milioni di dollari legato a un accordo pluriennale di fornitura, riducendo così il corrispettivo totale di 7 milioni di dollari e semplificando gli obblighi post-chiusura.
- Accordo di Prestito e Garanzia Modificato e Ristabilito. SKYT e le sue controllate hanno stipulato una nuova linea di credito senior garantita da 350 milioni di dollari a rotazione con scadenza 30 giugno 2030 con Siena Lending Group (agente) e un gruppo di finanziatori comprendente BSP, GRC e Ares. I proventi hanno rifinanziato il debito Siena/GRC, finanziato l'acquisto di Fab 25 e supporteranno il capitale circolante e gli investimenti in conto capitale.
Termini chiave del finanziamento:
- Interessi: prestiti Term-SOFR al tasso SOFR a 1 mese (floor 2,5%) + 4,0%–5,0%; prestiti a tasso base al maggiore tra prime rate, Fed funds + 0,5% o 7,0% + 3,0%–4,0%.
- Base di prestito: tassi di anticipo su crediti fatturati/non fatturati, inventario e attrezzature; l'agente può stabilire riserve aggiuntive.
- Vincoli: EBITDA minimo degli ultimi 12 mesi di 10 milioni di dollari; requisiti di liquidità (≥70 milioni di dollari dopo operazioni di sale-leaseback); FCCR ≥1,0× in determinate condizioni; limiti annuali per investimenti non finanziati; restrizioni su ulteriori debiti, gravami, vendite di asset e distribuzioni di dividendi.
- Garanzie: privilegio di primo grado su sostanzialmente tutti gli asset del mutuatario; garanzia del socio controllante.
I bilanci storici e pro-forma richiesti per l’attività acquisita saranno depositati tramite emendamento entro e non oltre il 16 settembre 2025.
SkyWater Technology, Inc. (SKYT) presentó un formulario 8-K divulgando tres eventos materiales fechados el 30 de junio de 2025:
- Finalización de la adquisición de Spansion Fab 25. La compañía cerró la compra de todas las participaciones en Spansion Fab 25, LLC, que posee sustancialmente todas las propiedades, planta, equipo, empleados y ciertas responsabilidades de la planta de fabricación de Infineon de 200 mm en Austin, TX. El precio de compra en efectivo fue aproximadamente de $93 millones, compuesto por un precio base de $73 millones y un pago provisional de capital de trabajo de $20 millones.
- Enmienda al Acuerdo de Compra de Participaciones. La Enmienda No. 1 aumentó la consideración en efectivo debida al cierre en $18 millones, pero eliminó un pago diferido previamente acordado de $25 millones vinculado a un acuerdo de suministro plurianual, reduciendo la consideración total en $7 millones y simplificando las obligaciones posteriores al cierre.
- Acuerdo de Préstamo y Garantía Modificado y Restablecido. SKYT y sus subsidiarias celebraron una nueva línea de crédito senior garantizada revolving de $350 millones con vencimiento el 30 de junio de 2030 con Siena Lending Group (agente) y un grupo de prestamistas que incluye BSP, GRC y Ares. Los ingresos refinanciaron la deuda Siena/GRC, financiaron la compra de Fab 25 y respaldarán el capital de trabajo y el gasto de capital.
Términos clave del financiamiento:
- Interés: préstamos Term-SOFR a la tasa SOFR a 1 mes (mínimo 2.5%) + 4.0%–5.0%; préstamos a tasa base al mayor entre prime, fondos federales + 0.5%, o 7.0% + 3.0%–4.0%.
- Base de préstamo: tasas de adelanto contra cuentas por cobrar facturadas/no facturadas, inventario y equipo; el agente puede establecer reservas adicionales.
- Convenios: EBITDA mínimo de los últimos 12 meses de $10 millones; requisitos de liquidez (≥$70 millones después de venta y arrendamiento); FCCR ≥1.0× bajo ciertas condiciones; límites anuales para gastos de capital no financiados; restricciones en deuda adicional, gravámenes, ventas de activos y pagos de dividendos.
- Garantía: gravamen de primera prioridad sobre sustancialmente todos los activos del prestatario; garantía del accionista matriz.
Los estados financieros históricos y pro forma requeridos para el negocio adquirido se presentarán mediante enmienda a más tardar el 16 de septiembre de 2025.
SkyWater Technology, Inc. (SKYT)는 2025년 6월 30일자로 세 가지 주요 사건을 공개하는 8-K 보고서를 제출했습니다:
- Spansion Fab 25 인수 완료. 회사는 Spansion Fab 25, LLC의 모든 지분을 인수 완료했으며, 이 회사는 Infineon의 텍사스 오스틴 200mm 제조 공장의 자산, 설비, 장비, 직원 및 일부 부채를 대부분 보유하고 있습니다. 현금 구매 가격은 약 9,300만 달러로, 기본 가격 7,300만 달러와 임시 운전자본 지급액 2,000만 달러로 구성됩니다.
- 지분 매매 계약 수정. 제1차 수정안은 클로징 시 지급할 현금 대금을 1,800만 달러 인상했으나, 다년간 공급 계약과 연계된 기존에 합의된 2,500만 달러의 연기 지급을 제거하여 총 대가를 700만 달러 줄이고 클로징 후 의무를 단순화했습니다.
- 수정 및 재작성된 대출 및 담보 계약. SKYT와 자회사는 Siena Lending Group(대리인) 및 BSP, GRC, Ares를 포함한 대출자 그룹과 함께 만기일이 2030년 6월 30일인 신규 선순위 담보 3억 5천만 달러 회전 신용 시설에 서명했습니다. 대출금은 Siena/GRC 부채를 재융자하고 Fab 25 인수를 자금 조달하며 운전자본 및 자본 지출을 지원할 예정입니다.
주요 금융 조건:
- 이자율: 1개월 SOFR(최저 2.5%) + 4.0%–5.0%의 Term-SOFR 대출; 기준금리 대출은 prime, 연방기금금리 + 0.5%, 또는 7.0% 중 높은 금리에 3.0%–4.0% 추가.
- 대출 기준: 청구 및 미청구 매출채권, 재고, 장비에 대한 선급 비율; 대리인이 추가 준비금을 설정할 수 있음.
- 약정: 최근 12개월 기준 최소 EBITDA 1,000만 달러; 유동성 요건(매각 후 ≥7,000만 달러); 특정 조건 하 FCCR ≥1.0×; 연간 미충당 자본 지출 한도; 추가 부채, 담보권, 자산 매각 및 배당 지급 제한.
- 담보: 차입자 자산 대부분에 대한 우선 담보권; 모회사 보증.
인수된 사업에 대한 과거 및 프로포르마 재무제표는 2025년 9월 16일까지 수정서로 제출될 예정입니다.
SkyWater Technology, Inc. (SKYT) a déposé un formulaire 8-K divulguant trois événements importants datés du 30 juin 2025 :
- Finalisation de l'acquisition de Spansion Fab 25. La société a finalisé l'achat de toutes les parts de Spansion Fab 25, LLC, qui détient substantiellement tous les biens, installations, équipements, employés et certaines dettes de l'usine de fabrication 200 mm d'Infineon à Austin, TX. Le prix d'achat en espèces était d'environ 93 millions de dollars, comprenant un prix de base de 73 millions de dollars et un paiement provisoire de 20 millions de dollars pour le fonds de roulement.
- Modification de l'Accord d'Achat des Parts Sociales. L'Amendement n°1 a augmenté la contrepartie en espèces due à la clôture de 18 millions de dollars, mais a supprimé un paiement différé précédemment convenu de 25 millions de dollars lié à un accord d'approvisionnement pluriannuel, réduisant la contrepartie totale de 7 millions de dollars et simplifiant les obligations post-clôture.
- Contrat de Prêt et de Garantie Modifié et Reformulé. SKYT et ses filiales ont conclu une nouvelle facilité de crédit renouvelable senior garantie de 350 millions de dollars arrivant à échéance le 30 juin 2030 avec Siena Lending Group (agent) et un groupe de prêteurs comprenant BSP, GRC et Ares. Les fonds ont refinancé la dette Siena/GRC, financé l'achat de Fab 25 et soutiendront le fonds de roulement et les dépenses d'investissement.
Principaux termes du financement :
- Intérêts : prêts Term-SOFR au taux SOFR à 1 mois (plancher 2,5 %) + 4,0 %–5,0 % ; prêts au taux de base au plus élevé entre prime, Fed funds + 0,5 % ou 7,0 % + 3,0 %–4,0 %.
- Base d'emprunt : taux d'avance sur créances facturées/non facturées, stocks et équipements ; l'agent peut fixer des réserves supplémentaires.
- Covenants : EBITDA minimum sur 12 mois glissants de 10 millions de dollars ; exigences de liquidité (≥ 70 millions de dollars après cession-bail) ; FCCR ≥ 1,0× sous certaines conditions ; limites annuelles pour les dépenses d'investissement non financées ; restrictions sur les dettes supplémentaires, les privilèges, les ventes d'actifs et les paiements de dividendes.
- Sécurité : privilège de premier rang sur pratiquement tous les actifs de l'emprunteur ; garantie parentale.
Les états financiers historiques et pro forma requis pour l'activité acquise seront déposés par amendement au plus tard le 16 septembre 2025.
SkyWater Technology, Inc. (SKYT) reichte ein 8-K ein und gab drei wesentliche Ereignisse zum 30. Juni 2025 bekannt:
- Abschluss der Übernahme von Spansion Fab 25. Das Unternehmen schloss den Kauf aller Mitgliedsanteile an Spansion Fab 25, LLC ab, die im Wesentlichen alle Vermögenswerte, Anlagen, Ausrüstungen, Mitarbeiter und bestimmte Verbindlichkeiten des 200-mm-Fertigungswerks von Infineon in Austin, TX, hält. Der Barzahlungspreis betrug ca. 93 Millionen US-Dollar, bestehend aus einem Basispreis von 73 Millionen US-Dollar und einer vorläufigen Zahlung von 20 Millionen US-Dollar für das Betriebskapital.
- Änderung des Mitgliedschaftsanteilkaufvertrags. Änderung Nr. 1 erhöhte die Barzahlung bei Abschluss um 18 Millionen US-Dollar, eliminierte jedoch eine zuvor vereinbarte aufgeschobene Zahlung von 25 Millionen US-Dollar, die an einen mehrjährigen Liefervertrag gebunden war, wodurch die Gesamtsumme um 7 Millionen US-Dollar reduziert und die Verpflichtungen nach dem Abschluss vereinfacht wurden.
- Geänderter und neu gefasster Kredit- und Sicherheitenvertrag. SKYT und seine Tochtergesellschaften schlossen eine neue senior besicherte 350 Millionen US-Dollar revolvierende Kreditfazilität mit Fälligkeit zum 30. Juni 2030 mit der Siena Lending Group (Agent) und einer Kreditgebergruppe einschließlich BSP, GRC und Ares ab. Die Erlöse refinanzierten die Siena/GRC-Schulden, finanzierten den Kauf von Fab 25 und unterstützen das Betriebskapital sowie Investitionen.
Wesentliche Finanzierungsbedingungen:
- Zinsen: Term-SOFR-Darlehen zu 1-Monats-SOFR (Mindestzins 2,5 %) + 4,0%–5,0%; Basiszinssatzdarlehen zum höheren Satz aus Prime, Fed Funds + 0,5 % oder 7,0 % + 3,0%–4,0%.
- Ausleihbasis: Vorschusssätze auf fakturierte/nicht fakturierte Forderungen, Inventar und Ausrüstung; der Agent kann zusätzliche Rücklagen festlegen.
- Auflagen: Mindest-EBITDA der letzten 12 Monate von 10 Millionen US-Dollar; Liquiditätsanforderungen (≥ 70 Millionen US-Dollar nach Sale-Leaseback); FCCR ≥ 1,0× unter bestimmten Bedingungen; jährliche unbelegte Investitionsgrenzen; Beschränkungen für zusätzliche Schulden, Belastungen, Vermögensverkäufe und Dividendenzahlungen.
- Sicherheit: vorrangige Sicherungsrechte an nahezu allen Vermögenswerten des Kreditnehmers; Konzernbürgschaft.
Erforderliche historische und pro-forma Finanzberichte für das erworbene Geschäft werden spätestens bis zum 16. September 2025 per Nachtrag eingereicht.