STOCK TITAN

Indonesia Energy Commences Drilling of WK-5 Well at Kruh Block

WK-5 targets deeper formations than K-29, including a potentially natural gas-bearing formation identified through seismic work.

(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Tags

Indonesia Energy (NYSE American: INDO) began drilling its WK-5 well at the Kruh Block in Sumatra, Indonesia, on October 21, 2026. The planned total depth is approximately 5,200 feet, compared with approximately 3,400 feet for the recently completed K-29 well. WK-5 will evaluate additional formations identified through a previous 3-D seismic survey, including a potentially natural gas-bearing formation.

K-29 recently began oil production. If successful, WK-5 production would complement existing output, with oil sold to Pertamina. The company is seeking Indonesian government approval to publicly disclose individual well production rates.

Loading...
Loading translation...
3 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 1 point

Hollow bars mark forward-looking points. How the balance works

Positive

  • Moderate pointWK-5 drilling began October 21, 2026, advancing development at the Kruh Block.
  • Moderate pointK-29 recently began oil production, adding another producing well at the Kruh Block.
  • Minor point. Forward-looking: it has not happened yet and may not happen.Approximately 5,200-foot planned depth targets additional formations, including a potentially natural gas-bearing formation.

Negative

  • Minor pointIndonesian government approval remains pending for public disclosure of individual well production rates.

Key Figures

Drilling commenced: October 21, 2026 Planned total depth: approximately 5,200 feet Total depth: approximately 3,400 feet
Drilling commenced
October 21, 2026
WK-5 well
Planned total depth
approximately 5,200 feet
WK-5 well
Total depth
approximately 3,400 feet
Recently completed K-29 well

Historical Context

1 past event · Latest: Oct 06
1 event
  1. Oct 06

    WK-5 rig-up

    24h Move
    -0.4%

    Company reported K-29 production and rig assembly, with WK-5 drilling expected by October end.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Key Terms

3-d seismic, total depth
2 terms
3-d seismic technical
"formations identified through IEC's previous extensive 3-D seismic program"
A geophysical survey method that records seismic waves from many shot points and receivers across an area to produce a three‑dimensional, volumetric image of the subsurface. Unlike 2‑D seismic which yields single cross‑section lines, 3‑D seismic produces a continuous data cube that lets geoscientists slice the earth in any direction to map geological layers, faults and potential fluid‑bearing horizons; the output is an interpreted image, not direct proof of hydrocarbons or minerals.
total depth technical
"WK-5 is planned to reach a total depth of approximately 5,200 feet"
Total depth is the combined quantity of buy and sell orders available at different prices in a market, showing how much of an asset could be traded before prices move. For investors it measures liquidity—like how wide and deep a river is for a barge: the deeper it is, the larger a trade can pass through without disturbing the price, which lowers execution risk and unexpected costs.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Significantly Deeper Well Will Test Additional Oil and Potential Natural Gas-Bearing Formations Identified Through 3-D Seismic Program

JAKARTA, INDONESIA AND DANVILLE, CA, Oct. 26, 2026 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced that drilling operations commenced on October 21, 2026, at its WK-5 well, marking another important milestone in IEC’'s ongoing development program at the Kruh Block in Sumatra, Indonesia.

WK-5 is planned to reach a total depth of approximately 5,200 feet, significantly deeper than the recently completed K-29 well, which was drilled to approximately 3,400 feet. The deeper drilling program is designed to evaluate additional formations identified through IEC's previous extensive 3-D seismic program, including a potentially natural gas-bearing formation. Both wells are located within IEC's approximately 63,000-acre Kruh Block.

A video featuring oil production from K-29 and a recent visit by IEC's delegation to the WK-5 wellsite can be viewed at the following link:

https://www.youtube.com/watch?v=uW2igiI9p4U

Frank Ingriselli, President of IEC, commented: "We are pleased to have commenced drilling WK-5 on schedule, following my visit to the Kruh Block earlier this month. This well represents an exciting opportunity for IEC as we drill significantly deeper than K-29 to evaluate additional formations identified by our previously announced 3-D seismic program. We believe these formations offer meaningful potential to expand the resource base and create long-term value for our shareholders.

"If successful, production from WK-5 would complement our ongoing production from K-29 and our other producing wells, with oil production sold to Pertamina, Indonesia's state-owned oil and gas company. We are also working to secure the necessary Indonesian government approval to publicly disclose individual well production rates and look forward to providing additional information once the required approvals are obtained.

"The successful commencement of WK-5 drilling, together with the recent initiation of oil production from K-29, demonstrates our team's continued progress in executing our Kruh Block development strategy. We remain focused on increasing production, evaluating new opportunities, and unlocking the long-term potential of our assets in Indonesia," concluded Mr. Ingriselli.

About Indonesia Energy Corporation Limited

Indonesia Energy Corporation Limited (NYSE American: INDO) is a publicly traded energy company engaged in the acquisition and development of strategic, high growth energy projects in Indonesia. IEC’s principal assets are its Kruh Block (63,000 acres) located onshore on the Island of Sumatra in Indonesia and its Citarum Block (195,000 acres) located onshore on the Island of Java in Indonesia. IEC is headquartered in Jakarta, Indonesia and has a representative office in Danville, California. For more information on IEC, please visit www.indo-energy.com.

Cautionary Statement Regarding Forward-Looking Statements

All statements in this press release, the YouTube videos described herein and related statements of Indonesia Energy Corporation Limited (“IEC”) and its representatives and partners that are not based on historical fact are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Acts”). In particular, the words “explore,” “could,” "estimates," “seek,” "believes," "hopes," “understand,” "expects," "intends," “on-track”, "plans," "anticipates," “aim,” “goal,” "may" and similar conditional expressions related to the future are intended to identify forward-looking statements within the meaning of the Acts and are subject to the safe harbor created by the Acts. Any statements made in this news release, other than those of historical fact, about an action, event or development, are forward-looking statements. In this press release, forward-looking statements include, without limitation those related to the timing for, and results of, 2026 and other drilling activities at IEC’s Kruh Block as well as the price of oil, which changes daily and could lower over time. While management has based any forward-looking statements contained herein on its current expectations, the information on which such expectations were based may change. These forward-looking statements rely on a number of assumptions concerning future events and are subject to a number of significant risks, uncertainties, and other factors, many of which are outside of the IEC's control, that could cause actual results to materially and adversely differ from such statements. Such risks, uncertainties, and other factors include, but are not necessarily limited to, those set forth in the Risk Factors section of IEC’s annual report on Form 20-F for the fiscal year ended December 31, 2025, filed on April 29, 2026, and other filings with the Securities and Exchange Commission (SEC). Copies are of such documents are available on the SEC's website, www.sec.gov and IEC’s website at https://ir.indo-energy.com/sec-filings/. IEC undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.

Company Contact:
Frank C. Ingriselli
President, Indonesia Energy Corporation Limited
Frank.Ingriselli@Indo-Energy.com


FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

When did Indonesia Energy begin drilling WK-5, and how deep will it go?

Indonesia Energy began drilling WK-5 on October 21, 2026, with a planned total depth of approximately 5,200 feet. The recently completed K-29 well was drilled to approximately 3,400 feet.

What is Indonesia Energy testing with the WK-5 well?

WK-5 will evaluate additional formations identified through a previous 3-D seismic survey, including a potentially natural gas-bearing formation. If successful, production would complement K-29 and the company's other producing wells.

Keep reading