STOCK TITAN

ASML begins construction of new Eindhoven campus, strengthening its presence in the Brainport region

ASML is developing a large new Eindhoven campus with phased capacity for up to 20,000 workplaces, anchored by a next-generation flow factory.

(Neutral)
(Very Positive)
Tags

ASML (ASML) has started construction of its second major industrial campus in the Brainport region at Brainport Industries Campus (BIC) North in Eindhoven.

The multi-phase project is planned to span about 350,000 square meters and could ultimately provide capacity for up to 20,000 workplaces, supporting ASML’s long-term growth and keeping key activities in the region. The first phase, expected to be completed in 2029, will house at least 3,000 employees, mainly teams relocating from existing locations, and will integrate production, logistics and office functions on one site.

A core feature will be ASML’s new flow factory for the TWINSCAN factory, an operating model designed to enable faster, more efficient and higher-scale module production and installation while maintaining quality, inspired by approaches used in automotive and aerospace industries.

Loading...
Loading translation...

Positive

  • New campus size approximately 350,000 m² with potential for up to 20,000 workplaces
  • First phase targeted completion in 2029 with capacity for at least 3,000 employees
  • Integrated operations combining production, logistics and offices on a single industrial campus
  • New flow factory model designed for faster, more efficient, higher-scale TWINSCAN module production

Negative

  • None.

Market Context

Before the headline, ASML had posted 4.17% in the provided market snapshot while all five listed pee...
Analysis

Before the headline, ASML had posted 4.17% in the provided market snapshot while all five listed peers were positive, so the campus announcement arrived against an already positive semiconductor-equipment backdrop rather than a post-headline reaction.

Key Figures

Campus development area: approximately 350,000 square meters Potential workplace capacity: up to 20,000 workplaces First-phase completion: 2029 +1 more
Campus development area
approximately 350,000 square meters
BIC North multi-phase development
Potential workplace capacity
up to 20,000 workplaces
Long-term campus capacity
First-phase completion
2029
Expected completion of the first phase
First-phase employees
at least 3,000 employees
Employees housed in the first phase

Key Terms

fte
1 terms
fte technical
"ASML’s more than 44,500 employees (FTE)"
A full-time equivalent (FTE) is a way to count labor by converting part-time and variable hours into the number of full-time workers they equal; for example, two half-time employees equal one FTE. Investors use FTEs to compare staffing levels, payroll exposure, and productivity across periods or companies, similar to comparing vehicle fleet size rather than counting drivers who work varying shifts. It helps standardize workforce cost and capacity measures.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

ASML begins construction of new Eindhoven campus, strengthening its presence in the Brainport region

  • Groundbreaking ceremony was held Tuesday September 8, 2026 at Brainport Industries Campus North
  • New campus will add manufacturing capacity in support of ASML’s planned growth needs

  
VELDHOVEN, the Netherlands, September 8, 2026 – ASML Holding N.V. (ASML) today marked the start of construction of its second major industrial campus in the Brainport region, the Netherlands. Together with partners, the company celebrated the milestone with a groundbreaking ceremony at Brainport Industries Campus (BIC) North, launching a multi-phase development project that will eventually span approximately 350,000 square meters and provide potential capacity for up to 20,000 workplaces.

The new location ensures that key activities remain closely connected within the region and are an integral part of the company’s global network. The milestone was celebrated during a ceremony attended by the Dutch Prime Minister Rob Jetten and representatives from government, customers, suppliers, knowledge institutions and regional partners.

"The growing global demand from the semiconductor industry requires continuous investments," said Christophe Fouquet, President and CEO of ASML. "As part of our global expansion plans, BIC North provides the space and flexibility we need to continue innovating and supporting our customers around the world. It will complement our existing office space and manufacturing capacity in the Brainport region and further strengthen our footprint in the Netherlands. This milestone would not have been possible without close collaboration with local, regional and national authorities and we are particularly grateful for the support we have received from the City of Eindhoven."

A new location, introducing an innovative way of working
The first phase of BIC North, expected to be completed in 2029, will house at least 3,000 employees, bringing together production, logistics and supporting office activities in one integrated industrial campus. These workplaces are primarily intended for teams relocating from existing ASML locations.

A key element of the campus will be ASML’s new flow factory, ASML’s next-generation innovative manufacturing operating model for the TWINSCAN factory. This model is designed to enable faster, more efficient and higher-scale module production and installation. It streamlines the flow of materials and work through the factory, helping improve productivity while maintaining high-quality standards. The approach follows proven models used in other industries such as automotive and aerospace.

Future footprint in the Brainport region
In the long term, the BIC campus could accommodate up to 20,000 workplaces, depending on future requirements, providing the flexibility needed to support industry growth.

ASML’s future footprint in the Brainport region will comprise three complementary campuses: a dedicated headquarters campus (De Run 1000) and an industrial campus (De Run 6000/7000) in Veldhoven, alongside the company’s second industrial campus at BIC North in Eindhoven. Together, these locations will support ASML’s innovation, manufacturing and corporate activities in the region.

The development of BIC North reflects the close collaboration between ASML, governments, knowledge institutions and many other stakeholders. Through public-private partnerships, ASML and its partners continue to invest in long-term priorities such as talent development, affordable housing and equal opportunity, helping to support sustainable growth for both the company and the Brainport region.
  

Media Relations contactsInvestor Relations contacts
Monique Mols +31 6 5284 4418Jim Kavanagh +31 40 268 3938
Sarah de Crescenzo +1 925 899 8985Pete Convertito +1 203 919 1714
Karen Lo +886 9 397 88635Peter Cheang +886 3 659 6771

About ASML
ASML is a leading supplier to the semiconductor industry. The company provides chipmakers with hardware, software and services to mass produce the patterns of integrated circuits (microchips). Together with its partners, ASML drives the advancement of more affordable, more powerful, more energy-efficient microchips. ASML enables groundbreaking technology to solve some of humanity's toughest challenges, such as in healthcare, energy use and conservation, mobility and agriculture. ASML is a multinational company headquartered in Veldhoven, the Netherlands, with offices across EMEA, the US and Asia. Every day, ASML’s more than 44,500 employees (FTE) challenge the status quo and push technology to new limits. ASML is traded on Euronext Amsterdam and NASDAQ under the symbol ASML. Discover ASML – our products, technology and career opportunities – at www.asml.com.

Forward-Looking Statements
This document and related discussions contain statements that are forward-looking within the meaning of the U.S. Private Securities Litigation Reform Act of 1995, including statements with respect to ASML's plans for the development and expansion of BIC North, expected timelines, size and workplace capacity and option for further expansion, anticipated benefits of BIC and ASML’s next-generation manufacturing operating model, and its future footprint in the Brainport region and other non-historical statements. Forward-looking statements do not guarantee future performance and involve risks and uncertainties, including risks related to the construction of BIC North, the ultimate timing of completion, size and capacity of the facility, risks relating to the realization of the expected benefits of the facility and manufacturing operating model and other risks indicated in the risk factors included in ASML’s most recent Annual Report on Form 20-F and other filings with the U.S. Securities and Exchange Commission. These forward-looking statements are made only as of the date of this document. We undertake no obligation to update any forward-looking statements after the date of this document or to conform such statements to actual results or revised expectations, except as required by law.

Attachment


FAQ

When will the first phase of ASML’s BIC North campus be completed and who will work there?

The first phase of BIC North is expected to be completed in 2029 and will house at least 3,000 employees. These workplaces are primarily intended for teams relocating from existing ASML locations, bringing production, logistics and supporting office activities together in one integrated industrial campus.

What is ASML’s new flow factory at BIC North and what is its purpose?

The BIC North campus will host ASML’s new flow factory, a next-generation manufacturing operating model for the TWINSCAN factory. It is designed to streamline the flow of materials and work through the factory, enabling faster, more efficient and higher-scale module production and installation while maintaining high-quality standards, following proven concepts from industries such as automotive and aerospace.

How will BIC North fit into ASML’s broader footprint in the Brainport region?

In the long term, ASML’s Brainport footprint is planned to consist of three complementary campuses: a dedicated headquarters campus at De Run 1000 and an industrial campus at De Run 6000/7000 in Veldhoven, alongside the second industrial campus at BIC North in Eindhoven. Together, these sites are intended to support ASML’s innovation, manufacturing and corporate activities in the region.

What broader regional priorities are linked to the development of BIC North?

The development of BIC North is part of public-private partnerships between ASML, governments, knowledge institutions and other stakeholders. The company and its partners continue to invest in long-term priorities such as talent development, affordable housing and equal opportunity, with the aim of supporting sustainable growth for both ASML and the Brainport region.

Keep reading