NioCorp Announces Positive Assay Results from Second Completed Diamond Drill Hole of Elk Creek Drilling Program

Rhea-AI Impact
(Moderate)
Rhea-AI Sentiment
(Neutral)
Tags

NioCorp (NASDAQ:NB) reported assay results from the second diamond drill hole (NEC25-025) at the Elk Creek Project on November 5, 2025. The hole reached 928.42 m total depth with 733.42 m within the carbonatite and returned weighted averages of Nb2O5 0.70%, Sc 75.99 ppm, TiO2 2.82%, and TREO 3,848.73 ppm. Multiple long intervals include Nb2O5 up to 1.28% over 34.00 m and TREO intervals to 6,017.03 ppm. Results are consistent with the existing resource model; remaining assays are being processed with final results anticipated by year-end 2025.

NioCorp (NASDAQ:NB) ha riportato i risultati delle analisi dal secondo pozzo di perforazione diamantina (NEC25-025) al Progetto Elk Creek il 5 novembre 2025. Il pozzo ha raggiunto una profondità totale di 928,42 m con 733,42 m all'interno del carbonatite e ha riportato medie pesate di Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82%, e TREO 3.848,73 ppm. Diversi lunghi intervalli includono Nb2O5 fino a 1,28% su 34,00 m e intervalli TREO fino a 6.017,03 ppm. I risultati sono coerenti con l'attuale modello di risorse; i rimanenti assay sono in fase di processing con risultati finali attesi entro la fine del 2025.

NioCorp (NASDAQ:NB) informó resultados de ensayo del segundo agujero de perforación de diamante (NEC25-025) en el Proyecto Elk Creek el 5 de noviembre de 2025. El pozo alcanzó una profundidad total de 928,42 m con 733,42 m dentro del carbonatito y arrojó promedios ponderados de Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82%, y TREO 3.848,73 ppm. Diversos intervalos largos incluyen Nb2O5 de hasta 1,28% en 34,00 m y intervalos TREO de hasta 6.017,03 ppm. Los resultados son consistentes con el modelo de recursos existente; los ensayos restantes se están procesando con resultados finales previstos para finales de 2025.

NioCorp (NASDAQ:NB)는 Elk Creek 프로젝트의 두 번째 다이아몬드 시추구멍(N EC25-025)에서의 분석 결과를 2025년 11월 5일에 발표했습니다. 해당 구멍은 총 깊이 928.42 m에 도달했고 탄산암 내 733.42 m를 포함하며 가중 평균으로 Nb2O5 0.70%, Sc 75.99 ppm, TiO2 2.82%, TREO 3,848.73 ppm를 보였습니다. Nb2O5가 34.00 m 동안 1.28%까지, TREO 구간은 6,017.03 ppm까지 이어지는 여러 긴 구간이 관찰되었습니다. 결과는 기존 자원 모델과 일치하며 남은 시료 분석은 처리 중이며 최종 결과는 2025년 말까지 예상됩니다.

NioCorp (NASDAQ:NB) a publié les résultats des analyses du deuxième puits de forage diamantaire (NEC25-025) sur le projet Elk Creek le 5 novembre 2025. Le puits a atteint une profondeur totale de 928,42 m avec 733,42 m dans le carbonatite et a donné des moyennes pondérées de Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82%, et TREO 3 848,73 ppm. Plusieurs longues sections incluent Nb2O5 jusqu'à 1,28% sur 34,00 m et des sections TREO jusqu'à 6 017,03 ppm. Les résultats sont cohérents avec le modèle de ressources existant; les analyses restantes sont en cours de traitement avec des résultats finaux prévus d'ici fin 2025.

NioCorp (NASDAQ:NB) meldete die Ergebnisse des zweiten Diamantbohrlochs (NEC25-025) beim Elk Creek-Projekt am 5. November 2025. Das Bohrloch erreichte eine Gesamttiefe von 928,42 m mit 733,42 m im Carbonatit und ergab gewichtete Durchschnitte von Nb2O5 0,70%, Sc 75,99 ppm, TiO2 2,82% und TREO 3.848,73 ppm. Mehrere lange Abschnitte umfassen Nb2O5 bis zu 1,28% über 34,00 m und TREO-Abschnitte bis zu 6.017,03 ppm. Die Ergebnisse stimmen mit dem bestehenden Ressourcenmodell überein; verbleibende Proben werden bearbeitet, endgültige Ergebnisse werden voraussichtlich bis Ende 2025 vorliegen.

NioCorp (NASDAQ:NB) أبلغت عن نتائج الاختبار من الحفرة الثانية الحفر الماسي (NEC25-025) في مشروع Elk Creek بتاريخ 5 نوفمبر 2025. وصلت الحفرة إلى عمق كلي قدره 928,42 م مع 733,42 م داخل الكربوناتي وأظهرت متوسطات وزنية لـ Nb2O5 0,70%، Sc 75,99 ppm، TiO2 2,82%، وTREO 3,848.73 ppm. تشمل عدة فترات طويلة Nb2O5 حتى 1,28% على 34,00 م وفترات TREO حتى 6,017.03 ppm. النتائج متوافقة مع نموذج الموارد الحالي؛ ما تزال التحاليل المتبقية قيد المعالجة مع توقع النتائج النهائية بحلول نهاية 2025.

Positive
  • Hole NEC25-025: 733.42 m of carbonatite intersected
  • Weighted averages: Nb2O5 0.70%, TREO 3,848.73 ppm
  • High Nb interval: 1.28% Nb2O5 over 34.00 m
  • High TREO interval: 6,017.03 ppm over 9.71 m
Negative
  • Assay results are not reserves under S-K 1300 or NI 43-101
  • Conversion to measured/proven classifications requires additional technical work
  • Conclusions limited: company notes individual drill holes are not definitive

Insights

Drill assays broadly match the existing model and show several higher-grade intervals; results support further resource conversion work.

NioCorp's second diamond hole (NEC25-025) returned a weighted average of 0.70% Nb2O5 across 733.42 m of carbonatite and multiple higher-grade Nb2O5 intervals including 1.28% over 34.00 m and 1.01% over 16.50 m. The hole also shows notable scandium concentrations (e.g., 108.93 ppm over 31.28 m) and TREO peaks up to 6017.03 ppm on discrete intervals. These figures align with the stated goal of infill drilling to confirm continuity and grade distribution within the Elk Creek deposit.

The immediate business mechanism is straightforward: infill assay data of this character supports technical work to reclassify some Indicated resources to Measured and some Probable reserves to Proven, subject to further analysis. Key dependencies and risks remain explicit: additional assay batches are pending from two independent labs, and the company states that conversion to reserves requires additional technical work and is not assured. The timetable given is clear — additional results in the next several weeks with final results anticipated by year-end 2025 — so near-term data releases will materially affect confidence in any reclassification.

Concrete items to watch: the remaining assay releases from the program, any QA/QC summaries from the two external labs, and formal resource/reserve updates that follow S-K 1300/NI 43-101 processes. Expect to judge impact once multiple holes show consistent grade/width patterns and when the company files any resource or reserve reclassification before year-end 2025.

CENTENNIAL, CO / ACCESS Newswire / November 5, 2025 / NioCorp Developments Ltd. ("NioCorp" or the "Company") (NASDAQ:NB), a leading U.S. critical minerals developer, is pleased to report assay results from the second diamond drill hole completed as part of the Company's drilling program at its critical minerals project in Southeast Nebraska (the "Elk Creek Project").

The second drill hole was completed to a total depth of 928.42 meters ("m") with a total drill hole length within the carbonatite of 733.42 m and intersected the targeted lithologies over its entire length. Extended intervals of mineralization were observed throughout the entire length of the drill hole, returning several long intervals that are consistent with the existing Mineral Resource model for the Elk Creek deposit.

"Results from this second drill hole are consistent with our current geological model and provide additional confirmation of the continuity and grade distribution within the deposit," said Mark A. Smith, NioCorp CEO and Chairman. "Several intervals returned higher-than-expected assay grades. While we do not draw conclusions from individual drill holes, the overall results to date are encouraging. All work is being conducted in accordance with the highest technical standards and in compliance with the Securities and Exchange Commission's S-K 1300 and Canada's NI 43-101 reporting requirements. These results reflect that level of rigor and further support our understanding of the deposit."

This drilling program and associated technical work was designed to support the conversion of a portion of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources and the subsequent conversion of a portion of its Probable Mineral Reserves into Proven Mineral Reserves. Assays from the remaining drill holes are being processed by two independent laboratories. Additional results are expected to be released in the next several weeks and final results are anticipated by year-end 2025.

Table 1: NEC25-025 - Full DDH Weighted Averages within the Carbonatite

Hole ID

Nb2O5
(%)

Sc
(ppm)

TiO2
(%)

LREO

(ppm)

HREO
(ppm)

TREO
(ppm)

DDH Length
(m)

NEC25-025

0.70

75.99

2.82

3333.32

515.41

3848.73

733.42

Notes:

  • LREO (Light Rare Earth Oxides): includes Lanthanum through Neodymium.

  • HREO (Heavy Rare Earth Oxides): includes Samarium through Lutetium.

  • TREO (Total Rare Earth Oxides): includes the summation of both LREO + HREO.

  • Reported interval analytical results are a weighted average based on reported value and individual sample lengths.

The drill hole was designed and oriented parallel to the ore body strike, guided by historical drill hole spacing, to infill geological data within the existing mineral resource.

Table 2: NEC25-025 Interval Highlights - Nb2O5

Hole ID

From

(m)

To

(m)

Int.
(m)

Nb2O5
(%)

NEC25-025

380.00

390.00

10.00

0.82

502.50

519.00

16.50

1.01

748.50

761.68

13.18

0.99

842.00

876.00

34.00

1.28


Table 3: NEC25-025 Interval Highlights - Sc

Hole ID

From

(m)

To

(m)

Int.
(m)

Sc
(ppm)

NEC25-025

627.84

659.12

31.28

108.93

769.50

801.50

32.00

103.04


Table 4: NEC25-025 Interval Highlights - TREO

Hole ID

From

(m)

To

(m)

Int.
(m)

TREO
(ppm)

NEC25-025

379.00

395.80

16.80

4784.40

446.00

470.00

24.00

5269.52

726.50

746.52

20.02

5728.88

796.79

806.50

9.71

6017.03

Table 5: Summary of Drill Hole Coordinates

Hole ID

Easting
UTM NAD83

Northing
UTM NAD83

Elevation
(m)

Azimuth

Dip

Total Depth (m)

NEC25-025

739201.94

4461347.03

354.87

300

-85

928.42


Sampling, Analytical Methods and QA/QC Protocols
All drilling was completed using a Boart Longyear LF160 diamond drill rig with HQ size core. Drill core samples from Phase I of the program were shipped to SGS Analytical's preparation facility in Denver, Colorado for standard sample preparation which includes weighing, drying, crush (< 4 kg) up to 75% passing 2 mm, riffle split (250 g) and pulverize (Cr steel) to 90% passing 75 µm. The samples were subsequently analyzed using GE-ICM91A50 (sodium peroxide fusion with subsequent analysis by ICP and ICP/MS), GO_XRF72+GC_XRF76V (Nb₂O₅ and Ta2O5). The drill core was saw-cut into half-core with one half being sent for geochemical analysis and the other half-core remaining in the core box onsite. A quality assurance/quality control ("QA/QC") protocol was incorporated into the drilling program and included the insertion of certified reference material, silica blanks, duplicate quarters, pulps and rejects all at a rate of approximately 5% respectively.

The assay results discussed in this press release are not measures of reserves or resources as defined in Subpart 1300 of Regulation S-K promulgated by the SEC ("S-K 1300") or National Instrument 43-101 ("NI 43-101"). The conversion of assay results in this news release into reserve or resource estimates in compliance with S-K 1300 and NI 43-101 requires additional technical work and analysis that remains ongoing. In addition, the assay results discussed in this press release may not be indicative of future assay results, and may not be indicative of our ability to convert any of the Elk Creek Project's Indicated Mineral Resources into Measured Mineral Resources or the subsequent conversion of any of its Probable Mineral Reserves into Proven Mineral Reserves. As such, the conversion of reported mineral resources to mineral reserves should not be assumed, and the reclassification of reported mineral resources from lower to higher levels of geological confidence should not be assumed.

Qualified Persons:
Trevor Mills, P.G., SME-RM, Principal Geologist / US Operations Manager of Dahrouge Geological Consulting USA Ltd., a Qualified Person as defined by NI 43-101, has reviewed and approved the technical information and verified the data contained within the news release. Mr. Mills has verified all scientific and technical data disclosed in this news release including the sampling and QA/QC results, and certified analytical data underlying the technical information disclosed herein. Mr. Mills noted no errors or omissions during the data verification process. The Company and Mr. Mills do not recognize any factors of sampling or recovery that could materially affect the accuracy or reliability of the assay data disclosed in this news release.

# # #

FOR MORE INFORMATION:
Jim Sims, Corporate Communications Officer, NioCorp Developments Ltd., (720) 334-7066, jim.sims@niocorp.com
Alex Guthrie, Director, Investor Relations, NioCorp Developments Ltd., (647) 999-0527, aguthrie@niocorp.com

@NioCorp $NB #Niobium #Scandium #rareearth #neodymium #dysprosium #terbium #ElkCreek

ABOUT NIOCORP
NioCorp is developing the Elk Creek Project that is expected to produce niobium, scandium, and titanium. The Company also is evaluating the potential to produce several rare earths from the Elk Creek Project. Niobium is used to produce specialty alloys as well as High Strength, Low Alloy steel, which is a lighter, stronger steel used in automotive, structural, and pipeline applications. Scandium is a specialty metal that can be combined with Aluminum to make alloys with increased strength and improved corrosion resistance. Scandium is also a critical component of advanced solid oxide fuel cells. Titanium is used in various lightweight alloys and is a key component of pigments used in paper, paint and plastics and is also used for aerospace applications, armor, and medical implants. Magnetic rare earths, such as neodymium, praseodymium, terbium, and dysprosium are critical to the making of neodymium-iron-boron magnets, which are used across a wide variety of defense and civilian applications.

Forward-Looking Statements
This press release contains forward-looking statements within the meaning of the United States Private Securities Litigation Reform Act of 1995 and forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking statements may include, but are not limited to, statements regarding the drilling program and the interpretation of the drilling and assay results and the benefits of such program, including estimations with respect to the extent of mineralization and the discovery of higher-grade intervals of mineralization; the potential conversion of Indicated Mineral Resources into Measured Mineral Resources and Probable Mineral Reserves into Proven Mineral Reserves; the expected results of the program; NioCorp's expectation of producing niobium, scandium, and titanium, and the potential of producing rare earths, at the Elk Creek Project; and NioCorp's ability to secure sufficient project financing to complete construction of the Elk Creek Project and move it to commercial operation. Forward-looking statements are typically identified by words such as "plan," "believe," "expect," "anticipate," "intend," "outlook," "estimate," "forecast," "project," "continue," "could," "may," "might," "possible," "potential," "predict," "should," "would" and other similar words and expressions, but the absence of these words does not mean that a statement is not forward-looking.

The forward-looking statements are based on the current expectations of the management of NioCorp and are inherently subject to uncertainties and changes in circumstances and their potential effects and speak only as of the date of such statement. There can be no assurance that future developments will be those that have been anticipated. Forward-looking statements reflect material expectations and assumptions, including, without limitation, expectations and assumptions relating to: NioCorp's ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; the future price of metals; and the stability of the financial and capital markets. Such expectations and assumptions are inherently subject to uncertainties and contingencies regarding future events and, as such, are subject to change. Forward-looking statements involve a number of risks, uncertainties or other factors that may cause actual results or performance to be materially different from those expressed or implied by these forward-looking statements. These risks and uncertainties include, but are not limited to, those discussed and identified in public filings made by NioCorp with the Securities and Exchange Commission and with the applicable Canadian securities regulatory authorities and the following: NioCorp's ability to operate as a going concern; NioCorp's requirement of significant additional capital; NioCorp's ability to receive sufficient project financing for the construction of the Elk Creek Project on acceptable terms, or at all; NioCorp's ability to achieve the required milestones and receive the full $10.0 million in reimbursement under the DoW Agreement; NioCorp's ability to receive a final commitment of financing from the Export-Import Bank of the United States or other debt financing or financial support on acceptable timelines, on acceptable terms, or at all; NioCorp's ability to access the full amount of the expected net proceeds under the standby equity purchase agreement (the "Yorkville Equity Facility Financing Agreement") with YA II PN, Ltd., an investment fund managed by Yorkville Advisors Global, LP; NioCorp's ability to continue to meet the listing standards of The Nasdaq Stock Market LLC; risks relating to NioCorp's common shares, including price volatility, lack of dividend payments and dilution or the perception of the likelihood of any of the foregoing; the extent to which NioCorp's level of indebtedness and/or the terms contained in agreements governing NioCorp's indebtedness, if any, the Yorkville Equity Facility Financing Agreement or other agreements may impair NioCorp's ability to obtain additional financing, on acceptable terms, or at all; covenants contained in agreements with NioCorp's secured creditors that may affect its assets; NioCorp's limited operating history; NioCorp's history of losses; the material weaknesses in NioCorp's internal control over financial reporting, NioCorp's efforts to remediate such material weaknesses and the timing of remediation; the possibility that NioCorp may qualify as a passive foreign investment company under the U.S. Internal Revenue Code of 1986, as amended (the "Code"); the potential that the business combination with GX Acquisition Corp. II and other related transactions could result in NioCorp becoming subject to materially adverse U.S. federal income tax consequences as a result of the application of Section 7874 and related sections of the Code; cost increases for NioCorp's exploration and, if warranted, development projects; a disruption in, or failure of, NioCorp's information technology systems, including those related to cybersecurity; equipment and supply shortages; variations in the market demand for, and prices of, niobium, scandium, titanium and rare earth products; current and future offtake agreements, joint ventures, and partnerships, including our ability to negotiate extensions to existing agreements or to enter into new agreements, on favorable terms or at all; NioCorp's ability to attract qualified management; estimates of mineral resources and reserves; mineral exploration and production activities; feasibility study results; the results of metallurgical testing; the results of technological research; changes in demand for and price of commodities (such as fuel and electricity) and currencies; competition in the mining industry; changes or disruptions in the securities markets; legislative, political or economic developments, including changes in federal and/or state laws that may significantly affect the mining industry; trade policies and tensions, including tariffs; inflationary pressures; the impacts of climate change, as well as actions taken or required by governments related to strengthening resilience in the face of potential impacts from climate change; the need to obtain permits and comply with laws and regulations and other regulatory requirements; the timing and reliability of sampling and assay data; the possibility that actual results of work may differ from projections/expectations or may not realize the perceived potential of NioCorp's projects; risks of accidents, equipment breakdowns, and labor disputes or other unanticipated difficulties or interruptions; the possibility of cost overruns or unanticipated expenses in development programs; operating or technical difficulties in connection with exploration, mining, or development activities; management of the water balance at the Elk Creek Project site; land reclamation requirements related to the Elk Creek Project; the speculative nature of mineral exploration and development, including the risks of diminishing quantities of grades of reserves and resources; claims on the title to NioCorp's properties; potential future litigation; and NioCorp's lack of insurance covering all of NioCorp's operations.

Should one or more of these risks or uncertainties materialize or should any of the assumptions made by the management of NioCorp prove incorrect, actual results may vary in material respects from those projected in these forward-looking statements.

All subsequent written and oral forward-looking statements concerning the matters addressed herein and attributable to NioCorp or any person acting on its behalf are expressly qualified in their entirety by the cautionary statements contained or referred to herein. Except to the extent required by applicable law or regulation, NioCorp undertakes no obligation to update these forward-looking statements to reflect events or circumstances after the date hereof to reflect the occurrence of unanticipated events.

SOURCE: NioCorp Developments Ltd.



View the original press release on ACCESS Newswire

FAQ

What did NioCorp (NB) report on November 5, 2025 for Elk Creek drill hole NEC25-025?

NEC25-025 reached 928.42 m total depth with 733.42 m in carbonatite and reported weighted averages including Nb2O5 0.70% and TREO 3,848.73 ppm.

Which high-grade intervals did NB report in NEC25-025 for niobium (Nb2O5)?

Highlighted Nb2O5 intervals include 1.28% over 34.00 m, 1.01% over 16.50 m, and 0.99% over 13.18 m.

How do NEC25-025 TREO and scandium results affect Elk Creek's resource model for NB?

Company states the results are consistent with the existing geological model and provide additional confirmation of continuity and grade distribution.

Are the November 5, 2025 assay results for NB considered mineral reserves?

No; the company explicitly states these assay results are not measures of reserves under S-K 1300 or NI 43-101 and require further work for conversion.

When will NioCorp release remaining Elk Creek assay results for NB?

The company said remaining assays are in process at independent labs with additional results expected in the next several weeks and final results anticipated by year-end 2025.

What QA/QC procedures did NioCorp use for the NEC25-025 assays?

Sampling used HQ core, half-core splits, and a QA/QC program including certified reference materials, blanks, and duplicates at ~5%.
Niocorp Developm

NASDAQ:NB

NB Rankings

NB Latest News

NB Latest SEC Filings

NB Stock Data

732.31M
109.00M
4.17%
23.52%
8.02%
Other Industrial Metals & Mining
Metal Mining
Link
United States
CENTENNIAL