Bowman Awarded Contract by City of Yonkers for Flood-Resilient Design of Fernbrook Park
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Located along the Hudson River, the new park will occupy multiple vacant lots and a bus depot. Bowman will leverage regional, landscape architecture and civil engineering expertise to design a park that provides residents and visitors with a public waterfront recreational space that can withstand periodic flooding. The park’s design will incorporate various flood-resilient features such as an efficient stormwater drainage system, elevating essential park elements and utilizing hardscape and planting materials that can bear high water volumes.
Bowman also conducted a traffic study to ensure the new facility would not impede logistics for a neighboring sugar plant and other local businesses.
“We value this opportunity to help the
Final design for the project is expected to be completed by the end of 2023, with park construction slated to begin in mid-2024. Once complete, the park will feature a range of amenities, including a playground, fitness equipment, a splash pad, a boat launch with kayak rentals and space for
Bowman has previously provided landscape architecture services in the
About Bowman Consulting Group Ltd.
Headquartered in
View source version on businesswire.com: https://www.businesswire.com/news/home/20230712002887/en/
General Media Contact:
Jennifer Kamienski, 201.519.4536
jkamienski@bowman.com
Source: Bowman Consulting