STOCK TITAN

Indonesia Energy Celebrates Oil Production from K-29 Well and Rig-Up at New WK-5 Well Location

K-29 oil is being sold to Pertamina, while planned hydraulic fracturing aims to maximize the well’s production.

(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Tags

Indonesia Energy (INDO) announced oil production from its recently drilled K-29 well and ongoing rig assembly at the nearby WK-5 location.

K-29 is producing with a jack-pump while dewatering; its production consists of approximately 60% oil and a 40% water cut. The oil is combined with output from other wells and sold to Pertamina. The company plans hydraulic fracturing at K-29 to maximize production.

WK-5 drilling is expected to start by the end of October 2026, with a planned depth of approximately 5,200 feet, versus approximately 3,400 feet for K-29. WK-5 is designed to test additional formations identified through 3-D seismic work, including a potential natural gas-bearing formation.

Loading...
Loading translation...
4 points · 0 major

How this balance works

Rhea-AI gives every point it takes from this document a weight. Minor counts 1, Moderate 3 and Major 9, so one Major point outweighs several Minor ones. The bar adds up the weights on each side, and when neither side holds more than 65% of the total the balance reads Mixed.

It reads the document as published, with the same rules for every company, and it does not look at what the market expected or at how the stock traded, so a point can be objectively good on a day the stock falls.

Rhea-AI Sentiment measures something else, the tone of the wording.

0 major · 1 point

Hollow bars mark forward-looking points. How the balance works

Positive

  • Moderate pointK-29 oil production is underway, with oil combined with other wells’ output and sold to Pertamina.
  • Minor point. Forward-looking: it has not happened yet and may not happen.WK-5 rig assembly is underway; drilling is anticipated to start by the end of October 2026.
  • Minor point. Forward-looking: it has not happened yet and may not happen.WK-5 targets additional formations, including potential natural gas, at a planned depth of approximately 5,200 feet.
  • Minor point. Forward-looking: it has not happened yet and may not happen.Planned K-29 hydraulic fracturing aims to maximize production using equipment and crews already mobilized.

Negative

  • Minor pointK-29 production consists of approximately 60% oil and a 40% water cut while dewatering continues.

Key Figures

Planned WK-5 depth: Approximately 5,200 feet K-29 depth: Approximately 3,400 feet Oil share: Approximately 60% +2 more
Planned WK-5 depth
Approximately 5,200 feet
Planned well depth
K-29 depth
Approximately 3,400 feet
Depth reached by K-29
Oil share
Approximately 60%
K-29 current production
Water cut
40%
K-29 current production
Anticipated WK-5 spud
By the end of this month
Planned drilling milestone

Historical Context

1 past event · Latest: Sep 02
1 event
  1. Sep 02

    K-29 oil discovery

    24h Move
    +4.0%

    Reported good-quality oil during K-29 testing, preceding the current report of production.

24h Move is the share-price change in the day after each event; other market factors may also have contributed.

Key Terms

spudding, 3-d seismic program, hydraulic fracturing, water cut
4 terms
spudding technical
"Preparations are also ongoing for the anticipated spudding of the WK-5 well"
Spudding is the moment when drilling machinery first breaks ground to start drilling an oil or gas well; think of it as the ceremonial first shovel in a construction project. For investors it signals that a planned exploration or development has moved from planning and permitting into active execution, which can change cost timing, risk profiles and the timetable for possible future production or revenue.
3-d seismic program technical
"formations identified through IEC’s extensive 3-D seismic program"
A 3-d seismic program is a planned survey that collects, processes and interprets seismic reflection data in three dimensions to image the subsurface. It uses a grid of controlled sound sources and receivers (on land, vessel or ocean bottom) to produce a continuous 3‑D seismic volume that reveals the shape, depth and internal structure of rock layers and faults; geoscientists then pick horizons and attributes from that volume for exploration and reservoir evaluation. The technique provides an indirect, seismic-based picture—not a direct measurement of fluids—so its resolution and reliability depend on survey design, data quality and processing choices.
hydraulic fracturing technical
"conduct a hydraulic fracturing operation on K-29"
Hydraulic fracturing is a method for extracting oil and natural gas that involves injecting pressurized fluid and small solid particles into underground rock to create and hold open tiny cracks, allowing trapped fuel to flow to a well. For investors, it matters because successful fracturing can sharply increase a well’s output and revenue potential, while also carrying higher upfront costs, regulatory scrutiny, and environmental risks that can affect a company’s value.
water cut technical
"a 40% water cut"
The share of water in the total liquids produced from an oil or gas well, expressed as a percentage by volume (water ÷ [oil + water]). Measured at the well or separator, water cut rises when more formation or injected water flows with hydrocarbons; higher water cut lowers the volume of marketable oil or condensate and increases handling and disposal needs.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google

Company and President Frank Ingriselli Also Highlighted in Recent CNBC Interview

JAKARTA, INDONESIA AND DANVILLE, CA, Oct. 06, 2026 (GLOBE NEWSWIRE) -- Indonesia Energy Corporation (NYSE American: INDO) ("IEC"), an oil and gas exploration and production company focused on Indonesia, today announced, that its President Frank Ingriselli led a delegation in early October to IEC’s Kruh Block in Sumatra, Indonesia to celebrate oil production from the recently drilled K-29 well.

The delegation also visited the nearby WK-5 well location, where site setup and rig assembly (using the same rig that drilled the K-29 well) are actively underway. Preparations are also ongoing for the anticipated spudding of the WK-5 well by the end of this month.

The WK-5 well is planned to be drilled to a depth of approximately 5,200 feet, significantly deeper than the K-29 well, which was drilled to approximately 3,400 feet. WK-5 is designed to test additional formations identified through IEC’s extensive 3-D seismic program, including a potential natural gas-bearing formation. K-29 and WK-5 are each located within IEC’s 63,000-acre Kruh Block on the island of Sumatra.

A video showing oil production from K-29 and the delegation’s visit to the WK-5 site can be viewed at the following link: https://www.youtube.com/watch?v=uW2igiI9p4U

In addition, IEC announced that Mr. Ingriselli and IEC were recently featured in a CNBC interview as part of a segment highlighting innovative microcap companies. The CNBC interview can be viewed here: https://youtu.be/uYdi3KfvFNs

These videos, along with an interview with Frank Ingriselli from the recent EnerCom conference, in Denver, Colorado are also available on IEC’s website at: https://ir.indo-energy.com

Mr. Ingriselli commented “I was extremely pleased to lead our delegation to the Kruh Block to celebrate production from K-29 and to visit the WK-5 location as we prepare to spud this exciting new well. WK-5 will be drilled significantly deeper than K-29 and is designed to test additional formations identified by our 3-D seismic program. We believe these formations have the potential to add significant value to IEC.

“With the drilling equipment and crews already mobilized at the Kruh Block, we are also taking advantage of this opportunity to conduct a hydraulic fracturing operation on K-29 with the goal of maximizing production. K-29 is currently producing with a jack-pump and dewatering, with production currently consisting of approximately 60% oil and a 40% water cut and separated into our storage tanks and is being combined with our other producing wells and sold to Pertamina, the Indonesian state oil and gas company.

“We are excited by the progress at Kruh and look forward to the upcoming drilling of WK-5 as we continue working to increase production and unlock the potential of our assets in Indonesia,” concluded Mr. Ingriselli.

About Indonesia Energy Corporation Limited

Indonesia Energy Corporation Limited (NYSE American: INDO) is a publicly traded energy company engaged in the acquisition and development of strategic, high growth energy projects in Indonesia. IEC’s principal assets are its Kruh Block (63,000 acres) located onshore on the Island of Sumatra in Indonesia and its Citarum Block (195,000 acres) located onshore on the Island of Java in Indonesia. IEC is headquartered in Jakarta, Indonesia and has a representative office in Danville, California. For more information on IEC, please visit www.indo-energy.com.

Cautionary Statement Regarding Forward-Looking Statements

All statements in this press release, the videos presented herein, and related statements of Indonesia Energy Corporation Limited (“IEC”) and its representatives and partners that are not based on historical fact are "forward-looking statements" within the meaning of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Acts”). In particular, the words “explore,” “could,” "estimates," “seek,” "believes," "hopes," “understand,” "expects," "intends," “on-track”, "plans," "anticipates," “aim,” “goal,” "may" and similar conditional expressions related to the future are intended to identify forward-looking statements within the meaning of the Acts and are subject to the safe harbor created by the Acts. Any statements made in this news release, other than those of historical fact, about an action, event or development, are forward-looking statements. In this press release, forward-looking statements include, without limitation those related to the timing for, and results of, 2026 and other drilling and anticipated production activities at IEC’s Kruh Block as well as the price of oil and natural gas, which changes daily and could lower over time. While management has based any forward-looking statements contained herein on its current expectations, the information on which such expectations were based may change. These forward-looking statements rely on a number of assumptions concerning future events and are subject to a number of significant risks, uncertainties, and other factors, many of which are outside of the IEC's control, that could cause actual results to materially and adversely differ from such statements. Such risks, uncertainties, and other factors include, but are not necessarily limited to, those set forth in the Risk Factors section of IEC’s annual report on Form 20-F for the fiscal year ended December 31, 2025, filed on April 29, 2026, and other filings with the Securities and Exchange Commission (SEC). Copies are of such documents are available on the SEC's website, www.sec.gov and IEC’s website at https://ir.indo-energy.com/sec-filings/. IEC undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.

Company Contact:
Frank C. Ingriselli
President, Indonesia Energy Corporation Limited
Frank.Ingriselli@Indo-Energy.com


FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

Is Indonesia Energy’s K-29 well producing oil?

K-29 is producing oil with a jack-pump while dewatering. Production consists of approximately 60% oil and a 40% water cut. The oil is separated into storage tanks, combined with output from other producing wells and sold to Pertamina, the Indonesian state oil and gas company.

When will Indonesia Energy begin drilling WK-5?

Indonesia Energy anticipates starting WK-5 drilling by the end of October 2026. Site setup and rig assembly are underway. The planned depth is approximately 5,200 feet, and the well is designed to test additional formations identified through 3-D seismic work, including a potential natural gas-bearing formation.

Keep reading