Indonesia Energy’s K-29 output is approximately 60% oil

Indonesia Energy’s portfolio also includes the 195,000-acre Citarum Block on Java, alongside its Kruh operations on Sumatra.

(Moderate)

Sentiment and the balance of points

Rhea-AI Sentiment reads the wording of the document, how positive or negative its language is on a 1 to 5 scale. The balance of points shown with the takes weighs what the document actually discloses, so the two can disagree, for example when a trial that missed its main goal is described in upbeat language.

Form Type
6-K

Rhea-AI Filing Summary

Indonesia Energy Corporation Limited (INDO) announced oil production from the recently drilled K-29 well in its 63,000-acre Kruh Block in Sumatra. The company says K-29 is producing with a jack-pump and dewatering, with production consisting of approximately 60% oil and a 40% water cut. Output is stored, combined with production from other producing wells, and sold to Pertamina, Indonesia’s state oil and gas company. The company is also conducting a hydraulic fracturing operation on K-29 with the goal of maximizing production.

At the nearby WK-5 site, setup and rig assembly are underway using the rig that drilled K-29, and preparations continue for anticipated spudding by the end of this month. WK-5 is planned to reach approximately 5,200 feet, compared with approximately 3,400 feet for K-29, and is designed to test formations identified through the company’s 3-D seismic program, including a potential natural gas-bearing formation.

Kruh Block area 63,000 acres Block on Sumatra containing K-29 and WK-5
WK-5 planned depth approximately 5,200 feet Planned well depth
K-29 drilled depth approximately 3,400 feet Depth of the recently drilled well
Oil in K-29 production approximately 60% Current production composition
Water cut at K-29 40% Current production composition
Citarum Block area 195,000 acres Block on Java
spudding technical
"anticipated spudding of the WK-5 well"
Spudding is the moment when drilling machinery first breaks ground to start drilling an oil or gas well; think of it as the ceremonial first shovel in a construction project. For investors it signals that a planned exploration or development has moved from planning and permitting into active execution, which can change cost timing, risk profiles and the timetable for possible future production or revenue.
hydraulic fracturing technical
"conduct a hydraulic fracturing operation on K-29"
Hydraulic fracturing is a method for extracting oil and natural gas that involves injecting pressurized fluid and small solid particles into underground rock to create and hold open tiny cracks, allowing trapped fuel to flow to a well. For investors, it matters because successful fracturing can sharply increase a well’s output and revenue potential, while also carrying higher upfront costs, regulatory scrutiny, and environmental risks that can affect a company’s value.
water cut technical
"approximately 60% oil and a 40% water cut"
The share of water in the total liquids produced from an oil or gas well, expressed as a percentage by volume (water ÷ [oil + water]). Measured at the well or separator, water cut rises when more formation or injected water flows with hydrocarbons; higher water cut lowers the volume of marketable oil or condensate and increases handling and disposal needs.
3-D seismic program technical
"formations identified through the Company’s extensive 3-D seismic program"
A 3-d seismic program is a planned survey that collects, processes and interprets seismic reflection data in three dimensions to image the subsurface. It uses a grid of controlled sound sources and receivers (on land, vessel or ocean bottom) to produce a continuous 3‑D seismic volume that reveals the shape, depth and internal structure of rock layers and faults; geoscientists then pick horizons and attributes from that volume for exploration and reservoir evaluation. The technique provides an indirect, seismic-based picture—not a direct measurement of fluids—so its resolution and reliability depend on survey design, data quality and processing choices.
dewatering technical
"currently producing with a jack-pump and dewatering"
Dewatering is the process of removing unwanted water from a construction site, mine, or industrial area—like draining a bathtub so work can continue on dry ground. For investors, it matters because it affects project timelines, operating costs, environmental compliance and permits; inadequate or costly dewatering can delay production, increase capital and cleanup expenses, and create regulatory or reputational risk that influences a company's financial performance.

FAQ

AI-generated questions and answers. How Rhea-AI works. Not financial advice.

How deep is INDO’s planned WK-5 well?

WK-5 is planned to be drilled to approximately 5,200 feet. It is designed to test additional formations identified through the company’s 3-D seismic program, including a potential natural gas-bearing formation.

When is WK-5 expected to begin drilling?

Preparations are ongoing for WK-5 spudding by the end of this month. Site setup and rig assembly are actively underway using the same rig that drilled K-29.

What is K-29’s current production mix at INDO?

K-29’s production currently consists of approximately 60% oil and a 40% water cut. The well is producing with a jack-pump and dewatering.

AI-generated analysis. How Rhea-AI works. Not financial advice.

See more from StockTitan in Google Search and AI answers. Adds StockTitan as a preferred source · opens Google
Add on Google
Learn about SEC filing dates

 

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

FORM 6-K

 

REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16

OF THE SECURITIES EXCHANGE ACT OF 1934

 

For the month of October 2026

 

Commission File Number 001-39164

 

Indonesia Energy Corporation Limited

(Translation of registrant’s name into English)

 

GIESMART PLAZA 7th Floor

Jl. Raya Pasar Minggu No. 17A

Pancoran – Jakarta 12780

Indonesia

(Address of principal executive offices)

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F.

 

Form 20-F ☒ Form 40-F ☐

 

 

 

 

 

 

INCORPORATION BY REFERENCE

 

This report on Form 6-K (“Form 6-K Report”) shall be deemed to be incorporated by reference into the shelf registration statement on Form F-3, as amended (Registration Number 333-278175) of Indonesia Energy Corporation Limited, a Cayman Islands exempted company (the “Company”), declared effective by the U.S. Securities and Exchange Commission (the “SEC”) on May 31, 2024 (“Registration Statement”), and into each prospectus or prospectus supplement outstanding under the Registration Statement, to the extent not superseded by documents or reports subsequently filed or furnished by the Company under the Securities Act of 1933, as amended, or the Securities Exchange Act of 1934, as amended.

 

INFORMATION CONTAINED IN THIS FORM 6-K REPORT

 

Press Release

 

On October 6, 2026, the Company issued a press release announcing that its President Frank Ingriselli led a delegation in early October to the Company’s Kruh Block in Sumatra, Indonesia to celebrate oil production from the recently drilled K-29 well. The delegation also visited the nearby WK-5 well location, where site setup and rig assembly (using the same rig that drilled the K-29 well) are actively underway. Preparations are also ongoing for the anticipated spudding of the WK-5 well by the end of this month.

 

The WK-5 well is planned to be drilled to a depth of approximately 5,200 feet, significantly deeper than the K-29 well, which was drilled to approximately 3,400 feet. WK-5 is designed to test additional formations identified through the Company’s extensive 3-D seismic program, including a potential natural gas-bearing formation. K-29 and WK-5 are each located within the Company’s 63,000-acre Kruh Block on the island of Sumatra.

 

A copy of such press release is filed as Exhibit 99.1 to this Report.

 

CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING STATEMENTS

 

This Form 6-K Report and the exhibit hereto contain certain ‘forward-looking statements” made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements include, but are not limited to, statements regarding our or our management’s anticipations, expectations, hopes, beliefs, intentions or strategies regarding the future (including, without limitation, with respect to the Company’s drilling and production plans at Kruh Block and exploration plans at Citarum Block) and other statements that are other than statements of historical fact. In addition, any statements that refer to projections, forecasts or other characterizations of future events or circumstances, including any underlying assumptions, are forward-looking statements. The words “explore,” “could,” “estimates,” “seek,” “believes,” “hopes,” “understand,” “expects,” “intends,” “on-track”, “plans,” “anticipates,” “aim,” “goal,” “may” or derivatives of these words and similar expressions may identify forward-looking statements, but the absence of these words does not mean that a statement is not forward-looking.

 

The forward-looking statements in this Form 6-K Report and the exhibit hereto are based upon various assumptions, many of which are based, in turn, upon further assumptions, including without limitation, management’s examination of historical operating trends, data contained in our records and other data available from third parties. Although we believe that these assumptions were reasonable when made, because these assumptions are inherently subject to significant uncertainties and contingencies which are difficult or impossible to predict and are beyond our control, we cannot assure you that we will achieve or accomplish these expectations, beliefs or projections. As a result, you are cautioned not to rely on any forward-looking statements.

 

Should one or more of risks or uncertainties related to our forward-looking statements materialize, should any of our assumptions prove incorrect, or should we be unable to address any of the factors which impact our forward-looking statements, our actual results (including those related to our drilling program at Kruh Block and our exploration plans at Citarum Block) may vary in material and adverse respects from those projected in these forward-looking statements. Consequently, there can be no assurance that actual results or developments anticipated by us will be realized or, even if substantially realized, that they will have the expected consequences to, or effects, on us. Given these uncertainties, prospective investors are cautioned not to place undue reliance on such forward-looking statements.

 

We undertake no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required under applicable laws. If one or more forward-looking statements are updated, no inference should be drawn that additional updates will be made with respect to those or other forward-looking statements.

 

EXHIBIT INDEX

 

Exhibit No.   Description
99.1   Press Release of the Company regarding management visit to K-29 and WK-5 well sites, dated October 6, 2026.

 

 

 

 

SIGNATURES

 

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

  INDONESIA ENERGY CORPORATION LIMITED
     
Dated: October 6, 2026 By: /s/ Frank Ingriselli
  Name: Frank Ingriselli
  Title: President

 

 

 

 

 

 

 

 

Exhibit 99.1

 

 

Indonesia Energy Celebrates Oil Production from K-29 Well and Rig-Up at New WK-5 Well Location

 

Company and President Frank Ingriselli Also Highlighted in Recent CNBC Interview

 

JAKARTA, INDONESIA AND DANVILLE, CA, October 6, 2026 - Indonesia Energy Corporation (NYSE American: INDO) (“IEC”), an oil and gas exploration and production company focused on Indonesia, today announced, that its President Frank Ingriselli led a delegation in early October to IEC’s Kruh Block in Sumatra, Indonesia to celebrate oil production from the recently drilled K-29 well.

 

The delegation also visited the nearby WK-5 well location, where site setup and rig assembly (using the same rig that drilled the K-29 well) are actively underway. Preparations are also ongoing for the anticipated spudding of the WK-5 well by the end of this month.

 

The WK-5 well is planned to be drilled to a depth of approximately 5,200 feet, significantly deeper than the K-29 well, which was drilled to approximately 3,400 feet. WK-5 is designed to test additional formations identified through IEC’s extensive 3-D seismic program, including a potential natural gas-bearing formation. K-29 and WK-5 are each located within IEC’s 63,000-acre Kruh Block on the island of Sumatra.

 

A video showing oil production from K-29 and the delegation’s visit to the WK-5 site can be viewed at the following link: https://www.youtube.com/watch?v=uW2igiI9p4U

 

In addition, IEC announced that Mr. Ingriselli and IEC were recently featured in a CNBC interview as part of a segment highlighting innovative microcap companies. The CNBC interview can be viewed here: https://youtu.be/uYdi3KfvFNs

 

These videos, along with an interview with Frank Ingriselli from the recent EnerCom conference, in Denver, Colorado are also available on IEC’s website at: https://ir.indo-energy.com

 

 

 

 

Mr. Ingriselli commented “I was extremely pleased to lead our delegation to the Kruh Block to celebrate production from K-29 and to visit the WK-5 location as we prepare to spud this exciting new well. WK-5 will be drilled significantly deeper than K-29 and is designed to test additional formations identified by our 3-D seismic program. We believe these formations have the potential to add significant value to IEC.

 

“With the drilling equipment and crews already mobilized at the Kruh Block, we are also taking advantage of this opportunity to conduct a hydraulic fracturing operation on K-29 with the goal of maximizing production. K-29 is currently producing with a jack-pump and dewatering, with production currently consisting of approximately 60% oil and a 40% water cut and separated into our storage tanks and is being combined with our other producing wells and sold to Pertamina, the Indonesian state oil and gas company.

 

“We are excited by the progress at Kruh and look forward to the upcoming drilling of WK-5 as we continue working to increase production and unlock the potential of our assets in Indonesia,” concluded Mr. Ingriselli.

 

About Indonesia Energy Corporation Limited

 

Indonesia Energy Corporation Limited (NYSE American: INDO) is a publicly traded energy company engaged in the acquisition and development of strategic, high growth energy projects in Indonesia. IEC’s principal assets are its Kruh Block (63,000 acres) located onshore on the Island of Sumatra in Indonesia and its Citarum Block (195,000 acres) located onshore on the Island of Java in Indonesia. IEC is headquartered in Jakarta, Indonesia and has a representative office in Danville, California. For more information on IEC, please visit www.indo-energy.com.

 

Cautionary Statement Regarding Forward-Looking Statements

 

All statements in this press release, the videos presented herein, and related statements of Indonesia Energy Corporation Limited (“IEC”) and its representatives and partners that are not based on historical fact are “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and the provisions of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended (the “Acts”). In particular, the words “explore,” “could,” “estimates,” “seek,” “believes,” “hopes,” “understand,” “expects,” “intends,” “on-track”, “plans,” “anticipates,” “aim,” “goal,” “may” and similar conditional expressions related to the future are intended to identify forward-looking statements within the meaning of the Acts and are subject to the safe harbor created by the Acts. Any statements made in this news release, other than those of historical fact, about an action, event or development, are forward-looking statements. In this press release, forward-looking statements include, without limitation those related to the timing for, and results of, 2026 and other drilling and anticipated production activities at IEC’s Kruh Block as well as the price of oil and natural gas, which changes daily and could lower over time. While management has based any forward-looking statements contained herein on its current expectations, the information on which such expectations were based may change. These forward-looking statements rely on a number of assumptions concerning future events and are subject to a number of significant risks, uncertainties, and other factors, many of which are outside of the IEC’s control, that could cause actual results to materially and adversely differ from such statements. Such risks, uncertainties, and other factors include, but are not necessarily limited to, those set forth in the Risk Factors section of IEC’s annual report on Form 20-F for the fiscal year ended December 31, 2025, filed on April 29, 2026, and other filings with the Securities and Exchange Commission (SEC). Copies are of such documents are available on the SEC’s website, www.sec.gov and IEC’s website at https://ir.indo-energy.com/sec-filings/. IEC undertakes no obligation to update these statements for revisions or changes after the date of this release, except as required by law.

 

Company Contact:

 

Frank C. Ingriselli

President, Indonesia Energy Corporation Limited