STOCK TITAN

Nocera proposes about $22M investment in BitRock

Available on EDGAR Accepted by SEC EDGAR Learn about SEC filing dates
(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
8-K

Rhea-AI Filing Summary

Nocera, Inc. (NCRA) entered a legally binding letter of intent with BitRock Ltd. on November 19, 2026, for a proposed cash investment of approximately US$22 million in newly issued BitRock shares. At an approximately US$50 million post-money valuation, Nocera’s proposed ownership would be approximately 44%; the pre-money valuation is approximately US$28 million. Proceeds are dedicated solely to construction of BitRock’s first AI data center, planned at approximately 10 MW of IT load.

Nocera’s funding obligation remains subject to satisfactory due diligence, a definitive investment agreement, required approvals, the accuracy of information provided by BitRock and no material adverse change. Nocera said it has not secured financing for the investment. The LOI has a 60-day term and may be extended by 30 days by mutual written consent while due diligence continues. BitRock would manage construction and day-to-day operations; its approximately 200 MW campus plan is a long-term objective, and this investment covers only the first phase.

Filing Explained

At September 30, 2026, Nocera’s cash equaled 67.4 days of its last reported quarterly operating cash use.

The signed LOI specifies that, if the proposed investment closes, Nocera’s BitRock stake would carry rights to appoint directors, receive periodic financial reports and participate in major decisions.

The LOI says that if due diligence materially differs from information BitRock provided, the pre-money valuation is to be adjusted; either party may request an independent valuation.

Sources and calculations
  • Available liquidity against the last reported quarterly operating outflow, in days at that rate $1,020,689 / ($1,392,363 / 92) = 67.4 days
Item 1.01 Entry into a Material Definitive Agreement Business
The company signed a significant contract such as a merger agreement, credit facility, or major partnership.
Item 7.01 Regulation FD Disclosure Disclosure
Material non-public information disclosed under Regulation Fair Disclosure, often investor presentations or guidance.
Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, or exhibit attachments filed with this report.
Proposed cash investment Approximately US$22 million For newly issued BitRock shares; subject to conditions
Proposed ownership Approximately 44% Based on an approximately US$50 million post-money valuation
Post-money valuation Approximately US$50 million BitRock valuation under the LOI
Pre-money valuation Approximately US$28 million BitRock valuation under the LOI; subject to adjustment based on due diligence
First-phase IT load Approximately 10 MW BitRock’s first AI data center in Alberta
LOI term 60 days From the November 19, 2026 Effective Date
Possible LOI extension 30 days By mutual written consent if due diligence is still in progress
Long-term campus plan Approximately 200 MW BitRock’s long-term plan; not a commitment under this investment
pre-money valuation financial
"pre-money valuation of approximately US$28,000,000"
Pre-money valuation is the estimated worth of a company before it receives any new investment. It can be thought of as the company's value right before adding fresh money, similar to valuing a house before a renovation. This figure helps investors understand how much of the company they will own after investing and how their investment impacts the company's overall value.
post-money valuation financial
"post-money valuation of approximately US$50,000,000"
Post-money valuation is the total value of a company immediately after a new round of investment, equal to the company's value before the investment plus the new cash injected. It matters to investors because it sets the price for ownership shares, shows how much of the company each investor owns, and determines future dilution and return potential—like seeing a home's price tag after renovations to understand each owner's share.
IT load technical
"IT load of approximately 10 MW"
power usage effectiveness (PUE) technical
"power usage effectiveness (PUE) target of approximately 1.225"
Power Usage Effectiveness (PUE) is a simple ratio that compares the total energy consumed by a data center (including cooling, lighting and other facility systems) to the energy used solely by the servers and networking equipment. For investors, a lower PUE means less energy is wasted — like a car that gets more miles per gallon — which usually translates into lower operating costs, smaller sustainability risks and a clearer picture of infrastructure efficiency.
colocation model technical
"colocation model in which customers install their own computing equipment"
A colocation model is a service arrangement where firms place their computer servers and networking equipment inside or immediately adjacent to an exchange’s or data center’s facility so their trading systems share the same physical space and direct network connections as the exchange’s matching engines. It typically supplies rack space, power, cooling and high-speed cross-connects and is used to minimize the time (latency) for order messages to reach the exchange; lower latency can improve the speed of order submission but does not by itself guarantee execution or better fills and usually involves recurring fees and strict security, access and technical requirements.
N+1 redundancy technical
"N+1 redundancy and uninterruptible power supply"
n+1 redundancy means a system is built with one extra identical component beyond the number required for normal operation, so if one part fails the system keeps running without disruption. For investors, it signals a deliberate trade-off between slightly higher up-front and maintenance costs and lower risk of outages, lost revenue or reputational damage—think of keeping a spare tire in the trunk so a single flat won’t stop your trip.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How much is NCRA proposing to invest in BitRock, and what stake would it receive?

Nocera proposes to invest approximately US$22 million for approximately 44% of BitRock at an approximately US$50 million post-money valuation. The investment remains subject to due diligence, a definitive agreement and other conditions.

Can BitRock’s valuation change after NCRA’s due diligence?

If due diligence results differ materially from information BitRock provided, the pre-money valuation is to be adjusted, and either party may request an independent valuation.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
false 0001756180 TW 0001756180 2026-11-19 2026-11-19 iso4217:USD xbrli:shares iso4217:USD xbrli:shares

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

WASHINGTON, D.C. 20549

 

FORM 8-K

 

CURRENT REPORT

 

Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

 

Date of Report (date of earliest event reported): November 19, 2026

 

NOCERA, INC.

(Exact name of registrant as specified in charter)

 

Nevada   001-41434   16-1626611

(State or other jurisdiction

of incorporation)

 

(Commission

File Number)

 

(IRS Employer

Identification No.)

 

3F (Building B), No. 185, Sec. 1, Datong Rd., Xizhi Dist., New Taipei City Taiwan 221, ROC

(Address of principal executive offices and zip code)

 

(886) 910-163-358

(Registrant’s telephone number, including area code)

 

N/A

(Former name or former address, if changed since last report)

 

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of registrant under any of the following provisions:

 

☐ Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

 

☐ Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

 

☐ Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

 

☐ Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

 

Securities registered pursuant to Section 12(b) of the Act:

 

Title of each class Trading Symbol Name of each exchange on which registered
Common Stock, par value $0.001 per share NCRA The Nasdaq Stock Market LLC

 

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§240.12b-2 of this chapter) 

Emerging growth company ☒

 

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act. ◻

 

 

 

   

 

 

Item 1.01. Entry into a Material Definitive Agreement.

 

On November 19, 2026 (the “Effective Date”), Nocera, Inc. (“Nocera” or the “Company”) entered into a letter of intent (the “LOI”) with BitRock Ltd. (“BitRock”), a corporation incorporated under the laws of the Province of Alberta, Canada, regarding a proposed cash investment by the Company in BitRock to fund construction of an artificial intelligence data center with an IT load of approximately 10 MW in Alberta, Canada (the “Project”).

 

Under the LOI, and subject to the conditions described below, the Company would subscribe in cash for newly issued shares of BitRock for an investment amount of approximately US$22,000,000, based on a pre-money valuation of BitRock of approximately US$28,000,000 and a post-money valuation of approximately US$50,000,000. The Company’s resulting ownership would equal its investment amount divided by BitRock’s post-money valuation, or approximately 44%. If the results of the Company’s due diligence differ materially from information provided by BitRock, the pre-money valuation is to be adjusted, and either party may request an independent valuation. The investment proceeds are to be used solely for construction of the Project. The instalments and disbursement conditions will be set out in a definitive investment agreement (the “Definitive Agreement”).

 

BitRock would be responsible for construction management and day-to-day operations of the Project. As a shareholder, the Company would have the right to appoint directors, receive periodic financial reports and participate in decisions on major matters, as further set out in the Definitive Agreement. BitRock has represented that certain customers have entered into memoranda of understanding with BitRock for hosting services. This information has not been independently verified by the Company and is subject to the Company’s due diligence. BitRock has also estimated that the Project’s hosting revenue will have a net profit margin of approximately 25% to 30%, which estimate has not been independently verified by the Company and is subject to the Company’s due diligence.

 

The LOI is legally binding upon execution, and the parties have agreed to execute the Definitive Agreement in good faith as soon as practicable on the terms of the LOI. The Company’s obligation to make the investment is subject to conditions precedent, including (i) completion of due diligence with results reasonably satisfactory to the Company, (ii) execution of the Definitive Agreement, (iii) each party’s receipt of all necessary internal corporate approvals and regulatory approvals, and (iv) the accuracy of information provided by BitRock and the absence of any material adverse change in BitRock’s business, assets or financial condition since the Effective Date.

 

The LOI is non-exclusive and contains confidentiality, non-circumvention and non-solicitation covenants. Each party bears its own expenses. The LOI has a term of sixty (60) days from the Effective Date, which may be extended by thirty (30) days with the written consent of both parties if due diligence is still in progress. The LOI may be terminated by mutual written agreement, by the Company if the conditions precedent have not been satisfied within the term, or by a non-breaching party following a material breach that is not cured within fifteen (15) days after notice. Neither party is liable for damages upon a termination by mutual agreement or by the Company for failure of the conditions precedent. The LOI is governed by the laws of the Province of Alberta and the federal laws of Canada applicable therein. Disputes are to be resolved by arbitration in Calgary, Alberta.

 

There can be no assurance that the Definitive Agreement will be executed or that the investment will be completed on the terms described above or at all.

 

The foregoing description of the LOI does not purport to be complete and is qualified in its entirety by reference to the full text of the LOI, which is filed as Exhibit 10.1 to this Current Report on Form 8-K and incorporated herein by reference.

  

 

 

 2 

 

 

Item 7.01. Regulation FD Disclosure.

 

On November 23, 2026, the Company issued a press release announcing entry into the LOI. A copy of the press release is furnished as Exhibit 99.1 hereto.

 

The information in this Item 7.01, including Exhibit 99.1, is being furnished and shall not be deemed “filed” for purposes of Section 18 of the Securities Exchange Act of 1934, as amended (the “Exchange Act”), or otherwise subject to the liabilities of that section, nor shall it be deemed incorporated by reference into any filing under the Securities Act of 1933, as amended, or the Exchange Act, except as expressly set forth by specific reference in such a filing.

 

Forward-Looking Statements

 

This Current Report on Form 8-K contains forward-looking statements within the meaning of the Private Securities Litigation Reform Act of 1995, including statements regarding the proposed investment, the execution of the Definitive Agreement and the construction and operation of the Project. These statements are subject to risks and uncertainties, including that the conditions precedent may not be satisfied, the LOI may terminate or expire before the Definitive Agreement is executed, the valuation may be adjusted, and information provided by BitRock has not been independently verified by the Company. Actual results may differ materially. Except as required by law, the Company undertakes no obligation to update any forward-looking statement.

 

Item 9.01. Financial Statements and Exhibits.

 

(d) Exhibits.

 

Exhibit No.   Description
10.1   Letter of Intent, dated November 19, 2026, between BitRock Ltd. and Nocera, Inc.
99.1   Press Release, dated November 23, 2026.
104   Cover Page Interactive Data File (embedded within the Inline XBRL document).

 

 

 

 

 3 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

 

 

  NOCERA, INC.
   
   
Date: November 23, 2026 By: /s/ Andy Ching-An Jin
 

Name: Andy Ching-An Jin

Title: Chief Executive Officer

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 4 

 

Exhibit 99.1

 

FOR IMMEDIATE RELEASE

 

Nocera Signs Binding Letter of Intent to Invest $22 Million for an Approximately 44%

Stake in BitRock, a Self-Powered AI Data Center Developer in Alberta

 

First 10 MW Facility on BitRock’s Own Natural Gas Power Extends the AI Platform Nocera Is

Building Through Its IRMA AI, INERGX and QMAX Agreements

 

TAIPEI, Taiwan, November 23, 2026 — Nocera, Inc. (Nasdaq: NCRA) (“Nocera” or the “Company”) today announced that it has entered into a binding letter of intent (the “LOI”) with BitRock Ltd. (“BitRock”), a Calgary-based developer of AI data centers powered by its own natural gas generation, to invest approximately US$22 million in cash for newly issued BitRock shares. At a post-money valuation of approximately US$50 million, the investment would give Nocera approximately 44% of BitRock, together with the right to appoint directors and to take part in decisions on major matters. The proceeds are dedicated solely to building BitRock’s first AI data center, a facility of approximately 10 MW of IT load in Alberta, Canada.

 

The LOI, fully executed on November 19, 2026, is legally binding, and the parties have committed to execute a definitive investment agreement as soon as practicable. Nocera’s obligation to fund is subject to completion of due diligence, execution of the definitive agreement, receipt of required approvals and other conditions, and the investment may not be completed on the terms described or at all.

 

Power First

 

Nocera believes the limit on new AI capacity in North America is no longer demand. It is power: grid connections that can take years to secure and approvals that have become harder to win. BitRock starts from the other end. Under the LOI, BitRock has represented that it owns its natural gas generation equipment and has obtained the permits required to generate and supply electricity in Alberta, and its first facility is planned around that generation. According to BitRock, it already holds its power generation, power supply and usage permits, and its future expansion will also be based mainly on self-generated power from natural gas.

 

Why Alberta

 

Alberta launched its AI Data Centres Strategy in December 2024 with a stated goal of attracting C$100 billion of data center investment over five years. According to public reports, the Alberta Electric System Operator has since fully allocated its interim 1,200 MW of grid capacity for large-load projects, and provincial policy now favors developers that bring their own generation. Nocera believes BitRock is built on that model.

 

Built in 10 MW Steps

 

According to BitRock, its planned campus is located near Hanna, Alberta, on an industrial site of approximately 37 acres, and uses prefabricated computing modules of approximately 2.5 MW each, with four modules making up the first 10 MW phase. BitRock’s long-term plan for the campus is approximately 200 MW, added in 10 MW units as customer demand warrants. This investment covers the first phase; each further phase would be evaluated and financed on its own merits.

 

According to BitRock, the campus is designed to a power usage effectiveness (PUE) target of approximately 1.225, with N+1 redundancy and uninterruptible power supply supporting stable operation of the compute load. Alberta’s cold climate is expected to reduce the energy and water needed for cooling.

 

BitRock plans to operate on a colocation model in which customers install their own computing equipment and BitRock provides powered data hall space and operations. Under that model, Nocera’s capital goes into power and data center capacity rather than chips. BitRock has represented that customers have signed memoranda of understanding for computing power hosting services.

 

“Power is the scarce asset in AI infrastructure, and BitRock is built around its own,” said Andrew Teng, Asia Director of Nocera. “We are putting capital into a facility designed to generate its own electricity, in a province that has asked developers to do exactly that, and we are doing it one 10 megawatt unit at a time. This is a measured entry into North American compute with a meaningful ownership position and a voice on the board.”

 

 

 1 

 

 

One AI Strategy, Four Layers

 

BitRock is the fourth piece of an AI platform Nocera has been assembling since June. On June 8, 2026, Nocera entered into a binding venture platform agreement with U.S.-based Digital Innovations Group, developer of the proprietary IRMA AI Engine, to pair IRMA’s AI technology with Nocera’s capital markets and acquisition platform. That transaction has not yet closed, as Digital Innovations Group is in the midst of a major expansion across the Asia Pacific region, and Nocera expects it to close before the end of 2026. On July 8, Nocera announced a binding agreement to acquire an equity interest in INERGX, an integrated energy storage and power platform built to serve AI data centers and other mission-critical users, and followed in August with a 50/50 joint venture, Nocera-INERGX Energy Ventures. On July 29, Nocera announced the acquisition of a 30% controlling interest in QMAX Technology Co., Ltd., a Taiwan-based authorized distributor of Micron / Crucial memory and storage products.

 

AI software, power, memory and now self-powered data center capacity: Nocera believes each transaction adds a layer of the infrastructure that artificial intelligence depends on. Certain of these transactions, including the BitRock investment and the Digital Innovations Group transaction, have not yet closed and remain subject to conditions.

 

Transaction Terms

 

•Investment: approximately US$22 million in cash for newly issued shares, on a pre-money valuation of approximately US$28 million, which reflects BitRock’s generation equipment, generation permits and land use rights, and a post-money valuation of approximately US$50 million, for approximately 44% of BitRock.
•Use of proceeds: solely for construction of the first data center of approximately 10 MW. Instalments and disbursement conditions will be set in the definitive agreement.
•Governance: as a shareholder, Nocera will have the right to appoint directors, receive periodic financial reports and participate in decisions on major matters. BitRock is responsible for construction management and day-to-day operations.
•Conditions to funding: due diligence reasonably satisfactory to Nocera, execution of the definitive agreement, required corporate and regulatory approvals, accuracy of the information provided by BitRock and no material adverse change at BitRock.
•Valuation protection: if due diligence results differ materially from the information BitRock has provided, the pre-money valuation will be adjusted, and either party may call for an independent valuation.
•Term: 60 days from signing, extendable by 30 days by mutual written consent while due diligence continues. The agreement is non-exclusive.

 

About BitRock Ltd.

 

BitRock Ltd. is a corporation organized under the laws of the Province of Alberta, Canada, with its registered office in Calgary, focused on the development and operation of AI data centers powered by self-generated natural gas.

 

About Nocera, Inc.

 

Nocera, Inc. (Nasdaq: NCRA) is building a portfolio of AI and energy infrastructure businesses across Asia, Europe and North America, spanning AI model aggregation and distribution, data center and compute assets, device and channel operations, and renewable energy and storage assets. For more information, visit www.Nocera.company. For AI partnership inquiries, contact AI@PhoenixMGMTConsulting.com.

 

 

 

 

 2 

 

 

Forward-Looking Statements

 

This press release contains forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, including statements regarding the Company’s proposed investment in BitRock, the resulting ownership interest and governance rights, the construction, capacity, timing and expansion of BitRock’s data center, BitRock’s business model and customers, and the Company’s AI and energy infrastructure strategy. The approximately 200 MW campus plan is BitRock’s long-term objective, not a commitment; this investment concerns only the first phase of approximately 10 MW. Such statements involve known and unknown risks and uncertainties, including that: Nocera is not obligated to fund the investment unless a definitive investment agreement is signed and all conditions are satisfied, including due diligence reasonably satisfactory to Nocera; the definitive agreement may not be signed on the terms described or at all; the LOI has a 60-day term and may expire or be terminated; the valuation, investment amount and ownership percentage may be adjusted; Nocera will require sufficient capital to complete the investment and has not yet secured financing for it; customer memoranda of understanding may not result in binding contracts; construction may face delays, cost overruns and equipment, fuel price, tariff and regulatory risks; the Digital Innovations Group transaction has not closed and may not close by the end of 2026, on the terms announced or at all; and the other earlier transactions referenced above remain subject to their own terms, conditions and risks. Actual results may differ materially from those expressed or implied. Nocera undertakes no obligation to update any forward-looking statement except as required by law. Statements concerning BitRock’s generation equipment, permits, site, technical design, customers and expansion plans are based on information provided by BitRock and have not yet been independently verified by Nocera. Nothing in this release constitutes an offer to sell or a solicitation of an offer to buy any security.

 

Public Relations & Global Partnerships:

 

Phoenix MGMT & Consulting

www.PhoenixMGMTconsulting.com

PR@PhoenixMGMTConsulting.com

 

 

 

 

 

 3 

 

 

Filing Exhibits & Attachments

5 documents

Keep reading