NioCorp (NASDAQ:NB) reported assay results from the second diamond drill hole (NEC25-025) at the Elk Creek Project on November 5, 2025. The hole reached 928.42 m total depth with 733.42 m within the carbonatite and returned weighted averages of Nb2O5 0.70%, Sc 75.99 ppm, TiO2 2.82%, and TREO 3,848.73 ppm. Multiple long intervals include Nb2O5 up to 1.28% over 34.00 m and TREO intervals to 6,017.03 ppm. Results are consistent with the existing resource model; remaining assays are being processed with final results anticipated by year-end 2025.
NioCorp (NASDAQ:NB) ha riportato i risultati delle analisi dal secondo pozzo di perforazione diamantina (NEC25-025) al Progetto Elk Creek il 5 novembre 2025. Il pozzo ha raggiunto una profondità totale di 928,42 m con 733,42 m all'interno del carbonatite e ha riportato medie pesate di Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82%, e TREO 3.848,73 ppm. Diversi lunghi intervalli includono Nb2O5 fino a 1,28% su 34,00 m e intervalli TREO fino a 6.017,03 ppm. I risultati sono coerenti con l'attuale modello di risorse; i rimanenti assay sono in fase di processing con risultati finali attesi entro la fine del 2025.
NioCorp (NASDAQ:NB) informó resultados de ensayo del segundo agujero de perforación de diamante (NEC25-025) en el Proyecto Elk Creek el 5 de noviembre de 2025. El pozo alcanzó una profundidad total de 928,42 m con 733,42 m dentro del carbonatito y arrojó promedios ponderados de Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82%, y TREO 3.848,73 ppm. Diversos intervalos largos incluyen Nb2O5 de hasta 1,28% en 34,00 m y intervalos TREO de hasta 6.017,03 ppm. Los resultados son consistentes con el modelo de recursos existente; los ensayos restantes se están procesando con resultados finales previstos para finales de 2025.
NioCorp (NASDAQ:NB)는 Elk Creek 프로젝트의 두 번째 다이아몬드 시추구멍(N EC25-025)에서의 분석 결과를 2025년 11월 5일에 발표했습니다. 해당 구멍은 총 깊이 928.42 m에 도달했고 탄산암 내 733.42 m를 포함하며 가중 평균으로 Nb2O5 0.70%, Sc 75.99 ppm, TiO2 2.82%, TREO 3,848.73 ppm를 보였습니다. Nb2O5가 34.00 m 동안 1.28%까지, TREO 구간은 6,017.03 ppm까지 이어지는 여러 긴 구간이 관찰되었습니다. 결과는 기존 자원 모델과 일치하며 남은 시료 분석은 처리 중이며 최종 결과는 2025년 말까지 예상됩니다.
NioCorp (NASDAQ:NB) a publié les résultats des analyses du deuxième puits de forage diamantaire (NEC25-025) sur le projet Elk Creek le 5 novembre 2025. Le puits a atteint une profondeur totale de 928,42 m avec 733,42 m dans le carbonatite et a donné des moyennes pondérées de Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82%, et TREO 3 848,73 ppm. Plusieurs longues sections incluent Nb2O5 jusqu'à 1,28% sur 34,00 m et des sections TREO jusqu'à 6 017,03 ppm. Les résultats sont cohérents avec le modèle de ressources existant; les analyses restantes sont en cours de traitement avec des résultats finaux prévus d'ici fin 2025.
NioCorp (NASDAQ:NB) meldete die Ergebnisse des zweiten Diamantbohrlochs (NEC25-025) beim Elk Creek-Projekt am 5. November 2025. Das Bohrloch erreichte eine Gesamttiefe von 928,42 m mit 733,42 m im Carbonatit und ergab gewichtete Durchschnitte von Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82% und TREO 3.848,73 ppm. Mehrere lange Abschnitte umfassen Nb2O5 bis zu 1,28% über 34,00 m und TREO-Abschnitte bis zu 6.017,03 ppm. Die Ergebnisse stimmen mit dem bestehenden Ressourcenmodell überein; verbleibende Proben werden bearbeitet, endgültige Ergebnisse werden voraussichtlich bis Ende 2025 vorliegen.
NioCorp (NASDAQ:NB) أبلغت عن نتائج الاختبار من الحفرة الثانية الحفر الماسي (NEC25-025) في مشروع Elk Creek بتاريخ 5 نوفمبر 2025. وصلت الحفرة إلى عمق كلي قدره 928,42 م مع 733,42 م داخل الكربوناتي وأظهرت متوسطات وزنية لـ Nb2O5 0,70%، Sc 75,99 ppm، TiO2 2,82%، وTREO 3,848.73 ppm. تشمل عدة فترات طويلة Nb2O5 حتى 1,28% على 34,00 م وفترات TREO حتى 6,017.03 ppm. النتائج متوافقة مع نموذج الموارد الحالي؛ ما تزال التحاليل المتبقية قيد المعالجة مع توقع النتائج النهائية بحلول نهاية 2025.
- Hole NEC25-025: 733.42 m of carbonatite intersected
- Weighted averages: Nb2O5 0.70%, TREO 3,848.73 ppm
- High Nb interval: 1.28% Nb2O5 over 34.00 m
- High TREO interval: 6,017.03 ppm over 9.71 m
- Assay results are not reserves under S-K 1300 or NI 43-101
- Conversion to measured/proven classifications requires additional technical work
- Conclusions limited: company notes individual drill holes are not definitive
Insights
Drill assays broadly match the existing model and show several higher-grade intervals; results support further resource conversion work.
NioCorp's second diamond hole (NEC25-025) returned a weighted average of
The immediate business mechanism is straightforward: infill assay data of this character supports technical work to reclassify some Indicated resources to Measured and some Probable reserves to Proven, subject to further analysis. Key dependencies and risks remain explicit: additional assay batches are pending from two independent labs, and the company states that conversion to reserves requires additional technical work and is not assured. The timetable given is clear — additional results in the next several weeks with final results anticipated by
Concrete items to watch: the remaining assay releases from the program, any QA/QC summaries from the two external labs, and formal resource/reserve updates that follow S-K 1300/NI 43-101 processes. Expect to judge impact once multiple holes show consistent grade/width patterns and when the company files any resource or reserve reclassification before
CENTENNIAL, CO / ACCESS Newswire / November 5, 2025 / NioCorp Developments Ltd. ("NioCorp" or the "Company") (NASDAQ:NB), a leading U.S. critical minerals developer, is pleased to report assay results from the second diamond drill hole completed as part of the Company's drilling program at its critical minerals project in Southeast Nebraska (the "Elk Creek Project").
The second drill hole was completed to a total depth of 928.42 meters ("m") with a total drill hole length within the carbonatite of 733.42 m and intersected the targeted lithologies over its entire length. Extended intervals of mineralization were observed throughout the entire length of the drill hole, returning several long intervals that are consistent with the existing Mineral Resource model for the Elk Creek deposit.
"Results from this second drill hole are consistent with our current geological model and provide additional confirmation of the continuity and grade distribution within the deposit," said Mark A. Smith, NioCorp CEO and Chairman. "Several intervals returned higher-than-expected assay grades. While we do not draw conclusions from individual drill holes, the overall results to date are encouraging. All work is being conducted in accordance with the highest technical standards and in compliance with the Securities and Exchange Commission's S-K 1300 and Canada's NI 43-101 reporting requirements. These results reflect that level of rigor and further support our understanding of the deposit."
This drilling program and associated technical work was designed to support the conversion of a portion of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources and the subsequent conversion of a portion of its Probable Mineral Reserves into Proven Mineral Reserves. Assays from the remaining drill holes are being processed by two independent laboratories. Additional results are expected to be released in the next several weeks and final results are anticipated by year-end 2025.
Table 1: NEC25-025 - Full DDH Weighted Averages within the Carbonatite
Hole ID | Nb2O5 | Sc | TiO2 | LREO (ppm) | HREO | TREO | DDH Length |
NEC25-025 | 0.70 | 75.99 | 2.82 | 3333.32 | 515.41 | 3848.73 | 733.42 |
Notes:
| |||||||
The drill hole was designed and oriented parallel to the ore body strike, guided by historical drill hole spacing, to infill geological data within the existing mineral resource.
Table 2: NEC25-025 Interval Highlights - Nb2O5
Hole ID | From (m) | To (m) | Int. | Nb2O5 |
NEC25-025 | 380.00 | 390.00 | 10.00 | 0.82 |
502.50 | 519.00 | 16.50 | 1.01 | |
748.50 | 761.68 | 13.18 | 0.99 | |
842.00 | 876.00 | 34.00 | 1.28 |
Table 3: NEC25-025 Interval Highlights - Sc
Hole ID | From (m) | To (m) | Int. | Sc |
NEC25-025 | 627.84 | 659.12 | 31.28 | 108.93 |
769.50 | 801.50 | 32.00 | 103.04 |
Table 4: NEC25-025 Interval Highlights - TREO
Hole ID | From (m) | To (m) | Int. | TREO |
NEC25-025 | 379.00 | 395.80 | 16.80 | 4784.40 |
446.00 | 470.00 | 24.00 | 5269.52 | |
726.50 | 746.52 | 20.02 | 5728.88 | |
796.79 | 806.50 | 9.71 | 6017.03 |
Table 5: Summary of Drill Hole Coordinates
Hole ID | Easting | Northing | Elevation | Azimuth | Dip | Total Depth (m) |
NEC25-025 | 739201.94 | 4461347.03 | 354.87 | 300 | -85 | 928.42 |
Sampling, Analytical Methods and QA/QC Protocols
All drilling was completed using a Boart Longyear LF160 diamond drill rig with HQ size core. Drill core samples from Phase I of the program were shipped to SGS Analytical's preparation facility in Denver, Colorado for standard sample preparation which includes weighing, drying, crush (< 4 kg) up to
The assay results discussed in this press release are not measures of reserves or resources as defined in Subpart 1300 of Regulation S-K promulgated by the SEC ("S-K 1300") or National Instrument 43-101 ("NI 43-101"). The conversion of assay results in this news release into reserve or resource estimates in compliance with S-K 1300 and NI 43-101 requires additional technical work and analysis that remains ongoing. In addition, the assay results discussed in this press release may not be indicative of future assay results, and may not be indicative of our ability to convert any of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources or the subsequent conversion of any of its Probable Mineral Reserves into Proven Mineral Reserves. As such, the conversion of reported mineral resources to mineral reserves should not be assumed, and the reclassification of reported mineral resources from lower to higher levels of geological confidence should not be assumed.
Qualified Persons:
Trevor Mills, P.G., SME-RM, Principal Geologist / US Operations Manager of Dahrouge Geological Consulting USA Ltd., a Qualified Person as defined by NI 43-101, has reviewed and approved the technical information and verified the data contained within the news release. Mr. Mills has verified all scientific and technical data disclosed in this news release including the sampling and QA/QC results, and certified analytical data underlying the technical information disclosed herein. Mr. Mills noted no errors or omissions during the data verification process. The Company and Mr. Mills do not recognize any factors of sampling or recovery that could materially affect the accuracy or reliability of the assay data disclosed in this news release.
# # #
FOR MORE INFORMATION:
Jim Sims, Corporate Communications Officer, NioCorp Developments Ltd., (720) 334-7066, jim.sims@niocorp.com
Alex Guthrie, Director, Investor Relations, NioCorp Developments Ltd., (647) 999-0527, aguthrie@niocorp.com
@NioCorp $NB #Niobium #Scandium #rareearth #neodymium #dysprosium #terbium #ElkCreek
ABOUT NIOCORP
NioCorp is developing the Elk Creek Project that is expected to produce niobium, scandium, and titanium. The Company also is evaluating the potential to produce several rare earths from the Elk Creek Project. Niobium is used to produce specialty alloys as well as High Strength, Low Alloy steel, which is a lighter, stronger steel used in automotive, structural, and pipeline applications. Scandium is a specialty metal that can be combined with Aluminum to make alloys with increased strength and improved corrosion resistance. Scandium is also a critical component of advanced solid oxide fuel cells. Titanium is used in various lightweight alloys and is a key component of pigments used in paper, paint and plastics and is also used for aerospace applications, armor, and medical implants. Magnetic rare earths, such as neodymium, praseodymium, terbium, and dysprosium are critical to the making of neodymium-iron-boron magnets, which are used across a wide variety of defense and civilian applications.
Forward-Looking Statements
This press release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements may include, but are not limited to, statements regarding the drilling program and the interpretation of the drilling and assay results and the benefits of such program, including estimations with respect to the extent of mineralization and the discovery of higher-grade intervals of mineralization; the potential conversion of Indicated Mineral Resources into Measured Mineral Resources and Probable Mineral Reserves into Proven Mineral Reserves; the expected results of the program; NioCorp's expectation of producing niobium, scandium, and titanium, and the potential of producing rare earths, at the Elk Creek Project; and NioCorp's ability to secure sufficient project financing to complete construction of the Elk Creek Project and move it to commercial operation. Forward-looking statements are typically identified by words such as "plan," "believe," "expect," "anticipate," "intend," "outlook," "estimate," "forecast," "project," "continue," "could," "may," "might," "possible," "potential," "predict," "should," "would" and other similar words and expressions, but the absence of these words does not mean that a statement is not forward-looking.
The forward-looking statements are based on the current expectations of the management of NioCorp and are inherently subject to uncertainties and changes in circumstances and their potential effects and speak only as of the date of such statement. There can be no assurance that future developments will be those that have been anticipated. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp's ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of metals; and the stability of the financial and capital markets. Such expectations and assumptions are inherently subject to uncertainties and contingencies regarding future events and, as such, are subject to change. Forward-looking statements involve a number of risks, uncertainties or other factors that may cause actual results or performance to be materially different from those expressed or implied by these forward-looking statements. These risks and uncertainties include, but are not limited to, those discussed and identified in public filings made by NioCorp with the Securities and Exchange Commission and with the applicable Canadian securities regulatory authorities and the following: NioCorp's ability to operate as a going concern; NioCorp's requirement of significant additional capital; NioCorp's ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp's ability to achieve the required milestones and receive the full
Should one or more of these risks or uncertainties materialize or should any of the assumptions made by the management of NioCorp prove incorrect, actual results may vary in material respects from those projected in these forward-looking statements.
All subsequent written and oral forward-looking statements concerning the matters addressed herein and attributable to NioCorp or any person acting on its behalf are expressly qualified in their entirety by the cautionary statements contained or referred to herein. Except to the extent required by applicable law or regulation, NioCorp undertakes no obligation to update these forward-looking statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events.
SOURCE: NioCorp Developments Ltd.
View the original press release on ACCESS Newswire