STOCK TITAN

Lion Copper outlines 6.7B lb Bear copper resource

Lion Copper & Gold files an NI 43-101 report confirming large indicated and inferred copper resources at the Bear Deposit, adjacent to its Yerington Copper Project.

(Very High)
(Neutral)
Form Type
8-K

Rhea-AI Filing Summary

LION COPPER & GOLD CORP. (LCGMF) announced the filing of an independent NI 43-101 Technical Report supporting the maiden Mineral Resource Estimate for its Bear Deposit in the Yerington Copper District in Nevada. The report is dated September 14, 2026, with an effective date of July 21, 2026.

The Bear Mineral Resource Estimate outlines an Indicated Resource of 6.71 billion pounds of contained copper (1,064 Mt at 0.29% Cu) and an Inferred Resource of 8.77 billion pounds (1,770 Mt at 0.22% Cu), using a 0.1% Cu cut-off for sulfide material. The company cautions that Mineral Resources are not Mineral Reserves and do not have demonstrated economic viability.

Bear is contiguous with the Yerington Copper Project and is described as a significant component of the broader district-scale copper strategy. Lion Copper & Gold is advancing Yerington through a Definitive Feasibility Study and permitting, with DFS completion targeted for Q1 2027, and plans for production of refined LME Grade A copper cathode for the U.S. market.

Positive

  • Bear Deposit hosts large copper resources, including 6.71 billion pounds indicated and 8.77 billion pounds inferred, enhancing the long-term resource base contiguous with the Yerington Copper Project.

Negative

  • None.

Filing Explained

The September 14 8-K furnishes the Bear technical report under Item 7.01 rather than filing it: the report is not subject to Section 18 liability and is not incorporated by reference into registration statements or other Securities Act or Exchange Act filings.

Item 7.01 Regulation FD Disclosure Disclosure
Material non-public information disclosed under Regulation Fair Disclosure, often investor presentations or guidance.
Item 9.01 Financial Statements and Exhibits Exhibits
Financial statements, pro forma financial information, or exhibit attachments filed with this report.
Indicated contained copper 6.71 billion pounds Bear Deposit Mineral Resource Estimate, 1,064 Mt at 0.29% Cu, sulfide, 0.1% Cu cut-off
Inferred contained copper 8.77 billion pounds Bear Deposit Mineral Resource Estimate, 1,770 Mt at 0.22% Cu, sulfide, 0.1% Cu cut-off
Indicated tonnage 1,064 million tonnes Bear Deposit indicated sulfide resource at 0.29% Cu, 0.1% Cu cut-off
Inferred tonnage 1,770 million tonnes Bear Deposit inferred sulfide resource at 0.22% Cu, 0.1% Cu cut-off
Cut-off grade 0.1% Cu Applied to indicated and inferred sulfide resources at Bear Deposit
Technical Report effective date July 21, 2026 Effective date of Bear Deposit NI 43-101 Technical Report
Technical Report date September 14, 2026 Date of NI 43-101 Technical Report of the Bear Deposit
DFS target completion Q1 2027 Planned completion timing for the Yerington Copper Project Definitive Feasibility Study
NI 43-101 regulatory
"prepared in accordance with National Instrument 43-101 - Standards of Disclosure"
A Canadian regulatory standard that sets the rules for how mining and exploration companies must report mineral resources and reserves, requiring technical reports prepared or signed off by an independent, certified expert. It matters to investors because it creates a consistent, transparent “inspection report” for mining projects, making it easier to compare prospects, judge the reliability of claims, and assess geological and financial risk before investing.
Mineral Resource Estimate technical
"supporting the maiden Mineral Resource Estimate ("MRE") for the Company's Bear Deposit"
A mineral resource estimate is a calculated approximation of how much metal or mineral material likely exists in a particular deposit and where it sits underground, similar to estimating how many cookies are in a jar by peeking at the layers. It matters to investors because it provides a data-based starting point for judging a project's potential value, future production and risks, while not guaranteeing recoverable or profitable amounts.
Indicated Resource technical
"establishes an Indicated Resource of 6.71 billion pounds of contained copper"
An indicated resource is a quantity of minerals estimated from sample data with a moderate level of confidence—higher than a rough estimate but not as certain as a fully proven quantity. For investors, it signals a reasonable but still uncertain expectation that commercial extraction could be feasible; think of it like a well‑researched recipe where ingredients and amounts are likely correct but still need final confirmation before you start cooking or spending large sums.
Inferred Resource technical
"and an Inferred Resource of 8.77 billion pounds of contained copper"
An inferred resource is an early-stage estimate of how much mineral material may be present and its likely quality, based on limited sampling and basic geological patterns rather than detailed data. It matters to investors because it indicates potential upside but carries high uncertainty—like a rough hand-drawn map that hints at treasure but needs much more surveying and testing before anyone can count on its value for planning or valuation.
Definitive Feasibility Study financial
"advancing the Yerington Copper Project through Definitive Feasibility Study and permitting"
A definitive feasibility study is a detailed, near-final assessment that shows whether a proposed project—often a mine, infrastructure or major industrial venture—can be built and operated profitably. It combines precise engineering plans, realistic cost estimates, production schedules and risk analysis to give lenders and investors a clear picture of expected returns and potential pitfalls, like a full blueprint and budget that helps decide whether to greenlight financing and construction.
LME Grade A copper cathode financial
"planned to produce refined LME Grade A copper cathode for the domestic U.S. market"

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

What did LCGMF disclose about the Bear Deposit in this 8-K?

The company filed an NI 43-101 Technical Report for the Bear Deposit, supporting a maiden Mineral Resource Estimate with substantial indicated and inferred copper resources adjacent to its Yerington Copper Project in Nevada.

How large is the Bear Deposit Mineral Resource Estimate reported by LCGMF?

The Bear MRE includes an Indicated Resource of 6.71 billion pounds of copper (1,064 Mt at 0.29% Cu) and an Inferred Resource of 8.77 billion pounds (1,770 Mt at 0.22% Cu), using a 0.1% Cu cut-off grade for sulfide material.

What is the relationship between the Bear Deposit and the Yerington Copper Project for LCGMF?

The Bear Deposit is contiguous with the Yerington Copper Project and is described as a significant part of Lion’s broader district-scale copper strategy, providing long-term resource optionality adjacent to Yerington’s planned infrastructure.

When does LCGMF expect to complete the Yerington Copper Project Definitive Feasibility Study?

Lion Copper & Gold states that the Definitive Feasibility Study for the Yerington Copper Project is on schedule for completion in Q1 2027, alongside ongoing permitting activities.

What product is planned from LCGMF’s Yerington Copper Project?

The Yerington Copper Project is planned to produce refined LME Grade A copper cathode for the domestic United States market, leveraging the broader copper resources in the Yerington Copper District.

Where can investors access the Bear Deposit NI 43-101 Technical Report for LCGMF?

The Technical Report is available under the company’s SEDAR+ issuer profile and will also be posted on the company’s website at LionCG.com.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

false 2026-09-14 0001339688 Lion Copper Corp. 0001339688 2026-09-14 2026-09-14

UNITED STATES
SECURITIES AND EXCHANGE COMMISSION
Washington, D.C. 20549
___________________________

FORM 8-K

CURRENT REPORT
Pursuant to Section 13 or 15(d) of the Securities Exchange Act of 1934

Date of Report (Date of earliest event reported): September 14, 2026

LION COPPER CORP.
(Exact name of registrant as specified in its charter)

British Columbia 000-55139 98-1664106
(State or other jurisdiction (Commission (IRS Employer
of incorporation) File Number) Identification No.)

517 West Bridge St., Suite A
Yerington, Nevada, United States 89447
(Address of principal executive offices) (ZIP Code)

Registrant’s telephone number, including area code: (775) 463-9600

Not Applicable
(Former name or former address, if changed since last report)

Check the appropriate box below if the Form 8-K filing is intended to simultaneously satisfy the filing obligation of the registrant under any of the following provisions:

Written communications pursuant to Rule 425 under the Securities Act (17 CFR 230.425)

Soliciting material pursuant to Rule 14a-12 under the Exchange Act (17 CFR 240.14a-12)

Pre-commencement communications pursuant to Rule 14d-2(b) under the Exchange Act (17 CFR 240.14d-2(b))

Pre-commencement communications pursuant to Rule 13e-4(c) under the Exchange Act (17 CFR 240.13e-4(c))

Securities registered pursuant to Section 12(b) of the Act:

Title of each class   Trading Symbols   Name of each exchange on which registered
   

Indicate by check mark whether the registrant is an emerging growth company as defined in Rule 405 of the Securities Act of 1933 (§ 230.405 of this chapter) or Rule 12b-2 of the Securities Exchange Act of 1934 (§ 240.12b -2 of this chapter).

Emerging growth company

If an emerging growth company, indicate by check mark if the registrant has elected not to use the extended transition period for complying with any new or revised financial accounting standards provided pursuant to Section 13(a) of the Exchange Act.


Item 7.01. Regulation FD.

On September 14, 2026, Lion Copper Corp. (the "Company") announced that it has filed the independent technical report supporting the maiden Mineral Resource Estimate ("MRE") for the Company's Bear Deposit, located within the Yerington Copper District in Lyon County, Nevada. The technical report, titled "NI 43-101 Technical Report of the Bear Deposit" and dated September 14, 2026, with an effective date of July 21, 2026, was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects and supports the Bear MRE previously announced by the Company on August 4, 2026. A copy of the press release is attached to this report as Exhibit 99.1.

The information and exhibits furnished pursuant to Item 7.01 are being furnished and shall not be deemed "filed" for purposes of Section 18 of the Securities Exchange Act of 1934 (the "Exchange Act") or otherwise subject to the liabilities of that Section, and shall not be incorporated by reference into any registration statement or other document filed pursuant to the Securities Act of 1933, as amended or the Exchange Act, regardless of any general incorporation language in such filing.

Item 9.01 Exhibits.

99.1* News release dated September 14, 2026
104 Cover Page Interactive Data File (embedded within the Inline XBRL document)

*This Exhibit is intended to be furnished to, and not filed with, the Commission pursuant to General Instruction B.2 of Form 8-K.

SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized.

      Lion Copper Corp.
Date: September 15, 2026   (Registrant)
     
     
      /s/ Maria Milagros Paredes
      Maria Milagros Paredes
Chief Financial Officer



CSE: LCU | OTCQB: LCGMD

 Lion Copper Corp. Announces Filing of NI 43-101 Technical Report for
Bear Deposit

YERINGTON, Nevada - September 14, 2026 - Lion Copper Corp. (CSE: LCU) (OTCQB: LCGMD) ("Lion" or the "Company") is pleased to announce that it has filed the independent technical report supporting the maiden Mineral Resource Estimate ("MRE") for the Company's Bear Deposit, located within the Yerington Copper District in Lyon County, Nevada.

The technical report, titled "NI 43-101 Technical Report of the Bear Deposit" and dated September 14, 2026, with an effective date of July 21, 2026 (the "Technical Report"), was prepared in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43-101") and supports the Bear MRE previously announced by the Company on August 4, 2026.

The Bear MRE establishes an Indicated Resource of 6.71 billion pounds of contained copper (1,064 Mt @ 0.29% Cu) and an Inferred Resource of 8.77 billion pounds of contained copper (1,770 Mt @ 0.22% Cu), further demonstrating the scale and long-term development potential of the broader Yerington Copper District.

John Banning, Chief Executive Officer of Lion Copper Corp., commented:

"The filing of the Bear Technical Report represents another important milestone for Lion and provides the comprehensive technical basis supporting the maiden Mineral Resource Estimate announced in August. Bear has materially expanded the scale of our copper endowment and reinforces our view of the Yerington Copper District as one of the largest undeveloped copper districts in the United States.

"Our immediate focus remains on disciplined execution at the Yerington Copper Project, where the Definitive Feasibility Study and permitting programs continue to advance. Over the longer term, Bear provides significant additional optionality immediately adjacent to Yerington and the potential to leverage the infrastructure being developed for the project."

Bear Mineral Resource Estimate

The maiden Bear MRE was previously announced by Lion on August 4, 2026. The Technical Report provides the supporting geological, drilling, estimation and technical information underlying the MRE, together with the assumptions and considerations used by the Qualified Persons in determining reasonable prospects for eventual economic extraction.


Table 1-1: Bear Deposit Mineral Resource Estimate

Material Cut-off Grade
(Cu%)
Tonnes (Mt) Cu% Contained Cu
(000 Cu lbs)
Indicated Sulfide 0.1 1,064 0.29 6,710,000
Inferred Sulfide 0.1 1,770 0.22 8,770,000

The Company cautions that Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.

Yerington Copper District

The Bear Deposit is contiguous with Lion's Yerington Copper Project and represents a significant component of the Company's broader district-scale copper strategy in Mason Valley, Nevada.

Lion is currently advancing the Yerington Copper Project through Definitive Feasibility Study and permitting, with completion of the DFS on schedule for Q1 2027. The Yerington Copper Project is planned to produce refined LME Grade A copper cathode for the domestic U.S. market.

The addition of Bear provides Lion with a substantial long-term copper resource base adjacent to the infrastructure contemplated for development at Yerington and creates significant optionality for future development across the district.

Technical Report Availability

The Technical Report is available under the Company's issuer profile on SEDAR+ and will also be available on the Company's website at LionCG.com.

Qualified Persons

The Qualified Persons (QPs), as that term is defined in NI 43-101, responsible for the preparation of the Report include:

  • Tim Maunula, P.Geo., Principal Geologist (AGP)
  • Michael McGlynn, SME-RM, QP, (Samuel Engineering)

Table 1-2: Bear Project Technical Report Qualified Persons and Areas of Responsibility

Name Professional
Designation
Title Responsible for
Sections
Mr. Tim Maunula P.Geo. Principal Geologist,
AGP Mining Consultants Inc.
Sections 1-12,14-19
Mr. Michael McGlynn SME-RM, QP Principal Metallurgical Engineer,
Samuel Engineering
Section 13

The other scientific and technical information contained in this news release has been reviewed and approved by John Banning, MMSA QP, Chief Executive Officer of Lion and a Qualified Person as defined under NI 43-101.

About Lion Copper Corp.

Lion Copper Corp. is a North American copper development company advancing its flagship Yerington Copper Project and broader copper district in Lyon County, Nevada. The Company is advancing the Yerington Copper Project through Definitive Feasibility Study and permitting in partnership with Nuton, a Rio Tinto venture.

The Yerington Copper Project is planned to produce refined LME Grade A copper cathode for the domestic U.S. market.

On behalf of the Board of Directors,

John Banning
Chief Executive Officer
Lion Copper and Gold Corp.
(775) 463 9600
info@lioncg.com

CSE: LCU | OTCQB: LCGMD

Forward-Looking Statements

This news release contains forward-looking statements and forward-looking information within the meaning of applicable Canadian securities laws and forward-looking statements within the meaning of applicable United States securities laws, including the safe harbor provisions of the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements include, but are not limited to, statements regarding the Bear Deposit, the Mineral Resource Estimate, the potential upgrading or conversion of the Mineral Resource, future exploration, drilling, geological interpretation engineering, mine planning, technical studies, permitting, financing, property acquisitions, access rights, and the earn-in arrangement. Forward-looking statements are generally identifiable by words such as "may", "will", "expect", "intend", "plan", "believe", "anticipate", "estimate", "potential", "could", "should" and similar expressions, and are subject to known and unknown risks and uncertainties that may cause actual results to differ materially, including risks relating to mineral resource estimation, exploration results, technical studies, metal prices, permitting, financing, title, access and property rights, environmental and regulatory matters, and market conditions.


Forward-looking statements are based on assumptions that management believes to be reasonable as of the date of this news release, including assumptions regarding the accuracy of the Mineral Resource Estimate and supporting technical information, metal prices, recovery assumptions, operating and capital cost assumptions, availability of financing, regulatory and permitting timelines, access to lands and infrastructure, and the ability to obtain or maintain necessary property interests and authorizations.

Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause actual results, performance or achievements to differ materially from those expressed or implied. Such risks include, without limitation, uncertainty of Inferred Mineral Resources, inability to convert Mineral Resources to Mineral Reserves, commodity prices, metallurgical recoveries, capital and operating costs, availability of equipment, labor and services, permitting and environmental matters, title, surface rights and property access, financing availability, and general economic, political and industry conditions.

Readers are cautioned not to place undue reliance on forward-looking statements. The Company does not undertake to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by applicable securities laws.


Filing Exhibits & Attachments

6 documents

Keep reading