Indonesia Energy Discovers Oil at K-29 Well
Indonesia Energy reports an oil discovery at K-29 and moves its rig to drill the WK-5 well as part of its 2026 program.
Sentiment and the balance of points
Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.
Rhea-AI Summary
Indonesia Energy (INDO) reported discovery of good quality oil during testing at its newly drilled K-29 well in the Kruh Block in Sumatra. K-29 was spud on July 25, 2026 and has reached a total depth of 3,378 feet, with initial production operations expected to begin in the next couple of weeks.
The company highlighted that the perforation gun was naturally bleeding oil, a result not seen in prior Kruh Block wells and typically viewed as very positive, suggesting the well may produce without fracturing. Drilling was completed with zero lost time injuries or environmental, health and safety incidents. The rig has been mobilized to the WK-5 well to continue the 2026 drilling program. A YouTube Live update with the president is scheduled for September 3, 2026.
Positive
- K-29 oil discovery of good quality during testing at Kruh Block
- Production at K-29 expected to start within the next couple of weeks
- Perforation gun naturally bleeding oil, suggesting potential natural production without fracturing
- Zero lost time injuries and no environmental, health or safety incidents at K-29
- Rig mobilized to WK-5 to continue the 2026 drilling program in Kruh Block
Negative
- None.
Details
News Market Reaction – INDO
On Sep 3, the first trading day after this news, INDO closed 4.01% above the previous close. Argus tracked a peak move of +4.5% during that session. Our momentum scanner recorded 8 alerts for this stock that day. Relative volume reached 82.4x the daily average during tracking.
Data tracked by StockTitan Argus for the Sep 3 session.
Key Figures
- Spud Date
- July 25, 2026
- K-29 well
- Total Depth
- 3,378 feet
- K-29 well
- Production Start
- Next couple of weeks
- Expected K-29 production operations
- Safety Incidents
- Zero lost time injury or other environmental, health and safety incidents
- K-29 drilling operations
- Kruh Block Size
- Approximately 63,000 acres
- K-29 and WK-5 location
- Citarum Block Size
- 195,000 acres
- Principal asset on Java
- Live Presentation
- September 3, 2026 at 12:15 p.m. Eastern Time
- YouTube Live operations update
Historical Context
-
K-29 reached total depth and entered preparation for testing operations.
-
Drilling progressed on schedule toward the targeted reservoir zone.
-
K-29 drilling commenced as the first planned 2026 Kruh Block well.
-
Operations began at K-29 while WK-5 preparations continued.
-
Management scheduled a conference presentation and institutional investor meetings.
24h Move is the share-price change in the day after each event; other market factors may also have contributed.
Key Terms
total depth technical
perforation gun technical
lost time injury technical
AI-generated analysis. How Rhea-AI works. Not financial advice.
Production Operations Will Commence in the Next Couple of Weeks
YouTube Live Broadcast Set for
Thursday, September 3, 2026 at 12:15 pm Eastern Time
JAKARTA, INDONESIA AND DANVILLE, CA, Sept. 02, 2026 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced that IEC has discovered good quality oil during testing operations at the newly drilled K-29 well at Kruh Block. K-29 was spud on July 25, 2026 and recently reached a total depth of 3,378 feet.
IEC also announced that actual production operations at K-29 are expected to commence in the next couple of weeks. Of particular note to the K-29 well is that the perforation gun used pursuant to Pertamina’s (Indonesia’s state-owned oil and gas company) approved perforation targets was naturally bleeding/seeping oil, which is typically viewed as a very good result. This has not been the case in previous wells at the Kruh Block. and the well may begin natural production without a fracturing procedure. IEC expects to gain further data and information as production operations commence. Additionally, the well was drilled with zero lost time injury or other environmental, health and safety incidents.
The drilling rig used at the K-29 well has now been mobilized and is on its way to the WK-5 wellsite to drill that well in continuation of IEC’s planned drilling operations for 2026.
Both K-29 and WK-5 are located within IEC’s approximately 63,000-acre Kruh Block on the island of Sumatra, Indonesia.
As previously announced, IEC will host a YouTube Live presentation featuring its President, Frank Ingriselli, on Thursday, September 3, 2026, at 12:15 p.m. Eastern time/9:15 a.m. Pacific Time.
The live presentation will be accessible at the following YouTube Live link: https://youtube.com/live/o8CkQxnlKZw?feature=share.
During the live presentation, Mr. Ingriselli will provide an update on operations and will take questions live from viewers.
About Indonesia Energy Corporation Limited
Indonesia Energy Corporation Limited (NYSE American: INDO) is a publicly traded energy company engaged in the acquisition and development of strategic, high growth energy projects in Indonesia. IEC’s principal assets are its Kruh Block (63,000 acres) located onshore on the Island of Sumatra in Indonesia and its Citarum Block (195,000 acres) located onshore on the Island of Java in Indonesia. IEC is headquartered in Jakarta, Indonesia and has a representative office in Danville, California. For more information on IEC, please visit www.indo-energy.com.
Cautionary Statement Regarding Forward-Looking Statements
All statements in this press release, the live presentation described herein, and related statements of Indonesia Energy Corporation Limited (“IEC”) and its representatives and partners that are not based on historical fact are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Acts”). In particular, the words “explore,” “could,” "estimates," “seek,” "believes," "hopes," “understand,” "expects," "intends," “on-track”, "plans," "anticipates," “aim,” “goal,” "may" and similar conditional expressions related to the future are intended to identify forward-looking statements within the meaning of the Acts and are subject to the safe harbor created by the Acts. Any statements made in this news release, other than those of historical fact, about an action, event or development, are forward-looking statements. In this press release, forward-looking statements include, without limitation those related to the timing for, and results of, 2026 and other drilling and anticipated production activities at IEC’s Kruh Block as well as the price of oil, which changes daily and could lower over time. While management has based any forward-looking statements contained herein on its current expectations, the information on which such expectations were based may change. These forward-looking statements rely on a number of assumptions concerning future events and are subject to a number of significant risks, uncertainties, and other factors, many of which are outside of the IEC's control, that could cause actual results to materially and adversely differ from such statements. Such risks, uncertainties, and other factors include, but are not necessarily limited to, those set forth in the Risk Factors section of IEC’s annual report on Form 20-F for the fiscal year ended December 31, 2025, filed on April 29, 2026, and other filings with the Securities and Exchange Commission (SEC). Copies are of such documents are available on the SEC's website, www.sec.gov and IEC’s website at https://ir.indo-energy.com/sec-filings/. IEC undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.
Company Contact:
Frank C. Ingriselli
President, Indonesia Energy Corporation Limited
Frank.Ingriselli@Indo-Energy.com
FAQ
AI-generated questions and answers. How Rhea-AI works. Not financial advice.